Edie & Ors v Brisbane City Council & Anor [2023] QPEC 9 (2024) QPELR 679
PLANNING AND ENVIRONMENT COURT
OF QUEENSLAND
CITATION: Edie & Ors v Brisbane City Council & Anor [2023] QPEC 9
PARTIES: SCOTT EDIE
(First Appellant)
KARI EDIE
(Second Appellant)
JARRAH GARD
(Third Appellant)
DAN GEORGE
(Fourth Appellant)
JESSICA GEORGE
(Fifth Appellant)
TAMARA MESSINBIRD
(Sixth Appellant)
TARA SEARLE
(Seventh Appellant)
MATTHEW SEARLE
(Eighth Appellant)
v
BRISBANE CITY COUNCIL
(Respondent)
ST. MAROUN’S MARONITE CHURCH BRISBANE
(Co-respondent)
FILE NO/S: 2301/21
DIVISION: Planning and Environment
PROCEEDING: Submitter appeal against approval
ORIGINATING
COURT: Planning and Environment Court, Brisbane
DELIVERED ON: 28 April 2023
DELIVERED AT: Brisbane
HEARING DATE: 29 July – 5 August 2022, with further submissions received 9
August 2022 and 17 August 2022
-- 1 of 35 --
2
JUDGE: McDonnell DCJ
ORDER: The appeal is adjourned to a date to be fixed for review to
enable the parties to consider appropriate conditions of
approval
CATCHWORDS: PLANNING AND ENVIRONMENT – APPEAL –
DEVELOPMENT APPLICATION – Appeal against decision
to approve a development application for a development
permit for a material change of use (place of worship, church
hall and townhouses – parish residences) – where the existing
Church is not fit for purpose – where the site is suitable for
the proposed development – reasonable community
expectations - whether the built form and scale of the
proposed development is compatible with the planning intent
- whether the development will result in unreasonable
amenity impacts – whether proposed development is
compliant with assessment benchmarks - whether the
proposed development can be conditioned to achieve
compliance with assessment benchmarks
CASES: Abelda v Brisbane City Council [2020] QCA 257
Acland Pastoral Co Pty Ltd v Rosalie Shire Council & Ors
[2008] QPELR 342
Ashvan Investment Units Trust v Brisbane City Council &
Ors [2019] QPELR 793
Brisbane City Council v YQ Property Pty Ltd [2020] QCA
253
Broad v Brisbane City Council & Anor [1986] 2 Qd R 317
Cannon Hill Investments Pty Ltd & Australian Country
Choice Production Pty Ltd v Brisbane City Council & Anor
[2022] QCA 246
Development Watch Inc v Sunshine Coast Regional Council
& Anor [2022] QCA 006
Dexus Funds Management Ltd v Fabcot Pty Ltd [2021] QCA
95
Dreamline Development Corporation Pty Ltd v Brisbane City
Council and Ors [2022] 169
Lennium Group Pty Ltd v Brisbane City Council [2019]
QPELR 835
Murphy v Moreton Bay Regional Council and Anor [2020]
QPELR 328
Seabridge Pty ltd t/as Clutha Creek Sands & Anor v Council
of the Shire of Beadesert & Anor [2001]
Trinity Park Investments Pty Ltd v Cairns Regional Council;
-- 2 of 35 --
3
LEGISLATION:
COUNSEL:
SOLICITORS:
Walters & Ors v Brisbane City Council & Anor [2019]
QPELR 487
Wattlevilla Pty Ltd v Western Downs Regional Council &
Anor [2015] QPELR 21
Wilhelm v Logan City Council & Ors [2020] QCA 273
Wilmar Trading (Australia) Pty Ltd v Brisbane City Council
& Anor [2022] QPEC 16
Planning Act 2016 (Qld) s 45(5), s 60
Planning and Environment Court Act 2016 (Qld) s 43, s 45, s
46, s 47
Planning Regulation 2017 (Qld) s 31(1), sch 24
H.M.C Stephanos for the appellants
R Yuen for the respondent
DLK Atkinson, K.C. and L I Walker for the co-respondents
Anderssen Lawyers Pty Ltd for the first to eighth appellants
City Legal – Brisbane City Council for the respondent
Thynne + Macartney Lawyers for the co-respondent
Introduction
[1] This is an appeal against the respondent’s decision to approve a development
application for a development permit for a material change of use (place of worship,
church hall and townhouses – parish residences) on land at 33 Bunya Street, 34 Peach
Street and 68 to 80 Dunellan Street, Greenslopes (the Site). The co-respondent is the
applicant.
[2] The Site was owned and operated by Our Lady of Lourdes Church (a Roman Catholic
Church) between 18 September 1955 until 25 February 1989. It was acquired by St
Maroun’s Maronite Church, Brisbane on 26 February 1989 and continues to operate
as a church. The proposed development involves the removal of the existing church
and parish residence buildings, the retention of the four pre-1947 dwelling houses
which will be reused as parish residences and the construction of a new church
building and church hall.
[3] The issues in dispute are whether the built form and scale of the proposed
development are compatible with the planning intent, whether the development will
result in unreasonable amenity impacts, and, to the extent that there is any non-
compliance with the relevant assessment benchmarks, whether the proposed
development can be conditioned to achieve compliance. The appellants do not dispute
that the Site is suitable for the proposed development having regard both to first
planning principles and the historical and long standing use of the Site for a place of
-- 3 of 35 --
4
worship1 The appellants do not oppose the co-respondent making improvements to
the existing Church to provide an updated building and agree that the Church is not
fit for purpose.2
The Site and the surrounding area
[4] The Site comprises 9 lots with a total area of 3,645m². It has three street frontages
comprising a frontage of approximately 10.05m to Peach Street, approximately
50.23m to Bunya Street, and approximately 70.4m3 to Dunellan Street. 4 It falls by
about 5.9m from a high point in the south-east corner to low points in the north-west
and south-west corners.5
[5] The Site is currently improved by a church and hall on Bunya Street, a brick dwelling
house being a parish residence on the corner of Bunya and Dunellan Streets, three
detached dwelling houses on Dunellan Street, and a detached dwelling house in Peach
Street. The current church and hall building is a 2-storey brick and timber building.6
The upper level is used for worship and the lower level is used for a range of pastural
activities. The church, hall and parish residence were constructed after 1946. The
other 4 dwellings were constructed before 1947.
[6] The surrounding area was described by the visual amenity and architectural experts
as follows:
“The site adjoins single detached dwelling houses of 1-2 storeys to the
south-east, south-west and north-west, the latter accommodating a
hairdressing business on the ground floor. It is understood that the
house to the south-east of the site (at 35 Bunya Street) is owned by the
Church.
To the north of the site, across Dunellan Street, is a commercial
business located on the intersection with Bunya Street (Hair salon).
Detached dwelling houses extend to the west of that building. To the
east of the site, across Bunya Street, is a multiple dwelling, contained
within two buildings which are separated by a central driveway access.
Beyond this immediate context, the surrounding area includes
predominantly one and two storey dwelling houses which are
interspersed with two and three storey multiple dwellings and
community facilities including Greenslopes State School, Greenslopes
Baptist Church, a Synagogue, and a Bowls Club (refer to Figure 2).
Approximately 410 metres to the east of the site is Logan Road, a busy
arterial road flanked by a range of commercial uses.”7
[7] The Site is in proximity to:
1 Ex. 2.04, Town Planning JER, 21 [107]. See also Mr Curtis T3-76, [l4].
2 Ex. 2.04, Town Planning JER, 20 [97].
3 Ex. 2.04, Town Planning JER, 6[10](c) says the frontage is 70.4m, but Ex 2.04, Visual Amenity &
Architecture JER, 4 [7] says the frontage to Dunellan Street is 60.34m. In any event, nothing turns
on this.
4 Ex. 2.04, Town Planning JER, 6 [10]((b) – (d)).
5 Ex. 2.02, Visual Amenity & Architecture JER, 4 [9].
6 Ex. 2.02, Visual Amenity & Architecture JER, 10 Fig. NP7.
7 Ex. 2.02, Visual Amenity and Architecture JER, 4 [10] – [12].
-- 4 of 35 --
5
(a) public park networks identified under the City Plan, which include both Local
and District sport and recreation zoned facilities along with Local and District
open space zoned parkland. The Sport and Recreation (District) zoned
parkland, the Thompson Estate Reserve, is approximately 220m from the Site
and offers a range of recreational facilities;8
(b) a variety of public and active transport options, including the Greenslopes
Busway Station and bus routes along Logan Road, Juliette Street and Ridge
Street;9
(c) two Growth Nodes on the Logan Road transport corridor identified in the
Strategic Framework, being the Greenslopes Growth Node and Greenslopes
Mall Growth Node.10
The current approval
[8] On 27 July 1954 an approval was granted for the site.11 The approval contains no
conditions as to parking, noise, hours of operation or numbers of people permitted
onsite. The lawful use of the premises is a matter to which regard must be had in
carrying out assessment of the application.12
Background to the application
[9] On 16 March 2020, the co-respondent lodged a development application with the
respondent seeking a development permit for a material change of use for a place of
worship (church building, church hall and parish residences) and a childcare centre
and a preliminary approval to demolish the pre-1947 dwellings. The development
application was accepted as properly made on 30 March 2020.13 The application did
not require referral to any referral agencies.
[10] Prior to public notification of the application, the co-respondent decided to retain the
pre-1947 dwellings. During the public notification of the application, 384 properly
made submissions were received by the respondent, of which 206 were in support and
178 opposed the proposed development.14
[11] Before the application was decided by the respondent, the childcare centre component
was removed from the application.15 Other changes made to the proposed
development included:
(a) increased deep planting from 8% to 18.1%;
(b) reduced building height and scale and outdoor sitting area;
(c) revised building material;
(d) increased boundary setbacks; and
8 Ex. 2.04, Town Planning JER, 18 [85]; see also Ex. 11.01 Locality Zoning Map.
9 Ex. 2.04, Town Planning JER, 18 [86].
10 Ex. 2.04, Town Planning JER, 18 [86]; see also Ex. 11.01 Locality Zoning Map and Ex. 11.02 SFM-
003 Strategic Framework Map.
11 Ex. 2.04, Town Planning JER, Attachment B.
12 Planning Regulation 2017 (Qld) s 31(1)(f) (‘Planning Regulation’).
13 Ex. 7.01, City Plan extracts, CEO Certificate, [1].
14 Ex. 9.01, Book of Submissions.
15 Ex. 2.04, Town Planning JER, 11 [41].
-- 5 of 35 --
6
(e) re-adjustment of the location and extent of acoustic barriers.
