Dixon v Timber Trend Kitchens Pty Ltd [2018] QCAT 133
CITATION: Dixon v Timber Trend Kitchens Pty Ltd [2018]
QCAT 133
PARTIES: Neil Dixon
(Applicant/Appellant)
v
Timber Trend Kitchens Pty Ltd
(Respondent)
APPLICATION NUMBER: BDL 109-17
MATTER TYPE: Building matters
HEARING DATE: 12 March 2018
HEARD AT: Brisbane
DECISION OF: Member King-Scott
DELIVERED ON: 2 May 2018
DELIVERED AT: Brisbane
ORDERS MADE: The Respondent Timber Trend Kitchens Pty
Ltd pay Neil Dixon the sum of $21,154.90 by
4.00 pm 31 May 2018.
CATCHWORDS: BUILDING CONTRACT – REQUIREMENT IN
WRITING BUT NOT SIGNED – MISTAKE –
where subcontractor underquotes – other party
not aware of mistake – unilateral mistake –
subcontractor alleges contract not signed
therefore not binding – requirement of contract
Queensland Building and Construction
Commission Act 1991 (Qld), s 67G
General Credits Ltd v Ebsworth (1986) 2 Qd R
162
Prudential Assurance Co Ltd v CM Breedon Pty
Ltd [1994] 2 VR 452
River Late Properties Ltd v Paul (1975) Ch.133
APPEARANCES and REPRESENTATION:
APPLICANT: Mr N Dixon self represented
-- 1 of 7 --
2
RESPONDENT: Mr Russell Piggott Director of the Respondent
self represented
REASONS FOR DECISION
Introduction
[1] The Applicant, Neal Dixon, is a building contractor who was engaged to
convert an office space to 2 residential units at 514 Brunswick Street
Fortitude Valley.
[2] The owners were Mr Dixon and his wife Linda. There was a formal Master
Builders Residential Building Contract entered into with Mr Dixon, as
contractor and he and his wife as owners.
[3] In August 2017, Mr Dixon sought a quote from the Respondent, Timber
Trend Kitchens Pty Ltd (Trend Kitchens). He provided plans for that
purpose. The initial email contact seems to have been addressed to the
sole director of Trend Kitchens, Russell Piggott.1
[4] Mr Dixon had previously had contact with Mr Pigott when Mr Dixon was site
manager for a construction company Devport. However, the contact on this
occasion was in relation to his own project. In some documents he refers to
his trading name, Dixonbuilt.
Evidence
[5] Mr Dixon and Mr Piggott were the only witnesses to give evidence. The bulk
of the evidence was contained in written statements. Mr Piggott provided
only a very sparse statement responding to Mr Dixon’s statement and an
initial statement making certain admissions to the effect that the deposit
should be refunded as should certain plumbing items which I will refer to
below.
[6] Subsequent dealings with Trend Kitchens were with its estimator Donna
Hall. Ms Hall, at the time of the hearing, had worked for Trend Kitchens for
at least eight years.
[7] A quote dated 24 August 2016 was received for $9,215.35 to supply and
install. It was as follows:
We have the pleasure in submitting to you our quotation for the supply and
installation of joinery items as drawings received and as detailed below.
Plans to be client approved
Kitchens x 2: 20mm Smart Stone Theron tops with shadow line, PVC edged
doors Moss Grey Sheen with Rocco Lini to Servery Back and
Island Gable Unit 7 only. Nover Lip pull Handles included,
Finger pull Overheads
1 See email dated 22 August 2016.
-- 2 of 7 --
3
Bath x 2: 20mm Smart Stone Theron tops with shadow line, PVC edged
doors Moss Grey Sheen. No Drawers included
Ensuite x 2 20mm Smart Stone Theron tops with shadow line, PVC edged
doors Moss Grey Sheen. Drawers included
Laundry x 2 P/fromed Laminate Rocco Lini tops PVC edged doors Moss
Grey Sheen.
