Dempsey Project Pty Ltd & Ors v Perpetual Corporate Trust Limited [2019] QCA 234
SUPREME COURT OF QUEENSLAND
CITATION: Dempsey Project Pty Ltd & Ors v Perpetual Corporate Trust
Limited [2019] QCA 234
PARTIES: DEMPSEY PROJECT PTY LTD
ACN 616 215 073
(first appellant)
DEMPSEY PROFITS PTY LTD
ACN 167 045 427
(second appellant)
JEFFREY RAYMOND WALTERS
(third appellant)
ANDREW KARL SHOFAY
(fourth appellant)
v
PERPETUAL CORPORATE TRUST LIMITED
ACN 000 341 533
(respondent)
FILE NO/S: Appeal No 4305 of 2019
SC No 1102 of 2019
DIVISION: Court of Appeal
PROCEEDING: General Civil Appeal
ORIGINATING
COURT:
Supreme Court at Brisbane – Unreported, 18 April 2019
(Dalton J)
DELIVERED ON: 29 October 2019
DELIVERED AT: Brisbane
HEARING DATE: 26 August 2019
JUDGES: Sofronoff P and Gotterson JA and Flanagan J
ORDERS: 1. Appeal dismissed.
2. The appellants are to pay the respondent’s costs of the
appeal to be assessed on the indemnity basis.
CATCHWORDS: APPEAL AND NEW TRIAL – APPEAL – GENERAL
PRINCIPLES – INTERFERENCE WITH DISCRETION OF
COURT BELOW – IN GENERAL – PARTICULAR CASES
– CONTROL OVER PROCEEDINGS – ADMISSION OF
EVIDENCE – where the respondent commenced proceedings
against the appellants to recover money owed by the appellants
under a loan agreement and written guarantees and to recover
possession of a property mortgaged to them – where the
respondent succeeded in obtaining summary judgment against
the appellants – where the appellants contended on appeal that
the learned primary judge erred in admitting an affidavit of the
respondent which annexed true copies of the security
-- 1 of 12 --
2
agreements and the registered mortgage – whether the learned
primary judge erred in admitting the affidavit
APPEAL AND NEW TRIAL – APPEAL – GENERAL
PRINCIPLES – INTERFERENCE WITH DISCRETION OF
COURT BELOW – IN GENERAL – PARTICULAR CASES
– CONTROL OVER PROCEEDINGS – REFUSAL OF
ADJOURNMENT – where the respondent commenced
proceedings against the appellants to recover money owed by
the appellants under a loan agreement and written guarantees
and to recover possession of a property mortgaged to them –
where the respondent applied for summary judgment against
the appellants – where, at the beginning of the hearing of the
summary judgment application, counsel for the appellants
sought an adjournment to allow them time to obtain further
evidence and to amend their pleadings in accordance with the
further evidence – where the learned primary judge refused the
application – whether the refusal to grant a short adjournment
denied justice to the appellants and materially prejudiced them
in resisting the application
Hanson Construction Materials Pty Ltd v Davey & Anor
[2010] 79 ACSR 668; [2010] QCA 246, distinguished
Maxwell v Keun [1928] 1 KB 645, considered
COUNSEL: A P J Collins for the appellants
M D Martin QC for the respondent
SOLICITORS: Tonio Lawyers for the appellants
Mills Oakley for the respondent
[1] SOFRONOFF P: I agree with Gotterson JA.
[2] GOTTERSON JA: Perpetual Corporate Trust Limited (“PCTL”) is a Custodian for
certain funds managed by GPS Investment Fund Limited (“GPS”). Dempsey Profits
Pty Ltd (“Profits”) is the trustee for the Dempsey Profits Trust and for the Walters
Family Trust. Until 9 January 2019, Mr Jeffrey Raymond Walters was the sole
director of Profits. Profits, as trustee of the trusts, is the registered proprietor of Lot 3 on
Registered Plan 55663 Title Reference 12161192 (“the land”), being land located at
16 Dempsey Street, Annerley in Brisbane.
[3] In 2017, Dempsey Project Pty Ltd (“Project”) was a development company. It wished
to develop and market five residential townhouses on the land. Its sole director then
was Mr Andrew Karl Shofay.
