186 OSHR BH Pty Ltd v Woollahra Municipal Council [2023] NSWLEC 1755
Catchwords: DEVELOPMENT APPLICATION – residential flat building – breach in height and floor space ratio development standards – variation of development standards - conciliation conference – agreement between the parties – orders
Land and Environment Court
New South Wales
Medium Neutral Citation:
186 OSHR BH Pty Ltd v Woollahra Municipal Council [2023] NSWLEC 1755
Hearing dates:
Conciliation conference held on 24 November 2023
Date of orders:
08 December 2023
Decision date:
08 December 2023
Jurisdiction:
Class 1
Before:
Bish C
Decision:
The Court orders:
(1) The appeal is upheld.
(2) Development Application DA592/2022, which seeks the demolition of existing structures, tree removal, and construction of a residential flat building with basement car parking,
landscaping
and a swimming pool on Strata Plan 11821, also known as 186-192 Old South Head Road, Bellevue Hill, is determined by the grant of consent, subject to the conditions in Annexure A.
(3) The Applicant is to pay the Respondent ’ s costs thrown away pursuant to s 8.15(3) of the
Environmental Planning and Assessment Act 1979
in the agreed sum of $16,000 payable within 35 days from the date of the final orders.
Catchwords:
DEVELOPMENT APPLICATION – residential flat building – breach in height and floor space ratio
development standards
– variation of development standards
- conciliation conference – agreement between the parties – orders
Legislation Cited:
Environmental Planning and Assessment Act 1979, ss 4.15, 4.16, 4.47, 8.7, 8.15
Environmental Planning and Assessment Regulation 2021, ss 23, 38
Land and Environment Court Act 1979, s 34
State Environmental Planning Policy (Biodiversity and Conservation) 2021, Pt 6.2
State Environmental Planning Policy (Building Sustainability Index: BASIX) 2004
State Environmental Planning Policy (Resilience and Hazards) 2021 ,
Ch 4
State Environmental Planning Policy (Transport and Infrastructure) 2021, ss 2.119, 2.122
State Environmental Planning Policy 65 – Design Quality of Residential Apartment Development ,
cll
28, 30
Water Management Act 2000, s 90
Woollahra Local Environmental Plan 2014 ,
cll
2.3, 4.3, 4.4, 4.6
Texts Cited:
Apartment Design Guide 2015
Woollahra Development Control Plan 2015
Category:
Principal judgment
Parties:
186 OSHR BH Pty Ltd (Applicant)
Woollahra Municipal Council (Respondent)
Representation:
Counsel:
A Gadiel (Solicitor) (Applicant)
B Crapis (Solicitor) (Respondent)
Solicitors:
Mills Oakley (Applicant)
Lindsay Taylor Lawyers (Respondent)
File Number(s):
2023/78814
Publication restriction:
Nil
Judgment
COMMISSIONER:
This is an appeal against the deemed refusal of Development Application
DA 592/2022
(the DA) by
Woollahra
Municipal Council
(the Council), which as amended, seeks demolition of existing structures and construction
of a
residential flat building with basement car parking ,
landscaping
and
a
swimming pool
on Strata Plan 11821, also known as 186-192 Old South Head Road, Bellevue Hill
(the site).
Background
The DA was lodged with Council on
22 December 2022 . The original DA was notified to residents, with eight submissions received, and was referred to the relevant authorities, pursuant to s 4.47 of the
Environmental Planning and Assessment Act 1979
(EPA Act).
The Applicant appealed against the
deemed
refusal of the DA, pursuant to s
8.7(1) of the EPA Act.
Pursuant to s 34(1) of the
Land and Environment Court Act 1979
(the LEC Act), the Court arranged a conciliation conference, which at the parties’ request, commenced without a site view and
was
held before me as
D uty Commissioner.
Prior to the conciliation, the Council agreed for the Applicant to amend the plans and documents that support the DA,
pursuant to
s 38
of the Environmental Planning and Assessment Regulation 20 21
(EPA Reg).
The amended DA
seeks :
demolition of the existing multi-dwelling
development;
construction of three new residential flat buildings identified as Buildings A, B and C (Building A containing 14 units, Building B containing 17 units and Building C containing 5 units); and
basement parking including 71 carparking spaces with 9 visitor spaces,
landscaping
and swimming pool .
