Body Corporate for Torwood Hill Residential Retreat v Fittell [2020] QSC 32
SUPREME COURT OF QUEENSLAND
CITATION: Body Corporate for Torwood Hill Residential Retreat CTS
24557 v Fittell [2020] QSC 32
PARTIES: BODY CORPORATE FOR TORWOOD HILL
RESIDENTIAL RETREAT CTS 24557
(applicant)
v
LYNETTE ANNE FITTELL
(respondent)
FILE NO: BS No 6249 of 2017
DIVISION: Trial Division
PROCEEDING: Application
ORIGINATING
COURT:
Supreme Court at Brisbane
DELIVERED ON: 6 March 2020
DELIVERED AT: Brisbane
HEARING DATE: 2 October 2019
JUDGE: Davis J
ORDER: The applicant pay the respondent:
1. all fees and charges paid or payable by her to experts
retained on her behalf in the application; and
2. sixty per cent of her other costs of the application
assessed on the standard basis.
CATCHWORDS: REAL PROPERTY – EASEMENTS – EASEMENTS
GENERALLY – CREATION – BY EXPRESS
AGREEMENT OR UNDER STATUTE – STATUTORY
EASEMENTS – where applicant applies for orders allowing
its contractors access to the respondent’s land to rectify a
retaining wall sitting on the common boundary between the
two properties – where orders made allowing access – where
costs submissions sought – where both parties seek their costs
– where applicant must show special circumstances to secure
such an order – where respondent had legitimate interests to
defend – where the respondent contributed to the protraction
of the proceedings – whether the respondent should bear some
of the costs burden
Body Corporate and Community Management Act 1997, s 94
Property Law Act 1974, s 180
Body Corporate and Community Management (Standard
Module) Regulation 1997, r 159
-- 1 of 14 --
2
Uniform Civil Procedure Rules 1999, r 681
2040 Logan Road Pty Ltd v Body Corporate for Paddington
Mews [2016] QSC 40, cited
Ex parte Edward Street Properties Pty Ltd [1977] Qd R 86,
cited
Lambert Property Group Pty Ltd v Body Corporate for
Castlebar Cove [2015] QSC 179, cited
Lang Parade Pty Ltd v Peluso & Ors [2006] 1 Qd R 42, cited
Re De Pasquale Bros Pty Ltd v NJF Holdings Pty Ltd [2000]
QSC 4, followed
COUNSEL: MT de Waard for the applicant
MT Steele with D Whitehouse for the respondent
SOLICITORS: OMB Solicitors for the applicant
McCullough Robertson for the respondent
[1] The applicant who is the body corporate of a unit block and who I will call “the Body
Corporate”, made application against the respondent (Ms Fittell) for orders allowing
its contractors access to her land to rectify a retaining wall sitting on the common
boundary between the two properties.
[2] On 2 October 2019, I made the following orders at the urging of both parties in these
terms:
“1. Pursuant to section 180 of the Property Law Act 1974 the
Respondent shall permit access to the applicant, its contractors,
engineers, servants and agents, for a period of up to six (6)
weeks, to attend upon Lot 8 on RP19673 Title Reference
15532063 known as 101 Annie Street, Auchenflower in the
State of Queensland (‘Lot 8’) to enable rectification work (being
that work described in the affidavit of Barry Jones, and the
report of Denis Riley dated 23 July 2019) to be carried out to
the entire length of the retaining wall structure approximately
on the boundary between Lot 8 and the Applicant’s land at
SP188059 known as 105 Annie Street, such access being
limited to:
(a) the length of the retaining wall;
(b) the area delineated by the blue hatching on the plan which
is exhibit 5 in the application; and
(c) any other areas reasonably necessary to carry out
rectification work to the retaining wall and/or to protect
the 101 Annie Street property upon 24 hours written
notice being provided to the respondent seeking her
consent, such consent not to be unreasonably refused by
the respondent.
-- 2 of 14 --
3
2. Order 1 is made subject to the following conditions:
(a) The statutory right of use be subject to the following
conditions:
(i) Indemnity
The Applicant shall indemnify and keep
indemnified the Respondent against any costs,
expenses, claims, demands or actions arising out of
the rectification work but not limited to any act or
omission occurring during the period of the
carrying out of the rectification work.
