Farrah v Brisbane City Council [2016] QPEC 19 [2016] QPELR 449
PLANNING AND ENVIRONMENT COURT
OF QUEENSLAND
CITATION: Farrah v Brisbane City Council [2016] QPEC 19
PARTIES: JEFFREY FARRAH
(appellant)
v
BRISBANE CITY COUNCIL
(respondent)
FILE NO/S: 3627/2014
DIVISION: Planning & Environment
PROCEEDING: Appeal
ORIGINATING
COURT: Planning & Environment Court of Queensland, Brisbane
DELIVERED ON: 14 April 2016
DELIVERED AT: Brisbane
HEARING DATE: 16, 17, 18 and 24 March 2016
JUDGE: RS Jones DCJ
ORDER: 1. The appeal is allowed.
2. I will hear from the parties as to any consequential
orders.
CATCHWORDS: APPEAL AGAINST REFUSAL OF AN APPLICATION TO
DEMOLISH TWO PRE-1911 HOUSES – where houses
located in inner city suburb of West End – where houses
located in a Demolition Control Precinct
WHERE THE HOUSES ARE STRUCTURALLY
UNSOUND – whether the houses are reasonably capable of
being made structurally sound – where houses are located in
an area of mixed development
VALUATION EVIDENCE – where evidence of the value of
the land and houses thereon of little assistance
Sustainable Planning Act 2009
Craig Securities (No. 2) Pty Ltd v Brisbane City Council
[2006] QPELR 601
Gould v Brisbane City Council [2001] QPELR 77
-- 1 of 19 --
2
Ken Ryan & Associates Pty Ltd v Brisbane City Council &
Ors [2008] QPELR 147
COUNSEL: Mr R Laidley for the appellant
Mr M Williamson for the respondent
SOLICITORS: McCarthy Durie Lawyers for the appellant
Brisbane City Legal Practice for the respondent
[1] This proceeding is concerned with an appeal against the respondent’s refusal to grant
a Preliminary Approval to carry out building works and, in particular, its refusal to
allow the appellant to demolish two pre-1911 houses. For the reasons set out below
the orders of the court are:
1. The appeal is allowed.
2. I will hear from the parties as to any consequential orders.
Background
[2] The houses are located at 8 and 10 Amersham Street in the inner city suburb of West
End. As is the case with a number of precincts within that suburb, the two dwellings
are located in an area of mixed land uses. Mr Kamitsis, the valuer relied on by the
respondent, described the suburb as an “eclectic” area.1 It would be fair to say though
that these two houses are located in an area of more various land uses than many other
locations within West End.
[3] Amersham Street runs in a virtually north south direction and the two houses are
located on the eastern side of the street. Accordingly, they face almost due west.
Immediately to the south are two unit/flat complexes of different vintages with little
aesthetic appeal. Immediately to the north is a timber unit/flat development, also of
little aesthetic merit. To the immediate northwest is a similar complex and to the
immediate southwest (if not, directly opposite) is a modern commercial radio station
building and, slightly further to the west a large industrial complex.2 The two houses
are located at the southern end of Amersham Street where it dead ends a short distance
past the southernmost house. The northernmost house (8 Amersham Street) looks
almost directly west down Ambleside Street where it intersects with Amersham
Street.
1 Transcript (T) 3-97 LL 26-32.
2 See generally Exhibit 1, Volume 2, Tab 20, at pp 8 and 9.
-- 2 of 19 --
3
[4] It is not in dispute that both houses are in an extremely dilapidated condition and are
not structurally sound.
[5] The houses are located on Lots 8 and 9 RP11142. Lot 8 is 688m2 in area and Lot 9,
637m2. Total frontage to Amersham Street is approximately 30m. The land is located
in the Low-Medium Density Residential Area and within a Demolition Control
Precinct under the respondent’s City Plan 2000 (CP2000) and City Plan 2014
(CP2014). The land is also located within the boundaries of the South Brisbane
Riverside Neighbourhood Plan and within the Boundary and Vulture Street Precinct.
[6] On or about 19 June 2014, the appellant lodged a Development Application seeking,
relevant to this proceeding, approval to demolish both houses. On 21 August 2014,
the respondent issued a Decision Notice refusing the application. The grounds for
refusal involved a number of reasons including, in particular, asserted conflicts with
a number of Desired Environmental Outcomes and Performance Criteria and
Acceptable Solutions under the Demolition Code of CP2000.3 On or about 17
September 2014 the appellant filed his notice of appeal. Consistent with the reasons
for refusing the applications the notice of appeal raised a number of issues.
