Dixonbuild Pty Ltd v Queensland Building and Construction Commission [2025] QCAT 401
QUEENSLAND CIVIL AND
ADMINISTRATIVE TRIBUNAL
CITATION: Dixonbuild Pty Ltd v Queensland Building and
Construction Commission [2025] QCAT 401
PARTIES: DIXONBUILD PTY LTD
(applicant)
v
QUEENSLAND BUILDING AND CONSTRUCTION
COMMISSION
(respondent)
APPLICATION NO/S: GAR550-24
MATTER TYPE: General administrative review matters
DELIVERED ON: 8 October 2025
HEARD AT: Brisbane
DECISION OF: A/Senior Member M Katter
ORDERS: The preliminary issue to be decided pursuant to
direction 4 made by the Tribunal on 19 March 2025 is
determined as follows:
The subject of item 1 in the Direction to Rectify is
not “building work” under the Queensland Building
and Construction Commission Act 1991 (Qld).
CATCHWORDS: ADMINISTRATIVE LAW - ADMINISTRATIVE
TRIBUNALS - QUEENSLAND CIVIL AND
ADMINISTRATIVE TRIBUNALS - general administrative
review - application by builder to review a decision by the
Queensland Building and Construction Commission regarding
decision to rectify or remedy - where preliminary issue to
determine - whether item 1 of decision to rectify or remedy
constitutes building work under the Queensland Building and
Construction Commission Act 1991 (Qld) - whether constructed
stormwater system is building work - whether pipes and traps
are a building or buildings - whether the works are connected to
the dwelling - where constructed stormwater system is not
building work
Queensland Building and Construction Commission Act 1991
(Qld)
Queensland Building and Construction Commission Regulation
2018 (Qld)
Cheshire Contractor Pty Ltd v Everett [2017] QSC 287
-- 1 of 5 --
2
APPEARANCES &
REPRESENTATION:
This matter was heard and determined on the papers
pursuant to s 32 of the Queensland Civil and Administrative
Tribunal Act 2009 (Qld)
REASONS FOR DECISION
[1] On 19 March 2025, the Tribunal differently constituted made the following direction:
3. The preliminary issue of whether the subject of item 1 in the Direction to Rectify
constitutes “building work” under the Queensland Building and Construction [sic]
Act 1991 (Qld) will be decided on the papers, without an oral hearing, after 22
March 2025.
[2] Item 1 in the “Defective work list” attached to the Direction to rectify or remedy dated
15 July 2024 describes the subject work (“the work”) as:
The as constructed stormwater system included associated earth works does allow for
the free collection and drainage of stormwater adjacent to and around the southern side
of the house, resulting in poor building practices in that the stormwater pits being higher
than adjacent ground levels and ground level not having sufficient grades to direct the
water away from the building. - This pertains to item 4 of the complaint form.
[3] Schedule 1 to the Queensland Building and Construction Commission Regulation
2018 (Qld) (“the Regulation”) is titled “Work that is not building work”. Section 11
of Schedule 1 sets out the following:
11 Work for water reticulation systems, sewerage systems or stormwater drains
(1) Construction, extension, repair or replacement of a water reticulation system,
sewerage system or stormwater drain, other than works connecting a particular
building to a main of the system or drain.
(2) In this section -
building includes a proposed building.
Is the “the work” building work?
[4] Item 1 in the Direction to rectify or remedy describes the work as a “constructed
stormwater system”. Further, the Respondent refers to the work as a “stormwater
drainage system”1 or “stormwater drainage”.2 The Building Inspector for the
Respondent, Rodney Turkington, describes the works as follows:3
16. Field gullies are pit-like structure that are seated in an excavation that is backfdled.
The terms ‘field’ gullies and ‘yard’ gullies can be used interchangeably. The
purpose of the gullies to collect surface water.
Effective filed gullies are integral because they carry water away from the
dwelling. When they are defective, there is the potential to impact the performance
of the dwelling.