[12] By decision notice dated 16 July 2021,16 the respondent approved the development
application subject to conditions.17 In particular:
(a) a requirement for onsite carparking to be only for the proposed use (Condition
8);
(b) that the church hall, church administration and parish residences are ancillary
to the proposed use for a place of worship (Condition 9);
(c) the provision of significant landscaping (Condition 18);
(d) limiting the hours of operation for the approved use (Condition 19);
(e) the maximum number of people allowed onsite including the indoor and
outdoor areas (Condition 22);
(f) acoustic measures and treatments (Conditions 23, 24 and 25);
(g) the provision of onsite car parking for 55 cars and 2 motor cycles (Condition
38); and
(h) requirements for equitable access (Condition 54).
[13] It is the position of the appellant that the extent of mitigation measure required by the
conditions are indicative of the unacceptable scale of the development.18
The proposed development
[14] The new church building will be located at the corner of Dunellan Street and Bunya
Street.19 It is a two storey, brick20 building comprising a seating area (340m²), 2
alters, office, meeting rooms and mezzanine choir loft. The new hall fronting Bunya
Street is a single storey brick building. The outdoor sitting and plaza area is 870m²
and connects the Church and the hall. The car park provides 57 parking spaces
comprising 55 spaces for cars and 2 spaces for motorcycles. It is located underneath
the church building and the hall and is accessed via a crossover in Dunellan Street.
Acoustic barriers are proposed.
[15] The 3 pre-1947 dwellings fronting Dunellan Street are to be raised, with timber batten
screens provided to the ground level. Privacy screening is proposed to the side
elevations. The pre-1947 dwelling fronting Peach Street will be provided with timber
batten screens to parts of the existing ground level and privacy screening to the side
elevations.
[16] Deep planting is proposed adjacent to the frontages to Bunya Street and Dunellan
Street, in the western part of the Site to the rear of the church building and hall, and
to the south of the church administration area where adjacent to the side boundary
16 Ex. 8.21, Decision Notice.
17 Ex. 2.04, Town Planning JER, 11 [43].
18 Ex 10.14 Written Submissions on Behalf of the Appellants, 37 [134].
19 Ex. 2.04, Town Planning JER, 9 [30](a).
20 Ex. 2.02 Visual Amenity and Architecture JER, 22 [49].
-- 6 of 35 --
7
with 36 Peach Street. 18.1% of the site area will be landscaped21 comprising 525m²
of deep planting and 135m² of lawn.
[17] To the extent there are inconsistencies between the approved landscape plans and the
architectural plans, the co-respondent is content for the architectural plans to prevail.
This involves enhanced landscaping.22
[18] The majority of the new church building is below 9.5m above the natural ground.
The maximum roof heights of the new church building are 10.2m to the rear gable
and 12.5m to the top of the bell tower dome.23 The highest parts of the new church
building are significantly set back from the street. The top of the bell tower dome is
set back approximately 9.4m from Bunya Street and 21m from Dunellan Street and
the rear roof gable peak is set back approximately 35m from Bunya Street and 15.5m
from Dunellan Street.24
[19] The new church building has a minimum setback of 4.16m from Bunya Street to the
portico, 5m from Dunellan Street to the plaza level church wall and a minimum
setback of 1.5m from Dunellan Street to the underground car park wall (which varies
in height from 1.2m to 2.5m).25 The single storey hall has setbacks of 3m from the
southern boundary and 7.535m from Bunya Street.26 The bell in the bell tower is
silent.
What is the statutory assessment framework for the decision?
[20] The appeal is to be determined under the Planning Act 2016 (Qld) (Planning Act) and
the Planning and Environment Court Act 2016 (Qld) (PECA). The Court stands in
the shoes of the assessment manager and decides the application anew.27 The co-
respondent bears the onus in the appeal.28 In deciding the application the Court must
confirm the decision appealed against, change the decision appealed against, or set it
aside and either make a decision replacing it or return the matter to the Council with
directions the Court considers appropriate.29
[21] As the Development Application was subject to impact assessment, the assessment:
(a) must be carried out;
(i) against the relevant assessment benchmarks in a categorising instrument
that was in effect when the development application was properly made.
(ii) having regard to any matters prescribed by the Planning Regulation 2017
(Qld). Relevantly, this includes any development approval for, and any
lawful use of, the premises or adjacent premises and the properly made
21 Ex. 2.02, Visual Amenity and Architecture JER, 7 [24].
22 Ex. 2.02, Visual Amenity & Architecture JER, 20, [44] (Mr Powell).
23 Ex. 2.02, Visual Amenity and Architecture JER, 7 [20](a).
24 Ex. 2.02, Visual Amenity and Architecture JER, 77 [23].
25 Ex. 2.02, Visual Amenity and Architecture JER, 7 [22].
26 Ex. 2.02, Visual Amenity and Architecture JER, 7 [21].
27 Planning and Environment Court Act 2016 (Qld), ss 43, 46(2) (‘PECA’).
28 PECA, s 45(1)(a).
29 PECA, s 47(1).
-- 7 of 35 --
8
submissions30 to the extent the assessment manager considers relevant
to the development31; and
(b) may be carried out against, or having regard to, any other relevant matter, other
than a person’s personal circumstances, financial or otherwise.32
[22] A broad discretion is conferred by s60(3) of the Planning Act in deciding an impact
assessable application.33 The decision maker is to balance the factors to which
consideration may be given. Non-compliance with an assessment benchmark does
not necessarily dictate refusal of a development application.34 The extent to which a
flexible approach to the exercise of discretion will prevail will turn on the facts and
circumstances of each case, including the nature and extent of the non-compliance, if
any, identified with an assessment benchmark.
What is the planning framework?
[23] Version 18 of Brisbane City Plan 2014 (City Plan) was in effect at the date the
development application was properly made.35 It is the only relevant categorising
instrument.
[24] Under City Plan, the Site is in the Character Residential (Infill Housing) Zone, is
within the Coorparoo and District Neighbourhood Plan (the Neighbourhood Plan) but
is not mapped within any of the precincts,36 and is covered by the Traditional Building
Character Overlay (the TBC Overlay).37 The Community Facilities Code38 and the
Transport, Access and Parking and Servicing Code39 The TAPS Code apply. Land
within 100-200m of the Site is in the Character Residential (Infill Housing) Zone.
Greenslopes Baptist Church and the South Brisbane Synagogue are both located
within the Character Residential (Infill Housing) Zone.
[25] Pursuant to City Plan, there is compliance with a code where the development
complies with either:
(a) The purpose, overall outcomes, and performance outcomes of the code; or
(b) The purpose, overall outcomes and acceptable outcomes of the code.40
30 Planning Regulation, s 31(1)(f) and (g) and definition of “common material” Planning Regulation,
Sch. 24.
31 Planning Regulation, s 31(2)(a).
32 Planning Act 2016 (Qld), s 45(5) (‘Planning Act’).
33 Ashvan Investments Unit Trust v Brisbane City Council & Ors [2019] QPELR 793 [35] –
[83];Murphy v Moreton Bay Regional Council and Anor [2020] QPELR 328 [469],[508]. This
approach was endorsed by the Court of Appeal in Brisbane City Council v YQ Property Pty Ltd
[2020] QCA 253 and Abelda v Brisbane City Council [2020] QCA 257.
34 Ashvan Investments Unit Trust v Brisbane City Council & Ors [2019] QPELR 793, [53].
35 Ex. 7.01, City Plan extracts, CEO Certificate, [1].
36 Ex. 7.01, City Plan extracts, CEO Certificate, paragraph [2].
37 Ex. 7.01, City Plan extracts, CEO Certificate, 101, s 6.2.1.5(1), Note 3.
38 Ex. 7.01, City Plan extracts, CEO Certificate 124 – 131.
39 Ex. 7.01, City Plan extracts, CEO Certificate 132.
40 Ex. 7.01, City Plan extracts, 80 s5.3.3(4)(c), see also Dreamline Development Corporation Pty Ltd v
Brisbane City Council and Ors [2022] 169, 185 [70]. Although this section relates to code
assessable development, it remains appliable in the context of impact assessable development: see
Lennium Group Pty Ltd v Brisbane City Council [2019] QPELR 835 [201] citing United Petroleum
Pty Ltd v Gold Coast City Council [2018] QPELR 510.
-- 8 of 35 --
9
[26] Where there is inconsistency, s1.5 of City Plan provides the hierarchy of scheme
provisions. To the extent of any inconsistency:
(a) the Neighbourhood Plan Code prevails over the other relevant codes;41 and
(b) the Character Residential Zone Code prevails over the Community Facilities
Code. 42
[27] The principles of statutory construction apply to the construction of planning
instruments.43 The planning scheme must be accepted as a comprehensive expression
of what will constitute, in the public interest, the appropriate development of the
Site.44
Issues in dispute
[28] The Order of 4 February 2022 defined the issues in dispute. These issues raised the
following matters: 45
Character and form
1. Whether the proposed development is compatible with the planning intent
for the area, including the character and built form requirements of the
planning scheme, having regard to both the following assessment
benchmarks and whether the proposed development is of a height, bulk and
scale that:-
(a) is appropriate, in relation to:-
(i) the prevailing built form and streetscape of the subject land
and its surrounds; and
(ii) the use proposed;
(b) is consistent with:-
(i) the existing and desired building height for the area; and
(ii) community expectations for development in the area;
Identified Assessment Benchmarks
(c) Strategic framework, s.3.4.1(1)(b) and (c) and s.3.4.2 – SO12 and
SO20;
(d) Character Residential Zone Code – Purpose and Overall Outcomes
4(j), 5(a), 5(d) and 5(g);
(e) Coorparoo and Districts Neighbourhood Plan Code – Overall
Outcomes 3(b), 3(e) and 3(j);
41 Ex. 7.01, City Plan extracts, CEO Certificate, s 1.5(d).
42 Ibid s 1.5(d) and (e).
43 Trinity Park Investments Pty Ltd v Cairns Regional Council; Dexus Funds Management Ltd v
Fabcot Pty Ltd [2021] QCA 95 [77], citing Zappala Family Co Pty Ltd v Brisbane City Council
(2014) 201 LGERA 82.