Notwithstanding that, in the proceeding before me it was accepted by both sides that
there was really only one “fundamental” issue to be determined. That issue was,
whether or not the two houses were reasonably capable of being made structurally
sound.4 In this context paragraph 7 of the notice of appeal provided:5
“The Applicant has provided sufficient evidence to show:
(a) the dwellings are structurally unsound and would
require extensive works including reroofing, re-
flooring, restumping, reinforcement of roof trusses
and replacement of corroded steel floor bearers;
(b) the dwelling sustained significant termite damage
from termite activity and borers, water damage and
deterioration of structural bearers and supports;
(c) the chimney in 8 Amersham Street requires major
repair, at substantial cost; and
(d) the dwellings are not reasonably capable of being
made structurally sound. In that regard, the Applicant
estimates that costs to bring the dwellings to a
presentable and habitable state will be
approximately $241,030.00 for 8 Amersham Street
3 Exhibit 1, Volume 1, Tab 10, at p 4.
4 Mr Laidley, counsel for the appellant, at T 1-3 LL 30-35.
5 Exhibit 1, Volume 1, Tab 11, at pp 5-6.
-- 3 of 19 --
4
and $266,770.00 for 10 Amersham Street…”
(emphasis added)
[7] As Mr Laidley, counsel for the appellant, acknowledged the relevant consideration is
not the cost to bring the dwellings to a “presentable and habitable state” but whether,
in circumstances where both the houses were structurally unsound, they were
reasonably capable of being made structurally sound.
The appropriate test
[8] Both houses are subject to the operation of the Temporary Local Planning Instrument
01/14. Pursuant to s 102 of the Sustainable Planning Act 2009 (“SPA”) a temporary
local planning instrument is a statutory instrument and has the force of law as
provided under the Statutory Instruments Act 1992. Table 2 of that Instrument
identifies that an “Additional Purpose” of the Code is to ensure the preservation of
residential buildings constructed prior to 1911 and to only allow the demolition of
such buildings in circumstances where they are incapable of being made structurally
sound. The relevant Performance Criteria provides:6
“An engineering report prepared by a Registered Professional
Engineer Queensland is submitted to Council which demonstrates to
the reasonable satisfaction of Council, that the building is
structurally unsound and not reasonably capable of being made
structurally sound.” (emphasis added)
No Acceptable Solution is prescribed for that Performance Criteria.
[9] In Gould v Brisbane City Council7 this Court was concerned with proceedings
involving the operation of the Heritage and Character Building provisions of the
respondent’s planning scheme. Section 7.3.6.2 provided:
“The Council may, on application made… waive the application…
with respect to a particular building where:
…
(c) the building is structurally unsound and not
reasonably capable of being made structurally
sound…”
[10] The words “reasonably capable of…” puts the focus on the state of the house in its
unsound condition and what would be required/involved to make it structurally
sound. The notional question that has to be answered is: “is what it would take
6 Temporary Local Planning Instrument 01/14 – Protection of Residential Buildings Constructed
Prior to 1911.
7 [2001] QPELR 77.
-- 4 of 19 --
5
(including the costs) to make the house structurally sound reasonable in the
circumstances?”
[11] In deciding that appeal Quirk DCJ stated the appropriate test to be applied in the
following terms:8
“ … That however does not provide an answer to the question
that I face, namely is this building ‘structurally unsound and
not reasonably capable of being made structurally sound’.
That question must be answered objectively. The subjective
inclinations of an individual owner provides no assistance in
that respect. As stated, the structural unsoundness of this
dwelling is not an issue. What has to be decided is whether
the dwelling is ‘reasonably capable of being made
structurally sound’. It is clear that, with unlimited resources,
structural soundness might be achieved. What is important
here is whether this could be done reasonably.
By reference to what criteria is a distinction to be made
between efforts that would be reasonable in this respect and
those that would not? I have decided that the proper approach
is to put one’s self in the position of a notional owner who is
reasonable and prudent: certainly not one who has an aversion
to old buildings and their preservation and certainly not one
who has an eye upon maximum commercial advantage. A
reasonable and prudent owner, nevertheless, would be one
who would consider whether any expenditure involved in
reinstating a particular building to structural soundness would
be money wisely spent.”
[12] His Honour was of course correct to observe that the test is an objective one and that
it has to be viewed in the light of what is reasonable in all the relevant circumstances.
One might, however, also be inclined to think that the “prudent” land owner would
be a person who would have his eye upon maximum commercial advantage.
[13] Following Gould, in Craig Securities (No. 2) Pty Ltd v Brisbane City Council9 Griffin
SC DCJ was concerned with the operation of the Demolition Code of the respondent’s
planning scheme insofar as it was concerned with a pre-1946 house within a
Demolition Control Precinct. An Acceptable Solution to that Code relevantly
provided that “an engineering report must be submitted demonstrating that the
building is structurally unsound and not reasonably capable of being made
structurally sound”.
8 Ibid paras [20]-[22].
9 [2006] QPELR 601.
