I AM THE LAW
Browse › Legislation › Victoria

Victorian Energy Efficiency Target Amendment (Prescribed Activities) Regulations 2013

Legislation · Victoria · 2020
Authorised by the Chief Parliamentary Counsel Authorised Version i Victorian Energy Efficiency Target Amendment (Prescribed Activities) Regulations 2013 S.R. No. 24/2013 TABLE OF PROVISIONS Regulation Page PART 1—PRELIMINARY 1 1 Objective 1 2 Authorising provision 2 3 Commencement 2 4 Principal Regulations 2 PART 2—MARCH 2013 AMENDMENTS 3 5 Definitions 3 6 Prescribed activities for which certificates may be created 3 7 Conditions and circumstances under which a certificate cannot be created 5 8 Schedule 20 amended 6 9 New Schedules 35 and 36 inserted 7 SCHEDULE 35—Low Flow Trigger Nozzle 7 PART A—CRITERIA 7 PART B—CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES 7 PART C—TIME AT WHICH ACTIVITY UNDERTAKEN 8 SCHEDULE 36—Water Efficient Prerinse Spray Valve 9 PART A—CRITERIA 9 PART B—CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES 9 PART C—TIME AT WHICH ACTIVITY UNDERTAKEN 10 -- 1 of 27 -- Regulation Page ii Authorised by the Chief Parliamentary Counsel PART 3—APRIL 2013 AMENDMENTS 11 10 Definitions 11 11 Schedule 1 amended 12 12 Schedule 2 amended 15 13 Schedule 3 amended 16 14 Schedule 4 amended 18 PART 4—JULY 2014 AMENDMENTS 20 15 Definitions 20 16 Conditions and circumstances under which a certificate cannot be created 20 17 Schedule 1 amended 21 18 Schedule 2 amended 21 19 Schedule 3 amended 21 20 Schedule 4 amended 22 ═══════════════ ENDNOTES 23 -- 2 of 27 -- Authorised by the Chief Parliamentary Counsel Authorised Version 1 STATUTORY RULES 2013 S.R. No. 24/2013 Victorian Energy Efficiency Target Act 2007 Victorian Energy Efficiency Target Amendment (Prescribed Activities) Regulations 2013 The Governor in Council makes the following Regulations: Dated: 26 February 2013 Responsible Minister: MICHAEL O'BRIEN Minister for Energy and Resources MATTHEW McBEATH Clerk of the Executive Council PART 1—PRELIMINARY 1 Objective The objective of these Regulations is to amend the Victorian Energy Efficiency Target Regulations 2008 to— (a) prescribe activities that will result in a reduction of greenhouse gas emissions that would not otherwise have occurred if the activities were not undertaken; and (b) prescribe the method and variables to be used to calculate the carbon dioxide equivalent of greenhouse gases to be reduced by those activities; and (c) incorporate more recent versions of certain documents that are relevant to certain prescribed activities; and -- 3 of 27 -- Part 1—Preliminary Victorian Energy Efficiency Target Amendment (Prescribed Activities) Regulations 2013 S.R. No. 24/2013 2 Authorised by the Chief Parliamentary Counsel (d) make other minor and technical amendments. 2 Authorising provision These Regulations are made under section 75 of the Victorian Energy Efficiency Target Act 2007. 3 Commencement (1) These Regulations (except Parts 3 and 4) come into operation on 1 March 2013. (2) Part 3 comes into operation on 19 April 2013. (3) Part 4 comes into operation on 1 July 2014. 4 Principal Regulations In these Regulations, the Victorian Energy Efficiency Target Regulations 20081 are called the Principal Regulations. __________________ r. 2 -- 4 of 27 -- Part 2—March 2013 Amendments Victorian Energy Efficiency Target Amendment (Prescribed Activities) Regulations 2013 S.R. No. 24/2013 3 Authorised by the Chief Parliamentary Counsel PART 2—MARCH 2013 AMENDMENTS 5 Definitions In regulation 4 of the Principal Regulations insert the following definitions— "ASTM F2324-03 means ASTM F2324-03 (2009) 'Standard Test Method for Prerinse Spray Valves' published by ASTM International in 2009; Smart Approved Watermark means a trademark that has either of the following trademark registration numbers— (a) 988613; (b) 988615;". 