4 yearly review of modern awards–Award stage [2019] FWC 2271
1
Fair Work Act 2009
s.156 – 4 yearly review of modern awards
4 yearly review of modern awards–Award stage
(AM2014/1)
JUSTICE ROSS, PRESIDENT MELBOURNE, 4 APRIL 2019
4 yearly review of modern awards – status – conference 3 April 2019.
[1] A Statement issued on 28 February 20191 provided an overview of three procedural
Statements that had been published regarding the process for the finalisation of the 4 yearly
review of modern awards (the Review).
[2] As mentioned in the 28 February 2019 Statement, a conference was convened on
Wednesday 3 April 2019 to deal with any questions regarding the scheduling and process for
finalising the Review. Interested parties were asked to file a short written submission stating
any issues or questions they wished to raise at the conference.
[3] Submissions were received from the following parties in response to the Statement:
The Construction, Forestry, Maritime, Mining and Energy Union (CFMMEU)
The National Aboriginal and Torres Strait Islander Health Workers Association
Limited (NATSIHWA)
The Australian Nursing and Midwifery Federation (ANMF)
Master Builders Australia (MBA)
[4] Each submission is dealt with below.
[5] The CFMMEU filed a submission2 noting the ‘difficulties parties are facing in meeting
the deadline for filing comments on the exposure drafts, particularly those parties with an
interest in multiple awards.’
[6] The timetable for the publication of exposure drafts throughout 2019 was prepared to
balance the completion of the Review with a number of competing priorities of the interested
parties. If parties have a particular concern about a specific deadline they can write to the
Commission regarding their concerns.3
1 [2019] FWC 1262
2 CFMMEU submission, 27 March 2019
3 A similar concern has been raised by the Australian Industry Group in submissions filed in response to Group 1 and Group
2 exposure drafts.
[2019] FWC 2271
STATEMENT
-- 1 of 4 --
[2019] FWC 2271
2
[7] The CFMMEU also raised a concern regarding the definition of ‘all purposes’ and
when this matter is to be finalised. The CFMMEU has a concern that the definition is
deficient in that it does not expressly state that the payment is included in the ‘ordinary hourly
rate’. The issue was referred to the plain language full bench for determination, and dealt with
in a Statement issued on 28 February 2019.4 Interested parties were invited to comment on
the Full Bench’s proposal and submissions relating to the matter were due to be filed on
Friday 22 March 2019. It was outlined that if there is no opposition to the provisional view,
the change would be applied to all exposure drafts as part of the plain language ‘light touch’
process.
[8] NATSIHWA filed a submission5 relating to the substantive claims in the Aboriginal
Community Controlled Health Services Award 2010. These claims are being dealt with in
AM2018/12. NATSIHWA requested that the Commission list a programming mention for
AM2018/12 to discuss timetabling issues related to the filing and service of evidence.
[9] The matter has been listed for a Mention before Deputy President Gostencnik on
Thursday 4 April 2019 at 10.30am.6
[10] The ANMF filed a submission7 providing comments on the exposure draft for the
Nurses Award 2010. The ANMF note in their submission that they will raise particular issues
relating to the exposure draft at the conference on 3 April 2019.
[11] The conference on 3 April was not intended to be an opportunity for parties to raise
specific issues or comments in relation to exposure drafts. Rather, it was an opportunity for
interested parties to raise questions regarding the scheduling and process for finalising the
Review. Any comments regarding specific exposure drafts will be taken into account by the
Commission when exposure drafts are updated and republished in line with ‘Update 2’8
[12] MBA filed a written submission relating to the Construction group of awards, which
are being dealt with in matter AM2016/23. MBA submit that that exposure drafts for the
Construction Awards were published on 22 March 2019, with the parties to file their first
round of submissions on their content by 12 April 2019. The Construction group of awards
contain the following awards:
Building and Construction General On-site Award 2010
Joinery and Building Trades Award 2010
Mobile Crane Hiring Award 2010
Plumbing and Fire Sprinklers Award 2010
[13] All of the above awards are in Group 4C. MBA submit that the ‘Construction Awards
contain a significant number of references to matters which remain under consideration by
both the Construction Awards Full Bench and others dealing with common issue matters.’9
4 [2019] FWCFB 1255 at [87] – [96]
5 NATSIHWA submission, 27 March 2019
6 See Notice of Listing – AM2018/12
7 ANMF submission, 27 March 2019
8 See [2019] FWC 932 at [5]
9 MBA submission, 27 March 2019, p.1
-- 2 of 4 --
[2019] FWC 2271
3
MBA request that due dates for submissions on the exposure draft for the Construction
Awards be deferred until the award stage proceedings have reached their conclusion.
