Australia Sunrise Development Pty Ltd v Zhang [2021] QDC 225
DISTRICT COURT OF QUEENSLAND
CITATION: Australia Sunrise Development Pty Ltd v Zhang [2021] QDC
225
PARTIES: AUSTRALIA SUNRISE DEVELOPMENT PTY LTD
ACN 168 603 110
(Applicant)
v
JIAHE ZHANG
(Respondent)
FILE NO: 1909/20
DIVISION: Civil
PROCEEDING: Trial
ORIGINATING
COURT:
District Court, Brisbane
DELIVERED ON: 16 September 2021
DELIVERED AT: District Court, Maroochydore
HEARING DATE: 17 August 2021
JUDGE: Byrne QC DCJ
ORDERS: 1. In respect of the contract of sale entered into by the
applicant and the respondent on 22 October 2015
(Lot 1604), damages are assessed in the sum of
$167,860.06, including interest to the date of
judgment.
2. In respect of the contract of sale entered into by the
applicant and the respondent on 4 November 2015
(Lot 1906), damages are assessed in the sum of
$95,734.80, including interest to the date of judgment.
3. The respondent pay the applicant’s costs of the
proceeding, including all reserved costs.
CATCHWORDS: REAL PROPERTY – TERMINATION AFTER BREACH OF
CONTRACT – DAMAGES – ASSESSMENT OF
DAMAGES – where the respondent entered into two “off the
plan” contracts for sale of residential lots with the applicant –
where the respondent paid a deposit on the purchase price for
each lot under the contracts – where the respondent breached
each contract by failing to attend settlement and not paying the
balance of the purchase price under each contract – where the
applicant elected to affirm the contracts – where the respondent
communicated an express repudiation of the contracts in
-- 1 of 11 --
2
LEGISLATION:
CASES:
COUNSEL:
SOLICITORS:
response to the applicant’s election to affirm – where in
reliance on the respondent’s repudiation and continued breach,
the applicant terminated the contracts – where neither of the
lots the subject of the contracts have been resold – where the
applicant claims damages for the loss of sale value on the lots
and the holdings costs associated with continued ownership of
the lots after termination – whether the damages claimed by
the applicant accurately reflect the position it would have been
in had the contracts been performed
CONTRACT LAW – ENTITLEMENT TO INTEREST –
DAMAGES – ASSESSMENT OF DAMAGES – where the
applicant claims interest on the settlement sums payable under
the contracts from settlement date until the date of termination
at the contractually prescribed rate – where the applicant
claims interest on the damages accrued in respect of each lot
from the date of termination to the date of judgment at the
contractually prescribed rate –– whether the applicant is
entitled to interest on the unpaid settlement sums at the
contractually agreed rate – whether the applicant is entitled to
interest on the damages accrued in respect of each contract
from the termination date until judgment date at the
contractually agreed rate – whether the applicant is entitled to
interest on the unpaid judgment sums at the contractually
prescribed rate as opposed to the rate prescribed by the Court
Uniform Civil Procedure Rules 1999 (Qld)
Australia Sunrise Development Pty Ltd v Shi, Brisbane District
Court No 1845 of 2020, 30 April 2021, Jarro DCJ unpublished
Castlemaine Tooheys Ltd v Carlton United Breweries Ltd
(1987) 10 NSWLR 468
Clambake Pty Ltd v Tipperary Projects Pty Ltd (No 7) [2009]
WASC 390
Commonwealth v Amann Aviation Pty Ltd (1991) 174 CLR 64
Johnson v Agnew [1980] AC 367
Mann v Paterson Constructions Pty Ltd (2019) 267 CLR 560
Orchid Avenue Pty Ltd v Parniczky [2015] QSC 207
Riggall & Anor v Thompson [2010] QCA 144
Robinson v Harman (1848) 1 Ex 850
South Sky Investments Pty Ltd v Luppi [2012] QSC 27
Mr. J.P. Morris for the applicant.
No appearance for the respondent.
HTW Legal Group for the applicant.
No appearance for the respondent.
-- 2 of 11 --
3
Introduction
[1] In late 2015 the respondent entered into two separate “off the plan” contracts to purchase
two units in a residential complex in Fortitude Valley that the applicant was then
developing. The applicant complains that the respondent failed to complete the contracts.
Proceedings were commenced by way of Originating Application on 2 July 2020.
Following an amendment of the Originating Application, Barlow QC DCJ on 8 October
2020 ordered that, in respect of each contract, judgment be entered for the applicant
against the respondent for damages of not more than $750,000 to be assessed by this
Court on a date to be fixed. The effect of that order is that it was a conditional
judgment.1
[2] Following further orders made on 10 June 2021 for the filing of material, the hearing for
the assessment of damages was heard by me.
