Allen & Anor v Contrast Constructions Pty Ltd [2025] QSC 18
SUPREME COURT OF QUEENSLAND
CITATION: Allen & Anor v Contrast Constructions Pty Ltd [2025] QSC
18
PARTIES: REECE JUSTIN ALLEN
(first plaintiff)
CHANTELL RENEE MARIA TAYLOR
(second plaintiff)
v
CONTRAST CONSTRUCTIONS PTY LTD
ACN 100 835 934
(defendant)
FILE NO/S: BS No 14319 of 2023
DIVISION: Trial Division
PROCEEDING: Application
ORIGINATING
COURT:
Supreme Court at Brisbane
DELIVERED ON: 13 February 2025
DELIVERED AT: Brisbane
HEARING DATE: 2 May 2024; further submissions filed 7 May 2024 and 28
May 2024
JUDGE: Kelly J
ORDER: Upon the undertaking of the defendant, should any claims
which are a subject of the statement of claim in this
proceeding be raised by the plaintiffs in or by way of
counter application to the Queensland Civil and
Administrative Tribunal proceeding BDL219-19, not to
plead or take any limitations defence in response to any
such claims,
1. This proceeding is stayed pending the determination of
the Queensland Civil and Administrative Tribunal
proceeding BDL219-19.
2. There shall be liberty to apply on three days’ notice.
3. I will hear the parties as to costs.
CATCHWORDS: PROCEDURE – CIVIL PROCEEDINGS IN STATE AND
TERRITORY COURTS – MOTIONS, INTERLOCUTORY
APPLICATIONS AND OTHER PRE-TRIAL MATTERS –
OTHER MATTERS – where various proceedings have been
commenced in the Queensland Civil and Administrative
-- 1 of 25 --
2
Tribunal (QCAT) – where the defendant seeks orders setting
aside or staying the proceeding as an abuse of process or,
alternatively, an order transferring the proceeding to QCAT –
whether the proceeding is an abuse of process because it gives
rise to multiplicity of proceedings – whether it is appropriate
and necessary to stay the proceeding to prevent an abuse of
process involving multiplicity of proceedings – whether it
would be appropriate to transfer the proceeding to QCAT
where there has been no defence filed and no joinder of issue
Queensland Building and Construction Commission Act 1991
(Qld), ss 29(1), 29(2), 71(1), 77(2)
Queensland Civil and Administrative Tribunal Act 2009
(Qld) s 20
Queensland Civil and Administrative Tribunal Rules 2009
(Qld) r 48
Uniform Civil Procedure Rules 1999 (Qld) rr 150(1)(f),
157(c)
Allen & Anor v Queensland Building and Construction
Commission [2019] QCAT 20, cited
Allen & Taylor v Queensland Building and Construction
Commission [2020] QCAT 63, cited
Allen v Queensland Building and Construction Commission
[2023] QCATA 66, cited
Arthur JS Hall & Co v Simons [2002] 1 AC 615, cited
Australian Hardboards Ltd v Hudson Investment Group Ltd
(2007) 70 NSWLR 201, cited
Batistatos v RTA (NSW) (2006) 226 CLR 256, cited
Burbank Australia Pty Ltd v Luzinat [2000] VSC 128, cited
Haines v Australian Broadcasting Corporation (1995) 43
NSWLR 404, cited
Henry v Henry (1996) 185 CLR 571, cited
Hunter v Chief Constable of the West Midlands Police [1982]
AC 529, cited
L Grollo Darwin Management Pty Ltd v Victor Plaster
Products Pty Ltd (1978) 33 FLR 170, cited
March v Metrotek Constructions Pty Ltd [2011] QDC 376,
cited
McGee v Independent Assessor & Anor [2023] QCA 225,
cited
Moore v Inglis (1976) 50 ALJR 589, cited
Morgan v WorkCover Corporation (2013) 118 SASR 297,
cited
Reichel v Magrath (1889) 14 App Cas 665, cited
Rippon v Chilcotin Pty Ltd (2001) 53 NSWLR 198, cited
Rogers v Roche (No 1) [2017] 2 Qd R 306, cited
Secretary of State for Trade and Industry v Bairstow [2004]
Ch 1, cited
State Bank of New South Wales Ltd v Stenhouse Ltd (1997)
Aust Tort Reps ¶81-423 (64,077), cited
-- 2 of 25 --
3
Sterling Pharmaceuticals Pty Ltd v The Boots Company
(Australia) Pty Ltd (1992) 34 FCR 287, cited
COUNSEL: Mr R Allen (sol) appeared on his own behalf and on behalf of
the second plaintiff
M K Stunden for the defendant
SOLICITORS: Project Legal for the plaintiffs
Cornwalls for the defendant
An application contending that this proceeding is an abuse of process
[1] On 17 February 2016, the applicant (“the builder”) and the respondents (“the
owners”) entered a contract for the construction of a residential dwelling (“the
contract”). On 29 February 2016, the builder took possession of the site and
commenced work under the contract. On 10 November 2017, at a time when
the work was partially complete, the owners served a notice to show cause on
the builder (“the show cause notice”).
[2] The owners issued the show cause notice under clause 39.2 of the general
conditions of the contract, which provided:
“39.2 Contractor’s Default
If the Contractor commits a substantial breach of the Contract,
the Principal may, by hand or by certified post, give the
Contractor a written notice to show cause.
Substantial breaches include, but are not limited to:
(a) failing to:
(i) provide security;
(ii) provide evidence of insurance;
(iii) comply with a direction of the Superintendent
pursuant to subclause 29.3; or
(iv) use the materials or standards of work required by the
Contractor;
(b) wrongful suspension of work;
(c) substantial departure from a construction program
without reasonable cause or the Superintendent’s
approval;
(d) where there is no construction program, failing to proceed
with expedition and without delay; and
(e) in respect of clause 38 knowingly providing documentary
evidence containing an untrue statement.”
-- 3 of 25 --
4
[3] A notice under clause 39.2 was required, inter alia, to state the alleged
substantial breach and that the contractor was required to show cause in
writing why the principal should not exercise a right referred to in clause 39.4.
[4] Clause 39.4 provided:
“39.4 Principal’s Rights
If the Contractor fails to show reasonable cause by the stated
date and time, the Principal may by written notice to the
Contractor:
(a) take out of the Contractor’s hands the whole or part of the
work remaining to be completed and suspend payment
until it becomes due and payable pursuant to subclause
39.6; or
(b) terminate the contract.”
[5] On 21 November 2017, the builder responded to the show cause notice. On
the same day, after having received the builder’s response, the owners
purported to terminate the contract. On 1 December 2017, the builder asserted
that the owner’s purported termination was a repudiation of the contract,
which the builder purported to accept and rely upon in terminating the
contract.
[6] Various proceedings have since started, and been conducted to differing
extents, in the Queensland Civil and Administrative Tribunal (“QCAT”), the
Court of Appeal and the trial division of this Court.
[7] By the current application, the builder seeks orders setting aside or staying this
proceeding, or striking out the statement of claim, as an abuse of process or,
alternatively, an order transferring this proceeding to QCAT.
