ERO Georgetown Gold Operations Pty Ltd v Henry (No 2) [2016] QLAC 3 (2016) 37 QLCR 186
LAND APPEAL COURT OF QUEENSLAND
CITATION: ERO Georgetown Gold Operations Pty Ltd v Henry (No. 2)
[2016] QLAC 3
PARTIES: ERO GEORGETOWN GOLD OPERATIONS PTY LTD
(appellant)
v
THOMAS PETER HENRY
(respondent)
FILE NOS: LAC No. 003-15
Land Court No. MRA036-14
DIVISION: Land Appeal Court of Queensland
PROCEEDING: Appeal from the Land Court of Queensland
ORIGINATING
COURT:
Land Court at Brisbane
DELIVERED ON: 24 June 2016
DELIVERED AT: Brisbane
HEARING DATE: Heard on the papers
JUDGE: Peter Lyons J (Chairperson)
WL Cochrane (Member)
WA Isdale (Member)
ORDER: 1. The appellant pay the respondent’s costs of and
incidental to the appeal in this Court, to be assessed
on the standard basis until 15 September 2015, and
thereafter on the indemnity basis.
CATCHWORDS: COSTS – Respondent successful before Land Appeal Court
sought costs under s 34 Land Court Act 2000 - appellant
submitted prima facie position with respect to costs under s
34 that each party should bear its own costs – held s 34 does
not create a general rule that parties bear their own costs,
rather what is the appropriate costs order in the circumstances
COSTS – Land Appeal Court must have regard to established
legal principles when determining costs discretion under s 34
Land Court Act 2000 – it follows that a party’s success will
often be a significant, though not necessarily decisive, factor
in determining an application for costs
COSTS – Calderbank offer at common law – consideration
of the appellant’s conduct in rejecting Calderbank offer -
held the rejection of a Calderbank offer by the appellant was
-- 1 of 11 --
2
unreasonable in the circumstances – respondent entitled to
indemnity costs from the date of making a Calderbank offer
Alcan (NT) Alumina Pty Ltd v Commissioner of Territory
Revenue (2009) 239 CLR 27
Baini v The Queen (2012) 246 CLR 469
Calderbank v Calderbank [1976] Fam. 93
ERO Georgetown Gold Operations Pty Ltd v Henry [2015]
QLAC 4
Chief Executive, Department of Natural Resources and Mines
v Kent Street Pty Ltd & Ors [2011] 2 Qd R 417
Gallo v Department of Environment and Resource
Management (No. 2) [2014] QLAC 11
Hegira Limited v Department of Natural Resources and
Water [2006] QLC 0079
Latoudis v Casey (1990) 170 CLR 534
Mentech Resources Pty Ltd v MCG Resources Pty Ltd (in liq)
& Ors [2012] QLAC 2
Mio Art Pty Ltd v Brisbane City Council (No 3); Greener
Investments Pty Ltd (in liq) v Brisbane City Council (No 3)
[2013] QLAC 3
Oshlack v Richmond River Council (1998) 193 CLR 72
Ostroco v Department of Main Roads (No. 2) [2012] QLAC
007
PT Limited & Westfield Management Limited v Department
of Natural Resources and Mines [2007] QLAC 0121
Queensland Fish Board v Bunney; ex parte Queensland Fish
Board [1979] Qd R 301
Re JJT & Ors; ex parte Victoria Legal Aid (1998) 195 CLR
184
Tamawood Limited & Anor v Paans [2005] 2 Qd R 101
The Appellants v Council of the Law Society of the Act and
Anor (2011) 252 FLR 209
Vass and Lambert v Coordinator-General (No. 2) [2015]
QLAC 2
Wyatt v Albert Shire Council [1987] 1 Qd R 486
YMCA v Chief Executive, Department of Transport and Main
Roads (No 2) [2012] QLAC 004
Acts Interpretation Act 1954
Civil Proceedings Act 2011
Land Court Act 2000
Land Court Rules 2000
Mineral Resources Act 1989
Property Law Act 1974
Supreme Court of Queensland Act 1991
Uniform Civil Procedure Rules 1999
Valuation of Land Act 1944
Water Act 2000
-- 2 of 11 --
3
COUNSEL: J K Carter for the appellant
E J Morzone for the respondent
SOLICITORS: Miller Harris Lawyers for the appellant
Emanate Legal for the respondent
THE COURT:
[1] The successful respondent in this appeal seeks its costs on the indemnity basis under
s 34(2) and s 72 of the Land Court Act 2000 (Qld) (LC Act). It seeks those costs both in
the appeal, and in the Land Court, on the basis that the Land Court had not determined
an application made by the respondent for costs.
