Bundaberg Regional Council v Muller [2019] QPEC 31 [2019] QPELR 972
PLANNING AND ENVIRONMENT COURT
OF QUEENSLAND
CITATION: Bundaberg Regional Council v Muller [2019] QPEC 31
PARTIES: BUNDABERG REGIONAL COUNCIL
(applicant)
v
DEBBIE LORRAINE MULLER AS TRUSTEE UNDER
INSTRUMENT 71566903
(respondent)
FILE NO/S: 4525 of 2018
DIVISION: Planning and Environment
PROCEEDING: Application
ORIGINATING
COURT: Planning and Environment Court, Brisbane
DELIVERED ON: 18 June 2019 (ex tempore)
DELIVERED AT: Brisbane
HEARING DATE: 18 June 2019
JUDGE: Kefford DCJ
ORDER: 1. The Respondent is fined $5 000 and the fine is to be
paid by 30 August 2019.
2. The Respondent by herself, her servants or agents
remove from land described as Lot 65 on RP22109 and
situated at 22 Kolan Street, Bundaberg (“the Land”), and
do not replace, all things in connection with the building
that has been placed on the Land, by 30 August 2019.
3. The Respondent pay the Applicant’s costs of and
incidental to the proceeding, fixed at $20 000, to be paid
by 30 August 2019.
CATCHWORDS: COURTS AND JUDGES – CONTEMPT – PARTICULAR
LEGISLATION:
CONTEMPTS – DISOBEDIENCE OF ORDERS OF
COURT – where an enforcement order was made by his
Honour Judge Rackemann in the Planning & Environment
Court on 16 March 2018 – where the order was made by
consent – where the enforcement order was not complied
with – whether the respondent is in contempt of the
enforcement order
District Court of Queensland Act 1967, s 129
Penalties and Sentences Act 1992, s 9
-- 1 of 9 --
2
Planning and Environment Court Act 2016, s 36
Uniform Civil Procedure Rules 1999, r 930, r 932
CASES: Bundaberg Regional Council v Bailey [2017] QPEC 31;
[2017] QPELR 782, considered
Bundaberg Regional Council v Lammi & Anor [2014] QPEC
52, [2015] QPLR 111, considered
Dubois v Rockhampton Regional Council [2014] QCA 215,
cited
Logan City Council v Whelan [2015] QPEC 23; [2015]
QPELR 659, considered
Whitsunday Regional Council v Branbid Pty Ltd & Anor
[2017] QPEC 66; [2018] QPELR 224, considered
SOLICITORS: Connor O’Meara for the appellants
The respondent represented herself
Introduction
[1] Ms Muller owns land at 22 Kolan Street, Bundaberg. In 2014, pursuant to a building
approval, she caused a relocated house to be placed on her land. The building
approval subsequently lapsed because Ms Muller neglected to undertake various
works to complete and secure the house.
[2] For almost three years, the Bundaberg Regional Council (“the Council”) has been
endeavouring to variously encourage, demand, require and eventually coerce
Ms Muller to either remove the house or obtain a new building development approval
and undertake the works necessary to complete and secure the house.
[3] The Court has made enforcement orders requiring steps be taken to rectify the
unlawful building works. Ms Muller accepts that she has not complied with the
enforcement orders.
[4] The Council seeks to have Ms Muller punished for contempt.
The enforcement order
[1] On 20 December 2017, the Council commenced proceedings for enforcement orders
with respect to an incomplete building relocated from other land (“the relocated
dwelling”) that was placed on land described as Lot 65 on RP22109 situated at 22 Kolan
Street, Bundaberg.
[2] On 16 March 2018, this court was satisfied that a development offence had been
committed by Ms Muller, namely the carrying out of assessable development without
all necessary development permits being in effect. His Honour Judge Rackemann
made an enforcement order pursuant to s 180 of the Planning Act 2016 (Qld).
-- 2 of 9 --
3
[3] The order of His Honour Judge Rackemann was:
“IT IS ORDERED PURSUANT TO SECTION 180(3) OF THE
PLANNING ACT 2016 THAT:
1. The Respondent by herself, her servants or agents remove from the
Land, and do not replace, all things in connection with the building
that has been placed on the Land (the “Resite Dwelling”), unless the
Respondent complies with paragraph 3 of this order.
