Greenhouse Gas Geological Sequestration Regulations 2009
i
Greenhouse Gas Geological Sequestration
Regulations 2009
S.R. No. 149/2009
TABLE OF PROVISIONS
Regulation Page
PART 1—PRELIMINARY 1
1 Objectives 1
2 Authorising provision 1
3 Commencement 2
4 Definitions 2
PART 2—AUTHORITIES 3
5 Injection testing plan—monitoring and verification plan 3
6 Injection testing plan—risk management plan 5
7 Maximum time period for commencement of injection 5
8 Injection and monitoring plan—monitoring and verification
plan 5
9 Injection and monitoring plan—risk management plan 8
10 Special access authorisation 8
11 Special access authorisation—special access well plan 8
12 Form of work program 9
13 Reporting of serious situations 10
14 Operation plan to include provision for review 11
15 Rent for occupancy of Crown land 12
16 Discovery of underground geological storage formation 12
17 Information, samples and records 13
PART 3—ENVIRONMENT MANAGEMENT PLAN 15
18 Operation plan must include an environment management
plan 15
19 Description of the environment 15
20 Description of environmental effects and risks 15
21 Environmental performance objectives and standards 16
22 Implementation strategy for the environment management
plan 16
23 Other information in the environment management plan 18
-- 1 of 32 --
Regulation Page
ii
PART 4—SPECIFIED INFORMATION TO BE SUBMITTED TO
MINISTER 19
24 Holder to provide information about wells made under certain
authorities 19
25 Holder of authority to provide information about surveys 20
26 Periodic overview report of greenhouse gas sequestration
operations 20
PART 5—PECUNIARY INTEREST STATEMENTS 23
27 Definitions 23
28 Duty of disclosure of pecuniary interests 23
29 Disclosure of interest register 24
30 Inspection of register 24
PART 6—FEES 25
31 Application fees 25
32 Late fee for renewal of exploration permit 25
33 Fee for renewal of exploration permit 25
34 Late fee for retention lease 25
35 Annual fees for exploration permit, retention lease or injection
and monitoring licence 25
36 Fees for transfer or renewal of an exploration permit, retention
lease or injection and monitoring licence 26
37 Fees for inspection of, or copy of document in, greenhouse gas
sequestration register 26
38 Fee for Minister's certificate 27
PART 7—GENERAL 28
39 Compensation agreement—application to VCAT 28
40 Period before a disputed claim can go to VCAT or Supreme
Court 28
41 Minister may require information from petroleum operators 28
═══════════════
ENDNOTES 30
-- 2 of 32 --
1
STATUTORY RULES 2009
S.R. No. 149/2009
Greenhouse Gas Geological Sequestration Act 2008
Greenhouse Gas Geological Sequestration
Regulations 2009
The Governor in Council makes the following Regulations:
Dated: 1 December 2009
Responsible Minister:
PETER BATCHELOR
Minister for Energy and Resources
TOBY HALLIGAN
Clerk of the Executive Council
PART 1—PRELIMINARY
1 Objectives
The objectives of these Regulations are—
(a) to provide for the elimination or
minimisation of the environmental, health
and safety hazards and risks associated with
greenhouse gas sequestration operations; and
(b) to prescribe various administrative matters,
fees and other requirements authorised by
the Act.
2 Authorising provision
These Regulations are made under section 303 of
the Greenhouse Gas Geological Sequestration
Act 2008.
-- 3 of 32 --
Part 1—Preliminary
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
2
3 Commencement
These Regulations come into operation on
1 December 2009.
4 Definitions
In these Regulations—
stored greenhouse gas substance means a
greenhouse gas substance that, under an
injection and monitoring licence, an
exploration permit or an injection testing
plan, has been injected into an underground
geological storage formation;
the Act means the Greenhouse Gas Geological
Sequestration Act 2008.
