Electricity Supply Industry Restructuring (Savings and Transitional Provisions) Act 1995
View - Tasmanian Legislation Online
Skip to main content
Tasmanian Legislation
Tasmania's consolidated legislation online
Toggle navigation
www.tas.gov.au
Home (current)
About
Related Links
Help
Search
Browse
In Force Legislation
Legislation As Made
Repealed Legislation
Bills -->
Preferences
Contact
Copyright and Disclaimer
Feedback
Submit
Table Of Contents
Toggle navigation
View whole Act
Statutory Rules
Legislative history
Search
Search Act
Find Component
Find Legislation
Atom Feeds
Current Document
Amendments
SRs
Authorised Versions
2019-09-13
PDF
-->
A
Results: match 0 of 0 provisions
Previous Hit
Next Hit
Return to search results
0 hits in page:
First
Last
Electricity Supply Industry Restructuring (Savings and Transitional Provisions) Act 1995
Electricity Supply Industry Restructuring (Savings and Transitional Provisions) Act 1995
An Act to make certain repeals and enact provisions of a saving or transitional nature in consequence of legislation providing for the restructuring of the electricity supply industry and for other purposes [Royal Assent 22 September 1995]
Be it enacted by His Excellency the Governor of Tasmania, by and with the advice and consent of the Legislative Council and House of Assembly, in Parliament assembled, as follows:
PART 1 - Preliminary
1.
Short title
This Act may be cited as the
Electricity Supply Industry Restructuring (Savings and Transitional Provisions) Act 1995 .
2.
Commencement
The provisions of this Act commence on a day or days to be proclaimed.
3.
Interpretation
In this Act
complementary legislation
means
(a) the
Electricity Supply Industry Act 1995 ; and
(b) the
Hydro-Electric Corporation Act 1995 ; and
(c) the
HEC Enterprises Corporation Act 1995 ;
construction Acts
means the Acts referred to in Part 2 of
Schedule 1 ;
[Section 3 Amended by No. 64 of 2000, s. 15, Applied:14 Nov 2000]
ESI Act
means the
Electricity Supply Industry Act 1995 ;
former Act
means the
Hydro-Electric Commission Act 1944 ;
HEC
means the Hydro-Electric Corporation formerly known as the Hydro-Electric Commission;
land
includes
(a) an estate or interest in land (including an easement); and
(b) a right or power over or in respect of land;
owner
of land means
(a) if the land has been alienated from the Crown by the grant of an estate in fee simple or another estate or interest conferring a right to possession of the land, the person who holds the relevant estate or interest; or
(b) in any other case, the Minister, authority or person responsible for the management of the land;
[Section 3 Amended by No. 64 of 2000, s. 15, Applied:14 Nov 2000]
regulated operations
means operations in the electricity supply industry for which a licence is required under the
ESI Act ;
Regulator
means the person holding office as the Regulator under the
ESI Act ;
[Section 3 Amended by No. 64 of 2000, s. 15, Applied:14 Nov 2000]
PART 2 - Transitional Provisions
4.
Presumptive licensing
(1)
A person who was, immediately before the commencement of this Act, lawfully carrying on operations in the electricity supply industry is taken to be licensed under the
ESI Act
to carry on regulated operations in the electricity supply industry if
(a) the person was carrying on operations of the same kind immediately before the commencement of this Act; or
(b) the person is authorised by regulation to carry on the operations.
(2)
A presumptive licence under
subsection (1)
terminates 6 months after the commencement of this Act if the person makes no application for a licence under the
ESI Act
within that period and, if an application is made for a licence under that Act, the presumptive licence terminates when the application is finally decided.
(3)
The regulations may prescribe conditions to which a presumptive licence under this section is subject.
5.
Presumptive appointment as system controller
(1)
On the commencement of this Act, the HEC is taken to have been appointed under the
ESI Act
as the system controller for all power systems operated by it immediately before the commencement of this Act.
(2)
An appointment under this section continues for 12 months after the commencement of this Act.
6.
Regulations and by-laws
(1)
A regulation in force under the
former Act
immediately before the commencement of this Act continues in force, subject to amendment or revocation under the
ESI Act
or this Act, as a regulation under the
ESI Act .
(2)
Subject to
subsections (3)
and
(4) , a by-law in force under the
former Act
immediately before the commencement of this Act continues in force, subject to amendment or revocation under the
ESI Act
or this Act, as a regulation under the
ESI Act .