The legal instruments
[4] On 23 August 2017, PCTL and Project entered into an agreement in writing (“Loan
Agreement”) whereby the former would provide financial accommodation up to
$1,825,300 to Project to enable it to undertake the townhouse development.1 The
terms of the loan were contained in a Loan Schedule2 and a document titled “GPS
Commercial Loan Terms”.3
1 Affidavit J Hoare sworn 2 April 2019 Exhibit “JH-1”: AB 2 63-128.
2 Ibid AB 2 63-79.
3 Ibid AB 2 85-128.
-- 2 of 12 --
3
[5] Clause 5 in the Loan Schedule required that the financial accommodation be secured
by a first registered mortgage over the land and by guarantees given by Profits and
by Mr Shofay and Mr Walters. On 6 September 2017, Profits executed Deeds of
Guarantee and Indemnity in its personal capacity and as trustee of each of the two
trusts.4 Deeds of Guarantee and Indemnity were executed by Mr Shofay and by
Mr Walters personally.5
[6] On the same day, both Profits in its personal capacity and as trustee and Project
separately executed a General Security Agreement, as Grantor, with PCTL.6
Conformably with that agreement, a mortgage, Mortgage No 718269403, was granted
by Profits as trustee over the land in favour of PCTL.7 It was registered on 12 September
2017.8
[7] The loan was to be repaid by the date which was 12 months from and including the
Settlement Date.9 By a Deed of Variation10 executed by the parties on 7 September
2018, the date for repayment of the balance outstanding and all other monies payable
to PCTL under the Loan Agreement was varied to 7 December 2018.11 The Annual
Interest Rate was also varied from 15 per cent per annum to 16.95 per cent per annum,
effective from 8 September 2018.12
The proceeding and the pleaded cases
[8] PCTL began proceedings in the Supreme Court of Queensland on 4 February 2019
against Project, Profits, Mr Walters and Mr Shofay as first, second, third and fourth
defendants respectively.13 In its Statement of Claim,14 as amended, it pleaded the
legal instruments to which I have referred; that PCTL had advanced $1,439,357.30 to
Project pursuant to the Loan Agreement; that Project had failed to repay the loan by
7 December 2018; that on 10 December 2018 it had made a demand in writing to all
of the defendants for repayment of the amount owing; that the amount owing had not
been repaid; and that at 31 January 2019, Project was indebted to PCTL under the
Loan Agreement in the amount of $1,676,481.56.15
[9] PCTL also pleaded against Profits that on 10 December 2018, it had given written
notice to Profits under s 84 of the Property Law Act 1984 (Qld) demanding payment
of $1,478,363.67, the amount then secured; and that by reason of the default of Profits
in making the payment of that amount, it was entitled under clause 14.2 of the
Mortgage to take possession of the land.
[10] By way of relief against all defendants, PCTL sought judgment for the amount of
$1,676,481.56 and interest thereon at the rate of 16.95 per cent per annum pursuant
to clause 3.1 of the Loan Schedule. Costs were also sought on an indemnity basis in
4 Exhibit “JH-2”: AB 2 129-153 and Exhibit “JH-3”: AB 2 154-178.
5 Exhibit “JH-5”: AB 2 204-228 and Exhibit “JH-4”: AB 2 179-203.
6 Affidavit DF Cliff sworn 4 April 2019 Exhibit “DFC-1”: AB 2 285-342 and Exhibit “DFC-2”: AB 343-400.
7 Exhibit “DFC-3”: AB 2 401-447.
8 Affidavit DF Cliff paragraph 4: AB 283.
9 Loan Schedule clause 4.1.
10 Exhibit “JH-6”: AB 2 229-241.
11 Ibid clause 2(b).
12 Ibid clause 2(a).
13 AB 1 10-12.
14 AB 1 31-37 amended by consent order made on 9 April 2019: AB 2 450.
15 This amount included interest and charges payable by Project pursuant to clause 7.10 of the Loan
Schedule and clause 13 of the GPS Commercial Loan Terms.
