Evangelista Pty Ltd v Eleven 17 Ocean Street Pty Ltd [2023] QSC 30 [2023] 10 QLR
SUPREME COURT OF QUEENSLAND
CITATION: Evangelista Pty Limited v Eleven 17 Ocean Street Pty Ltd
[2023] QSC 30
PARTIES: EVANGELISTA PTY LIMITED (ACN 008 516 292)
(applicant)
v
ELEVEN 17 OCEAN STREET PTY LTD (ACN 646 297
216)
(respondent)
AND
TWM (QLD) PTY LTD (ACN 605 969 024)
(applicant)
v
ELEVEN 17 OCEAN STREET PTY LTD (ACN 646 297
216)
(respondent)
FILE NO/S: BS 12166 of 2022 & BS 12167 of 2022
DIVISION: Trial
PROCEEDING: Trial
ORIGINATING
COURT:
Supreme Court
DELIVERED ON: 24 February 2023
DELIVERED AT: Brisbane
HEARING DATE: 15 February 2023
JUDGE: Freeburn J
ORDERS: 1. It is declared that the applicants’ termination of
their respective contracts with the respondent were
valid terminations and, in each case, the deposits
are declared to have been forfeited.
2. The parties be heard on the form of the orders and
the issue of costs.
CATCHWORDS: REAL PROPERTY – CONTRACT – SALE OF
COMMERCIAL PROPERTY – TERMINATION – where the
contract for the sale of commercial property was terminated by
the buyer under a special condition – where the buyer argues
that they were prevented from complying with the special
condition because of the failure of the seller to prepare the deed
contemplated by the special condition – whether the special
condition terminated under was an essential term – whether the
-- 1 of 19 --
2
buyer was prevented from complying with the special
condition – whether the buyer’s termination of the contract
was valid – whether the seller’s termination of the contract was
valid
COUNSEL: GJ Barr for the applicant
D De Jersey for the respondent
SOLICITORS: AVA Solicitors and FC Lawyers for the applicant
Clayton Utz Lawyers for the respondent
REASONS
Background
[1] Two applications are before the court. One is an originating application by
Evangelista Pty Ltd against Eleven 17 Ocean Street Pty Ltd (BS12166 of 2022). The
second is an application by TWM (Qld) Pty Ltd against the same respondent, Eleven
17 Ocean Street Pty Ltd (BS 12167 of 2022).
[2] For convenience I will refer to the parties as Evangelista, TWM and Eleven 17.
[3] Evangelista owns the property at 11-13 Ocean Street, Maroochydore (the Evangelista
Property). That property comprises a two-storey building on Ocean Street. The
Evangelista property has a carpark at the rear of the building but there is no means of
access to that carpark from Ocean Street. Access to that carpark can be gained by the
use of another carpark on an adjoining piece of land owned by the Sunshine Coast
Regional Council (the Council). Access to that Council carpark is via Duporth
Avenue in Maroochydore.1
[4] TWM owns the property adjoining the Evangelista Property at 15-17 Ocean Street
Maroochydore (the TWM Property). The TWM Property comprises a similar
building on Ocean Street, but it does have a laneway from Ocean Street that enables
access to the carpark behind the TWM Property. There is, however, a wall between
the Evangelista Property and the TWM Property that means that there is no access
between the carparks at the rear of those two properties.
1 Duporth Avenue runs roughly perpendicular to Ocean Street, but at an acute angle. Useful satellite and
Google street-view images are ex JP-1 and JP-2 to Mr Porter’s affidavit.
-- 2 of 19 --
3
[5] Ocean Street is a one-way street with limited carparking and on some occasions
Ocean Street is closed to vehicular traffic.
[6] It is necessary to explain something of the history of the Evangelista Property. The
previous owners of the Evangelista property were a Mr John Lunn and Ms Jeanette
Smith (Lunn & Smith). On 28 November 1991, Lunn & Smith entered into a licence
with the Council (the Licence). The effect of the Licence was that Lunn & Smith
granted to the Council, and to the owners and occupiers of the Council carpark as
well as their tenants, servants, workmen, licensees and other authorised persons, “full
right and liberty to pass and repass over such area as shall be notified” of an area
not less than three metres wide for the purpose of accessing that notified area on foot.
The purpose was to enable persons lawfully at the Council carpark to gain pedestrian
access to Ocean Street through the Evangelista Property. The Licence also granted to
Lunn & Smith reciprocal rights, and their owners, occupiers (etc), similar access to
and over the notified area of the Council carpark. That reciprocal licence was a little
broader than its counterpart in that access was granted to the Council carpark for both
pedestrian and vehicular traffic.
[7] Clause 3 of the licence is important for present purposes. In the event that either the
Council or Lunn & Smith sold their property, clause 3 obliged both the Council and
Lunn & Smith to obtain a covenant from their purchaser,2 in favour of the other
party,3 to this effect:
(a) the purchaser will recognise and be bound by the terms of the licence to the
same extent as if the purchaser had originally been named as a party to the
licence; and
(b) in the event of that purchaser selling, then that purchaser would obtain the same
covenant from that subsequent purchaser.