[2] In the Land Court, the respondent successfully sought an amendment of the
compensation payable to him by the appellant under the provisions of the Mineral
Resources Act 1989 (Qld) (MR Act).
Factual background
[3] The respondent contended (and it was not contested by the appellant) that the effect of
the Land Court’s determination was that he received an additional sum of $75,476,
being an amount of $37,907.10 compensation for the period up to 13 July 2015, with
additional monthly compensation of $3,954.62 for a further 9.5 months.
[4] On 19 June 2014, on 30 June 2014, and again on 11 July 2014 the respondent made
offers to settle the proceedings; as well as some other proceedings and some other
outstanding matters between the parties.
[5] On 15 September 2015, after the appellant had appealed against the Land Court’s
determination of compensation, the respondent offered to settle the matter on the basis
that the appellant pay the respondent $70,000, with each party to bear its own costs of
the proceedings in the Land Court, and in this Court. The offer invoked r 358 and r 360
of the Uniform Civil Procedure Rules 1999 (QLD) (UCPR); as well as Calderbank v
Calderbank1; foreshadowing that if it was refused, costs would be sought on the
indemnity basis. It was open for acceptance until 30 September 2015.
[6] None of these offers was accepted.
Statutory context
[7] Jurisdiction was conferred on the Land Court to hear the respondent’s claim for
amended compensation by s 283B of the MR Act. The respondent also sought relief
under s 363 of the MR Act, which conferred jurisdiction on the Land Court to hear
certain types of proceedings, though it was unnecessary to determine whether such
relief should be granted2.
1 [1976] Fam. 93.
2 See ERO Georgetown Gold Operations Pty Ltd v Henry [2015] QLAC 4 at [77]-[78].
-- 3 of 11 --
4
[8] Under s 5 of the LC Act, the Land Court3 has the jurisdiction given to it under that Act,
or another Act.
[9] Section 34 of the LC Act gives the Land Court the power to award costs. It is in the
following terms:
“34 Costs
(1) Subject to the provisions of this or another Act to the contrary, the
Land Court may order costs for a proceeding in the court as it
considers appropriate.
(2) If the court does not make an order under subsection (1), each party to
the proceeding must bear the party’s own costs for the proceeding.”
[10] By s 72 of the LC Act, s 34 of that Act is taken to apply, with necessary changes, to this
Court.
[11] There has been no suggestion that any provision of the MR Act is relevant for the
present application.
Submissions
[12] For the respondent, it was submitted that costs should follow the event, relying on a
statement by Keane JA in Tamawood Limited & Anor v Paans4; and on Hegira Limited
v Department of Natural Resources and Water5. Reliance was also placed on a passage
from the judgment of McHugh J in Latoudis v Casey6. It was submitted that the
respondent was forced to incur costs by the conduct of the appellant, and its refusal to
pay compensation; and that the respondent had acted reasonably and responsibly in
conducting the litigation. It was also submitted that the result was more favourable to
the respondent than his offers, and accordingly that he should be awarded indemnity
costs7.
[13] For the appellant it was submitted that each party should bear its own costs. The
Explanatory Notes to the bill which lead to the enactment of the LC Act confirmed that
under s 34, the general rule was that each party should bear their own costs8. PT
Limited & Westfield Management Limited v Department of Natural Resources and
Mines9 (PT Ltd) did not deal with s 34 of the LC Act, but with s 66 of the Valuation of
Land Act 1944 (Qld) (VL Act). Referring to PT Ltd, it was submitted that parties should
not be discouraged from seeking to assert rights by the fear of adverse costs. Reliance
was placed on a passage from the Court of Appeal’s decision in Chief Executive,
Department of Natural Resources and Mines v Kent Street Pty Ltd & Ors10 (Kent Street)
which stated that there are obvious reasons for the imposition of limitations on the
power of the Land Court and the Land Appeal Court to impose costs, these Courts being
3 No submissions were made as to the version of this Act to which reference should be made for this
application. It seems appropriate to rely on that which was current in September 2013.
4 [2005] 2 Qd R 101 at [30], [32], [33].
5 [2006] QLC 0079.
