Crawford v Ainsworth Investments Pty Ltd & Ors [2025] QSC 148
SUPREME COURT OF QUEENSLAND
CITATION: Crawford v Ainsworth Investments Pty Ltd & Ors [2025]
QSC 148
PARTIES: SCOTT ANDREW CRAWFORD
(plaintiff)
v
AINSWORTH INVESTMENTS PTY LTD
ACN 010 744 779
(first defendant)
and
GILLIAN ALEXIS
(second defendant)
and
WARREN JAMES DAVIES
(third defendant)
FILE NO/S: 15348 of 2022
DIVISION: Trial Division
PROCEEDING: Claim
ORIGINATING
COURT:
Supreme Court of Queensland at Brisbane
DELIVERED ON: 25 June 2025
DELIVERED AT: Brisbane
HEARING DATE: 20 May 2025 and further written submissions received on 18
June 2025
JUDGE: Copley J
ORDERS: I direct the parties to bring in Minutes of Orders that
reflect these reasons.
CATCHWORDS: EQUITY – EQUITABLE REMEDIES – SPECIFIC
PERFORMANCE – RELEVANT CONSIDERATIONS AND
DEFENCE MATTERS – ACTS INCONSISTENT WITH
CONTINUANCE OF CONTRACT – BREACH OF
CONTRACT – where the plaintiff and defendants entered into
a settlement agreement concerning the disposition of land –
where the settlement agreement provided for a transfer of a
half share to plaintiff as tenant in common in equal shares –
whether the plaintiff’s breach by failing to pay rates and
charges associated with the property under the agreement was
a breach of an essential obligation – where specific
performance is not precluded by the plaintiff’s breach, and
damages are an inadequate remedy
-- 1 of 23 --
2
EQUITY – EQUITABLE REMEDIES – SPECIFIC
PERFORMANCE – GENERALLY – where the defendants
made substantial improvements to the property which
increased its value – whether an order for specific performance
should accommodate the current value of the property
EQUITY – TRUSTS AND TRUSTEES – IMPLIED TRUSTS
– CONSTRUCTIVE TRUSTS – BREACH OF FIDUCIARY
OBLIGATIONS – whether the first defendant held the
property on trust and whether defendants breached the trust by
executing mortgages – whether the first defendant held the
property on trust for the plaintiff and itself
REAL PROPERTY – PARTITION OF LAND –
STATUTORY TRUST FOR SALE OR PARTITION –
GENERALLY – where s 38(1) of the Property Law Act 1974
(Qld) provides that the Court may appoint trustees for sale of
the property – whether upon sale, the amount the plaintiff can
receive from the proceeds should be limited
ESTOPPEL – ESTOPPEL BY JUDGMENT – RES
JUDICATA OR CAUSE OF ACTION ESTOPPEL –
GENERALLY – where the plaintiff previously instituted
proceedings against the defendants – where the previous
proceeding was dismissed for failure to comply with a self-
executing order – whether a self-executing order was a
determination on the merits of the previous proceeding
ESTOPPEL – ESTOPPEL BY JUDGMENT – ANSHUN
ESTOPPEL – GENERALLY – whether claims made in the
current proceeding could have been made in the previous
proceeding – where the plaintiff became aware of facts after
engaging with new legal representation – whether the claims
are precluded by Anshun estoppel
PROCEDURE – STATE AND TERRITORY COURTS:
JURISDICTION, POWERS AND GENERALLY –
INHERENT AND GENERAL STATUTORY POWERS – TO
PREVENT ABUSE OF PROCESS – ATTEMPTS TO
RELITIGATE – where the plaintiff previously instituted
proceedings against the defendants – where the previous
proceeding was dismissed for failure to comply with a self-
executing order – whether the current proceeding is an abuse
of process – whether permitting the current proceeding to
continue to a determination on the merits is unjustifiably
oppressive
Land Title Act 1994 (Qld)
Property Law Act 1974 (Qld), s 37, s 38
Chang v Registrar of Titles (1976) 137 CLR 177
Chartbrook v Persimmon Homes Ltd [2009] AC 1101
Codelfa Construction Pty Ltd v State Rail Authority of NSW
(1982) 149 CLR 337
-- 2 of 23 --
3
Commissioner of State Revenue (WA) v Rojoda Pty Ltd
(2020) 268 CLR 281
Commonwealth Director of Public Prosecutions v Citigroup
Global Markets Australia Pty Limited (No 3 – Privilege
Claims) [2021] FCA 1208
Dougan v Ley (1946) 71 CLR 142
DTR Nominees Pty Ltd v Mona Homes Pty Ltd (1978) 138
CLR 423
Golden Mile Property Investments Pty Ltd (in liq) v
Cudgegong Australia Pty Ltd (2015) 89 NSWLR 237
Goodwin v Goodwin [2004] QCA 50
Green v Sommerville (1979) 141 CLR 594
Hospital Products Ltd v United States Surgical Corporation
(1984) 156 CLR 41
In re Pavlou (A Bankrupt) (1993) 1 WLR 1046
John Alexander’s Clubs v White City Tennis Club Ltd (2010)
241 CLR 1
Leigh v Dickeson (1884) 15 QBD 60
Mango Boulevard P/L v Spencer & Others [2010] QCA 207
McWilliam v McWilliams Wines Pty Ltd (1964) 114 CLR 656
Mehmet v Benson (1965) 113 CLR 295
Paolucci v Makedyn Pty Ltd (2021) 20 BPR 41,749
Pianta v National Finance and Trustees Ltd (1964) 180 CLR
146
PSAL Pty Ltd v Raja [2016] WASC 295
Recycling Developments Pty Ltd & Anor v Bespoke Recycling
Industries Pty Ltd & Anor [2024] QSC 42
Shanahan v Fitzgerald [1982] 2 NSWLR 513
Tanwar Enterprises Pty Ltd v Cauchi (2003) 217 CLR 315
Tomlinson v Ramsey Food Processing Pty Ltd (2015) 256
CLR 507
UBS AG v Tyne (2018) 265 CLR 77
Zetta Jet Pte Ltd v The Ship “Dragon Pearl” (No 2) (2018)
265 FCR 290
COUNSEL: J Byrnes for the plaintiff
S Walpole for the defendants
SOLICITORS: Frews Solicitors for the plaintiff
Synkronos Legal for the defendants
The claim
[1] This proceeding, commenced by claim filed on 7 December 2022, concerns real
property located at 25 Freeman Road, Toorbul, Queensland. The first defendant is
the registered owner of the property.1
1 Described as Lot 2 on SP211490, Title Reference 50762792.
-- 3 of 23 --
4
[2] The plaintiff seeks the following:
(a) Declarations that:
(i) Prior to the grant by the first defendant of mortgages, it held the property
upon trust for the plaintiff and the first defendant as tenants in common
in equal shares;
(ii) In granting the mortgages and permitting their registration the first
defendant was guilty of a breach of trust upon which it held the property
or breached its fiduciary duties to the plaintiff;
(iii) The second and third defendants are accessories to the first defendant’s
breach of trust or breach of fiduciary duties;
(iv) In the premises of (i) to (iii) the first, second and third defendants are
liable to indemnify the plaintiff from and hold him harmless against the
consequences of the breach of trust or breach of fiduciary duties;
(v) In the alternative to (iv) and the orders as to the distribution of the
proceeds of sale below, equitable compensation as against the first,
second and third defendants as a consequence of the breach of trust or
the breach of fiduciary duties.