An overview of the proceedings in the aftermath of the contract
[8] On 5 December 2017, the plaintiffs made a claim against the Queensland
Building and Construction Commission (“the QBCC”) under an insurance
scheme established under Part 5 of the QBCC Act. The insurance scheme
countenanced the recovery of loss suffered by the owners where the builder
did not complete the contract but only if the owners had properly terminated
the contract at the default of the builder.1 Relevantly, the QBCC’s liability to
pay under the policy for incomplete work arose in circumstances where the
contract had been “properly terminated”. The expression “properly
terminated” was relevantly defined by the policy to mean “lawfully under the
contract or otherwise at law upon the contractor’s default”.
[9] On 19 March 2018, the QBCC (by one of its assessment officers) rejected the
owners’ insurance claim (“the QBCC decision”). Relevantly, the QBCC
decision noted that the owners’ claim had been “assessed” in the context of
the policy condition which required that “the homeowner demonstrates the
1 QBCC decision dated 19 March 2018.
-- 4 of 25 --
5
contract had been properly terminated at the default of the licensed
contractor”. The QBCC decision then materially stated:
“In this case, the QBCC is of the opinion that there is insufficient
basis for the owners to have given notice of termination under
clause 39.4 of the contract. Furthermore, [the] QBCC is unable
to identify evidence on which to show any appropriate basis for
the contract to have been terminated at law”.
[10] The QBCC decision concluded that “for the reasons outlined above”, the
owners’ claim was “declined in full”.
[11] On 11 April 2018, the owners applied to QCAT to review the QBCC decision
(“the QCAT Review proceeding”). The respondent was the QBCC. The
owners’ application materially provided:
“State briefly why you think the decision is wrong or not
properly made.
The QBCC has denied the [owners] indemnity for … claims
lodged pursuant to the QBCC Home Warranty Insurance Policy
….
The QBCC has denied indemnity for the following reasons:
1. The QBCC is of the opinion that there is insufficient
basis for the owners to have given notice of
termination under clause 39.4 of [the] contract.
2. The QBCC is unable to identify evidence on which
to show any appropriate basis for the contract to have
been terminated at law.
The decision of the QBCC is wrong and is not properly made
in accordance with the Policy and the QBCC Act. [The contract]
… was lawfully terminated by the [owners] on 21 November
2017 and was properly terminated as that term is defined in …
the Policy. The [owners] are entitled to indemnity under the
Policy.
Briefly describe any other facts you think are important.
The [owners] will provide the evidence of the facts applicable
to their application pursuant to orders sought by the [owners].
Briefly describe what you want to happen.
…
The [owners] seek the following relief:
“The decision of the [QBCC] … be substituted with the
following decision:
“[The owners’] claim for indemnity … be accepted on
the basis that [the owners] properly terminated [the
contract] on 21 November 2017.”
-- 5 of 25 --
6
[12] On 17 January 2019, a member of QCAT refused an application by the QBCC
to join the builder to the QCAT review proceeding (“the QCAT joinder
decision”). That application was made and heard on the papers at a time when
the QCAT review proceeding was “for all intents and purposes ready to be
listed for hearing”.2 The QBCC made the application on the basis that the
interests of the builder might be affected by the QCAT review proceeding
because, if the owners were successful and recovered payment by way of
indemnity under the insurance scheme, the QBCC might recover that payment
from the builder pursuant to s 71(1) of the Queensland Building and
Construction Commission Act 1991 (Qld) (“the QBCC Act”). That the
builder’s interests might be affected by the outcome of the QCAT review
proceeding, was accepted by the QCAT member as being “undoubtedly the
case”.3 Nevertheless, the QCAT member refused the joinder because the
application was made late, in circumstances where no explanation had been
provided for the delay.4 Relevantly, the QCAT member observed that the
owners had, by that time, filed voluminous statements and had expended
considerable effort and costs and should not be required to incur additional
costs and delays “as a result of the excessive and unexplained delay by the
QBCC relating to the joinder application”.5 The QCAT review proceeding
went forward to a final hearing without the builder being joined as a party.
[13] Another QCAT member, Mr Oliver, heard the QCAT review proceeding.
[14] The hearing was conducted under s 20 of the Queensland Civil and
Administrative Tribunal Act 2009 (Qld) (“the QCAT Act”) which required Mr
Oliver to produce the correct and preferable decision by way of a fresh hearing
on the merits.
[15] The hearing of the QCAT review proceeding commenced on 27 May 2019 and
appears to have continued in August 2019. The hearing before Mr Oliver
lasted some three days. The builder’s sole director, Mr Durkin, provided two
written statements, was called as a witness by the QBCC and was cross-
examined for approximately one and a half days by one of the owners, Mr
Allen.
[16] Before Mr Oliver, the owners contended that they had lawfully and properly
terminated the contract relying upon the show cause procedure. They also
contended that, after they took possession of the site, they had found further
evidence of defective building work which constituted substantial breaches.
The owners relied upon these alleged further substantial breaches to justify
their termination of the contract at law. Notably, clause 39.1 of the general
conditions preserved common law rights. Hence, before Mr Oliver, there was
an issue concerned with whether the builder’s response to the show cause
notice had given the owners an entitlement under clause 39 to terminate. There
was also an issue as to whether the discovery of the further alleged substantial
breaches entitled the owners to rely upon those breaches to justify their
election to terminate.
2 Allen & Anor v Queensland Building and Construction Commission [2019] QCAT 20, [3].
3 Allen & Anor v Queensland Building and Construction Commission [2019] QCAT 20, [4].
4 Ibid [5].
5 Ibid [6].
-- 6 of 25 --
7
[17] On 27 February 2020, Mr Oliver delivered his decision and reasons.
[18] Mr Oliver found that by 10 November 2017, the date of the show cause notice,
the work under the contract was about 70 per cent complete. By that time, the
relationship between the owners and the builder had significantly deteriorated.
Mr Oliver found that the builder’s response to the show cause notice was
reasonable and satisfactory.6 Mr Oliver expressed this conclusion in relation
to the show cause notice:7
“When looked at objectively, … each of the responses to the
notice addressed the [owners’] concerns. The responses were
not so inadequate that they gave rise to a right to terminate the
contract. In so far as it might be said that they are breaches, the
breaches were not … substantial breaches within the meaning
of clause 39 of the contract.”
[19] Mr Oliver considered the owners’ allegations as to the later discovered
substantial breaches and was not satisfied that, individually or collectively,
any of those matters constituted a substantial breach that gave rise to a right of
termination. Mr Oliver relevantly concluded:8
“What is critical to a consideration of each of those items is that
the works were only 70% complete and further work was to be
done to bring the works to practical completion. To go onsite
in a partially constructed building and pick selective items
which would normally be attended to during completion of the
works and contend that they are substantial defects is
particularly unfair to the [builder], where in every case, there is
an explanation as to why the works are in the state that they are
in, in particular the selected items identified by the [owners],
and also in circumstances where the [builder] was ready,
willing and able to complete the building project.”
[20] Relying upon his various findings, Mr Oliver affirmed the QBCC decision.
