"Automotive, Food, Metals, Engineering, Printing and Kindred Industries Union" known as the Australian Manufacturing Workers' Union (AMWU) v Opal Packaging Australia Pty Ltd T/A Opal Fibre Packaging [2024] FWC 1116
1
Fair Work Act 2009
s.739 - Application to deal with a dispute
"Automotive, Food, Metals, Engineering, Printing and Kindred Industries
Union" known as the Australian Manufacturing Workers' Union (AMWU)
v
Opal Packaging Australia Pty Ltd T/A Opal Fibre Packaging
(C2023/6934)
COMMISSIONER PERICA MELBOURNE, 30 APRIL 2024
Alleged dispute about any matters arising under the enterprise agreement and the NES
[1] On 13 November 2023, the “Automotive, Food, Metals, Engineering, Printing and
Kindred Industries Union” known as the Australian Manufacturing Workers’ Union (AMWU)
filed an application under s 739 of the Fair Work Act 2009 on behalf of its member, Mr. Alex
Tran (Tran).
[2] The application seeks the Commission to deal with a dispute over a decision by Tran’s
employer, Opal Packaging Australia Pty Ltd (Opal), to issue him a first and final warning for a
forklift incident which occurred on 29 August 2023 (the Incident). The dispute was brought to
the Commission as a step in the dispute settlement procedure in clause 16 of the Opal Fibre
Packaging National Enterprise Agreement 2022 (the Agreement).
[3] For the following reasons I have decided to resolve this dispute by answering the agreed
question as follows:
The final warning issued to Alex Tran was an appropriate disciplinary penalty consistent
with Appendix D.1(a) of the Agreement in all its terms, except the period of effect of
the warning should be reduced to nine months from the date of issue which expires on
Friday 31 May 2024. On that date, the final warning should be removed from his
personnel file provided he has performed his tasks on the forklift to the best of his ability
and in a safe manner up until that date.
Procedural History
[4] On 20 November 2023, a mention was conducted. Directions where subsequently issued
directing parties to attend a conciliation on 29 November 2023 and to file preliminary material
in the Commission.
[2024] FWC 1116 [Note: An appeal pursuant to s.604 (C2024/3220) was
lodged against this decision - refer to Full Bench decision dated 2 August
2024 [[2024] FWCFB 330] for result of appeal.]
DECISION
-- 1 of 25 --
[2024] FWC 1116
2
[5] The conciliation on 29 November 2023 was not successful. Further directions were
issued for the parties to file material in support of their respective cases.
[6] On 10 January 2024, the matter was listed for a mention to discuss the question for
arbitration. The question was subsequently agreed and is set out below. At the mention, the
parties were asked if they would consent to the dispute being resolved by way of
Recommendation. After consideration, Opal informed the Commission on 12 February 2024
that they would not accept this outcome.
[7] On 18 February 2024, following the filing of all material, the parties informed the
Commission that they consented to the matter being determined on the papers.
BACKGROUND
[8] Since September 2021, Tran has worked at the Brooklyn site of Opal. He is currently
employed as a Forklift Operator. The Site Manager of the Brooklyn site describes his
employment record as “impeccable”.
[9] On 29 August 2023, Tran was operating a forklift stacking pallets in an area known as
the “Heavy Duty Area” (HDA). Just before 9:00 AM, Tran struck the fire sprinkler line and
dragged it back with the forklift. The fire alarm was set off and water spread through the HDA.
This prompted the attendance of two fire trucks. Electrical repairs were required of the “main
machine” in the HDA, putting it out of action for a day. The machines in the other areas were
shut down for an hour and a clean-up was required for the water that had spread.
[10] On 31 August 2023, Opal issued Tran a first and final warning as a result of the Incident.
The dispute between Tran, the AMWU, and Opal is whether this is an appropriate disciplinary
penalty under the warning procedure in Appendix D of the Agreement.
THE QUESTION FOR DETERMINATION OF THIS DISPUTE
[11] The parties have agreed the question to be decided to resolve the dispute is:
“Was the final warning in the terms it was issued on 31 August 2023 to Alex Tran because
of his involvement in the forklift incident at Opal’s site in Brooklyn Victoria on 29th
August 2023 an appropriate disciplinary penalty consistent with Appendix D.1(a) of the
Agreement?”
JURISDICTION
[12] Clause 16 is the dispute settlement procedure in the Agreement. It confers a right to
arbitration in clause 16.2(f). The dispute is over the operation of the warning procedure in
Appendix D of the Agreement. It falls within the scope of the dispute settlement procedure
under clause 16.1(a). The jurisdiction of the Commission to arbitrate this matter is not
contested.
RELEVANT PROVISIONS OF THE AGREEMENT
-- 2 of 25 --
[2024] FWC 1116
3
Continuous Improvement under this Agreement
[13] Clause 1 of the Agreement contains a statement of its purpose:
“The main purpose of the Agreement is to ensure the ongoing commitment of the
management and employees of Opal, and the AMWU...to the principles of
Continuous Improvement (the principles of Continuous Improvement are stated
in Appendix A), high levels of productivity and operational excellence”.
[14] Appendix A sets out the six principles of continuous improvement. The six principles
are: ‘customer first’; constancy of purpose and leadership; focused involvement of people;
acting on facts and knowledge; emphasis on process and systems; and emphasis on continuous
improvement.
[15] Part of the commitment to “constancy of purpose and leadership” includes at A.2(f);
“being a coach, not a judge”. Part of the “emphasis on continuous improvement” includes at
A.6(a); “treating mistakes… as opportunities to learn and improve”.
The disciplinary procedure in the Agreement
[16] There is no dispute that the process requirements of the warning procedure in Appendix
D have been followed. Excluding the process requirements, the relevant parts of the Warning
Procedure in Appendix D of the Agreement are:
D.1 Policy
(a) It is the policy of Opal Fibre Packaging to adopt a constructive approach to
the discipline of all employees and to ensure they receive fair and just
treatment.
(b) The parties to this Agreement have committed to developing supplementary
guidelines relating to investigations conducted under this Agreement.
…
D.3 Records/documentation
(a) A written record of interview is to be completed at each stage of the
procedure and a copy placed on the employee's personal file.
(b) All counselling/warnings sessions are to be confirmed in writing (within
twenty-four hours) with the employee, including details of the corrective
action required and the understanding reached by both parties. Form DP 1 is
provided for this purpose.
(c) The employee is to be requested to sign all records of interview to
acknowledge the accuracy of the documentation. In the event that the
employee refuses to sign the document then a note to that effect should be
placed on the record.
-- 3 of 25 --
[2024] FWC 1116
4
(d) Disciplinary records shall cease to have effect for disciplinary action
purposes twelve months from the date of issue and shall be removed from
the employee’s personnel file and archived.
D.4 Procedure
General
(i) Disciplinary action may be taken at any one of the following steps, based
on any record of disciplinary action (in accordance with this Agreement)
during the previous twelve months and/or the severity of the
unacceptable performance and/or behaviour.