(ii) Insurance
The Applicant must effect and keep in place public
liability insurance in the sum of not less than
$10,000,000 in respect of the Applicant’s property
including the retaining wall.
The Applicant shall prior to commencing works
provide copies of:
(A) the Applicant's certificate of currency of
insurance;
(B) certificate of currency of insurance for
geotechnical engineers’ professional
indemnity insurance, work cover or
equivalent;
(C) certificate of currency of insurance for the
contractor engaged to carry out the
rectification works professional indemnity
insurance, work cover or equivalent;
(D) any other contractors, engineers or persons
required to attend on Lot 8 to perform the
rectification work of those parties relevant
certificate of currency for public liability and
work cover insurance.
(iii) Encroachment
Survey Plan
(A) Forthwith after completion of the
rectification works, the Applicant must
engage a Registered Surveyor to produce a
survey plan of the encroachment area. The
survey plan must include all areas of
encroachment of the wall and all associated
spoon drain drainage infrastructure required
to give effect to the rectification of the
retaining wall.
-- 3 of 14 --
4
(B) The Respondent will transfer to the
Applicant the area of encroachment
identified on the survey plan and the
Applicant will pay an amount as determined
by independent Registered Valuers. The
Applicant shall pay the Respondent’s
transaction costs of the transfer, including
stamp duty.
(C) The method and basis of valuation is:
(I) each party will appoint an
appropriately qualified and registered
valuer. The reasonable costs of such
valuations shall be paid by the
Applicant, and the Applicant must
indemnify the Respondent for those
costs;
(II) the valuers shall value the property on
a ‘before and after’ basis taking into
account the value of the area of land to
be transferred, based on the highest
and best use of the Respondent’s land;
(III) in the event of any difference in the
valuations then the parties agree to
adopt the mid-point between the two
valuations as the agreed value.
(iv) Supervision
(A) The Body Corporate must engage a
managing RPEQ geotechnical engineer,
being an independent contractor, to design,
supervise and certify the works in
accordance with all relevant Australian
Standards.
(B) The managing engineer must be on site at all
times necessary to fulfil his professional
obligations and provide the necessary design
and certification referred to in these orders.
(C) Certification must include both Form 15
(Design) and Form 16 (Construction).
(D) Forms 15 and 16 must reference design
drawings and specifications and daily
construction records and tests including for
all anchors.
(E) All failures must be recorded and
notification provided to the Respondent.
-- 4 of 14 --
5
(F) The managing geotechnical engineer or the
contractor may employ an inspector or other
suitably qualified person who is experienced
for attendance and recording on site who is
to be present at all times during the
Rectification Works for which the RPEQ
geotechnical engineer is not otherwise
present.
(v) Surety
Before commencing the Rectification Works the
Applicant must pay the amount of $250,000 into
the Applicant’s solicitor’s trust account to be held
on trust for the benefit of the Applicant to carry out
the proposed works, including the geotechnical
engineer and restoration works of the respondent’s
property.
(vi) Compensation
(a) The Applicant is to pay the Respondent $200
per night for the six week period
commencing upon the eve of the
commencement of the rectification, to be
paid in advance of the commencement of the
Proposed Works.
(b) The Applicant is to reimburse the
Respondent for reasonable moving costs
associated with vacating her land for the
period of the Proposed Works.
(c) The Applicant is to pay the Respondent the
amount of $1,000.00 compensation for
imposing the statutory right of user.
(b) General conditions of access
(i) The rectification of the retaining wall referred to in
paragraph 1 of these Orders, shall be performed in
a proper and tradesman like manner.
(ii) All stormwater is to be managed on 105 Annie
Street and directed to a lawful point of discharge,
and must incorporate a sub slab drainage system to
ensure stormwater is not collected behind the wall
or directed to the Respondent’s property as
designed by NJA Consulting stormwater
management plan.
(iii) Adequate drainage to direct water from weepholes
in the retaining wall to a lawful point of discharge.
-- 5 of 14 --
6
(c) Water Usage
All water used m the Rectification Works shall be
supplied from the Applicant’s lot.
(d) Washout Area- Concrete Pump
The Applicant agrees the concrete pump will not be
washed out on any part of the Respondent’s lot.
3. Costs
(a) The applicant is to file and serve an outline of
submissions on costs and any further affidavits in support
of that submission by 16 October 2019.