Factual summary
[3] The relevant details of the two contracts are:
• By way of written agreement dated 22 October 2015, the respondent agreed to
purchase Lot 1604 for the sum of $659,000 (“the Lot 1604 Contract”). The $65,900
deposit was paid on 5 November 2015; and
• By way of written agreement dated 4 November 2015, the respondent agreed to
purchase Lot 1906 for a price of $652,000 (“the Lot 1906 Contract”). The $65,200
deposit was paid on 23 November 2015.
[4] Each contract was essentially in identical terms, including clause 15, which relevantly
stated:
“Clause 15 – Breach of the Contract
15.1 You breach the Contract if:
(a) you fail to comply with any of your obligations under the contract
…
15.2 If you breach the contract, we may affirm or terminate the contract.
…
15.4 If we terminate the contract we may:
1 Rule 507 UCPR.
-- 3 of 11 --
4
(a) declare any part of the deposit paid by you forfeited and/or sue you
for breach; or
(b) declare any part of the deposit paid by you forfeited and/or re-sell the
lot, and any deficiency in the price on a resale and the expenses
arising from the resale shall be recoverable by us from you as
liquidated damages,
…
15.5 Our rights under this clause are in addition to any other rights which we
may have at law or in equity.
15.6 If you fail to pay on the due date any money payable by you under the
contract, you must pay interest at 15% per annum on the amount
outstanding from (and including) the due date until (and including) the date
of actual payment. Interest will be calculated and payable by you at the
same rate on the amount of any judgement we obtain against you, from the
date of judgement until the date of actual payment. All interest will be paid
by you on the settlement date or, if settlement does not occur, on demand.”
[5] The settlement date for both Contracts was 2 March 20202 at which time the respondent
failed to attend and settle.3 Subsequently, the applicant elected to affirm the Contracts
and require settlement and payment of interest from 3 March 2020 in accordance with
clause 15.6 of both Contracts. Specifically interest was sought “on the Settlement Sum
up to and including completion of the contract.”4
[6] On 2 July 2020 the applicant filed the abovementioned Originating Application.5 On 29
September 2020, the respondent deposed that due to his employment status and financial
situation, it would not be possible for him to complete the contracts.6 On 7 October 2020,
solicitors for the applicant wrote to the solicitors for the respondent terminating both
contracts in reliance on the respondent’s repudiation and continued breach and declaring
the whole of both deposits to be forfeited.7
[7] The properties the subject of this assessment have not been resold nor have any offers
been made for their purchase.8
2 Clause 8.2 of the Contracts.
3 Affidavit of Liguo Sun sworn 30 June 2020, paragraphs 21 and 40.
4 Affidavit of Liguo Sun sworn 30 June 2020, paragraphs 27 and 46, attachments LS-20 at page 363 and LS-
35 at page 716.
5 Court doc 1.
6 Affidavit of Jiahe Zhang affirmed 25 September 2020, paragraph 28.
7 Affidavit of Lawrence Kong sworn 8 October 2020, at exhibit LK-5, page 7.
8 Affidavit of Liguo Sun sworn 9 July 2021 at paragraphs 32 and 44.
-- 4 of 11 --
5
Natural Justice and Opposition to the Assessment
[8] The respondent did not appear at the assessment hearing, nor file any material, and so I
must consider whether he was properly notified of the hearing, and hence afforded
natural justice.
[9] The respondent had, until relatively recently, been legally represented. At the time of be
consent judgment granted by Barlow QC DCJ, the respondent was legally represented.
The application for directions concerning this assessment hearing was served on those
legal representatives, who acknowledged receipt of it, but notified an intention to
withdraw. Shortly thereafter, on 8 June 2021, the respondent filed a Notice of Acting in
Person. The next day the application and supporting material was then served on the
respondent by way of e-mail.9
[10] On 10 June 2021, Sheridan DCJ made orders which set out directions for the Assessment
of Damages hearing. The respondent did not attend that hearing, either actually or
virtually.
[11] Having considered all the material, I accept that:
• the respondent is aware of the proceedings and consented to the judgment ordered
by Barlow QC DCJ on 8 October 2020;
• the applicant complied with the requirements of rule 509 of the UCPR; and
• the respondent has been served with all relevant orders and material.
[12] I am satisfied that the respondent has been afforded sufficient and appropriate
opportunity to be heard on the assessment hearing, but has elected not to do so. The
consequence is that the assessment must occur on the basis of the applicant’s
unchallenged evidence.