6 Prescribed activities for which certificates may be created (1) For regulation 6(1)(p) of the Principal Regulations substitute— "(p) installing a high efficiency ducted gas heater that complies with the criteria specified in Part A of Schedule 20 in premises where none of the following products is installed— (i) gas ducted heating; (ii) a gas or liquefied petroleum gas space heater; (iii) a ducted evaporative cooler; (iv) a space air to air heat pump; (v) a ducted air to air heat pump; (vi) any other central heating or cooling product;". r. 5 -- 5 of 27 -- Part 2—March 2013 Amendments Victorian Energy Efficiency Target Amendment (Prescribed Activities) Regulations 2013 S.R. No. 24/2013 4 Authorised by the Chief Parliamentary Counsel (2) In regulation 6(3)(c) of the Principal Regulations, after "associated" insert "rotor". (3) In regulation 6(3)(c)(i) of the Principal Regulations, for "external" substitute "internal". (4) In regulation 6(3)(c)(ii) of the Principal Regulations, for "in any other case" substitute "in the case of an external rotor motor". (5) In regulation 6(3)(d)(ii) of the Principal Regulations, for "tombstone." substitute "tombstone;". (6) After regulation 6(3)(d) of the Principal Regulations insert— "(e) decommissioning a trigger nozzle that has a maximum water flow requirement of at least 12L/minute and that is not labelled with a Smart Approved Watermark and installing a trigger nozzle that complies with the criteria specified in Part A of Schedule 35; (f) installing a prerinse spray valve that complies with the criteria specified in Part A of Schedule 36 on an existing fitting for a prerinse spray valve on which no prerinse spray valve was previously installed; (g) decommissioning a prerinse spray valve that is not rated as having a 4 star or higher water efficiency (when assessed and labelled in accordance with AS/NZS 6400:2005 reissued in June 2011) and installing a prerinse spray valve that complies with the criteria specified in Part A of Schedule 36.". r. 6 -- 6 of 27 -- Part 2—March 2013 Amendments Victorian Energy Efficiency Target Amendment (Prescribed Activities) Regulations 2013 S.R. No. 24/2013 5 Authorised by the Chief Parliamentary Counsel 7 Conditions and circumstances under which a certificate cannot be created After regulation 10(1) of the Principal Regulations insert— "(1A) For the purposes of section 17(4) of the Act, a certificate cannot be created in relation to a prescribed activity referred to in regulation 6(1)(a) if— (a) the prescribed activity is undertaken after 18 April 2013; and (b) the prescribed activity relates to the installation of a product that complies with item 1C or item 1D of Part A of Schedule 1. (1B) For the purposes of section 17(4) of the Act, a certificate cannot be created in relation to a prescribed activity referred to in regulation 6(1)(b) if— (a) the prescribed activity is undertaken after 18 April 2013; and (b) the prescribed activity relates to the installation of a product that complies with item 2A of Part A of Schedule 2. (1C) For the purposes of section 17(4) of the Act, a certificate cannot be created in relation to a prescribed activity referred to in regulation 6(1)(c) if— (a) the prescribed activity is undertaken after 18 April 2013; and (b) the prescribed activity relates to the installation of a product that complies with item 3A of Part A of Schedule 3. r. 7 -- 7 of 27 -- Part 2—March 2013 Amendments Victorian Energy Efficiency Target Amendment (Prescribed Activities) Regulations 2013 S.R. No. 24/2013 6 Authorised by the Chief Parliamentary Counsel (1D) For the purposes of section 17(4) of the Act, a certificate cannot be created in relation to a prescribed activity referred to in regulation 6(1)(d) if— (a) the prescribed activity is undertaken after 18 April 2013; and (b) the prescribed activity relates to the installation of a product that complies with item 4A of Part A of Schedule 4.". 