(b) The respondent is to file and serve an outline of
submissions on costs and any further affidavits in support
of that submission by 30 October 2019.
(c) The applicant to file and serve an outline of submissions
in reply but limited to submissions on matters of law and
the correction of any factual assertions raised in the
respondent’s submissions.”
[3] Submissions as to costs were exchanged pursuant to Order 3. This is the
determination of the costs issue.
General background
[4] Both the Body Corporate’s unit block and Ms Fittell’s house sit on the northern side
of Annie Street, Auchenflower. Ms Fittell’s house sits to the east of the unit block.
Her property’s western boundary is common with the unit block’s eastern boundary.
[5] The natural slope of the land on the northern side of Annie Street is upwards from the
street to the rear. Earthworks were performed decades ago on the Body Corporate’s
land. The unit block was constructed so that the ground level of the unit block is all
on one level. This has been achieved by the construction of a retaining wall across
the front of the property (the southern boundary) and across the eastern boundary
which is common with Ms Fittell’s land. At the footpath (the southern boundary of
the property), the wall is about four metres high. The height of the wall diminishes
towards the northern boundary as the natural height of the land rises. The retaining
wall encroaches on Ms Fittell’s land, but that is not the major problem.
[6] As early as 2006, cracking was appearing in the retaining wall. At that point, large
jacaranda trees stood on Ms Fittell’s property near the base of the retaining wall. An
engineer’s report identified the jacaranda trees as one of three possible causes of the
cracking and they were removed.
[7] Negotiations for access to Ms Fittell’s property to enable rectification commenced in
earnest in 2014.
[8] The Body Corporate filed its originating application on 20 June 2017 and the
application came before me on 2 October 2019.
-- 6 of 14 --
7
The course of the hearing before me
[9] Before the hearing commenced, I had the opportunity to read some of the material
that had been filed. When the matter was called on, I told the parties that it appeared
obvious that the wall had to be fixed. It would follow, I observed, that the Body
Corporate had to be allowed access to fix the wall. It followed further, I thought, that
the only real issue was as to the terms upon which access to Ms Fittell’s property
should be allowed. The parties agreed.
[10] I was then told that the major issues were as follows:
(a) what geotechnical engineering supervision of the repairs was necessary;
(b) whether, and to what amount, the costs of the repairs ought to be secured by
the Body Corporate before repairs commenced;
(c) how any encroachment of the wall onto Ms Fittell’s property should be dealt
with; and
(d) what insurance for the works ought to be carried by the Body Corporate.
[11] Short argument ensued. It became evident that the necessity for geotechnical
engineering supervision was not so much an issue. What was more in issue was
whether, and to what extent, the potential costs of the geotechnical engineering
supervision ought to be secured in some way by the Body Corporate. It also became
apparent that there were differences between the parties beyond the issues identified
in paragraph [10] above.
[12] In due course, Ms Fittell produced a draft of the conditions upon which she would
allow access. The Body Corporate produced a draft of conditions which it would not
oppose being placed on its right to enter Ms Fittell’s land.
[13] The major differences between the two drafts were:
(a) the Body Corporate sought to limit its obligation to indemnify Ms Fittell
against liability to only loss which occurred during the rectification of the wall;
(b) Ms Fittell proposed $20 million insurance and the Body Corporate $10 million;
(c) Ms Fittell sought security for the work in the sum of $250,000 and the Body
Corporate conceded $200,000;
(d) Ms Fittell sought her “reasonable moving costs” to vacate the premises during
the rectification work. The Body Corporate sought to limit that cost to $1,000.
[14] There was further argument. The parties then agreed on the orders finally made.
They are the orders which appear in paragraph [2] above.
[15] On the issues that were in dispute:
(a) the Body Corporate conceded that the indemnity for liability ought not be
limited to loss incurred during the course of the rectification work;1
1 Condition 2(a)(i).
-- 7 of 14 --
8
(b) Ms Fittell conceded that $10 million insurance was sufficient;2
(c) the Body Corporate conceded that security in the sum of $250,000 ought to be
provided;3
(d) the Body Corporate conceded that Ms Fittell’s moving costs ought not be
limited to $1,000.4
Legal principles
[16] Section 180 of the Property Law Act 1974 provides:
“180 Imposition of statutory rights of user in respect of land
(1) Where it is reasonably necessary in the interests of
effective use in any reasonable manner of any land (the
dominant land) that such land, or the owner for the time
being of such land, should in respect of any other land
(the servient land) have a statutory right of user in respect
of that other land, the court may, on the application of the
owner of the dominant land but subject to this section,
impose upon the servient land, or upon the owner for the
time being of such land, an obligation of user or an
obligation to permit such user in accordance with that
order.