[8] Mr Dixon by email dated 6 September 2016 asked that his order be put into
the production queue. He anticipated installation approximately mid to late
October.
[9] By email dated 23 September 2016, Trend Kitchens provided a credit
application and a request for a 30% deposit. By email the following day Mr
Dixon returned the signed credit application. There was also a request for
some minor changes to the plans.
[10] By email dated 29 September 2016 Trend Kitchens was advised the deposit
of $2,764.60 was transferred to their account
[11] In a revised quote forwarded by email dated 12 October 2016 Ms Hall
advised that she had not included the stone price. The revised quote was
for $16,286.60. It was not accepted by Mr Dixon who requested some
adjustments to the original quote.
[12] By email dated 13 October 2016, Ms Hall adjusted the original quote to
include changes in both units. It is appropriate that I referred to the email
in part:
I can appreciate where the client is coming from, but everyone does make mistakes.
I have adjusted the original quote to include the changes to both units-the price has
increased by $1,619 plus GST this is mainly due to the changes in benchtop to u2.
This is the best price I can do. Can you please advise of client will accept this. I
have attached a revised quote and also current kitchen design with two more options
to u2.
[13] Mr Dixon responded by email dated 14 October 2016 to the effect that “My
client is prepared to take up the offer below i.e. Total $10,993.40.…" That
amount is reached by adding to the original quote the sum of $1,619.00 plus
GST.
[14] By way of response, Ms Hall requested that Mr Dixon arrange for one sink,
one basin and one tub to be delivered to Trend Kitchens for the purposes
of measurement. That was done.
[15] Mr Dixon also posted a Master Builders Contract signed and dated by him.
It is dated 14 October 2016. Mr Pigott in evidence admitted that he received
the document.
[16] By email dated 1 November 2016 Mr Dixon advised that the premises were
ready for a measure up.
[17] Mr Dixon referred to a diary note on 7 December 2016 relating to a phone
call he had with Mr Piggott. He initiated the call which was not answered
and he left a message. Mr Piggott returned his call. Mr Dixon diary notes
-- 3 of 7 --
4
that Mr Piggott advise the kitchen install will be on 14 December 2016 and
he was ready to go. Telephone records reveal the call was a minute or less
in duration.
[18] On 12 December 2016 Mr Dixon received an email from Ms Hall to the
following effect:
As previously advised the original quote did not have the price for the stone added
in, I have just been advised by management that unless the attached quote is
accepted (which is the original quote before changes plus a stone needed in) we will
not do the job. Can you please sign and send back as acceptance or if you choose
not to accept this we will refund your deposit.
[19] The new quote was for $15,790.50 an increase of $4,797.10.
Understandably, Mr Dixon was unimpressed. He endorsed on the bottom
quote which he returned the following:
Proceed with the cabinet manufacture/install ASAP to mitigate my potential losses
i.e. $1,000 pw liquidated damages, on the basis that I reserve my rights to challenge
the amended variation at a later date.
Russell advised on 7 December 2016, that delivery/install would take place on 14
December 2016, therefore can you confirm any changes to this date? Regards
[20] As stated above, both Mr Piggott and Mr Dixon gave evidence. The only
area of dispute was that Mr Piggott says the absence of the stone on the
contract was discussed on the telephone conversation of 7 December 2016
and that Mr Dixon became threatening. This is denied by Mr Dixon, he says
there was no mention of the missing stone on 7 December 2016 and the
conversation was perfectly amiable.
[21] Mr Piggott made references to threats in his cross application He said
“Several threats were made to myself personally by Neil Dixon which today
can be regarded as a form of harassment which I take offence to."
Elsewhere, in the same document, he submits that he did not sign the
QMBA contract and as a result damages cannot be claimed as no contract
exists no breach has occurred. He agrees that he still has the deposit and
by way of explanation says that it was not refunded because he did not have
the bank account details. He still has in his possession the 3 plumbing items
being the sink, basin and tub which have not been returned despite several
requests. He accepts that the claim for $654 for those items is correct.