[8] As it happens, Lunn & Smith did sell the Evangelista Property. They sold it to
Evangelista. In effecting that sale Lunn & Smith complied with the Licence and
secured from Evangelista a covenant in favour of the Council. The covenant is dated
2 For present purposes, these reasons refer to a potential purchaser. However, the drafting of the deed is
wider in the sense that it applies where there is a sale or other disposition.
3 That is, if the Council sold the carpark, then the Council was required to obtain a covenant from the
purchaser of the carpark in favour of Lunn & Smith. If Lunn & Smith sold the Evangelista Property
then Lunn & Smith were obliged to obtain a covenant from the purchaser in favour of the Council.
-- 3 of 19 --
4
24 December 1991 and contains the two undertakings referred to in paragraph [7]
above.
The Contracts
[9] In 2022, Evangelista decided to sell. Whilst there were prior put and call options, the
relevant contract for present purposes is a sale contract dated 21 June 2022 (the
Evangelista Contract). By the Evangelista Contract, Evangelista agreed to sell the
Evangelista Property to Eleven 17 for $9.25m, with a deposit of $462,500 (a sum
which had already been paid pursuant to the options).
[10] The Evangelista Contract was in the REIQ form for commercial land and buildings
but included special conditions, a council approval of a development (for both the
Evangelista and TWM Properties), and a copy of the Licence and the December xxx
covenant. TWM had jointly made that application for development approval.
[11] Clause 4 of the special conditions of the Evangelista contract made that contract
interdependent with a contract that Eleven 17 had entered into at the same time to
purchase the TWM Property. The TWM contract is dated 17 June 2022. By that
contract TWM agreed to sell the TWM Property to Eleven 17 for $9.25m with a
deposit of $462,500.
[12] The special conditions of the TWM contract contained a condition that mirrored the
equivalent provision in the Evangelista Contract so that the settlement of the TWM
contract was interdependent upon settlement of the Evangelista contract.
[13] The controversy in this case turns on the terms of special condition 5 in the
Evangelista Contract. That clause requires that Eleven 17 enter into a deed of
covenant with the Council on or before settlement. It will be necessary to return to
the terms of special condition 5.
[14] Of course, as is usual in contracts of this type, general condition 26 provided that time
was of the essence of the contract.
Clause 10
[15] Because of the submissions of the parties, it is necessary to mention Clause 10.1 of
the general conditions which provides:
-- 4 of 19 --
5
Subject to compliance by the Buyer with the Buyer’s obligations under
or by virtue of this Contract and subject to clause 10.2, the Seller shall
as required do all acts and execute all documents necessary for the
purpose of completing the sale and ensuring that the Buyer obtains a
good and valid title to the Property.
[16] That clause requires the seller, Evangelista, to co-operate so that the buyer, Eleven
17, can receive what it has bargained for under the contract, namely freehold title.
Similarly, clause 4.1 envisages that at settlement the buyer will pay the balance of the
purchase price in exchange for possession, a properly executed transfer and other
documents required so as to give the buyer good title.
[17] Thus, clause 10.1 is designed to ensure that Evangelista takes all reasonable steps to
give Eleven 17 good title. That clause is not particularly helpful when interpreting
special condition 5 which required Eleven 17 not Evangelista, to enter into a deed of
covenant with a third party (the Council).
The Events
[18] Against that background, it is necessary to explain the events that occurred after the
execution of both contracts.
[19] The date for settlement for both contracts was 15 July 2022. However, it is common
ground that the date for settlement of both contracts was extended to 29 July 2022.
[20] Oddly, until the eve of settlement, neither party mentioned the requirements of special
condition 5 that a covenant to be given by the buyer, Eleven 17, to the Council. At
6.06pm on 28 July 2022 the solicitors for Eleven 17 emailed the solicitors for
Evangelista, the seller, saying:
“I am preparing my checklist for settlement.
What is happening with the deed of covenant as per special condition
5 of the contract?
The deed of covenant is of fundamental importance and is the only
way to secure my client’s access to the property through and over the
council’s land.
What measures are being taken to comply with the contract?”
[21] It was a good question.
-- 5 of 19 --
6
[22] At 11.14am the next day, the day of settlement, the solicitors for the seller,
Evangelista, responded as follows:
“Thank you for your email. It appears that we all overlooked this
provision and I apologies [sic] for the fact that I had missed it.
Attached is the Deed of Covenant. Can you please have it executed
by Eleven 17 Ocean Street Pty Ltd and return the original executed
Deed of Covenant in duplicate to me, and we undertake to promptly
send the same to Sunshine Coast Regional Council to obtain their
execution of the Deed of Covenant.