__________________
r. 3
-- 4 of 32 --
Part 2—Authorities
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
3
PART 2—AUTHORITIES
5 Injection testing plan—monitoring and verification
plan
(1) For the purposes of section 38(d) of the Act, the
monitoring and verification plan included in an
injection testing plan prepared by the holder of an
exploration permit must include—
(a) details of—
(i) the characteristics of the geological
formation into which a liquid or gas is
proposed to be injected; and
(ii) any geological or other conditions that
may influence containment of injected
liquid or gas;
(b) a description of—
(i) the existing environment above, on and
below the surface of the ground; and
(ii) any resource above, on and below the
surface of the ground that a person is
entitled to extract or use under a
resource authority;
(c) details of the equipment proposed to be used
to monitor the behaviour of any injected
liquid or gas and where it is to be located;
(d) details of—
(i) the techniques that the holder of the
exploration permit proposes to use to
monitor, whether above, on or below
the surface of the ground, the behaviour
of any injected liquid or gas and its
effect on the environment; and
(ii) the length of time that each such
technique is to be used; and
r. 5
-- 5 of 32 --
Part 2—Authorities
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
4
(iii) how often each monitoring technique is
to be carried out;
(e) details of the methods to be used for
differentiating injected liquids or gases from
naturally occurring liquids or gases;
(f) details of—
(i) how the actual behaviour of injected
liquids or gases is to be verified against
the expected behaviour of injected
liquids or gases; and
(ii) how often the actual behaviour of
injected liquids or gases is to be
verified against the expected behaviour
of injected liquids or gases;
(g) details of—
(i) how the effect of injected liquids or
gases on naturally occurring liquids or
gases is to be verified against the effect
(if any) that the holder of the
exploration permit expected; and
(ii) how often the effect of injected liquids
or gases on naturally occurring liquids
or gases is to be verified against the
effect (if any) that the holder of the
exploration permit expected;
(2) For the purposes of section 55(2)(a) of the Act, a
monitoring and verification plan under
subregulation (1) must specify that a report on the
outcome of all monitoring and verification
activities carried out under the licence will be
provided monthly.
r. 5
-- 6 of 32 --
Part 2—Authorities
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
5
6 Injection testing plan—risk management plan
For the purposes of section 38(e) of the Act, the
risk management plan included in an injection
testing plan prepared by the holder of an
exploration permit must include—
(a) details of potential risks and damage to, and
impacts on, public health and the
environment that may result from injection
testing operations, whether or not in
emergency conditions;
(b) performance objectives and standards against
which performance by the holder of the
exploration permit in avoiding those risks,
damages and impacts is to be measured;
(c) a strategy for the management of those risks,
damages and impacts.
7 Maximum time period for commencement of
injection
For the purposes of sections 73(2) and 75(2) of the
Act, the maximum time period is 5 years
beginning on the date on which the application for
the injection and monitoring licence is made.
8 Injection and monitoring plan—monitoring and
verification plan
(1) For the purposes of section 94(j) of the Act, a
monitoring and verification plan included in an
injection and monitoring plan prepared by the
holder of an injection and monitoring licence must
include—
(a) details of—
(i) the characteristics of the geological
formation into which a greenhouse gas
substance is proposed to be injected;
and
r. 6
-- 7 of 32 --
Part 2—Authorities
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
6
(ii) any geological or other conditions that
may influence containment of a stored
greenhouse gas substance;
(b) a description of—
(i) the existing environment above, on and
below the surface of the ground; and
(ii) any resource above, on and below the
surface of the ground that a person is
entitled to extract or use under a
resource authority;
(c) details of the equipment proposed to be used
to monitor the behaviour of stored
greenhouse gas substances, and where it is to
be located;
(d) details of—
(i) the techniques that the holder of the
injection and monitoring licence
proposes to use to monitor, whether
above, on or below the surface of the
ground, the behaviour of any stored
greenhouse gas substance and its effect
on the environment; and
(ii) the length of time that each technique is
to be used; and
(iii) how often each monitoring technique is
to be carried out;
(e) details of the methods to be used for—
(i) differentiating stored greenhouse gas
substances from naturally occurring
greenhouse gas substances; and
(ii) differentiating between 2 or more kinds
of stored greenhouse gas substances.
r. 8
-- 8 of 32 --
Part 2—Authorities
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
7
(f) details of—
(i) how the actual behaviour of stored
greenhouse gas substances is to be
verified against the expected behaviour
of stored greenhouse gas substances;
and
(ii) how often the actual behaviour of
stored greenhouse gas substances is to
be verified against the expected
behaviour of stored greenhouse gas
substances;
(g) details of—
(i) how the effect of stored greenhouse gas
substances on naturally occurring
liquids or gases is to be verified against
the effect (if any) that the holder of the
exploration permit expected; and
(ii) how often the effect of stored
greenhouse gas substances on naturally
occurring liquids or gases is to be
verified against the effect (if any) that
the holder of the exploration permit
expected;
(2) For the purposes of section 111(2)(a) of the Act, a
monitoring and verification plan under
subregulation (1) must specify that a report on the
outcome of all monitoring and verification
activities carried out under the licence will be
provided every 3 months.