44 Wilhelm v Logan City Council & Ors [2020] QCA 273 [77].
45 Ex. 12.05 Agreed List of Issues.
-- 9 of 35 --
10
(f) Community Facilities Code – Overall Outcomes 2(a), 2(f)(iii-v), 2(j)
and PO1, PO14 and PO15.
Amenity
2. Whether the proposed development would result in unacceptable adverse
amenity impacts upon nearby residences having regard to both the following
assessment benchmarks and whether the proposed development is
inconsistent with the character and amenity of the area arising from traffic,
lighting, and noise associated with the proposed development (including its
hours of operation and levels of patronage) and built form considerations.
Identified Assessment Benchmarks
(a) Character Residential Zone Code – Purpose and Overall Outcomes
4(d), 4(j)46 and 7(f);
(b) Coorparoo and Districts Neighbourhood Plan Code – Overall
Outcome 3(j) and PO3;
(c) Community Facilities Code – Overall Outcomes 2(f)(iii-v) and PO1
and PO25;
(d) Transport, Access, Parking and Servicing Code – Overall Outcomes
2(c), (d), (e) and (f).
Conditions
3. To the extent any non-compliance with the identified assessment
benchmarks is established, whether the proposed development can be
conditioned to achieve compliance with those assessment benchmarks; and
Relevant matters
4. Whether the relevant matters relied upon by the respondent and the co-
respondent are made out and support approval of the proposal.
The submissions and reasonable community expectations
[29] The adverse submissions47 raised issues including loss of residential amenity, the
scale of the proposed development, its visual impact, that the design is inconsistent
with the predominant Queenslander character of the locality, acoustic impacts and
that the proposal was contrary to expectations.48 The submitters indicated a desire to
protect the character of the area and recognized that a church use will continue on the
Site.
[30] The submissions in support of the proposal49 related primarily to the inadequacy of
the current church and hall, that the proposal responded to the needs to the
congregation including providing an increased number of car parking spaces. 50 They
46 As it relates to amenity only. Whether the proposal fulfills a “local community facility need only” is
not a matter in issue in these proceedings.
47 Ex. 9.01, Properly made submissions.
48 Ex. 2.04, Town Planning JER, 10-11, [ 39].
49 Ex,. 9.01, Properly made submissions.
50 T5–40 [l]–[15].
-- 10 of 35 --
11
reflected an expectation that a long-standing use be able to continue on the Site in a
facility that was fit for purpose and accorded with contemporary standards.
[31] The properly made submissions related to a significantly different form of
development to that which is now proposed. Changes have been made to the
development application as outlined in [12] above. The submissions indicate the
development at that time was three storeys and had a height of 14.3m (or 11.84m
excluding the belltower) and included a childcare centre of 524 m² GFA to
accommodate 80 children. Thus, to the extent the submitters expressed concerns
about the size and scale of the proposal, they are not concerns about the proposal now
before the Court.
[32] For the purposes of s 45(5) of the Planning Act, I give limited weight to the
submissions in so far as they relate to the perceived impacts of this proposal. This is
because of the substantial differences between the proposal the subject of public
notice and the proposal before the Court, that those concerns are speculative and the
issue of amenity and impacts of this proposal have now been considered by the
experts in this appeal.
[33] As observed by the Court of Appeal, determining whether the development is within
reasonable community expectations is a three-step process involving:-
(a) a determination of the expectations of the community;
(b) an assessment of the reasonableness of those expectations considering the
planning provisions applying to the subject land; and
(c) after the reasonable expectations are identified by following the first two steps,
consideration of the extent to which those expectations are consistent with the
proposed development.51
[34] Regard must be had to the submissions in respect of the development application and
the statements prepared for the purposes of the appeal to determine the community
expectations. The appellants and the co-respondent each produced lay witness
statements. While each objected to parts of the statements produced by the other52
they each submitted that it was a matter of weight, rather than admissibility.53
[35] The appellants’ lay witness statements reveal concerns about bulk, height and scale,
traffic impacts, acoustic impacts and an expectation that any redevelopment of the
Church would be of a similar scale to that existing on the Site. Further, they reflected
an expectation that the residents would not experience the level of noise and traffic
impacts presently experienced. 54 The appellants submitted that the expectations of
the local community are for development that has a bulk, scale and form consistent
with and reflective of the character residential zoning of the area.
51 Development Watch Inc v Sunshine Coast Regional Council & Anor [2022] QCA 006 [45]–[47]
concerned a provision requiring consideration of the reasonable expectations of the local community
(that is different to the provision in the present case), as recently summarised in Cannon Hill
Investments Pty Ltd & Australian Country Choice Production Pty Ltd v Brisbane City Council &
Anor; Wilmar Trading (Australia) Pty Ltd v Brisbane City Council & Anor [2022] QPEC 16 [406].
52 Ex. 10.03 appellants’ objections; Ex. 12.06 co-respondent’s objections.
53 T1-50 [16]–[23]; T6-32 [19]–[29].
54 Ex. 3.12 Statement of Sarah Lavelle, 2 [11]; Ex. 3.16, Statement of Matthew Searle, 1 – 2 [5]; Ex.
3.08, Statement of Kathryn Baumann, 2 [13]; Ex. 3.11, Statement of Meriel Chamberlain, 2, [ 7]–[8].
-- 11 of 35 --
12
[36] The co-respondents produced four lay witness statements from members of the
community being long-standing55 members of the parish of the St Maroun’s Maronite
Church. These statements indicated that the church is important to the community
and that these witnesses are concerned that the present church building is outdated
and no longer fit for purpose, such that parishioners worship outside requiring that
the doors remain open, and that it lacks features to promote accessibility.
[37] The reasonable expectations of the community should also be informed by the
approval for and lawful use of the Site. The submissions and statements generally
reflect an expectation that the church use would continue. However, in my view, they
give insufficient weight to the current use which can continue with limited
restrictions, and misconstrue the City Plan as requiring that the proposal be of tin and
timber construction. For these reasons the appellants’ lay witness evidence and the
adverse submissions do not form a sound basis upon which to assess community
expectations.
[38] In addition to informing community expectations, the historic and ongoing use has
influenced the character and amenity of the area. The St Maroun’s Maronite Church
has been an integral part of the Greenslopes community for more than 30 years. I
respectfully adopt the observations of Kefford DCJ in Walters & Ors v Brisbane City
Council & Anor56 (concerning the redevelopment and expansion of an existing
retirement facility in a low-density residential area) that:
“Aveo submits the existing use is relevant in assessing the existing
character and amenity of the locality. I agree. This is an area where
the residents in detached houses have apparently successfully
cohabited with retirees in a retirement village for more than a
generation. This existing use has influenced the character and amenity
of the area. It informs reasonable public expectations.”
[39] I accept that it is reasonable that the community expect that the proposal has a scale
and form consistent with the amenity and character intended for the Site and
complements the traditional building character.
[40] Having found below that the proposed development is compatible with the built form
intent of the zone, reflects and complements the character and is of a bulk, scale and
form consistent with and reflective of that character, I am not satisfied that the
community’s expectations reflected in the adverse submissions and the appellants’
lay witness’s statements are reasonable.
Is the bulk, height and scale of the built form acceptable having regard to the
assessment benchmarks in dispute?
[41] The assessment benchmarks with which the appellants allege non-compliance in
relation to the built form and scale of the proposed development are set out below:
[42] Strategic outcome 3.4.1(b) and (c) and SO12 and SO20 of Element 2.1 of the Strategic
Framework provide that:
55 Two had been involved in the purchase or establishment of the Church at the present location in
1987 and the shortest length of time any of these witnesses had been involved with the Church was
25 years.
56 [2019] QPELR 487, [213].
-- 12 of 35 --
13
Strategic outcome
3.4.1(1)(b)
Brisbane is defined by the visual markers and amenity
created by a visually dominant City Centre, concentrated
centres along transport corridors, the Brisbane River, major
hills and valleys, bushlands and open space, traditional
character suburbs, mature urban vegetation and the bay and
bayside areas and islands. Brisbane’s neighbourhoods each
express their individual identity.
Strategic outcome
3.4.1(1)(c)
Brisbane has locations within the city which have cultural
heritage significance to a broad range of groups and
individuals. Character housing provides a link with
Brisbane’s history and helps to reinforce a strong sense of
place and community identity. Brisbane’s character elements
and built cultural heritage are appreciated protected and
managed. Locations of cultural significance for Aboriginal
people are recognised and protected.
SO12 The urban design of Brisbane’s development is cognisant of
the role and function of the individual area in which it is
located and reinforces or reinterprets the character of that
area.
SO20 Brisbane’s distinctive suburban identity is reinforced by its
character housing precincts.
[43] The purpose and overall outcomes OO4(j), OO5(a), OO5(d) and OO5(g) of the
Character Residential Zone Code provide that:
Purpose The purpose of the character residential zone is to:
a. ensure the character of a residential area is protected or
enhanced; and
b. provide for community uses, and small-scale services,
facilities and infrastructure, to support local residents.
OO4(j) Development for any other non-residential use service a local
community facility need only, such as a childcare centre or
substation, and is compatible with and integrates with the
built form intent of the Character residential zone. 57
OO5(a) Development occurs on an appropriately sized and
configured lot and is of a form and scale that reinforces a
distinctive subtropical character of low rise buildings set in
green landscaped areas.
OO5(d) Development provides that a new building or extension of a
building reflects and complements the city’s traditional
building character of housing built in 1946 or before
prevalent within the Traditional building character overlay in
57 That part of OO4(j) which states ”serve a local community facility need only” is not in issue.
-- 13 of 35 --
14
accordance with the Traditional building character (design)
overlay code.
OO5(g) Development responds to land constraints, mitigates any
adverse impacts on environmental values and addresses other
specific characteristics, as identified by overlays affecting the
site or in codes applicable to the development.
[44] Overall outcomes OO3(b), OO3(e) and OO3(j) of the Neighbourhood Plan Code
provide that:
OO3(b) Identified character housing and traditional character
streetscapes are retained and protected.
