East Coast Helicopters Pty Ltd v Stirling Helicopters Pty Ltd & Anor [2025] QDC 176
DISTRICT COURT OF QUEENSLAND
CITATION: East Coast Helicopters Pty Ltd v Stirling Helicopters Pty Ltd
& Anor [2025] QDC 176
PARTIES: EAST COAST HELICOPTERS PTY LTD ACN 164 169
822 AS TRUSTEE FOR THE ASANUMA FAMILY
TRUST
(Plaintiff)
And
KEVIN ASANUMA
(Second Defendant by Counterclaim)
v
STIRLING HELICOPTERS PTY LTD ACN 167 011 467
(First Defendant)
And
STIRLING CONSOLIDATED (QLD) PTY LTD ACN
110 482 203
(Second Defendant)
And
SCHULTZ EQUIPTMENT PTY LTD ACN 628 405 390
(Third Defendant)
And
GRANT BERNARD SCHULTZ
(Fourth Defendant)
FILE NO: 1551/24
DIVISION: Civil
PROCEEDING: Claim
ORIGINATING
COURT:
District Court at Brisbane
DELIVERED ON: 18 November 2025
DELIVERED AT: Brisbane
HEARING DATE: 27 and 30 May 2025
JUDGE: Porter KC DCJ
-- 1 of 44 --
2
ORDER: Preliminary Question:
Based on the findings of fact made by the Court
arising out of the matters pleaded in paragraphs
58, 59, and 63A to 63E of the Further Amended
Counterclaim and the responsive allegations
pleaded in the Answer and on the following
assumptions:
(a) the Second Defendant by Counterclaim
personally undertook maintenance of the
Aircraft or supervised the maintenance of the
Aircraft as pleaded in paragraph 63C of the
Counterclaim; or alternatively
(b) the Second Defendant by Counterclaim did
not personally undertake maintenance of the
Aircraft or supervise the maintenance of the
Aircraft as pleaded in paragraph 63C of the
Counterclaim; and
(c) the Plaintiff by Counterclaim suffered losses
of the type pleaded in paragraphs 63J and
63L of the Counterclaim,
did the Second Defendant by Counterclaim owe
the Plaintiff by Counterclaim the duty of care
pleaded in paragraph 63EA of the Counterclaim in
respect of losses of the type pleaded in paragraphs
63J and 63L of the Counterclaim?
Answer:
No.
CATCHWORDS: PROCEDURE – CIVIL PROCEEDINGS BEFORE STATE
AND TERRITORY COURTS – where proceedings were
commenced as a claim by the first defendant by counterclaim
(East Coast) on a contract for maintenance work undertaken
for the plaintiff by counterclaim (Stirling) – where East
Coast is insolvent – where Stirling counterclaimed against
East Coast for breach of contract and against the second
defendant by counterclaim (Mr Asanuma) in negligence –
where the Court has been tasked to determine a preliminary
question on East Coast’s claim in negligence against Mr
Asanuma
PROCEDURE – CIVIL PROCEEDINGS BEFORE STATE
AND TERRITORY COURTS – PRELIMINARY
QUESTION – whether Mr Asanuma owed a duty of care to
Stirling to take reasonable care in carrying out his roles as
Chief Engineer and Accountable Manager of East Coast so as
to avoid pure economic loss to Stirling
-- 2 of 44 --
3
CASES:
LEGISLATION:
NEGLIGENCE – DUTY OF CARE: EXISTENCE – PURE
ECONOMIC LOSS – where East Coast was a licensed
maintenance supplier under the Civil Aviation safety
scheme – where Stirling retained East Coast to carry out and
record maintenance work on its helicopters – where Mr
Asanuma was the Chief Engineer and Accountable Manager
under the East Coast’s approved manual – whether by reason
of those offices Mr Asanuma assumed responsibility directly
to Stirling to take reasonable care in carrying out his duties –
where Stirling alleges Mr Asanuma assumed responsibility
directly to Stirling to take reasonable care in carrying out his
duties by stating he was personally responsible for
maintaining logbooks – whether Stirling was vulnerable to
suffering economic loss due to negligence by Mr Asanuma
because East Coast possessed logbooks of the aircraft and
updated Aerotrack records – whether Stirling was vulnerable
to suffering economic loss due to negligence by Mr Asanuma
where it had contractual rights against East Coast
Brookfield Multiplex Ltd v Owners Corporation Strata Plan
61288 (2014) 254 CLR 185.
Mallonland Pty Ltd v Advanta Seeds Pty Ltd (2024) 418 ALR
639.
Woolcock Street Investments Pty Ltd v CDG Pty Ltd (2004)
216 CLR 515.
Civil Aviation Act 1988 (Cth)
Civil Aviation Regulations 1988 (Cth)
Civil Aviation Safety Regulations 1998 (Cth)
Uniform Civil Procedure Rules 1999 (Qld)
COUNSEL: J. Peden KC, J. Hughes and R. Liang for the first defendant
and plaintiff by counterclaim
J. Morris for the second defendant by counterclaim
SOLICITORS: McBratney Law for the first defendant and plaintiff by
counterclaim
Marino Law for the second defendant by counterclaim
-- 3 of 44 --
4
Contents
SUMMARY ............................................................................................................................ 5
THE PRELIMINARY QUESTION ..................................................................................... 5
THE STATUTORY CONTEXT .......................................................................................... 6
The Air Operator’s Certificate (AOC) ............................................................................ 6
East Coast not an AMO or CAMO under the Safety Regs ............................................ 7
East Coast’s maintenance approval ................................................................................. 7
East Coast’s approved procedures manual ..................................................................... 9
Maintenance releases and logbooks ............................................................................... 13
‘LAME’ & ‘AME’............................................................................................................ 15
Aerotrack .......................................................................................................................... 15
Systems of work................................................................................................................ 16
THE FACTS ......................................................................................................................... 16
The parties and witnesses ................................................................................................ 16
Stirling ........................................................................................................................... 16
East Coast ...................................................................................................................... 17
Initial dealings between East Coast and Mr Schultz .................................................... 17
The May 2021 meeting..................................................................................................... 18
The maintenance agreement/s ........................................................................................ 21
Who carried out the work? ............................................................................................. 23
Logbooks and Aerotrack access ..................................................................................... 24
THE PLEADED CASES ..................................................................................................... 26
The contract case against East Coast ............................................................................. 26
The duty of care ............................................................................................................... 27
MALLONLAND PTY LTD V ADVANTA SEEDS PTY LTD ....................................... 32
SUBMISSIONS .................................................................................................................... 36
The plaintiff’s case ........................................................................................................... 36
Assumption of responsibility contentions..................................................................... 36
Salient features contention ........................................................................................... 37
The defendant’s case ........................................................................................................ 37
ANALYSIS ........................................................................................................................... 38
Findings of fact ................................................................................................................. 38
The witnesses ................................................................................................................. 38
Findings on the 21 May 2021 meeting ......................................................................... 38
No duty arose .................................................................................................................... 39
The contract and the refusal of personal liability........................................................ 39
No express undertaking of liability .............................................................................. 40
No undertaking of liability under the Manual ............................................................. 41
Vulnerability not otherwise established ....................................................................... 43
Reasonable foreseeability of loss and ascertainable and determinate class ............... 44
Known reliance ............................................................................................................. 44
CONCLUSION .................................................................................................................... 44
-- 4 of 44 --
5
SUMMARY
[1] The preliminary question can be shortly stated as follows: whether the defendant by
counterclaim (hereafter the defendant or Mr Asanuma), owed a duty of care to
the plaintiff by counterclaim (hereafter the plaintiff or Stirling) to exercise the
standard of care of a reasonably competent “accountable manager” or “chief
engineer” (as those terms are relevantly defined) in performing or supervising
maintenance work on Stirling’s helicopters to avoid economic loss arising from
failures to exercise that standard of care in maintenance tasks and from failures
properly to record maintenance tasks in logbooks for the aircraft.
[2] For the reasons which follow, the answer to that question is no.
THE PRELIMINARY QUESTION
[3] On 21 March 2025 I made an order by consent for the determination of a separate
question in this proceeding under Chapter 13 Part 5 Uniform Civil Procedure Rules
1999 (Qld) (UCPR). The objective of the order was to determine the question of
the existence of a duty of care alleged by Stirling.
[4] The consent order was in the following form:
Based on the findings of fact made by the Court arising out of the matters pleaded in paragraphs
58, 59, and 63A to 63E of the Further Amended Counterclaim and the responsive allegations
pleaded in the Answer and on the following assumptions:
(a) the Second Defendant by Counterclaim personally undertook maintenance of the
Aircraft or supervised the maintenance of the Aircraft as pleaded in paragraph 63C of
the Counterclaim; or alternatively
(b) the Second Defendant by Counterclaim did not personally undertake maintenance of
the Aircraft or supervise the maintenance of the Aircraft as pleaded in paragraph 63C
of the Counterclaim; and
(c) the Plaintiff by Counterclaim suffered losses of the type pleaded in paragraphs 63J and
63L of the Counterclaim,
did the Second Defendant by Counterclaim owe the Plaintiff by Counterclaim the duty of care
pleaded in paragraph 63EA of the Counterclaim in respect of losses of the type pleaded in
paragraphs 63J and 63L of the Counterclaim?
[5] The answer to the preliminary question is no.
[6] The order refers to the version of the pleadings then current. On the first day of
hearing, Stirling was granted leave to amend its pleading. Stirling’s current
pleading is the third further amended counterclaim (the counterclaim). The
current responsive pleading is the further amended answer (the answer). The
-- 5 of 44 --
6
amendments to the counterclaim were made to paragraphs included in the order.
They added specific allegations of oral statements relied upon as sustaining the
assumption of responsibility and vulnerability contentions of Stirling.
Notwithstanding that change to the pleading landscape, both parties wished to push
on with the preliminary question.
THE STATUTORY CONTEXT
[7] Mr Asanuma and East Coast carried out work on Stirling’s helicopters pursuant to
the statutory scheme regulating civil aviation. The following statutes are relevant:1
(a) The Civil Aviation Act 1988 (Cth) (the CAA);
(b) The Civil Aviation Regulations 1988 (Cth) (the CA Regs); and
(c) The Civil Aviation Safety Regulations 1998 (Cth) (the Safety Regs).
The Air Operator’s Certificate (AOC)
[8] Mr Schultz is the guiding mind of Stirling. He is also the guiding mind of Stirling
Consolidated (Qld) Pty Ltd (Stirling Consolidated). Consolidated is the holder of
an AOC. The AOC authorises Consolidated “trading as Stirling” to operate single-
engine helicopters providing passenger and cargo services. The concept of Stirling
Consolidated “trading as Stirling” seems to be accepted under the civil aviation
scheme.2 It was not submitted by Mr Asanuma that this arrangement had any
impact on whether Stirling suffered the economic loss alleged or whether a duty of
care arose.
[9] An AOC is issued by the Civil Aviation Safety Authority (CASA)3 which
administers the statutory scheme. An AOC authorises the carrying on of identified
Australian air transport operations. AOCs are dealt with in Part 3 Division 2 of the
CAA.
[10] The requirements for obtaining an AOC are set out in s. 28 CAA. They require
CASA to be satisfied, inter alia, that the applicant has key personnel with sufficient
experience to carry out operations safely. Key personnel are defined to include the
head of the aircraft airworthiness and maintenance control part (if any) of the
organisation (HAAMC). In this case, Mr Amess was the HAAMC for Stirling. He
was approved by CASA as HAAMC for Stirling in September 2021. His role was:
(a) Ensuring compliance with the statutory scheme;
(b) The management of airworthiness and maintenance;
(c) Reporting and investigation of defects; and
(d) Liaising with others including East Coast.
1 Others were cited but turned out not to be relevant.
2 TS2-9.40 and one can infer from the use of the expression “trading as Stirling” in the AOC that the
arrangement is authorised under the statutory scheme.
3 CAA s 27.
-- 6 of 44 --
7
[11] The articulation of the safety obligations of an AOC holder are set out in Part 119
of the Safety Regs. Relevantly, the obligations include the following:
(a) That the holder has an approved exposition which explains how it will
comply with the obligations under the statutory scheme which it must comply
with (Reg. 119.205);
(b) The holder must maintain an organisational structure that effectively manages
the operations; and
(c) The holder must have in place certain key officers including a chief
executive, a head of flying operations, a head of training and checking of
flight crew and a safety manager.