(b) An order that a written agreement dated 20 February 2019 (the settlement
agreement) be specifically performed as required by clause 1 of the settlement
agreement, and that the costs of the transfer of the property be paid equally by
the plaintiff and the second defendant (as an implied term of the settlement
agreement), in the alternative, damages in lieu of specific performance of the
settlement agreement;
(c) Pursuant to s 38 of the Property Law Act 1974 (Qld) statutory trustees be
appointed as trustees for the sale of the property and that the property vest in
the trustees for the purposes of sale, along with various ancillary orders.
[3] The evidence comprised the following. A “resolution bundle” (exhibit 1) was agreed
to be admissible for all purposes. Counsel for the plaintiff tendered: affidavits from
two persons concerning the willingness of each to act as a trustee for any sale of the
property; a trust account receipt showing a deposit of $35,353.29 to the plaintiff’s
solicitors’ trust account; and correspondence to the defendants’ solicitors about those
funds. Counsel for the plaintiff called as witnesses the plaintiff and the executor of
the estate the settlement agreement was concerned with.
[4] The plaintiff advanced his case by addressing the issues in the following order;
submissions concerning specific performance and the inadequacy of damages;
submissions concerning the alleged breach of trust and the alleged breach of fiduciary
duties; and then submissions concerning the appointment of statutory trustees for sale.
It is convenient to deal with the plaintiff’s claims in the same order.
[5] The defendants’ position is that the plaintiff is not entitled to any of the relief sought
and the proceedings should be dismissed. However, in the event the Court considers
relief should be granted, the defendants contend that it should be confined to damages
in the amount of $437,500.
-- 4 of 23 --
5
[6] The defendants also contend that the plaintiff’s claims are precluded by the doctrine
of res judicata, Anshun estoppel or abuse of process.
[7] This judgment determines first whether the plaintiff is precluded from pursuing his
claim and the conclusion is that he is not precluded. The claim is then considered.
The results of that consideration are that there will be an order for specific
performance and an order for the appointment of statutory trustees for sale, upon the
parties bringing in minutes of orders which reflect the reasons below. No declarations
are made.
Background to the claim in the current proceeding
[8] The circumstances which have given rise to this proceeding are as follows.
[9] The plaintiff is the brother of the second defendant. The first defendant is a corporate
entity. The second defendant is the director of the first defendant, and has been the
sole director since 13 September 2018. The third defendant is her partner.
[10] The father of the plaintiff and the second defendant, John Alexander Crawford, died
in April 2017. In his will, he left a legacy ($5000), then the residue of his estate to
the plaintiff and the second defendant in equal shares as tenants in common.
[11] The settlement agreement resulted from a mediation on 20 February 2019. The
plaintiff (together with his lawyer), the first defendant (through its director, the
second defendant), the second defendant (together with her lawyer), the third
defendant and the executor of the father’s estate participated in the mediation. The
settlement agreement was signed by the plaintiff, the current defendants and the
executor. It was headed “BS 1497/16 BS2957/18 20 February 2019 Terms of
resolution of issues relating to the affairs of the estate of John Alexander Crawford
(JAC) and Ainsworth Investments Pty Ltd ACN 010 744 779 (AIPL)”. The terms
were as follows:2
“1 In part compromise of SAC’s claim against AIPL and the
executor and by way of further provision for SAC, AIPL will
transfer a half share in the Toorbul property to Scott Andrew
Crawford (SAC) as tenant in common with AIPL in equal
shares
2 The costs of transfer must be paid from JAC
3 Occupancy of the property must be as follows:
(a) The property has an existing fence such that it is divided
into two areas as approximately shown on the attached
aerial photo.
(b) SAC is entitled to occupy the portion of the property
(containing the house, sheds and infrastructure) north of
the fence for three years from today rent free.
2 As the settlement agreement was recorded partly in handwriting and partly in typed form, counsel were
asked to produce an agreed version of it in type written form. This version was made Exhibit 1B and
is the version reproduced above.
-- 5 of 23 --
6
(c) Gillian Alexis (GA) is entitled to occupy the residual
portion of the property from three years from today rent
free.
(d) Neither AIPL nor SAC may seek appointment of trustees
for sale or otherwise force a sale of the property for 3
years.
4 SAC must pay 70% of the rates, regulatory charges, insurance
(Public liability) and 100% of house and improvements
insurances for the property
5A GA must pay 30% of the rates, regulatory charges, insurance
(Public liability) and necessary outgoings for the property
5B Any commercial activity undertaken by either party would
require insurance appropriate to the activity, including public
liability at their cost
6 In part compromise of these actions, JAC waves (sic)
/discharges the ‘debt’ from AIPL the subject of the Statutory
Demand
7 In part compromise of SAC claims against AIPL, AIPL releases
SAC from all alleged indebtedness.
8 JAC transfers 21 shares back to GA, in part compromise of
these actions.
9 All Supreme Court proceedings (1497/2016 and 2957/2018
must be discontinued with all parties to pay their own costs
(including reserve costs), reserving the rights of JAC’s costs
out of the estate of JAC.
10 SAC must withdraw caveat #718486605 and discontinues his
application in BD 4751/17
11 The executor shall administer the estate, and make interim
residuary distributions, as soon as practicable
12 AIPL and SAC grant the other a right of first refusal to purchase
the half shares owned by them to the other upon the death of
SAC or GA respectfully (sic).
13 Fulfillment of these terms shall be in complete satisfaction of
all claims of any nature any party may have against another”
[12] The settlement agreement concerned three proceedings: Supreme Court proceedings
1497/16 and 2957/18 and District Court proceeding BD 4571/17. Proceeding
BS 1497/16 had been commenced in September 2016 by the deceased father’s
litigation guardian. The defendants were the plaintiff and the second defendant and
that proceeding sought, among other matters, relief in respect of shareholding in the
first defendant. The District Court proceeding had been commenced in December
2017 by a Ms Ybanez. She sought provision from the estate of the deceased. The
plaintiff also sought provision from the estate. Proceeding BS 2957/18 had been
commenced in March 2018 by the plaintiff against the first and second defendants
-- 6 of 23 --
7
and the executor of the estate, Mr Love. Among other matters, the plaintiff sought
relief as to shares in the first defendant that had been transferred from the deceased
to the second defendant and declarations that the first defendant held the property on
trust for the plaintiff.