8 Schedule 20 amended In Schedule 20 to the Principal Regulations, after the heading "HIGH EFFICIENCY DUCTED GAS HEATER", for "Prescribed activity under regulation 6(1)(p): Installing, in premises that are newly constructed and have not been previously occupied, a high efficiency ducted gas heater that complies with the criteria specified in Part A of Schedule 20." substitute "Prescribed activity under regulation 6(1)(p): Installing a high efficiency ducted gas heater that complies with the criteria specified in Part A of Schedule 20 in premises where no other central heating or cooling product is installed.". r. 8 -- 8 of 27 -- Part 2—March 2013 Amendments Victorian Energy Efficiency Target Amendment (Prescribed Activities) Regulations 2013 S.R. No. 24/2013 7 Authorised by the Chief Parliamentary Counsel 9 New Schedules 35 and 36 inserted After Schedule 34 to the Principal Regulations insert— "__________________ SCHEDULE 35 Regulation 6(3)(e) LOW FLOW TRIGGER NOZZLE Prescribed activity under regulation 6(3)(e): Decommissioning a trigger nozzle that has a maximum water flow requirement of at least 12L/minute and that is not labelled with a Smart Approved Watermark and installing a trigger nozzle that complies with the criteria specified in Part A of Schedule 35. PART A—CRITERIA 35A A trigger nozzle that— (a) is labelled with a Smart Approved Watermark; and (b) only uses water with a temperature of at least 45°C. PART B—CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES The carbon dioxide equivalent (in tonnes) of greenhouse gases to be reduced by decommissioning a trigger nozzle that has a maximum water flow requirement of at least 12L/minute and that is not labelled with a Smart Approved Watermark and installing a product referred to in Part A is calculated by multiplying the abatement factor for that item by the regional factor applying to the place where the product is installed. r. 9 -- 9 of 27 -- Part 2—March 2013 Amendments Victorian Energy Efficiency Target Amendment (Prescribed Activities) Regulations 2013 S.R. No. 24/2013 8 Authorised by the Chief Parliamentary Counsel The following are the abatement factors and regional factors for each item in Part A: Item 35A Abatement factor 1·42. 35A Regional factor: (a) If the product is installed in metropolitan Victoria: 0·85; (b) If the product is installed in regional Victoria: 1·40. PART C—TIME AT WHICH ACTIVITY UNDERTAKEN Item 35A At the beginning of the later of the following days— (a) the day on which the installation is completed; or (b) the day on which the replaced trigger nozzle is decommissioned. __________________ r. 9 -- 10 of 27 -- Part 2—March 2013 Amendments Victorian Energy Efficiency Target Amendment (Prescribed Activities) Regulations 2013 S.R. No. 24/2013 9 Authorised by the Chief Parliamentary Counsel SCHEDULE 36 Regulation 6(3)(f) and (g) WATER EFFICIENT PRERINSE SPRAY VALVE Prescribed activity under regulation 6(3)(f) and(g): Installing a prerinse spray valve that complies with the criteria specified in Part A of Schedule 36 on an existing fitting for a prerinse spray valve on which no prerinse spray valve was previously installed, or decommissioning a prerinse spray valve that is not rated as having a 4 star or higher water efficiency when assessed and labelled in accordance with AS/NZS 6400:2005 reissued in June 2011 and installing a prerinse spray valve that complies with the criteria specified in Part A of Schedule 36. PART A—CRITERIA 36A A prerinse spray valve that— (a) is rated as having a minimum 6 star water efficiency rating when assessed and labelled in accordance with AS/NZS 6400:2005 reissued in June 2011; and (b) has a cleanability score of 26 seconds or less when tested in accordance with ASTM F2324-03. PART B—CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES The carbon dioxide