r. 8
-- 9 of 32 --
Part 2—Authorities
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
8
9 Injection and monitoring plan—risk management
plan
For the purposes of section 94(k) of the Act, a risk
management plan included in an injection and
monitoring plan prepared by the holder of an
injection and monitoring licence must include—
(a) details of potential risks and damage to, and
impacts on, public health and the
environment that may result from injection
activities, whether or not in emergency
conditions;
(b) performance objectives and standards against
which performance by the holder of the
injection and monitoring licence in avoiding
those risks, damages and impacts is to be
measured;
(c) a strategy for the management of those risks,
damages and impacts.
10 Special access authorisation
For the purposes of section 131 of the Act, the
period for which a special access authorisation
continues in force, unless sooner cancelled or
surrendered, is the period ending 12 months after
the special access authorisation is granted or, if
that period is extended under section 132 of the
Act, at the end of that period as so extended.
11 Special access authorisation—special access well
plan
For the purposes of section 133(2) of the Act, a
special access well plan must include—
(a) a description of—
(i) the location and purpose of the well;
and
(ii) the proposed down hole activity; and
r. 9
-- 10 of 32 --
Part 2—Authorities
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
9
(b) the period during which it is expected that
the well will be used; and
(c) a description of—
(i) the characteristics of the geological
formation where the well is situated;
and
(ii) the existing environment above and on
the surface of the ground; and
(iii) any resource above, on and below the
surface of the ground that a person is
entitled to extract or use under a
resource authority; and
(d) details of—
(i) potential risks or damage to, and
impacts on, public health and the
environment that may result from down
hole activity, whether or not in
emergency conditions; and
(ii) performance objectives and standards
against which performance by the
holder of the special access authority in
avoiding those risks, damages and
impacts is to be measured; and
(iii) a strategy for the management of those
risks, damages and impacts; and
(e) details of the measures to be taken for the
decommissioning of the well.
12 Form of work program
For the purposes of section 148(d) of the Act, a
work program must be in—
(a) an electronic form; or
(b) a form approved by the Minister.
r. 12
-- 11 of 32 --
Part 2—Authorities
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
10
13 Reporting of serious situations
(1) For the purposes of section 181 of the Act, the
period within which a serious situation must be
reported by the holder of an authority is—
(a) in the case of a serious situation that has
occurred—
(i) by a preliminary report, 2 hours after
the authority holder or any person
associated with the activity first
becomes aware of the occurrence; and
(ii) by a further report, 3 days after the
authority holder or any person
associated with the activity first
becomes aware of the occurrence;
(b) in the case of a serious situation that may
occur—
(i) by a preliminary report, 2 hours after
the authority holder or any person
associated with the activity first
becomes aware that the serious
situation may occur; and
(ii) by a further report, 3 days after the
authority holder or any person
associated with the activity first
becomes aware that the serious
situation may occur.
(2) A preliminary report under subregulation (1) must
be given by telephone to the Department and must
include—
(a) the name of the informant; and
(b) the telephone number of the informant; and
(c) the name of the holder of the authority; and
r. 13
-- 12 of 32 --
Part 2—Authorities
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
11
(d) the location of the serious situation; and
(e) sufficient details to identify the serious
situation.
(3) A further report under subregulation (1) must be
given in writing to the Department and must
include—
(a) the holder's name, address, telephone
number and email address;
(b) details of the serious situation and where it
has occurred or may occur;
(c) as the case requires, details of—
(i) the leak or anticipated leak; or
(ii) the unpredicted behaviour or
anticipated unpredicted behaviour; or
(iii) the significant impact or anticipated
significant impact; or
(iv) the unsuitable, or anticipated unsuitable
underground geological storage
formation;
(d) details of any harm or damage that has been
or may be suffered by any person or the
environment;
(e) details of action taken, or to be taken, to
control or minimise harm or damage;
(f) any other information relevant to the serious
situation that has occurred, or may occur,
that is requested by the Minister.