-- 3 of 12 --
4
reliance upon clause 7.11 of the Loan Schedule. As against Profits, recovery of
possession of the land was also sought.
[11] The defendants filed a Notice of Intention to Defend on 6 March 2019.16 In their
Defence,17 they admitted that the legal instruments had been executed by them but
did not admit that the Loan Agreement had been breached. That was because PCTL
had failed to make timely advances under it “causing the development time to be
extended and preventing (Project and Profits) being in a position to sell the
townhouses” and because PCTL “appointed an unqualified person as project manager
which was not within the contemplation of the agreement, thus extending the building
time.” They pleaded that “by implication or on equitable grounds, the time for
repayment should have been extended.”18 Further, they did not admit that the amount
of $1,676,481.56 was owing.19
[12] The defendants also pleaded by way of counterclaim that in breach of contract, or in
failure to act in good faith, PCTL appointed a project manager who overrode the
defendants’ project manager. That resulted in delays to the development project
causing damage to them in an amount that could not be assessed until the development
was finalised.20 The failure to act in good faith, it was pleaded, discharged the
guarantees and indemnities.21 Damages in an amount to be assessed upon final
approval of the development, a declaration that the guarantees and indemnities were
void and costs were counterclaimed by way of relief.
[13] A Reply and Answer was filed on 28 March 201922 in which clause 8(k) of the GPS
Commercial Loan Terms was pleaded. It provided that Project was to make payments
due under the Loan Agreement “in cleared funds and free of any set-off or deduction”.23
A provision to similar effect in clause 5.2 of the Deeds of Guarantee and Indemnity
was also pleaded.24
The summary judgment application and the hearing
[14] PCTL filed and served an application for summary judgment on 2 April 2019.25 It
was listed for hearing on 18 April 2019. PCTL also filed and served a number of affidavits
for the purpose of proving the factual matters alleged in its Statement of Claim.
[15] The application came on for hearing before a judge of the Trial Division on 18 April
2019. At the commencement of the hearing counsel for the four defendants indicated
that his clients were applying for an adjournment.26 He filed and read by leave an
affidavit sworn by Mr F Dzelalija, solicitor, in support of that application.27 It was
received without objection.
[16] Counsel advanced a number of arguments for the adjournment. One of them related
to two affidavits sworn by Mr J Hoare, PCTL’s Portfolio Manager, sworn respectively on
16 AB 1 19-20.
17 AB 1 21-24.
18 Ibid paragraph 4.
19 Ibid paragraph 8.
20 Counterclaim paragraphs 4-9.
21 Ibid paragraph 10.
22 AB 1 25-27 subsequently amended on 5 April 2019: AB 1 28-30.
23 Ibid paragraph 10.
24 Ibid paragraph 13.
25 AB 2 55-56.
26 Transcript 1-2 ll9-10: AB 2 520.
27 AB 2 510-512.
-- 4 of 12 --
5
15 April 201928 and 18 April 2019,29 which the defendants complained had been
served less than eight business days before the hearing, thus short of the period
stipulated by UCPR r 296(1) for the filing and serving of an applicant’s material.
A second argument was that PCTL had amended its statement of claim, the amended
pleading having been served on 8 April 2018, some seven business days before the
day of the hearing. Thirdly, reliance was placed on statements by Mr Dzelalija in his
affidavit that he was seeking counsel’s advice on filing an amended defence and
counterclaim and that preparation of draft affidavits to resist the summary judgment
application was substantially advanced. Mr Dzelalija referred to grounds for defending
and counterclaiming which, in substance, mirrored those that had already been pleaded.