(3)
A by-law fixing charges for electricity in force under the
former Act
immediately before the commencement of this Act continues in force as an electricity tariff under the
ESI Act
until it is superseded by an electricity tariff published under the
ESI Act .
(4)
A by-law fixing charges for electricity that continues in force under
subsection (3)
or an electricity tariff published under the
ESI Act
fixing prices and conditions for the sale of electricity by the HEC is to be regarded as a tariff by-law for the purposes of the
Hydro-Electric Commission (Contributions) Act 1980 .
(5)
For the purposes of the
Government Prices Oversight Act 1995
(a) a by-law fixing charges for electricity that continues in force under
subsection (3)
or an electricity tariff published under the
ESI Act
fixing prices and conditions for the sale of electricity by the HEC is, before the relevant date, to be regarded as a statutory rule; and
(b) on and after the relevant date, an electricity tariff published under the
ESI Act
fixing prices and conditions for the sale of electricity by the HEC is not to be regarded as a statutory rule.
(6)
Until the relevant date,
section 47(3) ,
(3A) ,
(4) ,
(5) ,
(6)
and
(7) of the
Acts Interpretation Act 1931
applies to an electricity tariff published under the
ESI Act
fixing prices and conditions for the sale of electricity by the HEC as if the tariff were regulations within the meaning of that Act.
(7)
Notwithstanding
section 36(3)(b) of the
Government Prices Oversight Act 1995
, an order may be made specifying maximum prices for electricity under
section 36 of that Act
without amendment to this Act or the complementary legislation.
(8)
A regulation or by-law that continues in force under this section must be read subject to any adaptations and modifications that are necessary for its continued operation under the
ESI Act .
(9)
In this section,
relevant date
means the date when the first order affecting the prices that may be charged by the HEC for electricity takes effect under the
Government Prices Oversight Act 1995 .
7.
Contracts
(1)
This section applies to a customer who has contractual rights (which may be aggregate rights arising under 2 or more separate contracts) to draw electricity from a power system at a rate of 50 megawatts or above.
(2)
If, before the commencement of this Act, the HEC entered into a contract for the supply of electricity to a customer to which this section applies
(a) on conditions prohibiting or restricting the re-supply of the electricity; or
(b) on conditions providing for price discrimination according to whether the electricity is, or is not, to be re-supplied the contractual conditions and anything done to enforce the conditions are, for the purposes of
section 51 of the
Trade Practices Act 1974
of the Commonwealth, authorised by this Act.
(3)
If, before the commencement of this Act, the HEC entered into contracts with one or more customers to which this section applies and it appears from comparison of the conditions of the contracts that there is price discrimination according to whether the electricity is, or is not, re-supplied, the contractual conditions and anything done to enforce the conditions are, for the purposes of
section 51 of the
Trade Practices Act 1974
of the Commonwealth, authorised by this Act.
8.
Permits, licences, authorisations and approvals
(1)
Subject to
subsection (2) , if a permit, licence, authorisation or approval was in force under the
former Act
immediately before the commencement of this Act, and the
ESI Act
contains provision for a similar kind of permit, licence, authorisation or approval, it continues in force, subject to the
ESI Act , as if granted under the corresponding provision of the
ESI Act .
(2)
Unless renewed under the
ESI Act , a permit, licence, authorisation or approval that continues in force under
subsection (1)
expires
(a) at the end of the term for which it was granted or last renewed; or
(b) one year after the commencement of this Act whichever is the earlier.
9.
Electricity officers and authorised officers
(1)
An officer appointed by the HEC to exercise powers under
section 58 of the former Act
is, on the commencement of this Act, taken to have been appointed an electricity officer for the purposes of the
ESI Act .
(2)
An appointment under
subsection (1)
expires, unless revoked earlier by the HEC, 12 months after the commencement of this Act.
(3)
A person appointed by the HEC to exercise powers for the purposes of regulations under
section 61
or
62 of the former Act
is, on the commencement of this Act, taken to have been appointed as an authorised officer for the purposes of the
ESI Act .
(4)
An appointment under
subsection (3)
expires, unless revoked earlier by the Regulator, 12 months after the commencement of this Act.
PART 3
- . . . . . . . .
[Part 3 Repealed by No. 64 of 2000, s. 15, Applied:14 Nov 2000]
10.
[Section 10 Repealed by No. 64 of 2000, s. 15, Applied:14 Nov 2000]
. . . . . . . .
11.