East Coast not an AMO or CAMO under the Safety Regs
[12] This proceeding concerns performance of maintenance work on Stirling’s
helicopters. It was submitted at the hearing and alleged in the affidavits that that
work was authorised under, and regulated by, Part 42 of the Safety Regs which
deals with airworthiness and maintenance obligations of AOC holders. It was
alleged that East Coast was an Authorised Maintenance Organisation (AMO)
within the meaning of that Part and related parts of the Safety Regs. While
preparing my reasons, I queried if that was correct. In response, the parties agreed
that East Coast was not an AMO under the Safety Regs and that Part 42 did not
apply to it. East Coast also submitted, without challenge from Stirling, that Part 42
did not apply to Stirling at all, which seems to be correct.4 (If it was wrong, it
would seem Stirling would be in breach of its obligations for airworthiness and
maintenance because of the limited approvals held by East Coast compared to the
approvals required under Part 42 for AOC holders). Therefore, there is no basis for
submissions that statutory offices held by Mr Asanuma under Part 42 are relevant
to the duty of care alleged. He held no such offices.
East Coast’s maintenance approval
[13] East Coast is the holder of an approval to carry out maintenance work. It was not
the holder of an approval as an AMO under Part 42 of the Safety Regs, despite the
use of that description in evidence. East Coast had only one approval to do
maintenance work, and that was under reg. 30 CA Regs.
[14] Regulation 30 relevantly provides:
30 Certificates of approval
(1) Subject to subregulation (1A), a person engaged, or intending to engage, in any stage
of distribution or maintenance of aircraft, aircraft components or aircraft materials
may apply to CASA for a certificate of approval in respect of those activities.
(1A) A person may make an application under subregulation (1) in relation to the
maintenance of an aircraft or an aeronautical product only if Part 42 of CASR does
not apply to the aircraft or aeronautical product.
(2) An application must be in writing and must:
4 Stirling’s further submissions 19 August 2025; Mr Asanuma’s further submissions 19 August 2025.
-- 7 of 44 --
8
(a) set out the following:
(i) a statement of the activities to be covered by the certificate, including
any training or assessment in the maintenance of aircraft, aircraft
components or aircraft materials that the applicant intends to conduct;
(ii) …
(b) have with it evidence of:
(i) …
(iv) a system of quality control that satisfies the requirements of sub
regulation (2D); and
(c) if maintenance of class A aircraft is an activity to be covered by the
certificate—have with it a copy of the procedures manual, in which the system
of quality control procedures must be set out, that the applicant proposes to use
if the certificate of approval is granted.
(2A) CASA must grant the applicant a certificate of approval covering the activities to
which the application relates if CASA is satisfied that the applicant is able to carry out
the activities in a satisfactory manner.
(2B) In deciding whether it is satisfied as mentioned in subregulation (2A), CASA must
have regard to:
(a) …
(e) if the applicant is required by paragraph (2)(c) to have a procedures manual—
the applicant’s procedures manual.
(2C) A certificate of approval is subject to:
(a) a condition that each activity the certificate covers must only be carried out at a place
where the facilities and equipment necessary for the proper carrying out of the activity
are available to the holder of the certificate;
(b) a condition that the activities the certificate covers must be carried out in accordance
with a system of quality control that satisfies the requirements of subregulation (2D);
and
(c) if the certificate covers some or all of the following activities:
(vii) the maintenance of aircraft;
…
a condition that each of those activities that is covered by the certificate must be
carried out under the control of a person appointed by the applicant to control the
activities; and
…
(2D) A system of quality control must be in writing and must contain the following:
(a) the procedures to be followed in connection with the carrying out of the activities
covered by the certificate that, in particular, includes procedures for:
(i) the control of the work carried out under the certificate; and
(ii) the maintenance, control and calibration of equipment; and
(iii) the control of stores;
(b) a statement:
(i) that sets out the places at which the activities covered by the certificate are,
or will be, carried out and which activities are, or will be, carried out at
each place; and
(ii) that identifies any mobile facilities available to
the certificate of approval holder for the carrying out of the activities
-- 8 of 44 --
9
covered by the certificate and which activities are, or will be, carried out
using each mobile facility;
(c) in relation to each activity covered by the certificate that is required,
by paragraph (2C)(c), to be carried out under the control of a person--the name of the
position occupied by the person who controls the carrying out of the activity;
(d) a description of the applicant's organisational structure, the responsibilities of
employees within the structure and the procedures to be followed by the employees in
undertaking the activities covered by the certificate;
(e) a description of the resources for implementing quality management;
(f) a description of the audit system applying to the system of quality control;
(g) if the quality control system is set out in a procedures manual required
under paragraph (2)(c)--a statement of the procedures to be followed in relation to the
amendment of the procedures manual.
…
[underlining added]
[15] East Coast obtained an approval under reg. 30 on 18 February 2020 to work on
class A aircraft.5 East Coast had to have a procedures manual of the kind called for
in reg. 30(2)(c) and which provided for the matters in the underlined passages
above. A procedures manual is a common document in aviation regulations.
East Coast’s approved procedures manual
[16] East Coast had an approved procedures manual (the Manual). Stirling relies on
certain terms to support the alleged duty of care. The Manual relevantly provides:6
(a) By clause 1.6, Definitions:
Accountable Manager
The person who has corporate authority for ensuring that all maintenance can be resourced
and carried out to the standard required by the Civil Aviation Safety Regulations.
CAR 30 Approved Maintenance Organisation (AMO)
A facility holding an appropriate valid Certificate of Approval issued by CASA permitting
the facility to carry out maintenance, repair and modification of aircraft within the scope
permitted by the certificate.
Chief Engineer
The person who has corporate authority for ensuring that all maintenance activity is carried
out to the standard required by the Regulations, the approved maintenance data or industry
standards, and is the person assigned the responsibility for ensuring that:
• all maintenance is carried out IAW approved maintenance data by competent persons,
and
• facilities, tooling and equipment are maintained to an acceptable standard and used to
assure the called-up procedures and processes are correctly applied.
Continuing Airworthiness Management Organisation
The acronym ‘CAMO’ used for the purposes of this Manual includes:
• a Continuing Airworthiness Management Organisation.
5 Asanuma Exhs p. 27.
6 Asanuma Exhs p. 31.
-- 9 of 44 --
10
• the aircraft’s ‘Registered Operator,’ who is ultimately responsible for the aircraft’s
maintenance.
• The HAAMC or Maintenance Controller as the ‘Person responsible for continuing
airworthiness of the aircraft.’
In using the acronym, the intent is to identify the ‘person’ having control of the aircraft’s
approved maintenance program and the associated aircraft records. (A Part 42 CAMO may
have maintenance control of an aircraft maintained under CAR 30).
Release to Service
Certification by a LAME or holder of an appropriate approval within the AMO that the
maintenance has been competently carried out to approved maintenance data and the aircraft
or aeronautical product is airworthy at the date of certification in respect of the maintenance
carried out.
A Maintenance Release is certifying the aircraft is airworthy at the time of issue and the
capability to remain so until the next scheduled inspection.
Supervision
A person supervising the carrying out of maintenance done by another person shall:
a) be physically present at the place where maintenance is being carried out; and
b) observe the maintenance to the extent necessary to enable the supervisor to form an
opinion as to whether the maintenance has been properly carried out; and
c) is available to give advice and answer questions about the maintenance.
(b) By Part 4, Organisation Structure & Appointed Persons
4.1. Accountable Manager
The Accountable Manager is to maintain an understanding of this MPM and the
governing Regulations and be responsible for the direction and oversight of the
business operations of East Coast Helicopters Pty. Ltd.
The Accountable Manager has an oversight responsibility to ensure the MPM is
adhered to in daily operations. They may appoint other staff to undertake tasks and
duties required by the manual but the responsibility for maintaining adherence to the
complete system remains with the Accountable Manager.
In the absence of the Accountable Manager, where contact can be maintained through
email, mobile phone, Skype or similar technology the Accountable Manager may rely
on that contact capability to maintain operations provided a qualified LAME is
available on site for supervision of the maintenance activity during the period of
absence.
4.1.1. Duties
1. Ensure proper resourcing of facilities, equipment, materials, data and
competent human resources to assure regulatory compliance, and to meet
manufacturer’s recommendations and customer expectations.
2. With the Chief Engineer, ensure that appropriately trained and competent
personnel who are unaffected by fatigue symptoms are available for the
performance of all aircraft maintenance carried out under the Certificate.
3. Before the workshop maintains new or unfamiliar aircraft, components or
accessories to assess, on advice of the Chief Engineer, the need for additional
training of maintenance personnel or implementation of a skill upgrade
program.
4. Liaise with the Authority on airworthiness matters and ensure CASA audit
reports are noted and required corrective actions are responded to in a timely
fashion.
-- 10 of 44 --
11
5. General supervision of management and staff operations.
6. Record in an appointed person register appointments and the functions
delegated, including start/end dates for each appointment and, for each sub-
contract LAME the start/end dates for each on-site period they are contracted.
7. Approve changes to this manual and arrange distribution. Arrange any
necessary consequential training through the Chief Engineer.
8. Approve and resource the company and supplier audit schedule to assure the
Company is conducting maintenance IAW this manual and its CASA approval.
9. To advise CASA of changes IAW CASRs 11.071 through 11.073 as applicable.
4.2. Chief Engineer
The Chief Engineer is qualified by training and experience and is appointed with
oversight responsibility under CAR 30(2C)(c) to ensure the matters listed below are
adhered to on allocated jobs. They may assign other staff to undertake tasks and
duties required by this manual but the responsibility for maintaining adherence to the
system elements for which they are responsible remains with the Chief Engineer.
In the absence of the Chief Engineer, where contact can be maintained through email,
mobile phone, Skype or similar technology the Accountable Manager may rely on
that contact capability to maintain operations provided a qualified LAME is available
on site for supervision of the maintenance activity during the period of absence. When
no LAME is available on-site, maintenance activity is limited to the range of activities
listed under Schedule 8 of the CAR. (Maintenance that may be carried out on a Class
B aircraft by a pilot).
Where the Chief Engineer is absent for extended periods without direct
communication the Accountable Manager may appoint a suitably qualified person to
the Chief Engineer position to cover the absence.
The Accountable Manager shall advise CASA within 14 days of the appointment and
its duration.
4.2.1. Duties
The Chief Engineer is responsible to the Accountable Manager for the overall
operation of the workshop facilities and is the final authority on releasing aircraft to
service.
…
20. Ensure all company maintenance and certification records are suitably filed and
retained to meet CASA requirements.
…
29. For each scheduled maintenance event, the Chief Engineer will appoint a maintenance
coordinator for the purposes of coordinating scheduled maintenance in accordance
with the approved system of certification. They will ensure that:
• all maintenance called up on the applicable worksheets has been completed
and properly certified.
• maintenance performed during or after scheduled inspections which would
nullify certifications previously made have been completed and re-certified.
• where work is carried out away from the main location, the security of the
work records will be maintained until they can be returned to the main
location for archiving.
• Maintenance Releases are properly completed and signed.
[17] Part 5 is headed “Work Procedures – Maintenance”. It relevantly provides
-- 11 of 44 --
12
(a) By clause 5.1, General control of maintenance activities:
The Chief Engineer will provide control of all maintenance work and the main and
temporary locations via the systems and procedures laid out in this manual. They are
responsible for the complete and efficient performance of inspections carried out by the
company and the accomplishment of all work in accordance with approved data.
The work requiring specialist non-destructive inspection by X-ray, magnetic particle, eddy
current or ultrasonic test will be accomplished to CASA approved procedures by outside
vendors.
Modifications and repairs will be subject to inspection by the Chief Engineer or assigned
LAME.
Upon completion of a specific operation, an AME or tradesperson will sign off the records
using his initials indicating that the item is complete and ready for inspection. The Chief
Engineer or assigned LAME will then inspect the item to assure conformance to
specifications and established workmanship standards.
Functional checks of any system affected by the work involved will be accomplished before
final acceptance. Inspection acceptance will be indicated by the inspector’s signature.
Any work performed by another organisation for the East Coast Helicopters Pty Ltd will be
inspected by the Chief Engineer or assigned LAME. This inspection will be used to verify
that the work was performed in an airworthy manner, that parts and materials used were of
such a quality to be airworthy, and that the paperwork received verifies the authenticity of
the part and work performed. The ECH organisation shall not release any parts made by, or
parts having had work performed by a subcontractor until the Chief Engineer or assigned
LAME has approved the parts as being ‘serviceable’. (See definition Section 1.6).