(ii) When a manager or supervisor is going to have discussions with an
employee as outlined in the warning procedure at Appendix D of this
Agreement, the manager/supervisor shall do the following prior to any
meeting taking place:
(A) advise the relevant employee concerned that they will be
required to attend a meeting in the office: and
(B) the purpose of this meeting: and
(C) the right to Union representation.
(iii) Immediately after notifying the employee as outlined above, the
manager/supervisor will personally notify the Union delegate.
(iv) In all of the steps as follows the manager /supervisor will notify the
employee concerned of the issues /allegations within 2 working days of
becoming aware of the matter, so as to ensure that there is no
unreasonable delay in dealing with the problem.
(v) At the request of the employee, a delegate shall be given full disclosure
of all information and all details that will ensure all aspects of any
warning or disciplinary action is conducted in a fair and transparent
process, following the principles of natural justice.
…
Step 3: Final Warning
(a) If the performance and/or behaviour of the employee remains unsatisfactory
or is repeated, a Final Warning should be issued. The manager/supervisor
should:
(i) Warn the employee by stating all the issues/allegations which
have led to the Final Written Warning, which must include the
first written warning and counselling.
-- 4 of 25 --
[2024] FWC 1116
5
(ii) Provide an opportunity for the employee to respond to the
issues/allegations.
(iii) Fully investigate and give consideration to any matters raised by
the employee.
(b) If a final written warning is to be issued (Form DP 3), the manager/supervisor
should advise the employee in writing of:
(i) All the required corrective action and a review date that would
reasonably allow the person to improve their performance to the
required standard.
(ii) Warning that failure to improve will result in dismissal.
(c) The manager/supervisor should complete all required documentation as per
clause D.3 of this Appendix (Records/Documentation), including
confirmation in writing to the Departmental Manager or his/her nominated
representative of a record of the circumstances, time, and date of the Written
Warning.
SUBMISSIONS AND EVIDENCE OF THE AMWU
AMWU Submissions
[17] The argument of the AMWU is straightforward. The terms of Appendix D. states: “it is
the policy of Opal to adopt a constructive approach to the discipline of all employees and to
ensure they receive fair and just treatment.” The issue of a first and final warning to Tran was
neither constructive, nor fair and just, because Opal “failed to give appropriate weight and
consideration to the mitigating factors surrounding the Incident.1
[18] The mitigating factors identified by the AMWU which it says Opal did not adequately
take into account were:
• The area of the incident was not Tran’s usual place of work.
• The area of the incident had a lowered height.
• The stacker height within the area was too high.
• The lighting and visibility in the area was poor.
• The area of the factory has previously had multiple incidents of the same
nature.
[19] The AMWU also makes submissions on the nature of the Commission’s powers to
answer the question at issue here. It asserts “the Agreement does not mandate or provide any
definitive guidance or discretion about what should have been the appropriate response to
Tran’s actions.” It relies on a passage of decision of Gregory C in CFMEU v. MSS Strategic
Medical and Rescue2 which supports exercising the power to decide matters on “equity, good
conscience and the merits” under s 578(b) to answer the question:
-- 5 of 25 --
[2024] FWC 1116
6
“In summary, I am satisfied there is nothing in the Agreement, or in MSS’s internal
disciplinary procedures, that mandates or provides definitive guidance or discretion
about what should have been the appropriate response to Leighton’s actions. Therefore,
in reviewing those circumstances the Commission is essentially being asked to exercise
its discretion based on its broad powers to deal with matters having regard to “equity,
good conscience and the merits of the matter.”
AMWU Evidence
[20] The evidence filed by the AMWU consisted of two statements of Mr. Alex Tran (Tran),
dated 23 January 2023 and 14 February 2024, and two statements of the AMWU delegate at
the Brooklyn site of Opal, Mr. Hassan Yassine (Yassine), dated 18 January 2024 (the January
Yassine Statement) and 16 February 2024 (the February Yassine statement).
First Tran Statement
[21] In his first statement, Tran asserts he had “never been directed to work outside the Main
Warehouse”3 (rather than the HDA). On the day of the Incident, he was asked to put pallets in
the HDA because there was no room in the Main Warehouse.4 He states: “this was the first time
in my employment at Opal that I was required to operate a Forklift in the HDA” and that he
“had never been inducted to work” there.5
[22] He then gives the following account of the Incident.
[23] On the day of the Incident, he entered the HDA on the forklift and he “immediately
noticed that the lighting was significantly poor in this area, especially when compared to the
Main Warehouse. The HDA was very dark and made it very hard to visualise certain objects in
the short distance. Due to the lighting, [he] couldn’t see any water pipes in the path of the
forklift.”6
[24] The water pipes in the HDA are roughly 3.5 meters high, which he says “is a significant
difference to the Main Warehouse which are roughly 10 metres high. He adds there were “no
warning signs in the HDA that warned me of this difference in height. The HDA has a
significantly lowered height due to the roof/mezzanine floor above. The stacking height [of
the palettes] was also very high and unusual especially in an area such as the HDA.” As he
endeavoured to stack a palette, he “struck a water pipe causing it to burst.”
[25] He also comments on the final warning given to him: “I believe, due to the mitigating
factors I have presented and Opal’s inaction to deter future incidents, that a final warning is
harsh and unfair.”
Supplementary Tran statement
[26] Tran provided a supplementary statement dated 14 February 2024 which is responsive
to the Statement of Jose Lercara (Lercara) the site manager. Tran reaffirms the stacker height
impacted his ability to visualise objects. He contends that proposition is supported because it is
listed as a contributing factor in the Incident report. He concedes he hit the sprinkler pipe by an
-- 6 of 25 --
[2024] FWC 1116
7
incorrect maneuver, but this was contributed to by the environmental factors of the HDA he
had stated earlier: poor visibility, stacker height and the HDA was not his usual workplace.
Evidence of Hassan Yassine
[27] The AMWU filed two statements of Mr. Hassan Yassine, an employee at Opal’s
Brooklyn site, who is also the AMWU delegate and an OHS representative. One is dated 18
January 2024, the other 16 February 2023. Both statements cover the same facts. The February
statement can be regarded as an amendment of the January one. The general effect of the
February statement is to qualify or limit some of the statements of fact made in the January
Statement.7
The February Yassine Statement8
[28] I set out the key statements of fact made by Yassine in his February Statement here.
[29] According to Yassine, “the HDA at the Brooklyn site has been subject to two forklift
incidents in the past where the fire water pipe has been struck and has caused significant damage
and flooding. The lowered roof has been hit and this is visible in area.”