You will note that under the terms of the Licence, no consent of
Council is required, and it is a procedural matter that an incoming
owner must enter into the Deed of Covenant with Council covenanting
to be bound by the terms of the Licence as the new owner.
I am preparing a letter ready to send to Council with the Deed of
Covenant as soon as we receive it from you duly executed by your
client.
Again my apologies, however I submit that this is a procedural matter
only and there is no reason to delay settlement.
I look forward to hearing from you shortly.”
[23] At 2.09pm that day the solicitors for the buyer, Eleven 17 emailed a lengthy letter to
Evangelista’s solicitors. They explained that there were some practical difficulties in
getting the deed properly executed by the buyer. They said:
“…
We note that:
(a) Mr Bow sent a deed of covenant of the kind contemplated by
Special Condition 5 of the contract attached to an email dated 29
July 2022 sent at 11:14am);
(b) the deed of covenant appears to be drafted on the basis that it
requires the signature of a sole director whilst in fact (and in law)
it requires execution by either two directors or a director and the
secretary of the Buyer.
For the record, those parties live in different locations and whilst we
used best endeavours to have the deed of covenant executed as
quickly as possible, we were presented with some practical
difficulties in doing so by your client’s very belated production of the
document.
For the record, our client cannot simply execute the deed of covenant
and return it to you without the consent of Mr Greg Clark (the
permanent managing director of the ultimate holding company) under
-- 6 of 19 --
7
and by virtue of a governance instrument that requires Mr Clark to
consent to significant transactions.
Mr Clark lives in California and we are endeavouring to contact him
urgently.
Under special condition 5, the Buyer is required to enter into the deed
of covenant with the Sunshine Coast Regional Council ‘on or before
Settlement’ and, whilst Special Condition 5 spells out that the deed
of covenant must be prepared by your firm, it does not then deal with
how the Sunshine Coast Regional Council will be procured to ‘enter
into’ that deed of covenant.
It is almost inevitably the case that the responsibility for procuring
the Sunshine Coast Council to enter into this deed of covenant lies
with your client because your client is the only party that the Sunshine
Coast Regional Council will deal with in relation to the licence
agreement and the deed of covenant.
The Buyer has absolutely no ability or control the process (and
specifically to procure the Sunshine Coast Regional Council to ‘enter
into’ the deed of covenant).
Given the position your client has placed our client in by the
extraordinary belated delivery of the deed of covenant, if your client
is unable to procure execution of it by the Sunshine Coast Regional
Council then that is an issue for your client.
For the record, the contract requires that the deed of covenant be
entered into ‘on or before’ Settlement and accordingly our client
requires your client to procure execution of the deed of covenant by
the Sunshine Coast Regional Council before Settlement in terms of
Special Condition 5.”
[24] Eleven 17’s solicitors then attached a “duly executed deed of covenant”. The precise
status of that executed document is unclear given the requirement for Mr Clark’s
consent.
[25] As will be seen, it was inaccurate for Eleven 17’s solicitors to assert that it was
Evangelista’s obligation to secure the deed of covenant from the Council. And so, at
3.14pm that day the solicitors for the seller, Evangelista, responded by email saying:
“We refer to your letter of today’s date. We take issue with some of
the matters raised in your letter.
• All parties including your office overlooked the provisions of Special
Condition 5 in relation to your client entering into the Deed of Covenant.
• If you or your client wished to insist that the Deed of Covenant needed
to be executed by Sunshine Coast Regional Council prior to settlement,
you should have raised this issue a reasonable time previously, not
overnight on the day before settlement.
-- 7 of 19 --
8
• Special Condition 5 states that ‘On or before Settlement the Buyer must
enter into a Deed of Covenant with Sunshine Coast Regional Council
…’ The obligation under Special Condition 5 is on the Buyer and not
on any other party. Your client has executed the Deed of Covenant
today, and accordingly your client has ‘entered into a Deed of Covenant’
in accordance with the provisions of Special Condition 5. Special
Condition 5 does not state that the Deed of Covenant must be fully
executed by both the Buyer and Council.
• We disagree with your view that Special Condition 5 is not just a
procedural matter. The Contract is not subject to the Deed of Covenant
being executed by Sunshine Coast Regional Council and the Contract
does not in any way stipulate that Special Condition 5 is a fundamental
term of the Contract. Special Condition 5 imposes an obligation on the
Buyer to enter into the Deed of Covenant, and the Buyer has now done
so.”
and Evangelista’s solicitors continued, somewhat upping the stakes:
“In our view the Buyer has no right to refuse to settle or to delay
settlement on the grounds that the Sunshine Coast Regional Council
has not, executed the Deed of Covenant. The Seller’s position is that
if the Buyer fails to settle the Contract today, the due date for
settlement, then the Buyer will be in default under the Contract and
the Seller reserves its rights to take all action available to it as a
consequence of such default.”