Generation of Work Order Numbers, maintenance tracking, recording of all maintenance
activities and store inventory control is controlled on the Aerotrack system.
(b) By clause 5.5:
5.5. Work done under an arrangement (sub-contract work)
Before any work is carried out on behalf of East Coast Helicopters, it is a
responsibility of the Chief Engineer to evaluate the suitability of all sub-contact
individuals or organisations with which the company has, or will have, working
arrangements.
Where maintenance of an aeronautical product removed from an aircraft is
performed by another organisation not holding a Certificate of Approval, then that
work must be inspected and certified by East Coast Helicopters under the terms and
conditions of the ECH Certificate of Approval and IAW this manual.
Prior to contracting in any outside maintenance, East Coast Helicopters will provide
the Sub-Contractor with a Work Order detailing the work required, technical data to
be used and material specification. In return the Sub-Contractor will be asked to
provide assurances that the work can in fact be achieved and supplied with the
appropriate documentation to satisfy East Coast Helicopters Pty Ltd requirements.
5.5.1. Monitoring sub-contract staff CASA licences or approvals
It is the responsibility of each sub-contract LAME to provide East Coast
Helicopters with copies of personal qualifications, licence changes and licence
renewals. It is the LAMEs responsibility to ensure licenses are not exercised unless
they are current under Part 66 and are applicable to the maintenance carried-out.
When hiring sub-contract LAMEs the company shall ensure that each licence is
current under Part 66 for the intended duration and is appropriate to the intended
maintenance tasks. A Statutory Declaration, (Sat Dec), is required from the
-- 12 of 44 --
13
intending sub-contract LAME declaring that the 6 months maintenance activity in a
24-month period required by CASR Part 66 is met.
A hard copy of all East Coast Helicopters LAME and sub-contract LAME licences,
approvals and Statutory Declarations will be held in an applicable personnel file.
The Accountable Manager shall record in the Sub-Contractor Registry the start and
finish dates for each period a LAME sub-contactor is engaged by the company.
(c) By clause 5.11 Work Packs - Unscheduled and Schedule Maintenance:
5.11.1. Details in the Work Order Register
…
The Chief Engineer is ultimately responsible for the creation of each work pack and
will ensure the work required is entered onto the applicable forms and the forms are
assembled into a work pack.
…
(d) By clause 5.20, Maintenance release issue:
The MR Part One shall be endorsed with details of any maintenance required during
the period of validity of the MR as assessed from details in the aircraft’s logbook, the
immediately preceding MR and taking account of any recurrent AD’s.
…
The person certifying a Maintenance Release on behalf of the Company must be the
person who makes the coordination and final certification in the Log Book.
A Maintenance Release shall only be issued for the period stated on the approved
aircraft Log Book Statement or system of maintenance and endorsed with the highest
operational category (Day VFR, NVFR, IFR), pursuant to the Log Book Statement of
the aircraft being released.
The coordinating LAME or Chief Engineer is responsible for checking the
maintenance work pack is complete and will use the Form WCC/01Work Completed
Checklist to record the check. The check shall include, checking that appropriate
entries and signatures are made in the aircraft Log books and maintenance release.
(e) By clause 5.21 Logbook and Logbook Records:
The aircraft logbook in use shall meet the requirements mentioned in.... [various
provisions]
Before an aircraft is returned to service, the coordinating LAME will check that
records of maintenance requiring logbook certification are traceable to a completed
work pack ready for entry into the aircraft logbook. The coordinating LAME shall
ensure that a final certification in the logbook encompasses all necessary items in the
detail identified by CAR Schedule 6 and include:
…
[underlining added]
Maintenance releases and logbooks
[18] Maintenance releases and logbooks require further explanation. I gratefully adopt
Stirling’s opening submissions on these two points.
-- 13 of 44 --
14
[19] Every aircraft must have a physical logbook. The logbook, and other documents
referred to in the logbook, must be made available to CASA and to persons
engaged in maintenance on the aircraft.7 A logbook must, among other things:8
(a) Identify the aircraft’s maintenance programme (including details of
maintenance release inspections);
(b) Have provision for the recording and certification of maintenance carried out
on the aircraft;
(c) Have provision for the recording and certification of maintenance carried out
on the aircraft’s engine;
(d) Contain a record of when the engine was installed or removed and a record of
the date and aircraft time-in-service of the installation or removal;
(e) Contain a record of when any time-lifted components were installed or
removed, including a record of the date and aircraft time-in-service of the
installation or removal; and
(f) Contain a record of compliance with all applicable airworthiness directives,
including a record of the date and time-in-service of the compliance.
[20] While the parties did not identify the specific statutory provisions, it was common
ground that if a logbook was not properly maintained, it could mean that the AOC
holder was in breach of the relevant statutory duties, the aircraft might not be
certified airworthy and may be grounded. Further, the logbook would have to be
reconstructed so as to be accurate and all necessary work would have to be shown
to have been completed.
[21] The Safety Regs also require that if maintenance has been carried out on an aircraft
since it was last operated, a certificate of release to service called a maintenance
release must be issued for the aircraft.9
[22] The person signing a maintenance release must ensure that the following
information is recorded on the maintenance release at the time it is issued:
(a) The details of the aircraft to which the release relates;
(b) The name of the person authorised to carry out the maintenance who has
issued the maintenance release;
(c) The place, date and time, of issue of the release;
(d) The time at which the maintenance release ceases to be in force;
(e) The total time-in-service of the aircraft at the time of issue of the release;
and
(f) All requirements and conditions relating to maintenance (other than daily
inspections) required to be carried out on the aircraft by the Regulations and
the Civil Aviation Orders during the period the maintenance release is to
remain in force, including the total time-in-service or date at which that
maintenance is due.10
7 Regulations, reg. 50A(1).
8 Civil Aviation Order 100.5, s 3.2.
9 Safety Regulations, reg. 42.030(2)(b).
10 Civil Aviation Order 100.5, section 6.5.
-- 14 of 44 --
15
[23] A maintenance release may be issued in respect of an aircraft only if all
maintenance required to be carried out to comply with any requirement or
condition imposed under all regulations has been certified to have been
completed.11
[24] A person must not issue a maintenance release in contravention of the
Regulations.12 A person must not sign a maintenance release in respect of an
aircraft if the person is aware that information entered on the maintenance release is
incorrect or the maintenance release does not contain all information that it is
required by or under the Regulations to contain.13
[25] On the completion of flying operations on each day that an aircraft is flown, the
owner, operator or pilot in command must record on the maintenance release the
total time-in-service of the aircraft on the day.14
[26] It would appear similar consequences can flow from improperly prepared
maintenance releases as from an incomplete or inaccurate logbook.
‘LAME’ & ‘AME’
[27] There is a distinction between a Licensed Aircraft Maintenance Engineer (LAME)
and an Aircraft Maintenance Engineer (AME). I gratefully adopt the explanation
in Mr Asanuma’s submissions. While AMEs are qualified maintenance engineers
they have not sat additional exams and fulfilled the licencing criteria under reg. 66
CA Regs to be licenced by CASA. Accordingly, an AME is not qualified or
permitted to sign off on maintenance releases or other documents certifying
maintenance or other works as having been completed to statutory standards. A
LAME is required to ‘sign off’ such documents and affix their licence number.15
[28] Consistent with the qualifications of a LAME, the Manual permits a LAME to sign
off on maintenance releases and to do other work independently of supervision or
checking by the Chief Engineer: see [16] to [17].
Aerotrack
[29] As part of its system of work, East Coast used a software platform called
Aerotrack. Use of Aerotrack or any other software platform was not a statutory
obligation. However, the system assists in tracking and recording maintenance and
airworthiness work. It also facilitates recording time, costs and generating invoices.
Aerotrack permits its users to do the following (amongst other things):
(a) Create a file for a specific aircraft to record particulars of its components,
maintenance and operations;
(b) Generate a “runout”, which is a list of upcoming scheduled maintenance for
an aircraft. Runouts can be viewed online and printed;
11 Regulations, reg. 43(7).
12 Regulations, reg. 43(11).
13 Regulations, reg. 43(13)(d).
14 Regulations, reg. 43B(1).
15 Asanuma Affidavit at [19-21].
-- 15 of 44 --
16
(c) Record particulars of maintenance work including hours done, consumables
used and generate invoices for work done.
[30] It appeared uncontentious that only a LAME could (or perhaps should) enter
technical particulars in Aerotrack. This seems consistent with the statutory status
of a LAME under the scheme.
[31] East Coast had a subscription for Aerotrack and could provide its clients with
external log in details so that they could view the information held for an aircraft.
However, it appears only a subscriber could edit the data recorded for a particular
aircraft.
Systems of work
At all material times to this proceeding the system for the performance of maintenance of aircraft
that was implemented by East Coast and required to be followed by employees and agents (sub-
contractors) of East Coast, in respect of aircraft for which it was appointed as AMO (the East Coast
System), was that:
a. ECH would request and take possession of the Logbook for the aircraft;
b. ECH would request transfer of a copy of any existing Aerotrack file and in the absence
of same would create its own file on its Aerotrack system based upon the Logbook;
c. maintenance works to be performed on an aircraft were allocated to a LAME by the
Accountable Manager (Mr Asanuma);
d. the Accountable Manager (Mr Asanuma) would ensure that logistical arrangements,
parts, and resources, were arranged and made available for the task;
e. the allocated LAME completed the required maintenance works;
f. the allocated LAME completed the maintenance release, certification documents, and
Logbook entries; and
g. the allocated LAME updated the Aerotrack file.
THE FACTS
The parties and witnesses
Stirling
[32] Stirling and Stirling Consolidated are part of a group of companies controlled by
Mr Bernard Schultz and his wife. Mr Schultz trained as an engineer but qualified
as a helicopter pilot in 2019. From that time the Schultzes have invested in
helicopter operations businesses. They acquired their first helicopter in 2019
through a related company (Schultz Equipment) and acquired a further helicopter
sometime after that.
[33] Stirling and Stirling Consolidated were established in 2013 and operated a
commercial helicopter charter business. It appears Stirling Consolidated held the
AOC and Stirling operated the business (as described in paragraph [8] above). In
July 2021, the Schultzes acquired Stirling and Stirling Consolidated through
another group company. When the Schultzes acquired Stirling and Stirling
-- 16 of 44 --
17
Consolidated, Stirling already owned three helicopters. The Schultzes leased two
helicopters owned by another group company to Stirling and acquired another four
aircraft through Stirling over February 2022 to March 2023.
[34] Mr Digby Amess trained as a helicopter pilot in 2008 and has been involved in
aviation since then. He worked for Stirling from about 2010 and at the time of the
acquisition by the Schultzes, he was chief pilot for Stirling. In September 2021 he
became HAAMC for Stirling.
East Coast
[35] East Coast was incorporated in 2013. Until its liquidation in September 2024, it
provided maintenance services for helicopters. Mr Asanuma was its sole director
and shareholder. As explained from paragraph [13] and [15] above, East Coast
held the reg. 30 approval to carry out maintenance consistent with the terms of that
approval. It was an AMO, within the loose industry meaning of that term, though
not an AMO within the strict statutory definition of that term as explained in
paragraph [12] and [13] above.
[36] The Manual required an Accountable Manager and a Chief Engineer to be
appointed by East Coast. Mr Asanuma filled both roles. Mr Asanuma was also a
LAME. However, Mr Asanuma did not carry out all the work done by East Coast.
From time-to-time East Coast:
(a) Employed an apprentice;
(b) Employed AMEs (though not at the times relevant to this proceeding); and
(c) Retained LAMEs on a subcontract basis to perform work on behalf of East
Coast.
Initial dealings between East Coast and Mr Schultz
[37] Mr Schultz first met Mr Asanuma at Archerfield Airport in January 2019. At that
time, Schultz Equipment acquired its first helicopter (VH-ITM). East Coast was
already doing the maintenance for that aircraft. Mr Schultz asked Mr Asanuma if
East Coast would continue in that role. Mr Asanuma agreed. It is uncontentious
that Mr Schultz knew that East Coast was the entity which supplied those services.
[38] East Coast already had the logbook for VH-ITM and Mr Asanuma told Mr Schultz
that East Coast would retain it. East Coast also already had an Aerotrack file for
the helicopter which East Coast would continue to update. There was no written
contract with East Coast for this retainer.