[Section 11 Repealed by No. 64 of 2000, s. 15, Applied:14 Nov 2000]
. . . . . . . .
12.
[Section 12 Repealed by No. 64 of 2000, s. 15, Applied:14 Nov 2000]
. . . . . . . .
13.
[Section 13 Repealed by No. 64 of 2000, s. 15, Applied:14 Nov 2000]
. . . . . . . .
PART 4 - Continuing obligations related to water management
Division 1 - The Huon and Serpentine Rivers
14.
The HEC's obligations
(1)
The HEC
(a) must maintain a release valve with a capacity of not less than 2 832 litres per second so that water may be released down the Huon River from the structures that were established under the
Hydro-Electric Commission (Power Development) Act 1967 ; and
(b) must release water into the Huon River as required by
(i)
[Section 14 Subsection (1) amended by No. 45 of 1999, Sched. 6, Applied:01 Jan 2000]
an agreement between the HEC and the Minister; or
(ii)
[Section 14 Subsection (1) amended by No. 45 of 1999, Sched. 6, Applied:01 Jan 2000]
in default of agreement, a determination made by the Governor after considering representations from both the HEC and the Minister; and
(c) must not allow the conserved waters of the Serpentine River to rise to more than 308·46 metres above sea level or to fall to less than 306·93 metres above sea level, or a lower level authorised under
subsection (3) .
(2)
[Section 14 Subsection (2) amended by No. 45 of 1999, Sched. 6, Applied:01 Jan 2000]
Any income, expenditure or loss resulting from the release of water under
subsection (1)
(b)
must be shared between the HEC and the Minister in proportions determined by the Governor.
(3)
The Governor may, by order published in the Gazette , authorise the HEC to allow the conserved waters of the Serpentine River to fall to a level that is not less than 305·41 metres above sea level.
(4)
[Section 14 Subsection (4) inserted by No. 45 of 1999, Sched. 6, Applied:01 Jan 2000]
In this section,
Minister
means the Minister administering the
Water Management Act 1999 .
15.
Entitlement to compensation
(1)
An owner or occupier of land on, or in the valley of, the Huon River who suffers loss from an increase in the salinity of the waters of the Huon River or of the underground waters affected by it because the river's flow has been diminished by
(a) works for the conservation of its waters that were carried out under the
Hydro-Electric Commission (Power Development) Act 1967 ; or
(b) the use or management of those works is entitled to compensation for the loss from the HEC.
(2)
The compensation is to be assessed on the same basis as compensation under the
Land Acquisition Act 1993 .
Division 2 - The Lake River and River Ouse
[Division 2 of Part 4 Substituted by No. 17 of 2011, s. 4, Applied:06 Jul 2011]
16A.
Interpretation of Division
[Section 16A Inserted by No. 17 of 2011, s. 4, Applied:06 Jul 2011]
In this Division
2011 transition day
means the day on which the
Electricity Supply Industry Restructuring (Savings and Transitional Provisions) Amendment Act 2011
commences;
2011 transition period
means
(a) the 4-month period commencing on the 2011 transition day; or
(b) if the Minister's power of extension under
section 16C(3)
is exercised, the period referred to in
paragraph (a)
plus the period of extension;
entitlement holder
means
(a)
[Section 16A Amended by No. 24 of 2019, s. 4, Applied:02 Sep 2019]
in relation to land to which
section 16(2)(b)
of this Act applied immediately before the 2011 transition day see
section 16AB ; and
(b) the Lawrenny Water Trust, being the body corporate and politic by that name created by letters patent under the seal of the State on 11 February 1960 (as notified in the Gazette on 16 March 1960);
[Section 16A Amended by No. 24 of 2019, s. 4, Applied:02 Sep 2019]
former section 16C
means section 16C as in force immediately before the commencement of the
Electricity Supply Industry Restructuring (Savings and Transitional Provisions) Amendment Act 2019 ;
Lake River
means the Lake River from its source to its confluence with the South Esk River;
[Section 16A Amended by No. 24 of 2019, s. 4, Applied:02 Sep 2019]
water entitlement agreement
means an agreement that
(a) was made between the HEC and an entitlement holder under former section 16C; and
(b) is taken to have been validly made by virtue of
section 16C(2) , as amended by the
Electricity Supply Industry Restructuring (Savings and Transitional Provisions) Amendment Act 2019 ;
Water Minister
means the Minister administering the
Water Management Act 1999 .
16AB.