-- 5 of 19 --
6
[14] After identifying that the test was an objective one his Honour went on to say:10
“ In the context of structural repair to a ‘sound’ standard, the
reasonableness of the repair work must not only be
considered in the light of the physical ability to carry out that
work, but also considerations of complexity and cost in the
carrying out of that work.
…
In considering the extent to which a building may be made
‘structurally sound’, it is noteworthy that the Code does not
provide, directly or, in my view, even by inference, a
requirement that that standard of structural soundness meet
present-day building codes and standards.
The matter before me is not a building dispute and I am
therefore not persuaded that it is appropriate, nor necessary,
to deal with the repair items as documented by both
engineers… on an item by item basis.” (footnotes deleted)
[15] The next case to which I was referred in chronological order is that of Ken Ryan &
Associates Pty Ltd v Brisbane City Council & Ors11 where Wilson SC DCJ (as he
then was) was concerned with the operation of the Demolition Code concerned with
pre-1946 dwellings. In determining that appeal his Honour identified that one of the
two central issues in dispute was whether or not the subject dwelling was reasonably
capable of being made structurally sound. His Honour then went on to say:12
“The test to be applied under AS1.2 is an objective one. It suggests,
at first reading, an exercise which involves nothing more than bringing
the house back to a condition of structural soundness, and that costs
associated with repairs or renovations beyond that level will usually
be irrelevant. The test will not, however, be immutable and each case
must be considered in light of its own particular circumstances.”
(footnotes deleted)
[16] His Honour then went on to cite with approval the following passage from Craig
Securities Pty Ltd:13
“It is trite to say that the reasonableness, in considering capability of
structural soundness, will vary from case to case and will depend upon
a variety of factors. The very nature of testing reasonableness itself
will vary with the circumstances of each case and it is be impossible
to set boundaries or attempt specific tests. ‘Reasonable’ is a word of
common usage and should, in this legislation, be (sic) its ordinary,
everyday meaning. In fact, it is a function of the notion of
10 Ibid para [29], [32] and [33].
11 [2008] QPELR 147.
12 Ibid [15].
13 [2006] QPELR 601 at para [26].
-- 6 of 19 --
7
reasonableness that it must vary depending upon the particular
circumstances to which it is applied.”
[17] At first glance it would appear that there might be a difference between the reasoning
of Griffin SC DCJ in Craig Securities and that of Wilson SC DCJ (as he then was) in
Ken Ryan. In Craig Securities it was considered that the relevant tests did not require
that the standard of structural soundness meet present day building codes and/or
standards. However, in Ken Ryan it was observed that:14
“… here, the evidence shows that the decay giving rise to a need for
restoration is very much at the higher or worst end of the scale, and
that restoration to a level that is no more than ‘sound’ may not actually
make the premises safe. It is inconceivable that the City Plan
intended to accept, as appropriate and satisfactory, restoration to
a level where premises yet lacked the capacity for safe occupation,
and that must be a circumstance which is relevant to the
application of the test proposed in the Code.” (emphasis added)
[18] As to the observation of Wilson SC DCJ in Ken Ryan to the effect it would be
inconceivable that the respondent would consider a structure to be structurally sound
and yet be lacking the “capacity for safe occupation”. If his Honour was implying
there that the test required that the structure be made habitable I would respectfully
disagree. However, in saying that I am far from certain that that was what his Honour
was in fact saying; “occupation” and “habitation” do not necessarily mean the same
thing. In any event, while the requirement that a building be “habitable” might
provide much more scope for debate about what was involved and the cost thereof,
had the respondent intended such a meaning, as opposed to the requirement that the
house be “structurally sound” it would have been relatively straightforward to set that
as the benchmark.
[19] I respectfully consider that Judge Griffin correctly articulated the appropriate test and
that structurally sound includes making the structure waterproof and safe. However,
I do not consider that the test requires the structure to be fit for permanent habitation.
I should finally observe of this topic that, as Mr Williamson, counsel for the
respondent, submitted, when regard is had to paragraphs [16] to [19] of Ken Ryan it
seems tolerably clear that his Honour was addressing the need for a structurally sound
and safe end result, not a habitable one. Mr Laidley, for the appellant, agreed with
that analysis; as do I. Judge Wilson (as he then was) was, most likely, simply stating
that a structurally sound house would also be one that was safe to be in or about. In
14 At [16].
-- 7 of 19 --
8
this context I agree with the submission of Mr Williamson to the effect that
“structurally sound” contemplates a state of engineering integrity and safety rather
than structural perfection on restoration.