Consideration
[13] The principle governing an award of damages for breach of contract was enunciated by
Parke B in Robinson v Harman10 in the following terms:
“Where a party sustains a loss by reason of breach of contract, he is, so far as
money can do it, to be placed in the same situation, with respect to damages, as if
the contract had been performed.”
[14] In light of clause 15.5 of both contracts, the applicant correctly contends that damages
“are to be assessed in accordance with the common law and as provided for under the
contracts.”11 Clear words are required to rebut the presumption that a contracting party
does not intend to abandon any remedies for a breach of contract arising by operation of
9 Affidavit of Lawrence Kong sworn 9 June 2021, exhibit LK-2.
10 Robinson v Harman (1848) 1 Ex 850; at 855; 154 ER 363; at 365.
11 Applicant’s outline paragraph 13.
-- 5 of 11 --
6
law,12 and there has been no express rebuttal of the presumption by the applicant. I am
therefore satisfied the applicant is entitled to all its rights arising out of the breach both
at law and under the contract for the purposes of this assessment.
Loss of Sale Value and Resale Expenses
[15] The damages sought is the amount of the full contract price less the amount at which a
resale has or could be made, after allowance for other costs reasonably and justifiably
incurred. Those costs can include holding costs which will include body corporate fees
and other costs associated with continuing ownership, incurred as a result of
termination.13
[16] Although a matter for my discretion, I consider the appropriate point in time for the
purposes of the loss of sale calculations are from the date of termination of the contract,14
namely 7 October 2020. This is consistent with the applicant’s submissions. Holding
costs are payable to the date of assessment of damages, but not beyond.15
Loss of sale value
[17] The uncontested and updated expert evidence is that the market value of Lot 1604 as at
7 October 2020 (i.e. the date of termination of the contract by the applicant) was
$510,00016 and the market value of Lot 1906 as at the same date was $570,000. 17 The
same valuations apply as at 8 July 2021.18
Allowing for the deposits received, this component of the damages is calculated as
follows:
Lot 1604: Contracted price $659,000.00
Less deposit received $ 65,900.00
Less current market value $510,000.00
Total $ 83,100.00
Lot 1906: Contracted price $652,000.00
Less deposit received $ 65,200.00
Less current market value $570,000.00
Total $ 16,800.00
12 Castlemaine Tooheys Ltd v Carlton United Breweries Ltd (1987) 10 NSWLR 468 at 487 per Hope JA;
Riggall & Anor v Thompson [2010] QCA 144, [9]-[13].
13 Commonwealth v Amann Aviation Pty Ltd (1991) 174 CLR 64, per Mason CJ at [25]; Riggall & Anor v
Thompson, supra at [25], [39].
14 Johnson v Agnew [1980] AC 367, 400-401.
15 South Sky Investments Pty Ltd v Luppi [2012] QSC 27, [24].
16 Affidavit of Sicheng Gai sworn 12 July 2021, attachment SG3 page 54.
17 Affidavit of Sicheng Gai sworn 12 July 2021, attachment SG3 page 41.
18 ibid.
-- 6 of 11 --
7
Past commission fees paid and future commission fees to be paid
[18] In reliance on clause 15.4(b) above, the applicant in its submissions makes allowance for
both its costs of the uncompleted sale and any future sale.
[19] The applicant utilised an agency FM 21 Real Estate Pty Ltd for the purposes of
facilitating the parties entering into the contract. It was engaged by the applicant on the
basis of a 6% commission, of which half was paid on entering into the contracts, and the
balance payable on settlement.19 Had the contracts settled, the full 6% commission
would have been payable which equates to $39,540 on Lot 1604 and $39,120 on Lot
1906, resulting in outstanding amounts due on completion of the contracts of $19,770
and $19,560 respectively.
[20] A different agency has been engaged for the purposes of the resale of the two Lots. A
sliding scale of commission has been agreed depending on the conditions of sale, ranging
between 7.7% and 3.3 %. The applicant contends that a middle figure of 5.5% should be
used to calculate these costs. That equates to $28,050 for Lot 1604 and $31,350 based
on the present market values.
[21] In Riggall & Anor v Thompson20 the Court had occasion to consider the effect of a clause
(there numbered 9.4) of the same import as the present clause 15.4. The Court held that
the then clause 9.4(1)(b), in so far as it permitted recovery of costs of the original sale as
well as any resale was a penalty and unenforceable.21 I can see no reason to find
differently in the present matter.