[13] The settlement agreement addressed eight matters. First, the transfer of a half share
in the ownership of the property (clause 1). Second, the cost of this transfer (clause
2). Third, occupation of the property and the terms of occupation (clauses 3, 4, 5A
and 5B). Fourth, forgiveness of debts (clauses 6 and 7). Fifth, share transfers (clause
8). Sixth, the resolving of then pending proceedings (clauses 9 and 10). Seventh,
administration and distributions from the estate (clause 11). Eighth, future ownership
of the property (clause 12). The fifth matter only concerned the estate and the second
defendant. The first defendant undertook to transfer a half share in the property to
the plaintiff. The costs of the transfer were to be paid by the estate. Mr Love gave
evidence that at the time the settlement agreement was reached the estate had
sufficient funds available to meet the costs of the transfer.
[14] The trial proceeded on the basis that, apart from non-compliance with clause 4, the
plaintiff had complied with all the other obligations imposed on him by the settlement
agreement.
[15] As at 20 February 2019 the property was worth $875,000. Since that date the second
and third defendants have made substantial improvements, such as by building a
house on the property. On 5 September 2022 the land was worth $1.125m to $1.2m
and the property was worth $1.9m to $2.1m. The current value of the property is
$2.4m.
[16] On 19 February 2021 the first defendant executed a mortgage (signed by the second
defendant) in favour of the second defendant, in respect of the property and on the
same date the first defendant executed a mortgage (signed by the second defendant)
in favour of the third defendant, in respect of the property. The second and third
defendants caused the mortgages to be recorded in the Land Title Act 1994 register
on 11 May 2022. By these mortgages the first defendant charged the property with
the payment to the second and third defendants of all monies due from time to time
by the first defendant to the second and third defendants.
[17] On 11 August 2021 the plaintiff commenced a proceeding by claim in this Court
against the first and second defendants (‘the previous proceeding’).
[18] On 4 October 2022 the plaintiff lodged a caveat on the property.
[19] Since the signing of the agreement the plaintiff has never paid any rates, regulatory
charges, insurance (Public liability) or house insurance in relation to the property or
buildings on it. His evidence was that by the time of this trial he had been in
occupation of part of the property for the last 34 years.
[20] There is no dispute that the plaintiff has not received an unencumbered interest in the
property as a tenant in common in equal shares with the first defendant. There is no
dispute that if clause 1 of the settlement agreement had been performed he would
have received an unencumbered interest as just described.
-- 7 of 23 --
8
Evidence relevant to preclusion
[21] In the previous proceeding3 the plaintiff sought a declaration that the settlement
agreement4 be declared void for common mistake. On 30 September 2021 the
plaintiff was given leave to add Mr Love, the executor, as the third defendant. Leave
was also given to amend the claim so that the orders sought were:
(a) That the “Deed of 20th February 2019 be read and construed as entitling the
plaintiff to an unencumbered one half share of the Toorbul property that, save
for clauses 4 and 5 of the Deed is only subject to obligations and/or liabilities
attaching thereto or otherwise payable in respect to the parties’ performance of
all transactions required by the Deed which are no greater than those of [Ms
Alexis]”.
(b) “Specific performance of the Deed as so construed”.
[22] On 22 October 2021 the claim and statement of claim were amended to seek
rectification of the settlement agreement or a term implied based on a common
intention that the plaintiff was to receive an unencumbered one half interest in the
property only subject to obligations or liabilities attaching to the parties’ performance
of transactions required by the agreement that were no greater than those of the
plaintiff. Specific performance was sought based on that construction. The steps
taken up to 22 October 2021 were taken by solicitors on the plaintiff’s behalf.
[23] On 12 November 2021 the plaintiff filed a notice that he was acting in person. The
plaintiff gave evidence in the current proceeding about why he came to act for himself
in the previous proceeding. He said that he had lost all confidence in his solicitor and
could not afford to have anyone act for him after that. It was clear from his evidence
in this proceeding that the plaintiff had no legal training.
[24] On 25 November 2021 orders were made striking out some paragraphs in the
amended statement of claim. Leave was given for the plaintiff to file and serve a
further amended statement of claim within 28 days. The plaintiff did not comply with
that order. His explanation for not doing so in this proceeding was that he did not
know what to do, he had no money and he could not find anyone to help him.
[25] On 16 February 2022 the Court heard an application to strike out the further amended
statement of claim on the basis that it disclosed no reasonable cause of action and that
the plaintiff had not filed and served a further amended statement of claim.
Alternatively, dismissal for want of prosecution was sought. The Court made orders
that the time for complying with the previous order for filing a further amended
statement of claim be extended to 4:00 pm on 17 March 2022 and if the plaintiff did
not do so by then the proceeding would be dismissed and in that event the plaintiff
was to pay the defendants’ costs on the standard basis. Before these orders were made
the judge explained the nature of the orders to the plaintiff and informed him that if
he did not comply the case would “automatically be over”. The plaintiff said he
understood. The plaintiff did not file any further amended statement of claim by 4:00
pm on 17 March 2022 and the proceeding was dismissed.
3 BS 9188/21.
4 Referred to in that claim as the deed of settlement.
-- 8 of 23 --
9
[26] In this proceeding the plaintiff said he did not file the further amended statement of
claim as he did not have the ability.
Res judicata
[27] The defendants submit that res judicata applies to preclude a renewed claim for
specific performance in this proceeding. As the claims for damages in lieu of specific
performance and for the appointment of statutory trustees for sale depend on an order
for specific performance the defendants submit the effect of res judicata is that these
claims should also be dismissed. It is asserted that these claims merged in the order
made on 16 February 2022.
[28] In Commonwealth Director of Public Prosecutions v Citigroup Global Markets
Australia Pty Limited (No 3 – Privilege Claims) it was said that:5
“Res judicata (a ‘matter adjudicated’), in the strict sense, is the rule or
doctrine whereby a judicial determination which settles or quells a
controversy between persons or classes of persons concerning the
existence of certain rights or obligations results in those rights or
obligations ‘merging’ in the final judgment, with the result that those
rights or obligations cease to have any independent existence and
cannot be reasserted in subsequent proceedings: … For the doctrine
of res judicata to operate, it must be shown that the earlier judicial
determination was a final judgment on the merits and that, as between
the former and present litigation, there is identity of parties, as well
as identity of subject matter or cause of action: …”
[29] The plaintiff submits that res judicata does not apply because there was no final
determination of the plaintiff’s claim in the previous proceeding and properly
understood the claim in the present proceeding is in substance different from the claim
in the previous proceeding.
[30] In this proceeding, I consider that res judicata does not operate to preclude the
plaintiff from agitating the claim for specific performance, the claim for damages in
lieu or the claim for the appointment of statutory trustees for sale. The order made
on 16 February 2022, a self-executing order, was not a determination on the merits of
the previous claim for specific performance.
[31] In Zetta Jet Pte Ltd v The Ship “Dragon Pearl” (No 2) the Full Court of the Federal
Court said:6
“In some instances, judgment may be entered procedurally, such as by
operation of a self-executing order in default of compliance with a
direction or other order of the court. In some cases, dismissal is
effected by operation of the rules, such as where cases have been
inactive for a specified period and notice has been given but further
steps have not been taken. However, such cases are in a different
category because there is no hearing. They are akin to cases where
orders are made ex parte. The doctrine of res judicata does not apply
to orders of this kind: Mango Boulevard Pty Ltd v Spencer [2008]
5 [2021] FCA 1208 at [41].
