Edwards v Queensland Building and Construction Commission & Anor [2024] QCAT 397
QUEENSLAND CIVIL AND
ADMINISTRATIVE TRIBUNAL
CITATION:
PARTIES:
Edwards v Queensland Building and Construction
Commission & Anor [2024] QCAT 397
DONALD BRUCE EDWARDS
(applicant)
v
QUEENSLAND BUILDING AND CONSTRUCTION
COMMISSION
(first respondent)
RODNEY KEVIN RETELL
(second respondent)
APPLICATION NO/S: OCR208-21
MATTER TYPE: Occupational regulation matters
DELIVERED ON: 15 August 2024
HEARING DATE: 9 February 2023
HEARD AT: Brisbane
DECISION OF: Member Carrigan
ORDERS: The Application for miscellaneous matters seeking
to adduce further evidence filed in the Tribunal by
Donald Bruce Edwards 23 February 2023 is
dismissed.
The decision of the Queensland Building and
Construction Commission made on 19 May 2021 is
confirmed.
The Application to review a decision filed in the
Tribunal on 16 June 2021 by Donald Bruce Edwards
is dismissed.
CATCHWORDS: PROFESSIONS AND TRADES – LICENSING ALL
REGULATION OF OTHER PROFESSIONS, TRADES
AND CALLINGS – building certifiers – disciplinary
proceedings – where licensed building certifier issued an
approval for a Development Application – where licensed
building certifiers approval related to a Performance
Solution – whether the building certifier’s conduct
constituted “unsatisfactory conduct” – whether the building
certifier’s conduct constituted “unprofessional conduct”.
Queensland Civil and Administrative Tribunal Act 2009
(Qld), s 17, s 18. s 19, s 20, s 24
-- 1 of 37 --
2
Queensland Building and Construction Commission Act
1991 (Qld), s 86(2), s 87
Building Act 1975 (Qld), s 10, s 11(2), s 26, s 48, s 68, s
68A, s 136, s 137(2)
Planning Act 2016 (Qld), s 68
Cowen & Anor v Queensland Building and Construction
Commission & Anor [2017] QCAT 416
Kehl v Board of Professional Engineers of Queensland
[2010] QCATA 58
Queensland Building and Construction Commission v
Gerhardt [2015] QCATA 13
APPEARANCES &
REPRESENTATION:
Applicant: Self-represented
First Respondent: Mr R Ensby, Special Counsel, Gardens
Second Respondent: No appearance at the hearing
REASONS FOR DECISION
[1] The issue in these proceedings is whether the conduct of Rodney Kevin Retell (‘the
Certifier’) was “unsatisfactory conduct” or “professional misconduct”, as defined
under the Building Act 1975 (Qld) (‘Building Act’) by issuing a building approval on
22 August 2019 based upon a Performance Solution Report prepared by engineers for
a building at 35 Cameron Street, Fairfield, Brisbane.
[2] On 21 September 2020, Donald Bruce Edwards (‘the Applicant’) the registered
proprietor of the property at 35 Cameron Street, Fairfield, lodged a complaint with the
Queensland Building and Construction Commission (‘the Commission’) relating to
the conduct of the Certifier by issuing the building approval on 22 August 2019.
[3] Following an original decision by the Commission and then an internal review
decision dated 19 May 2021 of the original decision, the Commission decided that the
Certifier had not engaged in “unsatisfactory conduct” or “professional misconduct”
relevant to the complaint made by the Applicant.
[4] On 16 June 2021 the Applicant filed in the Tribunal an Application to review a
decision made by the Commission on 19 May 2021.
Background Facts
[5] These proceedings are part of a lengthy dispute which the Applicant has maintained
with the builder, Sovereign Homes (Qld) Pty Ltd (‘Sovereign Homes’) and the
Certifier in respect of the construction of an extension of the premises at 35 Cameron
Street, Fairfield. As this is an application to review the Commission’s decision made
on 19 May 2021 the Tribunal does not propose to go into all of the facts that have
been part of the history of this lengthy dispute relating to these premises, although
some historical matters will be referred to by way of background.
[6] The Certifier was originally licensed as an Assistant Building Surveyor from about
August 1998 until approximately 1 November 2012 when he was then licensed as a
-- 2 of 37 --
3
Building Certifier Level I. That license remained current at all material times to these
proceedings.
[7] On about 17 July 2014 plans were approved for the construction of an extension to
the Applicants premises at 35 Cameron Street, Fairfield.
[8] Throughout 2014 construction of the home was undertaken by the Applicant’s builder,
Sovereign Homes.
[9] One issue that arose (amongst others) was whether the builder had constructed the
roof gutters in accordance with the plans for the building approval. On 21 August
2018 the Tribunal held, in proceedings between the Applicant and Sovereign Homes,
that the builder had not constructed the gutter for the roof according to the plans and
specifications. The builder was held in breach of the contract.1
[10] The Applicant appealed the Tribunal’s decision on the basis of errors of law relating
to substantive matters and costs and interest. The Appeal Tribunal on 23 October 2020
refused to grant the Applicant leave to appeal and dismissed the appeal.2
Applicant’s First Complaint to QBCC
[11] The dispute in these proceedings has its beginning with the Applicant filing a
complaint with the Commission on 21 November 2018 against the conduct of the
Certifier for issuing a Form 21 on 8 January 2015 in reliance upon an Alternative
Building Solution proposal and other building work in circumstances where the
building work did not comply with the Building Act (‘the First Complaint’).
[12] On 3 September 2020 the Commission made a decision with respect to that First
Complaint by deciding that the Certifier had engaged in unsatisfactory conduct
pursuant to s 204 of the Building Act but had not engaged in professional misconduct.
The Applicant considered that decision was wrong and on 21 September 2020
requested an internal review of that decision.
[13] The Commission conducted the internal review and on 4 November 2020 decided that
the Certifier had engaged in unsatisfactory conduct in relation to number of matters
but had not engaged in unsatisfactory conduct in relation to a number of other items
referred to in the evidence.
Applicant’s Second Complaint to QBCC
[14] Previously, on 21 August 2019, a Performance Solution Report was prepared by
Anthony Gerard Freeman, engineer, of Aqualogical Plumbing Design Solutions
(‘Aqualogical’) in respect of the gutter for the roof drainage of the premises at
Fairfield.
[15] The next day, 22 August 2019, Mr Freeman issued a Form 15 certificate for the
alternate gutter design.
[16] On 22 August 2019 the Certifier issued a Development Application Decision Notice
and a Statement of Reasons which approved a Development Application based upon
the Alternative Building Solutions by Aqualogical for roof water drainage to the
premises at Fairfield. The Development Permit Approval was to be read in
1 See Respondent’s Statement of Reasons, Exhibit SOR 33, page 1582 and particularly at page 1607
para 147.
2 See Respondent’s Statement of Reasons, Exhibit SOR 35, page 1620.
-- 3 of 37 --
4
conjunction with a number of documents including the approved drawings and
documents, certificates and building certifier’s conditions and other applicable codes
for a Self-Assessable Development.
[17] The Applicant on 21 September 2020 gave the Commission a further complaint about
the Certifier’s Decision Notice of 22 August 2019 based on the Alternative Building
Solution for roof water drainage for the premises at 35 Cameron Street, Fairfield (‘the
Second Complaint’). The Second Complaint raised the issue whether the Certifier had
engaged in unsatisfactory conduct or professional misconduct.
[18] By 25 March 2021 the Commission had finalised its investigations into the Second
Complaint whether the Certifier had engaged in unsatisfactory conduct or professional
misconduct. The Commission decided, on that date, that the Certifier had not engaged
in unsatisfactory conduct or professional misconduct.
[19] On 21 April 2021 the Applicant made a request for an internal review of the
Commission’s decision on 25 March 2021 asserting that it was wrong as the earlier
Decision Notice from the Certifier was false and misleading, contained errors and
omissions and other defects.
[20] The Commission completed the internal review on 19 May 2021 and notified the
Applicant that it had decided that the Certifier had not engaged in “unsatisfactory
conduct” or “professional misconduct” as defined in the Building Act relevant to the
Second Complaint.
[21] On 16 June 2021 the Applicant filed in the Tribunal an Application to review a
decision of the Commission made on 19 May 2021.
The Tribunal’s Jurisdiction to Review the Decision of 19 May 2021
[22] The Tribunal’s review jurisdiction is conferred by an “enabling Act” to review a
decision made or taken to have been made by another entity under that Act.3
[23] The decision of the Commission on 19 May 2021 was made pursuant to the Building
Act. Accordingly, that decision is a “reviewable decision”.4
[24] A person affected by a reviewable decision of the Commission may apply to the
Tribunal for a review of that decision.5 Accordingly, in these proceedings, the
Queensland Building and Construction Commission Act 1991 (Qld) (‘QBCC Act’) is
the “enabling Act”.
[25] The Applicant has applied to the Tribunal in its review jurisdiction and the Tribunal
may deal with that application.6
[26] In conducting the review the Tribunal must decide the review in accordance with the
Queensland Civil and Administrative Tribunal Act 2009 (Qld) (‘QCAT Act’) and the
QBCC Act, including related legislation and in particular the Building Act. The
Tribunal has all the functions of the Commission for the reviewable decision being
reviewed.7
3 Queensland Civil and Administrative Tribunal Act 2009 (Qld), s 17 (‘QCAT Act’).
4 QBCC Act, s 86(2).
5 QBCC Act, s 87.
6 QCAT Act, s 18.
7 QCAT Act, s 19.
-- 4 of 37 --
5
[27] In conducting this review the Tribunal must hear and decide the review by way of a
fresh hearing on the merits and is to produce the correct and preferable decision.8 As
has been submitted by the Commission;9
It is not necessary for an error to be identified in the decision being reviewed.
Accordingly, it has to be understood that these review proceedings do not involve an
appeal from the Commission’s decision of 19 May 2021, but rather a “fresh hearing
on the merits”.
[28] In these proceedings in reviewing the decision the Tribunal may;10
(a) confirm or amend the decision; or
(b) set aside the decision and substitute its own decision; or
(c) set aside the decision and return the matter for reconsideration to the decision-
maker for the decision, with the directions the Tribunal considers appropriate.
Applicant files Application after hearing completed
[29] On 23 February 2023 the Applicant filed an Application for miscellaneous matters to
adduce further evidence in a document titled “Submissions of the Respondent – In
Response to the Applicant’s Submissions filed 23 August 2019”. This document had
previously been filed in the Tribunal by the Applicant's builder, Sovereign Homes, in
separate proceedings between the Applicant and that builder. The Applicant now
seeks to rely on that document in these proceedings.
[30] The Applicant explains the need to adduce this evidence on the basis that at the
hearing in these proceedings on 9 February 2019 “doubt was raised as to whether the
4th approval was for the existing gutter construction in 2014 or for proposed work”.
[31] The Applicant says that the evidence he now seeks to adduce;
demonstrates that the 4th Approval was used by Sovereign Homes, the Builder
to demonstrate to QCATA that the 4th approval was for the existing gutter.
[32] The Applicant submits that “there is no impediment to Sovereign’s Submissions of 28
August 2019 to QCATA being allowed into evidence”.11 The Applicant relies on s 28
of the QCAT Act. The Applicant submits;
(a) that at the hearing he always argued that the Approval was for existing work
and that that was supported by various evidence to which he refers;12
(b) that no work has occurred on the gutter since it was installed by Sovereign
Homes in late 2014;13
8 QCAT Act, s 20.
9 See the Statement of Reasons filed on 6 September 2021 at page 2 paragraph 7 and the Commission’s
reliance upon Cowen & Anor v Queensland Building and Construction Commission & Anor [2017]
QCAT 416 at [18] citing Kehl v Board of Professional Engineers of Queensland [2010] QCATA 58
at [9].