[39] Schultz Equipment acquired its second aircraft in about September 2020 (VH-
LBT). Mr Schultz asked Mr Asanuma if East Coast would take on maintenance of
VH-LBT. East Coast took on the job. Mr Asanuma asked for the logbook to be
provided. Again, no written contract was suggested.
[40] It appears that in about early May 2021, Mr Schultz rang Mr Asanuma and asked if
East Coast would enter into a maintenance agreement in relation to VH-ITM and
-- 17 of 44 --
18
VH-LBT. The precise reason given by Mr Schultz for this request was disputed. It
seems likely however it was proposed because of the plan to lease Schultz
Equipment’s aircraft to Stirling. Whatever the reason, the initiative for this written
agreement came from Mr Schultz. Mr Asanuma was agreeable and invited Mr
Schultz to send something through.
The May 2021 meeting
[41] In mid-2021, the Schultzes were in the process of acquiring the Stirling companies.
At that time Stirling owned three aircraft and Schultz Equipment was leasing (or
planned to lease) VH-ITM and VH-LBT to Stirling. Mr Schultz and Mr Amess
decided it would be convenient if East Coast maintained all of Stirling’s aircraft.
Mr Amess was not the HAAMC of Stirling at this stage.
[42] A meeting between Mr Schultz, Mr Amess and Mr Asanuma occurred at
Archerfield Airport in May 2021, likely 21 May. The discussion at this meeting is
said by Stirling to establish an assumption of personal responsibility by Mr
Asanuma for the accuracy of logbooks and maintenance releases which underpins
one strand of the submission in support of the alleged duty. What was said is
contested.
[43] It was common ground that the holder of an AOC has three options for managing
maintenance and airworthiness compliance:
(a) First, there is what might be called the full-service option. For this option,
the operator entrusts the entire maintenance process, including holding and
updating logbooks, to a maintenance contractor. In that case, the
maintenance contractor is responsible for planning and carrying out all the
work.
(b) Second, the operator might employ its own maintenance planner. In that
case, the operator would undertake responsibility for planning and timing of
maintenance but use a maintenance contractor to carry out the work in
accordance with directions from the operator. In this case, the operator’s
planner would hold the logbooks.
(c) Third, the operator might undertake its entire maintenance planning and
work schedule in house.
[44] It was also common ground that all of Mr Schultz’s dealings with Mr Asanuma (at
least until September 2022) were carried out on the understanding that Mr
Schultz’s companies adopted the first option.
[45] The evidence of the discussion on that day was as follows.
[46] Mr Schultz swore in his affidavit that:
(a) He told Mr Asanuma that Stirling did not have anyone who could perform
maintenance on its whole fleet and that it wanted East Coast to take on that
task. Mr Asanuma agreed;
-- 18 of 44 --
19
(b) He told Mr Asanuma he would update the maintenance agreement to add the
further aircraft;
(c) Mr Asanuma asked Mr Schultz to provide the logbooks and Aerotrack files
for the aircraft;
(d) Mr Asanuma said words to the effect that he wanted the logbooks because it
was his “personal responsibility to make sure the logbooks were updated and
correct”; and
(e) Mr Asanuma said East Coast would update the Aerotrack files.
(f) He asked Mr Asanuma if he would “sign a supplier agreement on behalf of
[East Coast] which contained a director’s guarantee. He told me he would
not sign the supplier agreement, saying words to the effect of ‘we don’t sign
those’.”
[47] In cross examination, he said that:
(a) He communicated that they were acquiring more aircraft and asked Mr
Asanuma if he could look after those aircraft. There was a discussion about
capacity and Mr Asanuma said he could get more people “if we have to”;
(b) He knew at the time that Mr Asanuma probably had subcontractors and knew
that one person could not care for all the Stirling aircraft.
[48] As to discussion about logbooks, Mr Schultz said in cross examination:16
(a) He had no particular recollection of discussion about logbooks other than that
the logbooks would have to be provided;
(b) He later said that Mr Asanuma said “he was the accountable manager, he
would [sic: was] required to personally have the logbooks”;
(c) He then said Mr Asanuma might have said accountable manager, chief
engineer or LAME.
(d) When challenged about the inconsistency between the detail in (b) to (c) and
his initial evidence in (a), he said that the first statement was not in respect of
the of 21 May meeting. He explained his evidence on the basis that he meant
to refer to other conversations. That explanation is not accepted. It is not
supported by the transcript.17
[49] In cross examination on the director’s guarantee issue, he said:
(a) Mr Asanuma said he did not know what a director’s guarantee was;
(b) Mr Schultz told Mr Asanuma that it meant that Mr Asanuma would be
personally liable for any failure of East Coast.
[50] Mr Amess swore that at the meeting:
16 TS2-24.27 to 25.49.
17 TS2-24.27 to .40.
-- 19 of 44 --
20
(a) Mr Schultz asked if East Coast would be willing to be AMO for Stirling’s
fleet and Mr Asanuma said yes and would hire more people if required;
(b) Mr Asanuma said he wanted to keep possession of the logbooks for the
aircraft because “it was his responsibility to make sure they are up to date”
and wanted the Aerotrack ‘system’ (file) for each aircraft transferred to him
“to make sure he was in control of updating it”;
(c) Mr Schultz asked Mr Asanuma if he would sign a supplier agreement that
had a director’s guarantee. Mr Amess said he did not know what a director’s
guarantee was at the time but that Mr Asanuma said, “no we do not need
one”.
[51] In cross examination, Mr Amess:
(a) Agreed that Mr Asanuma said that East Coast had multiple LAMEs
subcontracted and could get more people if required;
(b) Said that he did not query why Mr Asanuma wanted the logbooks because
that was a general practice in the industry;
(c) Agreed Mr Asanuma said the logbooks and Aerotrack files would be updated
by East Coast when maintenance was done;
(d) Maintained that Mr Asanuma did not say that he did not know what a
director’s guarantee was.
[52] Mr Asanuma said as follows in his affidavit:
(a) Mr Schultz said he was getting more aircraft and asked whether East Coast
could be the AMO for all of them, though Mr Asanuma denies Mr Schultz
mentioned Stirling;
(b) He was asked if East Coast could handle the extra work and said that East
Coast had multiple LAMEs subcontracted and could get more people if
required;
(c) He asked for the logbooks and Aerotrack files for all aircraft to be sent to
East Coast. Mr Amess asked why East Coast needed the logbooks and Mr
Asanuma said it was so East Coast could update the logbooks and input
Aerotrack data when maintenance was done;
(d) He denied saying it was his personal responsibility to update logbooks;
(e) As to the guarantee, he said he was asked to give one by Mr Schultz and did
not know what it was and that:
He said words to the effect that it was me as a director guaranteeing to be
personally liable for any failure of [East Coast] I remember I laughed and said
words to the effect that there was no way I would agree to be personally liable…
(f) He denied any discussion about any maintenance agreement.
-- 20 of 44 --
21
[53] In cross examination on that meeting, he maintained his evidence from his
affidavit.18
[54] I will make findings on this discussion later in these reasons.
The maintenance agreement/s
[55] The evidence touching on the written maintenance agreement/s is disputed, though
the email traffic allows findings as to what occurred.
[56] Mr Schultz swore that on 1 May 2021, Schultz Equipment and Sterling entered into
an agreement with East Coast for maintenance of VH-LTB and VH-ITM. He
swore that Schultz owned the aircraft but transferred them to Stirling once it was
acquired by the Schultz’s company.
[57] The agreement he exhibits is in the simplest terms and relevantly imposes
obligations on Schultz Equipment as the owner and on East Coast as the maintainer
to ensure complete regulatory documents are maintained and on East Coast to carry
out all maintenance which was required ‘at the direction of the owner’.
[58] The agreement he exhibits has the following heading:
[59] It has the following signing block:
[60] Mr Asanuma, on the other hand, exhibits an e-signed agreement with an audit
history showing that it was created on 14 July 2021 and signed by Mr Asanuma on
15 July 2021. It is in identical form to the agreement exhibited by Mr Schultz,
except that:
(a) It has the following heading:
18 TS2-63 to 64 and 71 to 72.
-- 21 of 44 --
22
(b) It has the following signing block:
[61] I find Mr Asanuma’s version is the first maintenance agreement and that Mr
Schultz’s evidence is wrong on that point. This finding is consistent with Mr
Amess’ evidence set out next, and the audit of the document in evidence history. It
is also signed by Mr McNab, who remained the operator at the time. I find that this
is the first maintenance agreement.
[62] The version relied upon by Mr Schultz as the 1 May 2021 agreement was prepared
later, as the documents confirm. It resulted from Mr Amess’ realisation that the
first maintenance agreement only had VH-LTB recorded. He sent a revised version
to Mr Asanuma on 30 August 2021, which Mr Asanuma signed and returned on the
same day. This is the second maintenance agreement.
[63] The rest of the evidence about the alleged maintenance agreements from Mr
Schultz and Mr Amess is wrong, and clearly so. Mr Schultz swears that between 1
May 2021 and 16 January 2023, the maintenance agreement was updated on three
occasions to add additional aircraft. He exhibits “these versions”. The exhibited
documents, however, are the first and second maintenance agreements, along with
a third maintenance agreement which is identical to the second, but which
includes five aircraft, the two in the second maintenance agreement plus three
more.
[64] The third maintenance agreement is identical to the second, except for the addition,
in different sized text, of the identifying letters for three additional aircraft. The
document could easily have been prepared using the second as a draft. There is
nothing in the evidence to support the conclusion it was ever provided to East
Coast, much less signed or otherwise approved by it. The electronic signatures do
not support any such conclusion.
[65] Mr Amess, like Mr Schultz, swears that he sent three further versions over the
same period. I infer this refers to the three identified by Mr Schultz. He does not
identify any others. The only alternatives are the three maintenance agreements
already identified, only one of which could possibly be a further version. He was
cross examined about the maintenance agreements.19 He agreed in cross
19 TS2-45.4 to 46.16.
-- 22 of 44 --
23
examination that he had looked at the “various maintenance agreements”. He
agreed he had no cause to be involved with amending maintenance agreements
before 21 September 2021, when he became HAAMC.
[66] Mr Asanuma swears that he signed no further maintenance agreements after the
first and second agreement.
[67] The objective evidence strongly supports Mr Asanuma’s evidence that the only two
maintenance agreements were the first and second identified above which were
entered into on 15 July 2021 and 30 August 2021. It also supports the conclusion
that there was no legally binding agreement in the form of the third maintenance
agreement. I find accordingly.
[68] Further, I reject Mr Schultz’s evidence that he or Mr Amess had conversations with
Mr Asanuma each time a new aircraft was acquired in which there was oral
agreement to vary the written maintenance agreement. That account is inconsistent
with the documentary record. It is reconstruction at best.
[69] Mr Schultz’s evidence and Mr Amess’ evidence about these agreements shows a
troubling lack of attention to the correctness of their affidavits.
[70] Given those findings, the question arises as to the basis upon which other work was
done. To my mind, any such work would have been done pursuant to an implied
retainer with East Coast to carry out work as directed for a reasonable fee. This
must follow because:
(a) All parties agree that East Coast was the entity that Mr Schultz dealt with;
and
(b) The arrangement was a formal one in the sense that East Coast was being
retained at arm’s length to carry out work for reward, consistent with the
requirements for maintenance under the statutory scheme known to the
parties.
[71] A term would be implied into that retainer that such work would be carried out
with due care and skill. There is a question as to whether Stirling or Stirling
Consolidated was the party to the maintenance and retainer agreements. Nothing
seems to turn on that for the purposes of this preliminary point because it appears
that if Stirling Consolidated had the contractual rights, they would have been
exercised for the benefit of Stirling, at least in practice. See paragraph [8] above.
Who carried out the work?
[72] East Coast did maintenance work for Stirling from about May 2021 until January
2023. Mr Asanuma explained that work increased from late 2021 when COVID-19
restrictions ceased to affect activity. East Coast engaged three LAMEs as
subcontractors over that period, with Mr Asanuma spending a lot of his time co-
ordinating job allocation, arranging travel, ordering supplies and performing
administration tasks. He only spent about a third of his time doing actual
maintenance work.
-- 23 of 44 --
24
[73] Mr Schultz swore that East Coast and Mr Asanuma as LAME performed all
maintenance on Stirling’s aircraft.20 Mr Asanuma swore in response that Mr
Schultz and Mr Amess were aware he used LAMEs as subcontractors. He based
that suggestion on the fact that they knew he could not possibly do all the work
himself, they received maintenance releases signed by other LAMEs and that they
would have discussions about where the experienced LAME was located so that
that person could work on a particular aircraft.