Based on the amended application and the agreed conditions of consent, the parties reached an agreement as to the terms of a decision in the proceedings that would be acceptable to the parties. The parties agree that the contentions of Council have been considered and are resolved. The issues raised by the objectors have also been considered in Council’s merit assessment. The agreed position of the parties, as described in their jurisdictional assessment, is for the Court to grant consent to the amended Development Application
DA592/2022 , with conditions.
Pursuant to s 34(3) of the LEC Act, I must dispose of the proceedings in accordance with the parties' decision if it is a decision that the Court could have made in the proper exercise of its functions. The parties' decision involves the Court
making a determination
under s 4.16 of the EPA Act and being satisfied, pursuant to s 4.15, and other relevant jurisdictional requirements, to grant consent to
DA592/2022 , subject to conditions in Annexure A.
Jurisdictional prerequisites
The proposed
basement of the
building will potentially
intercept groundwater and require dewatering, engaging the
Water Management Act 2000
(WMA Act)
. The DA is supported by the Response to SOFC – Geotechnical, prepared by CEC Geotechnical, dated 2 August 2023, that
assesses
potential
seepage in to
the basement. Pursuant to s 90
of the WMA Act
, an approval to discharge water is required ,
as
described in the conditions of consent .
WaterNSW
has provided general terms of approval that relate to the proposed development, which are included in the conditions of consent.
Section 4.15(1) of the EPA Act establishes the matters to be considered in determining a development application. The following jurisdictional requirements have been specifically considered and are addressed:
Woollahra
Local Environmental Plan 201
4
(
W LEP):
Pursuant to cl 2.3 of the
W LEP, the proposed residential development is situated over land zoned R3 Medium Density
Residential. The proposed development, as described to the Court, is permissible with consent. The amended DA addresses all the relevant objectives, aims, standards and requirements of the
W LEP,
except for
a breach in
the
cl 4.3 height
and
cl 4.4
floor space ratio (FSR)
development standard s,
that require
s
a
cl 4.6 request for
variation
to be sought
.
The
development
standard described in cl 4.3
of the WLEP
requires
a
maximum height
of
11 m.
The DA proposes a maximum height of 14.17 m, representing an exceedance of up to 5%.
The FSR
development
standard described in cl 4.4
of the WLEP
requires the FSR to not exceed
1.3:1 .
The proposed development proposes a maximum FSR of 1.32:1 m, representing an exceedance of 1.6%.
T he application relies on cl 4.6 written request s
to vary the height
and FSR development
standard s , pursuant to cl 4.6 of the
W LEP.
The height breach relates to balustrading and a portion of the roof form
on the proposed building .
The cl 4.6 written request provided to the Court explains that the
portion of the building
resulting in the
non-compliance in the height standard does not result in a development that is incompatible with the
desired, future
character of the surrounding area or results in adverse amenity, including solar access. The elements of the proposed development that result in the non-compliance will not perceptibly change the presentation of the proposed building to the streetscape or result in adverse bulk and scale impacts to adjoining developments. According to the cl 4.6 written request, the proposed development is consistent with the zone objectives and relevant development standard.
The Court must be satisfied to grant consent to the application that the cl 4.6 request to vary the standard is appropriately addressed, pursuant to the requirements set out in cl 4.6 of the
W LEP. Having reviewed the cl 4.6 written request and evidence before the Court, I am satisfied that the written request for variation of the height standard describes sufficient environmental planning grounds to justify the non-compliance, and that strict compliance of the standard would be both unreasonable and unnecessary. The proposed development, as described to the Court, is consistent with the objectives of the zone (R 3 )
described
in cl 2.3 and cl 4.3 height standard of the
W LEP. The breach in the height standard will not cause undue concern to (existing and future) surrounding residents, the streetscape, or those utilising the site. The relevant concerns raised by residents have been considered in the design of the dwelling. The proposed development is in the
public interest. I accept that there is no significant consequence to State or Regional environmental planning matters
as a result of
varying the development standard in this instance, and that there is no public benefit to maintaining the height standard for the proposed development.