10 QCAT Act, s 24.
11 Applicant’s Submissions dated 27 March 2023 at paragraph 11.
12 Applicant’s Submissions dated 27 March 2023 at paragraph 4.
13 Applicant’s Submissions dated 27 March 2023 at paragraph 7.
-- 5 of 37 --
6
(c) no Form 16 or Form 21 have been issued for the 4th Approval. The gutter
remains unapproved
[33] The Commission submits that this Application for miscellaneous matters is to reopen
the proceedings pursuant to s 138 of the QCAT Act.14 The Commission further
submits;
(a) the evidence in the form of Sovereign’s Submissions is not new evidence that
has arisen but was reasonably available when these proceedings were heard on
9 February 2023. For that reason alone, the Applicant’s Application must fail.
(b) The evidence in the form of Sovereign’s Submissions is not relevant;
(c) the Applicant did not seek an adjournment of the hearing on 9 February 2023,
when the Certifier did not attend that hearing, for the purposes of cross-
examining the Certifier, whose case was that the approval was not in respect of
existing work;
(d) allowing the evidence in the form of Sovereign Homes’ Submissions would be
likely to cause prejudice and would likely result in a significant delay in the final
hearing.
[34] The Applicant filed Submissions in Reply arguing that the Application for
miscellaneous matters was not a reopening as s 136 of the QCAT Act only “enlivened”
s 138 “after a decision is made” in the proceedings.15 The Applicant says no decision
has been made by the Tribunal in respect of the proceedings of 9 February 2023.
Further, the Applicant submits that reliance is made on the Tribunal’s discretion to
allow further evidence as made in the Directions by S M Aughterson of 7 June 202
which stated;
no further material may be filed in the proceedings without leave of the
Tribunal.
The Applicant does not accept that there is any prejudice to the other parties. The
evidence sought to be adduced “speaks for itself” and “nearly re-enforces” the
evidence at paragraph 4 of the Applicant’s Submissions of 27 March 2023.
[35] The Tribunal accepts that s 136 makes the “reopening” provisions dependent upon the
proceedings being “heard and decided by the Tribunal”. That is not the case in these
proceedings as no decision has been given.
[36] The Applicant relies upon the Tribunal’s discretion. A number of factors need to be
taken into account in the exercise of any discretion. Considerations of natural justice,
fairness, opportunity to be heard and of course the interests of the public and the need
for finality in proceedings as well as the proper and appropriate use of Tribunal
resources need to be part of the Tribunal’s decision whether to grant, or dismiss, the
Application for miscellaneous matters.
[37] The Submissions by the Commission are that the evidence contained in the Sovereign
Homes Submissions is not new evidence arising since the hearing of these
proceedings on 9 February 2023. The document dated 28 August 2019 which the
Applicant seeks to now adduce in evidence related to earlier proceedings between the
14 QBCC Submissions dated 27 April 2023 at paragraph 2.
15 Applicant’s Submissions in Reply dated 19 April 2023 at paragraph 3.
-- 6 of 37 --
7
Applicant and the Builder, Sovereign Homes. The document predates these
proceedings by several years and there is no explanation why those submissions were
not filed in these proceedings prior to 9 February 2023.
[38] The Tribunal afforded the Applicant opportunities to file the material he relied on in
these proceedings. Those opportunities arose as follows;
(a) on 9 July 2021 the Tribunal gave directions for the Applicant to file “all material
upon which he intends to rely at the compulsory conference”;
(b) on 2 February 2022 the Tribunal gave directions for the Applicant to file his
statement of evidence, including “[a] statement from each witness to give
evidence for him at the hearing including any experts” and any documents
referred to in any statements of evidence. On 21 March 2022 the Tribunal gave
directions for an extension of time for the Applicant to comply with the
directions of 2 February 2022;
(c) also, on 2 February 2022 a direction was made for any party to file further
statements of evidence in response to any statements of evidence by any other
party. On 11 April 2022 the Tribunal extended the time for any party to file
further statements of evidence in response to any of the statements of evidence
filed by any other party;
(d) on 7 June 2022 directions were made for the proceedings to be listed for a
hearing and it was also directed that;
(i) no further material may be filed in the proceedings without leave of the
Tribunal.
(ii) no Party will be allowed to present any evidence at the hearing that is not
contained in the statements filed in the Tribunal without justifying the
need for such additional evidence to the Tribunal.
[39] These directions of the Tribunal demonstrate that the parties, including the Applicant,
were given the opportunity in the period from 9 July 2021 until 9 February 2023 in
which to file in the Tribunal their statements of evidence, including witness statements
of evidence and supporting documents. It should be expected that this period, in
excess of 18 months, was a more than reasonable time for the parties to file their
evidence in these proceedings. That reasonable time is also reinforced by the fact that
the Applicant in these proceedings was no stranger to proceedings in this Tribunal and
the Development Tribunal with which he had earlier involvement and experience in
disputing with his builder, Sovereign Homes.
[40] The Applicant makes the concession that in respect of his argument that the 4th
Approval was for existing work his argument was supported by ample evidence before
the Tribunal.16
[41] The Applicant submits that he seeks to adduce the evidence in Sovereign Homes’
Submissions to “re-enforce the evidence at paragraph 4 of my 27 March 2023
submissions that the 4th decision notice was primarily for existing work and
complements the evidence in Edwards Response Submissions ……..”.
16 Applicant’s Submissions dated 27 March 2023 at paragraph(a)-(f).
-- 7 of 37 --
8
[42] The Applicant does not deal with the issue raised in the Statement of Philip John
Godfrey filed in the Tribunal on behalf of the Commission on 21 April 2022, where
he states;
………..the building approval issued by the Second Respondent relates to a
design put forward in respect of roof drainage. The building approval relates to
the proposed construction; it is not an approval in respect of the existing works
(in this case, there are existing works). At some time after building approval is
granted for the proposed construction, an inspection will be carried out to
determine if the works constructed comply with the building approval granted,
so that, if appropriate, a final inspection can be issued by the certifier. The
function of the certifier in issuing a final certificate for the construction works
is not a function that is subject to the second complaint. In considering the
Applicant’s second complaint, all the Commission is concerned with is whether
the Second Respondent’s conduct in assessing the application for the building
approval, and making a decision in relation to the application, involved any
unsatisfactory conduct or professional misconduct.
[43] The Applicant had to have been alerted from at least about 21 April 2022 that the
Commission was proceeding on the basis that the 4th Approval (referred to in the
above quote as the “building approval issued by the Second Respondent”) was for a
design put forward in respect of roof drainage and was contrary to his case that it
related to the existing works. The Applicant had the opportunity from 21 April 2022
to put before the Tribunal any relevant evidence which he sought to contest the
evidence from Philip John Godfrey that the approval related to a design in respect of
roof drainage.
[44] The Tribunal is also concerned with the limited extent to which the Applicant seeks
to adduce additional evidence. The Applicant seeks to rely on Sovereign Homes’
Submissions but not on the evidence from which those Submissions are drawn in
affidavits17 and other evidence will not be before the Tribunal in these proceedings.
The Applicant seeks to rely on the submissions but not the evidence on which those
submissions depend. The Applicant has not explained why the evidence will not be
before the Tribunal in these proceedings.
[45] The Tribunal is also concerned in terms of whether any prejudice is likely to be
suffered by the Commission or by the Certifier in these proceedings if the Application
for miscellaneous matters is granted. It is noted that the submissions from the
Commission do not go as far as to state that prejudice will occur but merely referred
to prejudice which is “likely” to occur. However, the Tribunal is concerned with
statements by a third party in the Sovereign Homes Submissions which on proper
analysis, and depending upon the affidavit or evidence on which they depend, may
require either further material or cross examination of the Applicant or a third party.
[46] The Tribunal is also concerned that this evidence is not a statement made by one of
the parties which could be in support of, or against, the interest of that party. Such a
statement can have probative value. Rather, the evidence the Applicant seeks to
adduce is a statement by a third party to these proceedings. The Tribunal is not bound
by any statement from a third party, such as Sovereign Homes, and as such it has little,
if any, probative value for the purposes of these proceedings.
17 The "affidavits and other evidence" in the Sovereign Homes Submissions which were available in
other proceedings but are not being provided to the Tribunal in these proceedings.
-- 8 of 37 --
9
[47] The Tribunal is concerned with the functions of the Certifier in these proceedings to
receive and assess a building development application.18 The Certifier’s approval was
based upon a Performance Solution Report which had to contain details of how the
performance solution is different from the relevant deemed-to-satisfy provisions
under the Building Code of Australia (‘BCA’) or acceptable solutions under the
Queensland Development Code (‘QDC’).19
[48] In the circumstances as discussed above the Tribunal is not persuaded that it should
grant the Application for miscellaneous matters so as to allow the Applicant to rely
on Sovereign Homes’ Submissions referred to in its Application. The Tribunal rejects
the Applicant’s submissions and will dismiss the Application for miscellaneous
matters.
Onus of Proof in these Proceedings
[49] The Commission in written submissions refers to several authorities and then
submits;20
The applicable standard of proof in disciplinary actions is the Briginshaw
standard which is the standard of proof on the balance of probabilities but on
the basis that the more serious the allegations, the higher the degree of
probability that is required.
[50] The Commission also adds that;21
…..it is also noteworthy that it has been held that a certifier is entitled to rely on
material a client gives him or her and has no independent obligation to verify
the truth of those documents save that a certifier may have an obligation to
inquire if the documents, on their face, suggest any regularity.
[51] The Applicant in his written submissions implies that he accepts the Briginshaw
standard in the following submission;22
The QBCC post hearing submission highlighted the Briginshaw standard of
proof on the balance of probabilities. The evidence that I seek to admit seeks to
heighten the standard of proof and authentication that the 4th Approval is for
existing work.
[52] The Tribunal accepts the submissions of both parties on the basis that the onus of
proof in these proceedings is the balance of possibilities as stated in the Briginshaw
standard. The Tribunal will apply that standard to the facts of these proceedings.
Requirements of the Certifier for a Building Development Application
[53] A certifier must prepare the statement of reasons for a decision to approve an
application on the basis of a performance solution.23 The statement of reasons is to
contain the following;24
18 Building Act, s 48(1)(a).
19 Building Act, s 26(b)(i).
20 Commission’s submissions dated 16 February, 2023 at paragraph 4.
21 Commission’s Submissions dated 16 February 2023 at paragraph 7 relying upon QBCC v Gerhardt
[2015] QCATA 13 at paragraph 34.
22 Respondent's Submissions dated 27 March 2023 at paragraph 5.
23 Building Act, s 68A.
24 Building Act, s 68A(3).
-- 9 of 37 --
10
The statement must contain details of-
how the performance solution is different from the relevant deemed-to-
satisfy provisions under the BCA or acceptable solutions under the QDC;
and
inspection or test results and any other documents or information relied
on to make the decision.
[54] The Certifier in these proceedings was the relevant assessment manager for the
approval granted on 22 August 2019.25
[55] On 22 August 2019 a Form 15 was given by Mr Freeman, Engineer, approving the
Performance Solution Report for the ‘alternative gutter design’ at the Applicant’s
property.