[26] At 4.37pm on 29 July 2022 the solicitors for the buyer, Eleven 17, sent a letter
terminating the contract:
We are instructed to give notice that our client terminates the contract of sale as
a consequence of the seller’s failure to comply with Special Condition 5 of the
contract.
[27] On any view it was a bold gambit. Special condition 5 was principally directed to the
buyer, not the seller. The principal focus of the condition was to require Eleven 17 to
enter into a deed of covenant with the Council. And so, Eleven 17’s termination was
based on a clause which, principally at least, imposed an obligation on Eleven 17.
[28] At 4.43pm on 29 July 2022 the solicitors for Evangelista sent a letter by email to the
respondent’s solicitors that rejected the right asserted by the respondent to terminate
and reserved all of Evangelista’s rights to take such action as it shall be advised as a
consequence of the respondent’s default. The letter also said:
We note that your firm failed to sign off in the PEXA workspace today. All
other parties including ourselves, FC Lawyers and your client’s bank were ready
to settle. As a consequence of your failure to sign off in the PEXA workspace
-- 8 of 19 --
9
settlement did not occur today. Today was the agreed Settlement Date with time
being of the essence.
[29] On 30 July 2022, Evangelista’s solicitors wrote to Eleven 17’s solicitors challenging
the termination. They stated that special condition 5 placed an obligation on the buyer
(Eleven 17) to enter into a deed of covenant with the Council and that there was no
obligation on the seller (Evangelista) to do anything other than to prepare the deed of
covenant. They said that, in particular, there was no obligation on the seller
(Evangelista) to arrange or facilitate the execution of the deed of covenant by either
the buyer (Eleven 17) or the Council. That obligation, it was stated, rested solely on
the buyer. Evangelista’s solicitors demanded to know what steps had been taken by
the buyer to discharge its obligation to enter into the deed with the Council. They also
required particulars of the seller’s alleged failure to comply with special condition 5.
[30] On 1 August 2022, Evangelista’s solicitors further argued their case.
[31] Evangelista’s solicitors must have passed on the deed of covenant to the Council
because on 5 August 2022 the Council returned the deed of covenant to Evangelista’s
solicitors, duly executed by the Council.
[32] On 8 August 2022, perhaps recognising that the settlement of the transaction was not
going to proceed, Evangelista’s solicitors wrote to Eleven 17’s solicitors advising that
their client elected to terminate the contract and declared the deposits to be forfeited.
[33] By these proceedings, commenced on 6 October 2022, Evangelista seeks a
declaration that Eleven 17’s purported termination was invalid and of no effect and
Evangelista seeks a declaration that the deposits have been forfeited. TWM seeks
equivalent declarations in its proceeding against Eleven 17.
Special Condition 5
[34] As mentioned, this case turns on the proper interpretation of special condition 5 of
the Evangelista contract. Special condition 5 is as follows:
On or before settlement the Buyer must enter into a Deed of Covenant
with Sunshine Coast Regional Council in the terms of the Licence
Deed dated 28 November 1991 that the Buyer will recognise and be
bound by the terms of the Licence and other covenants therein to the
same extent as if the Buyer had originally been named therein as the
‘Ocean Street Proprietor’, and that in the event that the Buyer sells or
otherwise disposes of its interest in the Property, then such Buyer shall
-- 9 of 19 --
10
obtain from such subsequent buyer or transferee a covenant agreeing
to be bound by the provisions of the Licence. The Deed of Covenant
will be prepared by the Seller’s solicitors and each party shall bear
their own costs in respect of such Deed of Covenant.
[35] It can be seen that there are in fact two separate limbs to special condition 5. The first
is an obligation imposed on the ‘Buyer’ – that is Eleven 17 – to enter into a deed of
covenant with the Council on or before settlement. The second is an agreement that
the deed of covenant was to be prepared by the Seller’s solicitors – that is
Evangelista’s solicitors. No date or time is specified for the preparation of the deed
of covenant by Evangelista’s solicitors, although the contract, plainly enough,
contemplated that Evangelista’s solicitors would prepare the draft deed of covenant
in good time before settlement so that Eleven 17 could then enter into the deed of
covenant on or before settlement.
A Positive Obligation?
[36] The first contest between the parties is how to characterise special condition 5.
Evangelista contends that special condition 5 imposes on the buyer, Eleven 17, a
positive obligation to enter into a deed of covenant with the council. That is the point
of the opening words of special condition 5: “On or before settlement the Buyer
[Eleven 17] must enter into a Deed of Covenant with Sunshine Coast Regional
Council …”
[37] I think that is correct. The first limb of special condition 5 does impose a positive
obligation on Eleven 17 to “enter into” a deed of covenant with the Council. The
obligation is to enter into the deed of covenant with the Council and to do that on or
before settlement.
[38] Eleven 17 submits that general condition 4.1 specified the concurrent obligations of
the parties at settlement, namely Eleven 17’s obligation to pay the balance of the
purchase price in exchange for, to summarise, all of the relevant instruments of title
in the possession or control of Evangelista.