[17] The learned primary judge refused the application for an adjournment. In reasons
given ex tempore, her Honour said:
“Well, I refuse the application for an adjournment. The basis upon
which it was sought was, in my view, quite unmeritorious. This
application was filed and served on the 2 nd of April 2018. The
substantive affidavit material was served that day. Another affidavit
was filed shortly thereafter, and no complaint was made, but it is late.
After that, two affidavits of Mr Hoare were filed and served; one three
days ago, and one with leave this morning. The affidavit with leave
this morning could not properly have been the subject of complaint, in
my view. It is the kind of affidavit that every lender makes on an
application such as this, simply giving the judge the up to date amount
of monies owing at the time the lender seeks judgment from the court.
That leaves the affidavit which is court document 14. It is a document
which has six substantive paragraphs. And it simply adds some more
details to what has already been sworn.
There was nothing in particular about it that was argued to cause the
defendants any particular difficulties. And in circumstances where
there’s been absolutely no attempt to file a proper defence, file
affidavits on this application or explain the reason for not doing so,
I really do not think there is any meritorious point at all in the
complaint that this affidavit was served late. Rule [296] is, in its terms,
mandatory and it has, in my view, most substantially been complied
with. And I’d excuse anything else as an irregularity under the rules.
The last point was that 13 days ago, a statement of claim – an amended
statement of claim was filed and served.
The point is taken that because it was served after 4 o’clock in the
afternoon, in fact, it was deemed to be served at a time when there
have only been seven clear business days between that service and
now. It, again, is a most unmeritorious argument in circumstances
where the defendant respondents are aware that a summary judgment
application has been made to rely on technical points, such as service
being effected after 4 o’clock in the afternoon, really are the type of
points made by defendants without any substantive defence. So in –
for all of those reasons, I refuse the adjournment.”30
28 AB 2 451-497.
29 AB 2 504-506. The learned primary judge granted leave for the filing and reading of this affidavit
notwithstanding the respondents’ objection: Transcript 1-2 l47.
30 Transcript 1-9 l29 – 1-10 l11.
-- 5 of 12 --
6
[18] Counsel for the defendants then indicated that he had additional sworn affidavits with
him which he and those instructing him wished “to finalise” with the benefit of
consultation with the defendants. Notwithstanding that, he sought leave to file and
read those affidavits on the basis that certain paragraphs would be struck from them.31
[19] The affidavits in question were one by Mr J Samardzija, a current director of Project
and of Profits,32 and by Mr J Uljarevic, their Project Manager,33 both sworn on 17 April
2019. Copies of the affidavits were provided to the learned primary judge and to
counsel for PCTL. The matter was then stood down to allow for consideration of them.
[20] I mention at this point that the defendants had foreshadowed an objection to the
substantive content of an affidavit that Mr DF Cliff had sworn on 4 April 201934
which had been filed in support of the application. Mr Cliff is a partner in the firm
of solicitors acting for PCTL in the application. The objection was to paragraphs 2,
3 and 4 of the affidavit by which true copies of the two General Security Agreements
and Mortgage No 718269403 were exhibited to it. The basis of the objection was
a proposition that the affidavit did not conform with UCPR r 295(2) because relevant
sources of information and reasons for belief in it were not stated by Mr Cliff.