2. Provided that paragraph 3 of this order is complied with, the
operation of paragraph 1 of this order shall be suspended. Where
paragraph 3 of this order is not complied with, the requirement in
paragraph 1 of this order shall be complied with, within 2 months of
the date of the non-compliance with paragraph 3.
3. The Respondent is to:
(a) maintain temporary security fencing on the Land to restrict
public access to the Land until such time as the building works
for the Resite Dwelling are completed in accordance with this
order;
(b) by 30 June 2018, lodge a properly made building
development application to a building certifier for a building
development approval to authorise the completion of the
building works for the Resite Dwelling, including making an
amenity and aesthetics referral to the Bundaberg Regional
Council (“Council”) for a concurrency agency response;
(c) by 14 August 2018, obtain an effective building development
approval to authorise the completion of the building works for
the Resite Dwelling;
(d) by 21 September 2018:
(i) complete all works necessary so that a Form 16
Inspection Certificate for the foundation (footings) stage
of the building work can be given by a building certifier;
and
(ii) provide to the Council a Form 16 Inspection Certificate
for the foundation (footings) stage of the building work;
(e) by 21 September 2018:
(i) complete all works necessary so that a Form 16
Inspection Certificate for the frame stage of building
work can be given by a building certifier; and
(ii) provide to the Council a Form 16 Inspection Certificate
for the frame stage of the building work;
(f) by 30 October 2018:
(i) complete all exterior building work in accordance with
the requirements of the building development approval
and any concurrence agency response; and
(ii) provide to the Council a statement from building certifier
that the external works have been completed in
accordance with paragraph 3(f)(i) of this order; and
-- 3 of 9 --
4
(g) by 30 October 2018:
(i) complete all necessary works under the building
development approval to enable a Form 21 Final
Inspection Certificate to be given by a building certifier;
and
(ii) provide to the Council a Form 21 Final Inspection
Certificate from a building certifier.
4. There be liberty to apply on the giving of three (3) business days
written notice to the other parties.”
[4] The order was endorsed with the following warning:
“If you, DEBBIE LORRAINE MULLER AS TRUSTEE UNDER
INSTRUMENT 715669303, do not obey this order within the time specified,
you will be liable to Court proceedings to compel you to obey it and
punishment for contempt.”
The contempt
[5] Section 36 of the Planning and Environment Court Act 2016 provides that a P&E
Court judge has the same power to punish a person for contempt as a District Court
judge. It also provides that s 129 of the District Court of Queensland Act 1967 applies
to the Planning and Environment Court in the same way as it applies to the District
Court.
[6] Section 129(1) relevantly provides that a person is in contempt of the District Court
if the person, without lawful excuse, fails to comply with an order of the court other
than an order mentioned in s 129(1)(e). That subsection does not apply in this case.
Under s 129(2), a District Court judge has the same power to punish for a contempt
mentioned in subsection (1) as a Supreme Court judge would have if the contempt
were a contempt of the Supreme Court.
[7] The enforcement orders required Ms Muller to either take particular steps to facilitate
the completion of the partially completed building works or remove the relocated
dwelling from the land.
[8] The Council alleges that, other than erecting temporary fencing around the relocated
dwelling, none of steps required under paragraph 3 of the enforcement order have
been complied with and the relocated dwelling remains on the land. The Council has
filed extensive affidavit material and statutory certificates in support of its allegations.
[9] The evidence of Ms McGinley, a Council officer, establishes that she inspected the
land on 13 July 2017, 18 September 2017, 10 December 2018 and 10 June 2019.
[10] On the 10 December 2018 inspection, the building works remained on the land, were
in an incomplete state and Ms McGinley did not observe that any building works had
been undertaken since her previous inspections in 2017. The photographs exhibited
in AGM 17 to the first affidavit of Ms McGinley demonstrates the incomplete nature
of the building works as at 10 December 2018.
[11] On the 10 June 2019 inspection, Ms McGinley could not detect any difference in the
state of the building works compared to the building works she observed during her
previous inspection on 10 December 2018. The photographs exhibited to her third
-- 4 of 9 --
5
affidavit demonstrates the incomplete nature of the building works as at 10 of June
2019.