[39] However, in my view that is a distraction. Clause 4.1 deals with what is to happen at
settlement. At settlement, in broad terms, Eleven 17 was obliged to pay the balance
of the purchase price in exchange for the instruments of title (etc) in the possession
or control of Evangelista. But special condition 5 is entirely different. That condition
-- 10 of 19 --
11
required that, on or before settlement, Eleven 17 “must enter into a Deed of Covenant
with Sunshine Coast Regional Council”.
[40] The deed of covenant was not one of the instruments contemplated in clause 4.1 as
being exchanged for the balance of the purchase price. First, the obligation was to
enter into the deed of covenant and to do so “On or before settlement”. That is in
contradistinction to the interdependent obligations of clause 4.1 which required an
exchange at settlement. And so, Eleven 17 may have complied with special condition
5 by entering into the deed of covenant with the Council a day or even a week before
settlement. Second, it was Eleven 17’s obligation to enter into the deed of covenant
with the Council. The clauses relied on by Eleven 17 [Clauses 4.1(g), (h) and (k)] are
clauses which require the seller, Evangelista, to give over good title and relevant
instruments such as leases etc. That is why those clauses refer to instruments in the
possession or control of the seller, Evangelista. Even once the deed of covenant was
entered into, the deed would not be in the possession or control of Evangelista.4
Third, the focus of special condition 5 is an obligation by Eleven 17 to enter into a
deed of covenant with the Council. The entry into such a deed is a commitment made
by Eleven 17 to the Council. It is not, to use the language of clause 4.1, an instrument
which evidences the estates or interests affecting the property [see clauses 4.1(g) and
(h)] and it is not a document which Eleven 17 could reasonably require to enable
Eleven 17 to manage the property [see clause 4.1(k)].
[41] In short, special condition 5 requires that Eleven 17 enter into an undertaking by
means of a deed of covenant with a third party. Such an undertaking is not what is
contemplated by clause 4.1 as being exchanged for the balance of the purchase price.
Was the Draft Deed Compliant?
[42] Eleven 17 contends that the deed that Evangelista prepared and sent at 11.14am on
29 July 2022 did not comply with special condition 5.
[43] Special condition 5 is not especially demanding. All it requires is that the deed of
covenant be prepared by Evangelista’s solicitors. The deed of covenant so prepared
4 Plain, the deed of covenant, once executed, would be in the power or possession of either the Council
or Eleven 17.
-- 11 of 19 --
12
need not be in a particular form. All that was required was it be in terms of the
Licence of 28 November 1991 that:
(a) Eleven 17 will be bound by Licence as if it was the original owner; and
(b) in the event that Eleven 17 sells or disposes of the Evangelista Property, it will
require the new buyer to be similarly bound.
[44] Both those requirements are met by the draft deed.
[45] Eleven 17 points out that the draft deed did not contain reciprocal licences. The point
being made by Eleven 17 is that the original Licence was a grant by the Evangelista’s
predecessors5 to the Council of a right of access over the Evangelista Property and an
equivalent right of access granted by the Council to Evangelista’s predecessor over
the Council’s carpark.6
[46] However, the Draft Deed was unequivocal. The recitals were as follows:
(a) The Ocean Street Proprietor is the purchaser from Evangelista Pty Ltd ACN
008 516 292 (‘the Current Proprietor’) of property described as Lots 6 and 7
on RP 27740, Title Reference 18056078 and 18056079 (‘the Ocean Street
Property’).
(b) The Duporth Avenue Proprietor is the registered owner of the land described
as Lot 9 on RP 138425, Title Reference 16144112 (‘the Duporth Avenue
Property’).
(c) The predecessors in title to the Current Proprietor entered into a Licence with
the Duporth Avenue Proprietor dated 28 November 1991 (‘the Licence’) which
granted reciprocal rights of access between the Ocean Street Property and the
Duporth Avenue Property on the terms and covenants contained in the Licence.
[47] The operative provisions, under the heading “NOW THIS DEED WITNESSES AS
FOLLOWS” involved two simple clauses:
1. The Ocean Street Proprietor [Eleven 17] covenants and agrees
with the Duporth Avenue Proprietor [the Council] to be bound by
the covenants and conditions contained in the Licence and all other
terms of the Licence as if the Ocean Street Proprietor had been
named as the original Ocean Street Proprietor in the Licence.
2. The Ocean Street Proprietor covenants and agrees that in the event
of sale or other disposition of its interest in the Ocean Street
Property then it will obtain from such purchaser or transferee a
covenant in favour of the Duporth Avenue Proprietor that such
5 Lunn & Smith.
6 See the description above at paragraph [6].
-- 12 of 19 --
13
other party will recognise and be bound by the terms of the
Licence and other covenants therein contained to the same extent
as if the purchaser or transferee had originally been named therein
as the Ocean Street Proprietor and that in the event of such
purchaser or transferee selling or otherwise disposing of its
interest in the Ocean Street Property to any person, persons or
corporation then such purchaser or transferee shall obtain from
such subsequent purchaser or transferee a covenant agreeing to be
bound by the provisions of the Licence.