17. The field gully pits installed by the Applicant are connected to a drain in that they
are physically connected to a pipe that drains water away from the location of the
field gully pit.
1 Submissions of the Respondent filed 21 February 2025 at paragraph 3.11.
2 Ibid at 3.12.
3 Statement of Rodney Turkington filed 21 February 2025 at paragraphs 16 to 17.
-- 2 of 5 --
3
[5] The Applicant refers to the work as “field gullies”.4 The Managing Director for the
Applicant states that the purpose of the field gullies is to . .collect stormwater.. .”.5
[6] There is no suggestion in the materials that the stormwater system is collecting water
from the dwelling on the property, nor is there anything that would satisfy the Tribunal
that the system is collecting water from any source other than “stormwater”.
Therefore, the Tribunal is satisfied that the work was indeed the construction of
drainage that can appropriately be described as a componentry forming a “stormwater
drain”.
[7] Neither party suggests that the stormwater system is physically connected to the
residential dwelling on the property. Therefore, in circumstances where the work was
for the construction of a stormwater drain not connected to the dwelling it would
appear prima facie that section 11 of Schedule 1 of the Regulation applies and that the
work is not building work. However, the Respondent submits to the contrary as
follows.
Licence requirement
[8] The Respondent submits that a licence is required to perform work to install a
stormwater drainage system.6 Whether or not a licence is required is immaterial to the
determination of whether or not the work was building work pursuant to the
Queensland Building and Construction Commission Act 1991 (Qld) (“the Act”).
Are the pipes and traps a building or buildings?
[9] The Respondent further submits that part of the stormwater drainage system is
actually a “building” because the “pipework and traps” are a fixed structure and
therefore satisfy the definition of “building” pursuant to the Act.7 8 The Respondent
refers to the decision in Cheshire^ wherein Justice Henry found that an agricultural
pipe was a fixed structure. However, as noted by the Applicant, the decision in
Cheshire related to section 5(1 )(k) of the now repealed Queensland Building Service
Authority Regulation 2003 (Qld) that excluded from the definition of building work
“construction, extension, repair or replacement of a water reticulation system,
sewerage system or stormwater drain, outside the boundaries of private property.”
Further, Justice Henry contemplated the possibility that the work the subject of the
dispute in Cheshire could have been excluded work if it were not on private property.9
The decision in Cheshire does not unequivocally support the submission of the
Respondent. Further, the decision in Cheshire was based on a substantively different
provision.
[10] Nonetheless, it is the submission of the Respondent that, in the present matter, a
stormwater drain is connected to a building (being the pipework and traps) and
therefore section 11 of Schedule 1 of the Regulation does not apply. The Building
Inspector for the Respondent, Mr Turkington, explains that the “purpose of the field
gullies is to carry water away from the dwelling”.10 The stormwater drain system is
4 Written argument of the Applicant filed 31 January 2025 at paragraphs 28 to 30.
5 Statement of Timothy Mark Bartholomaeus filed 31 January 2025 at paragraph 9.
6 Submissions of the Respondent filed 21 February 2025 at paragraph 3.11.
7 See Submissions of the Respondent filed 21 February 2025 at paragraph 3.16 to 3.28.
8 Cheshire Contractor Pty Ltd v Everett [2017] QSC 287, [21].
9 Ibid, [25],
10 Statement of Rodney Turkington filed 21 February 2025 at paragraph 23.
-- 3 of 5 --
4
made up of components and the purpose of the entire system, inclusive of all
componentry, is to act as a stormwater drain. If the Tribunal were to take a literal
approach, it could hold that any fixed component of a stormwater drain is indeed a
fixed structure thereby satisfying the definition of a building pursuant to the
legislation. Applying this approach, it would be difficult to imagine any stormwater
drain not having some fixed component that could be identified as the “building” part
of the system with another component identified as the stormwater drain. For
example, a stormwater drain might include an inspection or inlet point with a grate
fixed in place with concrete. The concrete and grate could then be described as fixed
structures or buildings. This literal interpretation gives rise to an absurdity in that any
stormwater drain that has some minor fixed component (such as a grate) would be
considered a stormwater drain connected to a “building”. Further, the literal
interpretation would render the exclusion in section 11 of Schedule 1 of the Regulation
(stormwater drains not building work) nugatory in circumstances where a stormwater
drain has any fixed component howsoever minor that component may be.