14 Operation plan to include provision for review
For the purposes of section 209(d) of the Act, an
operation plan given to the Minister by the holder
of an authority must provide for—
r. 14
-- 13 of 32 --
Part 2—Authorities
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
12
(a) a review by the holder of the risks identified
in the plan whenever there is a significant
change in the risks that the operation may
pose; and
(b) a review of the plan by the holder at least
once every 5 years; and
(c) submission to the Minister of a report by the
holder on the findings of each such review.
15 Rent for occupancy of Crown land
For the purposes of section 227(3) of the Act, the
amount of rent payable is the current market value
for occupying the land, having regard to the use of
the land permitted by the authority, as determined
by a valuer nominated by the valuer-general
within the meaning of the Valuation of Land Act
1960.
16 Discovery of underground geological storage
formation
(1) For the purposes of section 230(1)(a) of the Act,
the information that is required to be given to the
Minister regarding an underground geological
storage formation discovered in an authority area
is—
(a) the location of the formation and its extent;
(b) the geoscientific properties of the formation
and the surrounding area;
(c) particulars of properties of fluids found in
the formation and the surrounding area;
(d) particulars of pressures in the formation and
the surrounding area;
(e) an analysis of the suitability of the formation
for the storage of greenhouse gas substances;
r. 15
-- 14 of 32 --
Part 2—Authorities
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
13
(f) any other information requested by the
Minister in the direction given under
section 230 of the Act.
(2) The information under subregulation (1) must be
given in writing.
17 Information, samples and records
(1) For the purposes of section 231(a) of the Act, the
information required to be collected for the
purpose of monitoring compliance with the Act
is—
(a) geoscientific data;
(b) engineering and safety data;
(c) injection data;
(d) monitoring data.
(2) For the purposes of section 231(a) of the Act, the
samples required to be collected for the purpose of
monitoring compliance with the Act are—
(a) rock cores;
(b) cuttings;
(c) side wall cores;
(d) drilling muds;
(e) fluids;
(f) gases;
(g) other related substances.
(3) For the purposes of section 231(b) of the Act—
(a) the data referred to in subregulation (1) is to
be kept in accordance with industry
standards in a readily accessible electronic
format;
r. 17
-- 15 of 32 --
Part 2—Authorities
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
14
(b) the samples referred to in subregulation (2)
are to be kept in accordance with industry
standards.
(4) For the purposes of section 231(c) of the Act, the
holder of an authority must give to the Minister
information, samples and records in accordance
with any request made by the Minister.
__________________
r. 17
-- 16 of 32 --
Part 3—Environment Management Plan
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
15
PART 3—ENVIRONMENT MANAGEMENT PLAN
18 Operation plan must include an environment
management plan
(1) For the purposes of section 209(d) of the Act, an
operation plan given to the Minister by the holder
of an authority must include an environment
management plan in accordance with this Part.
(2) An environment management plan under this Part
is not required to include matters that are included
in the injection testing plan or injection and
monitoring plan that form part of the operation
plan.
19 Description of the environment
An environment management plan must—
(a) describe the existing environment that may
be affected by the greenhouse gas
sequestration operation, as well as any
relevant cultural, historical, aesthetic, social,
recreational, ecological, biological,
landscape and economic aspects of the
existing environment that may be affected;
and
(b) identify the particular relevant values and
sensitivities (if any) of the existing
environment.
20 Description of environmental effects and risks
An environment management plan must include
an assessment of the environmental effects and
risks of the greenhouse gas sequestration
operation that—
(a) identifies and evaluates the environmental
effects and risks that may arise directly or
indirectly from the normal activities of the
r. 18
-- 17 of 32 --
Part 3—Environment Management Plan
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
16
operation (including construction where
applicable); and
(b) includes an assessment of the risks of
potential effects on the environment resulting
from reasonably possible activities in
relation to the operation, or incidents or
events (whether planned or unplanned) that
are not normal activities, incidents or events
in relation to the operation.
21 Environmental performance objectives and
standards
An environment management plan must—
(a) define environmental performance objectives
and set environmental performance standards
against which performance by the holder of
the authority in protecting the environment
from the greenhouse gas sequestration
operation is to be measured; and
(b) include measurement methods for
determining whether the objectives and
standards have been met.