[56] A certifier may accept and, without further checking, rely on a certificate from a
‘competent person’26 provided the requirements in s 46 and s 49 of the Building
Regulation 2006 (Qld) (‘Building Regulation’) Part 7, Division 2 has been satisfied
or otherwise complied with. Reliance on the certificate is dependent upon;27
(a) whether the certifier has decided the person is a competent person of a type
relevant to the function;
(b) if the person was decided to be a competent person only for a particular aspect
of the decided type certificate relates to the aspect; and
(c) if the person was described to be a competent person only for particular
assessable building work-the certificate relates to the building work; and
(d) the person was, under Part 5 and this part, permitted to give this certificate; and
(e) for a certificate that is an inspection certificate, the person complied with section
47A; and
(f) the certificate complies with section 48.
[57] A further method, or alternate means, for a certifier to rely on evidence to show that
the National Construction Code (‘NCC’) requirements are met and the solution is “fit
for purpose” which is provided in the NCC, Part A5. While that Part of the NCC refers
to a “building” (as well as plumbing or drainage installation) the form of evidence
must be appropriate for the use of the material, form of construction or design to which
it applies.28 Of particular significance is that evidence of suitability relates to evidence
to support the use of a material, product, form of construction or design will meet a
Performance Requirement or a Deemed-to Satisfy Provision if it is in the form as
follows;29
A Certificate or report from a professional engineer or other appropriately
qualified person that –
25 Building Act, s 11(2).
26 Building Regulation, ss 17, 18. Certifier must keep a record of decisions about assessments of
competent persons (s 19).
27 Building Regulation, ss 48, 49(1)(a)-(f), (2).
28 NCC Part 5A s A5.0 and s A5.1.
29 NCC Part 5A s 5.2(1)(e).
-- 10 of 37 --
11
certifies that a material, product, form of construction or design fulfils
specific requirements of the BCA; and
sets out the basis on which it is given and the extent to which relevant
standards, specifications, rules, codes of practice or other publications
have been relied upon to demonstrate it fulfils specific requirements of
the BCA.
The Applicant’s Grounds for a Review of the Decision dated 19 May 2021
[58] The Applicant sets out in the Application to review a decision filed in the Tribunal a
number of grounds why the review of that decision should be successful. The
Applicant has also filed affidavits in the course of these proceedings and has filed
submissions for consideration by the Tribunal.
[59] In the Application to review a decision the Applicant considered the Commission’s
decision to be wrong or not properly made based on the following grounds;
(a) three (3) previous Approvals were found to be deficient by the QBCC and the
Development Tribunal. It is unreasonable for the Commission to treat this
decision as a mutually independent approval and ignore all previous issues as if
they did not exist;
(b) all Decision Notices are for the same gutter and by the same Certifier;
(c) administrative decision making requires that all relevant facts be taken into
account. The Applicant relies upon Standard 8 of the Certifier’s Code of
Conduct. The Applicant asserts “it is folly for precedent to be ignored and the
Certifier make another approval suffering the same deficiencies”;
(d) the Commission’s decision means that certifiers can continue to certify
knowingly wrong Building Applications without any deterrent. It is the public
that bears the costs of such decisions. This decision does nothing to uphold the
Commission’s role in maintaining standards within the industry or achieving
balance between the interests of building contractors and consumers;
(e) given the considerable antecedents, a higher degree of rigour would have
reasonably been expected from the Certifier when making the Decision Notice
dated 22 August 2019;
(f) it is reasonable that a consumer is entitled to receive approvals that are an
accurate representation of the building work both done and proposed to be done
in respect of the roof guttering system for the building. This has not been the
case now on four occasions;
(g) The Applicant relies upon other facts including the plans, size of the area where
the gutter is installed, a category 1 defect, and matters before the Development
Tribunal.
[60] The Applicant says that the Second Complaint against the Certifier is for issuing a
“knowingly incorrect” Decision Notice on 21 August 2019 for an Alternative Building
Solution for roof water drainage.30 The facts on which the Applicant relies include the
following;
30 See the Applicant’s Statement of Evidence filed 8 March 2022 at paragraph 5.
-- 11 of 37 --
12
(a) Sovereign Homes installed a gutter system in August 2014 which the Tribunal
has found was in breach of the contract and not in accordance with the contract
plan;31
(b) none of the 4 approvals by the Certifier represent what was built in 2014 and
the approvals 2, 3 and 4 seek to cover errors made by the builder and certifier
in 2014;32
(c) the gutter profiles relied on for each approval keep changing. All are much
larger than the original gutter installed by the builder in 2014. The profile in the
Performance Solution Report of 21 August 2019 is much larger.33 In comparing
measurements of the existing gutter (as shown in photographs) with the profiles
relied by Performance Solutions of 21 August 2019, the profile in the
Performance Solution Report is considerably wider than the available area for
the gutter.34 The Applicant says;35
The report by Aqualogical provides the basis for the DN. However, it
relies upon profiles for a gutter that does not exist. Neither of the gutter
profiles, referred to in the Aqualogical report match the dimensions of
the gutter that Sovereign as constructed. I believe that the factual basis
upon which Aqualogical has based its report is flawed.
(d) the plan is for the Performance Solution Report of 21 August 2019 which
provides insufficient detail of what was installed.36 The plan provided by the
builder is deficient in that it did not include design details including dimensions
of the width of the gutter, gutter falls and other detail which plans were relied
upon by the Certifier in the 4th approval.37 This plan does not represent what
was installed and “infects” the information in the Performance Solution Report,
Form 15 and the Statement of Reasons which form part of the Certifier’s
Decision Notice dated 22 August 2019. In the circumstances the Decision
Notice has no relevance to what has been installed;
(e) the Certifier is required to consider all available evidence and has failed to heed
earlier decisions of the QBCC and the Development Tribunal38 which upheld
earlier appeals;
(f) the Hydraulic Engineer and author of the Performance Solution Report has
never visited the Applicant’s home or spoken with the Applicant about the gutter
installed by the builder;
(g) in 2016 QBCC investigations determined that the gutters installed by the
Builder were a Category 1 defect and the certifier’s Decision Notice does not
address this defect by the full approval;
31 See the Applicant’s Statement of Evidence filed 8 March 2022 at paragraph 6.
32 See the Applicant’s Statement of Evidence filed 8 March 2022 at paragraph 8.
33 See the Applicant’s Statement of Evidence filed 8 March 2022 at paragraph 10.
34 See the Applicant’s Statement of Evidence filed 8 March 2022 at paragraph 37.
35 See the Applicant’s Affidavit filed 19 September 2019 at paragraph 9.
36 See the Applicant’s Statement of Evidence filed 8 March 2022 at paragraph 57.
37 See the Applicant’s Statement of Evidence filed 8 March 2022 at paragraph 53.
38 See the Applicant’s Statement of Evidence filed 8 March 2022 at paragraph 59-65.
-- 12 of 37 --
13
(h) the same conclusion can be applied to the Decision Notice as has already been
stated by the earlier Development Tribunal decisions;39
(i) Sovereign Homes and the Certifier conveniently used a loop hole in the
legislation which allows any person to make a building development application
without the written consent of the owner of the premises to which the application
relates.40 The Applicant says that the plans in the Performance Solution of 21
August 2019 have not been approved by him as the homeowner and are not the
contract plans of 30 June 2014.41 The Applicant says;42
No one from Aqualogical has inspected the gutters installed by Sovereign
in 2014 nor discussed their report with me as the home owner. No one
from Aqualogical has contacted me that has been constructed. The
Aqualogical’s Report does not list or detail the documents or information
it considered in preparing the report.
(j) the Performance Solution Report of 21 August 2019, as was the case in the
earlier approvals by the Certifier, was made knowing it would be used and
available by the builder. To ensure the Application is received from the builder
were true and correct however, the Certifier has shown a blatant disregard for
his responsibilities as a certifier and has not acted in the public interest;43
(k) accordingly, the Performance Solutions Report 21 August 2019, and the Form
15 cannot relate to the Applicant’s home at Fairfield and are both irrelevant. The
approval is a nullity.44 Similarly, the Notice of Reasons of 21 August 2019 are
also a nullity.
[61] The Applicant also refers to provisions in the Building Regulations45 and the approved
Guidelines46 relating to the Commission deciding on the competency of a certifier.
[62] Most of these grounds overlap to a greater or lesser extent and can be summarised as
follows;
(a) the three previous approvals involved the same subject matter as the fourth
approval and it is unreasonable to treat the fourth approval differently from the
earlier three approvals; and
(b) in the fourth approval the Certifier is required by Standard 8 to take into account
“all relevant facts” which includes the approvals found to be deficient; and
(c) the Certifier’s conduct shows that he engaged in unsatisfactory conduct or
professional misconduct.
[63] The Applicant submits that, apart from earlier findings by the Commission that the
Certifier had engaged in unsatisfactory conduct in relation to previous approvals,47
the Certifier has breached a number of legislative provisions as follows;
39 See Application to review a decision filed 16 June 2021 in the Attachment at page 3, paragraph 22.
40 See the Applicant’s Statement of Evidence filed 8 March 2022 at paragraph 18.
41 See the Applicant’s Statement of Evidence filed 8 March 2022 at paragraph 55.
42 See the Applicant’s Affidavit filed 19 September 2019 at paragraph 12.
43 See the Applicant’s Statement of Evidence filed 8 March 2022 at paragraph 70-74.
44 See the Applicant’s Statement of Evidence filed 8 March 2022 at paragraph 76.
45 Building Regulation, s 18(4).
46 Guidelines 1, 4 and 5.
47 See the Applicant’s Statement of Evidence filed 8 March 2022 at paragraph 86-99.
-- 13 of 37 --
14
(a) s 63 of the Planning Act 2016 (Qld) (‘Planning Act’) as the required documents
were in breach of;48
(i) s 63(3) which requires that the notice must state, or be accompanied by,
the documents prescribed by regulation (the plan, Form 15 and Alternative
Solution);
(ii) s 63(5)(d) which requires the notice to state the reasons for the assessment
managers decision – i.e. the Notice of Reasons;
(b) s 68A of the Building Act as the Certifier did not prepare a valid Notice of
Reasons;49 and
(c) s 136 of the Building Act as the Certifier has not acted in the public interest.50
[64] The Applicant also submits that the Certifier is in breach of the Code of Conduct
relating to a number of the following provisions.51
Code of Conduct – Standard 3
[65] Standard 3 requires that a Certifier must comply with legislative requirements.
[66] The Applicant submits that the Certifier is in breach of this Standard. The Applicant
relies upon his submissions relating to the breaches of the legislation which have
already been referred to in his submissions.52
[67] The “breaches of legislation” relied upon relate to;
(a) a breach of s 63(3) of the Planning Act as the Notice of Decision of 22 August
2019. The Applicant contends that the documents breach the legislation and
should not have been accepted or approved by the Certifier as;
(i) the plan was in breach of s 43(b) of the Planning Regulation 2017 (Qld)
as it was wholly deficient;
(ii) the Form 15 contents did not meet the requirements of s 48 of the Building
Regulation as the Alternative Solution relied on a builder;
(iii) the Alternative Solution is a breach of s 26(a)(ii) of the Building Act as it
did not compare the building work completed by the builder in 2004 with
the performance requirements. Accordingly it was wholly deficient;
(b) a breach of s 68A of the Building Act as the Statement of Reasons;
(i) failed to identify how the Alternative Solution installed in a 2014 gutter
would differ from the DTS provisions. The Certifier accepted the
Alternative Solution which does not exist at the property;
(ii) the Certifier relied upon information which does not reflect the gutters
installed by the builder in 2014. The Hydraulic Designer of the Alternative
Solution Report and the Certifier have not inspected the gutters.