[74] Mr Schultz made a quick concession in cross examination, that he knew Mr
Asanuma was not doing and could not do, all the work himself. 21 Given all those
matters, I do not understand how Mr Schultz could have sworn to the contrary if he
was giving proper attention to his affidavit.
[75] Further, if Mr Schultz had asked Mr Amess, Mr Amess would presumably have
told him the true position given that Mr Amess swore he “completely relied on the
maintenance releases”, and those documents showed other LAMEs had signed off
on a lot of the work done.
Logbooks and Aerotrack access
[76] There is a significant factual contest about dealings between Mr Asanuma and Mr
Schultz in relation to possession of logbooks and access to Aerotrack files.
[77] Let us start with Aerotrack. Mr Schultz initially swore to the following effect:
(a) Mr Asanuma initially provided Aerotrack log in details but at some point, he
changed the log in so Mr Schultz could not access Aerotrack files;
(b) In March 2022, Stirling obtained its own Aerotrack access and suggested
Stirling take over maintenance tracking and requested return of the aircraft
logbooks and Aerotrack login details, and Mr Asanuma refused;
(c) The only maintenance records Stirling could access once the Aerotrack files
and logbooks were provided to East Coast were the maintenance releases.
Mr Amess swore to the same effect.22
[78] In his oral evidence in chief, Mr Schultz conceded that he could log in and see
components and run out times. In cross examination, he made broader
concessions. He also showed a limited understanding of the availability of work
pack information on Aerotrack. It appeared to me his understanding of Aerotrack
was very limited.
[79] Mr Amess swore that:23
During the period when ECH and Mr Asanuma were performing maintenance works for
Stirling Helicopters, I received invoices for payment. On a number of occasions, either by
email or phone I asked Mr Asanuma for a copy of the completed work pack and runouts. The
completed work packs and runouts would have been another source of information for me to
20 Schultz [45] but cf. [54].
21 TS2-23.30 to 24.10.
22 Amess [23] and [28].
23 Amess [29].
-- 24 of 44 --
25
cross check the maintenance requirements for the aircraft. Mr Asanuma would tell me he
would send them, but he never did.
[80] “Never did” was quickly shown to be an exaggeration. He conceded in cross
examination that he was provided with run outs, though then said they were not
complete.
[81] Oddly, he also gave evidence he never had access to the Aerotrack files. That is
odd because he was the HAAMC and his affidavit complains about lack of
information, yet Mr Schultz had access. Should I infer that Mr Schultz did not
share log in details for Aerotrack with the officer of Stirling directly responsible for
compliance? Whatever the true position on this, it does not engender confidence in
the version relied upon by the plaintiff.
[82] Mr Asanuma disputed each of those allegations. He swore:
(a) He never cancelled Mr Schultz’s log in details;
(b) Mr Schultz never asked him for the logbooks or Aerotrack files in March
2022 or later;
(c) Mr Schultz did ask him for a copy of Aerotrack schedules in June 2022 and
again in September 2022. He did not comply because he considered Stirling
owed East Coast money for work done;
(d) Stirling could log in to Aerotrack and view runouts and that he provided
copies of work packs and runouts from time to time to Mr Amess.
[83] The objective evidence tends, yet again, to support Mr Asanuma’s version. Of
most relevance is the email exchange of 24 June 2022 and 27 September 2022.24 It
is brief but revealing. On 24 June Mr Schultz emailed Mr Asanuma:
Hi Kev,
Now we have our own copy of Aerotrack, can you transfer across a copy of the schedules for
our Aircraft.
[84] There was a follow up email on 27 September 2022:
Kevin,
Further to the below request, can you transfer across the schedules at the end of the week
before you go on holidays?
Can you also get the physical logbooks to Coolangatta so they can be collected by the
auditor next week.
[85] The tone and content of those emails is inconsistent with any unmet demand to
provide the logbooks to Stirling, much less one in March 2022. I do not accept any
such demand was made. Further, the documentary evidence and the concessions
by Mr Amess are inconsistent with the allegations that work packs and run outs
were never provided. Given the exaggeration in Mr Amess’ affidavit on that point,
I am not persuaded that Mr Asanuma’s responses were inadequate. Mr Amess’
24 Exhibit 3.
-- 25 of 44 --
26
allegation that only the maintenance releases were available to track work done,
and to be done, is wrong.
THE PLEADED CASES
The contract case against East Coast
[86] The proceedings were commenced as a claim by Mr Asanuma’s company, East
Coast Helicopters Pty Ltd (East Coast) on a contract for payment for maintenance
work undertaken by East Coast for Stirling. East Coast is insolvent and the
proceedings by it are stayed.
[87] Stirling counterclaimed against East Coast for breach of contract and against Mr
Asanuma in negligence. The counterclaim on the contract is also stayed. However,
allegations in the counterclaim on the contract are relevant to the case against Mr
Asanuma.
[88] Paragraphs 58 and 59 of the counterclaim25 plead the third maintenance agreement
with the following additions:
(a) That the contract was between Stirling Consolidated, Schultz Equipment and
East Coast (not Stirling);
(b) That the aircraft included VH-MTY by conduct; and
(c) That there was an implied term that East Coast would exercise reasonable
care and skill in providing services under the third maintenance agreement.
[89] It also pleads as a term that the owner of the aircraft was Schultz Equipment until
later, when Stirling was the owner and by conduct Stirling became a party to the
maintenance agreement “by way of novation”.
[90] The answer26 relevantly:
(a) Admits that the second maintenance agreement was signed on 1 May 2021;
(b) Alleges the first maintenance agreement was signed on 15 July and varied the
second maintenance agreement;
(c) Alleges there was no third maintenance agreement; and
(d) Admits East Coast had an implied duty to take reasonable care in performing
work under the maintenance agreements.
[91] The counterclaim then alleges several breaches of the maintenance agreement.
Stirling alleges that East Coast breached the maintenance agreement in that it:
(a) Failed to inform Stirling of upcoming maintenance due;
(b) Incorrectly completed maintenance releases;
25 Amended Defence and Third Further Amended Counterclaim.
26 Further Amended Answer.
-- 26 of 44 --
27
(c) Issued maintenance releases without having completed required logbook
entries;
(d) Carried out certain work incorrectly
(e) Failed to carry out statutory inspections;
(f) Failed to update component cards to correctly record flying hours and life
limits of components;
(g) Failed complete work packs; and
(h) Failed to ensure that employees and contractors signed Review Charts.
[92] The failures were designated the defective works, a description I will adopt.
Notably for the preliminary question, each of these acts were alleged to breach an
implied term that East Coast would exercise reasonable care and skill in providing
services under the Maintenance Agreement. The loss alleged was costs incurred in
rectifying the defective works, with particulars provided in paragraph 63L. This is
the same loss as claimed in negligence against Mr Asanuma.
[93] In broad terms, the answer denies the specific allegations of defective work and/or
alleges that it did not lead to any loss if it did occur and/or denies the work was part
of the scope of work of East Coast and/or alleges the loss arose from conduct of
Stirling.
The duty of care
[94] Stirling’s case on duty of care is articulated as follows.
[95] Paragraphs 63A and 63B allege characteristics of Mr Asanuma as follows:
63A. At all material times, the Second Defendant by Counterclaim, Mr Asanuma, was:
a. a natural person capable of being sued;
b. sole director of the Plaintiff;
c. an “accountable manager” of the Plaintiff within the meaning of section 42.575(1)
of the Civil Aviation Safety Regulations 1998 (Cth) (CASR);
d. a licenced aircraft engineer;
e. the Chief Engineer of the Plaintiff;
f. authorised and approved under the Civil Aviation Safety Regulations 1998 (Cth) to
carry out aircraft maintenance;
g. by reason of the matters pleaded in subparagraphs (b), (c) and (e) above,
responsible for:
(i) supervising the maintenance carried out by the Plaintiff pursuant to the
Maintenance Agreement
(ii) ensuring that maintenance carried out by the Plaintiff pursuant to the
Maintenance Agreement complied with CASR, the Civil Aviation Orders,
and the MPM;
-- 27 of 44 --
28
h. in possession or control of the “maintenance records” (as that term is defined in
regulation 42.015 of the CASR) for the Aircraft;
i. solely responsible for completing maintenance certification for maintenance
carried out by the Plaintiff pursuant to the Maintenance Agreement for the
purposes of Subpart 42.H of the CASR; and
j. exercising special skill or competence when performing and supervising
maintenance carried out pursuant to the Maintenance Agreement.
63B. At all material times, to the Second Defendant by Counterclaim’s knowledge, the First
Defendant:
a. carried on a commercial aircraft charter business;
b. used the Aircraft in the operation of its business; and
c. was not qualified, and employed no person who was qualified, to carry out or
supervise the maintenance to be performed pursuant to the Maintenance
Agreement.
[96] Mr Asanuma admits 63A(a) to (f) (on the basis that he was a LAME). He denies
63A(h) and (i) on the basis that East Coast was in possession of the logbooks and
East Coast was responsible for completing certification. As to 63A(g), Mr
Asanuma pleaded:
As to sub-paragraph g.;
(i) denies as untrue that the matters pleaded have the consequence of making Mr
Asanuma responsible for supervising the maintenance carried out by the
Plaintiff under the Maintenance Agreement as properly construed they do not;
(ii) denies as untrue that the matters pleaded have the consequence of making Mr
Asanuma responsible for ensuring that the maintenance carried out by the
Plaintiff under the maintenance Agreement complied with CASR, the Civil
Aviation orders, and the MPM as properly construed they do not and any such
responsibility fell on the Plaintiff.
[97] Mr Asanuma denies he had the knowledge of Stirling’s activities because he did
not know Stirling, in particular, carried on those activities, and that the
maintenance agreements identified Stirling Consolidated as the owner. He denies
he knew Stirling had no qualified maintenance persons because he did not know
Stirling’s structure and that he did know that it did have a HAAMC and used other
maintenance providers.
[98] Under the heading “duty of care” Stirling then alleged:
63C. Between about May 2021 to mid-February 2023, the Second Defendant by
Counterclaim:
a. personally undertook maintenance of the Aircraft on behalf of the Plaintiff
pursuant to the Maintenance Agreement; and
b. further and alternatively, supervised the maintenance of the Aircraft undertaken by
the Plaintiff pursuant to the Maintenance Agreement.
Particulars
-- 28 of 44 --
29
[The particulars comprised extensive references to individual acts and
omissions involving work on the various aircraft and appear to correlate
to the defective works]
63D. The Second Defendant by Counterclaim knew or ought to have known that the First
Defendant would rely upon the Second Defendant by Counterclaim to perform, and
to ensure that the Plaintiff performed, maintenance of the Aircraft pursuant to the
Maintenance Agreement with reasonable care.
Particulars
Such knowledge is to be inferred from the matters pleaded in paragraphs 58, 59,
63A(b) to (j), 63B and 63C above.
63DA. The First Defendant was vulnerable to suffering the economic harm or loss pleaded
in paragraphs 63E and 63L below because:
a. of one or more of the matters pleaded in paragraphs 63A(c) to (j), 63B, 63C
and 63D above, and paragraph 63E below; and
b. the First Defendant was unable, reasonably, to protect itself from the economic
harm or loss.
63DB. The Second Defendant by Counterclaim assumed a responsibility to the First
Defendant to take reasonable care to avoid the economic harm or loss pleaded in
paragraphs 63E and 63L below because:
a. of one or more of the matters pleaded in paragraphs 59(j), 63A(c) to (j),
63B, 63C and 63D above, and paragraph 63E below;
b. on or about 21 May 2021, Mr Asanuma attended a meeting with Mr
Schultz and Mr Amess on the Frist Defendant at Archerfield Airport
during which Mr Asanuma:
i. requested that the logbooks be given to him and that he would keep
them in his possession;
ii. said that it was his personal responsibility to make sure that the
logbooks were updated and correct;
iii. requested the electronic files for helicopters kept on the Aerotrack
system;
iv. said that ECH would update the Aerotrack system as part of the
performance of its maintenance duties; and
v. asked that Mr Schultz or Mr Amess arrange for the electronic
Aerotrack access for each of the helicopters to be transferred to him to
make sure that he was in control of updating it;
c. the logbooks were provided to Mr Asanuma and Aerotrack data files were
transferred to ECH;
d. Mr Asanuma thereafter retained the logbooks;
e. at some point prior to March 2022, Mr Schultz asked Mr Asanuma whether a
system could be implemented whereby the First Defendant did the maintenance
tracking and planning and ECH would do the maintenance work, but Mr Asanuma
refused to entertain that arrangement and insisted he must do it himself personally.
f. in around March 2022:
-- 29 of 44 --
30
i. Mr Schultz suggested to Mr Asanuma that the First Defendant take
over maintenance tracking for the Aircraft;
ii. Mr Schultz asked Mr Asanuma to return the logbooks and provide
him with Aerotrack log in details;
iii. Mr Asanuma refused to do so;
iv. Mr Asanuma said words to the effect that it was his sole responsibility
to ensure the logbooks and the Aerotrack records were kept up to date
and insisted that he kept the maintenance records for that reason.