[22] The Court in Riggall determined the appropriate approach was to order recovery of the
costs of the resale, but not the costs of the first sale as they would have been incurred
regardless of the termination of the contract.22 The effect of that is to put the parties as
close to being in the position they would have been had the first sale settled.23 That is
the approach I adopt here.
[23] However it must be remembered that the applicant has not paid all of the past deposit.
To put it in a close a position as possible to what it would have been in had the contracts
settled, those outstanding amounts need to be accounted for as though they had been
paid. It is convenient to make that adjustment to the component of future commission
fees.
[24] I reject the applicant’s submissions that regard should be had at all to the commission
fees already paid. Further, I consider that the applicant has erroneously submitted that
the future commission fees should be deducted from the value of the property. To do so
deprives the applicant of an allocation of damages for future fees, which allocation is
19 Affidavit of Liguo Sun sworn 9 July 2021 at paragraphs 21 and 23.
20 supra.
21 Riggall & Anor v Thompson, supra at [34].
22 Riggall & Anor v Thompson, supra at [39].
23 See paragraph 13 herein.
-- 7 of 11 --
8
designed to put the applicant in the place it would have been, as far as is possible, had
the settlement gone ahead.
The calculation of claimable commission fees is:
Lot 1604: ($510,000 x 5.5%) - $19,770 = $8,280.00
Lot 1906: ($570,000 x 5.5%) – 19,560 = $11,790.00
Holding Costs
[25] Pursuant to clause 14.1(b) of the contract, the respondent is liable for payment for all
outgoings on the Lots from the date of registration, namely 14 February 2020. They are
recoverable as they would not have been incurred by the applicant had the respondent
settled on both properties on the settlement date.24
[26] The holding costs have been particularised in the unchallenged evidence as:25
Lot 1604: Rates $2,259.76
Water and Sewerage $1,201.66
Body Corporate $5,391.20
Total $8,852.62
Lot 1906: Rates $2,259.76
Water and Sewerage $1,120.56
Body Corporate $5,542.50
Total $8,922.82
They are the appropriate amounts to order in respect of this component of the damages.
Interest payable
[27] The applicant relies on clause 15.6 of the contract to assert a right to payment of interest,
which it says the respondent was contractually bound to pay at the rate of 15% per annum
even if settlement did not occur. A demand for payment of interest on the settlement sum
“to and including the completion of the contract” was made on 5 June 2020.26
[28] There are three periods of time which must be considered in terms of whether interest
can or should be awarded at the contractually agreed rate. They are, first, the period
between the date of the intended settlement and the termination of the contract (“the
contractual interest period”), secondly the period between the termination of the contract
and the assessment of damages (“the pre-judgment period”) and lastly, the period after
the judgment assessing damages and the payment of the judgment debt (“the post-
judgment period”).
24 See fn 13 and 15 herein.
25 Affidavit of Liguo Sun sworn 9 July 2021 at paragraphs 18-20 and 39-41.
26 Affidavit of Liguo Sun sworn 30 June 2020 at paragraphs 45 and 46, attachment LS-35 page 716.
-- 8 of 11 --
9
The contractual interest period
[29] Payment of interest at the contract rate for the contractual interest period is relatively
uncontentious, given that an award in that amount is doing nothing more than giving
effect to the express terms of a contract whilst it remained on foot.27
[30] The interest is payable in respect of the settlement sums due. In respect of Lot 1604 that
figure was $594,430.6928 and in respect of Lot 1906 that figure was $588,158.08.29 The
contractual interest period is 219 days.30 I calculate this component of the interest to be
awarded as follows:
Lot 1604: $594,430.69 x 15% x 219/365 = $53,498.76.
Lot 1906: $588,158.08 x 15% x 219/365 = $52,934.22.
The pre-judgment period
[31] In reliance on clause 15.6 of the contract, the applicant submits that interest should be
payable at the contractually agreed rate from the date of termination to at least the date
of assessment of damages. In South Sky Investments Pty Ltd v Luppi,31 and Orchid
Avenue Pty Ltd v Parniczky32 similarly worded clauses were held to entitle the plaintiffs
to interest at the contractually agreed rate during the pre-judgment period. That is the
approach I will adopt here.