[21] The hearing of the application resumed a little over an hour later. The learned primary
judge at that point said that in the intervening period, she had considered the merits
of the opposition to Mr Cliff’s affidavit and was “inclined to overrule” it.35
[22] Counsel for the defendants requested short reasons for overruling the objection. Her
Honour than gave the following reasons ex tempore:
“The point was taken that court document eight which in this matter,
which exhibits the document, which are Guarantees (sic) and
Mortgage, relied upon by the plaintiff:
Must (implicitly) be sworn on information and belief
And so therefore that the documents had not be (sic) proved in this
application for summary judgment, i.e. for summary relief. The
documents are, in my opinion, within section 1305 of the Corporations
Law evidence of what they purport to be. The court rules allow
information belief on a summary application, and if there were still
problems I would be inclined to exercise my discretion under
section 129A of the Evidence Act to allow the affidavit, which is court
document eight, as proof of the documents in question. The documents in
question are admitted on the pleadings in this proceeding and there is
no serious or meritorious dispute about them. As I say, the point is simply
a tactical point which counsel for the respondents has chosen to take.”36
[23] Counsel for PCTL then indicated that he had no objection to the receipt of the
affidavit sworn by Mr Samardzija and Mr Uljarevic. Submissions ensued. Their
content and scope are sufficiently reflected in the following reasons which the learned
primary judge gave ex tempore for granting summary judgment:
31 Transcript 1-14 ll1-17.
32 AB 2 513-515.
33 AB 2 516-518.
34 AB 2 282-283.
35 Transcript 1-19 l29 – 1-30 l3.
36 Transcript 1-20 l16-31.
-- 6 of 12 --
7
“I am satisfied that the defendants had no real prospect of defending
the plaintiff’s claim. The defence filed on behalf of the defendants
does not, in my opinion, raise any proper defence known to the law.
In fact, so much was conceded by the defendants’ counsel. There is
no explanation for why a proper defence was not filed originally.
There is no explanation for why a proper defence had not been filed
by the date – or by – by today’s date.
The defendants raise various matters by counter-claim. They are
pleaded in a most sketchy manner. There are no proper particulars.
The pleading does not comply with the UCPR. But assuming that
there is something in the counter-claim, there is a no set-off clause in
the financial documents and it cannot go to the plaintiff’s claim. The
order that I make today will not prevent the defendants running their
counterclaim should they see fit to do so.
Late in the hearing of the application, affidavits were filed on behalf
of the defendants. They are – well – and there was also – at the
beginning of the application, an affidavit was filed which was sworn
by the solicitor who acted for the defendants. Again, the quality of
those affidavits is below what one would normally expect to see in an
application in this Court, in that no attention has been paid to proving
things properly or to being specific or particular about the matters
deposed to. Some of the matters allege mala fides on the part of the
plaintiff. One would have to have concerns about those allegations.
Nonetheless, the point with which I am concerned is that all of the
matters raised in those affidavits could only go to establishing
a counter-claim on the part of the defendants, which, as explained,
cannot avail them on this application.
The affidavit of Mr Uljarevic, filed today with leave, explains that he
is the project manager for an unnamed builder which was engaged –
or is said to be engaged by the defendants. He swears that, in his
opinion, the plaintiff’s conduct during the course of building work led
to delay – paragraphs 6 and 16 of the affidavit. This led to claims by
the subcontractors against the builders (not the defendant respondents)
– paragraph 6 and 8 of the affidavit. He deposes to the fact that the
defendant respondents have not paid the builder the last payment due
to the builder – paragraph 7 of the affidavit. As I say, some of that is
just irrelevant, but, at most, it goes to whether or not there is a counter-
claim which cannot avail the defendant respondents on this application.
Then there is an affidavit of Mr Samardzija. He is a director of some
of the defendant respondent companies. He deposes to the fact that
the plaintiff caused the building project to be delayed – paragraph 6, 7
and 10 – and that the defendants incurred cost because of that –
paragraph 10. But, in my opinion, the affidavit deposes to no more
than that.
It was submitted on behalf of the defendants that these matters went to
a Mackay v Dick-type obligation and really showed that the plaintiffs had
prevented the defendants having the benefit of this contract. In my
opinion, there is nothing in this point. The defendants did receive the
money they were entitled to receive under the lending contracts.