[48] Thus, under the draft deed, Eleven 17 committed to being bound by the covenants
and conditions contained in the Licence. The Licence contained the reciprocal grants
of access to the Ocean Street Proprietor and the Duporth Avenue Proprietor, and to
their occupiers, tenants, servants, workmen, licensees and other authorised persons.
[49] It follows that the draft deed met the description in special condition 5. Even if it had
not precisely met the description, it is to be noted that the obligation of Evangelista’s
solicitors was to “prepare” the deed of covenant. Identifying errors or omissions in
the draft does not mean that the draft loses its character as the deed of covenant.
[50] It is also worth noting that, in their letter at 2.09pm on 29 July 2022, Eleven 17’s
solicitors noted that the deed of covenant was “of the kind contemplated by the
contract”. That suggests that, at least at that point, the solicitors for Eleven 17
recognised that the deed prepared by Evangelista’s solicitors was in accordance with
the contract.
Prepared Too Late?
[51] Eleven 17 submits that, even if the draft deed complied with special condition 5, the
draft deed was prepared too late, and that Evangelista was therefore in breach of the
Evangelista Contract. On this point, Eleven 17 is on firmer ground. The contract did
not stipulate a time by which Evangelista’s solicitors were required to prepare the
draft deed. Thus, the law implies that the draft should be prepared within a reasonable
time.7
[52] What is a reasonable time will depend on the circumstances. Here, though, the
contract clearly contemplated that Evangelista’s solicitors would prepare the draft
7 Aberfoyle Plantations Ltd v Cheng [1960] AC 115. The High Court accepted Aberfoyle as undoubtably
correct on this point (although doubted on another point): Perri v Coolangatta Investments Pty Ltd
(1982) 149 CLR 537 at 543.
-- 13 of 19 --
14
deed in sufficient time so that Eleven 17 could enter into a deed of covenant with the
Council at or before settlement. Preparation of the draft deed, and its submission to
Eleven 17’s solicitors at 11.14am on the day fixed for settlement was plainly too late.
Indeed, the apologetic tone to the letter transmitting the draft deed at 11.14am, and
the offer to expedite the Council’s role, rather recognises that the draft deed was
provided very late.
[53] It follows that Evangelista was in breach of the second limb to special condition 5.
Evangelista was obliged to prepare the draft within a reasonable time. It did not do
so. Thus, Evangelista was in breach of the special condition.
Consequences of the Breach
[54] What, then, are the consequences of that breach?
[55] Eleven 17 contended that the breach entitled it to terminate. For that consequence to
flow it would be necessary to conclude that the term requiring Evangelista’s solicitors
to prepare the draft was a breach of an essential term.
[56] As has been mentioned, general condition 26 provided that time was of the essence
of the contract. Does that mean that Evangelista’s failure to prepare the draft deed
within a reasonable time constituted a breach of the ‘time of the essence’ provision?
In my view the answer is ‘No’. Surprisingly, there is very little authority on the issue.
One helpful judgment is that of Cooper J of the Supreme Court of New Zealand in
Blaauw v Watkins. There, His Honour said:
In my opinion the clause which purports to make time of the essence of the
contract can have no application to those provisions of the agreement which
relate to the payment of the purchase-money and to the time for giving and
taking possession. No definite date is fixed for either event. 8
[57] That case is consistent with DTR Nominees Pty Ltd v Mona Homes Pty Ltd9 where
the requirement was to register a plan “with all due dispatch”. The High Court held
that the use of that language meant that the requirement could not be construed as an
8 (1914) 33 NZLR 1375 at 1379. This case is referred to by the authors of CCH’s Queensland
Conveyancing Law and Practice at [8-165].
9 (1978) 138 CLR 423.
-- 14 of 19 --
15
essential term having regard to the language used and the nature of the obligation
which was imposed.10
[58] Even in the absence of that authority, it would be incongruous to regard the parties to
have intended that time was of the essence for an obligation where they have not
bothered to specify a time for compliance.
[59] The argument to the contrary is that the second limb of special condition 5 is plainly
intended as a precursor to Eleven 17’s obligation, under the first limb, to enter into a
deed of covenant with the Council. That first limb obligation must be a provision to
which general condition 26 applies so as to make time of the essence. And so, it can
be argued that there is an incongruity in interpreting Eleven 17’s obligation as an
essential obligation and yet interpreting the precursor obligation as non-essential.
[60] That argument has some force. There is certainly a tension between the two separate
obligations in special condition 5. Those who drafted special condition 5 may well
not have thought through the legal consequences of a breach of either or both of the
obligations in the special condition. However, there are several reasons why the
interpretation adopted above is to be preferred.