6 (1990) 170 CLR 534, 566-570.
7 Respondent’s Submissions on Costs, 4 December 2015, paras 12, 13, 23.
8 Written Submissions of the Appellant as to Costs, 18 December 2013, para 3 (ASC).
9 [2007] QLAC 0121.
10 [2011] 2 Qd R 417 at [14].
-- 4 of 11 --
5
intended to give members of the public a broad opportunity to litigate determinations
made under a statute which may have adverse consequences for them. It was submitted
that the prima facie position under s 34 of the LC Act was that each party bear its own
costs11.
[14] It was also submitted for the appellant that this Court has no power to make an order for
costs in the Land Court proceedings; and in particular, s 57 of the LC Act did not confer
such a power on it. The UCPR provisions relating to offers had no application12.
[15] In reply, it was submitted for the respondent that it was established that s 34 conferred
an unfettered discretion to award costs, regularly resulting in costs following the
event13. Oshlack v Richmond River Council14 was relied upon as support for a
submission that the most important factor guiding the exercise of a discretion to award
costs is the result of the litigation, the successful litigant generally being awarded its
costs. The legislation considered in Kent Street was similar in form to s 34. This Court
should follow its previous decision in Gallo v Department of Environment and
Resource Management (No 2)15 (Gallo), where it was held that this Court, when
determining an appeal from the Land Court, had the power to award the costs of the
proceedings in that court. It would be an unduly narrow reading of s 57 to hold that this
Court does not have power to make orders with respect to the costs of the Land Court
proceeding in an appeal from that Court16.
Discretion under s 34 of the LC Act
[16] In Mentech Resources Pty Ltd v MCG Resources Pty Ltd (in liq) & Ors (No 2)17 this
Court considered the effect of s 34 of the LC Act. It said18,
“Hence the Land Appeal Court may order costs ‘as it considers appropriate’.
The discretion to award costs is unfettered. However the rule often
followed, and the rule incorporated in r 689 of the Uniform Civil Procedure
Rules 1999, is that costs follow the event. That rule, while it does not
govern the exercise of the discretion here, nonetheless informs it, as there is
justice in that approach. It protects those put to unnecessary and substantial
expense at the behest of others.” (references omitted)
[17] That reasoning has been applied by this Court in YMCA v Chief Executive, Department
of Transport and Main Roads (No 2)19; Ostroco v Department of Main Roads (No 2)20;
and Mio Art Pty Ltd v Brisbane City Council (No 3); Greener Investments Pty Ltd (in
liq) v Brisbane City Council (No 3)21; and is at least implicit in the approach taken in
this Court to the award of costs in respect of the appeal to it in Gallo & Ors v Chief
11 ASC paras 5-9.
12 ASC paras 15-18.
13 Respondent’s Reply Submissions on Costs, 22 December 2015, para 2 (RRS).
14 (1998) 193 CLR 72, 96.
15 [2014] QLAC 11.
16 RRS, para 5.
17 [2012] QLAC 2.
18 Mentech at [4].
19 [2012] QLAC 004.
20 [2012] QLAC 007.
21 [2013] QLAC 3.
-- 5 of 11 --
6
Executive, Department of Environment and Resource Management (No. 2)22. That
approach is consistent with the principle stated in Oshlack that a successful litigant is
generally entitled to an award of costs. It is also consistent with the following statement
from his Honour’s judgment in Latoudis23:-
“…even when the discretion (to award costs) is uncontrolled, civil courts act
on the basis that a successful party has a reasonable expectation of obtaining
an order for costs and that the discretion to refuse to award costs should not
be exercised against the successful party except for a reason connected with
the case.”
[18] The appellant relied upon the Explanatory Note to the Bill which preceded the
enactment of the LC Act. Relevantly, it includes the following:
“Clause 34 the general rule is that parties to a proceeding bear their own
costs.
However, the Court may make an order as to costs it considers appropriate.
For example, a successful party may be granted an order that the other side
pay all or part of their (the successful party’s) costs.”
[19] The appellant’s submissions did not identify the basis on which it was said recourse
might be had to this material. Under s 14B of the Acts Interpretation Act 1954 (Qld)
(AI Act) that may occur where a statutory provision is ambiguous or obscure; of if the
ordinary meaning of the provision leads to a result that is manifestly absurd or
unreasonable. Recourse might also be had to such material to confirm the interpretation
conveyed by the ordinary meaning of the provision.