(2) A statutory right of user imposed under subsection (1)
may take the form of an easement, licence or otherwise,
and may be declared to be exercisable—
(a) by such persons, their servants and agents, in such
number, and in such manner and subject to such
conditions; and
(b) on 1 or more occasions; or
(c) until a date certain; or
(d) in perpetuity or for some fixed period;
as may be specified in the order.
(3) An order of the kind referred to in subsection (1) shall not
be made unless the court is satisfied that—
(a) it is consistent with the public interest that the
dominant land should be used in the manner
proposed; and
(b) the owner of the servient land can be adequately
recompensed in money for any loss or
disadvantage which the owner may suffer from the
imposition of the obligation; and
2 Condition 2(a)(ii).
3 Condition 2(a)(v).
4 Condition 2(a)(vi)(b).
-- 8 of 14 --
9
(c) either—
(i) the owner of the servient land has refused to
agree to accept the imposition of such
obligation and the owner’s refusal is in all
the circumstances unreasonable; or
(ii) no person can be found who possesses the
necessary capacity to agree to accept the
imposition of such obligation.
(4) An order under this section (including an order under this
subsection)—
(a) shall, except in special circumstances, include
provision for payment by the applicant to such
person or persons as may be specified in the order
of such amount by way of compensation or
consideration as in the circumstances appears to the
court to be just; and
(b) may include such other terms and conditions as
may be just; and
(c) shall, unless the court otherwise orders, be
registered as provided in this section; and
(d) may on the application of the owner of the servient
tenement or of the dominant tenement be modified
or extinguished by order of the court where it is
satisfied that—
(i) the statutory right of user, or some aspect of
it, is no longer reasonably necessary in the
interests of effective use of the dominant
land; or
(ii) some material change in the circumstances
has taken place since the order imposing the
statutory right of user was made; and
(e) shall when registered as provided in this section be
binding on all persons, whether of full age or
capacity or not, then entitled or afterwards
becoming entitled to the servient land or the
dominant land, whether or not such persons are
parties to proceedings or have been served with
notice or not.
(5) The court may—
(a) direct a survey to be made of any land and a plan
of survey to be prepared; and
(b) order any person to execute any instrument or
instruments in registrable or other form necessary
-- 9 of 14 --
10
for giving effect to an order made under this
section; and
(c) order any person to produce to any person specified
in the order any title deed or other instrument or
document relating to any land; and
(d) give directions for the conduct of proceedings; and
(e) make orders in respect of the costs of any of the
preceding matters and of proceedings generally.
(6) In any proceedings under this section the court shall not,
except in special circumstances, make an order for costs
against the servient owner.
(7) In this section—
owner includes any person interested whether presently,
contingently or otherwise in land.
statutory right of user includes any right of, or in the
nature of, a right of way over, or of access to, or of entry
upon land, and any right to carry and place any utility
upon, over, across, through, under or into land.
utility includes any electricity, gas, power, telephone,
water, drainage, sewerage and other service pipes or
lines, together with all facilities and structures reasonably
incidental to the utility.
(8) This section does not bind the Crown.” (emphasis added)
[17] Section 180(6) ousts the “general rule” enshrined in r 681 of Uniform Civil Procedure
Rules 1999 that costs follow the event. Mr de Waard for the Body Corporate correctly
accepts that the fact that his client obtained relief of a kind sought in the application
is not sufficient by itself to justify a costs order against Ms Fittell. The Body
Corporate must show “special circumstances” to secure such an order.
[18] Re De Pasquale Bros Pty Ltd v NJF Holdings Pty Ltd5 is a case where Chesterman J
(as his Honour then was) held that special circumstances existed and ordered costs
against a respondent to an application under s 180. De Pasquale bears some factual
resemblance to the current case in that the applicant there, like the Body Corporate
here, brought the application not to enhance its land but to protect it. However,
comparison of the facts in cases where “special circumstances” have been found or
not found is unlikely to be of assistance.
