"Automotive, Food, Metals, Engineering, Printing and Kindred Industries Union" known as the Australian Manufacturing Workers' Union (AMWU) v Infrabuild Wire Pty Limited T/A InfraBuild Wire [2024] FWC 2496
1
Fair Work Act 2009
s.437 - Application for a protected action ballot order
"Automotive, Food, Metals, Engineering, Printing and Kindred Industries
Union" known as the Australian Manufacturing Workers' Union (AMWU)
v
Infrabuild Wire Pty Limited T/A InfraBuild Wire
(B2024/1202)
DEPUTY PRESIDENT HAMPTON ADELAIDE, 13 SEPTEMBER 2024
Proposed protected action ballot of employees of Infrabuild Wire Pty Limited T/A InfraBuild
Wire
[1] This is an application by the “Automotive, Food, Metals, Engineering, Printing and
Kindred Industries Union” known as the Australian Manufacturing Workers’ Union (AMWU
or Applicant) made under s.437 of the Fair Work Act 2009 (Act) for a protected action ballot
order in relation to certain employees of Infrabuild Wire Pty Limited T/A InfraBuild Wire
(Infrabuild or Employer).
[2] I note that the Communications, Electrical, Electronic, Energy, Information, Postal,
Plumbing and Allied Services Union of Australia (CEPU) have made a separate application for
a protected action ballot order in relation to the same proposed agreement.1
[3] On 13 September 2024, the Commission was advised that the Employer, in effect, did
not object to the Application.
[4] In the circumstances, I have decided to determine the matter on the papers without
holding a hearing.
[5] On the basis of the material before me, including the declaration of Chloe Simmons,
Industrial Officer, setting out the steps taken by the AMWU in bargaining with the Employer
and that it has been, and is, genuinely trying to reach agreement with Infrabuild, I am satisfied
that there is a notification time in relation to the proposed agreement and that all of the
requirements in s.443(1) of the Act have been met.
[6] The ballot is to be conducted by the Australian Electoral Commission.
[7] For the purposes of s.443(3)(c) of the Act, the Commission has determined that the date
by which voting is to close is 28 October 2024.2 This also establishes the ballot period for the
purpose of s.448A(2) of the Act.
[2024] FWC 2496
DECISION
-- 1 of 2 --
[2024] FWC 2496
2
[8] An Order has been separately issued in PR779213.
[9] This matter will be assigned to another Member of the Commission to conduct the
s.448A compulsory conciliation conference along with the other related matter. To the extent
that this matter involves any additional bargaining representatives, that Member will issue an
Order requiring their attendance in the proposed enterprise agreement at the conference. It is
likely that Directions will also be issued to ensure that the parties attend the conference ready
to conduct meaningful negotiations.
DEPUTY PRESIDENT
Printed by authority of the Commonwealth Government Printer
<PR779214>
1 B2024/1103.
2 This is, in effect, 30 working days from the making of the Order and was the specific period sought in the application.
-- 2 of 2 --
Official source: https://www.fwc.gov.au/documents/decisionssigned/pdf/2024fwc2496.pdf