[12] Temporary security fencing was observed on both 10 December 2018 and 10 June
2019, albeit Ms McGinley noted that a portion of the fence had been pulled back,
leaving a gap where access could be obtained. That was noted during the inspection
on 10 June 2019.
[13] The Certificate pursuant to section 251 of the Local Government Act 2009
(“Certificate”) establishes that as at 14 June 2019:
(a) the Council has no record of a private certifier having been engaged in respect
of the Land since a Notice of Discontinuance of the previous private certifier
was lodged on 26 February 2015;
(b) the Council has no record of a further building development approval having
been given in respect of the Land, since the building development approval
granted on 21 October 2014 (which lapsed on 26 February 2015)16;
(c) the Council has no record of having received a Form 16 Inspection Certificate
for the foundation (footings) stage of the building works on the Land;
(d) the Council has no record of having received a form 16 Inspection Certificate
for the frame stage of the building works on the Land;
(e) the Council has no record of having received a statement from a building
certifier that the external works for building works on the Land have been
completed in accordance with the requirements of a building development
approval and any concurrence agency response; and
(f) the Council has no record of having received a Form 21 Final Inspection
Certificate from a building certifier with respect to the building works on the
Land.
[14] Ms Muller has filed material, but that material does not seek to rebut or contradict the
evidence of Ms McGinley or that established by the Certificate.
[15] During the hearing, Ms Muller accepted that the Court made an enforcement order on
16 March 2018. She also accepted that she was personally served with the
enforcement order on 23 March 2018; and that the Council’s allegations regarding
non-compliance are true.
[16] Ms Muller sought to excuse her failure to comply with the orders on the basis that the
builder whom she had engaged to move the house to the land, Mackay & Sons (Qld)
Pty Ltd, had not complied with its obligations and that the Queensland Building and
Construction Commission was responsible for the cost of rectification under an
insurance policy. At the time the enforcement order was made, the Queensland
Building and Construction Commission had notified Ms Muller, by letter dated 13
May 2016, that the items listed in a direction to the builder had been satisfactorily
rectified and that her complaint file would be closed. Ms Muller says, however, that
her complaint is still the subject of proceedings in the Queensland Civil and
Administrative Tribunal.
-- 5 of 9 --
6
[17] The Council submits that the relief that Ms Muller seeks in the QCAT proceedings
does not impact upon how or when the building works should have been completed
or her ability to comply with the enforcement orders. The Council also submits that,
to the extent that Ms Muller is seeking to extend the time by which she can seek an
external review of the Queensland Building and Construction Commission decision
with respect to her complaint about the builder’s work, it is of relevance that the
Queensland Building and Construction Commission decision was made on 13 May
2016 and the QCAT proceedings were commenced on 14 February 2019. The
respondent consented to enforcement orders some two years after the Queensland
Building and Construction Commission decision.
[18] The Council submits that even if it is accepted that Ms Muller has some remaining
avenue of challenge in respect of the Queensland Building and Construction
Commission decision, she could have taken that challenge before the determination
of the Planning and Environment Court enforcement proceedings which resulted in
the enforcement orders that she has breached. The Council submits the QCAT
proceedings do not amount to a lawful excuse.
[19] The matters sought to be relied on by Ms Muller do not provide a lawful excuse for
the failure to comply with the enforcement order.
[20] Having regard to the material relied on by the Council, I am satisfied beyond
reasonable doubt that Ms Muller has contravened the enforcement order made on 16
March 2018, in particular paragraphs 1 and 3(b) to (g). Ms Muller’s concessions also
support that finding.
[21] The Council submits that Ms Muller’s failure to comply with the Enforcement Orders
was flagrant and contumacious given the following circumstances:
(a) The relocated dwelling has been on the land since at least 19 September 2016
and the Council has been endeavouring since September 2016 to secure
compliance with the law.
(b) Efforts by the Council to secure compliance between September 2016 and
December 2017 were unsuccessful, resulting in the commencement of
Originating Application No. 4927 of 2017 in December 2017.