[20] Before going on to consider the evidence I would also make the observation that
obligations of the type involved here imposed on land owners have the potential to
result in material financial disadvantage in the absence of compensation being
payable. That is, limitations on the ability to deal freely with one’s land may well
result in an owner being denied the opportunity to maximise his selling price by
selling the land in a state capable of achieving its highest and best use. In
circumstances where, by way of examples, an owner could not afford to carry out the
works or simply refused to expend the necessary money, the end result may be that
structures are simply being left to deteriorate further. Such an outcome would neither
benefit the owner, the respondent, nor the broader community of Brisbane. In respect
of the former example Mr Williamson said that the owner could simply sell the
property. That may well be so but for whatever reason he may not want to.
The engineering evidence
[21] Both parties relied on engineering evidence, Mr Avery for the appellant and Mr Bligh
for the respondent, to identify what works would be required to make both houses
structurally sound. No doubt, with an eye to the reasoning of Griffin SC DCJ in Craig
Securities, under the preamble to both reports dealing with each of the houses
separately the engineers stated:15
“The authors are of the understanding that the structural repair works
are those that are required to make the house safe and also to achieve
weather resistance to avoid further degradation of the building
structure. There is no intent to bring the structure up to current
structural Standards or other Building Code Standards.”
[22] Both engineers identified what “items” needed to be repaired in respect of both
houses. Most of those items were agreed. However, in respect of 8 Amersham Street
Mr Avery identified the following additional works:16
the rear door and associate joinery required replacement;
15 Exhibit 1, Volume 1, Tabs 14 and 15.
16 Ibid, Tab 14 p 4.
-- 8 of 19 --
9
rot damage to the timber window frames on the northern external wall
required replacement;
“although not structural issues” the repair of the plumbing and electrical
systems in the dwelling to safe standards was also required.
[23] In respect of number 10, Mr Avery identified that, in his opinion, all timber sills, eight
chamfer boards and a supporting bearer on the northern wall had to be replaced. He
also again advocated for the repair of the plumbing and electrical systems despite
them not being a “structural issue”.17
[24] It was conceded on behalf of the appellant that most of the costs associated with the
repair of the plumbing and electrical systems were not required to make the houses
structurally sound.18 This of course has necessary flow on effects concerning the cost
of making the houses both structurally sound and habitable and those matters are dealt
with below.
[25] As to the other outstanding engineering matters, I accept that the rectification to the
rear door as identified by the appellant in respect of 8 Amersham Street is necessary
but I am unable to accept that it is necessary to carry out the works identified in respect
of the window frames on the northern external wall of that house. That is, I am not
satisfied that those works are required to make the house structurally sound and
weatherproof.
[26] As to 10 Amersham Street, it is sufficiently clear to me that having regard to Mr
Avery’s careful inspection of this house that the replacement of the chamfer boards
on the northern external wall ought to be replaced, including the supporting bearer.
In this context I accept Mr Avery’s evidence that if those chamfer boards were not
replaced then there would be an unacceptable risk of water damage to the timber
framing behind those walls.19 The agreed estimate for those works was $2,052.00.20
I am not satisfied that all the timber sills need to be replaced to make this house
structurally sound.
[27] For the reasons that follow, it is unnecessary in my view to delve further into any
remaining disputes between the engineers.
17 Ibid Tab 15, p 4.
18 T4-65 LL 27-45 and attachment to appellant’s written submissions.
19 T2-7 LL 17-30.
20 Exhibit 1, Volume 2, Tab 17, attachment 1 at p 2.
-- 9 of 19 --
10
The costing exercises
[28] To determine the costs of making the houses structurally sound the appellant relied
on Mr Lowry, a quantity surveyor, and the respondent on Mr Chapman, an
experienced registered builder. Mr Lowry also went on to provide costings for
bringing both houses to a “habitable” condition. The costs of bringing the houses to
a habitable condition, while not directly relevant to the issue of making the houses
structurally sound, was a matter addressed by the valuers.
[29] Mr Lowry’s original estimate for 8 Amersham Street was $184,115.00 including GST
and Mr Chapman’s estimate was $76,093.00 including GST.21 In respect of 10
Amersham Street their respective estimates were $249,858.14 including GST and
$119,780.76 including GST.22 Those estimates are set out in some detail in Exhibit
3. However, as is often the case, compromises were made by the experts and, in the
case of Mr Lowry, some confusion also arose in respect of some of his figures. At
the end of the day, both Mr Lowry and Mr Chapman revised their estimates for both
houses and Mr Chapman’s estimate in respect of 8 Amersham Street increased to
$84,000.00 and in respect of 10 Amersham Street increased to $126,000.00.23 On the
other hand, Mr Lowry’s estimates reduced to $130,000.00 in respect of 8 Amersham
Street and to $176,000.00 in respect of 10 Amersham Street.24
[30] On balance, in respect of this topic I preferred the evidence of Mr Chapman to that of
Mr Lowry. It is beyond doubt that Mr Lowry is a very experienced quantity surveyor
but at times his evidence became confusing and, at one stage, his evidence had to be
stood down to allow him to consider irregularities in his costings.25 On the other
hand, Mr Chapman struck me as a witness who was not only experienced in costing
such works but was also experienced in carrying out those works. In my view his
evidence was more indicative of what the actual costs might be. In this context I
should also observe that I accept that any complexities involved in making either of
the houses structurally sound would not be beyond the capacity of a builder with
similar experience and qualifications to that of Mr Chapman.