[20] There is no ambiguity about the language of s 34 of the LC Act. Nor as the result of the
adoption of the ordinary meaning of its language is it manifestly absurd or
unreasonable.
[21] Nor has it been suggested that reference to the note was necessary to identify the
purpose of s 34, so that effect might be given to s 14A of the AI Act. The purpose of s
34 is made plain by its language, being, relevantly, to confer a discretionary power on
the Land Court (and by extension, this Court) to award costs. No basis has been shown
on which recourse might be had to the Explanatory Note for the purpose of construing s
34.
[22] In Alcan (NT) Alumina Pty Ltd v Commissioner of Territory Revenue24 Hayne, Heydon,
Crennan and Kiefel JJ said
“This Court has stated on many occasions that the task of statutory
construction must begin with a consideration of the text itself. Historical
considerations and extrinsic materials cannot be relied on to displace the
clear meaning of the text. The language which has actually been employed
in the text of legislation is the surest guide to legislative intention. The
meaning of the text may require consideration of the context, which
22 (2014) 206 LGERA 342.
23 At 568.
24 (2009) 239 CLR 27 at [47].
-- 6 of 11 --
7
includes the general purpose and policy of a provision, in particular the
mischief it is seeking to remedy.” (references omitted)
[23] Section 34(1) makes clear that the Court has the power to make an order for costs,
which it considers appropriate. The range of considerations relevant to the exercise of
that power, and the weight to be given to them, is not identified by the provision, these
matters being left to the Court itself. Section 34(2) does not alter the effect of s 34(1).
It simply states the consequence of the Court not making an order for costs. The
Explanatory Note, if recourse to it were permissible, cannot affect the plain meaning of
these provisions. As was pointed out by the High Court in Baini v The Queen25,
paraphrases of the statutory language, whether found in parliamentary or other extrinsic
materials, are apt to mislead if attention strays from the statutory text. Still less can they
be said to alter its effect.
[24] While s 34 does not accord pre-eminence to the rule that the costs follow the event, in
contrast to r 681 of the UCPR, equally, it does not create a general rule that parties bear
their own costs. When an application is made for costs under it, the Court is required to
determine what order (if any) is appropriate. In carrying out that task, the Court is to
have regard to established principles relating to the exercise of such a discretion, to the
extent they are relevant to the facts of the case before the Court. One such principle is
the “rule often followed” that costs follow the event. The passage quoted from the
judgment of McHugh J in Latoudis is also relevant. It follows that a party’s success will
often be a significant, though not necessarily decisive, factor in its application for an
order for costs.
[25] The appellant relied on a statement of Callinan J in Re JJT & Ors; ex parte Victoria
Legal Aid26 about the effect of s 117 of the Family Law Act 1975 (Cth). The statement
was relied upon in support of a submission that, under s 34 of the LC Act, “the ‘prima
facie’ position is that each party bears its own costs of the proceeding, which involves
an express departure from the approach to a general discretion to award costs that
follow the event”27. The statement of Callinan J was, relevantly, that “authorises a
departure from what may be taken as the usual course in litigation, that costs follow the
event, to provide that parties will (subject to certain provision of the Family Law Act) be
required to bear their own costs”. His Honour’s statement reflects the structure of s
117, which gives primacy to the provision requiring each party to bear his or her own
costs; and conditions the power of the Court to award costs on its opinion that there are
circumstances which justify it in doing so. The statement is of no real assistance in
determining the effect of s 34.
[26] In support of its submission as to the “prima facie position”, the respondent relied upon
the statement in Kent Street as to limitations imposed by statute on the circumstances in
which the Land Court might make an order for costs. The passage relied upon by the
respondent28 sought to explain why the provisions in s 70 of the VL Act did not bind the
Court of Appeal when making a costs order. Again, the statement is of no assistance in
relation to the exercise of the much broader discretion conferred by s 34.
25 (2012) 246 CLR 469 at [14]; see also [35].
26 (1998) 195 CLR 184 at [125].
27 ASC, para 9.
28 Kent Street at [14].
-- 7 of 11 --
8
[27] The appellant also relied upon a passage from the judgment of this Court in PT Ltd29, as
follows
“Contemporary legislation in Queensland tends to make express provision
about costs if it is thought desirable that parties not be discouraged from
seeking to assert rights by the fear of adverse costs orders”.