[30] He gives particulars of the one such incident as follows:
“The last, occurred in either 2018 or 2019 and was on a Saturday. The employee in
question was Scott Gordon who was operating a forklift during his shift and was required
to perform work in the HDA. Gordon struck the fire system pipe and caused mass
flooding and the fire brigade had to attend the site. Gordon did not get any warning for
this incident.”9
[31] Yassine states: “The lowered roof in the HDA is damaged and is a very clear sign that
a forklift has collided with the roof approximately 5 metres away from where Alex Tran’s
incident happened.” He also states: “This area where the incident occur is mainly used for
storage of bottom sheet and binders, the whole area has a lowered roof due to the office being
located above it.”10
[32] Yassine also makes statements concerning remedial action that he alleges Opal has
taken as a result of the Incident:
“Opal have recently implemented measures in the HDA. The implementations have
occurred after the current dispute in the FWC was lodged. When the incident occurred
back in 2019, there was recommendation made to prevent these types of incidents, but
nothing was done in this regard. Recently they have painted poles, added warning signs,
and fixed/added more lighting. The pole where the incident happened is painted in bright
visible yellow all the way to the top approximately 400mm away from the fire system
pipe, which means that things can be stored up to the yellow paint.”11
SUBMISSIONS AND EVIDENCE OF OPAL
Opal Submissions
-- 7 of 25 --
[2024] FWC 1116
8
[33] It is not contested Tran had no prior disciplinary or safety breach record.
Training of Tran
[34] Opal makes the following submissions in relation to the competence and training of
Tran as a forklift driver. Tran was licensed to operate a forklift and had undergone all the
training necessary for him to operate a forklift safely and competently in any area on the site.
There was no requirement for him to be specifically inducted to drive a forklift in the HDA.12
[35] In September 2022, Tran was assessed as competent in the Safe Operating Procedures
(SOP) relevant to his work area, Baler and Shredder Operations. The Baler and Shredder SOPs
include the SOP “Forklift Operating Procedure”. The “Travelling & Traffic Procedure” Item
12, which is part of the SOP, states that forklift drivers should be aware of overhead objects
such as rails and electrical wires13 and that drivers should report any safety hazards to their
supervisor.
The Incident itself
[36] The submission of fact relied on by Opal are set out below.
“Tran was stacking top sheet board in the storage area when he went to take the top part
of stacks out but had lifted the mast of the forklift up “too high.” When he reversed out,
he hit the fire sprinkler pipeline and dragged it back with the forklift causing it to break
and pump water all over the site. This set off the fire alarm system and automatically
triggered two fire trucks to the site. The fire sprinkler system suffered significant damage
and the sprinkler system was out of use for multiple hours until repaired. Along with the
general clean up and repair there was damage to product at a cost of approximately
$70,000 was incurred.”
Opal on the mitigating circumstances and their consequences
[37] Opal disputes some of the mitigating circumstances which Tran and the AMWU rely on
in this dispute:
• There is no necessity for specific induction in this area, but it was noted it was “a
non-standard work area.”14
• The lighting and visibility are not so poor as to be a mitigating factor. Opal argues “it
is clear from photographs filed in the proceeding that the lighting is sufficient:15 It is
not a problem that has been raised before and again, arguably, if there was any
concern it should have and could have been reported”.16
• The fact that the roof in the area may be lower is of no relevance The height of the
top pallet was at the upper limit of the allowed storage/stack height which is marked
on top of the poles alongside in yellow. Tran reversed out without due note of the
height of his mast and then collected the sprinkler line. Tran’s statement that he was
not able to visualise objects in front of him or as he says, “in the path of the forklift”.
Should be disregarded as “the accident occurred when he was reversing and the SOP
says, has to be aware of overhead objects such as rails and electrical wires17.”
-- 8 of 25 --
[2024] FWC 1116
9
[38] Opal submits it did accept some of the mitigating circumstances in its assessment of the
Incident, such as Tran: 18
• accepted responsibility for his actions;
• was not working in his normal area;
• was not affected by drugs or alcohol; and
• had an otherwise good employment history.
[39] Opal considers these mitigating circumstances “do not displace or detract from what
was regarded as the fundamental cause of the incident, the use of equipment in an inappropriate
manner and the incorrect placement of equipment and objects”.
Opal on why the final written warning was appropriate
[40] Opal submits a final written warning was the appropriate outcome because of the
seriousness of the incident. According to Opal, “the incident created a serious risk to the safety
of Tran and others at the site. It is fortunate, for example, that the fire sprinkler pipe was not
electrical wires as referred to in Item 12 of the SOP”.
[41] Opal also argues Tran’s reversing the forklift with the mast too high and without proper
care of his surroundings caused significant property damage. The cost was approximately
$70,000. Tran caused the plant to be unproductive for 2 hours and one of the main machines to
be unproductive for 24 hours while the damage he caused was repaired and the plant assessed
for safety to resume operations.
Managerial Prerogative19
[42] Opal argues the severity of its disciplinary response to the Incident should be regarded
as an exercise in managerial prerogative. According to Opal, the disciplinary penalty applied
by the Respondent was contemplated by the Agreement and should be an important
consideration in terms of any discretionary decision to be made by the Commission.
The final warning decision was an exercise of managerial prerogative by Opal
[43] Opal relies on venerable authority such as the XPT case20 and Re Cram21 for various
propositions in relation to the management prerogative in matters of discipline, such as:
• an employer’s right to conduct and manage its business, as it sees fit, and without
external interference is not disputed. It is a well-known and long held principle,
stemming from such seminal cases as the “XPT case and RE Cram; Ex parte NSW
Colliery Proprietors Association Ltd (1987) 163 CLR 117.”
• the proper test to be applied …is for the Commission to examine all the facts and not
to interfere with the right of an employer to manage his own business unless he is
seeking from the employees something which is unjust and unreasonable.”
-- 9 of 25 --
[2024] FWC 1116
10
• …An exercise of managerial prerogative will not be unreasonable in this sense if a
reasonable person in the position of the employer could have made the decision in
question.”
[44] Opal also argued issuing of a final warning in these circumstances:
• is not unjust and unreasonable;
• is a decision a reasonable person could easily have made;
• is a fair and just outcome; and
• giving a disciplinary record an effective life of 12 months is a matter negotiated and
agreed by the parties in the Agreement.
Submissions on the differences between the two Yassine statements
[45] After the February Yassine Statement was filed, Opal filed further submissions which
pointed out the differences between that Statement and his earlier one and that given the
differences, the Commission should disregard submissions made by the AMWU which relied
on assertions in the earlier Statement.22
Opal Evidence
Lercara Statement
[46] Lercara is the Site Manager at the Brooklyn site, a position he has held for over two
years. He has worked in the paper and manufacturing industry for 42 years and holds a current
forklift truck operation licence.
Tran's training, qualifications and employment history and response to his Statement
[47] In his statement, Lercara gives evidence of the employment history of Tran with Opal.