The cl 4.6 written request provided to the Court explains that the non-compliance in the FSR standard does not result in a development that is
incompatible with the character of the surrounding area or results in adverse amenity, including solar access
or views . The elements of the proposed development that result in the non-compliance will not perceptibly change the presentation of the proposed building to the streetscape or result in adverse bulk and scale impacts to adjoining developments. According to the cl 4.6 written request, the proposed development is consistent with the zone objectives and relevant development standard.
Having reviewed the cl 4.6 written request and evidence before the Court, I am satisfied that the written request for variation of the FSR standard describes sufficient environmental planning grounds to justify the non -compliance, and that strict compliance of the standard would be both unreasonable and unnecessary. The proposed development, as described to the Court, is consistent with the objectives of the zone (R3)
described
in cl 2.3 and cl 4.4 height standard
of the
WLEP. The breach in the
FSR
standard will not cause undue concern to (existing and future) surrounding residents, the streetscape, or those utilising the site. The relevant concerns raised by residents have been considered in the design of the dwelling. The proposed development is in the public interest. I accept that there is no significant consequence to State or Regional environmental planning matters
as a result of
varying the development standard in this instance, and that there is no public benefit to maintaining the
FSR
standard for the proposed development.
I am satisfied that the requirements of cl 4.6 of the
W LEP have been addressed, and that a variation in the
c l l
4.3
and 4.4
of the
W LEP height
and FSR
development standard s, respectively,
should be granted.
State Environmental Planning Policy 65 – Design Quality of Residential Apartment
Development (SEPP 65):
The DA proposes development for residential apartments, that engages consideration of the relevant provisions of SEPP 65.
Pursuant to cl 28(2)(a) of SEPP 65,
t he
DA was not submitted
for the advice of a
design review panel.
Pursuant to cl 28(2)(b) of SEPP 65, the DA relies on a
SEPP 65 Design Verification
Statement , prepared by
CD Architects , dated
12 December 2022 , and the Design Principles Assessment ,
prepared by CD Architects, dated 28 November 2023 . The design quality principles established in SEPP 65
are stated to have
been considered and are addressed by the amended design.
Pursuant to cl 28(2)(c) of SEPP 65, the
compliance table
considers the requirements described in the Apartment Design Guide 2015. The relevant considerations are deemed to comply.
Pursuant to cl 30(2)(a) of the SEPP 65, the proposed
development has had regard and demonstrates design quality principles .
State Environmental Planning Policy (Transport and Infrastructure) 2021 (SEPP Infrastructure):
The site
has frontage to Old South Head Road, a classified road , engaging s
2.119
of the SEPP Infrastructure.
The DA is considered a traffic generating development,
also
engaging s
2.122.
The DA is supported by a
Traffic and Environmental Noise Assessment , prepared by
Acoustic Noise and Vibration Solutions P/L , dated
14 November
2022
.
The DA was referred to
Transport for NSW , and the general terms of approval issued are considered in the
amendments to the
development and
described in the
conditions of consent.
State Environmental Planning Policy ( Biodiversity and Conservation ) 2021
(SEPP
Biodiversity ):
The site is located within the Sydney Harbour catchment, engaging Pt 6.2 of the SEPP Biodiversity.
The DA is supported by a Statement of Environmental Effects, prepared by GSA Planning, dated December 2022, and a letter on
stormwater management, prepared by Civil and Stormwater Engineering Services, dated 27 July 2023.
There is no assessed adverse environmental impact
to the catchment
resulting from the proposed development.
State Environmental Planning Policy (Resilience and Hazards) 2021 (SEPP Resilience):
Pursuant to Ch 4 of the SEPP Resilience, the contamination status of the site must be considered, prior to grant of consent. Based on the existing use of the site as residential and documents that support the DA, the Council has appropriately considered that the site is not contaminated, which together with the agreed conditions of consent to address any unexpected finds, satisfy the relevant requirements of s 4.6
of the SEPP Resilience
.
The DA is supported by a
Preliminary
Site Investigation, prepared by
GEC Geotechnical , dated
10 November 2023 .
State Environmental Planning Policy (Building Sustainability Index: BASIX) 2004:
A BASIX Certificate ( 1359008M_02 ), issued
on
25 August
2023
is relevant to the proposed development, as amended, and is identified in the conditions of consent.