Entitlement holders for certain land
[Section 16AB Inserted by No. 24 of 2019, s. 5, Applied:02 Sep 2019]
(1)
A person is an entitlement holder, in respect of land to which
section 16(2)(b)
of this Act applied immediately before the 2011 transition day, if
(a) an order has not been made under
section 16D(2)
in respect of the land; and
(b) the person
(i) was the owner of the land immediately before the 2011 transition day; or
(ii) if the land has been transferred on or after the 2011 transition day, is receiving the benefit of the water entitlement agreement made in respect of the land.
(2)
If an order has been made under
section 16D(2)
in respect of land to which
section 16(2)(b)
of this Act applied immediately before the 2011 transition day, a person is an entitlement holder in respect of the land if the person is the holder of a valid authorisation
(a) to take water under the
Irrigation Clauses Act 1973 , or the
Water Management Act 1999 , in respect of the land; and
(b) that is in accordance with the order made under
section 16D(2)
in respect of the land.
16B.
Obligation of HEC to supply certain water entitlements
[Section 16B Inserted by No. 17 of 2011, s. 4, Applied:06 Jul 2011]
(1)
The HEC must make water available from the beds of the Lake River and the River Ouse to every entitlement holder.
(2)
The HEC's obligation under
subsection (1)
is taken to be a condition of its special licence under the
Water Management Act 1999 .
16C.
Quantification of HEC obligation to supply certain water entitlements
[Section 16C Inserted by No. 17 of 2011, s. 4, Applied:06 Jul 2011]
[Section 16C Substituted by No. 24 of 2019, s. 6, Applied:02 Sep 2019]
(1)
In this section
commencement day
means the day on which the
Electricity Supply Industry Restructuring (Savings and Transitional Provisions) Amendment Act 2019
commences.
(2)
For the purposes of this section, an agreement made, for the purposes of former section 16C, between the HEC and
(a) entitlement holders collectively; or
(b) groups of entitlement holders; or
(c) individual entitlement holders; or
(d) any combination under
paragraphs (b)
and
(c) is taken to have been validly made under that section if approved by the Water Minister as such an agreement before the commencement day, whether or not the agreement was made during or after the 2011 transition period.
(3)
For the avoidance of doubt, an agreement that
(a) was in force immediately before the commencement day; and
(b) on and after the commencement day, is taken to be a water entitlement agreement
remains in force, on the same terms and conditions, on the commencement day.
(4)
Subject to
section 16E , the amount of water to be made available under
section 16B(1)
to an entitlement holder is the amount specified in the water entitlement agreement, as fixed by order under
section 16D(2) , that applies to the entitlement holder.
(5)
Despite
subsection (4) , a water entitlement agreement is not capable of providing for the suspension, relinquishment, phased reduction or extinction (by any means) of the HEC's obligation under
section 16B(1)
and a term of any such agreement purporting to make such provision is, to that extent, void and unenforceable.
16D.
Orders providing for supply of certain water entitlements
[Section 16D Inserted by No. 17 of 2011, s. 4, Applied:06 Jul 2011]
(1)
[Section 16D Subsection (1) amended by No. 24 of 2019, s. 7, Applied:02 Sep 2019]
This section applies once, under
section 16C , a water entitlement agreement has been validly made in respect of
(a) entitlement holders collectively; or
(b) any group of entitlement holders; or
(c) any individual entitlement holder; or
(d) any combination under
paragraphs (b)
and
(c) .
(2)
[Section 16D Subsection (2) amended by No. 24 of 2019, s. 7, Applied:02 Sep 2019]
For the purposes of this Division, the Water Minister, by order, is to confer, on the entitlement holders, an authorisation to take water under the
Irrigation Clauses Act 1973
or
Water Management Act 1999 .
(3)
The order
(a)
[Section 16D Subsection (3) amended by No. 24 of 2019, s. 7, Applied:02 Sep 2019]
is to fix the amount of water to be made available under
section 16B(1)
to the entitlement holders; and
(b) may do all or any of the following:
(i) appoint one or more water districts under the
Water Management Act 1999 ;
(ii) prescribe conditions relating to the discharge of the HEC's obligation under
section 16B(1) ;
(iii) set limitations on the HEC's obligation under
section 16B(1) .
(4)
The order
(a) may be made at any time during or after the 2011 transition period; and
(b) is, as far as practicable, to incorporate the matters relevantly agreed or awarded under
section 16C ; and
(c) is not to prescribe anything repugnant to the matters relevantly agreed or awarded under
section 16C ; and
(d) may be of general application or apply differently according to persons, matters, limitations or restrictions, whether as to time, circumstance or otherwise, specified in the order.