22 Implementation strategy for the environment
management plan
An environment management plan must contain
an implementation strategy that—
(a) includes measures to ensure that the
environmental performance objectives and
standards in the environment management
plan are met; and
(b) identifies the specific systems, practices and
procedures to be used to ensure that—
(i) any potential adverse environmental
effects of, and any risks to the
environment arising from, the
greenhouse gas sequestration operation
r. 21
-- 18 of 32 --
Part 3—Environment Management Plan
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
17
are eliminated or continuously
minimised so far as is reasonably
practicable; and
(ii) the environmental performance
objectives and standards in the
environment management plan are met;
and
(c) establishes a clear chain of command, setting
out the roles and responsibilities of personnel
in relation to the implementation,
management and review of the environment
management plan; and
(d) includes measures to ensure that each
employee or contractor working on or in
connection with the greenhouse gas
sequestration operation—
(i) is aware of the employee's or
contractor's responsibilities in relation
to the environment; and
(ii) has the appropriate skills and training to
be able to fulfil those responsibilities;
and
(e) provides for the monitoring, audit and review
of the environmental performance and
implementation strategy of the holder of the
authority; and
(f) provides for the maintenance of a
quantitative record of emissions and
discharges to the air, land surface or below
that land surface environment—
(i) other than those relating to liquids,
gases or greenhouse gas substances
injected under an authority; and
r. 22
-- 19 of 32 --
Part 3—Environment Management Plan
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
18
(ii) that is accurate and can be monitored
and audited against the environmental
performance standards.
23 Other information in the environment management
plan
An environment management plan must contain
the following—
(a) a statement of the corporate environmental
policy of the holder of the authority; and
(b) a report on any consultations between the
holder and relevant authorities, interested
people and organisations in the course of
developing the environment management
plan; and
(c) a list of all environmental legislation of the
Commonwealth or the State that may apply
to the greenhouse gas sequestration
operation.
__________________
r. 23
-- 20 of 32 --
Part 4—Specified Information to be Submitted to Minister
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
19
PART 4—SPECIFIED INFORMATION TO BE SUBMITTED
TO MINISTER
24 Holder to provide information about wells made
under certain authorities
(1) If the holder of an exploration permit or an
injection and monitoring licence makes a well, the
holder must submit the following information to
the Minister—
(a) a description of the location and purpose of
the well and the proposed down hole
activity;
(b) the period during which it is expected that
the well will be used;
(c) a description of—
(i) the characteristics of the geological
formation where the well is situated;
(ii) the existing environment and
conditions, and any resource that a
person is entitled to extract or use under
a resource authority, above, on and
below the surface of the ground.
(2) The information required under subregulation (1)
must be provided to the Minister within—
(a) 3 months after the well is made; or
(b) the period approved by the Minister.
(3) If a well made by the holder of an exploration
permit or an injection and monitoring licence
ceases to be required or used, the holder must—
(a) decommission the well; and
(b) provide a report to the Minister on the
measures taken for the decommissioning of
the well.
r. 24
-- 21 of 32 --
Part 4—Specified Information to be Submitted to Minister
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
20
25 Holder of authority to provide information about
surveys
(1) If the holder of an exploration permit, retention
lease or injection and monitoring licence conducts
a seismic or any other survey in the course of
carrying out a greenhouse gas sequestration
operation under the permit, lease or licence, the
holder must submit to the Minister the following
information—
(a) the location and purpose of the survey;
(b) the date and duration of the survey;
(c) details of the geoscientific and other data
generated by the survey.
(2) The information required under subregulation (1)
must be provided to the Minister—
(a) within 3 months after the survey has been
conducted; or
(b) within the period approved by the Minister.
26 Periodic overview report of greenhouse gas
sequestration operations
(1) The holder of an authority must submit to the
Minister a report that complies with subregulation
(2) of the greenhouse gas sequestration operations
undertaken by the holder during each period of
12 months after the date on which the authority
was granted.
Penalty: 10 penalty units.