63E. It was reasonably foreseeable to a person in the position of the Second Defendant by
Counterclaim that unless he exercised reasonable care in performing and supervising
the maintenance carried out by the Plaintiff pursuant to the Maintenance Agreement
the First Defendant could suffer the loss (the Risk).
Particulars
By reason of the matters pleaded in paragraphs 58, 59, 63A(b) to (j), 63B and 63D
above, the Second Defendant by Counterclaim knew or ought to have known that:
a. the First Defendant carried on a commercial aircraft charter business;
b. the First Defendant used the Aircraft in the operation of its business;
c. the First Defendant was obligated to ensure the aircraft were airworthy;
d. the First Defendant could not operate or allow to be operated any Aircraft which
had not been maintained with reasonable care;
e. the First Defendant could not operate or allow to be operated any Aircraft which
the First Defendant could not confirm had been maintained with reasonable care;
f. the failure to exercise reasonable care when maintaining the Aircraft could result
in the Aircraft not meeting the requirements of the CASR;
g. the failure to exercise reasonable care when maintaining the Aircraft could result
in the Aircraft not being airworthy;
h. the failure to exercise reasonable care when maintaining the Aircraft could prevent
the First Defendant from using the Aircraft in its commercial operations;
i. the First Defendant could be required to repair or undertake further maintenance
of any Aircraft which had not been maintained, or which it could not confirm had
been maintained with reasonable care.
[99] As to paragraph 63C, Mr Asanuma admits he undertook maintenance work on
some of the aircraft and supervised his own work but did so as part of his
employment as a LAME by East Coast pursuant to the contract it had for that work.
He says much of the work particularised was carried out by other employees,
agents and contractors not directly under his supervision.
[100] As to paragraph 63D, Mr Asanuma denies he had or should have had the
knowledge alleged because neither he nor Stirling were parties to the maintenance
agreements and it was not part of the terms that he would do the work or supervise
the work himself.
[101] As to paragraph 63DA, Mr Asanuma pleads, relevantly, that Stirling was not
vulnerable to the harm alleged because:
-- 30 of 44 --
31
(a) It was able to review maintenance records via maintenance releases and
Aerotrack files and logbooks on request; and
(b) It was at liberty to obtain contractual protections.
[102] As to 63DB, Mr Asanuma relevantly:
(a) Pleaded his version of the 21 May 2021 conversation and his dealings over
the Aerotrack and logbooks as set out in the evidence above; and
(b) Pleaded no duty arose by reason of his version of events relating to the
request for the director’s guarantee.
[103] As to paragraph 63E, Mr Asanuma pleads relevantly that there was no reasonable
basis for Mr Asanuma to foresee that Stirling would suffer loss from the
maintenance agreement because Stirling was not a party to it.
[104] Stirling pleads the duty of care as follows;
63EA. In the premises pleaded in paragraphs 63A to 63E above, [Mr Asanuma] owed a
duty of care to [Stirling] to exercise the standard of care which is expected of a reasonably
competent Accountable Manager and Chief Engineer with [Mr Asanuma’s] skill and
competence in performing and supervising maintenance of the Aircraft pursuant to the
Maintenance Agreement.
[105] Stirling then pleads the alleged breaches of the duty of care in substantially the
same form as alleged in the claim against East Coast, albeit the articulation of the
specifics and particulars of the breaches is more refined.
[106] Stirling then pleads its loss as follows:
Causation
63J. As a result of the Breach of Duty, the First Defendant was:
a. unable to confirm that the Aircraft were airworthy;
b. required to:
(i) conduct an audit of the Aircraft logbooks;
(ii) replace or remove components of the Aircraft;
(iii) rectify, reassemble and repaint the main transmission for VH-LBT;
(iv) complete the inspections pleaded in paragraph 63F(f) above;
(v) update the logbooks and component cards for the Aircraft; and
(vi) repair and replace parts of VH-HOA due to the matters pleaded in 63F(j) above.
63K. But for the Breach of Duty, the matters pleaded in paragraph 63J above would not have
occurred.
63L. By reason of the matters pleaded in paragraphs 63J and 63IK above, the First Defendant
has suffered loss and damage.
Particulars
The First Defendant’s loss and damage is comprised of the following:
[107] The particulars identify losses in two categories: checking and reinstating the
logbooks and other maintenance records and repairing allegedly defective work.
-- 31 of 44 --
32
MALLONLAND PTY LTD V ADVANTA SEEDS PTY LTD
[108] Both parties relied on Mallonland Pty Ltd v Advanta Seeds Pty Ltd.27 Mallonland
was the producer of sorghum seed. It was sold in bags to farmers who cultivated
that crop. The bags of sorghum seed were contaminated with seeds of a plant
called shattercane which is related to sorghum but not usable for grain. Its
seedhead shatters and spreads seed widely and the plant grows vigorously,
outcompeting the sorghum.
[109] The seeds were supplied in 20kg bags to distributors who in turn supplied the seed
in those same bags to growers. There was no contract between Mallonland and the
ultimate purchaser. Nor were the terms of the sales from the distributors to the
farmers before the Court. When the seeds were supplied, Mallonland did not know
that the sorghum was contaminated by shattercane.
[110] The plaintiffs purchased the seed. They had no way of detecting the shattercane
seed. They sowed the seed and the shattercane grew with the sorghum,
contaminating the sorghum crop and the fields where it had been sown.
[111] To eliminate the shattercane contamination required the growers to stop growing
sorghum and remediate the fields affected. The growers did not allege property
damage or economic loss consequent on property damage. Rather they alleged
they had suffered pure economic loss from reduced income and increased
expenditure.
[112] Printed on the bags was data which, amongst other things, stated that the maximum
other seeds comprised .1%. Also printed on the bags was text under the heading
‘Warning’ summarised by the majority as follows (at [10]):
It was found that the packaging referred to simple concepts in “plain words” to convey
“several clear propositions”, including that the risk of using the product lay with the buyer
and that the producer was not accepting any responsibility for damage or loss caused by
negligence on its part. The text included clear statements that the bag must only be opened if
the buyer had read and agreed with the conditions on the bag and that the buyer should
return the bag for a refund if the conditions were not acceptable.
[113] It was found that the losses of the growers were reasonably foreseeable if due care
was not exercised in the production process of the seeds. It was also found that the
contamination arose from failure to exercise reasonable care in carrying out a
process called rogueing in a particular field where the contamination arose and in
failing to conduct a “grow out” of the seed. It was not in dispute that these
breaches caused the shattercane contamination and the consequent economic loss.
[114] The defect in the seed was a hidden defect. It was found that the growers’ capacity
to protect themselves from the breach of duty was limited to not purchasing the
seeds or not sowing it once purchased. It was accepted they could not realistically
obtain a warranty from the sellers against a defect in the seed causing economic
loss.
27 (2024) 418 ALR 639.
-- 32 of 44 --
33
[115] At trial and on appeal, the warning statements on the seed bags were decisive in the
rejection by both Courts of a duty of care to avoid pure economic loss owed by the
defendant to the growers. In the High Court:
[42] …the growers ultimately argued that the following matters supported the existence of
the alleged duty of care: (1) the reasonable foreseeability of the relevant risk of economic
loss if reasonable care was not taken in seed production; (2) the producer’s knowledge of the
risks of economic loss to which the growers were exposed if reasonable care was not taken
in seed production; (3) the producer’s capacity to control those risks by careful production;
(4) the growers’ vulnerability, in the sense that they could not protect themselves from the
consequences of a want of reasonable care in the production of the seed in such a way that
would cast the consequences on the producer; (5) as the intended consumers of the product,
the growers were not in an indeterminate class of victims of the producer’s want of care; and
(6) the recognition of the alleged duty of care would not give rise to legal incoherence.
[116] As to the effect of the warning:
[43] The growers also argued that the packaging in which the contaminated seed was sold
did not operate to affect the duty of care that was alleged to have arisen at the time of the
production of the contaminated seed (that is, before the disclaimer had been given to growers
on receipt of the bags of seed). Specifically, the growers submitted that the disclaimer did
not “intersect” with the producer’s knowledge because, according to the growers, the
disclaimer did not warn of a risk of which the producer was aware. Furthermore, it was said
that the disclaimer did not attenuate the growers’ vulnerability and could not have affected
whether the producer assumed responsibility for the task of producing the seed.
[117] The High Court rejected those submissions. Two judgments were given, one by
Gageler CJ, Gordon, Steward, Gleeson, Jagot and Beech-Jones JJ and the other by
Edelman J. The majority restated the general principles applicable to pure
economic loss cases. It is as well to recall them:
Principles governing the existence of a duty of care to avoid causing pure economic loss
[29] An essential element of the tort of negligence is that the defendant owes the plaintiff a
duty to take reasonable care when engaging in an activity to avoid causing the plaintiff a
particular type of damage or loss that is reasonably foreseeable. “A man is entitled to be as
negligent as he pleases towards the whole world if he owes no duty to them.”
[30] As a general rule, damages are not recoverable in negligence for pure economic loss,
that is, for loss that is not consequential upon injury to person or property. Ordinarily, a
person does not owe a duty to take reasonable care to avoid causing reasonably foreseeable
pure economic loss to another.
[31] This general rule reflects the well-established position at common law that the
infliction of economic loss does not, by itself, infringe any right or legally protected interest
of the plaintiff. The general rule is also said to reflect policy concerns about the potentially
excessive scope of liability for financial loss, referred to by Cardozo CJ as liability “in an
indeterminate amount for an indeterminate time to an indeterminate class”. Another policy
reason said to justify the general rule is a concern to avoid infringing upon the legitimate
pursuit of personal advantage.
[32] A consequence of the general rule is that damages for pure economic loss are not
recoverable if all that is shown is that the defendant’s negligence was a cause of the loss and
the loss was reasonably foreseeable. That is, reasonable foreseeability is a necessary but not
sufficient criterion for the existence of a duty of care to avoid causing pure economic loss.
Furthermore, indeterminacy of liability, in the sense that the defendant’s liability cannot be
realistically calculated, will ordinarily deny the existence of such a duty of care.
-- 33 of 44 --
34
[Footnotes omitted]
[118] The majority then turned to the assumption of responsibility:
[33] Where a defendant has assumed a responsibility towards the plaintiff to take reasonable
care to avoid economic loss to the plaintiff, a duty of care may well be established. The term
“assumption of responsibility” has been criticised as “imprecise and beguiling but
deceptively simple”. An assumption of responsibility is best understood as an undertaking
(whether express or implied) by a person to take on a task or job for another person or class
of persons, from which it can be inferred that the first person accepted that he or she would
take reasonable care when engaging in that task or job.
[34] Where a duty to take reasonable care to avoid causing pure economic loss is said to
arise out of an assumption of responsibility by a defendant to a particular person or class of
persons, the defendant can negate or limit that assumption and thus the duty by words or
conduct directed to that person or class. That is because such a negation or limitation
amounts to a denial of an assumption of responsibility on the part of the defendant which the
person or class cannot ignore or reject. For example, no duty to avoid causing pure economic
loss will arise in connection with the provision of advice or information if the defendant
“had effectually disclaimed any responsibility for it”.
[Footnotes omitted]
[119] As to the general approach, they restated the position as follows:
[36] In Sullivan v Moody, the Court observed that “[d]ifferent classes of case give rise to
different problems in determining the existence and nature or scope, of a duty of care … The
relevant problem will then become the focus of attention in a judicial evaluation of the
factors which tend for or against a conclusion, to be arrived at as a matter of principle.”
Since Sullivan v Moody, other than in cases involving an assumption of responsibility,
determining whether the relationship between the parties gives rise to a duty of care to avoid
causing pure economic loss has been understood in Australia to involve such an evaluation.