[19] Of importance and assistance though, is his Honour’s analysis of s 180. His Honour
observed that s 180 only vests jurisdiction in the court to make orders where the
owner’s refusal to accept the obligations sought to be imposed upon the land “is in
all the circumstances unreasonable”.6 His Honour reasoned that because s 180(6)
requires “special circumstances” before a costs order is made against a respondent, it
5 [2000] QSC 4.
6 Section 180(3)(c).
-- 10 of 14 --
11
must follow that unreasonable refusal is not sufficient itself to engage the jurisdiction
to award costs against a respondent. However, his Honour observed “… the
respondent’s conduct which amounts to an unreasonable refusal may be of such a
character as to constitute a ‘special circumstance’”.7 I accept and follow his Honour’s
reasoning.
[20] Mr Steele for Ms Fittell submitted that the usual order is that a respondent to a s 180
application ought be favoured with a costs order. Section 180 though says nothing
about the circumstances under which a respondent should recover costs against an
applicant. Where, unlike this case, an order has been secured against a respondent
other than by consent, a finding must be made that the respondent unreasonably
refused the applicant’s request to burden the land with the obligation before the
jurisdiction to make an order is triggered. There cannot be a presumption in favour
of granting costs to a party who has acted unreasonably.
[21] However, on any application under s 180 of the Property Law Act, an applicant seeks
orders interfering with proprietary rights vested in the land owner.8 The respondent
to an application under s 180 is entitled to argue for the imposition of conditions under
s 180(4) and the reasonableness or otherwise of the stance which a respondent adopts
on that issue must be relevant to the question of costs of the application.
The respective arguments here
[22] Ms Fittell submitted that the real issue was not whether the Body Corporate ought to
be granted access to her property in order to conduct repairs, but rather the conditions
upon which that access should be given. She submitted that it was appropriate for
her to seek the imposition of conditions which reasonably protected her position. She
submitted that the Body Corporate made significant concessions on the day of the
hearing which she says vindicates the reasonableness of her attitude to the application.
She seeks her costs against the Body Corporate.
[23] The Body Corporate seeks its costs against Ms Fittell. The Body Corporate submits
that special circumstances arise because Ms Fittell has been uncooperative and
obstructionist and her position has changed during the course of the litigation. The
Body Corporate submitted that Ms Fittell took various positions throughout the
litigation but resiled from those positions and sought to impose further, inconsistent
conditions. The Body Corporate submitted that the respondent’s conduct incurred
unnecessary costs for both parties. The Body Corporate also submitted that the
application was made out of necessity to secure the wall for the benefit of both parties
and pursuant to obligations which it had to maintain the common property by s 94 of
the Body Corporate and Community Management Act 1997.9 The Body Corporate
also submitted that the need for the repair of the retaining wall was caused by
Ms Fittell’s jacaranda trees undermining its structural integrity.
7 At [9].
8 Lang Parade Pty Ltd v Peluso & Ors [2006] 1 Qd R 42 at [23], Ex parte Edward Street Properties Pty
Ltd [1977] Qd R 86 at 91, Lambert Property Group Pty Ltd v Body Corporate for Castlebar Cove
[2015] QSC 179 at [132] and 2040 Logan Road Pty Ltd v Body Corporate for Paddington Mews [2016]
QSC 40 at [39]-[42].
9 See also Body Corporate and Community Management (Standard Module) Regulation 1997, r 159.
-- 11 of 14 --
12
[24] The Body Corporate’s position is that Ms Fittell should pay its costs or at least part
of its costs and the Body Corporate strongly resists any order to pay Ms Fittell’s costs
or any part thereof.
Consideration and determination of the costs
[25] I am not prepared to find that the problems with the retaining wall were caused wholly
or even substantially by the jacaranda trees which stood on Ms Fittell’s land.
[26] An expert report was prepared by Scott Woolcock, an engineer of the Bonacci Group,
on 21 March 2006, 10 upon the instructions of Ms Fittell. He opined that there were
three possible causes of the cracking in the wall, being:
“1. Uneven subsidence of the retaining wall foundation.
2. Distress due to lateral pressures from the retained material.
3. Distress due to forces exerted by jacaranda and brush box tree
roots.”