(2) A report under subregulation (1) must—
(a) be provided within 3 months after the end of
the relevant period of 12 month period;
r. 25
-- 22 of 32 --
Part 4—Specified Information to be Submitted to Minister
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
21
(b) be provided—
(i) in an electronic form; or
(ii) in a form approved by the Minister;
(c) be consistent with the industry standard for
reports of the same class;
(d) contain the following information—
(i) an overview of the operations, together
with a complete record of all
geoscientific and other data obtained
from the operations;
(ii) details of all technical investigations
and surveys carried out in that period;
(iii) a complete record of all drill holes,
together with logs and maps showing
the locations of the holes both at
surface and subsurface level;
(iv) the names of all greenhouses gases or
other liquids or gases injected during
the period;
(v) details of any material tested, along
with test results;
(vi) any interpretations formed as a result of
surveys or activities undertaken;
(vii) details of how the maps and sections
provided in the report are related to the
Map Grid of Australia (GDA94
coordinates) and the National
Topographic Map Series;
(e) contain a statement of expenditure in respect
of the period on operations carried out,
showing separately expenditure on—
(i) drilling operations;
(ii) seismic operations;
r. 26
-- 23 of 32 --
Part 4—Specified Information to be Submitted to Minister
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
22
(iii) technical evaluation and analysis;
(iv) geological studies;
(v) surveys;
(vi) construction or modification of
facilities;
(vii) administration;
(viii) any other expenses incurred in respect
of the operation not covered by
paragraphs (i) to (vii).
(3) A report under subregulation (1) must be dated
and signed by the holder of the authority and each
other person who prepared any part of the report.
(4) The Minister may, on a request from the holder of
an authority, or former holder of an authority,
extend the period within which a report under this
regulation is to be submitted.
__________________
r. 26
-- 24 of 32 --
Part 5—Pecuniary Interest Statements
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
23
PART 5—PECUNIARY INTEREST STATEMENTS
27 Definitions
In this Part—
domestic partner of a person means a person with
whom the person is in a domestic
relationship within the meaning of section
35(1) of the Relationships Act 2008;
family, in relation to an officer, means⎯
(a) a spouse or a domestic partner of the
officer; or
(b) a relative of the officer who is under the
age of 18 years and who normally
resides with the officer;
interest register means the register of interests of
officers established under regulation 29;
officer means a natural person who is employed in
the Department administering the Act;
reportable interest, in relation to an officer, means
a pecuniary interest of the officer, or of a
member of the officer's family, which might
appear to raise a conflict with the officer's
responsibilities as an officer but does not
include any remuneration or allowance
received by an officer under the Act or the
Public Administration Act 2004.
28 Duty of disclosure of pecuniary interests
(1) For the purposes of section 293 of the Act, an
officer must give a pecuniary interest statement of
all reportable interests to the Minister within
30 days after becoming an officer.
r. 27
-- 25 of 32 --
Part 5—Pecuniary Interest Statements
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
24
(2) For the purposes of section 293 of the Act, an
officer must give a pecuniary interest statement of
any change in a reportable interest, and any new
reportable interest, to the Minister within 30 days
after becoming aware of the change or interest.
(3) An officer must not perform or exercise any
function or power under the Act in relation to a
matter to which a reportable interest relates unless
the Minister authorises her or him to do so.
Penalty: 10 penalty units.
29 Disclosure of interest register
The Minister must cause an interest register to be
established and maintained containing the
information included in pecuniary interest
statements submitted to the Minister under
regulation 28.
30 Inspection of register
The interest register must be—
(a) kept at a place nominated by the Minister;
and
(b) must be open to inspection by any person.
__________________
r. 29
-- 26 of 32 --
Part 6—Fees
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
25
PART 6—FEES
31 Application fees
(1) For an application for an exploration permit, a fee
of 400 fee units is required to be paid.
(2) For an application for a retention licence, a fee of
400 fee units is required to be paid.
(3) For an application for an injection and monitoring
licence, a fee of 1000 fee units is required to be
paid.
(4) For an application for a special access
authorisation, a fee of 40 fee units is required to
be paid.
32 Late fee for renewal of exploration permit
For the purpose of section 32(3) of the Act, the
late fee is 10 fee units for each week or part of a
week after the due day for payment of the fee.
33 Fee for renewal of exploration permit
For the purposes of section 33(1)(b) of the Act,
the fee for the renewal of an exploration permit is
200 fee units.
34 Late fee for retention lease
For the purpose of section 60(3) of the Act, the
late fee is 10 fee units for each week or part of a
week after the due day for payment of the fee.