[21] The owners then sought to appeal Mr Oliver’s decision to QCAT’s Appeal
Tribunal (“the appeal from QCAT’s review decision”). The owners were
entitled to appeal to QCAT’s Appeal Tribunal on a question of law but
required leave to appeal on a question of fact or of mixed fact and law. The
owners sought to rely on additional evidence in the appeal, namely two
additional reports from an expert and a further affidavit of Mr Allen. The
judicial member who constituted the QCAT Appeal Tribunal was Mr McGill
SC. The hearing before Mr McGill SC occurred on 17 December 2021. Mr
McGill SC did not admit the expert reports but allowed the admission of
Mr Allen’s evidence as to what had been discovered in October 2020, after a
demolition of a driveway on an adjacent property. Before Mr McGill SC, the
owners contended for failures to accord natural justice and apprehended bias
and alleged 79 errors of law and 43 errors of fact.
6 Allen & Taylor v Queensland Building and Construction Commission [2020] QCAT 63, [111].
7 Ibid [112].
8 Ibid [148].
-- 7 of 25 --
8
[22] On 15 June 2023, Mr McGill SC made orders and delivered his reasons. Mr
McGill SC relevantly found that there was no reason to interfere with Mr
Oliver’s conclusion that the owners had not validly terminated the contract.
Mr McGill SC found that the alleged breaches of natural justice and apparent
bias had not been established.9 Mr McGill SC found that the owners had failed
to show that Mr Oliver made any error of law.10 One alleged error of law had
involved the contention that Mr Oliver had failed to consider that the owners
were entitled to terminate for illegality by the builder. Mr McGill SC found
that the case presented by the owners to Mr Oliver was not capable, as a matter
of law, of sustaining an entitlement to terminate the contract on the ground of
illegality.11
[23] Mr McGill SC allowed leave to appeal only on the question of whether, taking
into account the encroachment over the side boundary of the concrete, the
owners were entitled to and did terminate the contract at common law for
either repudiation or sufficiently serious breaches of non-essential terms.12 In
relation to that ground, Mr McGill SC relevantly reasoned as follows:13
“ … the only significant defects were the encroachment onto
the neighbouring land, the absence of back blocking in parts of
the plaster ceilings, and to a lesser extent water penetration
through inadequately sealed windows. There were some
additional minor matters, but on the whole they do not show
either a refusal, or an inability, to perform the contract other
than in a manner substantially inconsistent with its terms…. in
my opinion the behaviour of the builder in the present case has
not been shown to have amounted to repudiation of the
contract, so as to give rise to an entitlement to terminate on that
basis at common law.
As for the alternative ground … I do not consider that the
breaches of contract which have been demonstrated, taken
together, amount to a sufficiently serious set of breaches of
non-essential terms to entitle the appellants to terminate on
that basis at common law, since they did not deprive the
appellants of a substantial part of the benefit which they were
entitled to under the contract. I consider that damages were an
adequate remedy for such breaches as have been proved by the
appellants. It follows that, on this basis as well, the appellants
were not entitled to terminate the building contract at common
law.”
[24] Otherwise, as to the various errors of fact or mixed law and fact, Mr McGill
SC found that the owners had not established that there was a sufficient
likelihood that any finding of fact, which was of importance in the final
outcome before Mr Oliver, would be overturned in the event of a rehearing.14
9 Allen v Queensland Building and Construction Commission [2023] QCATA 66, [37].
10 Ibid [184].
11 Ibid [146].
12 Ibid [209].
13 Ibid [248]–[249].
14 Ibid [209].
-- 8 of 25 --
9
[25] Ultimately, Mr McGill SC expressed the following conclusion:15
“There is therefore no reason to interfere with the conclusion
of the Member, that the appellants had not validly terminated
the contract with the builder, and accordingly the decision of
the respondent to reject their claim under the insurance policy
was correct.”
[26] Mr McGill SC made the following material orders in the appeal from QCAT’s
review decision:
“1. So far as the appeal was on questions of law, the appeal is
dismissed.
2. Leave to appeal on questions of fact or mixed fact and law
granted, limited to the issues of whether the appellants were
in the circumstances entitled to terminate the building
contract at common law for repudiation or for sufficiently
serious breaches of non-essential terms; otherwise leave to
appeal refused.
3. Appeal by leave dismissed”.
[27] On 1 March 2024, the Court of Appeal dismissed an application for leave to
appeal the decision of Mr McGill SC.
[28] On 19 August 2019, at a time when the QCAT review proceeding remained
on foot, the builder filed an application in QCAT against the owners (“the
builder’s proceeding”). The owners filed a conditional response and an
interlocutory application contesting QCAT’s jurisdiction on the ground that
the builder had not complied with s 77(2) of the QBCC Act. That section
provides to the effect that a person involved in a building dispute may not
apply to QCAT to have the Tribunal decide the dispute unless the person has
complied with a process established by the QBCC to attempt to resolve the
dispute. In their interlocutory application, the owners sought orders
dismissing the builder’s proceeding or alternatively staying the proceeding
pending compliance with dispute resolution clauses contained in clause 42 of
the general conditions of the contract (as amended by special condition 13 of
the contract).
[29] On 21 May 2020, a member of QCAT decided that QCAT had jurisdiction in
the builder’s proceeding and refused to dismiss or stay the proceeding (“the
jurisdiction decision”). The owners sought leave to appeal the jurisdiction
decision (“the jurisdiction appeal”) and a stay pending the hearing of any
appeal. On 16 September 2020, the Appeal Tribunal refused the application
for a stay. On 15 April 2021, the Appeal Tribunal granted leave to appeal and
dismissed the jurisdiction appeal.
[30] On 23 August 2022, at a time when Mr McGill’s decision was reserved, the
builder filed its statement of claim in the builder’s proceeding. On 7 March
15 Ibid [250].
-- 9 of 25 --
10
2023, the owners’ response was filed. On 12 July 2023, the builder’s reply was
filed.
[31] The builder’s statement of claim makes the following material allegations
about the termination of the contract.
“153. On or about 10 November 2017, the Respondents
purported to give the Applicant a written notice to
show cause under clause 39 of the Contract.
154. On or about 21 November 2017, the Applicant
responded in writing to the Respondents alleged
notice to show cause.
…
155. On or about 21 November 2017, the Respondents
purported to terminate the Contract by written notice
to the Applicant alleging that the Applicant had failed
to show reasonable cause [the Wrongful
Termination].
…
156. The Respondents’ purported termination was
unlawful, unrighteous, or otherwise not validly
exercised under the Contract by reason that:
(a) the Applicant was not, at any material time, in
substantial breach of the Contract;
(b) prior to the Respondents issuing the aforesaid
notice to show cause or the Wrongful
Termination of the Respondents were in
substantial breach of the Contract.
Particulars
(i) The Respondents failed to ensure that the
Superintendent fulfilled all aspects of the
role and functions of the Superintendent
reasonably and in good faith in breach of
clause 20 of the General Conditions.
157. By either, the giving of the Wrongful termination, by
refusing to give the Applicant access to the Property
to carry out the Works after 21 November 2017 or
failing to pay the applicant Progress Claim 15, the
Respondents were in substantial breach of the
Contract or evidenced an intention to be unwilling to
perform their obligations under the Contract or
otherwise not be bound by the Contract [the
Repudiation].
158. On or about 1 December 2017, the Applicant notified
the Respondents in writing, inter alia, that:
-- 10 of 25 --
11
(a) the Applicant was not in substantial breach of
the Contract;
(b) the Respondents were in substantial breach of
the Contract at the time they elected to
wrongfully terminate the Contract;
(c) the Applicant accepted the Repudiation by the
Respondents and elected to terminate the
Contract.