[27] He went on to opine:
“The most likely causes of the initial cracking are subsidence of the
foundation or differential movement caused by tree roots. Lateral
pressures could then exacerbate any cracking.”
[28] Mr Woolcock was critical of the method of construction of the unit block. The fill
behind the retaining wall is likely builder’s rubble. This, he observed, cannot be
compacted and is therefore likely to be subject to significant subsidence.
[29] Whether the cause of the cracking can or cannot be ultimately determined is unclear.
At best for the Body Corporate the jacaranda trees are just one of three likely suspects.
[30] The unit block is unquestionably built on fill. It is the Body Corporate’s land which
has been artificially altered, not Ms Fittell’s. It is clearly the obligation of the Body
Corporate then to keep the fill retained. In that sense, failure of the wall is the Body
Corporate’s problem exclusively, not Ms Fittell’s. Section 94 of the Body Corporate
and Community Management Act 1997 confirms the Body Corporate’s obligations.
[31] It is true, as the Body Corporate submits, that the repair of the retaining wall benefits
Ms Fittell. However, it benefits her only by protecting her from interference with the
quiet enjoyment of her land caused by any failure of a retaining wall whose existence
is necessary only because of the way in which the unit block was constructed.
[32] Any rectification work is likely to significantly disrupt Ms Fittell’s quiet enjoyment
of her land. Both parties accepted that it was necessary for her to leave her home
during the rectification work.
[33] Ms Fittell clearly has a legitimate interest in:
(a) what rectification work is done;
(b) how the rectification work is done;
10 Exhibit 3, Expert Report Index, Annexure A to the Expert Report of Richard Hemphill.
-- 12 of 14 --
13
(c) what impact that rectification work will have upon her enjoyment of her
property;
(d) the rectification work being done and completed efficiently and quickly so as
to minimise disruption to her; and
(e) recouping any cost to which she might be exposed.
[34] The conditions which were ultimately imposed by agreement all in my view are
reasonable and necessary in order to satisfy the legitimate interests of Ms Fittell. The
Body Corporate resisted, even at the hearing before me, securing Ms Fittell to the
extent of $250,000 and then ultimately capitulated.
[35] In my view, giving proper security for the cost of the work was critical. As already
observed, the parties accept that Ms Fittell cannot live in her home while the
rectification work is performed. If the Body Corporate found itself unable to pay the
contractors, then Ms Fittell could be faced with a partly completed construction site
on her western boundary and her home, for all practical purposes, uninhabitable.
[36] I accept though the Body Corporate’s submissions that Ms Fittell’s conduct in the
application is open to valid criticism.
[37] The Body Corporate has been trying to resolve the issue of the retaining wall for at
least the last six years. Ms Fittell’s position has not always been consistent. Her
position does seem to have changed in relation to matters such as:
(a) whether an easement ought to be granted;
(b) how the costs and compensation which she should receive ought to be
calculated;
(c) the design of the rectification works;
(d) what rectification works were necessary (at one stage demolition of the unit
block was suggested);
(e) what experts were necessary to design and supervise the works; and
(f) stormwater management.
[38] I find that Ms Fittell has contributed to the protraction of, and therefore the costs of,
the proceedings.
[39] Faced with the significant problem of the pending structural failure of a four metre
high retaining wall on her western boundary, Ms Fittell was justified in seeking expert
opinion as to how the problem could and should be rectified. She should recover all
moneys she has paid to experts who she retained.
[40] In my view, the starting point is that Ms Fittell ought to recover her costs on the
standard basis. That is because she had legitimate interests to defend. She spent
money defending those interests. The expenditure of that money secured her the
reasonable conditions that were finally agreed on the date of the hearing.
-- 13 of 14 --
14
[41] However, her conduct of the defence of the proceedings has added not only to her
own costs, but also the costs of the Body Corporate and an adjustment ought to be
made.
[42] The respondent should recover sixty per cent of her costs.
Orders
[43] It is ordered the applicant pay the respondent:
1. all fees and charges paid or payable by her to experts retained on her behalf in
the application; and
2. sixty per cent of her other costs of the application assessed on the standard basis.
-- 14 of 14 --
Official source: https://www.sclqld.org.au/caselaw/QSC/2020/032