(5)
To avoid doubt
(a) the Water Minister's powers extend to the making of the order; and
(b) the order may, consistently with this section
(i) confer authorisations to take water under the
Irrigation Clauses Act 1973
or
Water Management Act 1999 ; and
(ii) appoint water districts under the
Water Management Act 1999 ; and
(c) the order has effect according to its terms; and
(d) in the event of any inconsistency between a term of the order and an enactment other than this section made before the order, the term of the order is not invalidated or rendered nugatory by the inconsistency.
(6)
The order
(a) is a statutory rule for the purposes of the
Rules Publication Act 1953 ; but
(b) is not subordinate legislation for the purpose of the
Subordinate Legislation Act 1992 .
16E.
Transitional supply of certain water entitlements
[Section 16E Inserted by No. 17 of 2011, s. 4, Applied:06 Jul 2011]
Until an order under
section 16D(2)
takes effect in respect of an entitlement holder
(a) the amount of water that the HEC must make available to the entitlement holder under
section 16B(1)
is the same amount as it was obliged to make available to the entitlement holder under
section 16(1)
of this Act immediately before the 2011 transition day; and
(b) the entitlement holder is taken to hold an authorisation, under the
Irrigation Clauses Act 1973
or
Water Management Act 1999 , to take the water so made available.
16.
[Section 16 Subsection (3) inserted by No. 45 of 1999, Sched. 6, Applied:01 Jan 2000]
[Section 16 Repealed by No. 17 of 2011, s. 4, Applied:06 Jul 2011]
. . . . . . . .
PART 5 - Miscellaneous
17.
[Section 17 Repealed by No. 64 of 2000, s. 15, Applied:14 Nov 2000]
. . . . . . . .
18.
Completion of certain construction projects
Notwithstanding the repeal of the construction Acts, the HEC may, in accordance with the regulations, continue and complete any work or activities that were authorised by any of those Acts.
19.
Regulations
(1)
The Governor may make regulations for the purposes of this Act.
(2)
Regulations may be made so as to apply differently according to matters, limitations or restrictions, whether as to time, circumstance or otherwise, specified in the regulations.
(3)
The regulations may
(a) provide that a contravention of, or a failure to comply with, any of the regulations is an offence; and
(b) in respect of such an offence, provide for the imposition of a fine not exceeding 10 penalty units and, in the case of a continuing offence, a further fine not exceeding one penalty unit for each day during which the offence continues.
(4)
The regulations may authorise any matter to be from time to time determined, applied or regulated by the Minister or an officer or person nominated in the regulations.
(5)
The regulations may contain provisions of a savings or transitional nature consequent on the enactment of this Act or complementary legislation.
(6)
A provision referred to in
subsection (5)
may take effect on and from the day on which this Act commences or a later day.
20.
Repeals
The Acts specified in
Schedule 1
are repealed.
21.
Administration of Act
Until provision is made in relation to this Act by order under
section 4 of the
Administrative Arrangements Act 1990
(a) the administration of this Act is assigned to the Minister for Energy; and
(b) the department responsible to the Minister for Energy in relation to the administration of this Act is the Office of Energy Planning and Conservation.
SCHEDULE 1 - ACTS REPEALED
Sections 3
and
20
PART 1
HydroElectric Commission Act 1944
Loan (HydroElectric Commission) Act 1957
Electric Power Development (Loan Agreement) Act 1968
PART 2
HydroElectric Commission (MerseyForth Power Development) Act 1963
HydroElectric Commission (Miena Dam) Act 1964
HydroElectric Commission (Lower Derwent Power Development and Miena Dam) Act 1966
HydroElectric Commission (Power Development) Act 1967
HydroElectric Commission (Pieman River Power Development) Act 1971
HydroElectric Commission (Doubts Removal) Act 1972
HydroElectric Commission (Power Development) Act 1974
Gordon River HydroElectric Power Development Act 1982
HydroElectric Commission (Doubts Removal) Act 1982
HydroElectric Commission (Power Development) Act 1983
from top.html -->
You are directed to information on how your personal information is protected. You are directed to a disclaimer and copyright notice governing the information provided.
©The State of Tasmania (The Department of Premier and Cabinet) 2026 (Ver. 6.0.73 Rev. 1612)