[61] First, even in the absence of the ‘time of the essence’ provision in general condition
26, the nature of the obligation in the first limb of special condition 5 suggests that
the intention was that the obligation was essential.11 The objective, after all, was for
Evangelista to comply with its own contractual obligations and for the covenant to,
in effect, run with the land.
[62] Second, the substantive nature of the obligation to enter into a deed of covenant with
the Council contrasts with the character of the second limb of special condition 5.
That second limb is concerned with the machinery as to how the deed of covenant is
to be prepared. Thus, the provision requires preparation of the document by the
solicitors for Evangelista. Eleven 17 and the Council were free to enter into their own
10 (1978) 138 CLR 423: “in the absence of such a provision we fail to see how a stipulation calling for
action to be taken expeditiously can of itself constitute an essential term.”
11 Of course, whether a term of a contract is essential or not is a question of interpretation of the contract
which must be determined having regard to the general nature of the contract considered as a whole
and having regard to the particular term. The main question is whether the promise is of such
importance that the promisee would not have entered into the contract unless assured of strict
performance: see CCH’s Queensland Conveyancing Law and Practice at [8-810] based on the High
Court’s decision in DTR Nominees Pty Ltd v Mona Homes Pty Ltd (1978) 138 CLR 423.
-- 15 of 19 --
16
deed of covenant or to alter a draft supplied by Evangelista. The obligation was
merely that the deed possess the character described in special condition 5.
[63] Third, the absence of any specification as to the time for Evangelista’s solicitors to
produce the deed makes it highly likely that the provision in the second limb as to the
preparation of the deed was really a machinery provision and that the parties did not
intend that any breach of that term would entitle the opposite party to terminate.
[64] For those reasons, I conclude that for the first limb, time was of the essence, and for
the second limb, time was not of the essence.
Separate Admissibility Issue
[65] Incidentally, counsel for Eleven 17 sought to tender as a part of its evidence, an
affidavit by Mr Timothy George. That affidavit explains that in November 2022,
Eleven 17’s solicitors made a request for access to documents held by the council
pursuant to the Right to Information Act 2009 (Qld). The request was largely
unproductive – principally because the council claimed legal professional privilege.
[66] Objection was taken to the tender of that affidavit by counsel for Evangelista. It was
said that the affidavit was outside the timetable prescribed for exchange of evidence,
it was irrelevant, and that paragraphs 10 and 11 of Mr George’s affidavit comprise
hearsay.
[67] There are reasons why the document was provided late. The Council sought to refine
the request. Then they refused access because of the claim of privilege. Paragraphs
10 and 11 of Mr George’s affidavit are merely intended to explain the Council’s
attitude to the request and would not therefore be hearsay.
[68] The affidavit is really only marginally relevant. It merely demonstrates that the
Council maintains a claim of privilege. The affidavit does not demonstrate that the
Council had any particular procedures to deal with deeds of covenant or that there is
any in-built delay. On that basis the affidavit will be admitted into evidence. However,
for reasons explained above, it is concluded that, in the circumstances, the draft deed
was provided too late, or unreasonably late.
-- 16 of 19 --
17
Prevention?
[69] Eleven 17 relies on a passage from the High Court’s judgment in Park v Brothers
(2005) 80 ALJR 317 at [43]:
If the conduct of the party in breach of contract prevents the
performance by the other party of the condition, then it has been said
to be ‘evident from common sense’ that it is ‘equal to performance’ of
the condition. The result has been explained sometimes in terms of
waiver, and sometimes in terms of estoppel. Lord Mansfield said that
‘reason’ dictated that if one party stops the other offering performance
by showing an intention not to perform ‘it is not necessary for the first
to go farther, and do a nugatory act’.
[70] The problem is that there is no evidence that either party took any steps to comply
with their obligations under special condition 5 before 6.06pm on to eve of settlement.
It was Eleven 17’s obligation to enter into the deed and it was the obligation of
Evangelista’s solicitor to prepare the deed. Neither party attended to those obligations
until the eve of settlement.
[71] The difficulty for Eleven 17, though, is that it contends that the drafting of a relatively
simple deed has prevented its own performance of its obligation to enter into the deed
– and yet it produces no evidence that it was Evangelista’s conduct in failing to
prepare the deed that prevented Eleven 17 from entering into the deed either on or
before 29 July 2022.
[72] It is important to keep in mind that Eleven 17’s obligation was to ‘enter into’ a deed
of covenant with the Council. That, presumably, involved some contact with the
Council, some ascertainment of the Council’s requirements,12 the preparation of the
deed (by Evangelista), and some arrangements for the execution of the deed by both
the Council and Eleven 17.13 There is no evidence that any of those steps were
undertaken prior to 6.06pm on the eve of settlement. Indeed, there is no evidence that
Eleven 17 had made any contact at all with the Council before the day of settlement.14
[73] What is required, if Eleven 17 is to sustain this ‘prevention’ argument, is some
evidence that it was prevented from performing its obligation to enter into the deed.