[14] I acknowledge the force of the point raised by the MBA. Separate directions regarding
the filing of submissions on the exposure draft for the Construction awards will be issued
when the Full Bench in AM2016/23 has been finalised.
Timeline for publishing exposure drafts — 2019
[15] The following table sets out the final publication dates and submission dates for
exposure drafts in Groups 1, 2, 3 and 4.
Date Event
Groups 1 – 2 13 February 2019 Exposure drafts for Group 1 republished
15 February 2019 Exposure drafts for Group 210 republished
13 March 2019 Parties to comment on updated Group 1 exposure drafts
15 March 2019 Parties to comment on updated Group 211 exposure
drafts
May 2019 Exposure drafts to be updated and republished with
‘plain language light touch’
June 2019 Parties to comment on updated ‘plain language light
touch’ exposure drafts
August 2019 Exposure drafts to be republished incorporating
adjusted rates and allowances as a result of the 2018-19
Annual Wage Review decision
September 2019 Parties to comment on updated rates in exposure drafts
October 2019 Exposure draft to be issued as new consolidated award
Groups 3 – 4 1 March 2019 Exposure drafts for Group 3A republished
8 March 2018 Exposure drafts for Group 3B, 3C and 3D12 republished
15 March 2019 Exposure drafts for Group 4A and 4B republished
22 March 2019 Exposure drafts for Group 4C and 4D13 republished
29 March 2019 Parties to comment on updated Group 3A exposure
drafts
29 March 2019 Exposure drafts for Group 4E and 4F republished
5 April 2019 Parties to comment on updated Group 3B, 3C, and 3D
exposure drafts
12 April 2019 Parties to comment on updated Group 4A and 4B
exposure drafts
19 April 2019 Parties to comment on updated Group 4C and 4D
exposure drafts
10 With the exception of the exposure drafts for the Fire Fighting Industry Award 2010 and the Nurses Award 2010
11 Comments relating to the Fire Fighting Industry Award 2010 and the Nurses Award 2010 are due on 22 March 2019
12 Comments relating to the Pastoral Award 2010 and the Horticulture Award 2010 are due on Friday 12 April 2019
13 The exposure draft for the Live Performance Award 2010 will be published shortly
-- 3 of 4 --
[2019] FWC 2271
4
Date Event
26 April 2019 Parties to comment on updated Group 4E and 4F
exposure drafts
May 2019 Exposure draft to be updated and republished with
‘plain language light touch’
June 2019 Parties to comment on updated ‘plain language light
touch’ exposure drafts
August 2019 Exposure drafts to be republished incorporating
adjusted rates and allowances as a result of the 2018-19
Annual Wage Review decision
[16] A transcript of the conference is available on the Commission’s website. As
mentioned at the conference, the Live Performance Award Exposure Draft will be published
shortly and interested parties will have until 4 pm on Monday 29 April 2019 to comment.
[17] A mention will be held in relation to the Registered and Licenced Clubs Award 2010
at 9:30 am on Wednesday 10 April 2019.
[18] As mentioned at the conference, a statement issued on 28 February 201914 set out the
process for the plain language ‘light touch’ which will be undertaken as part of the second
update of exposure drafts. An example of an exposure draft that has been through this process
will be published shortly and a conference has been listed at 9:30 am on Monday 29 April
2019 to deal with the scope of the ‘light touch’.
[19] As set out in a statement of 6 February 201915, a number of Full Benches have been
constituted to deal with substantive claims in modern awards in accordance with the 2019
timetable. Any questions about these matters should be directed to the chambers of the
presiding member.
PRESIDENT
Printed by authority of the Commonwealth Government Printer
<PR706580>