21 Exhibit 1, Volume 1, Tab 16, at p 5.
22 Exhibit 1, Volume 2, Tab 17, attachment 1 at p 3.
23 Exhibit 11.
24 Refer to attachment to Mr Laidley’s written submissions.
25 T2-95: 2-96.
-- 10 of 19 --
11
[31] That said, the evidence of a number of the witnesses made it tolerably clear to me that
there are risks associated with trying to provide accurate estimates when dealing with
houses as old and dilapidated as these. For example, Mr Avery, when being cross-
examined about 8 Amersham Street, expressed the opinion that the scope of works
could increase because it was not able to be said with any degree of certainty what
the structural integrity might be behind the existing wall linings.26 Mr Lowry was of
a similar view.27 Indeed, it was Mr Lowry’s opinion that uncertainties associated
with what might arise during the process of making the houses structurally sound
could well result in a number of variations to Mr Chapman’s notional building
contract prices.28 In this context Mr Chapman’s costings were based on his company
actually tendering to do the necessary works.
[32] During the course of his cross-examination Mr Chapman acknowledged that his
estimates did not provide for any “surprises” or “unknowns” and that in the event of
such occurring there would either be costs to be borne by his company or to be dealt
with with the owner as variations to the building contract.29 In his re-examination the
following exchange took place between myself and Mr Chapman:30
QUESTION: Yes. But in a job like this, bearing in mind the state
of repair, the age of the buildings, etcetera, etcetera, is
this one where you would expect typically, from your
experience, variations to occur?
ANSWER: Well, these – this brief that the engineer has – has
prepared is fairly straightforward, and each of the
items on their own are fairly – fairly simple items to
price. Now – now, it may well be that there would
be some – some unforeseen has come into play, and
certainly that might increase the price by a small
amount. But, I mean, because they’ve – each item
has been – been described and it’s been discussed a
lot of times, there’s not a lot of grey areas. Where you
do get grey areas on a – on a renovation job is that it’s
pretty hard for every single element of the whole job
to be described, and you would probably come across
some more variations in that case. But because we’re
only talking about select items and they’ve been
discussed and – and looked at, I wouldn’t expect
26 T2-11 LL 28-35.
27 T2-74 LL 25-33.
28 T2-75 LL 35-45: T2-76 LL 1-13.
29 T3-5 LL 30-45 to T3-6.
30 T3-39 LL 23-47: T3-40 LL 1-4.
-- 11 of 19 --
12
there to be a – be a very big variation at all, your
Honour.
QUESTION: To put it this way, it’s – if I’m the owner and I say,
‘now, Mr Chapman, I want a fixed price contract. I
don’t want to hear anything about variations at the end
of this’--- would you change these figures and, if so,
by – would it be five percent, ten percent, 20 percent?
ANSWER: Well, that’s a hard question, because I would ---
QUESTION: Well, don’t answer it if you don’t think you can, but-
--?
ANSWER: Yeah. Well, I wouldn’t be comfortable by just saying
I just add another ten percent and you’ll be right,
because I’m – I’m quoting on specific items and – and
sometimes if you find a problem, you think gee wiz.
I should have seen that. Well, I’ll have to cover that
myself. And we do get that on occasions, you know,
to keep a good relation with the owner. But if there
is something that is totally unexpected by all
parties, I think it’s fair and reasonable to raise that
as a – as a potential variation… (emphasis added)
[33] Notwithstanding my preference for the evidence of Mr Chapman I consider that, there
being a not unrealistic risk of variations occurring, it is appropriate to factor that risk
into his estimates. Doing the best that I can with the evidence before me I have
reached the conclusion that the prudent owner would, in respect of 8 Amersham Street
budget for in the range of $86,000.0031 to $96,000.00 and, in respect of 10 Amersham
Street a range between $126,000.00 and $140,000.00. I have allowed a wider range
for 10 Amersham Street because more works are required. I agree with Mr
Williamson that, for the reasons given, it is more likely than not that the cost of
making each of the houses structurally sound will tend towards the lower end of the
range between the estimates of Mr Chapman and that of Mr Lowry.