6 (2018) 265 FCR 290 at [30].
-- 9 of 23 --
10
QCA 274 at [57]-[61]. They are not a final determination of rights.
Consistently with that position, a self-executing order for judgment
operating in default of compliance can always be the subject of an
application for an extension of time for compliance after the specified
date: …”
[32] In Mango Boulevard P/L v Spencer & Others, Fraser JA said:7
“[115] In Pople v Evans, Ungoed-Thomas J discussed the authorities,
both ancient and modern, and concluded:
‘Lord Maugham said in New Brunswick Rail Co v British
& French Trust Corporation Ltd [1939] AC 1, 19:
‘The doctrine of estoppel is one founded on
considerations of justice and good sense. If an issue
has been distinctly raised and decided in an action, in
which both parties are represented, it is unjust and
unreasonable to permit the same issue to be litigated
afresh between the same parties or persons claiming
under them.’
That case and the Kok Hoong case [1964] AC 993 showed
the concern of the courts to limit the operation of res
judicata to issues which can be fairly regarded or treated as
having been disposed of by the order relied on on their
merits, for example, by trial, admission or compromise. It
seems to me that the non-technical and substantial nature
of res judicata ‘founded on the considerations of justice
and good sense’ has no place for mere dismissal for want
of prosecution …
[116] The same reasoning appears to me to be equally applicable in
relation to a judgment given for non-compliance with
obligations to disclose documents under procedural rules or
pursuant to an order for disclosure. The two different forms
of order have a common foundation in conduct by a party
which is so procedurally deficient as to justify summary
termination of the proceeding without regard to the merits.
Plainly such judgments do not involve any actual
determination on the merits and I see no reasonable basis for
treating them as determining the merits of any issue. Such
judgments should be distinguished from default judgments
which have been treated as giving rise to a res judicata or an
issue estoppel, such as a judgment based upon default of
pleading (which may be explained on the ground that the party
in default has or should be taken to have admitted the
allegations) and a consent judgment based upon a
compromise (where the parties should be held to their
compromise). …”
7 [2010] QCA 207 at [115]-[116].
-- 10 of 23 --
11
[33] As the previous proceeding was not disposed of on the merits, it is unnecessary
therefore for the purposes of determining this aspect of the defendants’ argument
about preclusion to decide whether the claim in the current proceeding is different
from the claim in the previous proceeding.
Anshun
[34] The defendants rely on Anshun estoppel8 as precluding the entirety of the plaintiff’s
claims. In Tomlinson, it was said:9
“… ‘Anshun estoppel’ … operates to preclude the assertion of a claim,
or the raising of an issue of fact or law, if that claim or issue was so
connected with the subject matter of the first proceeding as to have
made it unreasonable in the context of that first proceeding for the
claim not to have been made or the issue not to have been raised in
that proceeding. …” (Footnotes omitted)
[35] The defendants submit this form of estoppel arises because the allegations and claims
for relief made by the plaintiff in the current proceeding are so closely connected with
the allegations and claims he made in the previous proceeding that “the plaintiff’s
claims in the present proceeding could have been made in the previous proceeding;
the plaintiff’s claims in the present proceeding should have been made in the previous
proceeding; and, it was unreasonable for the plaintiff not to have raised the claims he
now makes in the present proceeding in the previous proceeding”.10
[36] Various claims are made in the present proceeding. The claim for declarations relates
to the mortgages executed in February 2021 and registered in May 2022. The
plaintiff’s evidence was that he only discovered the existence of the mortgages when
his current solicitors informed him about them. This evidence was not contradicted
or even challenged. I accept the plaintiff’s evidence. The previous proceeding had
been commenced by different solicitors. Accordingly, the claim for various
declarations is not a claim that could have been made in the previous proceeding as
the plaintiff did not then know about the mortgages.
[37] In the present proceeding the plaintiff makes a claim for specific performance of the
settlement agreement. His claim in the previous proceeding was a claim for specific
performance of the settlement agreement. Although the previous proceeding sought
specific performance of the settlement agreement “as so construed”, that does not in
substance render the current claim for specific performance different from the
previous claim for specific performance.11
[38] Accordingly, this form of estoppel does not operate to preclude the plaintiff from
claiming specific performance in the current proceeding or from pursuing his other
claims.
8 As explained in Tomlinson v Ramsey Food Processing Pty Ltd (2015) 256 CLR 507 (Tomlinson).
9 Tomlinson at [22].
10 Defendants’ closing submissions paragraph 116.
11 Chartbrook v Persimmon Homes Ltd [2009] AC 1101 at [23].
-- 11 of 23 --
12
Stay
[39] The defendants submit that the entirety of the proceeding should be stayed on the
basis of abuse of process. Alternatively that the claims for specific performance,
damages in lieu and the appointment of statutory trustees for sale, should be stayed
on the basis of abuse of process. The previous proceeding had been dismissed due to
the plaintiff’s failure to file an amended statement of claim by 17 March 2022 and
nearly a year later the plaintiff commenced the current proceeding in which he seeks
to re-agitate what are in substance the same claims, as well as vexing the defendants
with new claims.
[40] Commencing a proceeding which raises a claim or claims that have been previously
determined and/or commencing a proceeding which raises a claim or claims that
ought reasonably to have been raised for resolution in an earlier proceeding can
constitute an abuse of process.12 As already stated, the previous proceeding was not
determined on the merits. It was dismissed when the plaintiff failed to file an
amended statement of claim within a specified time. However, undue vexation,
which an order for a stay can prevent, is not confined to a proceeding commenced
about a claim which has been previously determined on its merits.13
[41] Permitting the plaintiff’s current proceeding to continue to a determination on the
merits is not unjustifiably oppressive to the defendants and would not bring the
administration of justice into disrepute for the following reasons. 14
[42] The plaintiff provided an explanation about the failure to file the amended statement
of claim by 17 March 2022. His explanation was that having lost confidence in his
solicitor he did not have the resources to obtain a new solicitor and he did not have
the ability to replead his claim. He knew that if he did not do so by 17 March 2022
the proceeding would be dismissed. His explanation was not challenged in this
proceeding. I accept it as being a truthful explanation. It explains why the plaintiff
allowed the previous proceeding to be dismissed. It was not to his obvious advantage
to have allowed this to occur.
[43] The delay between the dismissal of the previous proceeding and the commencement
of the current proceeding was only in the order of nine months. It was not a lengthy
delay. No particular detriment has been identified as flowing to the defendants from
the commencement of the current proceeding beyond the fact that they have had to
incur expenses to defend themselves against claims that they may have thought would
not trouble them again. The plaintiff’s evidence was that he complied with the order
requiring him to pay the defendants’ costs in the previous proceeding. This evidence
was not challenged and I accept it.