He states that Tran had a “impeccable employment record” other than the incident.23
[48] According to Lercara, when Tran commenced his employment with Opal, he undertook
the standard Brooklyn site induction. This included training and assessment in the Safe
Operating Procedures (SOPs) relevant to his work area, Baler and Shredder Operations. The
Baler and Shredder SOPs include the SOP "Forklift Operating Procedures". The Forklift
Operating Procedures SOP and Tran's competency assessment were attached to his Statement.24
[49] Lercara responded to Tran’s claims that “the HDA was not his usual standard
workplace”. He states: “Alex has operated a forklift in the HDA in the past. He has delivered
and collected materials to and from the area on a number of occasions.”25
[50] In response to the claim that there is no such thing as specific induction for the HDA,
Lercara states: “The site induction covers all areas in which an employee may work. As the
holder of a forklift licence, Alex is expected to assess unfamiliar environments to ensure he can
safely operate a forklift. The Site's forklift SOP includes a requirement to “be aware of overhead
objects such as rails and electrical wires”.”26
-- 10 of 25 --
[2024] FWC 1116
11
[51] In response to Tran’s statement that one of the reasons for the incident was poor lighting
in the HDA, Lercara replies that Tran should not have operated the forklift and instead reported
the hazard to his supervisor. Lercara posits an alternative theory to poor lighting; he states:
“Alex didn't see the fire sprinkler pipe in the path of the forklift because he didn't check
carefully enough before reversing, not because the lighting or visibility was inadequate.”27
[52] In response to Tran’s statement in relation to the lower height of the water pipes
compared to the Main Warehouse, Lercara says: “The height of fire sprinkler pipe is adequate
for the safe operation of a forklift. The fire sprinkler pipe is painted red and is clearly visible.
It was Alex's responsibility to check for hazards before reversing the forklift and he didn't do
so.” Lercara also noted “the maximum lifting height was clearly marked in yellow paint on all
of the poles around the area where the incident occurred”.28
[53] Lercara gives the reason Tran struck the fire sprinkler pipe is “because he didn't operate
the forklift safely as required by his forklift licence and the Site's forklift SOP, not because the
area was unsafe for him to operate a forklift. Specifically, he: used an incorrect lifting technique
by lifting the top pallet from the stack instead of the second pallet; and didn't check the location
of the fire sprinkler pipe or that the mast was under the maximum lifting height before reversing
the forklift”.29
Involvement with the Incident30
[54] Lercara was present on the day of the incident. He gives an account of it in his Statement.
On the day of the Incident, he was working in his office at 8:45 AM. He heard sirens and noise
coming from the factory. He did not see the Incident but instead saw “the aftermath”. He
explains: “I saw the fire sprinkler pipe was broken and partly dislodged from the bolts holding
it to the roof. Water was pouring out of the pipe and was flooding the factory floor. The forklift
was parked near where it had hit the pipe. He went to check on Tran who had got off the forklift.
Lercara sent Tran home on pay for the rest of the day. He provided Tran with a dry change of
clothes. Tran’s own clothes were soaked with water from the burst fire sprinkler pipe. Tran
drove himself home. Lercara then took three photos and a video of the scene. The photos were
filed and are in the Digital Court Book31 and the Commission viewed the video on 29 November
2023.
The consequence of the Incident
[55] According to Lercara, the Incident caused a significant safety risk. “The fire sprinkler
pipe that Alex hit with his forklift is made of thick steel and is very heavy. It would have taken
significant force from the forklift for it to have been dislodged. It landed quite close to a
pedestrian walkway. It could have seriously injured or killed someone.”32
[56] Lercara also states: “The Incident severely restricted the Site's productivity for the rest
of the day. Our main machine was shut down for the entire day. The other four machines at the
Site were shut down for around an hour. This meant that we couldn't complete a number of
customer orders that had been scheduled for the day.”33
[57] Finally, Lercara estimates the Incident cost Opal approximately $70,000, including:
-- 11 of 25 --
[2024] FWC 1116
12
• the fire brigade's costs for attending the Site.
• Wormald's costs for repairing the fire sprinkler pipe.
• the cost of labour for the removal of water from the factory, electrical, repairs and
rectifying the main machine.
• loss of the opportunity for the five machines to generate approximately $27,000 worth
of products.34
Site Safety and the HDA
[58] Lercara reports: “In the last 12 months, there have been no lost time injuries and no
medical treatment injuries at the Brooklyn site. Before the date of the Incident, none of the HSE
Committee members raised any safety concerns about lifting heights, lighting, or visibility in
the HDA. None of the HSRs has exercised their powers under the OHS Act in relation to lifting
heights, lighting, or visibility in the HDA.”
[59] Lercara also makes submissions about the safety of the HDA. He states: “The HDA is
safe for the operation of forklifts. In the location where the Incident occurred: the area is well
lit, there is ample room for a forklift to operate safely; the lifting height limit is marked in bright
yellow paint on all poles and is clearly visible; and the fire sprinkler hose is painted red and is
clearly visible.” He claims: “This is established by the photos in the Report and my photos and
video of the Incident.”35
The Incident report
[60] Lercara was not involved in the preparation of the Incident Report. Lercara asserts the
list of factors under the heading “other contributing factors” in the report did not cause the
Incident. He understood the other contributing factors in the Report are “areas of potential
improvements in safety in the area where the incident occurred and do not signify that the area
was or is unsafe”.36
Earlier incidents and damage to the roof in the HDA
[61] Lercara states since Opal acquired the business, other than the Incident, there have been
no instances of forklifts colliding with water pipes causing significant damage and flooding at
the Brooklyn site. He also affirms that he is “broadly aware of the 2018 or 2019 involving Scott
Gordon” referred in the February Statement of Yassine. He was not involved in the Gordon
Incident. The Gordon Incident occurred before Opal acquired the business and before Lercara
became Site Manager.37
[62] In response to the Yassine Statement, Lercara refutes the claim there is damage to the
roof of the factory which contributed to the Incident. He responds to Yassine that “it is not true
that forklifts often collide with structures in the factory. A forklift collision is a serious matter.
Employees are under strict instructions to report any safety incidents involving mobile powered
plant.” He states he has “not received any reports of forklift collisions other than the Incident
from anyone at the Site, including HSRs”.
The decision to issue a first and final warning
-- 12 of 25 --
[2024] FWC 1116
13
[63] Lercara also made statements concerning the process he went through in deciding the
disciplinary step he would take as a result of Tran’s involvement in the Incident.38 He states:
“I considered all of the available relevant information including my direct observations
of the aftermath of the Incident, the Report and the information Alex and his
representative provided during the disciplinary procedure. I decided that a final written
warning was the appropriate outcome. …
In coming to this decision, I took into account the following mitigating factors:
• The "other contributing factors" referred to on page 6 of the incident report [namely
“area layout and height stack to be reviewed, it was the operators non -standard work
area, sprinkler line visibility is not good due to the height even though sprinkler line
is painted in red, area lighting to be reviewed, area has previously had multiple
incidents of the same nature”].
• the incident was an accident, not deliberate.
• Alex immediately took responsibility for the incident.
• Alex's negative drug and alcohol test result after the incident;
• Alex's otherwise impeccable employment record.
I balanced the mitigating factors against, the seriousness of the safety risk Alex created;,
the fact that Alex operated the forklift negligently and in a way that was contrary to his
obligations under his forklift licence and the Site's forklift SOP; the property damage
and loss of productivity and the resulting cost to the business and the need to reinforce
the message that safety is the most important priority at the site and across the
Respondent's entire business.
In recognition of the mitigating factors, I also worded the final warning quite mildly.
The warning only requires Alex to "...perform your tasks on the forklift to the best of
your ability in a safe manner”.”