48 See the Applicant’s Statement of Evidence filed 8 March 2022 at paragraph 106.
49 See the Applicant’s Statement of Evidence filed 8 March 2022 at paragraph 106.
50 See the Applicant’s Statement of Evidence filed 8 March 2022 at paragraph 106.
51 See the Applicant’s Statement of Evidence filed 8 March 2022 at paragraph 104-117.
52 See the Applicant’s Statement of Evidence filed 8 March 2022 at paragraph 104 and paragraph 103.
-- 14 of 37 --
15
Code of Conduct – Standard 4
[68] Standard 4 requires that the Certifier must not perform building certifier functions
where there is a potential for a conflict of interest.
[69] The details of the conflict of interest alleged relate53 to the relationship between the
Certifier and the builder, Sovereign Homes, and the failure to act in the public interest.
[70] The Applicant submits that the certifier was receiving a benefit courtesy of Sovereign
Homes.54
Code of Conduct – Standard 7
[71] Standard 7 requires that the Certifier must abide by moral and ethical standards
expected by the community.
[72] The Applicant contends that the Certifier’s conduct in the Approval dated 22 August
2019 was a breach of Standard 7 as the Certifier must, when performing a building
certifier’s functions;
(a) apply all relevant building laws, regulations etc. reasonably and without favour;
(b) perform the functions with honesty, integrity and impartiality;
(c) not knowingly enter into any conduct that could bring, or tend to bring, the
profession of building certifiers into disrepute.
[73] The Applicant says that there has been a lack of honesty, integrity and impartiality in
the Certifier performing his duties because of his long involvement in this project
(over six years) and having access to;55
(a) 4 voluminous submissions from the Applicant in two previous Appeals;
(b) sitting through two (2) Development Tribunal appeal hearings, hearings about
all the issues with the gutters; and
(c) two (2) Development Tribunal Decisions.
Code of Conduct – Standard 8
[74] Standard 8 requires that the Certifier must take all reasonable steps to obtain all
relevant facts when performing building certifying functions.
[75] The Applicant relies on statements from the Certifier that he does not climb onto roofs.
The Applicant contends that the Certifier, or someone else on his behalf, should have
made an inspection of the Applicant’s roof and gutter.
[76] The Applicant contends that the Certifier had access to considerable material which
was ignored by him. That material consisted of;
(a) evidence before the Development Tribunal hearings which was in his possession
at the time he gave his approval on 22 August 2019;
53 See the Applicant’s Statement of Evidence filed 8 March 2022 at paragraph 98-99.
54 See the Applicant’s Statement of Evidence filed 8 March 2022 at paragraph 98-99.
55 See the Applicant’s Statement of Evidence filed 8 March 2022 at paragraph 1109-112.
-- 15 of 37 --
16
(b) four (4) voluminous submissions from the Applicant in two (2) previous
Appeals;
(c) sitting through two (2) Development Tribunal appeal hearings, hearings about
all the issues with the gutters; and
(d) two (2) Development Tribunal Decisions.
[77] The Applicant contends that the Certifier took no steps to satisfy himself that the
information received from the Builder and/or Hydraulic Designer was valid.56
Code of Conduct – Standard 9
[78] Standard 9 requires that the Certifier must clearly document reasons for decisions.
[79] The Applicant contends that the Certifier’s reasons for deciding the competency of
Aqualogical are not valid as the Certifier did not keep a record of the competency of
the author of that document pursuant to s 19 of the Building Regulation.
[80] The Applicant contends the Certifier is in breach of Standard 9.
Unsatisfactory Conduct
[81] The Applicant submits that the Certifier has engaged in separate counts of
unsatisfactory conduct and has contravened codes of conduct Standards 3, 4, 7, 8 and
9 by reason of;
(a) demonstrating incompetence, lack of adequate knowledge, skill, judgement,
integrity, diligence and care in a number of aspects57 of his conduct as a
Certifier.
Professional Misconduct
[82] The Applicant submits that the Certifier has engaged in Professional Misconduct by
reason of knowingly being deceptive.58 The Applicant relies upon the same grounds
as have already been stated above for “Unsatisfactory Conduct”59 as well as repeated
unsatisfactory conduct.60
[83] The Applicant seeks a penalty far greater than a reprimand and submits strong action
must be taken to cease this ongoing conduct.61
The QBCC’s Response to the Application.
[84] The Commission relies upon evidence from Philip John Godfrey, a Principal
Certification Officer of QBCC, who provided historical background information
relating to the earlier proceedings and to these proceedings. However, he stated in
respect of the Certifier’s Approval of 22 August 2019;
56 See the Applicant’s Statement of Evidence filed 8 March 2022 at paragraph 116.
57 See the Applicant’s Statement of Evidence filed 8 March 2022 at paragraph 122(a)-(c).
58 See the Applicant’s Statement of Evidence filed 8 March 2022 at paragraph 123-126.
59 See the Applicant’s Statement of Evidence filed 8 March 2022 at paragraph 123 and the reliance upon
paragraph 122.
60 See the Applicant’s Statement of Evidence filed 8 March 2022 at paragraph 123 and reliance upon
paragraphs 86 to 91.
61 See the Applicant’s Statement of Evidence filed 8 March 2022 at paragraph 124-126.
-- 16 of 37 --
17
It is important to note that the building approval issued by the Second
Respondent relates to a design put forward in respect of the roof drainage. The
building approval relates to the proposed construction; it is not an approval in
respect of the existing works (in this case, there are existing works). At some
time after building approval is granted for the proposed construction, an
inspection will be carried out to determine if the works constructed comply with
the building approval granted, so that, if appropriate, a final inspection
certificate can be issued by the certifier.
[85] Mr Godfrey went on to discuss the purpose of the Alternative Building Solution in
these terms;
The purpose of the ‘alternative building solution’ (Performance Solution) is to
provide a roof drainage design that complies with the BCA performance
requirements for P2. 2. 1 Rainwater Management and P 2. 2. 2
Weatherproofing. The Performance Solution submitted by Anthony Freeman
demonstrates compliance through a combination of ‘Expert Judgement” and
comparison with the Deemed-to-Satisfy Provisions.
Expert Judgement means the judgement of an expert who has the qualifications
and experience to determine whether a Performance Solution complies with the
Performance Requirements (BCA 2019 volume 2, Schedule 3 Definitions).
[86] Mr Godfrey said that the Performance Solution Report requires an amendment to the
gutter as follows;
The overflow weir shall be 400 mm long and extend down to 95 mm above the
base of the rain head.
[87] In response to the Applicant’s statement that the Performance Solution internal gutter
dimensions are inconsistent with the as-constructed gutter, Mr Godfrey said;
(a) the certifier had the DA Form 2 where Sovereign Homes had checked the box
confirming all information in the development application was true and correct;
and
(b) the certifier accepted the application as “properly made” and was required to
assess the application against the building assessment provisions including the
performance requirements of the BCA.
[88] Mr Godfrey says that the approval of 22 August 2019 approved a design that is
compliant with the Performance Requirements of the BCA. He says that approval does
not approve the current as-constructed internal gutter. Final certification occurs after
the approved works have been carried out and inspected to determine whether they
comply with the building approval issued.
[89] Mr Godfrey concludes his statement of evidence by stating;
It is my view that until the competent person can inspect the roof gutter and can
certify that building works have been carried out to satisfy the performance
solution, the Second Respondent cannot certify the roof drainage design subject
to the third approval (approval of 22 August 2019) has been complied with.
[90] The Commission commences its submissions by identifying that these proceedings
relate to the Certifier’s conduct in issuing the approval dated 22 August 2019 by the
adoption of a Performance Solution Report with respect to construction of the gutter
between the Applicant’s existing dwelling and the new extension. That approval noted
-- 17 of 37 --
18
that the documentation included not only the Alternative Performance Solution but
also;
(a) Architectural Plans-Sovereign Homes DWG NoWD-01A-WD05A;
(b) Hydraulic-Form 15 dated 22 August 2019 Anthony Gerard Freeman and
referenced Job No A190823 Performance Solution Report.
[91] The Commission’s submissions consider a number of the concepts which the
Applicant was critical of relating to the Performance Solution Report, alleged
deficiencies in the Plans, the Decision Notice and other matters which will be
discussed in further detail below.
Commission’s Submissions-Performance Solution
[92] The Commission refers to s 26 of the Building Act for the required contents of a
performance solution. That solution must;
(a) state
(i) the performance requirements with which the building work
purports to comply; and
(ii) how the building work complies with the performance
requirements; and
(b) contain details of
(i) how the alternative solution is different from the relevant deemed
to satisfy provisions under the BCA or acceptable solutions under
the QDC; and
(ii) inspection or test results and other documents or information relied
on to prepare the application.
[93] The Commission submits that the NCC is a performance-based code containing the
“performance requirements” which must be met to achieve compliance. The NCC
Volume 1 and Volume 2 provisions are included in the BCA. The performance
requirements in the NCC;62
may be satisfied by a “performance solution”, a “deemed-to-satisfy solution”,
or alternatively by a combination of a “performance solution” and a “deemed-
to-satisfy solution”
[94] The Commission submits that it is satisfied the Aqualogical Performance Solution
Report satisfies the requirements of s 26 of the Building Act as;63
(a) the Report states the relevant performance requirements with which the building
work purports to comply;
(b) states how the author believes the building work complies with the performance
requirement;
(c) contains details of how the performance solution is different from the relevant
deemed-to-satisfy provisions under the NCC; and
62 Statement of Reasons for the Decision filed on 6 September 2021 at page 29 paragraph 110.
63 Statement of Reasons for the Decision filed on 6 September 2021 at page 31 paragraph 120.
-- 18 of 37 --
19
(d) includes documents and information relied on to prepare the performance
solution.
[95] The Commission submits that the Certifier was able to rely upon the assessment
within the Performance Solution Report pursuant to NCC 2019, Volume 2 Part A2.2
as the author is an appropriately qualified person to provide the report, being licensed
by the QBCC in the class of Hydraulic Services Design.64
[96] The Commission further submits that the Certifier was entitled to accept and rely upon
the Aqualogical Performance Solution Report as an accurate representation of the
building work both done and proposed to be done in respect of the roof guttering
system for the building.65
[97] In the circumstances as set out, the Commission submits that the Certifier did not
engage in unsatisfactory conduct or professional misconduct in issuing the Decision
Notice relating to building work both done and proposed to be done in respect of the
roof guttering system for the building.66
[98] The Commission submits it is satisfied that the Statement of Reasons issued by the
Certifier on 22 August 2019 complied with the requirements of s 68A(3) of the
Building Act as;
(a) it details how the performance solution differs from the relevant ‘deemed-to-
satisfy provisions’ under the NCC; and
(b) includes information about the documents and other information relied on by
the Certifier in making the decision to approve the Performance Solution.
[99] The Commission submits that as the Certifier failed to provide information regarding
the assessment of Mr Freeman, Engineer, as a “competent person”, it is not satisfied
that the Certifier has assessed Mr Freeman as the required “competent person” relating
to the issue of the Form 15. However, the Commission is satisfied that the Form 15
was able to be relied upon by the Certifier based upon his reliance of Mr Freeman
being a QBCC licensee of the relevant class pursuant to the provisions of the NCC
Part A5. The evidence is that Mr Freeman is licensed in the class of Hydraulic Services
Design, which allows him, amongst other things, to prepare the plans, specifications
and other documents associated with rainwater and stormwater drainage.