[44] There was no determination of the merits of the previous claim. Accordingly, the
plaintiff’s current proceeding is by no means a “serial” proceeding.15
12 Tomlinson at [26].
13 UBS AG v Tyne (2018) 265 CLR 77 at [46] (UBS).
14 Tomlinson at [25].
15 UBS at [46].
-- 12 of 23 --
13
Specific performance and the inadequacy of damages
[45] Various arguments were made regarding performance of clauses 1 to 4 of the
agreement.
[46] The plaintiff submits that the first defendant failed to transfer the interest in the
property pursuant to clause 1 of the agreement. His position is that he was not
required to do anything else as a precondition to the transfer of the interest in the
property. The plaintiff recognises that specific performance will not be ordered
unless damages are an inadequate remedy,16 but submits that land is unique and
damages are usually not regarded as adequate even where the person seeking specific
performance intends to sell the land.17
[47] The defendants recognise that the settlement agreement conferred a contractual right
to a transfer from the first defendant,18 but argue that specific performance should be
refused for three reasons. First, the estate has not paid the transfer costs as required
by clause 2 of the agreement. Thus, the obligation to transfer the half share to the
plaintiff under clause 1 of the agreement has not yet arisen because there is no
obligation it is said that can be specifically performed. Second, specific performance
is only available if the party seeking it is not himself in breach of the contract and is
ready, willing and able to perform it. The plaintiff has failed to perform the obligation
imposed on him by clause 4. Third, being a discretionary remedy, the plaintiff in this
proceeding, as in the previous proceeding, challenges the proper construction of the
agreement. That circumstance along with his failure to comply with clause 4 should
result in the Court withholding the remedy.
[48] The position is that the estate cannot meet the costs of the transfer of the half share of
the interest as required by clause 2. Mr Love gave evidence that all the funds in the
estate were expended by 27 July 2021. Currently, the estate owes $44,000 to third
parties and cannot pay the costs of transferring a half share to the plaintiff, the transfer
costs being estimated to be approximately $22,000.
[49] The plaintiff submits that the inability of the estate to pay the costs of the transfer
need not present an obstacle to specific performance. Clause 2 attempted to spread
the burden of the costs. If the estate had paid the costs that expense would ultimately
have been borne by the residuary beneficiaries (the plaintiff and the second
defendant). A term can be implied that if the estate cannot meet the transfer costs the
equal residuary beneficiaries will bear the costs equally.
[50] The defendants submit however that elements (1), (2) and (3) from the well
recognised test for the implication of a term into the agreement cannot be established.
[51] In Codelfa Construction Pty Ltd v State Rail Authority of NSW Mason J said:19
“The conditions necessary to ground the implication of a term were
summarized by the majority in B.P. Refinery (Westernport) Pty. Ltd.
v. Hastings Shire Council: ‘(1) it must be reasonable and equitable;
16 Paolucci v Makedyn Pty Ltd (2021) 20 BPR 41,749 at [17].
17 Pianta v National Finance and Trustees Ltd (1964) 180 CLR 146 at 151; Recycling Developments Pty
Ltd & Anor v Bespoke Recycling Industries Pty Ltd & Anor [2024] QSC 42 at [52].
18 Defendants’ closing submissions at paragraph 50.
19 (1982) 149 CLR 337 at 347.
-- 13 of 23 --
14
(2) it must be necessary to give business efficacy to the contract, so
that no term will be implied if the contract is effective without it; (3)
it must be so obvious that ‘it goes without saying’; (4) it must be
capable of clear expression; (5) it must not contradict any express
term of the contract’.”
[52] It might be reasonable and equitable that equal beneficiaries under the will share
equally in the costs of the transfer. Clause 2 provided that the estate was to bear those
costs and ultimately that would have been at the expense of the plaintiff and the
second defendant as residuary beneficiaries. However, obstacles to the implication
of the term the plaintiff seeks are whether such an implied term is necessary to give
business efficacy to the contract and is so obvious it goes without saying. I do not
consider such a term is necessary to give efficacy to the contract. It is not obvious
that the second defendant should be required to share in the costs of transferring a
half share to the plaintiff. A more obvious term and one which would satisfy the test
for the implication of a term is that if the estate could not do so, the person to benefit
from the transfer should pay the costs of the transfer.
[53] The plaintiff has given evidence in this proceeding that he is prepared to pay the costs
of the transfer. An order for specific performance could be made conditional on the
plaintiff paying the costs of the transfer. In this way no obligation would be imposed
on any party.
[54] In cross-examination, the plaintiff conceded that he understood clause 4 of the
agreement required him to pay 70% of the rates, regulatory charges and various
insurance premiums. He agreed he had not paid those amounts. His evidence was,
“it was a case of you transfer the 50 per cent, my – and I will start paying that
immediately. And that – that didn’t happen, so that was why I’ve put it aside until
such time it was worked out”. The plaintiff’s position is that he did not pay the rates
etc because his understanding was that the obligation arose only once he had received
his half share in the property. The genuineness of this belief finds support in the
assertion of it in an email he sent to the second defendant on 11 May 2020. Also, the
plaintiff testified that he had deposited about $35,000 into his solicitors’ trust account
and was willing to instruct his solicitors to use those funds to pay the outgoings for
the property if that was necessary to obtain specific performance. The evidence is
that these outgoings have been paid by the first defendant.
[55] The plaintiff submits that clause 4 is concerned with expenses usually borne by the
owner of a property. It is clear when considered in the context of the agreement under
which the plaintiff was to receive part ownership of the property that he is only
obliged to pay the expenses set out in clause 4 from the time when he receives his
half share.
[56] Clause 4 is to be construed differently. The clause obliged the plaintiff to begin
paying 70% of the rates, regulatory charges, insurance (Public liability) and house
and improvements insurance from the date the agreement was made. This was
because clause 3(b) provided that “from today”, meaning from 20 February 2019, the
plaintiff was entitled to occupy the part of “the property (containing the house, sheds
and infrastructure) north of the fence for three years from today rent free”.
Clause 3(c) provides that the second defendant was entitled to occupy “the residual
portion of the property from three years from today rent free”. Clause 5A obliges the
-- 14 of 23 --
15
second defendant to pay 30% of the “rates, regulatory charges, insurance (Public
liability) and necessary outgoings for the property”. The agreement allowed the
plaintiff to occupy the portion of the property which contained the house, sheds and
infrastructure whereas the second defendant was only to occupy the “residual”
portion. The requirement for the plaintiff to pay 70% of the rates etc thereby reflects
his more extensive right of occupation of structures, commencing on 20 February
2019. Nor is the argument that the expenses the plaintiff has not paid would normally
be borne by an owner persuasive. The settlement agreement made a different
arrangement from what might be regarded as the usual incidents of ownership. The
right of occupation and the obligations attached to occupation commenced on 20
February 2019. The transfer of a half share of the fee simple, on the other hand, was
not stipulated to occur on 20 February 2019. The plaintiff is in breach of clause 4.