Massey Statement
[64] Mr. Lyle Massey (Massey) has held the position of Production Manager at Opal since
September 2022. Massey was the investigation lead for the safety investigation into the
Incident. The investigation team for the Incident included two Health and Safety
Representatives (HSRs) and the Maintenance Manager of Opal.39
Summary of Incident Report
[65] On 30 August 2023, Massey issued a report on the safety investigation. He provided a
copy to Lercara on that date. In his statement, he summarises the findings in the report.
[66] He states: “There were two individual behavioural causes to the incident which were
“incorrect placement of equipment or objects”; and “using equipment in an inappropriate
manner”.40
-- 13 of 25 --
[2024] FWC 1116
14
[67] The “individual behavioural causes” were attributable to the actions and failures of the
forklift operator, Tran. He states Tran “caused the incident when he moved a pallet from a stack
using an incorrect and unsafe method. He lifted the top pallet from a stack and in doing so,
raised the mast of the forklift above the lifting height limit marked in yellow paint on the poles
in the HDA. Alex didn’t properly check around him for hazards before reversing the forklift
with the mast raised too high. As a result, he struck the fire sprinkler hose, causing the hose to
burst and partially dislodge from the roof.”41
[68] Massey also explained “The pipe that he damaged was a fire sprinkler pipe as opposed
to a pipe that carries water. The fire sprinkler system is a safety system which, if damaged, will
cause the site to shut down until the issue is rectified and trigger an automatic call to the fire
brigade. In the risk analysis the risk level of the incident was rated as “high”, with the
consequences rated as “serious” and the likelihood rated as “possible”.42
[69] Massey also states:43
“Any causes of the incident related to unsafe conditions in the incident location, such as
poor lighting or visibility, or inadequate height limits for stacking or lifting, would have
been identified as “system or procedure causes” under the heading “Investigation
Summary”. The summary includes a list under the heading “Other contributing factors”,
as follows:
• Area layout and height stacking to be reviewed, potentially needs to be lowered 0.5
meters more in this specific area to mitigate the risk of re-occurrence.
• This was the operators non-standard work area.
• Sprinkler line visibility is not good due to the height, even though sprinkler line is
painted red.
• Area lighting to be reviewed.
• Area has previously hand multiple incidents of the same nature due to lowered height
of the roof/mezzanine floor above.”
[70] The “other contributing factors” are not causes of the Incident or a concession that the
area is unsafe. They are recommendations for potential safety improvements that could be made
in light of the Incident. The “other contributing factors” list was developed by the Investigation
Team, which included both HSRs and Site management representatives.44
[71] In relation to the prior incidents referred to in both Yassine statements, Massey states
he was “not aware of the details of either incident” and noted the Incident was added to the
Report for completeness and transparency.
[72] The recommendations in the “other contributing factors” section of the Report were first
discussed in the Site’s Health, Safety and Environment Committee meeting on 3 October 2023.
There was consensus that the recommendations were sensible and appropriate. No one on the
HSE Committee objected to the recommendations or raised any concerns about the adequacy
of the lighting, visibility, or height limits in the HDA.45
Conditions and safety at the site
-- 14 of 25 --
[2024] FWC 1116
15
[73] Massey also sought to contextualise the Incident relative to the focus on safety at the
Brooklyn site; “Mobile powered plant, including forklifts, is at the forefront of the site’s safety
agenda. Any safety incidents involving mobile powered plant are treated seriously and result in
drug and alcohol testing of the employee(s) involved and a full safety investigation.” Massey
asserts: “the condition of the roof of the HDA is completely irrelevant to the Incident. It did not
contribute to the incident in any way.”
[74] During Massey’s employment with Opal, and since Opal acquired the business, it is not
the case that “forklifts often collide with structures in this area”. Any such incidents would be
notified to Massey and would be investigated. He has not been notified of or investigated any
forklift collisions other than the Incident.
[75] Massey also makes the following statements:46
“The HDA is safe for the operation of forklifts. None of the Site’s HSR representatives
have raised any safety concerns or taken any action in relation to the lighting, visibility,
or height limits in the HDA, such as issuing a provisional improvement notice under the
Occupational Health and Safety Act 2004 (Vic) Before the incident, no one on the HSE
Committee identified any concerns about lighting, visibility, or height limits”.
…
In my regular factory walkarounds, I have observed that the lighting, visibility, and
height limits are all adequate for the safe operation of forklifts in the HDA. There is no
requirement under the OHS Act for warning signs in relation to lighting, visibility, or
height limits. At the time of the incident, the height limit was marked in bright yellow
paint on the poles in the Heavy-Duty Area Alex was aware of what the yellow paint
meant”.
[76] Massey also confirms Opal has implemented improved safety measures in response to
the lessons learned from the Incident, not in response to the dispute proceedings.
PRINCIPLES OF INTERPRETATION OF THE AGREEMENT
[77] The principles of construction for enterprise agreements are well known. I will not
rehearse them here. I adopt the summary of the principles expressed by the Full Court of the
Federal Court in Workpac v. Skene.47
[78] The gravamen of the principles are words in an enterprise agreement are to be given
their ordinary meaning, read as a whole and in context. A purposive, rather than pedantic or
narrow, approach to interpretation is appropriate. The language of a particular agreement is to
be understood in light of its industrial purpose and context.
THE DISCIPLINARY REGIME IN THE AGREEMENT
[79] The “main purpose” of the Agreement is to ensure ongoing commitment to the
principles of continuous improvement as articulated in the Agreement. The agreed elements of
continuous improvement include “treating mistakes as opportunities to learn and improve” and
“being a coach, not a judge”. The express designation of the main purpose of the Agreement as
-- 15 of 25 --
[2024] FWC 1116
16
a commitment to those principles must colour the interpretation of the rest of the Agreement,
including the disciplinary procedure.
[80] Opal has committed to adopting a “constructive approach” to the discipline of
employees and to ensure they receive fair and just treatment. I take the commitment to a
constructive approach to have its plain meaning which is to be helpful or positive.
[81] A warning procedure is designed to punish but also to teach. A warning can act as an
opportunity for the disciplined employee to learn from their mistakes and to modify the
behaviour for which they were warned.
[82] Opal’s express commitment to both a constructive approach to discipline and also to
continuous improvement must colour the interpretation given to the words of the warning
procedure. In this context, the role of a warning within the procedure should be seen as punitive
but also educative. The process of continuous improvement requires a commitment from
management that mistakes (including mistakes serious enough to lead to a warning) are seen as
opportunities to learn and improve.
[83] This is reinforced by the terms of the procedure itself. In Step 3, which is the final
warning procedure, the manager “should” advise the employee of all corrective action and a
review date that would reasonably allow the person to improve their performance to the required
standard and that “failure to improve will result in dismissal”.
[84] The role of a warning under the Agreement is firstly an opportunity to correct errant
behaviour as well as to punish. A final warning is a last chance opportunity to correct the
behaviour which is the subject of the warning.
[85] The requirement in Appendix D.3(d) under the heading “Records/documentation” that
“disciplinary records cease to have effect for disciplinary action purposes twelve months from
the date of issue and shall be removed… and archived” is obviously designed to prevent the
existence of ‘zombie’ warnings or verbal counselling. Without such a provision, an ancient
warning or verbal counselling could be revived years later in a disciplinary procedure against
an employee.