Woollahra
Development Control Plan 20
15
(
W DCP):
The original DA was publicly notified in accordance with the
W DCP, with
eight
submissions received. The relevant requirements of the
W
DCP have been considered in Council’s merit assessment and are generally complied with, based on the amended
plans
and supporting documents to the amended DA, and as described in the agreed conditions of consent.
Pursuant to
s 23
of the EPA Reg, the application has satisfied the Court with the provision of consent from relevant landowner.
Grant of consent
Based on the amended plans and supporting documents to the DA, the parties explained to the Court that there are no jurisdictional impediments to the making of the agreement or for the Court in making the orders, as sought.
The Council has undertaken the appropriate merit assessment of the proposed development. The Court is advised that the issues raised in contention have been addressed by the amendments made to the application.
I am satisfied, based on the evidence before me, that there are no jurisdictional impediments to this agreement and that Development Application
DA592/2022
can be granted consent.
As the parties' decision is a decision that the Court could have made in the proper exercise of its functions, I am required under s 34(3) of the LEC Act to dispose of the proceedings in accordance with the parties' decision.
The Court notes that:
Woollahra
Municipal Council, as the relevant consent authority, has agreed,
under
section 38
of the Environmental Planning and Assessment Regulation 20
21 , to the Applicant amending Development Application
DA592/2022
as follows:
Tab
Document
Date
1.
Amended architectural plans prepared by CDA architects (Rev D)
Individually as dated below
Drawing No.
Title
Rev
Date
DA1001
Cover Sheet
D
16 August 2023
DA1002
Compliance Table
D
16 August 2023
DA1003
Unit Schedule
D
16 August 2023
DA1004
BASIX Commitment
B
16 August 2023
DA1005
Site Plan
D
16 August 2023
DA1007
Demolition Plan
D
16 August 2023
DA1102
Ground Floor Plan
D
16 August 2023
DA1103
Level 01 Floor Plan
D
16 August 2023
DA1104
Level 02 Floor Plan
D
16 August 2023
DA1105
Level 03 Floor Plan
D
16 August 2023
DA1106
Level 04 Floor Plan
D
16 August 2023
DA1107
Level 05 Floor Plan
D
16 August 2023
DA1108
Level 06 Plan
D
16 August 2023
DA1109
Roof Level Building C Floor Plan
D
16 August 2023
DA2001
Building Elevations
D
16 August 2023
DA2002
Building Elevations
D
16 August 2023
DA2011
Building A South Elevation
D
16 August 2023
DA2012
Building A West Elevation
D
16 August 2023
DA2013
Building A North Elevation
D
16 August 2023
DA2014
Building
A
East Elevation
D
16 August 2023
DA2021
Building B South Elevation
D
16 August 2023
DA2022
Building B West Elevation
C
28 July 2023
DA2023
Building B North Elevation
C
28 July 2023
DA2024
Building B East Elevation
D
16 August 2023
DA2031
Building C South Elevation
D
16 August 2023
DA2032
Building C West Elevation
D
16 August 2023
DA2033
Building C North Elevation
D
16 August 2023
DA2034
Building C East Elevation
C
28 July 2023
DA3001
Building Sections
D
16 August 2023
DA3002
Landscape Section
D
16 August 2023
DA3011
Building A Sub-Level Section
D
16 August 2023
DA3032
Ramp Section
C
28 July 2023
DA3101
Building Detail Section
C
28 July 2023
DA5001
Pre + Post Adaptable Unit Layout
D
16 August 2023
DA5002
Pre + Post Adaptable Unit Layout
C
28 July 2023
DA5003