[57] In Green v Sommerville it was said:20
“It is well settled that a plaintiff in a suit for specific performance is
not required to show that he has strictly complied with all his
obligations under the contract; it is enough that he has performed and
is ready and willing to perform the substance of the contract …”
(Footnotes omitted)
[58] The plaintiff’s breach of clause 4 is not a substantial breach of the contract. In
Mehmet v Benson, Barwick CJ said:21
“The question as to whether or not the plaintiff has been and is ready
and willing to perform the contract is one of substance not to be
resolved in any technical or narrow sense. It is important to bear in
mind what is the substantial thing for which the parties contract and
what on the part of the plaintiff in a suit for specific performance are
his essential obligations.”
[59] The plaintiff’s essential obligations were not those imposed by clause 4. The
substantial matters bargained for in the present case were a transfer of a half share in
the property, rights to occupation of portions of the land and the plaintiff
discontinuing his claims against the first defendant and the estate. This last matter
was addressed when the plaintiff ended his claims in BS 2957/18 and BD 4571/17.22
[60] The second defendants’ position is that the total of the expenses due pursuant to
clause 4 is $35,353.29. The plaintiff’s evidence, which I accept, is that he has set
aside about $35,000 in the event that he needs to meet expenses relating to clause 4.
An order for specific performance could be made conditional on the plaintiff paying
the sum presently owing for unpaid rates and insurance to the first defendant. In this
way no obligation would be imposed on any party.
[61] The plaintiff ought not be denied the remedy of specific performance on discretionary
grounds. The plaintiff’s claim in the previous proceeding, in which initially he sought
a declaration that the settlement agreement be declared void for common mistake and
which then became a claim concerning the proper construction of clause 4, should not
result in a refusal of specific performance. In advancing these claims the plaintiff did
20 (1979) 141 CLR 594 at 610.
21 (1965) 113 CLR 295 at 307.
22 The caveat referred to in clause 10 (718486605) was withdrawn on 11 May 2022.
-- 15 of 23 --
16
not evince an intention not to perform the contract. He has complied with his
substantial obligations under the agreement. In any event, in the previous proceeding
the plaintiff did seek “Specific performance of the Deed as so construed.” His
conduct can be regarded as involving the maintenance of a wrong view of the contract
but nevertheless demonstrating a willingness to perform his obligation under clause
4 upon the Court determining the true nature of the obligation.23
[62] Specific performance of the agreement remains possible.
[63] A contract for the sale of land “has always been considered a proper subject for
specific performance.”24 As previously noticed, the plaintiff’s association with the
property goes back for some decades. Also, his evidence was that he and his father
acquired it through the vehicle of the first defendant.
[64] The plaintiff argues that damages would be inadequate because absent an order for
specific performance the plaintiff would lose his interest in the property and would
become an unsecured creditor against the first defendant. The plaintiff points out that
according to an email the second defendant sent to him on 31 December 2024 the first
defendant has no income. Although the property was unencumbered at the date the
settlement agreement was made, mortgages were executed by the first defendant on
19 February 2021 through its director, the second defendant, in favour of the second
and third defendants. Each of these mortgages charged the whole of the property for
all monies due from time to time from the mortgagor to the mortgagees. Both
mortgages were registered on 11 May 2022.
[65] The defendants have not advanced any particular argument in support of the
contention that damages would be an adequate remedy. They do submit damages in
lieu of specific performance would be the “appropriate”25 remedy because they say a
monetary remedy will more easily accommodate the adjustment they say will be
necessary to ensure the plaintiff does not gain a windfall benefit from improvements
made to the property, since 2019 by the defendants. This is a matter dealt with below.
[66] For the reasons advanced by the plaintiff I am satisfied that damages would not be an
adequate remedy.
[67] There is no dispute that as at 20 February 2019 the value of the property was
$875,000. This was substantially the value of the land because only a nominal value
was attributed to the improvements. The plaintiff accepts that since March 2019 the
defendants have made various changes to the property which constitute
improvements and have increased its value. The plaintiff accepts that the
improvements include:
(a) a house with six bedrooms, four bathrooms and 20 six watt solar panels;
(b) a one bedroom cottage;
(c) at least one shed;
(d) stables capable of sheltering six horses;
23 DTR Nominees Pty Ltd v Mona Homes Pty Ltd (1978) 138 CLR 423 at 432.
24 Dougan v Ley (1946) 71 CLR 142 per Dixon at 150.
25 Defendants’ closing submissions paragraph 81.
-- 16 of 23 --
17
(e) two biocycle treatment plants, three pumps, four water tanks and associated
water reticulations; and
(f) landscaping and external lights, fencing, gates and underground power services
and plumbing.
[68] It is accepted, by all parties that as at 5 September 2022 the value of the property was
$1.9m to $2.1m with a land value of $1.125m or $1.2m. The significance of 5
September 2022 is that it was the date by which the plaintiff required the defendants
to execute the transfer forms and release the mortgages over the property. It is
accepted by all parties that the current value of the property is $2.4m, which
apportions $1.4m for the land and $1m for the improvements. The plaintiff
recognises that a decree for (“… specific performance could make provision for the
improvements)”.26
[69] The defendants’ position is that if specific performance is to be granted an adjustment
should be made to the decree to recognise the value added to the property by the
improvements made by the second and third defendants. The defendants did not
tender any evidence about the costs expended on the improvements.
[70] The defendants contend that the plaintiff cannot rely on the delay in the performance
of the agreement arising from his breach of the agreement so as to obtain an interest
greater than he would have received in 2019 by reason of the defendants’
improvements. The defendants argue that if the contract had been performed in 2019,
when the value of the property was $875,000, that value being substantially
attributable to the land, all the plaintiff would have obtained would have been an
interest with a value of 50% of $875,000. As it is accepted that the current value is
$2.4m apportioned as $1.4m for the land and $1m for the improvements, the
defendants submit that, at best the plaintiff would be entitled to 50% of the current
land value. So an order for specific performance could be conditional upon the
plaintiff paying the first defendant $1m for the increase in value due to the
improvements.
[71] For the reasons which follow I consider an order for specific performance should
accommodate the plaintiff effectively receiving half of the current value of the land.
Mr Love’s evidence was that at the time when the estate had funds available to pay
the costs of the transfer he could not get the plaintiff and the first defendant to return
a signed transfer form to him. This mutual failing impeded the transfer occurring in
2019. Also, the first defendant applied on 11 May 2022 to remove the caveat the
subject of clause 10 of the agreement. A statutory declaration signed on its behalf by
the second defendant discloses that as at that date both defendants regarded the
settlement agreement as on foot. The statutory declaration included:
“6. On 20 February, 2019 the Caveator as Plaintiff and the Company
as First Defendant and other parties participated in a mediation
of the Proceedings and other proceedings. As a consequence of
that mediation the Caveator and the Company agreed on terms
of resolution of issues (“Terms of Resolution”) with respect to
the Proceedings and resolved their disputes regarding them.