(c) Ms Muller, through her then solicitor, consented to the Enforcement Orders in
Originating Application No. 4927 of 2017 on 16 March 2018.
(d) Other than erecting temporary fencing (which has been in place since October
2016 in response to an enforcement notice), Ms Muller has taken no steps to
comply with the enforcement orders. In that respect, the Council notes that:
(i) Ms Muller has ignored the requirement to make a building
development application and obtain a new effective building
development approval, which were required to occur by 30 June 2018
and 14 August 2018 respectively;
(ii) Ms Muller has ignored the requirement to remove the relocated
dwelling from the land, which arose as and from 1 July 2018 and was
required to be completed by 1 September 2018;
-- 6 of 9 --
7
(iii) Ms Muller has ignored the balance of the requirements of paragraph 3
of the enforcement orders, which were required to be completed by 30
October 2018 (had she not otherwise failed to comply with paragraph
3(b) of the enforcement orders);
(e) Ms Muller was given an opportunity to purge her contempt. In that respect the
Council notes that:
(i) The Council, through its solicitors, wrote to Ms Muller on 5 October
2018 urging her to apply to the Court as soon as possible to seek
amendments to the Enforcement Orders.
(ii) In the same letter, the Council advised that upon the making of an
application to vary the enforcement orders, the Council would agree to
amended timeframes to facilitate the completion of the building works.
(iii) Rather than take up the Council’s recommendations and apply to the
Court to vary the Enforcement Orders, the letter from Connor O’Meara
of 5 October 2018 seems to have prompted Ms Muller to engage in a
series of communications with Queensland Building and Construction
Commission which ultimately resulted in the commencement of the
QCAT Proceedings.
[22] I am satisfied that the Council has also demonstrated, beyond reasonable doubt, that
the non-compliances involved deliberate disobedience of the court’s orders.
Contempt of the enforcement orders has been established.
The appropriate remedy for contempt
[23] In Bundaberg Regional Council v Bailey [2017] QPEC 31; [2017] QPELR 782 the
Court observed, at 788, that:
“…contempt of the court is a serious matter. It goes significantly to the heart
of the justice system. The community will have no faith in orders that the
Court makes in circumstances where people treat those orders with total
disregard without any risk of penalty. Deterrence, of course, works in two
ways. One is the general deterrence, to deter other people from carrying out
conduct such as this, but also, at a personal level, to deter you from further
breaches of court orders.”
[24] The court has the same powers to punish for contempt as has the District Court for a
contempt of that court.
[25] Those powers are the subject of Chapter 20, Division 3 of the Uniform Civil
Procedure Rules 1999. Pursuant to r 930(2) of the Uniform Civil Procedure Rules,
the Court may punish an individual by making an order that may be made under the
Penalties and Sentences Act 1992.
[26] As was noted by his Honour Judge Horneman-Wren in Bundaberg Regional Council
v Lammi & Anor [2014] QPEC 52; [2015] QPELR 111 at 114-5, paragraph 10, citing
Dubois v Rockhampton Regional Council [2014] QCA 215 at 73-4 :
“…in punishing for contempt the court is exercising its inherent powers. The
reference to the Penalties and Sentences Act 1992 (Qld) in r 930 of the UCPR
-- 7 of 9 --
8
does not confine the court’s powers to make only those orders contained in
the Act.”
[27] The maximum penalty that the District Court can impose on Ms Muller, as an
individual, is 4175 penalty units, which is $545,046.25 at the moment.
[28] In determining an appropriate sentence, regard ought be had to s 9 of the Penalties
and Sentences Act and a sentence of imprisonment should only be imposed as a last
resort.
[29] As was observed by his Honour Judge Horneman-Wren in Bundaberg v Lammi &
Anor [2014] QPEC 52; [2015] QPELR 111 at paragraph 19:
“The purpose of a court imposing a sanction upon persons in contempt of its
orders is two-fold. It is both to punish for the past failure to comply, and to
coerce future compliance.”
[30] The Council submits that the Court should exercise its discretion to impose a fine on
Ms Muller rather than imprisonment.
[31] The Council makes reference to a number of comparable cases.