OO3(e) Development demonstrates high-quality built form and
public realm outcomes that contribute to a strong sense of
place and the creation of high quality streetscapes.
OO3(j) Development is of a height, scale and form which is
consistent with the amenity, character and infrastructure
assumptions intended for the relevant precinct, sub-precinct
or site.
[45] Overall outcomes OO2(a), OO2(f)(iii) and (iv) and (v) and OO2(j) of the Community
Facilities Code provide that:
OO2(a) Development is of a design, siting, construction and built
form that is suited to the facility, in accordance with the
particular operational, functions and locational requirements
of community services and facilities.
OO2(f)(iii) Development is of a scale, height and bulk that provides a
high level of amenity.
OO2(f)(iv) Development is generally consistent with the character of the
area.
OO2(f)(v) Development transitions sensitively to surrounding uses.
OO2(j) Development complements the prevailing scale, built form
and streetscape of the zone or zone precinct and surrounding
areas.
PO1 Development ensure that the hours of operation are:
a. consistent with reasonable community expectations for
the use and are consistent with the purpose of the zone or
zone precinct;
b. controlled so that the community facility does not impact
on the amenity of:
i. a residence within the building where the use is located;
-- 14 of 35 --
15
ii. nearby sensitive uses.
PO14 Development design must be consistent with the reasonable
expectations for built form, site layout and landscape design
of development on surrounding land.
PO15 Development has a building form that is varied and building
bulk that is reduced by design elements such as awnings,
recesses and projections, and a range of material colours and
textures.
[46] The appellants called Mr Curtis to address visual amenity and architecture. The
respondent called Dr McGowan to address visual amenity. The co-respondent called
Mr Olsson to address architecture, and Mr Powell to address visual amenity,
landscaping and character. Planning evidence was given by Mr Buckley for the
appellants, Ms Owens for the respondent and Mr Mewing for the co-respondents.
[47] Mr Curtis conceded that height was not an issue.58 Bulk and scale are inherently
subjective matters. Context is relevant.
[48] Mr Curtis, Mr Powell, Mr Olsson and Mr McGowan agreed that:
(a) the local area is characterised by detached housing, including housing with
traditional building character, as well as a range of larger multiple dwellings,
two other religious facilities and a school;
(b) the proposed development would not cause undue impacts on surrounding
residential properties in terms of over-shadowing, overlooking or on outlook;
(c) the proposed landscaping is adequate; and
(d) the enhanced landscaping (see [18]) would be beneficial.59
[49] Mr Powell and Dr McGowan agreed that the proposed landscaping and deep planting
was generous and well-located, and would assist to integrate the built form, reinforce
the sub- tropical character and contribute to high quality streetscapes. Mr Olsson
opined that the landscaping is appropriately located and generously provided, is
substantial in scale and density, mitigates potential impacts, and reinforces the
character of low-rise buildings in green landscaped areas. He is of the opinion that
the landscaping would enhance the public realm of Dunellan and Bunya Streets and
reinforce a distinctive sub-tropical character in the area. I accept this evidence.
[50] Mr Powell, Mr Olsson and Mr McGowan agreed:
(a) the proposed development will, in terms of height, scale and form, achieve an
appropriate degree of compatibility and complementarity with the existing and
intended character of the local area;
58 T3-94, [15]–[22].
59 Ex. 2.02, Visual Amenity and Architecture JER, 44 [113].
-- 15 of 35 --
16
(b) the proposed development will not result in undue impacts in terms of
overbearing.60
[51] Mr Curtis focused on the traditional building character houses in ascertaining the
existing character, and considered that they contributed to the cohesiveness of the
streetscape and identity of the local character zone.61 Mr Curtis opined that the
traditional building character of the area remains the prevalent character.62 He opined
that buildings in the area that were not traditional building character detracted from
the prevailing traditional building character of the area.63 However, he accepted that
he would defer to Mr Olsson with respect to traditional building character.64
[52] Mr Olsson opined that the area has a mixed use character, being a composite of timber
detached houses interspersed with community buildings, commercial and multiple
dwelling housing in a range of materials including timber, brick, and painted render
finishes and a combination of these.65
[53] Mr Powell described the character of the Site as transitioning from east to west, from
the brick and timber church to the brick parish residence, to the Dunellan Street access
and the pre-1947 dwellings to the west.66 He observed a similar transition in the
immediate context of the Site, with large contemporary multiple dwellings across
Bunya Street (including brick buildings), a commercial use across the road in
Dunellan Street and pre-1947 dwellings to the west of the commercial use.67 He
found this transition was further reinforced in the immediate locality comprising that
area within approximately 200m of the Site. 68 There is a greater mix of forms in the
south and east69 and a more consistent character to the west of the parish residence
on Dunellan Street.70 This mix of forms includes pre-war and post-war buildings.
[54] In my view, in arriving at this opinion, Mr Curtis erred in identifying the existing
character as he failed to give sufficient weight to the non-traditional building
character development in the area. It is the combination of the nature of the built
forms and materials used in the area that inform its character. For these reasons, I
prefer the evidence of Mr Olsson and Mr Powell in relation to the character of the
area.
[55] I find that the character of the immediate locality, informed by a mix of land uses,
building forms and materials, is mixed. That there is a mix of building types and
building materials in the area is apparent from the images in NP5 to NP14,71 Exhibit
12.12, and the Built Form Context Map.72 The character of the locality is not pristine.
Nor does it have a dominant traditional building character.
60 Ex. 2.02, Visual Amenity and Architecture JER, 44[114].
61 Ex. 2.02, Visual Amenity and Architecture JER, 26 [61], 28, [62].
62 Ex. 2.02, Visual Amenity and Architecture JER, 26 [60], [70].
63 Ex. 2.02, Visual Amenity and Architecture JER, 26 [60].
64 T3-83 [10] - T3-86, [12].
65 Ex. 2.02, Visual Amenity and Architecture JER, 22 [46]-[48].
66 Ex. 2.02, Visual Amenity and Architecture JER, 10 [37].
67 Ex. 12.01, Book of Plans, 50-51; Ex. 2.02, Visual Amenity and Architecture JER, 12, [38].
68 Ex. 2.02, Visual Amenity and Architecture JER, 12 [39].
69 Ex. 12.01, Book of Plans, 51-54, Fig NP8 – NP14.
70 Ex. 12.01, Book of Plans, 49,51, Fig NP4 and NP7.
71 Ex. 2.02 Second Visual Amenity and Architecture JER 12 – 17.
72 Ex. 204 Town Planning Joint Expert Report, 51.
-- 16 of 35 --
17
[56] The visual amenity experts agreed that significant views of the proposal are unlikely
to be obtained from beyond the four photomontage viewer locations they identified.73
Three of the viewpoints are in Dunellan Street and one is in Bunya Street.
[57] Mr Curtis described the proposed development as an integrated development which
reads as a whole. This campus like setting74 contributes, in my view, to the sense of
place the proposal achieves.
[58] Mr Curtis considered the church building to be nicely proportioned and well-
articulated and the bell tower to be tasteful. He considered that it presented “as a
church” with the landscaping contributing to softening the look of the building.75 He
was somewhat critical of the proposed hall which he said delivered nothing to the
street.
[59] Mr Curtis’ opined that the development has not been designed to reflect and
complement the neighbouring existing traditional character houses. This opinion was
informed by his characterisation of the area which I do not accept. For these reasons
I prefer the evidence of Mr Powell, Mr Olsson and Mr McGowan.
[60] Mr Olsson considered that the church built form was quite articulated:
“the way the corner sets in from both streets quite substantially by
about 10 metres. The portico comes forward. The bulk of the church
is set back. The roofs are articulated by having different levels, the
higher roof, the clerestory, the lower lean-to roof. Going down
Dunellan Street, the way – halfway down that built form you have two
arches creating in total three bays along that street elevation. In the
details – in the bell tower, …there are rendered cornices and different
colours of materials...it’s actually a highly articulated and highly
detailed building.” 76
[61] Mr McGowan observed that even though it is a reasonably large building, “the roof
form and the horizontal articulation to the walls, the stepping of the height, the set
backs and the provision of landscaping all contribute to break down that bulk and –
and achieve a – what I think’s an appropriate level of compatibility with the built
form in the area.”77
[62] Dr McGowan identified the following attributes of the proposed development:
“(a) The subject site is relatively large, and the built form is
dispersed (as six separate buildings) across the site;
(b) the church building and hall are well separated from the
detached houses and landscaping is located within the site to
assist with the visual separation of the church building from the
hall and the houses;
(c) apart from a very limited extent of ridgeline and the belltower
on the church building, all of the built form proposed is less than
73 Ex. 2.01, First Visual Amenity Joint Experts’ Report, 2 [6].
74 T3-65[16]–[19].
75 T3-66[14]–[33].
76 T3-23[35]–[44].
77 T3-33 [44].
-- 17 of 35 --
18
9.5 metres above ground, which I consider to be a height that
would be compatible with most other built form in the area;
(d) the parts of the development that exceed 9.5 metres (being part
of the ridge of the church and the belltower) would not, because
of their height have any material impact on the character of the
area;
(e) the proposed church building and the hall are well set back from
the street frontages and, as Mr Powell notes, the higher parts of
the church building (the ridgeline and belltower) are located
some distance into the site;
(f) while it is larger than detached housing in the area, the scale of
the church building is reduced by fenestration and articulation,
including a stepped (clerestory) roof volume;
(g) the proposed church building adopts a sloping roof that is a
consistent feature of housing in the area;
(h) the proposed hall is a modest building, with limited street
presence and would be a compatible form and scale with other
built form in the area;
(i) the church building and hall are of an overall scale that is similar
to a number of multiple dwellings in the area;
(j) the detached houses are entirely consistent with the scale and
form of housing in the area;
(k) the detached houses and the hall provide an effective transition
in building scale from the larger church building to
neighbouring housing;
(l) as Mr Olsson observes, the proposed building utilise building
materials that are extant in the area, which assist with achieving
a relationship to the built form of the area;
(m) landscaping around the boundaries of the site is appropriately
positioned and of appropriate scale to help soften the
appearance and apparent scale of the church building and the
hall from views in the street and houses opposite;
(n) street tree planting (which is required by the conditions of
approval but has not been shown in the photo montages) would
further soften the appearance of the built form;
(o) landscaping at the rear of the site will help to soften the
appearance of the church and hall from views to the west of the
site;
(p) the landscaping on the site includes areas of deep planting that
are capable of accommodating large trees which will soften the
appearance of the built form, and also contribute to the
landscape character of the area.”78
78 Ex. 2.02, Visual Amenity and Architecture JER, 34-35, [78].
-- 18 of 35 --
19
[63] In Dr McGowan’s opinion, a sub-tropical outcome is achieved through building
separation and landscaping.79
[64] Mr Powell opined that, subject to the imposition of conditions, the proposal:
“(a) will not compromise the strategic outcome for Brisbane’s
neighbourhoods to each express their individual identity and
will reinforce local distinctive design and landscaping;
(b) will not compromise the purpose of the character residential
zone to ensure that the character of the residential area; (being
mixed and transitional) is protected and enhanced;
(c) is compatible with and integrates with the built form intent for
the Zone; and reinforces the sub-tropical character of low rise
buildings in green landscaped areas
(d) will contribute to a strong sense of place and high quality
streetscapes;
(e) is of a height, scale and form consistent with intended character
for the site (refer to (c)); and
(f) will complement the prevailing scale, built form and streetscape
of the zone and will vary building form and reduce building bulk
by incorporating design elements”80 (footnotes omitted`)
[65] I accept the evidence of Dr McGowan and Mr Powell regarding the attributes of the
proposed development.