Alleged Deficiencies in the Plan
[100] The Commission says that it has considered;67
(a) the builder’s plan for the property in the approval of 22 August 2019; and
(b) the deficiencies alleged by the Applicant in the approved plan and concluded;68
(i) there is sufficient detail provided on the plan to demonstrate that the
proposed box gutter complies with performance requirements P2.2.1 and
P2.2.2.69
64 Statement of Reasons for the Decision filed on 6 September 2021 at page 31 paragraph 121.
65 Statement of Reasons for the Decision filed on 6 September 2021 at page 32 paragraph 122.
66 Statement of Reasons for the Decision filed on 6 September 2021 at page 32 paragraph 123.
67 Statement of Reasons for the Decision filed on 6 September 2021 at page 29 paragraph 111-115.
68 Statement of Reasons for the Decision filed on 6 September 2021 at page 29 paragraph 112.
69 For this statement the Commission refers to SOR-27 at p 1482; SOR-21 at p 1111.
-- 19 of 37 --
20
[101] The Commission therefore submits that the Aqualogical Performance Solution Report
in the Certifier’s approval of 22 August 2019 contained and assessed the relevant
detail for the performance solution including, but not limited to;70
(a) additional information specific to the ‘the gutter’ design, including:
(i) roof catchment areas;
(ii) design flow rate;
(iii) gutter gradient for each component; and
(b) a comparison with deemed to satisfy provisions for a box gutter.
[102] The Commission submits that the Performance Solution Report and the Approved
Plans are to be assessed together. In doing so the Commission considers the Certifier
did not engage in unsatisfactory conduct or professional misconduct due to any failure
in the approved plans to determine that the relevant gutter complied with the relevant
performance requirements.71
The Statement of Reasons of 21 August 2019
[103] On 22 August 2019 the Certifier provided a Statement of Reasons for the approval of
the Aqualogical Performance Solution Report. The Statement of Reasons is required
by s 68A of the Building Act. That Statement must contain specified details.72
(a) how the performance solution is different from the relevant deemed-to-satisfy
provisions under the BCA or acceptable solutions under the QDC; and
(b) inspection or test results and other documents or information relied on to make
the decision.
[104] The Commission submits that the Certifier complied with the requirement for the
specified details in the Statement and accordingly it considers the Certifier did not
engage in unsatisfactory conduct or professional misconduct in giving the approval.73
The Form 15 of 22 August 2019
[105] On 22 August 2019 the engineer, Mr Freeman, issued a Form 15 in conjunction with
the Aqualogical Performance Solution Report.
[106] The Form 15 when given by a “competent person” to a certifier is a certificate that a
building design or specification will, if installed or carried out under the certificate,
comply with the building assessment provisions.74 A certifier may decide an
individual is a "competent person".75
[107] The significance of such a certificate is that the certifier, in carrying out functions
under the Act, may accept and without further checking, rely on the certificate from
70 Statement of Reasons for the Decision filed on 6 September 2021 at page 29 paragraph 113.
71 Statement of Reasons for the Decision filed on 6 September 2021 at page 30 paragraph 115.
72 Building Act, s 68A(3).
73 Statement of Reasons for the Decision filed on 6 September 2021 at page 30 paragraph 127-128.
74 Building Regulation, Part 7, Division 2, s 46.
75 Building Regulation, Part 5, s 17.
-- 20 of 37 --
21
the “competent person” provided a number of criteria are satisfied76 and must, for at
least seven years, keep a record that an individual is a “competent person”.77
[108] The Commission says that the Certifier in these proceedings failed to provide any
information about an assessment of whether Mr Freeman, the engineer, was a
competent person and is not satisfied that the proper assessment has been made. It
does not accept the Form 15 on that basis.
[109] However, the Commission refers to an alternative means by which the Form 15 was
able to be relied upon by the Certifier pursuant to the NCC 2019, Volume 2. It
considers that the Certifier was able to accept Mr Freeman as an appropriately
qualified person holding a QBCC licence in the class of Hydraulic Services Design.
The Commission submits that this allows Mr Freeman to prepare the plans,
specifications and other documents associated with rainwater and stormwater
drainage. On that basis the Commission considers that the Certifier did not engage in
unsatisfactory conduct or professional misconduct by accepting the Form 15 in
association with issuing the approval on 22 August 2019.
[110] The Applicant contends that the Certifier is in breach of several provisions of the Code
of Conduct. The Commission responded to those contentions as set out below.
Code of Conduct – Standard 3
[111] Standard 3 requires a certifier to comply with legislative requirements.
[112] The Commission submits that the relevant legislative requirements in these
proceedings are as follows;
(a) a certifier’s function is to carry out building assessment work, other than a part
of the building assessment work under s 46 of the Building Act a referral agency
may carry out;78 and
(b) a private certifying function is to receive and assess a building development
application and decide the building development application and give a decision
notice for the application.79
[113] The Commission submits, for the reasons advanced in its Statement of Reasons, that
it does not consider that the Certifier failed to comply with the relevant legislative
requirements in giving the approval on 22 August 2019.
Code of Conduct – Standard 4
[114] Standard 4 requires a building certifier not to perform a building certifying function
where there is a potential conflict of interest.
[115] There are a number of occasions prescribed in the legislation which provide where a
certifier has a conflict of interest in performing a private certifying function.80
[116] The Commission submits that it does not consider the Certifier in these proceedings
had a conflict of interest as there was no evidence to suggest that;
76 Building Regulation, Part 7, Division 2, s 49.
77 Building Regulation, Part 5, s 19.
78 Building Act, s 10.
79 Building Act, s 48.
80 Building Act, s 137(2).
-- 21 of 37 --
22
(a) the Certifier was to carry out building work the subject of the relevant approval;
(b) the Certifier was engaged by the owner for other functions; or
(c) the Certifier has a direct or indirect pecuniary interest in the building subject of
the relevant approval.
[117] The Commission acknowledged the common practice for building contractors to
utilise the services of the same licensed private certifier on an ongoing basis for
various building projects. It acknowledged that in these proceedings there was an
ongoing working relationship between the Certifier and the builder. However, it was
not satisfied that a conflict of interest on the part of the Certifier was made out with
respect to the giving of the approval on 22 August 2019.
Code of Conduct – Standard 7
[118] Standard 7 requires a building certifier to abide by moral and ethical standards
expected by the community.
[119] The Commission submits that this Standard is in issue because of the Applicant’s
contention that the Certifier;81
has been dishonest and his conduct clearly lacks integrity and impartiality.82
[120] The Commission says that it considered this issue.
[121] The Commission submits it does not consider the Certifier’s conduct in issuing the
relevant approval contravened Standard 7.
Code of Conduct – Standard 8
[122] Standard 8 requires a building certifier to take all reasonable steps to obtain relevant
facts when performing building certifying functions.
[123] The Commission refers to the Building Regulations83 which outline the various stages
for inspection of assessable building work and submits that there is no legislative
provision which stipulates that a building certifier is required to undertake a site
inspection before granting any building development approval.84 Nor does the
Commission consider it a reasonable expectation for a Certifier to enter upon the roof
of a property to take measurements of the stormwater gutters given the relevant
approval from the Engineer.
[124] The Commission submits that a certifier is able to rely on and accept information
provided to him including the Form 15 and the Aqualogical Performance Solution
Report.
[125] It does not consider that the Certifier’s conduct contravened Standard 8.
Code of Conduct – Standard 9
[126] Standard 9 requires a building certifier to clearly document reasons for building
certifying decisions.
81 Statement of Reasons filed 6 September 2021 at page 38 paragraph 150.
82 Statement of Reasons filed 6 September 2021 at SOR-21 at page 1121 paragraphs 106-109.
83 Building Regulation, s 24.
84 Statement of Reasons filed 6 September 2021 Page 39, paragraph 155.
-- 22 of 37 --
23
[127] The Commission submits, for reasons set out in this Statement of Reasons, the
Certifier complied with the obligations with respect to the Statement of Reasons and
documentary evidence required when issuing the relevant approval.
[128] It does not consider the Certifier contravened Standard 9.
Code of Conduct – Standard 1
[129] Standard 1 requires a building certifier perform building certifier functions in the
public interest.
[130] The Commission refers to the Building Act85 which provides that it is an offence for
a private certifier not to act in the public interest in performing private certifying
functions. A list of occasions is set out where a private certifier is not acting in the
public interest.86
[131] the Commission submits it does not consider the Certifier’s conduct was contrary to
the public interest as;
(a) there is no evidence that the Certifier sought or obtained a benefit to act other
than in accordance with the Building Act;
(b) the Certifier did not act in a way contrary to the functions of a private certifier
under the Building Act or Planning Act;
(c) for the reasons listed in the Statement of Reasons, the Certifier did not
contravene the Code of Conduct; and
(d) the Certifier’s conduct was neither grossly negligent or grossly incompetent.
Unsatisfactory Conduct and Professional Misconduct
[132] The Commission submits that its investigations concluded the Certifier had not
engaged in relevant unsatisfactory conduct or misconduct as provided in the
definitions in Schedule 2 of the Building Act.
The Certifier’s Evidence and Submission
[133] The Certifier relies upon a Statement of Evidence filed in the Tribunal on 4 April
2022. That Statement exhibits a number of forms and other documents related to the
approval of 22 August 2019.
[134] One such exhibit is the Form 2 provided by Sovereign Homes seeking a Development
Permit where the level of assessment is “Code assessment” in respect of a
“Performance Solution For A Gutter System”. This Form 2 forms part of the
Certifier’s Engagement Agreement.
[135] The Certifier relies upon the “Building Certification Decision Notice” of 22 August
2019. That document states;
This approval is given on the basis of an Alternate building Solution against the
BCA Vol 2 2019 - for collection and disposal of roof water from the dwelling
as required by the Performance Solution prepared by AQUALOGICAL
Plumbing Design Solutions Anthony Freeman Rev B dated 21/08/2019.
85 Building Act, s 136.
86 Building Act, s 136(2).
-- 23 of 37 --
24
[136] The Applicant includes the Notice of Reasons for the approval, the Form 15 for the
alternative gutter design and the Performance Solution Report along with other
documents. He also includes the Curriculum Vitae of Anthony Freeman and Neil
Blair, a licensed plumber, drainer and gas fitter.
Meaning of “Unsatisfactory Conduct” or “Professional Misconduct”
[137] The Building Act defines the term “unsatisfactory conduct” for the purpose of these
proceedings as including the following conduct by a certifier;
(a) conduct that shows incompetence, or a lack of adequate knowledge, skill,
judgement, integrity diligence or care in performing building or private
certifying functions;
(b) conduct that is contrary to a function under this Act or another Act regulating
building certifiers ……… including, for example –
(i) disregarding relevant and appropriate matters; and
(ii) acting outside the scope of the building certifier’s powers; and
(iii) acting beyond the scope of the building certifier’s competence; and
(iv) contravening the code of conduct;
(c) conduct that is of a lesser standard the standard that might reasonably be
expected of the building certifier by the public, or the building certifier’s
professional peers.
[138] The term “professional misconduct” is also defined in the Building Act. It is an
extensive definition containing a number of significant descriptions of various
conduct that comes within the meaning of this term. It is not necessary to set out those
provisions in full. However the definition includes incompetence, lack of adequate
knowledge, skill, judgement, integrity, diligence or care in performing certifying
functions of conduct which is categorised as a component of “professional
misconduct”.
Conclusions relating to the Certifier’s Approval of 22 August 2019
[139] The evidence in these proceedings establishes that although the Certifier gave
approval based on the Performance Solution Report on 22 August 2019 there has been
no building work undertaken in accordance with the approval. These proceedings are
concerned with the Certifier’s approval and whether that is conduct that constitutes
“unsatisfactory conduct” or “professional misconduct”.