159. In the premises, the Applicant righteously or validly
terminated the Contract on or about 1 December
2017 [the Termination].
Further or in the alternative:
160. In or about late 2017 or early 2018, the Respondents
made a claim to the Queensland Building and
Construction Commission [the Commission] for
indemnity under the Home Warranty Insurance
Scheme for defective and incomplete work under the
Contract.
161. On or about 19 March 2018, the commission made a
decision, inter alia:
(a) Disallowing a claim under the statutory Home
Warranty Scheme.
(b) That the Respondents had not validly
terminated the contract by the Wrongful
Termination.
162. The Respondents applied to the Queensland Civil and
Administrative Tribunal to review the Commission’s
decision.
163. The Queensland Civil and Administration Tribunal:
(a) Determined that:
(i) The Respondents did not have a right to
terminate the Contract by the Wrongful
Termination.
(ii) The Applicant had not acted in any way
which constituted repudiatory conduct
sufficient to entitle the Respondents to
terminate the contract.
(iii) The Applicant was not in substantial
breach of the Contract at the time of
issuing the purported notice to show
cause nor at the Wrongful Termination.
-- 11 of 25 --
12
(b) Affirmed the decision of the Commission dated
19 March 2018 that, inter alia, the
Respondents’ Wrongful Termination was not
proper and lawful.
Particulars
(i) Allen & Taylor v Queensland Building
and Construction Commission [2020
QCAT 63 determined on 27 February
2020.
164. In the premises, the Respondents are estopped from denying
that the Respondents did not have a right to terminate the
Contract by the Wrongful Termination or otherwise at law in
around November 2017.”
[32] The owners have responded to those allegations by contending that they
validly terminated the contract both under the contract and at law and denying
that any estoppel has arisen because the QCAT review proceeding involved
only the QBCC and the respondent. The owners have positively alleged in the
builder’s proceeding that they lawfully terminated the contract. Notably, in its
responsive pleading, the builder has not replied to the effect that for the owners
to now raise such an allegation involves an abuse of process.
[33] The builder’s statement of claim also includes various claims for extensions
of time, an adjustment to the date for practical completion and liquidated
damages. The builder intends to seek leave to amend its statement of claim.
The proposed amended statement of claim is in evidence and materially
deletes any allegation to the effect that the owners are estopped from alleging
that they had a right to terminate the contract.
[34] On 21 November 2023, the owners served on the builder the originating
process in this proceeding.
[35] In this proceeding, the owners, inter alia, allege that their purported
termination of the contract was lawful, both under the contract and at law. The
owners seek to claim remedies and rights by reference to their lawful
termination of the contract.16 Relevantly, the owners seek the following relief
against the builder:
(a) $23,927.00 as a liquidated sum;
(b) $488,440.47 as a liquidated sum or as damages for breach of contract
for fraud and fraudulent concealment of defects (deceit) or further and
alternatively restitution;
(c) damages for breach of contract in the amount of $80,001.24 for non-
completion;
(d) alternatively, damages for breach of contract in the amount of
$568,441.43 for non-completion;
16 Statement of Claim [87] and [88].
-- 12 of 25 --
13
(e) damages for breach of contract for the cost of alternative
accommodation in the amount of $159,599.91;
(f) liquidated damages for delay in the amount of $6,300.00;
(g) unspecified damages for breach of contract in tort or deceit for defects
or non-completion;
(h) interest and pre-judgment interest;
(i) costs.
[36] On 14 December 2023, the builder filed in this proceeding a conditional notice
of intention to defend and the current application.
Is this proceeding an abuse of process?
[37] In Batistatos v RTA (NSW),17 the plurality said:
“What amounts to abuse of court process is insusceptible of a
formulation comprising closed categories. Development
continues.”
[38] The arguments in this case centred upon two recognised categories of abuse
of process which may conveniently be labelled “re-litigation abuse” and
“multiplicity of proceedings abuse”.
Re-litigation abuse: relevant principles
[39] The principle favouring finality and certainty of judgments underlies re-
litigation abuse of process in civil litigation.18 In McGee v Independent
Assessor & Anor,19 Cooper J (with whom Bond and Dalton JJA agreed)
observed that raising an issue which was made or raised and determined in an
earlier proceeding may constitute an abuse of process even where the earlier
proceeding has not given rise to an estoppel. It can be an abuse for a party to
seek to raise an issue, even though the party was not a party to the earlier
proceeding, nor the privy of a party to that proceeding.20
[40] In Rogers v Roche,21 Fraser JA was careful to observe that finality and
certainty considerations may not have “equal force in all cases as a factor in
the decision whether re-litigation is an abuse of process”.22 Fraser JA referred
with approval to Morgan v WorkCover Corporation,23 where Blue J, with
whom Kourakis CJ and Sulan J agreed, observed:
“The mere fact that the person against whom the abuse is
alleged was a party in both proceedings and seeks to litigate an
17 (2006) 226 CLR 256, 265 [9].
18 Rogers v Roche (No 1) [2017] 2 Qd R 306, [45]; McGee v Independent Assessor & Anor
[2023] QCA 225, [52].
19 [2023] QCA 225, [52].
20 Ibid.
21 [2017] 2 Qd R 306, [45].
22 Ibid.
23 (2013) 118 SASR 297, 331.
-- 13 of 25 --
14
issue decided in the earlier proceedings is not sufficient to give
rise to abuse of process. Something more is required.”
[41] In Rogers, Fraser JA referred to Reichel v Magrath24 as the seminal case about
re-litigation abuse of process in the context of civil litigation. In that case,
Reichel had taken proceedings against the Bishop of Oxford for a declaration
that he was still the vicar of a benefice and that an instrument of resignation
was null and void. He lost at first instance and his two appeals were dismissed.
In a second proceeding, Magrath claimed to be the incumbent of the benefice,
having been appointed to fill the vacancy caused by Reichel’s resignation.
Reichel was refusing to vacate the parsonage houses and glebe lands. Magrath
sought declarations and injunctions to evict Reichel. By way of defence,
Reichel sought to set up the case which had been rejected in his action against
the Bishop. Despite not having been a party to the earlier proceeding, Magrath
successfully had Reichel’s defence struck out as an abuse of process. On
appeal to the House of Lords, Lord Halsbury LC relevantly said:25
“…it would be a scandal to the administration of justice if, the
same question having been disposed of by one case, the litigant
were to be permitted by changing the form of the proceedings
to set up the same case again. It cannot be denied that the only
ground upon which Mr Reichel can resist the claim by Mr
Magrath to occupy the vicarage is that he (Mr Reichel) is still
vicar of Sparsholt. If by the hypothesis he is not vicar of
Sparsholt and his appeal absolutely fails, it surely must be in
the jurisdiction of the Court of Justice to prevent the defeated
litigant raising the very same question which the Court has
decided in a separate action. I believe there must be an inherent
jurisdiction in every Court of Justice to prevent such an abuse
of its procedure and I therefore think that this appeal must
likewise be dismissed”.
[42] In Hunter v Chief Constable of the West Midlands Police,26 the plaintiffs had
been arrested on suspicion of having caused explosions in a Birmingham pub.
Whilst on remand, they signed statements admitting the charges. There was an
issue as to whether the statements had been procured by violence and threats.