This “salient features” approach, as it is now known, has attracted significant judicial
criticism. However, neither the growers nor the producer argued that there should be a
departure from the approach in this case.
[37] Their Honours’ reference in Sullivan v Moody to “factors … for or against” recognition
of a duty of care in a novel case should not be understood as inviting any form of “instinctive
synthesis” of competing considerations “without a chain of reasoning linking these factors
with the ultimate conclusion”. This is why an incremental and analogical approach, paying
close attention to relevant precedents and any risk of incoherence in the principles they
establish, is necessary.
[Footnotes omitted]
[120] Their Honours then made observations about knowledge of risk and vulnerability
as factors in the incremental and analogical approach. Relevantly on vulnerability
they observed:
[39] Another matter that adherence to the required incremental and analogical approach has
identified as relevant to the existence of a duty of care to avoid causing pure economic loss
is a plaintiff’s “vulnerability” to the particular type of economic loss that eventuated. The
relevant vulnerability is the plaintiff’s inability to protect him or herself from the economic
loss that eventuated as a consequence of a defendant’s carelessness, either entirely or in a
way that would cast the consequence of loss on the defendant (for example, by contractual
stipulations). A mere likelihood of suffering economic loss if reasonable care is not taken
will not amount to vulnerability. As McHugh J explained it in Woolcock, a plaintiff may be
unable to protect him or herself from the risk of economic loss by reason of “ignorance or
-- 34 of 44 --
35
social, political or economic constraints”. Conversely, the capacity of a person to protect him
or herself from economic loss by contractual agreement (or, by analogy, by any other
reasonable means) is a reason, and often a decisive one, for rejecting the existence of a duty
of care.
[121] Edelman J agreed in the analysis and conclusion of the majority on the salient
features approach, albeit criticising that approach (as did the majority). His
Honour’s judgment focused, relevantly, on assumption of responsibility.
[122] The plaintiff relied in particular on his Honour’s observation that an assumption of
responsibility historically could arise without consideration. His Honour
explained:
[61] …unlike modern contractual duties, an assumption of responsibility can arise without
any consideration. For instance, in actions against gratuitous bailees (and not merely
contractual bailees) for a failure to return goods, the courts recognised an assumed duty of
the bailee which, “like the action against the surgeon or the carpenter”, was based “on an
undertaking (an assumpsit)” and was, in effect, an action “for failure to perform a promise to
return”. The assumed duty or undertaking was also recognised as arising by implication from
an office or calling without requiring consideration. Hence, a common carrier or innkeeper
was held to have assumed responsibility to the public to provide carriage or lodging. In the
absence of any requirement for consideration, their duties were recognised to arise
“independently of contract, and whether [their] defaults took the form of acts or of
omissions”, based upon the “supposition ‘that every one who undertakes any office,
employment, trust, or duty, contracts with those who employ or entrust [them], to perform it
with integrity, diligence, and skill’”.
[Footnotes omitted]
[123] His Honour went on:
[64] The source of the modern application of assumption of responsibility in the law of torts
is the speeches of their Lordships, and particularly Lord Devlin, in Hedley Byrne. Although a
disclaimer precluded any finding of an undertaking in that case, their Lordships recognised
that liability could arise following an undertaking that care would be taken concerning the
accuracy of a statement. As Lord Devlin explained, it would be an “extreme assertion” to
suggest that liability based upon an assumption of responsibility could only arise in instances
of breach of a “contractual or fiduciary duty”. That assertion would mean that a patient who
gave up their occupation could recover damages from a doctor in a private hospital if, for a
fee, the doctor had negligently advised the patient that they could not pursue their
occupation, but could not recover damages if the same advice had been given in a public
hospital without a fee. Lord Devlin rightly explained that this was “nonsense”. It was “a
refusal to make sense”. Lord Devlin continued, explaining that an assumption of
responsibility could not be confined to categories such as common callings:
“If a defendant says to a plaintiff: ‘Let me do this for you; do not waste your money
in employing a professional, I will do it for nothing and you can rely on me,’ I do
not think [the defendant] could escape liability simply because [the defendant]
belonged to no profession or calling, had no qualifications or special skill and did
not hold [themself] out as having any.”
In other words, Hedley Byrne recognised that liability could arise based upon the breach of
an undertaking “which, because there is no consideration, is not enforceable under the rules
of contract”.
[Footnotes omitted]
-- 35 of 44 --
36
SUBMISSIONS
The plaintiff’s case
[124] The pleaded duty omits reference to the kind of loss to which it relates. However,
Stirling accepts it must be loss of the kind pleaded. The duty alleged is therefore a
duty owed by Mr Asanuma to Stirling to exercise the standard of reasonable care
expected of a reasonably competent Accountable Manager and Chief Engineer with
his skill and competence in performing and supervising maintenance of the Aircraft
under the Maintenance Agreement to avoid causing economic loss to Stirling in the
form of:
(a) The costs of correction of negligent work done; and
(b) The costs of correction of incomplete and inaccurate logbooks and
component cards.
[125] The plaintiff relied on three contentions to sustain the duty alleged:
(a) First, that the duty arose from an assumption of responsibility based on Mr
Asanuma’s offices as Accountable Manager and Chief Engineer;
(b) Second, that the duty arose from an express assumption of responsibility by
Mr Asanuma; and
(c) Third, that an analysis of the salient features of the relationship sustain the
duty.
[126] The contentions can be summarised as follows.
Assumption of responsibility contentions
Mr Asanuma’s roles
[127] Stirling relies on the following facts:
(a) East Coast was an AMO and Mr Asanuma was East Coast’s Accountable
Manager and Chief Engineer;
(b) As such, under the Manual he had responsibility for maintaining adherence to
the Manual; and
(c) As such, he was ultimately responsible for ensuring East Coast complied with
the regulatory framework and for supervising maintenance carried out.
Express assumption
[128] Stirling submits that Mr Asanuma assumed responsibility by reason of his
statements made at the 21 May 2021 meeting taken in their context. It relies
further on the following allegations:
(a) Mr Asanuma said he wanted possession of the logbooks because it was his
personal responsibility to keep them up to date, even though it was not a legal
requirement to hold them; and
-- 36 of 44 --
37
(b) Mr Asanuma when asked refused to sign a supplier agreement with a
director’s guarantee.
Salient features contention
[129] Stirling relied on the following factors.
[130] First, that Stirling was vulnerable to economic loss resulting from lack of
reasonable care by Mr Asanuma because it could not protect itself from that risk. It
relies on:
(a) Mr Asanuma’s refusal to accept personal liability to Stirling;
(b) East Coast had possession of the logbooks and Stirling’s only access to
maintenance records was maintenance releases, so it could not determine if
logbooks were properly maintained.
(c) Mr Asanuma had control of the Aerotrack files so Stirling could not check if
they were maintained properly;
(d) Mr Asanuma cut off access eventually for Stirling so it could not obtain
information from the Aerotrack files;
(e) Mr Asanuma refused to return the logbooks when requested; and
(f) Mr Asanuma’s position of responsibility as stated above.
[131] Second, Mr Asanuma had knowledge or means of knowledge of an ascertainable
class of persons at risk of foreseeable harm.
[132] Third, Mr Asanuma knew or ought to have known that Stirling would rely on him
to exercise reasonable care in performing or supervising maintenance.
The defendant’s case
[133] The defendant contends that no duty arose from Mr Asanuma’s office under the
Manual. He submits that the Manual defines employment roles and responsibilities
for its own internal management purposes. Further, he submits that on the proper
construction of the Manual it was not Mr Asanuma’s responsibility to check that
work done by other LAME’s was done correctly.
[134] As to the assumption of responsibility from the alleged statement about personal
responsibility, the defendant makes three principal points:
(a) First, he submits that that matter was not pleaded, and he objects to the point
being run;
(b) Second, he disputes the allegations relied upon in any event; and
(c) Third, he submits the refusal to provide a guarantee is a complete rejection of
a willingness to assume personal responsibility.
[135] The defendant contends this last point provides an answer to the duty of care case
and relies on an analogy with the warning in Mallonland.
-- 37 of 44 --
38
[136] As to salient features, specifically, Mr Asanuma further submitted:
(a) Consistent with Mallonland, care should be exercised in extending the scope
of a duty to avoid pure economic loss;
(b) Stirling was not vulnerable because of its own capacity to check the records.
This relates to the loss arising from inadequate record keeping only;
(c) It would be reasonably foreseeable that an owner or operator might suffered
economic loss from breach of the duty alleged, though Mr Asanuma said the
written maintenance agreements did not identify Stirling as either; and
(d) As to known reliance, Mr Asanuma cavilled with the factual basis for known
reliance.
ANALYSIS
Findings of fact
The witnesses
[137] Neither Mr Schultz nor Mr Amess were reliable witnesses. There were significant
difficulties with their evidence:
(a) In relation to the maintenance agreements, see paragraphs [55] to [61];
(b) In relation to Mr Schultz’s allegation about Mr Asanuma doing all the work
on the aircraft (albeit objected to), see paragraph [72] to [75];
(c) In relation to their evidence on Aerotrack access and requests for possession
of logbooks, see paragraph [76] to [85].
[138] Those parts of their evidence show a consistent theme of self-serving inaccuracy in
both Mr Schultz and Mr Amess. On the other hand, Mr Asanuma’s evidence
tended to be supported by the contemporaneous documents.
Findings on the 21 May 2021 meeting
[139] There was a meeting on 21 May 2021 at which Mr Schultz, Mr Amess and Mr
Asanuma attended. At that meeting, Mr Schultz asked Mr Asanuma if East Coast
could take on more aircraft maintenance. Mr Asanuma said it could and would
take on more staff if required.
[140] At that time, Stirling had no capacity to conduct maintenance itself nor to plan the
maintenance program and direct East Coast. All parties knew that and acted on
that basis. Further, all parties knew that if East Coast was to plan and carry out
maintenance, it required possession of the logbooks and control of the Aerotrack
files for all aircraft. While Mr Asanuma probably reiterated that East Coast needed
the logbooks and Aerotrack files, that was expected by Mr Schultz and Mr Amess.
-- 38 of 44 --
39
[141] It is entirely possible that Mr Asanuma did say something about needing the
logbooks and Aerotrack files so they could be kept up to date, but as I have found,
that is exactly what all parties expected East Coast would do.
[142] I do not accept that Mr Asanuma said that it was his “personal responsibility to
make sure the logbooks were updated and correct”. Not only is Mr Schultz
generally unreliable, his evidence on this part of the conversation in cross
examination was unpersuasive, as explained in paragraph [48] above.
[143] Further, even if Mr Asanuma did say something about responsibility, this statement
would have been made in the context accepted by all that East Coast, not Mr
Asanuma, was supplying the services. Even if I accepted, which I do not, that Mr
Asanuma said it was “his responsibility” to maintain the logbooks (as Mr Amess
alleges), that does not objectively communicate personal responsibility. Rather, in
the context in which it was said, it was a statement on behalf of East Coast.
[144] That leaves the conversation about the director’s guarantee. I do not accept the
evidence of either Mr Schultz or Mr Amess on the contentious aspects of this
discussion. I prefer Mr Asanuma’s version, not only because his evidence is
generally more reliable, but it is a likely reaction of a person who had incorporated
being asked to give up the protection of that process.
[145] Frankly, it matters little which version is correct. Even on Mr Schultz’s version,
they were left in no doubt that Mr Asanuma was not willing to accept personal
liability. It is hard to place any other interpretation on the statement “we don’t sign
those” when asked for a director’s guarantee. Even “we do not need one” is more
consistent with “we do not need one because I am not undertaking personal
liability” than “we do not need one because I am personally responsible without it”.
No duty arose
The contract and the refusal of personal liability
[146] Mr Asanuma’s refusal to provide a personal guarantee is a factor which prevents
the duty alleged by Stirling from arising, particularly in the context in which it was
made.
[147] Let us first look at the context. All parties agree that, from the start of their
dealings, East Coast was the entity which was dealing with Stirling and its related
companies. That is reflected in and confirmed by the several written maintenance
agreements. The contracts with East Coast provided contractual remedies for work
done on the aircraft without reasonable care.