35 Annual fees for exploration permit, retention lease
or injection and monitoring licence
(1) The following annual fees are payable—
(a) for an annual fee for an exploration permit,
550 fee units;
(b) for an annual fee for a retention lease,
550 fee units;
r. 31
-- 27 of 32 --
Part 6—Fees
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
26
(c) for an annual fee for an injection and
monitoring licence, 550 fee units.
(2) The annual fee payable in respect of the first year
after the grant of an authority must be paid no
later than 7 days after the authority is granted.
(3) The annual fee payable in respect of the second or
subsequent year after the grant of an authority
must be paid before the first anniversary of the
grant of the authority.
36 Fees for transfer or renewal of an exploration
permit, retention lease or injection and monitoring
licence
The following fees are payable—
(a) for transfer, or part transfer, of an
exploration permit, 400 fee units;
(b) for renewal of a retention lease, 200 fee
units;
(c) for transfer of a retention lease, 400 fee
units;
(d) for transfer, or part transfer, of an injection
and monitoring licence, 400 fee units.
37 Fees for inspection of, or copy of document in,
greenhouse gas sequestration register
For the purposes of section 286 of the Act, the
following fees are payable—
(a) for inspection of the greenhouse gas
sequestration register, 2 fee units;
(b) for inspection and searching of the
greenhouse gas sequestration register
website, nil;
(c) for each page of a copy of a document or
entry in the greenhouse gas sequestration
register, $4;
r. 36
-- 28 of 32 --
Part 6—Fees
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
27
(d) for information downloaded from the
greenhouse gas sequestration register
website, nil.
38 Fee for Minister's certificate
The fee payable for a certificate under section 287
of the Act is 5 fee units.
__________________
r. 38
-- 29 of 32 --
Part 7—General
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
28
PART 7—GENERAL
39 Compensation agreement—application to VCAT
For the purposes of sections 48(2), 104(2) and
118(2) of the Act, the period after which a person
may make an application to VCAT in respect of a
claim is 30 days after the claim is first made.
40 Period before a disputed claim can go to VCAT or
Supreme Court
For the purposes of section 206(2) of the Act, the
period of time after which a person may make an
application to VCAT in respect of a claim or refer
a claim to the Supreme Court is 30 days after the
claim is first made.
41 Minister may require information from petroleum
operators
For the purposes of section 234 of the Act, the
Minister may direct the holder of an authority
issued under the Petroleum Act 1998 to give the
Minister information about—
(a) the characteristics of the geological
formation in the area to which the authority
applies;
(b) any petroleum operations being carried out
by the authority holder or that are proposed
to be carried out by the authority holder in
those geological formations;
(c) any infrastructure, whether above, on or
below the surface of the ground, associated
with those petroleum operations;
r. 39
-- 30 of 32 --
Part 7—General
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
29
(d) any impact (if any) that the holder believes
any greenhouse gas sequestration operation
may have on petroleum operations in that
area.
═══════════════
r. 41
-- 31 of 32 --
Greenhouse Gas Geological Sequestration Regulations 2009
S.R. No. 149/2009
30
ENDNOTES
Fee Units
These Regulations provide for fees by reference to fee units within the
meaning of the Monetary Units Act 2004.
The amount of the fee is to be calculated, in accordance with section 7 of that
Act, by multiplying the number of fee units applicable by the value of a fee
unit.
The value of a fee unit for the financial year commencing 1 July 2009 is
$11.69. The amount of the calculated fee may be rounded to the nearest
10 cents.
The value of a fee unit for future financial years is to be fixed by the
Treasurer under section 5 of the Monetary Units Act 2004. The value of a
fee unit for a financial year must be published in the Government Gazette and
a Victorian newspaper before 1 June in the preceding financial year.
Penalty Units
These Regulations provide for penalties by reference to penalty units within
the meaning of section 110 of the Sentencing Act 1991. The amount of the
penalty is to be calculated, in accordance with section 7 of the Monetary
Units Act 2004, by multiplying the number of penalty units applicable by the
value of a penalty unit.
The value of a penalty unit for the financial year commencing 1 July 2009 is
$116.82.
The amount of the calculated penalty may be rounded to the nearest dollar.
The value of a penalty unit for future financial years is to be fixed by the
Treasurer under section 5 of the Monetary Units Act 2004. The value of a
penalty unit for a financial year must be published in the Government Gazette
and a Victorian newspaper before 1 June in the preceding financial year.
Endnotes
-- 32 of 32 --