A judge decided on a voir dire that the statements were voluntary. During their
criminal trial, the accused repeated their allegations as to the involuntariness
of their statements and the trial judge gave directions to the jury. The accused
were found guilty. The police officers alleged to have been responsible for the
alleged assaults were charged but acquitted. Some years later the plaintiffs
commenced civil proceedings against the chief constables of the West
Midlands and the Lancashire police and also against the Home Office for
damages for assault and personal injuries relying upon the same assaults they
had alleged for the purpose of claiming that their statements were involuntary.
On appeal to the House of Lords, Lord Diplock considered that the case
exemplified an abuse of process because the proceedings had the purpose of
mounting a collateral attack upon a final decision made by another court of
24 (1889) 14 App Cas 665.
25 Ibid 668.
26 [1982] AC 529.
-- 14 of 25 --
15
competent jurisdiction in previous proceedings in which the plaintiffs had a
full opportunity of contesting the decision.
[43] Notably, Hunter did not decide that the initiation of proceedings collaterally
challenging an earlier judgment is necessarily an abuse of process, only that it
might be.27 It is necessary to always consider the nature and effect of the earlier
judgment, the nature and basis of the claim made in the later proceedings and
any grounds relied on to justify the collateral challenge.28 In Haines v
Australian Broadcasting Corporation,29 Hunt CJ at CL recognised that there
were “obviously limitations to striking out pleadings or causes of action as an
abuse of process upon the basis stated in [Reichel]”. His Honour identified one
such limitation as follows:
“The issue determined in the earlier case which is sought to be
litigated in the later case must be one which the party
propounding it in the latter lost in the former. … … As most
of the cases have emphasised, all the circumstances of the
determination in the earlier case may be considered, and there
can be no definitive statement of the circumstances which will
inevitably lead to a finding of abuse of process.”
[44] The following summary of relevant settled propositions was provided by Sir
Andrew Morritt V-C in Secretary of State for Trade and Industry v Bairstow:30
“In my view [the cases] establish the following propositions …
A collateral attack on an earlier decision of a court of
competent jurisdiction may be but is not necessarily an abuse
of the process of the court. … If the parties to the later civil
proceedings were not parties to or privies of those who were
parties to the earlier proceedings, then it will only be an abuse
of the process of the court to challenge the factual findings and
conclusions of the judge or jury in the earlier action if … it
would be manifestly unfair to a party to the later proceedings
that the same issues should be relitigated or … to permit such
relitigation would bring the administration of justice into
disrepute.”31
[45] In an often cited judgment in State Bank of New South Wales Ltd v Stenhouse
Ltd,32 Giles CJ Comm Div recognised guiding considerations for an inquiry as
to re-litigation abuse as being oppression and unfairness and concern for the
integrity of the system of the administration of justice. His Honour listed
relevant matters as including the importance of the issue in and to the earlier
proceedings, the opportunity available and taken to fully litigate the issue, the
terms and finality of any finding as to the issue, the identity between the issues
in the two proceedings, the extent of the oppression and unfairness to the other
27 Arthur JS Hall & Co v Simons [2002] 1 AC 615, 643.
28 Secretary of State for Trade and Industry v Bairstow [2004] Ch 1, 16 [36].
29 (1995) 43 NSWLR 404, 414.
30 [2004] Ch 1, 16–17 [38].
31 Blue J made observations to a similar effect in Morgan v WorkCover Corporation (2013) 118
SASR 297, 331.
32 (1997) Aust Tort Reps ¶81-423 (64,077), 64,089.
-- 15 of 25 --
16
party if the issue is re-litigated, the impact of re-litigation upon the principle
of finality of judicial determination and public confidence in the
administration of justice and an overall balancing of justice to the alleged
abuser against the matters supportive of abuse of process.33
Multiplicity of proceedings abuse: relevant principles
[46] In Batistatos,34 the plurality referenced “the line of authority dealing with the
stay of proceedings instituted in a second forum where there are pending
proceedings in another forum and the continuance of the second proceedings
would be an abuse of the process of the first forum.” The High Court has said,
as a general proposition, that it is “prima facie vexatious and oppressive, in the
strict sense of those terms, to commence a second or subsequent action in the
courts of this country if an action is already pending with respect to the matter
in issue”.35 In Burbank Australia Pty Ltd v Luzinat,36 Beach J relevantly
observed:
“Where a party to a proceeding institutes a second proceeding
in a different form in relation to the same subject matter as the
first proceeding, prima facie the second proceeding is
vexatious and will be stayed … In such a situation the courts
have for many years taken the view that a litigant already
deeply involved in one piece of litigation would be unduly
harassed if a second piece of litigation was to proceed at the
same time as the first. And such a principle applies to
proceedings whether they be before a court, a board or a
tribunal”.37
[47] Where there are multiple proceedings, the factors relevant to the exercise of
the discretion to grant a stay will always be fact specific. The general principle
draws upon Moore v Inglis38 where a plaintiff had commenced two court
proceedings, one in the High Court and one in a Supreme Court. That
circumstance led Mason J to consider whether there could be discerned a
legitimate reason “for allowing the plaintiff to maintain a second proceeding
in this Court relating to the subject matter already in course of litigation in the
Supreme Court”.39
[48] An example of multiplicity abuse can be seen in L Grollo Darwin
Management Pty Ltd v Victor Plaster Products Pty Ltd.40 In that case an action
was commenced in the Supreme Court of the Northern Territory against a
33 These statements of principle have been referred to with approval by Handley JA (with whom
other members of the New South Wales Court of Appeal agreed) in Rippon v Chilcotin Pty
Ltd (2001) 53 NSWLR 198, 204 [32] and by Cooper J (with whom Bond and Dalton JJA
agreed) in McGee v Independent Assessor & Anor [2023] QCA 225, [75].
34 (2006) 226 CLR 256, 265 [9].
35 Henry v Henry (1996) 185 CLR 571, 591.
36 [2000] VSC 128, [28]–[30].
37 Those comments were referred to with approval by Campbell JA (with whom Tobias J agreed)
in Australian Hardboards Ltd v Hudson Investment Group Ltd (2007) 70 NSWLR 201, [1],
[34].
38 (1976) 50 ALJR 589, 592.
39 Ibid.
40 (1978) 33 FLR 170.
-- 16 of 25 --
17
party who later commenced an action in the Federal Court. A judge of the
Federal Court stayed the Federal Court proceeding and an appeal from that
decision was unsuccessful. The Full Court of the Federal Court relevantly
observed:41
“As matters stood therefore there was a duplicity of
proceedings in relation to the question whether the goods in
question were supplied to the first appellant. In these
circumstances a discretion arose in the learned judge to decide
whether it was in the interests of justice that one of the actions
should proceed before the other and if he considered that the
action in the Northern Territory should proceed before the
action in this Court and that a stay of this action was
appropriate for that purpose, then he had jurisdiction so to
order.”
[49] In Sterling Pharmaceuticals Pty Ltd v The Boots Company (Australia) Pty
Ltd,42 Lockhart J observed that the law should “strive against permitting
multiplicity of proceedings in relation to similar issues”.43 His Honour
identified relevant considerations as including which proceeding was
commenced first, whether the termination of one proceeding is likely to have
a material effect on the other, the public interest, the undesirability of two
courts competing to see which of them determines common facts first, the
circumstances relating to witnesses, whether the preparatory work done to
prepare a proceeding might be wasted, how far advanced the proceedings are
in each court and balancing the advantages and disadvantages to each party.
