Gas (Pipeline Corridor) South Esk Order 2014
View - Tasmanian Legislation Online
Skip to main content
Tasmanian Legislation
Tasmania's consolidated legislation online
Toggle navigation
www.tas.gov.au
Home (current)
About
Related Links
Help
Search
Browse
In Force Legislation
Legislation As Made
Repealed Legislation
Bills -->
Preferences
Contact
Copyright and Disclaimer
Feedback
Submit
Table Of Contents
Toggle navigation
View whole SR
Authorising Act
Legislative history
Search
Search SR
Find Component
Find Legislation
Atom Feeds
Current Document
Amendments
Authorising Act
-->
A
Results: match 0 of 0 provisions
Previous Hit
Next Hit
Return to search results
0 hits in page:
First
Last
Gas (Pipeline Corridor) South Esk Order 2014
Gas (Pipeline Corridor) South Esk Order 2014
I make the following order under
section 79E of the
Gas Act 2000
. 14 October 2014 MATTHEW GROOM Minister for Energy
1.
Short title
This order may be cited as the
Gas (Pipeline Corridor) South Esk Order 2014 .
2.
Commencement
This order takes effect on the day on which its making is notified in the Gazette .
3.
Interpretation
In this order
Act
means the
Gas Act 2000 .
4.
Planning corridor
(1)
In this clause
pipeline
means the pipeline that
(a) is referred to in the licence granted under
section 24
of the Act to Tas Gas Networks Pty Ltd on 14 July 2003, as amended; and
(b) extends from
(i) the Carrick Offtake Facility to the northern bank of the South Esk River adjacent to Main Street, Hadspen; and
(ii) the northern bank of the South Esk River adjacent to Main Street Hadspen to the easternmost point of the property situated at 514 Meander Valley Road, Hadspen; and
(iii) the easternmost point of the property situated at 514 Meander Valley Road, Hadspen to the Westbury Road District Regulator Station; and
(c) is shown bounded by a heavy, black, broken line on Plan 9751 in the Central Plan Register, a reduced copy of which is set out, by way of illustration only, in
Schedule 1
to this order.
(2)
A planning corridor is declared in respect of the pipeline.
(3)
The planning corridor declared in respect of the pipeline
(a) extends along the length of the pipeline and is
(i) for so much of the pipeline as is referred to in
paragraph (b)(i)
and
(iii) of the definition of pipeline
in
subclause (1)
of this clause 150 metres wide on each side of the pipeline; and
(ii) for so much of the pipeline as is referred to in
paragraph (b)(ii)
of the definition of pipeline in
subclause (1)
of this clause 38 metres wide on each side of the pipeline; and
(b) extends away from each end of the pipeline in a semicircle with a radius of 150 metres from the centre-line at that end of the pipeline.
(4)
For the purposes of
subclause (3)(a)
of this clause, the width of each side of the planning corridor in respect of the pipeline is measured
(a) from the centre-line of the pipeline; and
(b) at a right angle from the centre-line of the pipeline.
SCHEDULE 1 - Plan
Clause 4
Displayed and numbered in accordance with the
Rules Publication Act 1953 . Notified in the Gazette on 22 October 2014 This order is administered in the Department of State Growth.