…
26 Plaintiff’s closing submissions at paragraph 84.
-- 17 of 23 --
18
9. The interest claimed by the Caveator in the Caveat is merged in
the Terms of Resolution and pursuant to paragraph 10 of the
Terms of Resolution the Caveator as Plaintiff is obliged inter alia
to withdraw Caveat #7108486605.”
[72] Consideration has been given to whether an order for specific performance should
accommodate the current value of the property. However, the current value is due to
improvements made to the property by the second and third defendants. That led to
consideration about whether an order for specific performance should make an
allowance for the amount expended by the second and third defendants which resulted
in the improved value.27 Further submissions were sought from the parties about
whether any adjustment should be made based on the value of the improvements or
made based on the costs expended which resulted in those improvements. Both
parties submitted that there should not be an adjustment in monetary terms based on
costs expended as no evidence had been tendered about the costs.
[73] In the further submissions, the defendants submitted there should be an adjustment
for the value of the improvements and that the best way to give effect to this would
be by way of an order providing for a monetary payment by them to the plaintiff with
a suitable adjustment of the amount to reflect the value of the improvements, rather
than the appointment of statutory trustees for sale. As to the quantum, if the
appropriate valuation date is the current value, the improvements should be entirely
excluded and the order should be that the defendants pay the plaintiff a sum of money
representing 50% of the current value of the land.
[74] The plaintiff’s further submission was that improvements should not be provided for
in any decree for specific performance but if the Court decides they should be, then
assuming current value the Court could order the proportionate distribution of the net
sale proceeds by the statutory trustees by percentage “based on the value of
improvements relative to the overall value”. Assuming a value of $2.4m and based
on improvements of $1m, the plaintiff should receive 33.33% of the net proceeds of
sale which would be $700,000 if a sale achieved $2.4m.
[75] I consider the appropriate outcome should include a term in the order that the net
proceeds of sale be distributed so that the plaintiff receives 33.33% and the first
defendant receives 66.66% of those proceeds.
[76] In due course there shall be an order for specific performance conditional upon the
plaintiff first paying (1) the sum presently owing for the outgoings the subject of
clause 4 of the agreement to the first defendant, and (2) the costs of the transfer. The
order shall include the term set out in the paragraph above.
Declarations
[77] The plaintiff seeks a number of declarations: a declaration that prior to the first
defendant granting mortgages over the property to the second and third defendants,
the first defendant held the property on trust for him and the first defendant as tenants
in common in equal shares; alternatively, a declaration that in granting the mortgages
the first defendant breached its fiduciary duty to him. In the event either of these
declarations is made, further declarations are sought concerning the alleged
27 In re Pavlou (A Bankrupt) [1993] 1 WLR 1046 at 1048; Leigh v Dickeson (1884) 15 QBD 60 at 67.
-- 18 of 23 --
19
accessorial liability of the second and third defendants and their liability to indemnify
the plaintiff against the consequences of the breach of trust or breach of fiduciary
duty.
[78] The plaintiff’s evidence was he did not consent to the second and third defendants
lodging the mortgages and did not know of them until his solicitors informed him
about them. He had not received any benefit from the mortgages. This evidence was
not challenged. I accept the plaintiff’s evidence about these matters.
[79] The plaintiff argues the effect of clause 1 was that the first defendant held the property
on trust for it and him as tenants in common in equal shares. The trust was a
constructive trust arising from the first defendant’s role as vendor or because clause
1 was specifically performable at the time of the agreement. He submits that at the
moment of entry into a valid contract for the sale of land the vendor becomes in equity
a naked or bare trustee for the purchaser28 and at that point the purchaser acquires
equitable ownership of the land. The plaintiff relies on PSAL Pty Ltd v Raja where it
was stated:29
“As counsel for PSAL submitted, the High Court in Tanwar (a case
concerning relief from forfeiture) emphasised that the source of the
parties’ rights is the contract for the sale of the land, rather than the
existence of a relationship of trustee and beneficiary. Nevertheless,
the Court has not overturned, nor cast doubt on, its many previous
decisions which establish that once the contract of sale becomes
specifically enforceable (in the manner described above), the vendor
holds the land as a bare trustee for the purchaser, pursuant to a
constructive trust, and the purchaser acquires equitable ownership of
the land.” (Footnotes omitted)
[80] He submits that the first defendant breached the trust when it entered into the two
mortgages because it burdened the property it held on trust for the plaintiff.
[81] The defendants argue that the claim for a declaration must fail because the first
defendant did not hold the property on trust for it and the plaintiff from the date of
the agreement. In reliance upon Tanwar Enterprises Pty Ltd v Cauchi30 the
defendants submit that even if the plaintiff was to be regarded as a purchaser of an
interest in the property, it is not correct to regard the vendor (first defendant) as
holding land on trust for the purchaser. In Tanwar, Gleeson CJ, McHugh, Gummow,
Hayne and Heydon JJ said:31
“At all events, the analogies drawn over a century ago in Lysaght with
the trust and the mortgage are no longer accepted. Jacobs J observed
in Chang v Registrar of Titles that:
‘[w]here there are rights outstanding on both sides, the
description of the vendor as a trustee tends to conceal the
essentially contractual relationship which, rather than the
28 Golden Mile Property Investments Pty Ltd (in liq) v Cudgegong Australia Pty Ltd (2015) 89 NSWLR
237 at [98] (Golden Mile).
29 [2016] WASC 295 at [69].
30 (2003) 217 CLR 315 (Tanwar).
31 At [53].
-- 19 of 23 --
20
relationship of trustee and beneficiary, governs the rights and
duties of the respective parties.’
Subsequently, in Kern Corporation Ltd v Walter Reid Trading Pty
Ltd, Deane J said:
‘[I]t is both inaccurate and misleading to speak of the unpaid
vendor under an uncompleted contract as a trustee for the
purchaser’.
In Stern, Gaudron J points out, consistently with authority in this
Court, that the ‘interest’ of the purchaser is commensurate with the
availability of specific performance. That availability is the very
question in issue where there has been a termination by the vendor
for failure to complete as required by the essential stipulation.
Reliance upon the ‘interest’ therefore does not assist; it is bedevilled
by circularity.” (Footnotes omitted)
[82] The defendants also submit that the relationship between the plaintiff and the first
defendant cannot be equated to a vendor-purchaser relationship. Clause 1 of the
agreement was not an agreement for the sale and the purchase of the property, it was
part of an agreement to settle legal proceedings reached at a mediation. Clause 1
conferred a contractual right to a transfer from the first defendant, but did not create
an equitable interest at the time of entry into the agreement.