Another important consideration is the risk of inconsistent findings posed by
multiple proceedings concerning the same subject matter.44
This proceeding is an abuse of process
[50] I will deal firstly with the question as to whether this proceeding is an abuse
of process because it involves the re-litigation of an issue already decided in
the QCAT review proceeding and in the appeal from QCAT’s review
decision.45 The builder orally submitted that the issue as to the lawfulness of
the owners’ purported termination of the contract on 21 November 2017 was
“the precise issue which was decided adversely against [the owners] both in
front of [Mr Oliver] and then on appeal to [Mr McGill SC]”. The builder
further orally submitted that the owners “have had the benefit of two hearings
on the identical ultimate issue in QCAT and lost”.
[51] I am not satisfied that it is an abuse of process for the owners, in the builder’s
proceeding or in this proceeding, to place into issue the lawfulness of their
purported termination of the contract on 21 November 2017. The mere fact
that the owners were parties to the QCAT review proceeding and the appeal
from QCAT’s review decision and now seek to litigate an issue decided
41 Ibid 177.
42 (1992) 34 FCR 287.
43 Ibid 291.
44 Burbank Australia Pty Ltd v Luzinat [2000] VSC 128, [30].
45 In terms of the agreed list of issues, this question embraces issues one, two, seven and eight
of the list of issues.
-- 17 of 25 --
18
against them in those proceedings, is not sufficient to give rise to an abuse of
process. In deciding whether an instance of re-litigation abuse has arisen, it is
necessary to consider the nature and effect of the earlier decisions, the nature
and basis of the claim made in this proceeding and whether there is a
justification for what may be perceived as a collateral challenge to the earlier
determinations of the issue.
[52] The context in which the QCAT review proceeding was heard and determined
may be outlined as follows. A QBCC assessment officer assessed and rejected
the owners’ claim to indemnity under an insurance policy. In undertaking the
assessment, the assessment officer formed an opinion to the effect that there
was an insufficient basis for the owners to have terminated the contract
pursuant to clause 39.4 of the general conditions. Further, the assessment
officer had been “unable to identify evidence on which to show any
appropriate basis for the contract to have been terminated at law”. The
assessment officer’s decision was to decline indemnity to the owners under
the policy of insurance. The QCAT review proceeding was fundamentally
concerned with whether the assessment officer’s decision to decline indemnity
represented the correct and preferable decision. The decision was reviewed by
QCAT, without the builder participating in the QCAT review proceeding as a
party. The builder, although recognised as being someone whose interests
would be affected by the decision in the QCAT review proceeding, was not
joined as a party to that proceeding for procedural reasons which favoured the
interests of the owners. The extent of the builder’s involvement in the QCAT
review proceeding was the giving of evidence by its director.
[53] In the builder’s proceeding, and in this proceeding, the owners seek to defend,
or claim, relief in the form of contractual remedies based on contractual rights
and entitlements arising under the contract. In each of these proceedings, the
determination of contractual rights and entitlements is to occur in an
adversarial context involving the parties to the contract. In the builder’s
proceeding, the owners are sought to be made liable for damages. In this
proceeding, the builder is sought to be made liable for damages. Confronted
with a substantial claim for damages against them, it would be unfair to
confine the owners’ defence of such a claim to findings and determinations
made in review proceedings concerned with an opinion formed by an
assessment officer of QBCC and made in circumstances where the owners had
sought indemnity under a policy of insurance and were not being confronted
with allegations as to their liability for damages under the contract.
[54] Some further material aspects of the builder’s proceeding should be noted.
First, in the builder’s proceeding, the builder itself has placed into issue the
lawfulness of its termination of the contract. Mr Durkin’s affidavit correctly
described “the issue of who terminated the [c]ontract” as being “in issue in”
the builder’s proceeding.46 That issue is intertwined with the lawfulness of the
owners’ purported termination of the contract on 21 November 2017, which is
asserted by the builder to have been repudiatory conduct which it accepted.
Secondly, the builder’s pleadings in the builder’s proceeding have not asserted
any abuse of process arising out of the re-litigation of the issue concerned with
46 Affidavit of Bradley Cameron Durkin filed 15 February 2014, ex BCD-08, [33].
-- 18 of 25 --
19
the lawfulness of the owner’s purported termination of the contract. In that
regard, the builder’s submissions notably conceded that, in a hypothetical
context, had the QCAT review proceeding determined that the correct and
preferable decision was that the owners were entitled to indemnity because
they had lawfully terminated the contract, it would not have been an abuse of
process for the builder to place into issue the lawfulness of the owners’
termination in any subsequent litigation between the owners and the builder
involving their respective rights under the contact.
[55] The context of the decision in the QCAT review proceeding and the identified
aspects of the builder’s proceeding warrant the conclusion that there is no
manifest unfairness to the builder in allowing the re-litigation of the issue as
to the lawfulness of the owners’ termination of the contract. Further, having
regard to all of the matters, there is no affront to the administration of justice,
and the overall balancing of justice does not warrant a finding that it is an
abuse of process, for the owners to place into issue the lawfulness of their
termination of the contract in litigation between the builder and the owners
involving their respective rights and liabilities under the contract.
[56] I will now deal with the question as to whether this proceeding is an abuse of
process because it gives rise to multiplicity of proceedings.47 It may be
accepted that the power to stay on the ground of abuse of process is a power
to be exercised with caution.48 Having regard to the matters I have outlined
below, I am satisfied that it is appropriate and necessary to temporarily stay
this proceeding to prevent an abuse of process involving multiplicity of
proceedings.
[57] In the builder’s proceeding, the builder claims damages for delay. The builder
alleges that the adjusted date for practical completion is 26 February 2018 and
the amount of the claimed damages for delay is $253,354.86. The builder
claims a quantum meruit in the amount of $211,565.54 and claims in debt or
as damages the amount of progress claim 15, being $131,388.51. There is a
further claim for damages or in restitution in respect of an alleged failure to
return cash retention. The owners’ responsive pleading filed 7 March 2023 is
detailed. It is apparent from the response that, notwithstanding the outcome of
the jurisdiction decision and the jurisdiction appeal, the owners seek to
maintain their objection to jurisdiction.49 Beyond that objection, the owners’
response has pleaded positive cases in defence of the builder’s various claims.
By reason of the owners’ responsive pleading, there has been a joinder of issue
in respect of when, and by whom, the contract was lawfully terminated. The
builder alleges that it lawfully terminated the contract on 1 December 2017.
The owners allege that they lawfully terminated the contract on 21 November
2017. They further allege that as at the date of their termination of the contract,
the builder had not acquired any unconditional right to payment in respect of
progress claim 15. The owners positively contend that the “proper date for
practical completion” under the contract is 9 October 2017. The owners have
47 In terms of the agreed list of issues, this question embraces issues three and six of the list of
issues.
48 Moore v Inglis (1976) 50 ALJR 589, 593.
49 Response of the Owners in QCAT filed 7 March 2023 [227](b).
-- 19 of 25 --
20
pleaded numerous factual allegations in defence of the builder’s claimed
extensions of time.