The valuation evidence and discussion
[34] Broadly speaking, the valuation evidence of Mr Crawford, the valuer for the
appellant, was intended to establish that the cost of making the houses structurally
sound and/ or habitable would result in an overcapitalisation of the land and,
therefore, be an unreasonable impost on the owner. On the other hand, the evidence
31 Mr Chapman’s estimate of $84,000 plus $2,050 for the chamfer boards at 10 Amersham Street.
-- 12 of 19 --
13
of Mr Kamitsis was intended to show that the carrying out the works would result in
a financial benefit to the owner or, at the very least, be cost neutral. That is, not result
in overcapitalisation of the land.
[35] A difficulty in trying to reconcile the evidence of the valuers is that while they both
purported to carry out an “as is” valuation, that is valuing each of the lots and houses
thereon in their current state, in fact their starting points were quite different.
According to Mr Kamitsis, his “as is” value for 8 Amersham Street was $970,000.00
and for 10 Amersham Street $920,000.00.32 According to Mr Crawford his “as is”
value for number 8 was $750,000.00 and for number 10, $720,000.00.33 Mr Kamitsis’
“as is” valuation was predicated upon three critical assumptions:34
(i) The dwelling cannot be demolished;
(ii) The property can only be used on a single residential basis (that
is, as a single dwelling house); and
(iii) Despite the LMR Zone, no further development potential
exists on the land beyond the ability to renovate the dwelling.
[36] Mr Crawford, on the other hand, described his “as is” basis as being the market value
of each of the properties capable of being sold with vacant possession.35
[37] As identified above, Mr Lowry also prepared an estimate of bringing both houses to
a habitable condition. In respect of 8 Amersham Street that cost was $220,576.0736
and in respect of 10 Amersham Street, $175,111.58.37 However, as a consequence of
concessions being made concerning the scope of the works to make the buildings
structurally sound in contrast to being habitable the appellant now contends that the
cost of making each of those houses habitable would involve an extra $251,080.0038
and $228,313.00 respectively.39
[38] According to Mr Kamitsis:40
“… That money spent on the dwelling, whether it encompasses only
works required to make the dwelling structurally sound or some
32 Exhibit 1, Volume 2, Tab 18, at pp 6/33 and Tab 19, at pp 6/33.
33 Ibid Tab 20, at pp 29/29.
34 Ibid Tab 18, at pp 6/33.
35 Ibid Tab 20, at pp 4/29.
36 Exhibit 1, Volume 1, Tab 16, attachment 2.
37 Exhibit 1, Volume 2, Tab 17, attachment 2.
38 I.e. $220,576.00 plus $30,504.00. In circumstances where Mr Chapman did not carry out a similar
exercise and Mr Lowry’s evidence was not seriously challenged on this topic I consider it reasonable
to adopt these figures.
39 I.e. $175,112.00 plus $53,201.00.
40 Exhibit 1, Volume 2, Tab 18, at pp 6/33.
-- 13 of 19 --
14
broader building renovation project, is unlikely to result in an over
capitalisation given the location. That is, the majority of the cost of
works is likely to be reflected within the value of the property once
completed.” (emphasis added)
[39] The same reasoning was said to apply to both number 8 and number 10. On the other
hand, Mr Crawford’s opinion was that if both houses were renovated to a habitable
condition the market value for number 8 would be $930,000.00 and for number 10,
$900,000.00.41 That “habitable” value was premised on the basis that if both houses
were structurally sound and habitable then the added value they would give to the
land would be $180,000.00 for both.42 However, Mr Crawford concluded:43
“Mr Lowry assesses the difference in cost for 8 Amersham to make
the house habitable in addition to the cost to make the house
structurally sound of $220,577. He similarly assesses the cost in
regard to 10 Amersham Street of $175,111. Considering the added
value of the improvements for each house that is habitable over and
above the land value is $180,000 it would be nonsensical to attempt to
undertake a calculation that results in a value less than the value of the
land suitable for a single lot dwelling.”
[40] Mr Kamitsis, on the other hand, considered that even adopting Mr Lowry’s cost of
making both houses structurally sound and habitable, the net worth of each property
would be indicative of market value, having regard to the sales evidence and, in
particular, the sale at 9 Mitchell Street, West End. Mr Kamitsis’ approached this
exercise in the following way:44
“8 Amersham Street – “as is” valuation $970,000 plus cost of
renovation $434,672 = $1,404,672
10 Amersham Street – “as is” valuation $920,000 plus restoration
costs of $432,969 = $1,344,949”
According to Mr Kamitsis:45
“9 Mitchell Street sold for $1,600,000 on a smaller allotment. Given
it provides three bedrooms without views, the sale price provides
strong evidence that the risk of over capitalisation is low even when
adopting Mr Lowry’s ‘as if structurally sound and habitable’ cost. If
Mr Crawford’s ‘as is’ figures were adopted, the subject property
would be even more appealing as a renovation project when compared
to the sale at Mitchell Street. The above mentioned analysis aligns
with paragraph 10.8 of my trial report whereby I noted that ‘money
spent on the dwelling, whether it encompasses only works required to
41 Ibid Tab 20, at pp 29/29.
42 Ibid Tab 20, at pp 27/29, para 5.3.2.
43 Ibid para 5.4.
44 Ibid Tab 21, at pp 21/23.
45 Ibid paras 89 – 90.
-- 14 of 19 --
15
make the dwelling structurally sound or some broader building
renovation project, is unlikely to result in an over-capitalisation
given the location. That is, the majority of the cost of works is likely
to be reflected within the value of the property once completed.”
