Airworthiness Directive - AD/A320/116 Amdt 1 - Wing Fuel Boost Pump Wiring CASA Airworthiness Directive Jurisdiction:Commonwealth of Australia;CorporateName:Civil Aviation Safety Authority; Issue 6/2002,Aircraft above 5700 kg,Airbus Industrie A319, A320 and A321 Series Aeroplanes,Wing Fuel Boost Pump Wiring,116 Amdt 1 DellaCa, Donna 2 1 2022-10-26T01:57:00Z 2022-10-26T01:58:00Z 3 721 4111 Office of Parliamentary Counsel 34 9 4823 16.0000
2006-09-22T00:00:00Z Toolkit http://www.activepdf.com 2022-10-26T00:00:00Z
AIRWORTHINESS
DIRECTIVE
For
the
reasons
set
out
in
the
background
section,
the
CASA
delegate
whose
signature
appears
below
revokes
Airworthiness
Directive
(AD)
AD/A320/116
and
issues
the following AD under subregulation 39.1 (1) of CAR 1998. The AD requires that the action set out in the requirement section (being action that the delegate
considers necessary to correct the unsafe condition) be taken in relation to the aircraft or aeronautical product mentioned in the applicability section: (a) in the
circumstances mentioned in the requirement section; and (b) in accordance with the instructions set out in the requirement section; and (c) at the time mentioned in
the compliance section.
Airbus
Industrie
A319,
A320
and
A321
Series
Aeroplanes
AD/A320/116
Amdt
1
Wing
Fuel
Boost
Pump
Wiring 6/2002
Applicability:
All
Model
A319/A320/A321
aeroplanes
without
both
Airbus
Industrie
modifications 30861
and
31612
embodied
or
Airbus
Industrie
Service
Bulletin
(SB)
A320-28-1093
incorporated.
Requirement: 1.
If
not
previously
accomplished,
revise
the
Limitations
Section
of
the
Aeroplane Flight Manual (AFM) by inserting the following:
FUEL
SYSTEM
In
case
any
wing
fuel
tank
fuel
pump
circuit
breaker
1QA,
2QA,
7QA
or
8QA is tripped, do not re-engage.
This
may
be
accomplished
by
inserting
a
copy
of
this
Directive
or
the
revised Temporary Revision 2.04.00/31 into the AFM.
2.
If
wing
fuel
tank
pump
circuit
breaker
1QA,
2QA,
7QA
or
8QA
trips,
either:
remove
the
applicable
fuel
pump
fairing
and
perform
visual
inspections
of
the following to detect any damage caused by electrical arcing and, if necessary, carry out the rectification specified in sub-paragraphs 2.a.(i), 2.a.(ii) or
2.a.(iii).
(i)
Electrical
wiring
-
If
any
damage
to
the
wiring
is
detected
replace
the
wire with new wire or repair it in accordance with the Aircraft Wiring Manual (AWM), Electrical Standard Practices Manual (ESPM), Chapter 20.
(ii)
Fairing
-
If
any
damage
to
the
fairing
is
detected
replace
the
fairing
with
a new serviceable fairing using the appropriate installation and sealing
procedures.
(iii)
Wing
skin
within
the
fairing
area
-
If
any
damage
to
the
wing
structure
is detected repair the damaged structure in accordance with the aircraft Structural Repair Manual (SRM) or another approved method.
Caution:
When
replacing
the
fairing
following
the
inspection,
ensure
that
fuel
boost pump wiring is not pinched or otherwise damaged.
Incorrect replacement of the fairing could cause damage to the wiring.
or,
b.
ensure
that
the
applicable
circuit
breaker
cannot
be
reset
by
collaring
the
circuit breaker(ie secure the circuit breaker in the open position by a positive means).
Note
1:
If
the
Requirement
2.b.
option
is
adopted,
the
aircraft
may
be
dispatched
in accordance with an approved MEL (based on associated DGAC MMEL 28-21).
3.
If
a
circuit
breaker
is
collared
opened
in
accordance
with
Requirement
2.b.
carry out the Requirement 2.a. inspection.
4.
If
any
damage
is
detected
during
the
Requirement
2.a.
inspections
submit
a
report to Airbus Industrie including the following details:
description
of
the
damage
found,
aeroplane serial
number,
total
number
of
landings,
total
time
in
service
(hours),
and
details
of
the
last
maintenance
actions
performed
on
the
fuel
boost
pump
and/or
fairing.
Modify the engine feed pump electrical harness and underwing fairings in accordance
with
SB
A320-28-1093
and
remove
the
AFM
amendment
introduced
by Requirement 1.
Note
2:
DGAC
AD
2002-221(B)
refers.
Compliance: For
Requirement
1
-
Remains
unchanged
as
‘Within
ten
days
after
the
effective
date of the original issue of this Directive’.
For
Requirement
2
-
Before
further
flight
unless
SB
A320-28-1093
has
been incorporated in accordance with Requirement 5.
For
Requirement
3
-
Within
ten
days
of
the
circuit
breaker
being
collared
open
in accordance with Requirement 2.b.
For
Requirement
4
-
Within
ten
days
after
accomplishing
the
Requirement
2.a.
inspection.
For
Requirement
5
-
Before 30
April
2004.
This
Amendment
becomes
effective
on
13
June
2002.
Background: The original issue of this Directive superseded AD/A320/111, clarified the inspection requirements
and
allowed
despatch
of
the
aircraft
with
wing
fuel
tank
pumps
rendered inoperable.
AD/A320/111
was
issued
to
limit
the
risk
of
electrical
arcing
between
the wing fuel tank boost pump wiring and the wing structural skin by the introduction of an AFM limitation.
This
Amendment
introduces
terminating
action
for
Requirements
1
and
2.
The
original
issue
of
this
Airworthiness
Directive
became
effective
on
28
February
2001.
James
Coyne
Delegate
of
the
Civil
Aviation
Safety
Authority 3 May 2002
The
above
AD
is
notified
in
the
Commonwealth
of
Australia
Gazette
on
22
May
2002.