-- 7 of 12 --
8
Despite the submission of counsel for the defendant respondents, their
– the affidavit material did not actually swear that the plaintiff’s action
caused the defendants not to be able to repay the money they received
from the plaintiff. At most, what the affidavit material does is show
that perhaps there is a counter-claim. Because of the no set-off clause,
this is irrelevant to whether or not I ought to grant judgment.”37
[24] I note that this appeal does not put in issue the correctness of these reasons on the
material before the learned primary judge. It is apparent also that her Honour accepted
a submission for PCTL that it was contractually entitled to costs on an indemnity basis.
Orders made
[25] Conformably with these reasons, the learned primary judge made orders on 18 April
2019 that Profits deliver up possession of the land; that there be judgment for PCTL
against the respondent defendants for $1,719,041.99;38 and that the respondent
defendants pay PCTL’s costs of the proceeding including the application, to be
assessed on the indemnity basis.39
The appeal
[26] On 24 April 2019, the respondent defendants, whom I shall hereafter refer to as the
appellants, filed a notice of appeal against the summary judgment.40 Some six
grounds of appeal are set out in that document. They are underpinned by two separate
propositions. These propositions are that the learned primary judge erred in admitting
Mr Cliff’s affidavit and that her Honour erred in refusing the adjournment. The
appellants seek orders that include a setting aside of the summary judgment.
[27] In their respective written and oral submissions, the parties addressed the two
propositions rather than the individual grounds of appeal. It is convenient to adopt
a similar approach to consideration of the appeal.
The admission of Mr Cliff’s affidavit
[28] Appellants’ submissions: The appellants submitted that Mr Cliff could not have had
personal knowledge of the General Security Agreements and the registered mortgage.
Any statement he made verifying them must therefore have been based on
information supplied to him by others and his belief in it. His affidavit did not state
the sources of the information or his reasons for belief in it as required by UCPR
r 295(2). Hence it was not eligible in proof of PCTL’s claim.
[29] Reference was made to the decision of this Court in Hanson Construction Materials
Pty Ltd v Davey & Anor41 for the proposition that an affidavit in support of a summary
judgment application that does not state sources of information and reasons for belief
in it is objectionable. As well, the appellants submitted that reliance by her Honour
on s 1305 of the Corporations Act 2001 (Cth) was misplaced. That was because there
was no evidence that any of the three documents was a book of account kept by PCTL
or purported to be so.42
37 AB 1 7-8.
38 This was the amount certified as owing at that date by Mr Hoare in his affidavit sworn 18 April 2019.
39 AB 1 9.
40 AB 1 1-5.
41 [2010] QCA 246 at [31].
42 Appellants’ Outline of Submissions (“AOS”) paragraph 22, citing ss 1305(1), (2).
-- 8 of 12 --
9
[30] PCTL’s submissions: PCTL submitted that the learned primary judge had correctly
applied s 129A of the Evidence Act 1997 (Qld). It does not require that sources of
information or reasons for belief be deposed to in the circumstances in which it may
apply. The provision allows the court to admit a document to which it applies in any
way the court sees fit. It was further submitted that this was a strong case for
admitting the documents in question under the section because they had been
admitted on the pleadings.
[31] Discussion: I would hesitate to accept the appellants’ proposition that Mr Cliff must
have relied on information in order to swear that what was exhibited to his affidavit
were true copies of the General Security Agreements and the registered mortgage. It
is not apparent that he need have relied on information to swear that. He was not
cross examined. Thus, any reliance that he may have placed on information was not
established by that route.
[32] The present circumstances are distinguishable from those in Hanson. In that case,
there was good reason for concluding that it was likely that the deponent did not have
personal knowledge that certain invoices were unpaid and that she must have relied
on other unidentified business records in order to swear that they were unpaid. I am
therefore unpersuaded that Mr Cliff’s affidavit was one to which the requirements in
r 295(2) necessarily applied.