[58] In this proceeding, as the builder has not yet filed a defence, there has been no
joinder of issue. In terms of the allegations made by the owners in this
proceeding, the owners allege that they lawfully terminated the contract on 21
November 2017 and that the termination gave rise to certain entitlements on
their part, including the return of part of the deposit in the amount of
$23,927.00, damages for the additional cost of completing the residence to 22
March 2020 in the amount of $568,441.43, further yet to be quantified
damages to complete the residence to final completion and damages for the
costs of the owners having to find alternative accommodation in the amount
of $159,599.91. The owners have also claimed liquidated damages for delay
in the amount of $6,300 and allege that the date for practical completion is 9
October 2017. The owners make a series of allegations about a variety of work
having been performed in breach of the contract and statutory warranties.
Those claims are advanced “in contract, tort or deceit”. The statement of claim
includes allegations to the effect that the builder fraudulently concealed
defects and is required to pay damages or make restitution to the owners in the
amount of $488,440.47.
[59] Having regard to that overview of the issues joined in the builder’s proceeding
and the allegations made in this proceeding, it is patently clear that the
proceedings concern the same general subject matter, namely rights and
entitlements arising under the contract and involve a significant overlap of
issues and allegations. The commencement of this proceeding second in time
has given rise to the spectre of inconsistent findings. The commencement of
this proceeding is prima facie vexatious and oppressive.
[60] The owners have suggested grounds for justifying their commencement of this
proceeding despite the currency of the builder’s proceeding. None of these
grounds provide a proper basis for commencing multiple proceedings in
different courts or tribunals, burdening the builder with a new proceeding in a
different court or tribunal or allowing the spectre of inconsistent findings.
[61] First, the owners submitted that the parties, by the contract, had agreed to refer
any dispute to either QCAT or a court. In the context of that agreement, the
owners submitted that they were “simply exercising their right to elect to
commence proceedings in this court, an election which binds the builder”. The
owners asserted that they commenced the proceeding in this court because
“[the] contract says they can”. These submissions did not engage with an
important matter of principle, namely that the right of a party to commence
and conduct a court proceeding is subject to the procedural and substantive
law administered by the court. In Batistatos, the plurality relevant said:50
“The ‘right’ of the plaintiff with a common law claim to
institute an action is not at large. It is subject to the operation
of the whole of the applicable procedural and substantive law
administered by the court, whose processes are enlivened in the
50 (2006) 226 CLR 256, [65].
-- 20 of 25 --
21
particular circumstances. This includes the principles
respecting abuse of process.”
[62] Earlier, the plurality had observed:51
“The plaintiff certainly has a ‘right’ to institute a proceeding.
But the defendant also has ‘rights’. One is to plead in defence
an available limitation defence. Another distinct ‘right’ is to
seek the exercise of the power of the court to stay its processes
in certain circumstances. On its part, the court has an obligation
owed to both sides to quell their controversy according to law.”
[63] Secondly, the owners submitted that QCAT does not have jurisdiction to hear
the builder’s proceeding by reason of non-compliance with s 77 (1) and (2) of
the QBCC Act. Mr Allen deposed that prior to his being served with the
builder’s proceeding, no notice of dispute under clause 42.1 of the general
conditions of the contract had been served and there had been no conference
or participation in any process established by the QBCC in relation to the
dispute. By reference to these facts, the owners objected to QCAT’s
jurisdiction in the builder’s proceeding. The owners’ objection to jurisdiction
has already been the subject of the jurisdiction decision and the jurisdiction
appeal. Despite those decisions, the owners, by their responsive pleading, seek
to maintain their objection to QCAT’s jurisdiction.52 In that regard, the
owners’ submissions referred to this court having a supervisory jurisdiction
over QCAT. The owners submitted that they “always have (and maintain) their
rights in the nature of certiorari in relation to jurisdictional error by QCAT”.
[64] Mr Allen deposed to a chronology of relevant events in the builder’s
proceeding.53 That chronology reveals that, following the dismissal of the
jurisdiction appeal on 15 April 2021, the owners have not applied for leave to
appeal that decision but rather have been content to plead, in their response to
the builder’s statement of claim, that QCAT lacks jurisdiction. The owners
have not started a proceeding in this court seeking relief in the nature of
certiorari. In the result, QCAT has determined that it has jurisdiction in the
builder’s proceeding and that determination is not the subject of any current
appeal. Ultimately, the owners submitted that there was “arguable doubt” as
to the jurisdiction of QCAT in respect of the builder’s proceeding and that
such “arguable doubt” was relevant as a “discretionary factor to be taken into
account as to whether [this proceeding] was an abuse of process.” I reject that
submission. As matters presently stand, the owners have made an unsuccessful
application in QCAT objecting to jurisdiction and had an appeal from that
decision dismissed. They have not sought leave to appeal or commenced any
proceeding seeking relief in the nature of certiorari. In these circumstances,
the decision of QCAT remains binding upon the owners and this court should
not engage in speculation about whether there is “arguable doubt” as to the
jurisdiction of QCAT. It is a matter for QCAT as to how it deals with that part
of the owners’ responsive pleading asserting an objection to jurisdiction in the
face of the jurisdiction decision and the jurisdiction appeal.
51 Ibid [63].
52 Response of the Owners in QCAT filed 7 March 2023 [227](b).
53 Affidavit of Reece Justin Allen filed 13 March 2024 [29].
-- 21 of 25 --
22
[65] Thirdly, the owners submitted that the builder’s prosecution of the builder’s
proceeding has been “grossly dilatory”. I do not accept that description of the
delay. I accept that there has been significant delay in the conduct of the
builder’s proceeding since its commencement on 19 August 2019. The delay
is partly explained by the builder’s conduct having been influenced by other
events. The conduct of the builder’s proceeding has involved an unsuccessful
interlocutory application made by the owners objecting to jurisdiction and a
subsequent appeal from that decision. The jurisdiction objection took some 12
months to resolve. Mr Allen’s affidavit implicitly acknowledged that the
builder’s prosecution of the builder’s proceeding had been impaired until such
time as the builder had successfully opposed the owners’ application for a
stay.54
[66] Further, as at the time of the commencement of the builder’s proceeding, Mr
Oliver was yet to deliver his decision and reasons in the QCAT review
proceeding. Mr Oliver’s decision and reasons were delivered some three
months after the commencement of the builder’s proceeding. The owners then
commenced an appeal from that decision which took some time to conduct
and culminated in the decision from Mr McGill SC on 15 June 2023. The
subsequent appeal to the Court of Appeal was dismissed. Mr Durkin deposed
that he had placed the builder’s proceeding “on hold” for a period of time as
he had hoped that if the QCAT review proceeding was resolved in favour of
the QBCC “it would be easier” to resolve the builder’s proceeding. He was not
cross examined on his affidavit and I accept that part of his evidence as
reflecting his thinking and decision making. It would have been preferable for
the builder to have sought case management directions from QCAT which
effectively sought a temporary stay of the builder’s proceeding whilst the
QCAT review proceeding or the appeal from the QCAT review decision
remained unresolved. The fact that no such case management directions were
obtained does not mean that the builder’s conduct was wholly unreasonable or
intentionally dilatory.