equivalent (in tonnes) of greenhouse gases to be reduced by either— (a) installing a prerinse spray valve that complies with the criteria specified in Part A on an existing fitting for a prerinse spray valve on which no prerinse spray valve was previously installed; or (b) decommissioning a prerinse spray valve that is not rated as having a 4 star or higher water efficiency (when assessed and labelled in accordance with AS/NZS 6400:2005 reissued in June 2011) and installing a prerinse spray valve that complies with the criteria specified in Part A— r. 9 -- 11 of 27 -- Part 2—March 2013 Amendments Victorian Energy Efficiency Target Amendment (Prescribed Activities) Regulations 2013 S.R. No. 24/2013 10 Authorised by the Chief Parliamentary Counsel is calculated by multiplying the abatement factor for that item by the regional factor applying to the place where the product is installed. The following are the abatement factors and regional factors for each item in Part A: Item 36A Abatement factor: 2·99. 36A Regional factor: (a) If the product is installed in metropolitan Victoria: 0·85; (b) If the product is installed in regional Victoria: 1·40. PART C—TIME AT WHICH ACTIVITY UNDERTAKEN Item 36A At the beginning of the later of the following days— (a) the day on which the installation is completed; or (b) the day on which the replaced prerinse spray valve (if any) is decommissioned.". __________________ r. 9 -- 12 of 27 -- Part 3—April 2013 Amendments Victorian Energy Efficiency Target Amendment (Prescribed Activities) Regulations 2013 S.R. No. 24/2013 11 Authorised by the Chief Parliamentary Counsel PART 3—APRIL 2013 AMENDMENTS 10 Definitions In regulation 4 of the Principal Regulations— (a) for the definition of Be substitute— "Be means the electrical energy used annually by the parts of a solar or heat pump water heater system that use purchased electrical energy, other than resistive heating units or a heat pump package (consisting of a compressor, integral controls, pumps and fans), measured in MJ/Yr as determined as part of the performance evaluation process in— (a) in the case of item 1C or 1D in Schedule 1—AS 4234—1994 published on 22 August 1994; or (b) in the case of item 1E or 1F in Schedule 1—AS/NZS 4234:2008 reissued in November 2011;"; (b) for the definition of Bs substitute— "Bs means the supplementary purchased gas or electrical energy used annually by a solar or heat pump water heater to directly heat the water by a gas burner, electrical resistive heating unit or heat pump package (consisting of a compressor, integral controls, pumps and fans), measured in MJ/Yr as determined as part of the performance evaluation process in— (a) in the case of item 1C or 1D in Schedule 1—AS 4234—1994 published on 22 August 1994; or r. 10 -- 13 of 27 -- Part 3—April 2013 Amendments Victorian Energy Efficiency Target Amendment (Prescribed Activities) Regulations 2013 S.R. No. 24/2013 12 Authorised by the Chief Parliamentary Counsel (b) in the case of item 1E or 1F in Schedule 1—AS/NZS 4234:2008 reissued in November 2011;". 11 Schedule 1 amended (1) In Schedule 1 to the Principal Regulations, in Part A, after item 1D insert— "1E A boosted solar or heat pump water heater that— (a) is certified by an accredited body to AS/NZS 2712:2007 reissued in November 2011; and (b) achieves a minimum of 60% annual energy savings as determined in accordance with AS/NZS 4234:2008 reissued in November 2011 when modelled in zone 4 (Melbourne); and (c) is listed in the ESC register. 