[33] In any event, it was open to her Honour to have relied on s 129A in order to admit
these documents. Relevantly, that provision applies where a fact in issue in civil
proceedings is the proof of documents43 and the court considers that the fact in issue
is not seriously in dispute.44 In such circumstances, the court may order that evidence
of the fact be given “in any way the court directs”.
[34] Here, the relevant fact in issue was proof of the General Security Agreements and the
registered mortgage. Further, those documents were not seriously in dispute. The
former were pleaded in paragraph 4 of the Amended Statement of Claim and the latter
in paragraph 5(c)(1) thereof.45 In paragraph 1 of their Defence, the appellants
admitted paragraphs 4 and 5.46 It was therefore open to direct, as her Honour in effect
did, that evidence of those documents be given by admission of Mr Cliff’s affidavit
to which they were exhibited as true copies.
[35] It is therefore unnecessary to consider whether the documents are ones to which
s 1305 applied. The appellants have not established that the learned primary judge
erred in admitting Mr Cliff’s affidavit.
The refusal of the adjournment application
[36] Appellants’ submissions: The appellants submitted that the learned primary judge
erred in not granting a short adjournment to allow them time to obtain further evidence
and to amend their pleadings in accordance with it. As well, two of Mr Hoare’s affidavits
and the amended statement of claim had been served less than eight business days
before the hearing. A short adjournment would not have prejudiced PCTL, it was
submitted.
43 ss (1)(a)(ii).
44 ss (1)(b)(i).
45 AB 1 32.
46 AB 1 21.
-- 9 of 12 --
10
[37] Reference was made to the observations of Brennan, Deane and McHugh JJ in Sali v
SPC Ltd47 that the proposition enunciated by the English Court of Appeal in Maxwell
v Keun48 had become firmly established and had been applied by appellate courts on
many occasions. It is to the effect that although an appellate court will be slow to
interfere with the discretion of a trial judge to refuse an adjournment, it will do so if
the refusal will result in a denial of justice to the applicant and the adjournment will
not result in any injustice to the other party.
[38] PCTL’s submissions: PCTL submitted that, at best, any further evidence that the
appellants would seek to obtain would be to further the broad allegations they had
made that PCTL had engaged in conduct that was “designed to prevent (them) from
having the full benefit of the commercial contract which had been entered into” and
that it had deliberately delayed loan draw-downs “to cause considerable delay in
respect of completion of the project”.49 Such evidence would ground, at the most,
a counterclaim. It would not ground a defence.50
[39] Further, the amendments to the statement of claim were to plead contractual
provisions in the Loan Schedule (clause 7.1) and the General Security Agreements
(clause 1.1) as a basis for the claim for indemnity costs. The two affidavits of
Mr Hoare deposed to uncontroversial matters. Thus, the appellants were not
prejudiced by service of the Amended Statement of Claim or those affidavits less than
eight business days before the hearing of the application.51
[40] Discussion: The principle in Maxwell v Keun is one that is activated when a refusal
to grant an adjournment will result in a denial of justice to the applicant for it. Thus,
a critical issue for determination here is whether the refusal of the short adjournment
denied justice to the appellants. That issue turns upon whether or not the refusal
materially prejudiced them in resisting the application.
[41] In my view, the service of the Amended Statement of Claim and Mr Hoare’s two
affidavits within the eight business day period did not have that effect. As PCTL
submitted, the amendments to the pleading concerned, in substance, contractual terms
within admitted documents. The earlier of Mr Hoare’s affidavits exhibited two
agreements and a registered mortgage all of which were admitted on the pleadings.
The other affidavit swore to the amount outstanding at the date of the hearing. It did
not open some new area of potentially controversial fact.
[42] I now turn to the further evidence that the appellants intimated they wished to pursue.
I preface a consideration of it with the observation that PCTL had pleaded and proved
the advances made under the Loan Agreement52 which the appellants did not
positively deny.53 The original repayment date and the variation of it to 7 December
2018 were also pleaded and admitted.54 The Defence did not challenge that the
monies advanced had not been repaid by that date.