[28] The statement was made about s 341 of the Property Law Act 1974 (Qld), analogous to
s 117 of the Family Law Act. In that case, this Court recognised that in revenue appeals
(of which it was an example) a cautious approach should be taken to the awarding of
costs; but that the words of the statutory provision conferring the power to award costs
must be kept firmly in mind, and costs should be awarded in an appropriate case30. The
present case is not a revenue appeal.
[29] As was recognised in PT Ltd by reference to Wyatt v Albert Shire Council31, where a
broader discretion is conferred to award costs, the power is to be exercised judicially,
but the Court can have regard to “settled practice”. It specifically recognised the
relevance of the outcome of litigation32.
[30] It follows that the appellant’s submission that the prima facie position under s 34 of the
LC Act is that each party is to bear its own costs should be rejected. A party’s success
will often be a significant factor in the exercise of the discretion to award costs under
that section.
Costs of the appeal
[31] There is no reason to think that the respondent’s success should not be regarded as
significant in determining the application for costs. Section 34 is not drafted as an
express provision intended to ensure that parties are not discouraged from seeking to
assert rights by the fear of an adverse costs order. While there might be cases where
this consideration is important, there is no reason to think that this is one of them. It
follows that the respondent should have its costs of the appeal.
[32] Since several of the respondent’s offers incorporate terms which go beyond the
resolution of his claim for compensation, and the effect of which it is difficult to
evaluate, they cannot be measured against the respondent’s ultimate success. The most
that can be said is that they displayed a willingness on the part of the respondent to
attempt to resolve his dispute with the appellant without further litigation.
[33] The only offer capable of being measured against the respondent’s ultimate success is
that of 15 September 2005.
[34] The appellant submitted that this offer should not be tested against the provisions of r
360 of the UCPR, r 4 of the Land Court Rules 2000 (LCR) not being apt to incorporate
it into those rules. Rule 360 is not an isolated provision, being one of a number of rules
found in Part 5 of Chapter 9 of the UCPR. Its operation is confined to cases where there
are pleadings, or, as the result of an order or direction, documents in the nature of
29 [2007] QLAC 0121 at [22].
30 See PT Ltd at [15], [18], [23].
31 [1987] 1 Qd R 486.
32 PT Ltd at [21]-[22].
-- 8 of 11 --
9
pleadings33. For this reason alone, the applicability of r 360 to an appeal to this Court
may be doubted.
[35] More significantly, s 34 confers an unfettered discretion to award costs. Power is
conferred, in bare terms, on the Supreme Court, the District Court and the Magistrates
Court to award costs by s 15 of the Civil Proceedings Act 2011 (Qld)34, the section
making no provision for the manner in which the power is to be exercised. However, s
85 of the Supreme Court of Queensland Act 1991 (together with s 21 of Schedule 1 to
that Act) authorises the Governor in Council to make rules as to costs in civil
proceedings. It is as a result of these statutory provisions that the power to award costs
is regulated, for example, by r 360 and r 681. It is hardly to be thought that the rule
making power conferred by s 21 of the LC Act was intended to authorise the making of
a rule altering the effect of s 34. It follows that r 360 of the UCPR does not apply to
this appeal.
[36] Nevertheless, it is well established that a failure to accept an offer to settle a matter may
result in an award of costs on the indemnity basis. The principle was established in
Calderbank. The policy which lies behind the provisions of the UCPR previously
mentioned would encourage its application. Although the fact that the offer was made
but not accepted is a weighty factor, an order for indemnity costs does not follow as of
course35. Where the result is more favourable to the offeror, than the offer was, it has
been said that there is a persuasive burden on the offeree to show that its failure to
accept the offer was (objectively36) reasonable37. A number of factors have been
identified as relevant where a Calderbank offer has been made38. They will be
considered shortly. The following proposition appears in Dal Pont39, based on some
authorities:
“If, say, the offer is a genuine attempt to compromise, is clearly expressed,
is open for sufficient time that the offeree can give it due consideration, and
is made at a stage of the proceedings when the offeree has access to
sufficient information to assess its merit, the court will likely order the
offeree to pay the offeror’s costs after the date of the offer, probably on the
indemnity basis, should the offer prove more favourable to the offeror than
the judgment.” (references omitted).