1F A gas or liquefied petroleum gas boosted solar water heater that— (a) is certified by an accredited body to AS/NZS 2712:2007 reissued in November 2011; and (b) achieves a minimum of 60% annual energy savings as determined in accordance with AS/NZS 4234:2008 reissued in November 2011 when modelled in zone 4 (Melbourne); and (c) is listed in the ESC register.". (2) In Schedule 1 to the Principal Regulations, in Part B, after the item headed "1D Abatement factor:" insert— r. 11 -- 14 of 27 -- Part 3—April 2013 Amendments Victorian Energy Efficiency Target Amendment (Prescribed Activities) Regulations 2013 S.R. No. 24/2013 13 Authorised by the Chief Parliamentary Counsel "1E Abatement factor: (a) If the product is a small system as determined in accordance with AS/NZS 4234:2008 reissued in November 2011 based on the system's peak daily thermal energy load delivery characteristics and— (i) is installed in metropolitan Victoria: 40⋅47 – [0⋅003938 × (Bs + Be)]; (ii) is installed in regional Victoria: 42⋅79 – [0⋅004163 × (Bs + Be)]; (b) If the product is a large system as determined in accordance with AS/NZS 4234:2008 reissued in November 2011 based on the system's peak daily thermal energy load delivery characteristics and— (i) is installed in metropolitan Victoria: 65⋅62 – [0⋅003938 × (Bs + Be)]; (ii) is installed in regional Victoria: 69⋅37 – [0⋅004163 × (Bs + Be)]; 1F Abatement factor: (a) If the product is a small system as determined in accordance with AS/NZS 4234:2008 reissued in November 2011 based on the system's peak daily thermal energy load delivery characteristics and— (i) is installed in metropolitan Victoria: 40⋅47 – [0⋅015 × (0⋅0573 × Bs + 0⋅2625 × Be)]; r. 11 -- 15 of 27 -- Part 3—April 2013 Amendments Victorian Energy Efficiency Target Amendment (Prescribed Activities) Regulations 2013 S.R. No. 24/2013 14 Authorised by the Chief Parliamentary Counsel (ii) is installed in regional Victoria: 42⋅79 – [0⋅015 × (0⋅0573 × Bs + 0⋅2775 × Be)]; (b) If the product is a large system as determined in accordance with AS/NZS 4234:2008 reissued in November 2011 based on the system's peak daily thermal energy load delivery characteristics and— (i) is installed in metropolitan Victoria: 65⋅62 – [0⋅015 × (0⋅0573 × Bs + 0⋅2625 × Be)]; (ii) is installed in regional Victoria: 69⋅37 – [0⋅015 × (0⋅0573 × Bs + 0⋅2775 × Be)];". (3) In Schedule 1 to the Principal Regulations, in Part B, after the item headed "1C–1D Regional factor:" insert— "1E–1F Regional factor: 1.". (4) In Schedule 1 to the Principal Regulations, in Part C, after item 1D insert— "1E–1F At the beginning of the day which is the later of the day on which the installed product is first able to produce and deliver water heated by solar energy and the day on which the electric resistance water heater is decommissioned.". r. 11 -- 16 of 27 -- Part 3—April 2013 Amendments Victorian Energy Efficiency Target Amendment (Prescribed Activities) Regulations 2013 S.R. No. 24/2013 15 Authorised by the Chief Parliamentary Counsel 12 Schedule 2 amended (1) In Schedule 2 to the Principal Regulations, in Part A, after item 2A insert— "2B A solar retrofit kit (solar collector, pump and controller) that— (a) is certified by an accredited body to AS/NZS 2712:2007 reissued in November 2011; and (b) achieves a minimum of 50% annual energy savings as determined in accordance with AS/NZS 4234:2008 reissued in November 2011 when modelled in zone 4 (Melbourne) using the Plumbing Characteristics specified in the Sustainability Victoria Guidelines to calculate annual solar energy savings for domestic solar water heaters produced by adding a Retrofit Kit (collectors and pump) to an existing tank (version 6.0 updated June 2011); and (c) is listed in the ESC register.". (2) In Schedule 2 to the Principal Regulations, in Part B, after the item headed "2A Abatement factor:" insert— "2B Abatement factor: (a) If the product is installed in metropolitan Victoria: 28·44 − [0·001706 × (Bs + Be)]; (b) If the product is installed in regional Victoria: 30·06 − [0·001804 × (Bs + Be)].". r. 12 -- 17 of 27 -- Part 3—April 2013 Amendments Victorian Energy Efficiency Target Amendment (Prescribed Activities) Regulations 2013 S.R. No. 24/2013 16 Authorised by the Chief Parliamentary Counsel (3) In Schedule 2 to the Principal Regulations, in Part B, after the item headed "2A Regional factor:" insert— "2B Regional factor: 1.". (4) In Schedule 2 to the Principal Regulations, in Part C, after item 2A insert— "2B At the beginning of the day on which the electric resistance heater, as modified by the installed product, is first able to produce and deliver water heated by solar energy.". 