[66] I am satisfied that the Site is appropriately sized and configured, enabling the built
form to be dispersed across the Site as six buildings, separated by landscaping and an
outdoor sitting area which reinforces a sub-tropical character.
[67] Mr Buckley accepted that non-residential uses could occur in the locality. He
obtained guidance as to the built form intent from the Character Residential Zone
Code. He opined that the planning purpose of the relevant provisions is to maintain
a scale, or achieve a compatible scale, with adjoining dwelling houses to the Site and
to the precinct and the protection or enhancement of local character.81 Mr Buckley
agreed that if the Court found that there are no unacceptable visual amenity, noise,
lighting and traffic impacts the scale of the proposed use is considered acceptable.82
[68] That a new building must reflect and complement the city’s traditional building
character83 suggests that it is not intended that the proposal mimic that character.
Churches have a role and function in the community, which is different to the role
and function of housing. Mr Olsson, relying upon the definition of ‘complement’
being to “contribute extra features to something in such a way as to improve or
emphasise its quality,”84 considered the role of a community building such as a church
79 T3-33[25] – [28].
80 Ex. 2.02, Visual Amenity and Architecture JER, 21, [45].
81 Ex. 2.04, Town Planning JER, 60 [160]-[161].
82 T5-86, [1]–[25].
83 OO5(d) of the Character Residential Zone Code.
84 Ex. 6.03, Mr Olsson’s Statement of Evidence, 21-22 [53].
-- 19 of 35 --
20
complements and contributes extra features to a community. He also opined that it
complemented the character of the area by its use of traditional design motifs such as
a pitched roof, entry arch and belltower.85
[69] Mr Olsson and Dr McGowan gave evidence that it is not a good design outcome for
a church to mimic traditional building character; that a tin and timber church would
be a highly compromised outcome. 86 I accept this evidence. City Plan does not
envisage such a design. Rather, it is intended to be of a height, scale and form
consistent intended with the amenity and character and be compatible with and
integrate with the built form intent of the zone which is different. Traditional building
character is more than timber and tin. City Plan recognises that there are other styles
of buildings, including the interwar styles of Spanish mission and Californian
bungalow, and building materials that are consistent with the character.
[70] The design of the church, in particular that the church is well set back from the street
frontages with the belltower and the ridge of the church located further into the Site,
ensures that the height of the church is compatible with other built form in the area.
Those parts of the development that exceed 9.5m would not, due to their height, have
any material impact upon the character of the area.
[71] I accept that the landscaping and the design elements including the articulation,
setbacks and the stepped roof form all contribute to a softening of the built form.87
These features, in combination with the use of materials, colour and detailing
including traditional design motifs, ensure that the proposal is compatible with and
integrates with the built form intent of the Character Residential.88 These design
features facilitate a varied building form, reducing building bulk. The retention of
the pre-1947 dwellings on the Site facilitates a sensitive transition to surrounding
areas.89
[72] For these reasons, I am satisfied that this proposal is consistent with the reasonable
expectations of the community as informed by City Plan and reflects and
complements the city’s traditional building character of housing built in 1946 or
before.
[73] Mr Powell, Mr Olsson and Dr McGowan consider the proposal contributes to a high
quality streetscape through its form, scale and landscaping outcomes.90 This is
supported by the visual aids. I consider the built form and landscaping of the proposal
will contribute to a high quality streetscape.
[74] For these reasons, I am satisfied that, with the landscaping proposed, the “identified
character housing and traditional character streetscapes are retained and protected”,
the proposal “complements the prevailing scale, built form and streetscape of the
zone…and surrounding areas” and is “consistent with…the character”. The built
form of the proposal, including its size, scale, materials, colour and detailing are
consistent with that character. I am satisfied that identified character housing and
85 Ex. 6.03, Mr Olsson’s Statement of Evidence, 21-22 [58].
86 T3-26[5]–[26];T3-35[35]–T3-36[7].
87 T3-21, [30]; T3-22 [20]-[33].
88 T3-50, [18]-[22].
89 Ex. 2.02, Visual Amenity and Architecture JER, 26 [57](h); T2-40 [12]; T3-37 [8]–[12]; T3-88[36]–
[42].
90 Ex. 2.02, Visual Amenity and Architecture JER, [45](d), [57](e), [83](g).
-- 20 of 35 --
21
traditional character streetscapes are retained and protected, that the design
complements the prevailing built form and streetscape of the zone and surrounding
areas and is consistent with the character intended for the Site.
[75] Reasonable expectations with respect to built form, site layout and landscape design
should be informed by an objective reading of the applicable provisions of City
Plan.91 I am satisfied the proposal meets those provisions.
[76] The Appellant said the proposal is not “small-scale”. The Council agreed.92
Ms Owens expressed the view that the current facility on the Site was not of a small
scale. As Mr Buckley observed the Church draws parishioners from the local
community as well as more broadly.93 This is supported by the submissions.
[77] I accept that the proposal cannot be characterised as small-scale. However, it does
support local residents. Thus, while on the basis of my findings I am satisfied that
the proposal ensures that the character of a residential area is protected or enhanced,
meeting Purpose (a) of the Character Residential Zone Code, as the proposal is it is
not small-scale it does not achieve compliance with Purpose (b) of the Character
Residential Zone Code.
[78] For these reasons, I am satisfied that, subject to the provision of landscaping as
proposed, the assessment benchmarks identified in respect of this issue in so far as
they relate to built form, except Purpose (b) of the Character Residential Zone Code,
are met by the proposal. As the proposal is otherwise compliant in relation to the
character and form components of the assessment benchmarks in dispute, I am
satisfied that this non-compliance would not result in any adverse planning
consequences. This is because to the extent the proposal is not small scale, it can be
viewed only from a small number of vantage points, any amenity impacts are
ameliorated by the design, landscaping, the transition facilitated by the retention of
the pre-1947 dwelling houses, and the imposition of conditions.
Does the proposed development have unacceptable amenity impacts?
[79] The appellants contended that the bulk, height and scale of the proposed development
and its hours of operation and levels of patronage would result in unacceptable
amenity impacts, in terms of traffic, lighting, noise and general amenity. They said
that while the proposal can be designed to achieve technical compliance with the
relevant standards, noise and lighting may result in adverse amenity impacts,
particularly as they are beyond the reasonable expectations of the community for
development in this zone.
[80] Issues regarding built form were addressed above. I am satisfied that the built form
is compliant with the City Plan provisions except for the requirement that the proposal
be small-scale, and will not for reasons of bulk, height and scale result in unacceptable
amenity impacts. It is consistent with the character of the area.
[81] The assessment benchmarks with which the Appellants allege non-compliance in
relation to the amenity impacts of the proposed development are set out below:
91 Ashvan Investment Units Trust v Brisbane City Council & Ors [2019] QPELR 793 [153].
92 T5- 54 [9] – [14].
93 Ex. 2.04, Town lanners’ JER, 10 [106].
-- 21 of 35 --
22
[82] The purpose and overall outcomes OO4(d), OO4(j) and OO7(f) of the Character
Residential Zone Code provide that:
Purpose The purpose of the character residential zone is to:
a. ensure the character of a residential area is protected or
enhanced; and
b. provide for community uses, and small-scale services,
facilities and infrastructure, to support local residents.
OO4(d) Development reflects and supports the high level of comfort,
quiet, privacy and safety (including impacts of glare, odour,
light, noise, traffic, parking, servicing and hours of operation)
reasonably expected within a predominantly low density
permanent residential environment.
OO4(j) Development for any other non-residential use service a local
community facility need only, such as a childcare centre or
substation, and is compatible with and integrates with the
built form intent of the Character residential zone.
OO7(f) Development is compatible in scale with adjoining dwelling
houses, both within or adjoining the Infill housing zone
precinct in order to maintain an appropriate level of amenity
and privacy to an adjoining dwelling.
[83] Overall outcome OO3(j) and performance outcome PO3 of the Neighbourhood Plan
Code provides that:
OO3(j) Development is of a height, scale and form which is
consistent with the amenity, character and infrastructure
assumptions intended for the relevant precinct, sub-precinct
or site.
PO3 Development is of a height, scale and form which is
consistent with the amenity, character and infrastructure
assumptions intended for the relevant precinct, sub-precinct
or site.
[84] Overall outcome OO2(f)(iii), (iv) and (v) and Performance outcomes PO1 and PO25
of the Community Facilities Code provide that:
OO2(f)(iii) Development is of a scale, height and bulk that provides a
high level of amenity.
OO2(f)(iv) Development is generally consistent with the character of the
area.
OO2(f)(v) Development transitions sensitively to surrounding uses.