[86] I interpret the words of Appendix D.3(d) as a mandatory obligation on the employer that
the disciplinary action be removed from the employee’s personnel file after the expiration of
twelve months. D.3(d) does not mandate that a warning must be kept on the personnel file for
twelve months. The effect of the plain words is to denude the disciplinary action of effect after
twelve months. The twelve-month time period acts as a maximum length for a disciplinary
action to have effect.
CONSIDERATION OF THE INCIDENT AND THE MITIGATING
CIRCUMSTANCES
The Incident itself
[87] A helpful narrative of the cause of the Incident is contained in the “any additional details
or comments” section of the Incident report which reads: 48
-- 16 of 25 --
[2024] FWC 1116
17
“The height of the top pallet was the upper limit of the allowed storage/stack hight which
is marked on the poles in yellow. Therefore, when the operator raised the mast of the
forklift to take the top pallet off that was on top of 2 full pallets of board the forklift mast
had exceeded the allowed storage/stack hight significantly. When reversing out operator
was unaware of the height of his mast and then collected the sprinkler lines”
Operator error and the cause of the Incident
[88] Lercara gives the reason for the Incident as “Tran did not operate the forklift safety as
required by his forklift licence and the ...forklift standard operating procedure. He used an
incorrect lifting technique by lifting the top pallet from the stack instead of the second pallet
and did not check the location of the fire sprinkler pipe or that the forklift mast was under the
maximum lifting hight before reversing the forklift.”49
[89] Massey states the individual behavioural causes of the Incident were attributable to
Tran. Tran caused the Incident when he moved a pallet from a stack using “an incorrect and
unsafe method…and he did not check properly around him for hazards before reversing the
forklift with the mast raised to high”.
[90] Tran, in his supplementary statement, concedes: “I did strike the fire sprinkler pipe
because of an incorrect manoeuvre of the forklift however it was contributed to by other
factors which are contained in the incident report” (emphasis added). I take that as a
concession that he was at fault subject to the impact of the “contributing factors”.
Significant damage
[91] The “incorrect manoeuvre” had serious consequences (none of which were contested).
Opal incurred a cost of $70,000 which included remedial repairs, shutdown of the four
machines outside the HDA for an hour, the main machine shut down for a day and the
consequent failure to complete a number of scheduled customer orders.
[92] The concession by Tran that he had “incorrectly manoeuvred” the forklift, which
caused his employer to incur seventy thousand dollars in costs and lost production, is a
weighty consideration in an assessment of the appropriate disciplinary step to be applied to
the conduct.
Tran’s training to work in the HDA and experience working there
[93] Tran gives as a mitigating circumstance that he never operated a forklift in the HDA
and that he was not inducted in the area.
[94] Lercara states Tran was inducted to the site which included training and a competency
assessment relevant to his work area. The competency assessment on induction assessed his
familiarity with the site’s forklift Standard Operating Procedures which included a
requirement to “be aware of overhead objects such as rails and electrical wires”. He states:
“there is no such thing as specific induction for the HDA”.
-- 17 of 25 --
[2024] FWC 1116
18
[95] On the question of Tran’s familiarity or otherwise with the HDA, Lercara stated that
he had “operated a forklift in the HDA in the past and collected materials to and from the area
on a number of occasions”. Tran concedes he worked in HDA but refutes he had operated a
forklift in this area.
[96] An argument that an employee must be inducted to work in every workspace on a site
is not persuasive. I find that Tran was adequately trained to work in the area and had breached
the Standard Operating Procedure for the operation of a forklift in the Incident. On the
question of Tran’s experience in the HDA, there is a contest on the evidence. I find that he did
not normally work in the area and was not familiar with driving a forklift in the HDA as a
result.
Light in the HDA
[97] The AMWU claims the light in the area was inadequate and was a contributing factor
to the Incident. Tran says the area was “very dark” and was “significantly poor”. Lercara says
the HDA is well lit, and this is established by the Incident report and his photos and video.
Massey observes from his “regular walk arounds the lighting is adequate”.
[98] After reviewing the photographs and video taken by Lercara, I cannot make an
adequate assessment of the lighting in the HDA. There is a direct conflict in the evidence
before me on the adequacy of the lighting which I cannot resolve in an arbitration determined
on the papers.
[99] In light of Tran’s concession on the “incorrect manoeuvre”, there is persuasive force in
the evidence of Lercara that “Alex didn’t see the fire sprinkler pipe because he did not check
carefully enough before reversing, not because lighting and visibility was inadequate”.
Lower ceiling and higher stacking height in the HDA
[100] The AMWU and its witnesses rely on a mitigating circumstance that “the area of the
Incident had lowered height”.
[101] Tran in his evidence says that the fire sprinkler pipe was 3.5 metres high, which is
significantly different from the main warehouse where he normally works that has a height of
10 metres. He also noted that the “stacking height is very high and unusual.” Lercara and
Massey both stated the height of the sprinkler pipe and the height limits in the HDA are
adequate for the safe operation of the forklift.
[102] The lower ceiling height and the higher stacker height in the HDA compared to the
main warehouse, where he normally worked, could have contributed to the Incident in so far
as Tran was not familiar with the lower ceiling or higher stacking height in the HDA. This is
not to suggest that either the stacking height or the higher stack height was unsafe.
Earlier similar incidents
[103] Yassine in his February Statement states that there have been two incidents within the
HDA in which a water pipe had been struck, causing flooding. He gives particulars of an
incident in 2018 or 2019 where an employee, Scott Gordon, was operating a forklift in the
-- 18 of 25 --
[2024] FWC 1116
19
HDA causing mass flooding and the fire brigade to attend on site. He says: “Mr Gordon did
not get a warning for this incident”. He also states the lowered roof in the HDA has signs of
damage where he a forklift clearly had collided with the roof.
[104] Lercara concedes: “he is broadly familiar with the Scott Gordon incident”. He was not
involved in it, and it was before Opal acquired the business. On the issue of the forklift roof
collisions, he states he had received no report of forklift collisions other than the incident in
question. Massey states since September 2022 he had not been notified or investigated any
forklift collisions other than the Incident.
[105] The “signs of damage” on the roof of the HDA cannot constitute evidence of earlier
relevant incidents.
[106] Lercara confirms the Scott Gordon incident occurred. I accept that a similar incident
occurred before Opal operated the Brooklyn site, where a forklift hit the sprinkler pipe
causing flooding and the call out of the fire brigade.
[107] The fact, asserted by Yassine, that an earlier operator of the site warned an employee
over a similar incident has no relevance to this arbitration. There is nothing before me to draw
a relevant comparison between the decision not to discipline Gordon compared to Tran.
There is no evidence of the regulation of discipline under the earlier operator, or the
circumstances or employment history of Scott Gordon
“Other contributing factors” in the Incident report
[108] At page 6 of the Incident report under the heading “other contributing factors” are the
following points:50
• Area layout and height stacking to be reviewed, potentially needs to be lowered 0.5
metres more in this specific area to mitigate the risk of reoccurrence.