[22] If it is necessary to make a finding of credit then I prefer the version of Mr
Dixon to that of Mr Piggott. Mr Piggott appeared quite dismissive of the claim
and oblivious to any inconvenience and potential damage Trend Kitchen’s
conduct had caused Mr Dixon. On the other hand Mr Dixon did not impress
me as a person who would make threats but one could well understand his
annoyance at the way he had been treated.
Was there a contract?
[23] Trend Kitchens submits that there was no contract as it was not signed by
them. Mr Dixon accepted the initial offer of $9,215.35 by email dated 6
September 2015. Trend Kitchens requested a 30% deposit and a signed
-- 4 of 7 --
5
credit application. The credit application was completed and forwarded on
27 September 2016. The deposit was paid on 29 September 2016.
[24] At that stage there was a contract between the parties. The contract was
not a domestic building contract as it was a contract between a building
contractor and subcontractor.2 The contract was a building contract under
Part 4A of the Queensland Building and Construction Act 1991 (the Act)3
and did not have to be in writing as it was less than $10,000.00.4
[25] On 12 October 2016 Ms Hall advised of her error in quoting and submitted
a revised quote. Negotiations ensued and a variation was agreed. The offer
made by Ms Hall on behalf of Trend Kitchens was to increase the original
quote by $1,619.00 plus GST5. It attached the quote which was not included
in the filed material. Trend Kitchens in its response do not submit that it was
not for $10,993.00. That sum was accepted by email dated 14 October
2016. This email amounted to an implied acceptance of what was in
essence a variation of the contract.
[26] Ms Hall’s response was her email dated the same day requesting delivery
of sinks, basins and tubs for fitting and dimensions of appliances. Trend
Kitchens submit a staff member made the request, and, I presume by
implication was not an agent of Trend Kitchens. I reject this, Ms Hall was
involved in most, if not all negotiations and was held out as having authority
to negotiate on behalf of Trend Kitchens.
[27] At this point the contract had to be reduced to writing.6
[28] A contract in writing was posted to Trend Kitchens at or about the time it is
dated, namely, 14 October 2016. Trend Kitchens admits it received the
document. The written contract was forwarded following negotiations which
included Mr Dixon advising that his client was prepared to take up the offer
of $10,993.40. He then forwarded the written contract.
[29] Discussions continued between the parties for an installation date in
December 2016.
[30] In my opinion, a contract came in to existence between the parties on 14
October 2016 and was formalised in the written document dated 14 October
2016, which complied with Part 4A of the Act. The sole basis that Trend
Kitchens disputes any agreement seems to be on the basis that it did not
sign the document.
Mistake
[31] At no time, prior to it realising it had made a further mistake in not including
the price of the stone in its quote, did Trend Kitchens dispute the existence
2 See s 3 Schedule 3B Queensland Building and Construction Act 1991.
3 See s 67AAA.
4 See 67G (1)(b) Queensland Building and Construction Act 1991.
5 Email dated 13 October 2016 Hall to Dixon.
6 S67G (2)(c) Queensland Building and Construction Act 1991.
-- 5 of 7 --
6
of a contract. By email dated 12 December 2016 it advised Mr Dixon of its
mistake.
[32] Although, that may have been Ms Hall’s mistake I do not accept that Mr
Dixon was aware of it. It might be argued that the significant difference in
price between the initial quote and the first revised quote should have
alerted him to that fact. In fact, it was not argued. Indeed, it has never been
suggested that he was or should have been aware of it. It was not raised in
any subsequent correspondence nor in the filed material nor was it raised
in the course of the hearing.