Pre + Post Adaptable Unit Layout
C
28 July 2023
DA5004
Pre + Post Adaptable Unit Layout
B
28 July 2023
DA6001
Shadow Diagrams
D
16 August 2023
DA6021
Solar Study - 21 June 9.00am
D
16 August 2023
DA6022
Solar Study - 21 June 10.00am
D
16 August 2023
DA6023
Solar Study - 21 June 11.00am
D
16 August 2023
DA6024
Solar Study - 21 June 12.00pm
D
16 August 2023
DA6025
Solar Study - 21 June 1.00pm
D
16 August 2023
DA6026
Solar Study - 21 June 2.00pm
D
16 August 2023
DA6027
Solar Study - 21 June 3.00pm
D
16 August 2023
DA6028
Solar Study Table
D
16 August 2023
DA6031
COS Solar Study - 9.00am
B
28 July 2023
DA6032
COS Solar Study - 10.00am
B
28 July 2023
DA6033
COS Solar Study - 11.00am
B
28 July 2023
DA6041
Unit AG01 Solar Study
B
28 July 2023
DA6043
Unit A101 Solar Study
B
28 July 2023
DA6044
Unit A103 Solar Study
B
28 July 2023
DA6045
Unit A201 Solar Study
C
16 August 2023
DA6046
Unit A202 Solar Study
B
28 July 2023
DA6047
Unit A203 Solar Study
B
28 July 2023
DA6048
Unit A301 Solar Study
C
16 August 2023
DA6049
Unit A302 Solar Study
B
28 July 2023
DA6050
Unit A303 Solar Study
B
28 July 2023
DA6051
Unit A401 Solar Study
C
16 August 2023
DA6052
Unit A402 Solar Study
B
28 July 2023
DA6061
Unit B104 Solar Study
B
28 July 2023
DA6062
Unit B204 Solar Study
B
28 July 2023
DA6063
Unit B205 & 305 Solar Study
B
28 July 2023
DA6064
Unit B206 Solar Study
B
28 July 2023
DA6065
Unit B207 Solar Study
B
28 July 2023
DA6066
Unit B304 Solar Study
B
28 July 2023
DA6067
Unit B306 Solar Study
B
28 July 2023
DA6068
Unit B307 Solar Study
B
28 July 2023
DA6069
Unit B403 Solar Study
B
28 July 2023
DA6070
Unit B404 Solar Study
B
28 July 2023
DA6071
Unit B405 Solar Study
B
28 July 2023
DA6072
Unit B406 Solar Study
B
28 July 2023
DA6073
Unit B501 Solar Study
B
28 July 2023
DA6074
Unit B502 Solar Study
B
28 July 2023
DA6081
Unit C308 Solar Study
B
28 July 2023
DA6082
Unit C309 Solar Study
B
28 July 2023
DA6083
Unit C407 Solar Study
B
28 July 2023
DA66084
Unit C408 Solar Study
B
28 July 2023
DA6085
Unit C503 Solar Study
B
28 July 2023
DA6086
Unit C503 Solar Study
B
28 July 2023
DA7001
GFA Calculation
D
16 August 2023
DA7002
GFA Calculation
D
16 August 2023
DA7003
GFA Calculation
D
16 August 2023
DA7004
GFA Calculation
D
16 August 2023
DA7011
Solar Access Plan
D
16 August 2023
DA7021
Ventilation Diagrams
D
16 August 2023
DA7031
Streetscape 3D View
D
16 August 2023
DA7032
Streetscape 3D View
D
16 August 2023
DA7033
Streetscape 3D View
D
16 August 2023
DA7034
Rear 3D View
C
28 July 2023
DA7037
DSZ - ADG Calculation (7%)
C
28 July 2023
DA7039
DSZ - DCP Calculation
B
28 July 2023
DA7040
Communal Open Space Diagram
D
16 August 2023
DA7041
Finishes Schedule
D
16 August 2023
DA7051
LEP Height Blanket
D
16 August 2023
DA7052
LEP Height Blanket
D
16 August 2023
DA7053
LEP Height Blanket
D
16 August 2023
DA7054
LEP Height Blanket
D
16 August 2023
DA7061
Front Setback
A
16 December 2022
DA7062
Rear Setback
A
16 December 2022
DA7071
Cut & Fill Diagram - Sheet 1
D
16 August 2023
DA7072
Cut & Fill Diagram - Sheet 2
D
16 August 2023
DA7073
Cut & Fill Diagram - Sheet 3
D
16 August 2023
DA7074
Cut & Fill Diagram - Sheet 4
D
16 August 2023
DA7075
Cut & Fill Diagram - Sheet 5
D
16 August 2023
DA7076
Cut & Fill Diagram - Sheet 6
D
16 August 2023
DA7081
Privacy Diagrams
C
28 July 2023
DA7082
Wayfinding Diagram
C
16 August 2023
DA7091
Car Space & Condenser Layout
B
28 July 2023
2.