[140] The Applicant by filing the Application to review a decision in the Tribunal on 16
June 2021 seeks to have the Tribunal review the decision of the Commission made on
19 May 2021. The Commission’s decision related to the Second Complaint made by
the Applicant about the Certifier’s conduct and whether it was “unsatisfactory
conduct” or “professional misconduct”. As previously stated the Tribunal’s function
is to review the Commission’s decision by means of a “fresh hearing on the merits”
and to produce the “correct and preferable decision”. Accordingly, this is not an
appeal from the Commission’s decision and there is no onus on the Applicant to prove
that the Commission’s decision was ‘made in error” or otherwise a wrong decision.
These proceedings in the Tribunal are a “fresh hearing on the merits” to produce the
-- 24 of 37 --
25
correct and preferable decision relating to the conduct of the certifiers approval dated
22 August 2019.
[141] The Applicant’s material filed in the Tribunal raises a number of issues why the
Applicant says the Certifier’s conduct was allegedly “unsatisfactory conduct” and/or
“professional misconduct”. The Tribunal has already referred to the Applicant’s
evidence and submissions which contain a number of grounds on which the Applicant
supports this contention about the Certifier. At one level, the Applicant relies on
everything that has occurred since 2014 up to the Commission’s decision of 19 May
2021 to demonstrate the alleged misconduct by the Certifier. That includes the three
earlier approvals by the Certifier, the First Complaint to QBCC, material which had
previously been provided to the Commission, the Tribunal and the Development
Tribunal decisions and other matters to support the Applicant’s contention. The
Applicant says that the Certifier failed to take all the facts relating to this history since
2014 into account in his approval of 22 August 2019 which gives rise to the alleged
conduct claimed. The Applicant does not seek to differentiate between relevant and
irrelevant factors in that chronology but seeks to rely on all events that have occurred
since 2014 notwithstanding that what is before the Tribunal in these proceedings
relates to a Performance Solution Report by Mr Freeman, a Form 15, the Plans and
the Certifier’s approval. Whether the Applicant considers the circumstances of the
Certifier’s approval on 22 August 2019 different in some way than the earlier events
occurring since 2014 has not been demonstrated by the Applicant in his submissions.
Rather, the Applicant seeks to have all matters since 2014 before the Tribunal
demonstrating the alleged misconduct by the Certifier in providing the approval on 22
August 2019.
[142] At another level the Applicant does refer to specific instances as indicating the alleged
misconduct of the Certifier. For example, the Applicant’s material before the Tribunal
refers to the failure of the Certifier and Mr Freeman, engineer, to visit the Applicants
property and inspect the roof and the gutter in dispute at any time prior to 22 August
2019. The fact that the Certifier and the Engineer did not inspect the gutter does not
appear to be controversial. The evidence from the Commission and that of the Certifier
does not attempt to establish that such an inspection took place. The Tribunal can
conclude that there was no inspection but, in the circumstances, that does not satisfy
the contention of alleged misconduct by the Certifier. The Applicant does not address
the provisions in the Building Regulation that a certifier, in carrying out functions
under that Act, may rely upon the certificate/form from a “competent person”
provided the relevant criteria is satisfied there is no need to check the contents of the
certificate/form.87 The Applicant does not explain why his submissions should be
accepted ahead of the statutory provisions in the Building Regulation relating to the
carrying out of a certifier’s functions under the Act.
[143] The Applicant also refers to a number of deficiencies in the plans and documents
associated with the Performance Solution Report and the approval. For example, the
Applicant has taken measurements of the gutter at his premises and says the
measurements for the gutter in the plans do not fit his gutter and must be for some
other gutter, but not his. Against this, the Commission’s evidence and submissions are
that it has considered these alleged deficiencies in the approved plans and has
concluded that there is sufficient detail provided in the plans to demonstrate that the
87 Building Regulation, Part 7, ss 19, 49.
-- 25 of 37 --
26
proposed box gutter complies with the performance requirements in P2.2.1 and
P2.2.2.88 The Applicant relies on his own evidence in these proceedings and does not
provide evidence from an independent person with technical or professional
qualifications. If the Applicant has technical or professional qualifications they are
not, or are not satisfactorily, set out in the evidence before the proceedings. The
Applicant holds himself out as the owner89 of the property situated at 35 Cameron
Street Fairfield. This is a factual dispute between the parties but the Applicant does
not provide any technical or professional evidence whether or not there is compliance
with the performance requirements in P2.2.1 and P2.2.2. The Performance Solution
Report has been completed by an engineer. The Applicants case is his calculations
should be accepted by the Tribunal ahead of the Report prepared by an engineer. In
the absence of any evidence from an appropriately qualified expert, it is difficult, in
those circumstances, to prefer the evidence of the Applicant ahead of a Report by an
engineer. The Applicant brought these proceedings and bears the onus of proof of
establishing his claims and needs evidence which, on the balance of probabilities if
accepted by the Tribunal, is sufficient to establish his claim. Merely because the
Applicant has a contrary view to that of the engineers in his Report is not sufficient.
Just to challenge the Report with his own evidence does not satisfy the onus of proof
to establish his claim when unsupported by any evidence from an appropriately
qualified person. The Tribunal is not satisfied by the Applicants evidence that there
are a number of deficiencies in the plans and documents associated with the
Performance Solution Report and the approval. The Tribunal prefers and accepts the
submissions of the Commission. The Tribunal rejects the claim by the Applicants
which will be dismissed.
[144] There does appear to be common ground in respect of the issue that any person may
make a building development application incorporating a performance solution
without the written consent of the owner of the premises to which the application
relates. The Commission refers to various provisions in the Planning Act which
produce this result.90 While both parties expressed some degree of surprise that the
legislature has not made it mandatory that development application involving as
assessable building work be accompanied by the written consent of the owner of the
property, there does not appear to be any dispute between the parties as to these
circumstances where the owner is not involved in the process.
[145] If an alternative solution is used the Building Act specifies the requirements for the
relevant documentation.91 The contents of documents relied on must state the
particular performance requirements with which it is to comply and how that is
different from the relevant deemed-to-satisfy provisions. The Performance Solution
Report relied on by the Certifier deals with these matters as follows;
(a) by setting out the performance provisions relating to rainwater management and
waterproofing;92
(b) the building work complies with the performance requirements;93
88 Statement of Reasons filed 6 September 2021 at page 29, paragraph 112, & SOR-27 at page 1111.
89 Affidavit of Donald Bruce Edwards file 19 September 2019 paragraph 1.
90 Decision Notice of the Commissioner 19 May 2019 at paragraphs 14-15; paragraphs 19-25.
91 Building Act, s 26.
92 Performance Solution Report exhibited to the Statement of Evidence of the Certifier at page 33.
93 Performance Solution Report exhibited to the Statement of Evidence of the Certifier at page 34-35.
-- 26 of 37 --
27
(c) set out details of how the performance solution is different94; and
(d) includes documents and information relied on to prepare the Report.95
[146] This evidence as demonstrated by the contents of the Performance Solution Report
satisfies the Tribunal that the Performance Solution Report complies with s 26 of the
Building Act.
[147] A certifier in carrying out duties under the Act in relation to the approval of a building
development application relying on a performance solution is required to prepare a
statement of reasons.96 To comply with that requirement the statement of reasons must
contain the following details;97
(a) how the performance solution is different from the relevant deemed-to-satisfy
provisions under the BCA or acceptable solutions under the QDC; and
(b) inspection or test results or other documents or information relied on to make
the decision.
[148] The Certifier prepared a statement of reasons on 22 August 201998 which;
(a) contains a discussion of how the Performance Solution is different from the
relevant deemed-to-satisfy provisions contained in the NCC 2019;99and
(b) identifies documentation including the “Report, Form 15 and plans”100 as well
as referring to the “Supporting Documentation”.101
The Tribunal is satisfied on the basis of the contents of the Performance Solution
Report, as referred to in (a) and (b) above, the Certifier complied with the requirement
to provide a statement of reasons as required by the Building Act.
[149] An issue arose in the proceedings whether Mr Freeman, the engineer, could be
regarded as a “competent person” for the purposes of the Certifier issuing the approval
to 22 August 2019. This required the Certifier to comply with various statutory
requirements relating to keeping of records in connection with establishing that a
person is a “competent person”. The evidence before the Tribunal clearly establishes
that the Certifier failed to comply with the statutory requirements and has not kept a
record of decisions about assessments of competent persons required by the Building
Regulation. However, as has already been explained, an alternative procedure for
establishing a person is a competent person is provided by the NCC and a certifier can
rely on evidence needed to show that the NCC requirements are met and the solution
is “fit for purpose”. The NCC provides that a certificate or report from a professional
engineer certifying that any material or form of construction or design fulfils specific
requirements of the BCA and sets out the basics on which it is given and the extent to
which it is being relied upon fulfils specific requirements of the BCA. The evidence
before the Tribunal is that Mr Freeman is a licensed engineer with the QBCC in the
94 Performance Solution Report exhibited to the Statement of evidence of the Certifier at page 36-39.
95 Performance Solution Report exhibited to the Statement of evidence of the Certifier at page 41-59
Appendices.
96 Building Act, s 68A.
97 Building Act, s 68A(3).
98 Statement of Reasons attached to the Certifier’s Statement of Evidence at 15-27.
99 Statement of Reasons attached to the Certifier’s Statement of Evidence at page 19-26.
100 Statement of Reasons attached to the Certifier’s Statement of Evidence at page 19.
101 Statement of Reasons attached to the Certifier’s Statement of Evidence at page 27.
-- 27 of 37 --
28
relevant class of Hydraulic Services Engineer and holding the licence in the grade of
Nominee Supervisor which permits him to prepare plans and specifications in respect
of properties such as the Applicant’s. Mr Freeman is authorised to provide the
certificate/report including the Form 15. The Tribunal accepts that evidence and finds
that Mr Freeman was at all relevant times a “competent person” to provide the
Performance Solution Record and the Form 15.
[150] The Certifier was able to rely upon these documents, including the plans, without the
need for the Certifier to personally check the information or to physically inspect the
roof gutter. The Tribunal finds that the Certifier was under no relevant obligation to
enter upon the roof of the premises and inspect the dimensions of the roof gutter to
which the Performance Solution Report applies. The Certifier was relying upon the
information provided by Mr Freeman in the various documents associated with
Performance Solution Reports of 22 August 2019.
[151] The Performance Solution Report was accompanied by a Form 15 provided by Mr
Freeman, engineer, relating to gutter design compliance. The Certifier can rely on the
Form 15 and in particular s 46 of the Building Regulation which provides;
A competent person…may give the building certifier a certificate that a building
design or specification will, if installed or carried out under the certificate,
comply with the building assessment provisions.
The certificate must comply with section 48.
[152] The Form 15 specifies that there is compliance with NCC 2019 Building Code of
Australia, AS/NZS 3500 Part 3 and the Performance Solution Report. The Certifier
was entitled to rely upon that Form 15 as a compliance certificate for building gutter
design.
[153] A further issue raised by the Applicant related to a conflict of interest on the part of
the Certifier because in the past he had performed other numerous certifying tasks for
Sovereign Homes. The fact that a professional person has undertaken previous
engagements of the same contractor is not by itself evidence of a conflict of interest.