47 (1993) 116 ALR 625 at 628.
48 [1928] 1 KB 645 at 650, 657, 658.
49 Affidavit F Dzelalija paragraph 9: AB 2 511.
50 PCTL’s Outline of Submissions (“POS”) paragraph 4.
51 POS paragraphs 5-8.
52 Amended Statement of Claim paragraph 11: AB 1 34 and affidavit of J Hoare sworn 2 April 2019
paragraph 3(f): AB 2 58-60.
53 Defence paragraph 3: AB 1 21.
54 Amended Statement of Claim paragraphs 5(b) and 7: AB 1 32, 33 and Defence paragraph 1: AB 1 21.
-- 10 of 12 --
11
[43] The learned primary judge in her reasons for granting summary judgment observed
that all of the matters raised in the appellants’ three affidavits could only go to
establishing a counterclaim for damages. In my view, her Honour was correct for the
following reasons.
[44] Firstly, the pleading in paragraph 4 of the Defence that the time for repayment should
have been extended beyond 7 December 2018 to some other unspecified date was not
a pleading that the parties had agreed to extend it, either expressly or impliedly. At
most, it might be regarded as an allegation that PCTL had been contractually obliged
to extend the repayment date further but had failed to do so. So regarded, it could
only ground a claim for damages.
[45] Secondly, the other matters pleaded as breaches of contract or of equitable obligations
in the appellants’ counterclaim could only have grounded relief by way of damages.
They did not directly impugn the integrity of PCTL’s debt claim or claim to possession as
such.
[46] Her Honour was also correct in her view of the operation of clause 8(k)55 of the GPS
Commercial Loan Terms and its counterpart in clause 5.2 of the Deeds of Guarantee
and Indemnity.56 As noted, those clauses required repayments to be made “in clear
funds and free from any set-off or deduction”. Thus, by agreement, the appellants were
precluded from relying on unliquidated damages claims by way of set-off as a defence.
[47] It remains to note that the adjournment sought was to obtain further details of the
already made broad allegations; that is to say, further details of conduct attributed to
PCTL which might give rise to claims for damages against it. No additional matter
was identified as warranting investigation which arguably might have grounded
a viable defence to PCTL’s claims.
[48] For these reasons, I conclude that the appellants were not prejudiced in their defence
of the summary judgment application by the refusal of the adjournment. They have
not established a basis for appellate interference with the decision to refuse it.
Disposition
[49] The appellants have not established a viable ground of appeal. It follows that their
appeal must be dismissed. They must pay PCTL’s costs of the appeal. As to the basis
on which those costs should be assessed, PCTL’s submission is that they should be
assessed on an indemnity basis. I agree.
[50] Clause 2 of the General Security Agreements obliges the Grantor to pay PCTL “the
Secured Moneys”.57 The definition of “Secured Moneys” in clause 1 of these
agreements includes, in item (d)(ix), legal fees incurred in the exercise of any right of
a Secured Party, as PCTL is, on a solicitor and own client basis. It was by these
proceedings that PCTL sought to enforce its right to possession of the land. Hence
the legal fees incurred by it in responding to an appeal in those proceedings are
Secured Moneys which are payable by Project and Profits. I would accept that it is
arguable that they are not also recoverable as additional legal fees within the meaning
of clause 7.11 of the Loan Schedule. However, in view of the operation of clause 2
of the General Security Agreements, it is not necessary to resolve that issue.
55 AB 2 104.
56 AB 2 139, 189.
57 AB 2 298, 356.
-- 11 of 12 --
12
Orders
[51] I would propose the following orders:
1. Appeal dismissed.
2. The appellants are to pay the respondent’s costs of the appeal to be assessed on
the indemnity basis.
[52] FLANAGAN J: I agree with the reasons of Gotterson JA and the orders that his
Honour proposes.
-- 12 of 12 --