[32] Under that clause, the interest is payable on the amount outstanding. That requires
calculation of the damages for the loss of the sale to be awarded as at the date of
termination. They are:
Lot 1604: Loss of sale component $ 83,100.00
Plus future commission fees $ 8,280.00
Plus holding costs $ 8,852.62
Total Damages Unit 1604 $100,232.62
Lot 1906: Loss of sale component $16,800.00
Plus future commission fees $11,790.00
Holding costs $ 8,922.82
Total Damages Unit 1906 $37,512.82
27 Mann v Paterson Constructions Pty Ltd (2019) 267 CLR 560, [164]-[165]; Australia Sunrise Development
Pty Ltd v Shi, Brisbane District Court No 1845 of 2020, 30 April 2021, Jarro DCJ unpublished at page 9,
line 34.
28 Affidavit of Liguo Sun sworn 9 July 2021 at paragraphs 13 and 14, attachment LS-3 page 350.
29 Affidavit of Liguo Sun sworn 9 July 2021 at paragraphs 34 and 35, attachment LS-11 page 413.
30 3 March 2020 to 7 October 2020.
31 [2012] QSC 27, [23]
32 [2015] QSC 207, [23]
-- 9 of 11 --
10
[33] The pre-judgment interest period is 343 days.33 I assess this component of the interest
claimed as follows:
Lot 1604: $100,232.62 x 15% x 343/365 = $14,128.68.
Lot 1906: $37,512.82 x 15% x 343/365 = $5,287.76.
The post-judgment period.
[34] The applicant seeks interest on the judgment sum at the rate of 15% per annum,
contending that such an approach is permitted by section 59(3) of the Civil Proceedings
Act 2011 as a rate of interest otherwise ordered by the Court, and further contending that,
although a discretion is vested in the Court as to whether any other rate of interest should
be ordered, “the court ought honour the bargain struck by the parties”.
[35] Clause 15.6 is worded in a way that the period it contemplates may include a period post-
judgment, but it does not expressly include that period.
[36] In Clambake Pty Ltd v Tipperary Projects Pty Ltd (No 7)34 EM Heenan J considered the
exercise of what was essentially the same discretion under the Western Australian
legislation. His Honour noted that contractual terms which provided for a higher rate of
judgment on moneys owing merged in any judgment given in the action unless the
contract specifically provided that any judgment should carry interest at the higher rate
until payment is made in full “and that this should form part of the judgment”. The
current clause does not, in my view, contain sufficient specificity to justify interest being
awarded at the higher rate after the time of the judgment, and thereby avoid the doctrine
of merger.
[37] I have reached this conclusion with some caution noting that my approach differs from
that of Daubney J in South Sky Investments Pty Ltd v Luppi35. However I do note that his
Honour was not apparently required to consider the issues raised in Clambake. I also
note on the other hand that in Orchid Avenue Pty Ltd v Parniczky36 Burns J declined to
order interest post-judgment at the higher rate, although again he was not apparently
asked to consider the issues raised by EM Heenan J.
[38] There is a further matter which, in my view, is relevant but was not considered in
Clambake, although it was raised in argument. If interest at the higher rate – which is
quite a high rate in today’s economic environment – were allowed on the total award in
the judgment, the applicant would be receiving an entitlement to effectively
compounding interest. That is, 15% interest would be accruing on all of the judgment,
including the significant portions at which interest had already been assessed at 15%.
True it is that the prescribed amount would also have this compounding effect, but the
33 8 October 2020 to 16 September 2021.
34 [2009] WASC 390, [105]-[110].
35 supra.
36 supra.
-- 10 of 11 --
11
lesser rate alleviates at least some of that unfairness, which is in any event allowed for
by legislation as the usual position.
[39] Interest post-judgment should accrue at the prescribed rate.
Calculations
[40] Damages are assessed as follows:
Lot 1604: Damages $100,232.62
Plus interest to date of termination $ 53,498.76
Plus interest from termination date
to the date of judgment $ 14,128.68
Total Damages including interest
to date of judgment $167,860.06
Lot 1906: Damages $37,512.82
Plus interest to date of termination $52,934.22
Plus interest from termination date
to the date of judgment $ 5,287.76
Total Damages including interest
to date of judgment $95,734.80
Costs
[41] The applicant seeks its costs, including costs reserved on previous occasions. There is
no reason why they should not be granted in accordance with the usual practice.
Orders
[42] My orders are as follows:
1. In respect of the contract of sale entered into by the applicant and the respondent
on 22 October 2015 (Lot 1604), damages are assessed in the sum of $167,860.06,
including interest to the date of judgment.
2. In respect of the contract of sale entered into by the applicant and the respondent
on 4 November 2015 (Lot 1906), damages are assessed in the sum of $95,734.80,
including interest to the date of judgment.
3. The respondent pay the applicants costs of the proceeding, including all reserved
costs.
-- 11 of 11 --