In any industry, including the building industry, there is no embargo on professional
services being rendered on more than one occasion for another person, such as a
building contractor. The Applicant has not referred to any statutory provision or other
issue which would otherwise prevent the Certifier from carrying out duties as a
certifier under the Building Act for Sovereign Homes. For example, although it is not
an exhaustive list of conflicts of interest, it is clear that on the evidence in these
proceedings the Certifier;
(a) was not carrying out building work the subject of the building certifying
functions; or
(b) engaged by the builder to perform a function other than;
(i) a building certifying function: or
(ii) to manage a development application; or
(iii) give regulatory advice about any matter; or
(c) has a direct or indirect pecuniary interest in the building.
-- 28 of 37 --
29
[154] The Applicant has not provided evidence in the course of these proceedings in the
Tribunal to establish any of the above conflicts of interest. Neither has the Applicant
provided any evidence of any other category of conflict of interest. The Applicant has
provided his own personal view of what he regards as being a conflict of interest. The
test whether there is a conflict of interest is not subjective. Rather, it is an objective
test identified by reference to events or facts which a reasonable person would regard
as being a conflict of interest. The Applicant has not provided evidence to establish
on reasonable grounds that there is such a conflict. The Tribunal is not satisfied that
the Certifier in conducting the certifying procedures under the Building Act for
Sovereign Homes was in any way in a conflict-of-interest situation. The Tribunal
accepts the submissions by the Commission that the Certifier was not in a conflict of
interest in certifying procedures for Sovereign Homes. The Tribunal rejects the
allegations of the Applicant that the Certifier has been in a conflict-of-interest
situations..
[155] The evidence in these proceedings establishes that the Certifier was involved in
assessing a Development Application from the builder, Sovereign Homes. Building
work on the roof gutter the subject of the Development Application had not
commenced. The only matter before the Certifier was whether to approve the
Development Application on the basis of the Performance Solution Report, the Form
15 and the relevant plans. In that situation the functions of a Certifier under the
Building Act were to;102
(a) receive and assess the building development application; and
(b) decide the building development application, and give a decision notice for the
application.
[156] The evidence before the Tribunal is that the Certifier carried out those statutory
functions and provided his approval and statement of reasons on 22 August 2019. The
Certifier carried out those functions without any relevant breach of the building
legislation and in a manner which was free of any conflict-of-interest issues.
[157] The Applicant also maintains that the Certifier was in breach of several provisions of
the Code of Conduct. Those alleged breaches will be considered below.
Code of Conduct - Standard 3
[158] The Applicant relies upon breaches by the Certifier of s 63(3) and s 63(5)(d) of the
Planning Act.103
[159] The requirement in s 63(3) relates to the Notice of Decision stating or accompanied
by documents. That requirement states;
The notice must also state, or be accompanied by, the documents prescribed by
regulation.
102 Building Act, s 48(1), (3).
103 Applicant’s Statement of Evidence filed 8 March 2022 page 15, paragraph 107 and paragraph 106.
-- 29 of 37 --
30
[160] The Applicant contends this provision is breached because pursuant to s 43(b) of the
Planning Regulation 2017 (Qld) the plans are wholly deficient.104 The deficiency is
said to be as the “plan notes”;105
(a) “Do not scale of drawings”; and
(b) “Gutter system to be measured on site”.
[161] The difficulty with the Applicant’s first contention that the plan was in breach of s
43(b) of the Planning Regulation 2017 (Qld) rather than a breach of s 63(3) of the
Planning Act is that to establish this breach the evidence needs to demonstrate that the
Notice of Decision did not “state, or be accompanied by, the documents prescribed by
regulation”. The Applicant’s argument appears to be that because the plans had the
above alleged deficiencies in the “plan notes” it was “wholly deficient” and therefore
“should not have been accepted and approved by” the Certifier. The evidence and
submissions by the Applicant on this issue do not direct themselves to the requirement
that the Notice of Decision “must also state, or be accompanied by, the documents
prescribed by regulation”. The evidence before the Tribunal is that the Notice of
Decision of 22 August 2019 did state the plans relied upon in Attachment A to that
Notice under the heading “Approved Documentation”.106 The plans stated in the
notice were the Architectural Plans “Sovereign Homes DWG N0WD-01A-WD05A”.
As the Notice of Decision clearly stated the plans, contrary to the submissions of the
Applicant, the Tribunal is not satisfied that there has been a breach of s 63(3) of the
Planning Act as contended for by the Applicant. The Tribunal rejects the Applicant’s
submissions on this issue and finds that the Applicant has not established a breach of
s 63(3) of the Planning Act.
[162] The Applicant’s second contention is that the Form 15 was in breach of s 49 of the
Building Regulation as the certificate did not meet the requirements of s 48 of the
Building Regulation as the Alternative Solution Report relied on was not for the
gutters installed by the builder. This second contention seeks to establish breaches of
s 48 and s 49 whereas the issue raised by the Applicant is whether the Notice of
Decision was a breach of the requirements to “state, or be accompanied by, the
documents prescribed by regulation”.(s 63(3) of the Planning Act). Again, the
Applicant’s argument appears to be that because the Form 15 was allegedly in breach
of s 48 and 49 of the Building Regulation it was “wholly deficient” and therefore
“should not have been accepted and approved by” the Certifier. The Applicant’s
evidence is, or rather implies, that the Form 15, accompanied the Notice but for the
reasons advanced did not comply with ss 48 and 49 of the Building Regulation. This
second contention relates to a breach of s 63(3) on the basis that the Notice did not
state or be accompanied by, as the Applicant suggests, the Form 15. The evidence
before the Tribunal establishes the Form 15 not only accompanied the Notice, but that
Notice also stated that it relied upon the Form 15 as set out in Attachment A of the
Notice referred to in “Approved Documentation”.107 The second contention relied
upon by the Applicant is that the Form 15 was not for the gutter installed by the
builder. If that statement means that the Form 15 was not intended for the Applicant’s
roof gutter, then that statement is also factually incorrect. As the Notice of Decision
104 Applicant’s Statement of Evidence filed 8 March 2022 page 14-15, paragraph 106.
105 Applicant’s Statement of Evidence filed 8 March 2022 page 8-9, paragraphs 44-59 particularly at
paragraph 45.
106 Certifier’s Statement of Evidence filed for April 2022 at pages 7-10, particularly page 8.
107 Certifier’s Statement of Evidence filed for April 2022 at pages 7-10, particularly page 8.
-- 30 of 37 --
31
clearly stated the Form 15 was one of the approved documents, contrary to the
submissions of the Applicant, for the gutter to the Applicant’s premises. The Tribunal
accepts that the Form 15 was given in respect of the Applicant’s property and is not
satisfied that there has been a breach of s48 and s 49 as contended for by the Applicant.
The Tribunal accepts the Commission’s submissions. The Tribunal rejects the
Applicant’s submissions on this issue and finds that the Applicant has not established
a breach.
[163] The Applicant’s third contention is that the Alternative Solution was in breach of s
26(a)(ii) of the Building Act as it did not compare the building work completed by the
builder in 2014 with the performance requirements. This third contention has the same
defects as has already been referred to in the first and second contention above. This
third contention sets out to establish breaches of s 26(a)(ii) of the Building Act rather
than to deal with the issue raised in the Applicant’s Statement of Evidence that there
has been a breach of s 63(3of the Planning Act. The Tribunal has already made
findings in these proceedings to the effect that the Alternative Solution did make the
comparison which the Applicant contends was not made in that document. The
evidence before the Tribunal is that the Notice of Decision did state that the
Aqualogical Plumbing Design Solution Performance Solution Report was one of the
documents in its “Approved Documentation”.108 As the Notice of Decision clearly
stated the Performance Solution Report was one of the approved documents, contrary
to the submissions of the Applicant. the Tribunal is not satisfied that there has been a
breach of s 63(3) of the Planning Act as contended for by the Applicant. The Tribunal
rejects the Applicant’s submissions on this issue and finds that the Applicant has not
established a breach of s 63(3) of the Planning Act.
[164] Even if (as the Applicant contends) these various Plans, the Form 15 and Alternative
Solution Report are deficient, this has not been demonstrated on the evidence before
the Tribunal. Nevertheless, each document has been referred to in the Notice of
Decision and meets the requirements of s 63(3) of the Planning Act.
[165] The Applicant’s fourth contention is that the Notice of Decision is in breach of s
63(5)(d) of the Planning Act as it did not state the reasons for the assessment
manager’s decision.109 The Applicant submits that this breach is made out because the
Notice of Decision did not;
(a) identify how the Alternative Solution for the gutters installed in 2014 differ from
the DTS provisions; and
(b) contained inspection or other results and other documents or information relied
on to make the decision.
[166] The requirement in s 63(5)(d) Planning Act is that the Notice of Decision must state;
the reasons for the assessment manager’s decision;
[167] This fourth contention is that the decision notice must state the reasons for the
assessment manager’s decision as required by s 63(d) (presumably the Applicant
means s 63(5)(d) of the Planning Act). The Applicant then argues that the decision
108 Certifier’s Statement of Evidence filed for April 2022 at pages 7-10, particularly page 8.
109 Applicant’s Statement of Evidence filed 8 March 2022 page 14-15, paragraphs 106.
-- 31 of 37 --
32
notice was not valid in accordance with s 68A of the Building Act as that notice did
not;
(a) identify how (a valid) Alternative Solution for the gutters installed in 2014
differs from the DTS provisions. The Certifier accepted an Alternative Solution
which analyses gutters which do not exist at the property; and
(b) contained inspection or other results from other documents or information relied
on to make the decision. The hydraulic engineer and the Certifier have not
inspected the gutters.
[168] The Applicant’s argument proceeds on the basis that there was a relevant decision
notice but it was not valid and “should not have been accepted and approved by” the
Certifier. There are several aspects in which it can be said that the fourth contention
should not be accepted. Firstly, that contention does not address the requirements of
s 63(5)(d) but rather seeks to establish that the Notice of Decision was not valid by
reason of failure to comply with s 68A of the Building Act. Secondly, the Applicant’s
submissions are not established to the Tribunal’s satisfaction as those submissions;
(a) require the decision notice to state how the Performance Solution Report
analyses gutters which do not exist at the Applicant’s property, presumably
based upon the Applicant’s own measurements compared to the measurements
in the Alternative Solution. This issue has already been dealt with previously in
terms of the Certifier being able to rely upon the certificates/Form 15 provided
by a competent person such as Mr Freeman, engineer; and
(b) do not justify why information was relied upon from others rather than an
inspection of the gutters by the author of the Alternative Solution Report for the
Certifier. Again, the Certifier was entitled to rely upon certificates/the Form 15
from Mr Freeman.
[169] The Applicant appears to accept a decision notice was given by the Certifier, but says
that it was invalid as it was non-compliant with s 68A. That non-compliance has not
been established by the Applicant.
[170] The evidence from the Commission is that the approval of 22 August 2019 is for an
approved design that is compliant with the performance requirements of the BCA. It
contends that as the Certifier had a DA Form 2 where Sovereign Homes have clicked
the box confirming all information in the development Application is true and correct,
which was accepted by the Certifier as “properly made”, the Certifier was required to
assess the application against the building assessment provisions including the
performance requirements of the BCA. The Commission also submits that it was
satisfied the Statement of Reasons comply with the requirements of s 68A(3) as;
(a) it details how the performance solution differs from the relevant “deemed-to-
satisfy provisions” under the NCC; and
(b) includes information about the documents and other information relied upon by
the Certifier in making the decision to approve the Performance Solution.
[171] The Tribunal is satisfied that the Certifier provided a decision notice as required by
the legislation. The Tribunal is not satisfied that there has been any relevant breach of
s 63(5)(d) of the Planning Act as contended for by the Applicant. The Tribunal rejects
the Applicant’s submissions on this issue and finds that the Applicant has not
-- 32 of 37 --
33
established a breach of the Planning Act. The Tribunal accepts the submissions by the
Commission.