Landscape drawings prepared by Myles Baldwin Design (Rev D)
Individually as dated below
Drawing No.
Title
Rev
Date
697_DA_01
Cover Page
D
24 August 2023
697_DA_02
Plant Schedule
D
24 August 2023
697_DA_03
Softworks Zoning
D
24 August 2023
697_DA_04
Existing Tree Plan
D
24 August 2023
697_DA_05
Existing Tree Report
D
24 August 2023
697_DA_06
Tree Masterplan
D
24 August 2023
697_DA_10
Landscape Plan Ground Floor
D
24 August 2023
697_DA_11
Landscape Plan Level 01
D
24 August 2023
697_DA_11
Landscape Plan Level 01
D
24 August 2023
697_DA_12
Landscape Plan Level 02 A
D
24 August 2023
697_DA_13
Landscape Plan Level 02 B
D
24 August 2023
697_DA_14
Landscape Plan Level 03 A
D
24 August 2023
697_DA_15
Landscape Plan Level 03 B
D
24 August 2023
697_DA_16
Landscape Plan Level 04
D
24 August 2023
697_DA_17
Landscape Plan Level 05
D
24 August 2023
697_DA_18
Landscape Plan Level 06
D
24 August 2023
697_DA_45
Typical Details
D
24 August 2023
697_DA_70
General Specification
D
24 August 2023
3.
Landscape statement prepared by Myles Baldwin Design
28 August 2023
4.
Site analysis prepared by CDA architects (Rev D)
Individually as dated below
Drawing No.
Title
Rev
Date
DA1011
Site Analysis - Transport, Amenity & Network Analysis
A
16 December 2022
DA1012
Site Analysis Plan
B
28 July 2023
DA1013
Site Analysis – Built Form
B
28 July 2023
DA1014
Site Analysis – Isometric Views
C
28 July 2023
DA1014.1
Isometric Views
A
28 July 2023
DA1015
Residential Flat Building
A
16 December 2022
DA1016
Site Analysis -Opportunities & Constraints
A
16 December 2022
DA1017
Site Analysis - Existing Public Stairway Analysis
A
16 December 2022
DA1018
Site Analysis - Proposed Public Stairway Analysis
A
16 December 2022
5.
Structural drawings prepared by Capital Engineering Consulting
4 July 2023
Drawing No.
Title
Rev
Date
S0000
Cover Sheet
B
20 July 2023
S0101
Shoring And Bulk Excavation Plan
C
20 July 2023
S0105
Shoring Wall Elevations - Sheet 1
C
20 July 2023
S0106
Shoring Wall Elevations - Sheet 2
B
20 July 2023
S0110
Shoring Sections - Sheet 1
B
20 July 2023
S0111
Shoring Sections - Sheet 2
B
20 July 2023
S0120
Shoring Wall Details - Sheet 1
B
20 July 2023
6.
Stormwater concept plans prepared by C & S Engineering Services Pty Ltd (Rev C)
Individually as dated below
Drawing No.
Title
Rev
Date
000
Cover Sheet Plan
C
27 July 2023
101
Stormwater Concept Plan Basement Sub Level Sheet 1 of 2
G
23 August 2023
102
Stormwater Concept Plan Basement Sub Level Sheet 1 of 2
B
27 July 2023
103
Stormwater Concept Plan Ground Level
E
23 August 2023
104
Stormwater Concept Plan Level 1
E
23 August 2023
107
On-Site Detention Details and Calculation Sheet 1 Of 2
C
27 July 2023
107.1
On-Site Detention Details and Calculation Sheet 2 Of 2
B
27 July 2023
108
Catchment Plan and Music Results
B
27 July 2023
109
Sediment & Erosion Control Plan & Details
A
21 November 2022
110
Miscellaneous Details Sheet
B
27 July 2023
111
Upstream Catchment Plan Contours Mapping
C
23 August 2023
112
OSD Catchment Plan
And
Drains Results
A
27 July 2023
7.
Stormwater design statement prepared by C & S Engineering Services Pty Ltd
28 August 2023
8.
Stormwater drawing issue register prepared by C & S Engineering Services Pty Ltd
-
9.
Survey plan prepared by
Geometra
Consulting
21 September 2022
10.