(emphasis added)
[41] The above figures used by Mr Kamitsis were those of Mr Lowry’s before the changes
to the evidence and the concessions referred to above. Using Mr Chapman’s costs to
bring the houses to a structurally sound condition plus Mr Lowry’s revised costs to
bring the houses to a habitable condition would reduce his notional value for number
8 of in the order of $1,317,081.0046 and for number 10, $1,238,312.00.47
[42] Apart from his views concerning the risk or absence thereof, of over capitalisation,
Mr Kamitsis did not place a dollar value on the added value to the land the houses in
a structurally sound condition might bring. And, no real indication of what that value,
if indeed there is any added value, might be is able to be discerned from the evidence.
The highest sales evidence in this regard is that the house on the Early Lane sale, in
a similar conclusion to the subject two houses, added no value48 and the sale at 16
Cordeaux Street revealed that a house in a superior state of repair also added little
value to the land.49
[43] In addition to relying on the 9 Mitchell Street sale to support his valuation thesis, Mr
Kamitsis also relied on the sale at 6 Early Lane to criticise the approach of
Mr Crawford. After analysing that sale Mr Kamitsis opined:50
“Mr Crawford ascribes $145,000 to the value of these improvements
despite them being uninhabitable and not structurally sound and yet
only $180,000 to each of the subject dwellings ‘as if structurally sound
and habitable’.
I expect the reason for the apportionment here is that if Mr Crawford
had a (sic) placed a realistic on the improvements like $0 or $10,000
this would have the effect of increasing the land value for this 506m2
allotment and would therefore be at odds with his ‘as is’ valuations for
the subject land. A rational analysis of this sale would conclude it
represents mainly land value.”
[44] During the course of his evidence Mr Crawford reduced the value of the
improvements of this sale from $145,000.00 to $115,000.00. Notwithstanding that, I
46 i.e. $970,000.00 + $96,000.00 + $220,577.00 + $30,504.00.
47 i.e. $920,000.00 + $140,000.00 + $175,111.00 + $3,201.00.
48 Exhibit 1, Volume 2, Tab 19, at p 15/33 and paras [44] and [45] below.
49 Ibid p 20/33 and paras [44] and [45] below.
50 Ibid Tab 21, at pp 17/23.
-- 15 of 19 --
16
accept this criticism. In circumstances where the house at Early Lane was neither
habitable nor structurally sound, it could not sensibly be said to have a value of in the
order of $145,000.00 or even $115,000.00. In this regard I accept Mr Kamitsis’
evidence about the state of repair of that house.
[45] Land value of in the order of $845,000.00 for the Early Lane sale also sits relatively
comfortably with the sale at 16 Cordeaux Street. While I am unable to accept Mr
Kamitsis’ evidence that the house on this site had no value51 given the renovations
being carried out52 by the owners, I do accept that the sale largely reflects land value.
The difference between Early Lane at $845,000.00 for 506m2 and 10 Cordeaux Street
at, say $1,000,000.00 for 405m2 is readily accounted for by reference to the former
sale being a somewhat dated sale,53 being lower and flood affected54 and being located
in a less desirable location overall.55 I also prefer Mr Kamitsis’ analysis of the sales
at 61 Gray Road and 40A Drury Street to that of Mr Crawford.56
[46] On balance, I consider it very likely that Mr Crawford has materially underestimated
the “as is” value of both properties. Further, it is far from clear how his value for both
houses of $180,000.00 in a habitable state was derived. Accordingly, I am unable to
give any weight to his assessment of the “as is” values.