• This was operators non-standard work area.
• Sprinkler line visibility is not good due to height, even though sprinkler line is painted
red.
• Area lighting to be reviewed.
• Area has previously had multiple incidents of the same nature due to lowered hight
of roof/mezzanine floor above.
[109] Lercara expressly states that, in deciding the disciplinary step he would take against
Tran, he took into account “the following mitigating factors”51 which include “the other
contributing factors” listed on page 6 of the report.52
[110] Lercara explains “the other contributing factors” did not cause the Incident. If they
did, they would have been included in an earlier section of the report dealing with the cause of
the Incident. “I understood other contributing factors to be areas for potential improvements
in the area and don’t signify that the area was unsafe”.
[111] Massey argues: “The other contributing factors are not causes. They are
recommendations for potential safety improvements that could be made in light of the
Incident. The other contributing factors list was developed by the investigation team which
-- 19 of 25 --
[2024] FWC 1116
20
included HSRs and Site management representatives.” He goes on: “the recommendations in
other contributing factors section of the Report were first discussed in the Site’s Health Safety
and Environment Committee meeting and no one objected to the recommendations or raised
any concerns about the adequacy of the lighting, visibility or height limits in the HDA”.
[112] The AMWU argues that words “contributing factors” specified in the report should be
given their plain English meaning. It makes the point that Opal is arguing that contributing
factors are not contributing factors but potential safety improvements that could be made.
[113] The evidence and submissions of Opal are confused. If the plain words “contributing
factors” have no fixed meaning in the incident report, and in fact mean “recommended safety
improvements”, why would Lercara take them into account in his decision making on
discipline? If they did not in fact contribute to the Incident, why would they be relevant to
mitigation in a disciplinary context?
[114] A factor can be a contributing factor without being the cause of the Incident. The plain
meaning of contribute is “help to bring about the result.” An environmental factor can
contribute to an accident caused by operator error without an imputation that the work site is
unsafe.
[115] The fact the investigating team reached a consensus on these remedial steps to make
the HDA safer is a matter I consider to be important in my assessment of the discipline
decision in issue here. As Lercara took the “contributing factors” into consideration in his
disciplinary decision, those factors can be part of the consideration of the question I am asked
to answer in this arbitration.
[116] I cannot take into account all of the contributing factors listed in the Incident report.
For the earlier stated reasons, I cannot find there were “multiple incidents of the same nature”.
The only incident which both parties confirm is the Gordon incident in 2018 or 2019. Also, on
the papers and as result of the conflicting evidence, I cannot reach a concluded view on the
adequacy of the lighting in the HDA. Other than those two factors, I take the other factors into
account as mitigating circumstances.
Opal and its right to manage
[117] Opal argues I should not interfere with its decision to issue a first and final warning in
its terms against Tran as to do otherwise would interfere with its management prerogative. It
refers to venerable, and often cited authority in the XPT case.53 In XPT, a Full Bench of the
Australian Conciliation and Arbitration Commission found the Commission would not
interfere with a decision of the State Rail Authority of New South Wales to end double
staffing of drivers on XPT trains. In that case the Full Bench stated:
“It seems to us that that proper test to be applied which has been applied for many years
by the Commission is for the Commission to examine all the facts and not to interfere
with the right of the employer to manage his own business unless he is seeking from the
employees something which is unjust and unreasonable.”54
[118] XPT was decided four decades ago, in an entirely different statutory context founded
on the conciliation and arbitration power. Since the advent of enterprise bargaining,
-- 20 of 25 --
[2024] FWC 1116
21
employers have agreed to terms that regulate areas that were once their sole preserve,
including matters of discipline. As these matters are regulated through agreements, the
Commission often has power to consider and review disciplinary decisions of employers
measured against the terms regulating disciplinary action.
[119] The relevance of managerial prerogative in a decision to discipline an employee where
the disciplinary procedure is regulated by an enterprise bargain has been considered by the
Full Bench of this Commission in Gareth Lloyd v. Australian Western Railroad Pty Ltd:55
“In the original application, the Appellant was applying for the Commission to determine
that there would be no disciplinary penalty, or a lesser penalty, imposed by the
Respondent. In approaching the determination of the dispute, it is the common objective
intention of the particular terms of the Agreement when considered as a whole that must
be taken into account. The Commissioner correctly found that the scope of the dispute
resolution procedure within the Agreement included disciplinary matters. Clause 14 of
the Agreement provided a range of discretionary responses to alleged misconduct. The
Agreement did not provide an absolute right or obligation for the employer to apply a
particular disciplinary outcome. Given the terms of the Agreement, including the dispute
resolution provisions that permitted disputes about matters arising under the instrument
to be determined by the Commission, it would not have been inconsistent with the
Agreement for the Commission to determine that one of the other disciplinary options,
or the chosen option differently applied, should have been implemented by the
Respondent. Provided that any determination made to that end would operate within the
parameters of the agreed provisions in clause 14, the terms of the Agreement and that
determination could coexist and be applied without modifying or contradicting the terms
of that instrument.
It follows that the Commissioner had the jurisdiction to deal with the dispute. The fact
that the disciplinary penalty applied by the Respondent was contemplated by clause 14
of the Agreement would be an important consideration in terms of any discretionary
decision to be made by the Commission. In that regard, the principles within the XPT
case would be a relevant starting point for any consideration.”
[120] The regulation of discipline by the Agreement in this case is distinguishable from the
regulation of disciplinary matters in the agreement in Lloyd. In Lloyd, the “disciplinary matters”
provision specified the various disciplinary steps and mandated process requirements including
a prescription for adherence to the principles of natural justice. The regulation of the
disciplinary process in the Agreement not only prescribes the disciplinary steps and process
requirements, but also commits Opal to an overarching “constructive approach” to disciplinary
matters and to a standard of treatment that is “fair and just”.
[121] The relevance of whether the decision of the employer was “unjust and unreasonable”
in the manner contemplated by XPT is displaced by the regulation in the Agreement which
requires a constructive approach and fair and just treatment. The question I am asked to decide
invokes D.1(a) in Appendix D. That clause mandates the constructive approach and the standard
of treatment. The question before me is whether the disciplinary decision is appropriate and
consistent with that approach and standard of treatment.
-- 21 of 25 --
[2024] FWC 1116
22
[122] The dispute resolution procedure empowers the Commission to arbitrate disputes over
matters “under the Agreement.” The parties have agreed to terms that prescribe both the
approach to be taken in disciplinary matters and a standard of fair and just treatment for
employees subject to discipline. If the approach taken by Opal, or treatment given to a
disciplined employee by Opal do not meet the agreed standards, the Commission has power to
displace the disciplinary decision of Opal.
[123] I adopt the Full Bench decision in Lloyd as authority for the proposition I have power
to “determine that one of the other disciplinary options, or the chosen option differently applied,
should have been implemented” by Opal.
WAS THE DECISION TO GIVE TRAN THE FIRST AND FINAL WARNING IN ITS
TERMS THE APPROPRIATE DISCIPLINARY RESPONSE?