PO1 Development ensure that the hours of operation are:
-- 22 of 35 --
23
a. consistent with reasonable community expectations for the
use and are consistent with the purpose of the zone or zone
precinct;
b. controlled so that the community facility does not impact
on the amenity of:
i. a residence within the building where the use is located;
ii. nearby sensitive uses.
PO25 Development must be located to minimise the introduction of
non-local traffic into residential streets which are minor
roads.
[85] Overall outcomes OO2(c), OO2(d), OO2(e) and OO2(f) of the Transport, Access,
Parking and Servicing Code (TAPS Code) provide that:
OO2(c) Development provides safe access for all transport modes
that does not impact adversely on the efficiency and safety of
the transport network or diminish the amenity of nearby land
uses.
OO2(d) Development ensures that impacts on amenity caused by
traffic generation is consistent with the community’s
reasonable expectations for the intended use.
OO2(e) Development provides site access arrangements to ensure
that any adverse impacts on other development, the transport
network and those who use it, are minimised to maintain
amenity of the area and the safety and efficiency of the
transport system.
OO2(f) Development ensures that access, parking and servicing
arrangements and impacts such as noise, are consistent with
the community’s reasonable expectations and avoid risk of
damage to people, property and vehicles.
[86] Amenity is a broad and flexible concept and covers a wide range of considerations,
both tangible and intangible.94 Consideration of amenity is informed by the planning
scheme and must be reasonable.95 This Court has observed that “the standard of
amenity that residents are entitled to enjoy or expect is to be assessed objectively
having regard to the planning scheme and its intent for development of the area.”96
94 Broad v Brisbane City Council & Anor [1986] 2 Qd R 317.
95 Acland Pastoral Co Pty Ltd v Rosalie Shire Council & Ors [2008] QPELR 342, 348-349 [40].
96 Wattlevilla Pty Ltd v Western Downs Regional Council & Anor [2015] QPELR 21, 45 [96].
-- 23 of 35 --
24
[87] In considering the amenity impact of the proposal, it is relevant to consider the current
use of the Site.97 The current use generates noise, lighting, traffic and parking impacts
which are concerns raised by the local residents.98
[88] The current church building has little, if any, acoustic treatment. Due to the lack of
space in the church building, areas external to the church building have been used in
the course of church activities including church services, weddings and funerals,
when people have been forced to worship on the verandas, lawns, staircases, carpark
and sometimes on the street.99
[89] There is no formal parking facility for the current church. The grassed area, accessed
from Dunellan Street, and the area in front of the presbytery’s garage, accessed from
Bunya Street, have been used for informal car parking and can accommodate about
22 vehicles.100 Otherwise, parishioners park in the street. On street parking is a
common feature in this part of Greenslopes.101
[90] While the current approval contains no conditions regarding parking, noise, light or
hours of operation, the use must, of course, comply with regulatory controls,
including noise controls, and the environmental protection laws. Amenity impacts of
the development arising from traffic, lighting and noise were addressed by experts in
the respective disciplines.
Proposed Conditions – hours of operation and maximum number of persons
[91] The Council imposed conditions upon approval of the application. The co-respondent
proposed amendments to those conditions in so far as they addressed hours of
operation, numbers of persons onsite and acoustic treatment. The changes to the
hours of operation and numbers of people were proposed in order that the conditions
were more readily enforced.
[92] The co-respondent proposed a condition regarding the hours of operation for the
proposed development because the acoustic experts recommended that the condition
be amended from that imposed by the Council to restrict the hours and use of the
outdoor sitting and plaza area. The proposed condition follows:
(a) Church -
(i) 8am to 9pm, Monday to Sunday;
(ii) 11pm to 12:30am Christmas Eve; and
(iii) 11pm to 12:30am Easter;
(b) Hall - 7am to 10pm, Monday to Sunday;
(c) Outdoor sitting area and Plaza area – 11.30am to 3.30pm, Monday to
Sunday; Plaza area use outside these hours to be solely for persons to enter
97 Planning Regulation, s 31(1)(f); see Walters & Ors v Brisbane City Council & Anor [2019] QPELR
487, 518(213).
98 Ex. 3.01, [15]; Ex. 3.02, [9]; Ex. 3.03, para [9]; Ex. 3.04, [8]-[9]; Ex. 3.05, [11]; Ex. 3.06, [13]; Ex
3.07, [7]; Ex. 3.08, [15]–[17]; Ex. 3.10, [14]; Ex. 3.11, [9]; Ex. 3.12, [8]; Ex. 3.13, [6]-[7]; Ex. 3.14,
[9]; Ex. 3.15, [10](e); Ex. 3.17; Ex. 3.18, [15]–[17] and see Ex. 9.01.
99 Ex. 4.01, First statement of Father Salame, 3-4 [16](a) and (b).
100 Ex. 6.02, Ms Pekol’s statement of evidence, 5 [13].
101 T4-61 [17]–[20].
-- 24 of 35 --
25
and exit the site, to move between the buildings and the undercover car park
and for movement between the site buildings;
(d) Loading/unloading - 7am to 6pm, Monday to Sunday.102
Note: Any activity undertaken outside the above prescribed hours is
permitted, provided it does not generate noise that is clearly audible
and creates a disturbance within a dwelling or its associated balcony
or patio.
[93] The Council’s Condition 22 provided that:
“The maximum number of persons on site at any given time is not to
exceed 400, with the number of people in each of the following areas
limited to a maximum of:
Church 200 people
Hall 100 people
Outdoor seating area and plaza 100 people”
[94] The co-respondent proposed Condition 22 as follows:
“The maximum number of persons onsite at any given time is not to
exceed 400.
The maximum number of persons in the Outdoor Sitting Area and
Plaza is not to exceed 100 at any given time and is not to be used
(other than for access purposes) for more than 4 hours in any one
day”103
[95] If its condition 22 was imposed, the co-respondent also proposed Condition 24 to be
amended to require glazing and external walls of the church building and hall to
achieve increased weighted sound reduction indices.
[96] The co-respondent submitted that its proposed condition 22 would be preferred
because:
(a) the fixed 4-hour period is easier to police;
(b) the nomination of those particular hours is at a time when ambient noise is high
and disruption to neighbours is low;
(c) the sound measures in the church and hall are very elaborate;
(d) the Court would not restrict the church’s use of the land more than is strictly
necessary;
(e) the church does not intend to change how the land is used but they would like
some flexibility;
(f) on a given day up to 300 people can be at the Site;
102 Ex. 8.22, approval package, 11, condition 19 and Ex. 12.03, Thynne Macartney letter dated 28 July
2022.
-- 25 of 35 --
26
(g) one can very readily imagine a situation where there is a large funeral or
wedding (that involves, for instance, people from other faiths, or other
geographic areas) and the service could be livestreamed into the hall;
(h) there can be no suggestion that any increased numbers will happen with any
frequency;
(i) there is very forceful evidence that the church has and will be a good neighbour;
(j) this condition is easier to police;
(k) the management plan (which received Ms Owens’ approval) ensures good
practice, as does the close presence of the priest in a quasi caretaker role.
[97] The appellants indicated a preference for the Council’s Condition 22 because it
limited the number of people leaving the hall at the end of a function to 100.
Traffic Impacts
[98] Mr Pekol addressed traffic and parking impacts.
[99] The Site is presently served by six driveways. The proposed development includes
four permanent driveways and one temporary driveway controlled by removable
bollards.
[100] Mr Pekol opined, and I accept, that the number, location and design of the driveways
are consistent with the requirements of the TAPS Planning Scheme Policy and will
ensure adequate levels of vehicular and pedestrian safety on Dunellan and Bunya
Streets.104
[101] The proposed driveway on Dunellan Street will be located in generally the same
location as the existing driveway servicing the church.105 Mr Pekol opined that the
proposed vehicular access arrangement will improve local amenity by accessing the
church from Dunellan Street, rather than from Bunya Street.106 The removal of two
permanent driveways will marginally improve traffic operations and safety.107
[102] In relation to traffic operations pursuant to the Council’s proposed Condition 22, Mr
Pekol opined that the proposed development:
(a) would result in an imperceptible increase in traffic volumes and congestion on
the local street network;
(b) would result in traffic volumes on the local street network that would be within
the limits nominated in the Council’s infrastructure Design Planning Scheme
Policy;
(c) would not generate significant levels of additional traffic during the peak
school times; and
(d) minimises the introduction of non-local traffic into minor residential streets.
104 Ex. 6.02, Mr Pekol’s Statement of Evidence, 10 [35].
105 Ex. 6.02, Mr Pekol’s Statement of Evidence, 9 [29].
106 Ex. 6.02, Mr Pekol’s Statement of Evidence, 9 [29].
107 Ex. 6.02, Mr Pekol’s Statement of Evidence, 9 [25], 19 [72](c).
-- 26 of 35 --
27
[103] Relevantly, PO25 of the Community Facilities Code requires that:
PO25
Development must be located to
minimise the introduction of non-local
traffic into residential streets which are
minor roads
AO25
Development is not located on a minor
road.
[104] Mr Pekol accepted that Dunellan, Bunya and Peach Streets are each “minor roads” as
defined by City Plan. However, he did not consider Dunellan Street to be a minor
residential street because it:
(a) provides access to a number of non-residential and commercial land uses
including two places of worship, a community hall, a hairdresser and several
food and drink outlets;
(b) provides access to and is used to drop off/pick up of students at the nearby
Greenslopes State School;
(c) is the primary access route to and from several other residential cross streets;
(d) caters for car parking demands generated by the nearby Greenslopes Hospital;
and
(e) has centreline markings (which differentiates it from other nearby streets that
do not have centreline markings) and a school crossing.108
[105] PO25 does not require that there be no non-local traffic introduced into minor roads,
but rather that the introduction of such traffic be minimised. Accordingly, I am
satisfied that any non-compliance with PO25 does not warrant refusal of the proposed
development because:
(a) the vehicular access via Dunellan Street remains unchanged as between the
current use and the proposal;
(b) Dunellan Street serves a range of non-residential uses and is a connector to the
sport and recreation zoned parklands to the west and the Greenslopes growth
nodes to the east;109 and
(c) I accept Mr Pekol’s evidence that the proposed development will result in an
imperceptible increase in traffic volumes on the local street network and
minimises the introduction of non-local traffic into minor residential streets.110
[106] As a result of the analysis of crash data for the Dunellan Street/Bunya Street
intersection and the Dunellan Street/Peach Street intersection by Mr Pekol, he opined
that the historic safety performance of these two intersections is acceptable with few
serious crashes and no fatal crashes. He considered this result consistent with the low
background traffic volume, low speed environment and adequate site distances at
these intersections. He opined that these factors would mitigate the likelihood of
additional crashes if the proposal proceeded, and that the proposal did not pose an
unacceptable safety risk to pedestrians walking along Dunellan Street.111
108 Ex. 6.02, Mr Pekol’s Statement of Evidence, 16 [64].
109 T4-64, [10]–[26].
110 Ex. 6.02, Mr Pekol’s Statement of Evidence, 17 [65].
111 Ex. 6.02, Mr Pekol’s Statement of Evidence, [68]–[70].
-- 27 of 35 --
28
[107] Mr Pekol reviewed historical car parking data which suggested to him that the car
parking demand associated with the existing church during a typical Sunday service
equates to about 46 cars.