[32] In Bundaberg Regional Council v Lammi & Anor [2014] QPEC 52; [2015] QPELR
111, the Court ordered that respondents were jointly fined $5000. In that case, there
was evidence of regret from the respondents for their failure to comply and evidence
of a willingness to take steps to achieve compliance. Until today, there was no such
indication from Ms Muller.
[33] In Bundaberg Regional Council v Bailey [2017] QPEC 31; [2017] QPELR 782, the
respondent was released on her entering into a recognisance in the amount of $1000.
In that case, there was evidence before the Court that there were a number of financial
and health issues that would have materially impacted upon the respondent’s ability
to comply with the enforcement orders. There is no evidence of those type of
circumstances in this case.
[34] The Council submission also make reference to Logan City Council v Whelan [2015]
QPEC 23; [2015] QPELR 659 where a fine of $12,000 was imposed on a corporate
entity and $2500 on an individual respondent for a failure to comply with an
enforcement order requiring that approvals be obtained or unlawful use cease. In that
case, the Court was mindful that the respondents accepted a finding of contempt
without a need for a hearing and that some steps had been taken toward compliance
under the enforcement order and that further steps had been taken since the contempt
proceedings had been on foot. That is not the case here.
[35] In Whitsunday Regional Council v Branbid Pty Ltd & Anor [2017] QPEC 66; [2018]
QPELR 224, the Planning and Environment Court found that the flagrant refusal to
cease carrying on the unlawful use of the land can only be described as contumacious.
The Court imposed a $15,000 fine on the corporate entity and $5000 on the individual
respondent. In that case, the Court also ordered each respondent to pay 30 per cent
of the applicant’s costs of and incidental to the proceeding on an indemnity basis.
[36] The Council submits that the present circumstances demonstrate greater defiance than
encountered in both Bailey and Lammi because there is no evidence of any acceptance
of any wrongdoing or remorse. It submits that the reliance on the QCAT proceedings
-- 8 of 9 --
9
is an effort to deflect wrongdoing, which is not an excuse let alone a reasonable or a
lawful excuse. It says there is no evidence of mitigating circumstances of the nature
before the Planning and Environment Court in Bailey and no evidence of remorse or
a willingness or even attempts to comply.
[37] It seems, just today, Ms Muller accepts that there is a need to comply with the orders
of this Court, regardless of the existence of the QCAT proceedings. She has not
otherwise referred to evidence of mitigating circumstances, that is, other than her
complaints that the builder had not complied with its obligations in her arrangements
with it when it located the house on the property.
[38] Important principles in determining the appropriate sentence in this case include
specific deterrence and general deterrence.
[39] In terms of specific deterrence, there needs to be a penalty that is sufficient to compel
compliance given the disobedience of the enforcement orders was ongoing and wilful.
In that regard I am mindful of the correspondence from Connor O’Meara to Ms
Muller on 5 October 2018 and the complete absence of any efforts made by Ms Muller
to bring the matter back before the Court, despite having been invited in that letter to
apply to the Court because she was already in contempt of the Court orders.
[40] General deterrence is also a relevant consideration. The disobedience of Court orders
lessens the community’s faith in enforcement orders. The community’s faith in
orders of the Court needs to be maintained.
[41] The Court’s powers in contempt proceedings also extend to making an order of costs
under r 932 of the Uniform Civil Procedure Rules. The costs of a proceeding for
punishment for contempt are within the Court’s discretion, whether a specific
punishment is imposed or not.
[42] In my view, appropriate punishment for the contempt would be an order that the
respondent is fined $5000. I will also order that the respondent, Ms Muller, by
herself, her servants or agents remove from the land described as Lot 65 on RP22109
and situated at 22 Kolan St Bundaberg, and do not replace all things in connection
with the relocated building that has been placed on the land by the 30 th of August
2019, and order that the respondent, Ms Muller pay the applicant’s costs of and
incidental to the proceeding fixed at $20,000.
[43] In terms of the fine, I will order that the fine is to be paid by 30 August 2019. With
respect to costs, I will also order that they are to be paid by 30 August 2019.
-- 9 of 9 --
Official source: https://www.sclqld.org.au/caselaw/QPEC/2019/031