Traffic letter prepared by CJP Consulting engineers
24 August 2023
11.
Traffic without prejudice letter prepared by CJP Consulting engineers
19 September 2023
12.
Response to council’s excavation comments prepared by GSA Planning
28 August 2023
13.
BASIX stamped amended architectural plans prepared by CDA architects (Rev D)
25 August 2023
14.
BASIX certificate (certificate no. 1359008M_02)
25 August 2023
15.
NatHERS
certificate no. 0008325440
25 August 2023
16.
Clause 4.6 Request – Floor Space Ratio (FSR) prepared by GSA Planning
September 2023
17.
Clause 4.6 Request – Height prepared by GSA Planning
September 2023
18.
Amended waste management plan prepared by Dickens Solutions Pty Ltd
June 2023
19.
Environmental response to statement of facts and contentions prepared by CEC Geotechnical
20 July 2023
20.
Preliminary site investigation report prepared by CEC Geotechnical
8 June 2023
21.
Shoring design report prepared by Capital Engineering Consultants
24 July 2023
22.
Letter prepared by AA Power Engineering in relation to substation location
1 August 2023
23.
Response to SOFAC - geotechnical report prepared by CEC Geotechnical (
the geotechnical response to SOFAC
) comprising:
2 August 2023
24.
Risk assessment description (
Appendix A of the geotechnical response to SOFAC
)
2 August 2023
25.
Shoring drawing and settlement calculation (
Appendix B of the geotechnical response to SOFAC
)
20 July 2023
26.
Hydrogeological assessment and dewatering management plan (
Appendix C of the geotechnical response to SOFAC
) comprising:
20 July 2023
(i) Geotechnical investigation report prepared by CEC Geotechnical (
Appendix A of the hydrogeological assessment and dewatering management plan
) comprising:
a. Site plan with borehole locations dated 11 November 2022 (Appendix A)
b. Borehole logs and DCP Test Results dated 11 November 2022 (Appendix B)
c. Point load test results dated 21 November 2022 (Appendix C)
d. Laboratory test results dated 15 November 2022 (Appendix D)
e. Site classification general information (Appendix E)
20 July 2023
(ii) Additional information for ground water level monitoring report (
Appendix B of the hydrogeological assessment and dewatering management plan
)
20 July 2023
(iii) Dewatering management plan (Appendix C of the hydrogeological assessment and dewatering management plan) comprising:
a. Site plan showing potential discharge point (stormwater pits) dated 20 July 2023 (Appendix A)
b. Laboratory test results dated 6 March 2023 (Appendix B)
c. WaterNSW
groundwater guidelines (Appendix C)
20 July 2023
27.
Arboricultural
assessment/tree root mapping report prepared by TALC
12 September 2023
28.
Arboricultural
impact assessment prepared by TALC
12 September 2023
29.
Owners consent letters
23 September 2022
20 September 2023
30.
Statement of compliance access for people with a disability prepared by Accessible Building Solutions
20 October 2023
31.
Response letter prepared by C & S Engineering Services
27 July 2023
32.
Design verification statement prepared by CDA Architects
28 November 2023
The Applicant has filed the amendments to the Development Application
DA592/2022
with the Court on
24 November
2023 and
29
November 2023
.
The Court orders that:
The appeal is upheld.
Development Application
DA592/2022 , which seeks the
demolition of existing structures, tree removal, and construction of a
residential flat building with basement car parking ,
landscaping
and a swimming pool
on
Strata Plan 11821, also known as 186-192 Old South Head Road, Bellevue Hill , is determined by the grant of consent, subject to the conditions in Annexure A.
The Applicant is to pay the Respondent’s costs thrown away pursuant to s 8.15(3) of the
Environmental Planning and Assessment Act 1979
in the agreed sum of $16,000 payable within 35 days from the date of the final orders.
Sarah Bish
Commissioner of the Court
23.78814 Annexure A
**********
DISCLAIMER - Every effort has been made to comply with suppression orders or statutory provisions prohibiting publication that may apply to this judgment or decision. The onus remains on any person using material in the judgment or decision to ensure that the intended use of that material does not breach any such order or provision. Further enquiries may be directed to the Registry of the Court or Tribunal in which it was generated.