[67] Although there has been delay in the builder’s proceeding, the point has been
reached where an interlocutory application has been finally resolved, the
builder and owners have exchanged pleadings, the builder proposes to seek
leave to amend in identified terms and the builder’s evidence is in the process
of being prepared. At this stage, the builder’s witnesses have been identified
as Mr Durkin and Mr Andrew King, a quantity surveyor. I find that the
builder’s proceeding, which was commenced first in time, has, unlike this
proceeding, progressed to a stage where it is well advanced and it is realistic
to expect that the builder’s proceeding will be ready for final hearing before
this proceeding.
[68] Fourthly, the owners made various submissions criticising QCAT for denying
them procedural fairness, failing to take “fair and appropriate steps” and
“proper steps as case management”. Reference was made to the conduct of
another QCAT proceeding commenced by the owners against the QBCC on 4
May 2018 in which the owners sought review of another decision made by the
QBCC in relation to a non-completion claim under the insurance scheme. With
54 Affidavit of Reece Justin Allen filed 13 May 2024 [30](b).
-- 22 of 25 --
23
reference to that proceeding, it was submitted that QCAT had “a long history
of delaying any relief sought by [the owners]” and the owners believed that
QCAT would not conduct the builder’s proceeding “fairly, equally and with
appropriate quickness”. The QCAT proceeding which was commenced on 4
May 2018 had been discontinued by the owners on 20 July 2023. As to that
discontinuance, Mr Allen deposed that one of the reasons for their
discontinuance was that “the delay, including by QCAT itself, made the
administrative proceedings redundant because we had decided we had to bring
a claim for damages in this Court”. There were further submissions directed
towards QCAT apparently lacking “resources to decide even simple matters
quickly”. These submissions were not balanced, argumentative and advanced
by the owners in a context in which they had filed no application in this court
seeking any kind of relief in respect of the builder’s proceeding and no
application in the builder’s proceeding seeking a stay of that proceeding on
grounds other than the jurisdictional ground the subject of the jurisdiction
decision. I reject these submissions. The submissions failed to acknowledge
that the owners have on the face of the record contributed to delays in QCAT
by conducting an unsuccessful interlocutory application in the builder’s
proceeding. QCAT has not “delayed” the owners’ relief in the QCAT review
proceeding. Rather, the owners were found to have no entitlement to relief in
the QCAT review proceeding. It may be observed that Mr Oliver found that
the owners had filed in the QCAT review proceeding, a significant volume of
evidence, much of which was repetitive, and submissions in reply which went
far beyond a response to the QBCC’s submissions. As a result, Mr Oliver
noted that it had been an onerous task to “sift through the material to try and
discern the substantive issues.” The owners’ submissions also overlooked that
QCAT had essentially deferred to the owners’ interests in refusing the
QBCC’s application to join the builder to the QCAT review proceeding.
[69] Fifthly, the owners advanced submissions which emphasised procedural
differences between a proceeding conducted in this court and a proceeding
conducted in QCAT. Reference was made to procedural rules in this court
governing pleadings and disclosure and the power of the court to direct the
parties to engage in alternative dispute resolution. It was noted that the rules
of evidence do not necessarily apply in QCAT and there are limited rights of
appeal from QCAT. None of these submissions provided a cogent reason for
allowing this proceeding to continue in parallel with the builder’s proceeding.
Having regard to the positive pleas contained in the owners’ responsive
pleading in QCAT, it is uncontroversial that the contract was a “domestic
building contract” and the builder’s proceeding, and the allegations raised in
this proceeding, involve a “domestic building dispute” within the meaning of
those terms as contained in the QBCC Act. Parliament has intended that
QCAT, with its different rules and procedures aimed at facilitating its objects,
is an appropriate forum in which domestic building disputes may be decided.55
The differences in rules and procedures tend to emphasise the appropriateness
of QCAT as a forum for deciding domestic building disputes. They do not
provide a cogent reason for countenancing multiple proceedings in different
courts or tribunals.
55 QBCC Act s 77.
-- 23 of 25 --
24
[70] Further, although the owners extolled the benefits of this court’s pleading
rules, their statement of claim had not observed those rules. Notably, the
statement of claim included a number of allegations of fraudulent concealment
by the builder which were made without any proper particulars.56 On the face
of the pleading, it is unclear who, on behalf of the builder, is alleged to have
acted with fraudulent intent or knowledge. The pleading disclosed that Mr
Durkin was the sole director of the builder and a Mr George had been the site
supervisor. No attempt was made to plead facts attributing knowledge or
relevant conduct to either person. A number of allegations of fraudulent
concealment of defects involved nothing more than bare allegations.57 In my
consideration, a relevant consideration was not so much that this court has
pleading rules but rather that the owners were purporting to commence a
parallel proceeding in this court without complying with those rules.
[71] Whilst the owners referred to delay in the builder’s proceeding, they did not
satisfactorily explain their own delay in commencing this proceeding or their
failure to take any steps to stay the builder’s proceeding, other than on the
ground which was the subject of the jurisdiction decision. To date, the builder
has incurred costs (including legal costs and expert fees) in the amount of
$233,531.00 in relation to the conduct of the builder’s proceeding.58 It was
also apparent that the owners had made a deliberate decision to refrain from
advancing claims for relief in the builder’s proceeding and had decided to
advance their claims for relief in this proceeding.59 The owners conceded that
the subject matter of their claims in this proceeding concerned matters which
they could have raised as claims in QCAT.60 They submitted that they would
now be prejudiced by any stay of this proceeding because limitation periods
may have since expired in relation to the claims they sought to advance in this
proceeding, meaning they might not be able to advance those claims in QCAT.
That prejudice was a prejudice of the owners’ own making by reason of their
strategic decision to commence a parallel proceeding in this court without
seeking to advance claims by way of counter application61 in QCAT. Further,
the prejudice has been addressed by an undertaking by the builder. The
undertaking is to the effect that the builder will not take any limitations
defence in response to any claims sought to be advanced by the owners in or
by way of counter application to the builder’s proceeding where those claims
are presently a subject of the statement of claim in this proceeding. In that
regard, the parties’ submissions accepted that, to the extent that ss 29(1) and
(2) of the QBCC Act impose time periods for the starting of proceedings based
on breaches of statutory warranty, those provisions were procedural in nature.
[72] I have also formed the view that it would be inappropriate to transfer this
proceeding to QCAT in circumstances where there has been no defence filed
and no joinder of issue. In that regard, I agree with the reasoning and approach
of McGill DCJ SC in March v Metrotek Constructions Pty Ltd.62
56 Uniform Civil Procedure Rules 1999 (Qld) rr 150(1)(f), 157(c).
57 See by way of example para 150(e), 179(e) and 235(e) of the Statement of Claim.
58 Affidavit of Bradley Cameron Durkin filed 15 February 2014, ex BCD-08, [16].
59 T 1-74.09 and 25.
60 T 1-74.09.
61 Queensland Civil and Administrative Tribunal Rules 2009 (Qld) r 48.
62 [2011] QDC 376, [5].
-- 24 of 25 --
25
Orders
Upon the undertaking of the builder, should any claims which are a
subject of the statement of claim in this proceeding be raised by the
owners in or by way of counter application to the Queensland Civil and
Administrative Tribunal proceeding BDL219-19, not to plead or take
any limitations defence in response to any such claims,
1. This proceeding is stayed pending the determination of Queensland
Civil and Administrative Tribunal proceeding BDL219-19.
2. There shall be liberty to apply on three days’ notice.
3. I will hear the parties as to costs.
-- 25 of 25 --