[108] Applying the TAPS Policy and assuming the condition imposed by the respondent
with respect to onsite numbers, he determined that the parking requirement for the
proposed development should be set at 44 spaces. Thus, in his opinion the proposal
satisfies the requirements in the TAPS Planning Scheme Policy and would eliminate
the need for church patrons to park in Dunellan and Bunya Streets during a typical
Sunday service.
[109] Mr Pekol opined that the development does not need to provide sufficient onsite car
parking to accommodate peak parking demands, such as those associated with feast
days or a large wedding or funeral. In forming this opinion, he relied upon
Austroads’s Guide to Traffic Management, Part 11 (2020) which indicates that it is
not conventional practice to provide parking supply to meet demand on the busiest
day of the year but rather it was accepted practice to adopt a level of supply to satisfy
the parking demand that will only be exceeded for a number of hours or days each
year. He opined that the proposed parking provision of 57 spaces more than meets
the respondent’s TAPS Planning Scheme Policy requirements and exceeds the 85 th
percentile parking demand calculated from the historic parking data.
[110] Given the low frequency of major event days and the ability of the surrounding street
network to accommodate additional on street parking demands from time to time, he
opined that it would be acceptable for a degree of overflow parking to occur on street
on major event days. This opinion was informed by Mr Pekol’s observation that
Dunellan Street has a line marked “parking lane” on both sides of the street and Bunya
Street has ample carriageway width to accommodate kerbside parking on both sides
simultaneously with two through traffic lanes. For these reasons, I accept Mr Pekol’s
approach.
[111] For these reasons, he opined that the proposed car parking provided more than enough
capacity to cater for the weekly parking demand. He anticipated some overflow
parking on “major event” days, but considered it would be unreasonable to expect the
proposal to provide off-street car parking and accommodated demand associated with
these events.112 Mr Pekol considered that if the proposal proceeded traffic impacts
from car parking would decrease from that which is presently experienced in the
street.113 The onsite parking spaces proposed will reduce the demand for on-street
parking and parking congestion in the local streets114 and will improve local
amenity.115 I accept this evidence.
[112] Mr Pekol opined that the number of car parking spaces proposed complied with the
requirements of the TAPS Planning Scheme Policy,116 and so AO13 of the TAPS
Code is satisfied. The proposed development is therefore taken to “provide onsite car
parking spaces to accommodate the design peak parking demand without any
112 Ex. 6.02, Mr Pekol’s Statement of Evidence, 13 [49].
113 Ex. 6.02, Mr Pekol’s Statement of Evidence, 13 [48].
114 Ex. 6.02, Mr Pekol’s Statement of Evidence, 14 [53](b).
115 T5-13, [35]–[40].
116 Ex. 6.02, Mr Pekol’s Statement of Evidence, 20 [73](b).
-- 28 of 35 --
29
overflow of car parking to an adjacent premises or adjacent street.” (PO13 of the
TAPS Code).117
[113] Mr Pekol’s evidence report assumed the imposition of Council’s Condition 22.
However, he said that if Condition 22 as proposed by the co-respondent was imposed,
his opinions did not change with respect to car parking and potential traffic amenity
impact,118 unless 400 people were onsite once a month.119 Father Salame’s said that
large events potentially attracting more than 100 people occur on Church Feast days,
Holy Week, Christmas week and funerals. He observed they do not occur very often
and attract between 50 and 200 people.120
[114] I accept that the additional onsite car parking will improve the existing traffic and
parking situation and local amenity and there will be no unacceptable traffic
operations impact and traffic safety risk on the local street network as the result of
approval of the proposed development. Having regard to Mr Pekol’s evidence, I am
satisfied that, OO(2)(c), (d), (e) and (f) (in so far as it relates to traffic issues) are met.
Hours of operation
[115] In the Character Residential Zone the community may reasonably expect that
“development reflects and supports the high level of comfort, quiet, privacy and
safety (including impacts of glare, odour, light, noise, traffic, parking, servicing and
hours of operation) reasonably expected within a predominantly low density
permanent residential environment.”121
[116] PO1 of the Community Facilities Code deals with hours of operation.122 They are to
be:
(a) “consistent with reasonable community expectations for the use”, and
“consistent with the purpose of the zone”;123 and
(b) “controlled so that the community facility does not impact on the amenity of
… nearby sensitive uses”.
[117] The corresponding acceptable outcome, AO1.1, requires development for a non-
residential use, including indoor activity areas, to have hours of operation that are
limited to 7am to 6pm.
[118] The appellants submitted that the proposed hours of operation, particularly in respect
of the hall, are neither consistent with reasonable expectations for the use, nor
consistent with the purpose of the Character Residential Zone (to protect and enhance
character residential areas). They said the hours are not controlled to avoid impacts
on the amenity of nearby sensitive uses and are excessive. Further, they said it is not
appropriate for residents of the Character Residential Zone to endure congregation
members attending the Site, with associated traffic and noise, seven days a week,
117 The appellants have not alleged non-compliance with Overall Outcome OO2(j)(ii) of the TAPS
Code.
118 T4-59 [34] to T4-60 [32].
119 T4-66 [45] to T4-67 [2].
120 Ex. 4.07, Statement of Father Salame, 5 [21].
121 Ex. 7.01, City Plan extracts, CEO certificate, 101, s 6.2.1.5 (4)(d).
122 Ex. 7.01, City Plan extracts, CEO certificate, 125.
123 The “;” is to be considered “and”; Ex. 7.01, City Plan extracts, CEO certificate, 38, s 1.3.3(1).
-- 29 of 35 --
30
from 7 am to 10pm for events in either the church building or in the hall, and even
longer on Christmas Eve and Easter. It was submitted that as conditioned by the
Council the lay witnesses’ concerns about impacts arising from the late operating
hours indicate that the hours of operation are outside their reasonable expectations.
[119] These concerns arise in circumstances where the church is presently operating on the
Site and there are limited controls on its use. It is not sufficient to examine the hours
of operation in isolation. Rather, it is necessary to examine the impact of the hours
of operation on amenity. In the present circumstances this requires a consideration
of the impacts of lighting and noise.
Lighting
[120] In relation to lighting impacts of the proposed development (including those from
security lighting), Mr King’s evidence is that:
“48. Lighting can be readily designed, installed and operated to meet
amenity spill and glare requirements of AS4282 which protects
the amenity of surrounding areas.”124
[121] In Mr King’s opinion, an approval of the proposed development with conditions
would deliver a better amenity outcome for the neighbourhood than the existing
facility, from a noise and lighting perspective.125 A condition requiring that all
external lighting comply with the relevant Australian standard can be imposed.
[122] The appellants submitted that even if designed, installed and operated to meet amenity
spill and glare requirements of AS4282, it is usually inevitable that there will be some
light spill beyond the boundary.
[123] I accept the evidence of Mr King that lighting can be conditioned to achieve an
appropriate amenity outcome. I am satisfied that there are no lighting issues which
warrant refusal of the proposed development.
Acoustics
[124] The proposed development incorporates a number of design features to control noise
including acoustic barriers. The retention of the 4 pre-1947 dwellings act as a buffer
between the use and adjoining neighbours. Conditions limiting patron numbers
(including those in the outdoor area) and hours of operation and requiring the
adoption of a noise management plan are proposed to address potential acoustic
issues. Mr King, retained by the co-respondent, prepared a noise management
plan.126 Mr Beyers, retained by the appellants, and Mr King recommended a range
of noise mitigation measures which they opined satisfy the technical requirements
with respect to noise emissions. 127
[125] Despite this, the appellants submitted that while the expert evidence should be
respected and given due weight, the Court must have regard to the reasonable and
genuine concerns about impacts on amenity notwithstanding those expert opinions.
The appellant said that in the Character Residential zoned area it is not within
124 Ex. 6.01, Mr King’s Statement of Evidence, 18 [48].
125 T4-15 [9]–[40].
126 Ex. 2.03, Noise Joint Report.
-- 30 of 35 --
31
reasonable expectations for residents to be subjected to the sounds of people
chattering and cars departing the site until 10.00pm as permitted by the proposed
conditions.
[126] In Mr King’s opinion, approval of the proposed development with conditions would
deliver a better amenity outcome for the neighbourhood than the existing facility,
from a noise perspective.128 However, Mr Beyers remained concerned about noise
generated by people potentially congregating on the streets or in the plaza area while
moving between the church building and hall and their vehicles parked off-site. These
concerns arose because compliance with the acoustic criteria is reliant upon the
implementation of conditions limiting the patronage and operations of the church hall
and outdoor areas. If the arrangements for controlling noise are not achievable, noise
exceedances will occur.
[127] His concern about the adverse impacts on residential amenity of the noise associated
with church goers leaving the buildings increased when having regard to the co-
respondent’s proposed Condition 22. His concern arose because this condition
theoretically means 400 people may leave the church building or hall at one time
(although the evidence was that 400 people could not be seated in the church at one
time). To accommodate this change, Mr King recommended that the building
acoustic ratings on the glazing and external walls be increased.129 This does not
address Mr Beyers’ concerns. I prefer Mr Beyers’ evidence on this issue and so prefer
Council’s Condition 22, modified to permit the use of the outdoor sitting area and
plaza as it reduces the likelihood of an increased number of people leaving a building
at one time.