[172] The Applicant’s fifth contention is that the Certifier has not acted in the public interest
and is in breach of s 136 of the Building Act. The Applicant relies upon a number of
matters including that the Certifier;
(a) seeks, or agrees to accept, a benefit as a reward or inducement to act other than
under the Building Act, or
(b) acts in a way contrary to the function of the Certifier; and/or
(c) has acted in a way, in relation to the certifier’s practice, that is grossly negligent
or grossly incompetent.
[173] These allegations are extremely broad and of a wide-ranging nature. They are not
particularised by the Applicant so as to identify the specific conduct said to be caught
by these allegations. In the absence of particulars of the alleged conduct the Tribunal
is placed in a difficult position to know exactly what it is that the Applicant relies
upon to establish the alleged failure to act in the public interest. What is known is that
the Applicant has made multiple allegations of breaches and failures by the Certifier
in relation to the approval dated 22 August 2019. However, none of these allegations
already considered by the Tribunal have found any failure on the part of the Certifier.
Those allegations considered have not been successful. For instance, the Tribunal has
already considered above the allegations relating to the Certifier’s alleged conflict of
interest. The Tribunal has already found that there was no conflict of interest by the
Certifier and has in effect dismissed those allegations. In the circumstances, the
Tribunal is not satisfied that the Certifier has acted contrary to the public interest and
is not satisfied that the Applicant has made out the allegations relating to this issue.
The Tribunal rejects the Applicant’s submissions on this issue and finds that the
Applicant has not established a breach of the Planning Act or Building Act.
[174] The evidence provided by the Applicant has not satisfied the Tribunal that the Certifier
has failed to comply with legislative requirements and rejects the Applicant’s
submissions. The Commission made submissions in relation to Standard 3 and the
Tribunal accepts its submissions for the reasons advanced in the Statement of
Reasons. The Tribunal dismisses the Applicant’s claim that the Certifier’s conduct
failed to comply with the alleged requirements and that there was a breach of Standard
3 of the Code of Conduct.
Code of Conduct – Standard 4
[175] The Applicant relies upon the conflict of interest allegations.
[176] The Commission submits that there are a number of occasions prescribed in the
legislation which provide where a Certifier has a conflict of interest. However, it
submits that it does not consider the Certifier in these proceedings had a conflict of
interest and there is no evidence available to support that allegation.
[177] The Tribunal has already considered the conflict of interest allegations above and
came to the conclusion that is not satisfied that there was such a conflict. The Tribunal
has in effect rejected the Applicant’s allegation of a conflict of interest and repeats
and relies upon those above reasons. Accordingly, the Tribunal rejects the Applicant’s
allegations of a conflict of interest and rejects the Applicant’s conclusion that the
Certifier is in breach of Standard 4 of the Code of Conduct. The Tribunal rejects the
-- 33 of 37 --
34
Applicant’s submissions on this issue and finds that the Applicant has not established
a breach of the Planning Act. The Tribunal dismisses the Applicant’s claim that the
Certifier’s conduct was a breach of Standard 4 of the Code of Conduct.
Code of Conduct – Standard 7
[178] The Applicant contends that the Certifier’s conduct in granting the approval dated 22
August 2019 was in breach of Standard 7 as the Certifier did not abide by moral and
ethical standards expected by the community.
[179] The Applicant refers to the Certifier’s alleged failure of lack of honesty, integrity and
impartiality in performing his duties.
[180] The Commission says that it has considered these issues and does not consider the
Certifier’s conduct in issuing the relevant approval as having contravened this
Standard.
[181] The Applicant refers in particular to its previous Appeal submissions and the
proceedings involved in two (2) Development Tribunal proceedings and appeals. All
of those matters predated the Certifier’s decision of 22 August 2019. No doubt the
Applicant contends that that prior history is evidence of a failure to abide by moral
and ethical standards expected by the community. The evidence considered by the
Tribunal in these proceedings has not so far established any breach or failure by the
Certifier in the performance of a certifier’s functions under the Building Act. The
Applicant has failed to adduce any evidence as to what might be the “moral and ethical
standards expected by the Community” and how those standards have not been met
by the Certifier. The Applicant has made many allegations against the Certifier but
has failed to establish that any of them amount to a failure to abide by moral and
ethical standards expected of the community. The Tribunal does not accept the
Applicant’s allegations and finds that it is not satisfied that the Certifier is in breach
of Standard 7. The Tribunal dismisses the Applicant’s claim that the Certifier’s
conduct was a breach of Standard 7 of the Code of Conduct.
Code of Conduct – Standard 8
[182] The Applicant contends that there has been a breach of Standard 8 which requires the
Certifier to take all reasonable steps to obtain all relevant facts when performing
building certifying functions.
[183] The Applicant relies upon, amongst other matters, the failure of the Certifier to climb
onto the roof of the Applicant’s property and to inspect the gutter which is the subject
of these proceedings. This overlooks the statutory provisions in the Building Act that
absolve the Certifier from having to check the information provided in a
certificate/Form 15 in the Development Application.
[184] The Applicant also relies on other matters such as evidence before the Development
Tribunal hearings, submissions and the decisions on those hearings. In general what
the Applicant is submitting is that the Certifier took no steps to satisfy himself that the
information received in certificates or similar forms from the builder and/or the
Hydraulic Designer was valid. As previously stated the legislation does not require
the Certifier to check this information.
[185] The Commission submits that the Certifier is able to rely on and accept information
provided to him including the Form 15 and the Aqualogical Performance Solution
Report. It does not consider that the Certifier contravened Standard 8.
-- 34 of 37 --
35
[186] The Tribunal has already referred above to the statutory provisions that the Certifier
is not required to check the information provided in the Development Application.
The Applicant does not specify any other relevant provisions which require the
Certifier to verify that all details provided to him are in fact valid. As the Applicant
has not provided to the Tribunal any relevant statutory provision in support of his
contention requiring the Certifier to check the validity of information provided, the
Tribunal is not satisfied that the Certifier is in breach of Standard 8. The Tribunal
dismisses the Applicant’s claim that the Certifier’s conduct was a breach of Standard
8 of the Code of Conduct.
Code of Conduct – Standard 9
[187] The Applicant contends that the Certifier is in breach of Standard 9 as there was no
record of the competency of the author of the Aqualogical Solutions Report. This is a
breach of the Standard as it is alleged there is a clear failure to document reasons for
the decision of 22 August 2019.
[188] The Commission submits that for the reasons set out in its Statement of Reasons the
Certifier complied with his obligations when issuing the relevant approval.
[189] This issue of failure to document details about the role the Aqualogical Solutions
Report has already been discussed and decided above in these proceedings. While the
Certifier did not keep a record as required, there was compliance with the NCC
requirements and sufficient information existed by which it could be determined that
the author of the Alternative Solution was a “competent person”. Accordingly, the
Tribunal is not satisfied that the Certifier has acted in breach of Standard 9 of the Code
of Conduct. The Tribunal dismisses the Applicant’s claim that the Certifier’s conduct
was a breach of Standard 9 of the Code of Conduct.
Unsatisfactory Conduct
[190] The definition of “unsatisfactory conduct” requires conduct that shows incompetence,
or a lack of adequate knowledge, skill, judgement, integrity, diligence or care in
performing private certifying functions.
[191] The functions of a private certifier include in these proceedings;110
(a) receiving and assessing a building development application; and
(b) deciding the building development application, and giving a decision notice for
the application.
[192] The evidence before the Tribunal is that the Certifier did perform those functions and
notwithstanding multiple allegations of alleged breaches and failures by the Certifier,
no finding has been made by the Tribunal of any such breach or failure.
[193] The Applicant has not established, to the satisfaction of the Tribunal, any basis upon
which the Certifier’s conduct could be categorised as being incompetent, or displaying
a lack of adequate knowledge, skill, judgement, integrity, diligence or care in
performing private certifying functions. The Applicant has been unsuccessful in
providing any evidence to the Tribunal relating to these criteria for a determination of
unsatisfactory conduct. In these circumstances the Tribunal dismisses the Applicant’s
110 Building Act, s 48.
-- 35 of 37 --
36
claim that the Certifier engaged in unsatisfactory conduct in relation to those matters
involving the approval given on 22 August 2019.
Professional Misconduct
[194] The definition of “professional misconduct” for a building certifier involved conduct
relating to the following three elements which are all cumulative. Professional
misconduct is conduct that;
(a) shows incompetence or a lack of adequate knowledge, skill, judgement,
integrity, diligence or care in performing building certifying functions; and
(b) compromises the health or safety of a person or the amenity of a person’s
property, significantly conflicts with a local planning scheme; and
(c) is contrary to a function under this Act or another Act regulating building
certifiers.
[195] The first element of the definition involves concepts already discussed above in
relation to “unsatisfactory conduct”. So far as professional misconduct involves these
elements the Tribunal is not satisfied that the Certifier has engaged in conduct which
shows incompetence or a lack of adequate knowledge skill, judgement integrity,
diligence or care in performing building certifying functions. That finding is repeated
here and the Tribunal is not satisfied there is, or any sufficient, evidence to establish
that the conduct of the Certifier infringes the first element of the definition of
“professional misconduct”.
[196] As the definition of “professional misconduct” involves three elements which are
cumulative, it would follow that failure to establish one of those elements may well
mean that a finding of professional misconduct cannot be established. However,
putting that to one side for a moment, Tribunal will consider the remaining two
elements in the definition.
[197] The second element involves conduct that compromises the health or safety of a
person or the amenity of a person’s property or significantly conflicts with a local
planning scheme. There is no evidence of any conflict with a local planning scheme.
There is simply no evidence that the health or safety of a person or that person’s
amenity is compromised so far as their property is concerned. The evidence fails to
establish this second element The Tribunal is not persuaded that the Certifiers
conduct, as alleged in these proceedings, infringes the second element of the definition
of “professional misconduct. As this part of that definition has not been established
the assertion of professional misconduct against the Certifier should be dismissed.
[198] The third element in the definition refers to conduct under this Act or another Act
regulating building certifier. The Applicant has made multiple allegations of breaches
or failures by the Certifier in the approval dated 22 August 2019. Those matters, or
the main allegations, have already been considered by the Tribunal above in these
proceedings and resulted in the Tribunal not being satisfied that there was any relevant
breach or failure by the Certifier. It follows that the evidence fails to establish this
third element. The Tribunal is not persuaded that the Certifiers conduct, as alleged in
these proceedings, infringes the third element of the definition of “professional
misconduct. As this part of that definition has not been established the assertion of
professional misconduct against the Certifier should be dismissed.
-- 36 of 37 --
37
[199] Accordingly, the Tribunal is not satisfied on the evidence in these proceedings that
the Certifier has engaged in professional misconduct within the meaning of the
definition stated in the Building Act. The Tribunal dismisses the Applicant’s claim
that the Certifier engaged in professional misconduct in terms of the allegations
brought in these proceedings.
[200] The Tribunal will, for the reasons set out above, dismiss the Application to review the
decision made by the Commission on 19 May 2021.
Orders
[201] The Application for miscellaneous matters to adduce further evidence filed in the
Tribunal by Donald Bruce Edwards on 23 February 2023 is dismissed.
[202] The decision of the Queensland Building and Construction Commission made on 19
May 2021 is confirmed.
[203] The Application to review a decision filed in the Tribunal on 16 June 2021 by Donald
Bruce Edwards is dismissed.
-- 37 of 37 --
Official source: https://www.sclqld.org.au/caselaw/QCAT/2024/397