[148] Stirling was not vulnerable to any failure of Mr Asanuma or any of East Coast’s
other employees or agents to exercise reasonable care as a matter of law because it
had those remedies available in contract.28 As the majority observed in
Mallonland, capacity of a person to be protected from economic loss by contract is
a reason, often a decisive one, for rejecting a duty of care. The majority referred to
28 If Stirling strictly speaking was not a party to the retainers, Stirling Consolidated was.
-- 39 of 44 --
40
Woolcock29 and Brookfield30 as authorities supporting and elucidating that
proposition. What is notable in both of those cases, is that the plaintiff did not in
fact have a direct contractual remedy for the loss. In this case, Stirling did have
such a remedy and sued to enforce it by its counterclaim against East Coast.
[149] Stirling’s real complaint is not that it was vulnerable to Mr Asanuma not taking
reasonable care, but that it was vulnerable to East Coast’s insolvency. That is not a
vulnerability relevant to a duty to take reasonable care. Further, in this case, Mr
Schultz was well aware of that risk and sought to address it by seeking a personal
guarantee from Mr Asanuma. He went ahead despite not obtaining such a
guarantee. He accepted the insolvency risk, as do all unsecured creditors. It is not
the role of the law of torts to provide commercial comfort to an unsecured creditor.
[150] That alone is sufficient to provide a full answer to Stirling’s case. However, the
situation for Stirling is worsened by the refusal of Mr Asanuma to provide a
personal guarantee. The effect of such a refusal in the above circumstances was to
communicate clearly to Mr Schultz that Mr Asanuma would not undertake any
liability himself, and that Stirling was left to its rights against East Coast. This is
strongly analogous to the circumstances in Mallonland. Paraphrasing the analysis
of the ‘Warning’ in the majority judgment at [47], the refusal to give the personal
guarantee was positively not assuming the responsibility, which is at the core of
Stirling’s case, being personal responsibility for defaults by East Coast under the
maintenance agreements and retainers.
[151] Indeed, the circumstances here are in some respects more compelling than in
Mallonland. The refusal was made to Stirling directly and it addressed directly the
question of personal liability.
No express undertaking of liability
[152] Based on my findings, Mr Asanuma said nothing in that meeting by which he
undertook personal responsibility for performance of work under the maintenance
agreements or under the implied retainer which applied to work done outside the
scope of those written agreements: see paragraphs [70] and [71] above.
[153] Further, there is nothing which assists Stirling arising out of the circumstances that
East Coast obtained and retained the logbooks and maintained the Aerotrack files.
That occurred because all parties knew that Stirling was not in a position at that
time to record, track and direct maintenance work itself. In that sense, it was East
Coast’s job to provide full-service maintenance. But that is because that is what
Stirling needed. It did not involve any suggestion of personal responsibility in Mr
Asanuma.
[154] Two further points need to be made.
(a) First, even if Mr Schultz’s version was accepted, it would fail to make out
the whole of Stirling’s case. Mr Schultz’s version alleges a statement about
29 Woolcock Street Investments Pty Ltd v CDG Pty Ltd (2004) 216 CLR 515.
30 Brookfield Multiplex Ltd v Owners Corporation Strata Plan 61288 (2014) 254 CLR 185.
-- 40 of 44 --
41
updating the logbooks. That does not extend to work Mr Asanuma did on the
aircraft. So that part of the alleged duty would in any event not be supported.
(b) Second, and more fundamentally, I consider that Mr Asanuma’s rejection of
the invitation to provide a director’s guarantee had the effect of excluding
any personal duty to Stirling, even if he had said something suggestive of
acceptance of personal responsibility. It is impossible for the former to stand
in the face of the latter.
No undertaking of liability under the Manual
[155] While the above considerations provide a full answer to Stirling’s case, I also
address the other matters raised. I turn then to Stirling’s argument that Mr Asanuma
undertook responsibility by reason of his offices.
[156] Stirling relies on an assumed duty arising by implication from an office or calling
without requiring consideration. The office relied upon is Mr Asanuma’s office as
Accountable Manager and Chief Engineer under the Manual. Stirling’s argument
can be summarised as follows:
76. The following facts are relevant to the first assumption of responsibility by Mr
Asanuma to Stirling:
(a) …
(c) according to East Coast’s own Maintenance Procedures Manual “the
responsibility for maintaining adherence to the complete system remains
with the Accountable Manager” (which cannot be disputed);
(d) Mr Asanuma’s role of Accountable Manager and Chief Engineer of East
Coast was to ensure East Coast had resources to comply with its
Maintenance Procedures Manual, liaise with the owner/operate [sic:
operator] and HAAMC, ensure employees and sub-contractors were
suitably qualified and trained, to allocate work to employees and sub-
contractors, and generally to supervise the employees and sub-contractors
(not disputed);
(e) as the Accountable Manager and Chief Engineer of East Coast, Mr
Asanuma was ultimately responsible for:
(i) ensuring that East Coast complied with the regulatory framework
under the Safety Regulations, including those relating to the
maintenance of aircraft logbooks and issuing maintenance
releases.
(ii) supervising the maintenance carried out by East Coast,
[footnotes omitted]
[157] I do not consider that any duty arose on that basis (even if the contractual rights and
refusal of the guarantee is disregarded). It was ultimately accepted that Mr
Asanuma did not hold any statutory office. Accordingly, the only basis for
Stirling’s argument was the Manual. However, I do not consider the Manual can
sustain that argument.
-- 41 of 44 --
42
[158] Mr Asanuma was cross examined on the Manual. The cross examination sought to
obtain admissions that Mr Asanuma was personally responsible for his actions as
Accountable Manager and Chief Engineer under the Manual. But that begs the
question of personally responsible to whom and why?
[159] The Manual articulates obligations personal to the Accountable Manager and Head
Engineer, roles filled by Mr Asanuma. However, that does not of itself amount to
an assumption of responsibility to Stirling. The Manual states how East Coast will
meet its safety and regulatory obligations. It is a document which has legal force,
in that it is a condition of the license. It identifies persons who have “corporate
responsibility” for certain tasks. That communicates that the individual holding the
office undertakes responsibility on behalf of East Coast. In my view it cannot be
characterised as an assumption of responsibility by those individuals to third
parties.
[160] That conclusion is supported by the fact that there is no suggestion that the Manual
was ever sought out and read by Stirling, nor that it was provided to Stirling. Much
less that Mr Asanuma provided it to Stirling in circumstances which would
objectively communicate an assumption of responsibility to Stirling in respect of
the responsibilities he had under the document. I do not accept that in those
circumstances, the content of the Manual insofar as it relates to Mr Asanuma can
be relied upon by Stirling as comprising an undertaking of responsibility to it.
[161] A further consideration is that if the mere existence of Mr Asanuma’s roles under
the Manual is sufficient to sustain a duty of care, it is difficult to see how that duty
could be limited just to Stirling or entities in the same position. Failure to exercise
reasonable care as Chief Engineer or Accountable Manager could lead to economic
loss for many plaintiffs in many situations. Stirling articulated no basis upon which
a duty so arising would be limited to entities in its position and there is no obvious
basis to do so. The spectre of unlimited liability to an indeterminate class haunts
this argument.
[162] There remains one issue to deal with. Stirling submitted that Mr Asanuma had a
duty under the Manual not only to attend to regulatory compliance, but also a
personal duty to see that reasonable care was taken when work was done by
persons other than him. I reject that construction of the Manual. Both the context
and the terms of the Manual stand against it.
[163] As to the regulatory context, it is uncontentious that a LAME can sign off on work
done and indeed only a LAME can do so. That stands against construing the
Manual as requiring the Chief Engineer to supervise and review all the work done
by the LAME and to take responsibility for it. Also relevant is the factual context.
Stirling knew that Mr Asanuma would not be doing all the work and could not
possibly do so, particularly where maintenance work was done while the
helicopters were away from East Coast’s maintenance base.
[164] As to the terms of the Manual, I refer to clause 4.2 set out in paragraph [16](b)
above. On the proper construction of that clause, it does not require the Chief
Engineer to personally sign off on work done by a LAME. The obligation created
-- 42 of 44 --
43
by that clause is for the Chief Engineer to ensure adherence to the system elements,
that is the system of work designed to secure safe operations. That construction is
reinforced by clause 4.2.1, which focuses on processes and record keeping, not on
actual work. It says nothing about the Chief Engineer inspecting and signing off on
all actual work done by another LAME. Indeed, the fact that the Chief Engineer is
not required to be a LAME makes that conclusion compelling: see all the
underlined references in paragraphs [16] and [17] above.
[165] That analysis applies a fortiori to the Accountable Manager. Indeed, Stirling’s
reliance on the Manual in respect of the duty alleged for the Accountable Manager
is articulated without reference to the specific role allocated to that office. It is
evident from the terms of the Manual that the Accountable Manager’s role is a
management role, not a maintenance work or supervision role: see clauses 4.1 and
4.1.1 in paragraph [16](b) above. I do not think that that role supports the duty
articulated by Stirling at all.
[166] There is no basis in the Manual to support any undertaking of responsibility by Mr
Asanuma for carrying out of work done by other LAMEs with reasonable care.
Vulnerability not otherwise established
[167] Stirling was not vulnerable to a lack of reasonable care by Mr Asanuma in any
sense which supports the duty of care alleged.
[168] First, the contractual rights with East Coast meant that Stirling was not vulnerable.
It had remedies against East Coast for any failure by Mr Asanuma or anyone else
working for East Coast to exercise reasonable care. Stirling was vulnerable to
insolvency of East Coast, but that is a different matter.
[169] Second, Stirling submits that the refusal of personal liability by Mr Asanuma made
it vulnerable in the sense that it could not obtain a warranty in contract from him.
But it had a warranty in contract from the entity providing the services.
[170] Third, I am not persuaded on the facts that Stirling was vulnerable by reason of not
having possession of the logbooks or of lack of access to Aerotrack. While I accept
they did not have physical possession of the logbooks, I am not persuaded that they
ever asked Mr Asanuma to make them available for inspection or took any other
steps to monitor their contents. Nor does the evidence support the conclusion that
Mr Asanuma would not have provided access or copies if requested, at least until
the falling out between the parties in September 2022 over unpaid invoices.
[171] As to Aerotrack, I have found that:
(a) Mr Asanuma did not cancel Stirling’s access to Aerotrack, at least prior to
September 2022;
(b) Mr Schultz seemed to have a limited understanding of the information one
could obtain from Aerotrack;
(c) Mr Amess’ evidence that Mr Asanuma did not provide information when
sought was at best exaggerated; and
-- 43 of 44 --
44
(d) It appears Mr Schultz did not provide the passwords for access to Aerotrack
files to Mr Amess, even though Mr Amess was the HAAMC and Mr Amess
did not seek them.
[172] The evidence supports the view that any vulnerability Stirling suffered by reason of
lack of physical access to the logbooks arose primarily from the failure of Stirling
to take advantage of opportunities to access or inspect those documents and that
Stirling simply did not understand or use Aerotrack properly.
Reasonable foreseeability of loss and ascertainable and determinate class
[173] Mr Asanuma would have reasonably foreseen that if he did not ensure that the
logbooks were kept properly and if maintenance work was done negligently, that
economic loss of the kind alleged would likely occur. I also accept that the class of
persons to whom such a duty was owed was ascertainable and determinate in the
sense of being the operator which utilised the aircraft in its business. Mr Asanuma
did not really submit to the contrary.
[174] These are necessary but not sufficient conditions for the duty to arise.
[175] However, I do not accept Mr Asanuma would reasonably foresee that if other
LAMEs did not do their work competently, his lack of reasonable care would cause
loss to owners or operators. That is because there is no basis at all to conclude,
whether under the Manual or under the statutory scheme, he was obliged to
supervise and sign off on the work done. Quite the contrary. Stirling’s submission
on this point is inconsistent with the statutory status of a LAME and the
construction of the Manual which not surprisingly is consistent with that statutory
status. Stirling’s submissions on this point had an air of unreality.
Known reliance
[176] I accept Mr Asanuma knew or would have known that Stirling was relying on East
Coast to perform its contract with reasonable care and skill. It is another matter to
conclude he knew or would have known Stirling was relying on him personally,
especially after he rejected the proposed personal liability. I am willing to accept
that, in broad terms, Mr Asanuma might have expected that Stirling was relying on
him as the principal of East Coast to do his work with reasonable care. But beyond
that, I am not persuaded.
CONCLUSION
[177] Mr Asanuma did not owe a duty to Stirling to take reasonable care in carrying out
his roles with East Coast so as to avoid pure economic loss to Stirling. I will hear
the parties as to costs and further orders in the proceedings.
-- 44 of 44 --
Official source: https://www.sclqld.org.au/caselaw/QDC/2025/176