13 Schedule 3 amended (1) In Schedule 3 to the Principal Regulations, in Part A, after item 3A insert— "3B A gas or liquefied petroleum gas boosted solar water heater that— (a) is certified by an accredited body to AS/NZS 2712:2007 reissued in November 2011; and (b) achieves a minimum of 60% annual energy savings as determined in accordance with AS/NZS 4234:2008 reissued in November 2011 when modelled in zone 4 (Melbourne); and (c) is listed in the ESC register.". (2) In Schedule 3 to the Principal Regulations, in Part B, after the item headed "3A Abatement factor:" insert— "3B Abatement factor: (a) If the product is a small system as determined in accordance with AS/NZS 4234:2008 reissued in November 2011 based on the system's peak daily thermal energy load delivery characteristics and— r. 13 -- 18 of 27 -- Part 3—April 2013 Amendments Victorian Energy Efficiency Target Amendment (Prescribed Activities) Regulations 2013 S.R. No. 24/2013 17 Authorised by the Chief Parliamentary Counsel (i) is installed in metropolitan Victoria: 12⋅27 – [0⋅015 × (0⋅0573 × Bs + 0⋅2625 × Be)]; (ii) is installed in regional Victoria: 12⋅27 – [0⋅015 × (0⋅0573 × Bs + 0⋅2775 × Be)]; (b) If the product is a large system as determined in accordance with AS/NZS 4234:2008 reissued in November 2011 based on the system's peak daily thermal energy load delivery characteristics and— (i) is installed in metropolitan Victoria: 17⋅95 – [0⋅015 × (0⋅0573 × Bs + 0⋅2625 × Be)]; (ii) is installed in regional Victoria: 17⋅95 – [0⋅015 × (0⋅0573 × Bs + 0⋅2775 × Be)];". (3) In Schedule 3 to the Principal Regulations, in Part B, after the item headed "3A Regional factor:" insert— "3B Regional factor: 1.". (4) In Schedule 3 to the Principal Regulations, in Part C, after item 3A insert— "3B At the beginning of the day which is the later of the day on which the installed product is first able to produce and deliver water heated by solar energy and the day on which the gas or liquefied petroleum gas water heater is decommissioned.". r. 13 -- 19 of 27 -- Part 3—April 2013 Amendments Victorian Energy Efficiency Target Amendment (Prescribed Activities) Regulations 2013 S.R. No. 24/2013 18 Authorised by the Chief Parliamentary Counsel 14 Schedule 4 amended (1) In Schedule 4 to the Principal Regulations, in Part A, after item 4A insert— "4B A solar pre-heater that— (a) is certified by an accredited body to AS/NZS 2712:2007 reissued in November 2011; and (b) achieves a minimum of 50% annual energy savings as determined in accordance with AS/NZS 4234:2008 reissued in November 2011 when modelled in zone 4 (Melbourne) using the Post Heater Characteristics specified in Sustainability Victoria's Guidelines to calculate annual solar energy savings for domestic solar water heaters produced by adding a solar pre-heater to an existing gas hot water system (Version 3.0 updated June 2011); and (c) is listed in the ESC register.". (2) In Schedule 4 to the Principal Regulations, in Part B, after the item headed "4A Abatement factor:" insert— "4B Abatement factor: (a) If the product is a small system as determined in accordance AS/NZS 4234:2008 reissued in November 2011 based on the system's peak daily thermal energy load delivery characteristics and— (i) is installed in metropolitan Victoria: 7⋅53 – [0⋅006 × (0⋅0573 × Bs + 0⋅2625 × Be)]; r. 14 -- 20 of 27 -- Part 3—April 2013 Amendments Victorian Energy Efficiency Target Amendment (Prescribed Activities) Regulations 