[33] The negotiations that preceded the last quote allowed for a number of
adjustments as well as a request by Mr Dixon to substantially lower the
quote. In the email dated 13 October 2016 Mr Dixon said:
I have put your revised quote to my client and she has dismissed the variation. She
further advises if need be she will accept the original plan layout to which she has
already paid the deposit on. If minor variations can’t be done without increasing the
price by 80% approx. it makes it difficult for me to reason with the client.
Can you revisit your most recent quote and adjust where possible and advise ASAP
of any amendments thanks
[34] I am aware that, although the email is written as if “the client” is a third party,
the client was, in fact, Mr Dixon and his wife. A fact that both parties were
aware of. It was submitted by Trend Kitchens that the quote was done for
an entity Devport and not Dixonbuilt. Mr Dixon, previously worked for
Devport. However, from the time of the lodgement by Mr Dixon of the Credit
Application that Trend Kitchens required, Trend Kitchens was aware with
whom they were contracting.
[35] Where a mistake is made by one party, neither in law nor in equity, can a
party have the contract set aside on the basis of unilateral mistake.7
[36] It follows that Mr Dixon is entitled to damages for breach of contract.
[37] Mr Dixon was advised by email dated 12 December 2016 that the original
quote, again, did not include the price of stone and unless he accepted the
revised quote, which now stood at $15,790.50, Trend Kitchens would not
do the job. Mr Dixon responded, by endorsing the quote with the following:
Proceed with the cabinet manufacture/install ASAP to mitigate my potential losses
i.e. $1000 per week liquidated damages, on the basis that I reserve my rights to
challenge the amended variation at a later date. Russell advised on 7 December
2016 that delivery/install would take place on 14 December 2016, therefore, can you
confirm any changes to that date?
[38] By email dated 14 December 2016, Ms Hall advised that management did
not accept his notation on the signed quote and would be refunding the
deposit.
7 River Late Properties Ltd v Paul (1975) Ch. 133, General Credits Ltd v Ebsworth (1986)
2 QdR 162 and Prudential Assurance Co Ltd v CM Breedon Pty Ltd [1994] 2 VR 452.
-- 6 of 7 --
7
[39] By email dated 14 December 2016 Mr Dixon stated, inter alia, the following:
Had the option, management proposes in your most recent correspondence, been
an option two months ago (when the quote/variation was accepted) I would have
accepted management's decision, and we both could have parted our ways moved
on. However, to put an unreasonable proposition i.e. unconditionally accept an
approximate 50% increase 48 hours from delivery/installation or the contract will be
terminated apart from being a breach of the accepted terms and conditions, your
decision will cause financial hardship to myself and my client.
[40] The parties did not resolve the differences and Mr Dixon had to obtain
quotes and proceed with the installation at a much later date. Mr Dixon
obtained quotes from three other cabinetmakers. He accepted the lowest
quote of $19,300. He requested return of the deposit from Trend Kitchens
as well as return of the sink, laundry tub and basin. Trend Kitchens have
not returned any of those items nor has it refunded the deposit.
[41] Included in Mr Dixon's claim is a claim for liquidated damages at a rate of
$1,000 per day. I note in the contract with the cabinetmaker who, ultimately,
undertook the work that there was an allowance for liquidated damages of
$157 per day which actually exceeds $1,000 per week. The breach of
contract by Trend Kitchens delayed completion of the construction of the 2
residences and their ultimate rental. Had a claim for loss of rental been
claimed it would have exceeded the present claim. In my opinion, the rate
for liquidated damages is reasonable.
[42] Mr Dixon's claim is made up as follows:
Reimburse the cost to purchase replacement sink,
laundry tub and basin $654;
Refund deposit $2,764.60
Difference between contract price $10,933.40
and subsequent cost $19,300.00 $8,306.60
Liquidated damages $1,000 per week for 8.3 weeks $9,114.00
Filing fee $315.70
Total $21,154.90
[43] I direct that Timber Trend Kitchens Pty Ltd pay Mr Neil Dixon the sum of
$21,154.90 by 4.00 pm on 31 May 2018.
-- 7 of 7 --