The evidence does not establish that. It cannot be the case that Eleven 17 was entitled
12 The Council may have required, for example, an application or a fee or a particular form.
13 The execution was a matter of some complication for Eleven 17 – a matter known only to Eleven 17.
14 On the day of settlement Eleven 17 sought to make the entry into the deed Evangelista’s responsibility.
-- 17 of 19 --
18
to take no steps at all to enter into the deed with the Council, and to then say, in effect,
‘well I have taken no steps to enter into the deed with the Council and that is entirely
because you failed to prepare a draft of the deed.’ At the least Eleven 17 was required
to adduce some evidence that Evangelista’s failure to prepare the deed has prevented
Eleven 17 from entering into a deed with the Council.
[74] An analogous line of cases are those cases starting with Meehan v Jones.15 There the
contract for the sale of land including an oil refinery was subject to two special
conditions. One was that the buyer was to enter into a satisfactory agreement with
Ampol for the supply of fuel. The other was that the buyer receive an approval for
finance on satisfactory terms. The principal arguments concerned whether the
agreements were void for uncertainty. The High Court upheld the bargain. However,
in the course of their reasons Mason and Wilson JJ held that it was implied that the
buyer had an obligation to do all that was necessary on his part to obtain finance.
Gibbs CJ and Murphy J considered that it was not necessary to give business efficacy
to the contract that it should be implied that the buyer will make reasonable attempts
to obtain finance.
[75] The views of Mason and Wilson JJ in Meehan v Jones have prevailed,16 and the
implication that a buyer is obliged to take reasonable steps has been extended to other
special conditions which require the buyer to make an application for the consent or
approval of a third party.17 The requirement to take reasonable steps has also been
implied into other special conditions such as the condition that the buyer sell their
property before settlement,18 or that the consent of the Treasurer be obtained before
settlement.19
[76] In this case, there is no difficulty in implying that special condition 5 required Eleven
17 to take reasonable steps to enter into the deed of covenant with the Council. As
discussed above, on its proper interpretation, the first limb to special condition 5
15 (1982) 149 CLR 571.
16 See, for example, Smith v Pisani (2001) 78 SASR 548; Christensen, Dixon, Duncan & Jones, Land
Contracts in Queensland, 4 th ed at 414.
17 Plumor Pty Ltd v Handley (1996) 41 NSWLR 30 where McLelland CJ in equity said that the
proposition that special condition 28 imposed on the defendant an implied obligation to take all
reasonable steps available to him to obtain that FIRB consent within the stipulated fourteen-day period
was a proposition that is “undoubtedly correct”, quoting Butts v O’Dwyer (1952) 87 CLR 267 at 279;
Christensen (etc) at 414.
18 Perri v Coolangatta Investments Pty Ltd (1982) 149 CLR 537; Christensen (etc) at 414-415.
19 Plumor Pty Ltd v Handley (1996) 41 NSWLR 30; Christensen (etc) at 414-415.
-- 18 of 19 --
19
imposed a positive obligation on Eleven 17 to enter into a deed of covenant with the
Council, and to do so before or at settlement. Some violence would be inflicted on
that positive obligation if Eleven 17 were permitted to sit on its hands until the day of
settlement and to then say that it has been unable to, or it now has insufficient time
to, enter into a deed with the Council.
[77] Whilst in some cases it may be true to say that the failure of solicitors to prepare a
draft deed could prevent the opposite party for proceeding, that has not been
demonstrated by evidence here. On the one hand there is no evidence that in fact the
failure to prepare the draft deed caused Eleven 17 to be unable to fulfil its obligations.
And, on the other hand, there is no evidence that suggests that Eleven 17 took any
steps at all to comply with the positive obligation it owed to enter into the deed of
covenant with the Council.
[78] It is worth noting that the deed of covenant was a simple one-page document. Its
terms were prescribed and followed an earlier deed of covenant entered into by
Evangelista. And the deed was a commitment to the Council – a third party. This
was not a case where the task of preparing the deed required Evangelista to commit
to a variety of terms. The terms of the transaction were, as I say, prescribed.
[79] It follows that the evidence does not establish that Eleven 17 was prevented from
complying with its obligation under special condition 5.
A Right to Terminate
[80] That means that, at the time it purported to terminate, Eleven 17 was in breach of the
contract. Eleven 17 did not have a right to terminate. Its purported termination was a
wrongful repudiation of the contract. Evangelista accepted that wrongful repudiation
and elected to terminate on 8 August 2022.
[81] It follows that the court should declare the Evangelista contract to have been validly
terminated by Evangelista on 8 August 2022 and that the deposits have been forfeited.
Equivalent declarations in favour of TWM should be made in its proceeding against
Eleven 17.
-- 19 of 19 --
Official source: https://www.sclqld.org.au/caselaw/QSC/2023/030