2013 S.R. No. 24/2013 19 Authorised by the Chief Parliamentary Counsel (ii) is installed in regional Victoria: 7⋅53 – [0⋅006 × (0⋅0573 × Bs + 0⋅2775 × Be)]; (b) If the product is a large system as determined in accordance with AS/NZS 4234:2008 reissued in November 2011 based on the system's peak daily thermal energy load delivery characteristics and— (i) is installed in metropolitan Victoria: 10⋅26 – [0⋅006 × (0⋅0573 × Bs + 0⋅2625 × Be)]; (ii) is installed in regional Victoria: 10⋅26 – [0⋅006 × (0⋅0573 × Bs + 0⋅2775 × Be)];". (3) In Schedule 4 to the Principal Regulations, in Part B, after the item headed "4A Regional factor:" insert— "4B Regional factor: 1.". (4) In Schedule 4 to the Principal Regulations, in Part C, after item 4A insert— "4B At the beginning of the day on which the gas or liquefied petroleum gas water heater, as modified by the installed product, is first able to produce and deliver water heated by solar energy.". __________________ r. 14 -- 21 of 27 -- Part 4—July 2014 Amendments Victorian Energy Efficiency Target Amendment (Prescribed Activities) Regulations 2013 S.R. No. 24/2013 20 Authorised by the Chief Parliamentary Counsel PART 4—JULY 2014 AMENDMENTS 15 Definitions In regulation 4 of the Principal Regulations— (a) for the definition of Be substitute— "Be means the electrical energy used annually by the parts of a solar or heat pump water heater system that use purchased electrical energy, other than resistive heating units or a heat pump package (consisting of a compressor, integral controls, pumps and fans), measured in MJ/Yr as determined as part of the performance evaluation process in AS/NZS 4234:2008 reissued in November 2011;"; (b) for the definition of Be substitute— "Bs means the supplementary purchased gas or electrical energy used annually by a solar or heat pump water heater to directly heat the water by a gas burner, electrical resistive heating unit or heat pump package (consisting of a compressor, integral controls, pumps and fans), measured in MJ/Yr as determined as part of the performance evaluation process in AS/NZS 4234:2008 reissued in November 2011;". 16 Conditions and circumstances under which a certificate cannot be created Regulation 10(1A), (1B), (1C) and (1D) of the Principal Regulations are revoked. r. 15 -- 22 of 27 -- Part 4—July 2014 Amendments Victorian Energy Efficiency Target Amendment (Prescribed Activities) Regulations 2013 S.R. No. 24/2013 21 Authorised by the Chief Parliamentary Counsel 17 Schedule 1 amended (1) In Schedule 1 to the Principal Regulations, in Part A, items 1C and 1D are revoked. (2) In Schedule 1 to the Principal Regulations, in Part B— (a) the item headed "1C Abatement factor:" is revoked; (b) the item headed "1D Abatement factor:" is revoked; (c) the item headed "1C-1D Regional factor:" is revoked. (3) In Schedule 1 to the Principal Regulations, in Part C, items 1C and 1D are revoked. 18 Schedule 2 amended (1) In Schedule 2 to the Principal Regulations, in Part A, item 2A is revoked. (2) In Schedule 2 to the Principal Regulations, in Part B— (a) the item headed "2A Abatement factor:" is revoked; (b) the item headed "2A Regional factor:" is revoked. (3) In Schedule 2 to the Principal Regulations, in Part C, item 2A is revoked. 19 Schedule 3 amended (1) In Schedule 3 to the Principal Regulations, in Part A, item 3A is revoked. (2) In Schedule 3 to the Principal Regulations, in Part B— (a) the item headed "3A Abatement factor:" is revoked; r. 17 -- 23 of 27 -- Part 4—July 2014 Amendments Victorian Energy Efficiency Target Amendment (Prescribed Activities) Regulations 2013 S.R. No. 24/2013 22 Authorised by the Chief Parliamentary Counsel (b) the item headed "3A Regional factor:" is revoked. (3) In Schedule 3 to the Principal Regulations, in Part C, item 3A is revoked. 