[47] I have concluded that Mr Kamitsis’ sales analysis, particularly of the Early Lane and
16 Cordeaux sales supports his “as is” valuations of $970,000.00 and $920,000.00
but that neither of the houses as they presently stand add any value to the land. In
fact it could be said that they might stand as impediments to the owner maximising
his selling prices. According to Mr Kamitsis, if vacant both lots could be sold
together as one development site for “at least” $2,500,000.00.57
[48] As to Mr Kamitsis’ valuations on a habitable basis, even if correct, a matter I have
some reservations about,58 it is not to the point to say that if an owner spent
51 T3-102 LL 10-25.
52 Exhibit 1, Volume 2, Tab 19, at pp 20/33.
53 Ibid pp 15/33.
54 T3-59.
55 Exhibit 1, Volume 2, Tab 19, at pp 15/33.
56 Exhibit 1, Volume 2, Tab 21 at pp 11 & 13.
57 T4-38 LL 1-14.
58 T4-22 to T4-24.
-- 16 of 19 --
17
$700,000.00 to $800,000.00 on improvements “there is a good chance you will get
your money back”59 or that there would only be a low risk of over capitalisation.60
[49] As I have already said, Mr Kamitsis’ “as is” valuations may well be correct based on
the three “critical assumptions” that he proceeded on:
(i) neither of the subject dwelling could be demolished;
(ii) neither of the lots could be used for any other purpose other
than a single dwelling house;
(iii) despite the zoning of the land no further development potential
exists beyond the ability to renovate the subject houses.
[50] However, in my view, those assumptions are not warranted. The first must be
predicated on the notion that both houses are in fact reasonably capable of being made
structurally sound. The second and third assumptions really just flow on from that.
But for those assumptions the market value of Lots 8 and 9 combined would exceed
to a material extent the values attributed to those lots by Mr Kamitsis.
[51] For the reasons given, I have come to the conclusion that the valuation evidence offers
limited assistance in determining whether, given the costs involved, it could be said
that both houses are reasonably capable of being made structurally sound. The
totality of the valuation evidence only goes so far as to lead me to conclude that the
appellant would be required to expend large sums of money in circumstances where,
while it being likely that the works would add value, roughly on a dollar for dollar
basis, there is not an insignificant risk that it may not.
[52] As Griffin SC DCJ observed in Craig Securities, the Planning Instrument is
concerned with preserving character housing not with the financial circumstances of
the owner, including those that might flow from having to have them preserved. That
said, his Honour was also, with respect, correct in identifying that the actual costs
involved was a “vital” component in the exercise a Court is required to carry out.61
[53] In Craig Securities, given the circumstances of that case the costs of carrying out the
structural work, be it $53,000.00 or $32,000.00 was considered to be a “relatively
modest cost”. In Gould it was found that the costs involved “would substantially
59 T4-32 LL 22-28.
60 Exhibit 1, Volume 2, Tab 21, at p 21.
61 At paras [30] and [31].
-- 17 of 19 --
18
outweigh the costs of demolition and redevelopment”.62 That is certainly not the case
here.
[54] This case should of course not be decided on the basis of what was considered
reasonable or unreasonable in other cases as, save for very rare cases, no two are the
same. In this case the owner would be required to spend up to $96,000.00 for 8
Amersham Street and up to $140,000.00 for number 10 and up to $236,000.00 to
make both houses structurally sound. To adopt the terminology of Wilson SC DCJ
in Ken Ryan, they are large sums of money to spend to restore very dilapidated houses
to a level which reflects nothing more than being safe.63
[55] In his written submissions Mr Williamson also contended:64
“The cost of the works to repair each building as estimated by
Mr Chapman are not unreasonable once it is appreciated that the “as-
is” value for each property exceeds $900,000…”
[56] Mr Kamitsis valued 8 Amersham Street at $970,000 and Number 10 at $920,000.
The submission has a certain degree of attraction but, in my opinion, only at a
superficial level. The costs of the works for number 8 is in the order of 10% of the
“as is” value but in respect of number 10 the ratio is increased by some 50% to 15%
of the “as is” value. Further, as identified above, there is at least some risk that if the
works were carried out the owner may not even recover those costs on any sale of the
houses. Finally, the “as is” value does not reflect the vacant market value of the land.
In my opinion the assessment of the “reasonableness” of the costs is not supported by
any comparison with the “as is” values.
[57] The evidence established first: to bring the houses to a structurally sound state will
cost in the order of $96,000.00 and $136,000.00 respectively. Second: that while
likely, there is still a risk that that expenditure would not be recovered if each of the
houses were sold in the open market in a structurally sound condition. Third: at this
state of repair, the houses are far from habitable and to bring them to a habitable state
would require a considerable amount of further expenditure. It could not be said to be
reasonable to require expenditure of the nature identified that would result in the
situation where there would be two uninhabitable houses which, unless further
62 At para [26].
63 At para [19].
64 At paragraph [29].
-- 18 of 19 --
19
significant funds were spent to make habitable, might be left to begin to deteriorate
again.
Conclusion
[58] In my opinion the quantum involved results in the situation that neither house could
be said to be reasonably capable of being made structurally sound. The extent of that
unreasonableness is made more profound when viewed in the light of the owner
having to make both houses structurally sound at a cost of in the order of $240,000.00.
Orders
[59] For the above reasons the orders of the Court are:
1. The appeal is allowed.
2. I will hear from the parties as to any consequential orders.