[11] To give effect to the purpose of section 11 of Schedule 1 of the Regulation being the
exclusion of stormwater drains from the definition of building work, the Tribunal
considers that the work, including all componentry of the work, which was installed
“to carry water away from the dwelling”, remains a stormwater drain despite having
fixed components.
Are the works connected to the dwelling?
[12] The Respondent submits, in the alternative, that the field gullies “... provided drainage
in connection with the dwelling.”11 On the submission of the Respondent this would
mean section 11 of Schedule 1 of the Regulation does not exclude the work from the
definition of building work. The Respondent submits that a “physical connection is
not required to satisfy the definition [of connection]”.12 It is arguable that a stormwater
drain may be, in effect, connected to a building (in this context a dwelling) without
the drain’s componentry physically touching the dwelling. For example, stormwater
could fall from a short cut-off downpipe into a collection point of a stormwater drain
that is slightly detached from the dwelling (whether or not this hypothetical example
abides by regulation or codes is a different matter). In this hypothetical example, the
stormwater collected from the roof of a dwelling is captured and entirely controlled
and directed by design to move through a specific set course into the stormwater drain.
To broaden the interpretation of “connecting” to an interpretation that goes beyond
the controlled movement of stormwater collected from the dwelling through a specific
passage to the stormwater drain would again render section 11 of Schedule 1 of the
Regulation futile because it could be said that all stormwater drains constructed on a
property with a dwelling (even stormwater drains not proximate to the dwelling) will
invariably move stormwater away from a dwelling thereby “connecting” the
stormwater drain to the building/dwelling as part of drain system to move water away.
This interpretation would mean that any stormwater drain on any property with a
dwelling would be, in effect, connected for the broad purpose of moving stormwater
away from the dwelling thereby nullifying the provision in question.
[13] In the present matter, there is no controlled movement of stormwater collected from
the dwelling through a specific passage to the stormwater drain. To the contrary, the
11 Submissions of the Respondent filed 21 February 2025 at paragraph 3.29.
12 Ibid at paragraph 3.33.
-- 4 of 5 --
5
Building Inspector Mr Turkington confirms that the water from the roof of the
dwelling is collected to supply water from the dwelling.13 The water from the roof is
not directed through a specific passage to the stormwater drain. The works cannot be
described as works connecting the dwelling to any part of the stormwater drain. It is
not necessary to consider whether any part of the stormwater drain could be described
as a “main” because there is no connection between the dwelling and any part of the
drain.
[14] The work was for the construction of a stormwater drain. The work is not building
work.
Earthmoving and excavating
[15] Schedule 1 of the Regulation also excludes earthmoving and excavating from the
definition of building work. Item 1 in the Defective work list refers to “...associated
earth works...”. The associated earth works were undertaken as part of the work for
the construction of the stormwater drain. It is not necessary to consider whether the
associated earth works could be described as “earthmoving or excavation” and
independently excluded from the definition building work pursuant to section 32 of
Schedule 1 of the Regulation because the associated earth works were part of the work
for the construction of a stormwater drain and would, in any event, remain as work
that is not building work because it is captured by section 11 of Schedule 1 of the
Regulation.
Conclusion
[16] The Tribunal is satisfied that the work is not building work. Accordingly, the
preliminary issue/question to be decided pursuant to direction 4 made by the Tribunal
on 19 March 2025 is determined as follows:
1. The subject of item 1 in the Direction to Rectify is not “building work” under
the Queensland Building and Construction Commission Act 1991 (Qld).
13 Statement of Rodney Turkington filed 21 February 2025 at paragraph 23.
-- 5 of 5 --