20 Schedule 4 amended (1) In Schedule 4 to the Principal Regulations, in Part A, item 4A is revoked. (2) In Schedule 4 to the Principal Regulations, in Part B— (a) the item headed "4A Abatement factor:" is revoked; (b) the item headed "4A Regional factor:" is revoked. (3) In Schedule 4 to the Principal Regulations, in Part C, item 4A is revoked. ═══════════════ r. 20 -- 24 of 27 -- Victorian Energy Efficiency Target Amendment (Prescribed Activities) Regulations 2013 S.R. No. 24/2013 23 Authorised by the Chief Parliamentary Counsel ENDNOTES 1 Reg. 4: S.R. No. 158/2008 as amended by S.R. Nos 109/2010, 127/2010, 31/2011, 56/2011, 146/2011, 6/2012, 14/2012, 32/2012 and 43/2012. —— Table of Applied, Adopted or Incorporated Matter The following table of applied, adopted or incorporated matter is included in accordance with the requirements of regulation 5 of the Subordinate Legislation Regulations 2004. Statutory rule provision Title of applied, adopted or incorporated document Matter in applied, adopted or incorporated document Regulation 6(6) which inserts regulation 6(3)(g) into the Principal Regulations, and regulation 9 which inserts Schedule 36 into the Principal Regulations Australian/New Zealand Standard 6400:2005 Water efficient products - Rating and labelling. Published by Standards Australia/Standards New Zealand on 1 June 2005 and reissued June 2011 incorporating Amendments Nos 1, 2, 3, 4 and 5 The whole Regulation 5 which amends regulation 4 of the Principal Regulations and regulation 9 which inserts Schedule 36 into the Principal Regulations ASTM F2324-03(2009) Standard Test Method for Prerinse Spray Valves. Published by ASTM International in 2009 The whole Regulation 10 which amends regulation 4 of the Principal Regulations Australian Standard 4234— 1994 Solar Water Heaters - Domestic and heat pump - Calculation of energy consumption. Published by Standards Australia on 22 August 1994 The whole Endnotes -- 25 of 27 -- Victorian Energy Efficiency Target Amendment (Prescribed Activities) Regulations 2013 S.R. No. 24/2013 24 Authorised by the Chief Parliamentary Counsel Statutory rule provision Title of applied, adopted or incorporated document Matter in applied, adopted or incorporated document Regulations 10 and 15 which amend regulation 4 of the Principal Regulations and regulations 11 to 14 which amend Schedules 1 to 4 of the Principal Regulations Australian/New Zealand Standard 4234:2008 Heated water systems—Calculation of energy consumption. Published by Standards Australia/Standards New Zealand on 21 August 2008 and reissued November 2011 incorporating Amendments Nos 1 and 2 The whole Regulations 11 to 14 which amend Schedules 1 to 4 of the Principal Regulations Australian/New Zealand Standard 2712:2007 Solar and heat pump water heaters— Design and construction. Published by Standards Australia/Standards New Zealand on 12 September 2007 and reissued November 2011 incorporating Amendments Nos 1 and 2 The whole Regulation 12 which amends Schedule 2 to the Principal Regulations Sustainability Victoria Guidelines to calculate annual solar energy savings for domestic solar water heaters produced by adding a Retrofit Kit (collectors and pump) to an existing tank (version 6.0 updated June 2011). Published by Sustainability Victoria in June 2011 The whole -- 26 of 27 -- Victorian Energy Efficiency Target Amendment (Prescribed Activities) Regulations 2013 S.R. No. 24/2013 25 Authorised by the Chief Parliamentary Counsel Statutory rule provision Title of applied, adopted or incorporated document Matter in applied, adopted or incorporated document Regulation 14 which amends Schedule 4 to the Principal Regulations Sustainability Victoria Guidelines to calculate annual solar energy savings for domestic solar water heaters produced by adding a solar preheater to an existing gas hot water system, Version 3.0 June 2011. Published by Sustainability Victoria in June 2011 The whole -- 27 of 27 --