[128] Mr Beyers and Mr Buckley expressed concern about the ability of the church to
enforce compliance with the noise management plan. In particular, Mr Buckley
expressed concern about the church’s ability to monitor the number of people on site
and turn away those who exceeded the number. He considered that the expectations
of a person attending church would be quite different to, for example, a gym member
similarly turned away for reasons which included that:-
(a) while restrictions were in place during the COVID experience, such restrictions
he considered more likely to be easier to accept because the restrictions were
set by government and the alternative was “potentially calamitous”;
(b) where there is such a strong faith and community-based connection with the
church at this location, he doubted that where there remained ample seating
capacity to accommodate more people, people would accept being turned
away;
(c) where external worship has been part and parcel of past operations, denying
someone entry to the building and suggesting that they leave the premises
would be another level of unpleasant management that church leaders would
need to enforce and he considered that it would be “impossible in all situations,
and at least impractical”;
(d) that even if parishioners were denied entry to the building they would be likely
to remain in the plaza as the setting and ambience would encourage this; and
128 T4-15 [9]–[40].
129 Ex. 12.04, Letter from Mr Paul King dated 28 July 2022, 2 [11].
-- 31 of 35 --
32
(e) that requiring the local government to monitor and step in is not the type of
balanced outcome the planning system anticipates.130
[129] Mr Buckley accepted that the ability to manage numbers goes to the heart of the
acceptability of the use.131
[130] Father Salame,132 David Merhab,133 and Rania Alexander134 gave evidence of their
experience during the Covid-19 restrictions successfully implementing restrictions on
the numbers of people attending on site. Father Salame has first-hand experience of
enforcing on-site restrictions of patron numbers which confirmed that the co-
respondent can manage the number of people on site and maintain attendance
numbers and spoke of the steps required and the understanding of the parishioners
during that time.
[131] I would expect that members of the church community would be understanding of the
need to comply with the management plan and respectful of those tasked with its
enforcement. It must, of course, be assumed that persons will act lawfully and comply
with conditions of approval.135 For these reasons, I do not accept that the conditions
are difficult for the church to implement.
[132] The noise management plan requires the implementation and maintenance of a people
counting system. Those booking functions are to be informed in writing of the
restrictions on the maximum number of people as required by the conditions, church
members/staff are responsible for maintaining records of the numbers of people on
site and the keeping of records means that they may be made available to the Council
for inspection when required. Conditions can be imposed requiring the
implementation, maintenance and compliance with the noise management plan. The
Council can then gather evidence of any breaches. Thus, a limit on the number of
people on site is not difficult for the Church to monitor and for the Council to enforce.
[133] I am satisfied that these concerns do not warrant refusal of the proposed development
because:
(a) a condition can be imposed restricting the use of the outdoor sitting area and
plaza to “11.30am to 3.30pm, Monday to Sunday” and the plaza area to be used
outside of those hours solely for persons entering and exiting the site and
moving between the buildings and the undercroft car park and between the site
buildings.136 I am satisfied that limited use of the plaza area will address Mr
Beyers’ concerns;
(b) Mr King’s evidence is that the noise modelling and assessment is
conservative137 and the noise management plan, with compliance required by
130 Ex. 5.01, Individual Statement of Mr Buckley, [17].
131 T5-73 [33].
132 Ex. 4.07, Statement of Father Salame, [15].
133 Ex. 4.06, Statement of David Merhab,[13].
134 Ex. 4.03, Statement of Rania Alexander, [11].
135 Seabridge Pty ltd t/as Clutha Creek Sands & Anor v Council of the Shire of Beadesert & Anor [2001]
QPELR 191, 195 [18].
136 Ex. 12.03.
137 See, for example, T4-24 [10]–[25].
-- 32 of 35 --
33
the conditions, can adequately deal with the management of people in outdoor
areas,138 and can be implemented and managed by the co-respondent; and
(c) the existing church facility already generates noise impacts in the outdoor areas
and the streets.
[134] A single storey house is located to the south at 35 Bunya Street. Non-compliance
with the noise criteria will arise only if a two-storey house is built at that location.
Mr King’s evidence is that the height of the noise barrier between the hall and Bunya
Street could be increased to achieve compliance.139 In the event that 35 Bunya Street
is redeveloped in the future, the then owner ought to be aware of the proposed
development, and any potential noise impact, and will be expected to design the house
accordingly. I am satisfied that this does not warrant refusal of the application.
[135] Mr King’s evidence is that the conditions are “more than enough”.140 In Mr King’s
opinion, approval of the proposed development with conditions would deliver a better
amenity outcome for the neighbourhood from a noise and lighting perspective than
the existing facility.141
[136] The appellant raised a concern about the “note” forming part of the condition
concerning the hours of operation. The content of this note is adopted from the
Community Facilities Code. It is intended to allow for people to attend to pray and
for quiet reflection outside the hours specified in the conditions. In the circumstances,
I am satisfied it is appropriate.
[137] Ultimately, the acoustic experts were satisfied that amenity impacts arising from
noise generated by people on site could be satisfactorily addressed by conditions such
that noise from the proposed development would not be inconsistent with the
character and amenity of the area.
[138] Accordingly, I am satisfied that the proposed hours of operation will not result in
unacceptable amenity impacts and are consistent with reasonable expectations for the
use as informed by the historic and current use of the Site.
[139] For these reasons, I am satisfied that compliance with the assessment benchmarks in
dispute in relation to amenity impacts can be achieved by the imposition of
appropriate conditions regarding hours of operation, acoustic matters including
implementation of a noise management plan and the number of persons on site.
Relevant matters
[140] The co-respondent and the respondent said the development ought to be approved
having regard to the following relevant matters:
(a) the proposed development is appropriate, consistent with community
expectations and serves a community need, given the existing and historical
use of the subject land as a Place of Worship and associated hall;
138 See, for example, T4-24 [39] to T4-25 [37].
139 T4-29 [15]-[28].
140 T4-10 [30]-[40].
141 T4-15 [9]-[14].
-- 33 of 35 --
34
(b) the proposed development retains and protects traditional character residential
buildings on the subject land;
(c) the proposed development is an appropriate, well-designed and attractive
redevelopment of the subject land, that will:-
(i) increase accessibility for disabled and elderly users of the church;
(ii) improve safety and accessibility for the surrounding streets, by reducing
the parking and functional impacts of the existing church and hall by
retaining existing access points whilst providing 55 internal, off-street
car parking spaces (where there is presently no formal off-street car
parking) and internalising vehicular access to the front of the church for
ceremonial purposes;
(iii) improve the existing community facility, including by:-
(A) imposing enforceable conditions on the operation of the proposed
development in relation to the number of users, noise limits, hours
of use, landscaping, servicing and internal traffic arrangements,
access and parking;
(B) improving the comfort, convenience and functionality for users of
the church and hall by providing an appropriately located and
highly accessible space designed to modern standards; and
(C) containing church activities within the subject land, including
internal access to the church from the underground carpark and
outdoor areas on the subject land;
(d) the proposed development is well-located in close proximity to other
community facilities;
(e) the proposed development will not cause any unacceptable planning or amenity
impacts; and
(f) the proposed development is consistent with the Strategic Framework and
Community Facilities Code, in that it will:-
(i) contribute to the provision of a wide range of community facilities that
support the community’s wellbeing (Strategic Intent, s.3.4.1(1)(p));
(ii) strengthen local identity and respond to and reinforce locally distinctive
design, landscape, social values and patterns of development (s 3.4.2
Element 2.1, Table 3.4.2.1, SO5 and L5.1);
(iii) contribute to Brisbane having a range of accessible multi-purpose
community facilities which meet the social and cultural needs of the local
and wider community (s.3.4.5, Element 2.4, Table 3.4.5.1, SO1);
(iv) be located near centres and public transport stations and clustered around
existing facilities and linked with the active travel and public park
network (s.3.4.5, Element 2.4, Table 3.4.5.1, L1.2; Community facilities
code, Overall Outcome (2)(e));
(v) ensure that one of Brisbane’s existing and appropriately located
community facilities is protected (s.3.4.5, Element 2.4, SO2);
-- 34 of 35 --
35
(vi) provide a benefit to the broader community that outweighs any potential
amenity impacts, if they are established (s.3.4.5, Element 2.4, Table
3.4.5.1, L2.1; Community facilities code, Overall Outcome 2(h));
(vii) support local character and amenity within Suburban Living Areas
(s.3.7.6 Element 5.5; Table 3.7.6.1, SO7); or
(viii) contribute to the range of non-residential land uses that generally support
the needs of Suburban Living Areas (s.3.7.6 Element 5.5; Table 3.7.6.1,
SO7).142
[141] The appellants submitted that:
(a) the proposed development is an inappropriate scale and far exceeds community
expectations for development on the Site;
(b) the proposed development will cause unacceptable planning and amenity
impacts;
(c) to the extent that there is compliance with assessment benchmarks that ought
not be given weight as a relevant matter – that is what the development ought
to do.
[142] The present use of the Site can continue with limited restrictions upon its operation
and use. The existing approved church facility is no longer fit for purpose. It is
inadequate for the community using the facility and inadequate for the community
within which the Site is located – particularly for reasons of amenity. I am satisfied
that the Site is well located for the proposed development and retains and protects the
traditional character residential buildings on the Site. The proposal is well designed
and has architectural merit. I am satisfied that this is an appropriate development
which reflects and complements the City’s traditional building character. The
proposal will improve the accessibility and functionality for users of the church and
hall and will regulate the operation of the use, benefitting the local community.
[143] To the extent there is non-compliance with the assessment benchmarks, I am satisfied
that refusal of the application is not warranted. The co-respondent has otherwise
demonstrated that compliance with the assessment benchmarks can be achieved with
the imposition of conditions.
[144] For these reasons, I am satisfied that the exercise of the discretion favours approval
of the development application.
Conclusion
[145] I am satisfied that the co-respondent has discharged the onus and that the proposal
can be conditioned to achieve compliance with the assessment benchmarks. The
development application the subject of the appeal will be approved subject to
conditions. The appeal is listed for review on a date to be fixed to enable the parties
to agree appropriate conditions.
142 Ex. 12.05, Agreed List of Issues.
-- 35 of 35 --
Official source: https://www.sclqld.org.au/caselaw/QPEC/2023/009