[124] I find the cause of the Incident was Tran failed to follow the Standard Operating
Procedure for operating his forklift. This operator error had serious consequences in that it led
to the shutdown of the plant, remedial costs, and lost production. Opal estimates the Incident
led it to incur $70,000 in costs.
[125] It is not contested for the two years eleven months of his employment prior to the
Incident Tran had an exemplary employment record. Once the Incident occurred, he
immediately took responsibility for it. He was not under the influence of alcohol or drugs. The
incident was an accident and not deliberate.
[126] I find that although he had worked in the HDA before, it was not his normal work area,
and he was not familiar with the layout or the considerable differences between his normal
place of work in the Main Warehouse and the HDA. I find the lower roof height and higher
stack height were safe but considerably different to Tran’s normal area, and this may have
contributed to the accident. It is also noteworthy that a similar accident had occurred where a
forklift hit the sprinkler pipe in 2018 or 2019 before Opal ran the Brooklyn site.
[127] Lercara states the decision to give the final warning was “the need to reinforce the
message that safety is the most important priority on site across Opal’s business”. In his
evidence he stated: “The incident caused a significant safety risk. The fire sprinkler pipe that
Alex hit is made of thick steel and is very heavy. It landed quite close to a pedestrian walkway.
It could have seriously injured or killed someone”. Lercara said the mitigating circumstances
led him to decide to give Tran a final warning rather than to terminate Tran’s employment.
[128] I accept that a first and final warning was an appropriate way to send a message
concerning safety at the Brooklyn Site. I also accept that in circumstances where an accident
occurs through operator error with a cost to their employer of $70,000 a final written warning
is an appropriate penalty.
[129] Tran had an otherwise exemplary employment record and, on the material before me,
the prospects of recidivism seem remote. If the purpose of the warning was to send a message
that safety is important on the site, surely the issue of the final warning, which has been in effect
for eight months since August 2023, is sufficient for that purpose.
-- 22 of 25 --
[2024] FWC 1116
23
[130] Opal is bound by an enterprise agreement whose main purpose is to ensure its
commitment to continuous improvement. This includes management being “a coach, not a
judge” and “mistakes being opportunities to learn or improve”. When considered through the
frame of a disciplinary approach that is required to be constructive, a decision to have a final
warning to have effect for the maximum term allowable by D.3(d) may not, in these
circumstances, demonstrate a constructive approach.
[131] Given the prospects of Tran engaging in further dangerous conduct is low, what purpose
does it serve for the warning to be on his personnel file for twelve months? It is not in my view
a constructive approach in the circumstances of this case to have the final warning run its full
term of effect.
[132] In his decision-making, Lercara considered the options he had available to him were a
strict binary, either full and final warning or dismissal. He did not consider a third variable, the
length of operation of the final warning.
[133] I have no evidence before me of the performance of Tran since the Incident. If it is the
case that in the eight months since the warning he has continued to be a good employee and has
been under a final warning for that time, the safety message which it was designed to achieve
has been achieved. Given his otherwise exemplary service, and taking into account the
mitigating factors, I do not consider it to be either constructive nor fair or just for the final
warning to continue until 31 August 2024. It is more consistent with a focus on continuous
improvement, where mistakes are treated as opportunities to learn and improve, if the length of
effect of the final warning is more limited.
[134] The twelve-month expiry set for disciplinary conduct under the Agreement is a
maximum. In all the circumstances it would be appropriate if the period of the warning expire
nine months from the date it was issued, which is Friday 31 May 2024.
CONCLUSION
[135] I therefore resolve this dispute by answering the question with the following answer.
Question
[136] Was the final warning in the terms it was issued on 31 August 2023 to Alex Tran because
of his involvement in the forklift incident at Opal’s site in Brooklyn Victoria on 29 August 2023
an appropriate disciplinary penalty consistent with Appendix D.1(a) of the Agreement?
Answer
[137] The final warning issued to Alex Tran was an appropriate disciplinary penalty consistent
with Appendix D.1(a) of the Agreement in all its terms, except the period of effect of the
warning should be reduced to nine months from the date of issue which expires on Friday 31
May 2024. On that date, the final warning should be removed from his personnel file provided
he has performed his tasks on the forklift to the best of his ability and in a safe manner up until
that date.
[138] This dispute is therefore resolved by answering that question.
-- 23 of 25 --
[2024] FWC 1116
24
Comment
[139] I note this is the second arbitrated decision of a warning dispute between these parties
at this location this year.56 I urge the parties to redouble their efforts to resolve disputes of this
kind without the necessity for an arbitrated outcome.
COMMISSIONER
Printed by authority of the Commonwealth Government Printer
<PR774340>
1 DCB at p. 23
2 [2014] FWC 4336.
3 DCB at p. 27.
4 Ibid.
5 Ibid.
6 Ibid.
7 As a result of the filing of the February statement Opal made supplementary submissions which dispute some statements of
fact in the second statement. It also makes submissions on the veracity and credit I should ascribe to the statement and to the
submissions of the AMWU based on the assertions in the first statement.
8 Mt. Yassine’s second statement is one page long as reproduced at p. 200 of the DCB.
9 Ibid.
10 Ibid.
11 Ibid.
12 DCB at p. 50.
13 DCB at p. 67.
14 DCB at p. 50.
15 DCB at pp. 45 to 47.
16 Ibid.
17 Ibid.
18 DCB at p. 51.
19 These submissions are at p. 51-53 of the DCB.
20 (1984) CAR 188.
21Ex parte NSW Colliery Proprietors Association Ltd (1987) 163 CLR 117.
22 DCB at pp. 203 and 204.
-- 24 of 25 --
[2024] FWC 1116
25
23 DCB at p. 57.
24 DCB at p. 58.
25 Ibid.
26 Ibid.
27 DCB at p. 59.
28 Ibid.
29 Ibid.
30 Lercara’s statements of fact about his involvement in the incident itself are at DCB at pp. 55-56.
31 DCB at p. 45 to 47.
32 DCB at p. 56.
33 Ibid.
34 Ibid.
35 DCB at p. 58.
36 DCB at p. 56.
37 DCB at p. 59.
38 DCB at pp 59 and 60.
39 DCB at p. 70.
40 DCB at p. 71.
41 Ibid.
42 Ibid.
43 DCB at p. 72
44 Ibid.
45 Ibid.
46 DCB at p. 73.
47 [2018] FCAFC 131 at [197].
48 DCB at p. 36.
49 DCB at p. 58.
50 DCB at p. 36.
51 DCB at p. 60, paragraph 50 subparagraph a.
52 Ibid.
53 (1984) 295 CAR 188, a decision of a Full Bench of the Australian Conciliation and Arbitration Commission.
54 Ibid at p. 191 from paragraph d.
55 [2017] FWCFB 143 at [37] and [38].
56 The other is AMWU v Opal Fibre Packaging [2024] FWC 5, a decision of Allison C.
-- 25 of 25 --
Official source: https://www.fwc.gov.au/documents/decisionssigned/pdf/2024fwc1116.pdf