[83] If the relationship were to be regarded as akin to purchaser and vendor, would there
be a trust relationship? In Chang v Registrar of Titles, Jacobs J said:32
“… a vendor at the stage of contract where the contract is enforceable
by specific performance has at times been described as a trustee: see,
e.g. Shaw v. Foster; Lysaght v. Edwards; and if by that no more is
meant than that the purchaser is regarded by equity as the beneficial
owner of the estate of which the vendor is the legal owner then there
is no difficulty in describing the vendor as a trustee. However, if by
such a description it is sought to transpose into the law of vendor and
purchaser the law governing the rights and duties of trustees, statutory
or otherwise, considerable difficulties arise. … confusion … can arise
from giving this description to a party to a contract for the sale of land
assumed to be capable of specific performance simply because he has
the obligation under the contract to transfer property to the other party
on completion of the contract and because equity regards the other as
beneficial owner. Where there are rights outstanding on both sides,
the description of the vendor as a trustee tends to conceal the
essentially contractual relationship which, rather than the relationship
of trustee and beneficiary, governs the rights and duties of the
respective parties.” (Footnotes omitted)
32 (1976) 137 CLR 177 at 190.
-- 20 of 23 --
21
[84] The position of a vendor of land was distinguished also in Commissioner of State
Revenue (WA) v Rojoda Pty Ltd:33
“…[a] metaphorical and improper description, which continues to be
regarded as inaccurate, of a vendor of land under a specifically
enforceable contract of sale as a trustee.”
[85] The plaintiff therefore puts the position too highly when he asserts that at the moment
of entry into a valid contract for the sale of land the vendor becomes a trustee for the
purchaser. His reliance on Golden Mile for this proposition is misplaced. In that
case, Emmett JA said:34
“… While a vendor of real property under a valid contract of sale may
become a trustee of the property for the purchaser, there is a question
as to the time when such a trust relationship arises … The vendor may
be regarded unconditionally as a trustee for the purchaser when the
contract is performed by the purchaser by payment of the purchase
price.”
[86] In McWilliam v McWilliams Wines Pty Ltd it was said that:35
“…, where the purchase money specified in the contract has been paid
… the vendor thereafter becomes a bare trustee.”
[87] In the present proceeding the relationship between the plaintiff and the first defendant
is not a relationship of purchaser and vendor. It is simply a relationship created by a
contract. The conduct of the first defendant in undertaking to transfer a half share in
the property is not to be recognised as a constructive trust. It was one part of an
agreement in which both parties (the plaintiff and the first defendant) agreed to
perform particular tasks to resolve their legal dispute.
[88] Regarding the mortgages, the settlement agreement contained no prohibition on the
first defendant mortgaging the property. Such a term is not to be implied because:
“The creation of a mortgage or charge by a vendor is not of itself
inconsistent with the contractual rights of the purchaser provided that
the vendor retains the power to discharge the mortgage or extinguish
the charge at or prior to completion so as to be able to perform his
contractual obligation to cause the land to be vested in the purchaser
on completion free from any such mortgage or charge.”36
[89] No evidence has been tendered to establish the value of the mortgages.
[90] The plaintiff contends in the alternative that the first defendant was in a fiduciary
position because the settlement agreement created a beneficial interest in the property.
The plaintiff was vulnerable because the first defendant as the registered owner had
agreed to transfer the interest in the property to him. This meant that the first
defendant had a duty of loyalty to the plaintiff in respect of the property. The first
33 (2020) 268 CLR 281 at [28].
34 Golden Mile at [99].
35 (1964) 114 CLR 656 at 660.
36 Shanahan v Fitzgerald [1982] 2 NSWLR 513 at 514.
-- 21 of 23 --
22
defendant breached the prospective fiduciary duty by entering into the mortgages
either in its own interest or in the interest of the second and third defendants.
[91] The plaintiff’s argument is that the agreement itself gave rise to a fiduciary duty. The
argument is that the settlement agreement regulated the rights and liabilities of the
plaintiff and the first defendant.
[92] In Hospital Products Ltd v United States Surgical Corporation (1984) 156 CLR 41
Mason J said:37
“… it is the contractual foundation which is all important because it is
the contract that regulates the basic rights and liabilities of the parties.
The fiduciary relationship, if it is to exist at all, must accommodate
itself to the terms of the contract so that it is consistent with, and
conforms to, them. The fiduciary relationship cannot be
superimposed upon the contract in such a way as to alter the operation
which the contract was intended to have according to its true
construction.”
[93] Clause 1 created a contractual obligation to transfer a half share but an obligation
dependent upon someone else paying the transfer costs (clause 2). It was also
dependent upon the plaintiff performing his other obligations (clauses 9 and 10).
Clause 7 created an obligation on the first defendant to release the plaintiff from his
alleged indebtedness to it. A relationship of trust and confidence is not to be seen
here. It was a relationship where one party would do certain things and the other
party would do certain things and if those things were done they would result in
various legal proceedings being discontinued and a half share being transferred. Any
vulnerability of the plaintiff or any reliance by him on the first defendant is only the
vulnerability or reliance that any contracting party is exposed to. The first defendant
did not undertake to do anything for or on behalf of the plaintiff.38
[94] As the first defendant did not hold the property on trust for the plaintiff and itself and
as there was no fiduciary relationship between the first defendant and the plaintiff, it
is unnecessary to consider the asserted liability of the second and third defendants.
Their liability would have stemmed from either a trust or a fiduciary relationship.
Appointment of statutory trustees for sale
[95] The plaintiff seeks the appointment of statutory trustees for the sale of the property.
As I intend to order specific performance of the settlement agreement the plaintiff
will then gain an entitlement to be registered as a co-owner of the property. Two
independent persons have consented to act as trustees.
[96] Where any property is held in co-ownership,39 s 38(1) of the Property Law Act
relevantly provides that the Court may, on the application of one of the co-owners,
appoint trustees of the property and vest the property in those trustees to be held by
them on a statutory trust for sale.
37 (1984) 156 CLR 41 at 97.
38 John Alexander’s Clubs v White City Tennis Club Ltd (2010) 241 CLR 1 at [87]-[91].
39 The term co-ownership is defined in s 37 of the Property Law Act to mean “ownership whether at law
or in equity in possession by 2 or more persons as joint tenants or as tenants in common”.
-- 22 of 23 --
23
[97] The power conferred by s 38 is a discretionary power, however, it will ordinarily be
exercised in favour of the appointment of trustees for sale.40
[98] The argument the defendants advance against the making of an order is that the
plaintiff is not entitled to specific performance. However, I have held that he is
entitled to that remedy subject to him complying with two conditions. In this event,
the defendants argue that there should be an order made providing that the maximum
amount the plaintiff can receive from the proceeds of any sale (prior to the deduction
of the costs of such a process) is $437,500. However, for the reasons set out earlier
the appropriate outcome is that the net proceeds of sale be distributed so that the
plaintiff receives 33.33% and the first defendant receives 66.66% of those proceeds.
The form of orders
[99] As reflected in these reasons, I intend to order:
1. That the first defendant specifically perform and carry into execution the deed
of settlement executed on 19 February 2019 subject to the term and conditions
set out at paragraphs [75], and [76] above; and
2. That statutory trustees be appointed for the sale of the property.
[100] Accordingly, I direct the parties to bring in minutes of orders that reflect these
reasons.
[101] Upon the making of the orders I will hear the parties as to costs.
40 Goodwin v Goodwin [2004] QCA 50 at page 4.
-- 23 of 23 --