[37] The statement recognises the fact that the range of options available to a court will vary
depending on whether the offeror is the successful or unsuccessful party. If it is the
successful party, in most cases the only advantage to be secured by the offer is an award
of indemnity costs from the time of the offer. If it is the unsuccessful party, the offer
may protect it from an order for costs from that time; or even secure a favourable order,
whether on the standard basis or the indemnity basis. Where the offeror is the
successful party, an indemnity order is more likely than when it is the unsuccessful
party. There is much to be said for the proposition that, when the offeror is ultimately
the successful party in the litigation, it should have the benefit of an indemnity order.
33 See r 352 and 353 of the UCPR.
34 See also s 5 of that Act.
35 G.E. Dal Pont, Law of Costs (3rd ed, 2013, LexisNexis Butterworths: Australia) para 13.72 (Dal Pont).
36 Dal Pont para [13.72].
37 Dal Pont para [13.73].
38 Dal Pont paras [13.73]-[13.86], [13.88].
39 Dal Pont para [13.73].
-- 9 of 11 --
10
Otherwise the incentive to make such an offer is significantly reduced, as is the
encouragement to the offeree to accept it; and effect is not given to the policy of
encouraging the early resolution of litigation.
[38] The proposition just quoted makes no express reference to the reasonableness of the
offeree’s failure to accept the offer. It may be said that the factors referred to are
relevant in determining whether that failure is reasonable, but they may not be
exhaustive. For example, it would appear that a reasonable belief, after proper
consideration, that there are strong prospects of success may make the failure
reasonable40.
[39] In the present case, the September offer was made well before the hearing of the appeal;
but at a time when, because there had been a determination in the Land Court, the
appellant was well able to assess the merits of the case. Moreover, it knew that there
was already a determination adverse to it, giving it reason for some caution in the
assessment of the merits of its appeal. It has not suggested that it had good reason to
think it had substantial prospects of success. Nor is it inherently likely that it took that
view. There was no obvious error in the Land Court’s determination. Indeed, it might
be thought that the appellant faced significant difficulties in these proceedings. The
respondent’s claim arose from the fact that the appellant had placed a fence across the
respondent’s principle means of access to his leasehold property, Flat Creek Station, on
which he also conducted a camping ground for tourists. The compensation agreement
which the appellant’s predecessor had entered into with the respondent included a
condition that roads in the area should be maintained in good order41; and its mining
lease was subject to a condition that, without the prior approval of the relevant Minister,
the appellant was not to obstruct or interfere with any right of access had any person in
respect of the area of the mining lease, under s 276(1)(d) of the MR Act. The appellant
sought to contend that its conduct was not a material change of circumstances. It
obviously faced considerable difficulties in its contention.
[40] The appellant was given a reasonable period of time in which to consider the offer.
There is no reason to doubt that the offer was a genuine attempt to compromise the
litigation. It was clearly expressed, and it gave notice that indemnity costs would be
sought if it was refused. It might also be said that the result is substantially more
favourable to the respondent. Although the compensation is only a little higher than the
amount which the respondent was prepared to accept, the respondent was prepared to
forego costs. The costs of the proceedings in the Land Court are likely to be significant,
particularly in comparison with the amount in issue. There was a three day hearing
(with expert witnesses) in a remote location producing an appeal record in this Court of
six volumes. The costs of the appeal are also likely to be significant.
[41] For the appellant it was contended that it had legitimate concern about the findings of
the learned Member; with the possibility that the lease might be cancelled, or that a
penalty might be imposed. The submission did not refer to evidence that the appellant
in fact had such a concern; or that there was any real risk of the cancellation of the lease
or the imposition of a penalty. The risk of either of these events would seem quite low,
given that the appellant had reinstated the respondent’s access, it would seem with some
direction from the Department of Natural Resources and Mines, by about 29 April 2015.
40 Compare Dal Pont para [13.85].
41 ERO Georgetown Gold Operations Pty Ltd v Henry [2015] QLAC 4 at [12].
-- 10 of 11 --
11
[42] When these considerations are weighed up, they favour the making of an order for costs
on the indemnity basis.
[43] Accordingly, the appellant should be ordered to pay the respondent’s costs of the
appeal; on the standard basis until 15 September 2015, and thereafter on the indemnity
basis.
Costs in the Land Court
[44] After substantial reasons on this question were prepared, it came to the notice of the
Court that the Land Court had made an order for the costs of the proceedings before it.
There being no appeal from that order, and the appeal against the Land Court’s
determination of the proceedings before it having been dismissed, there is no occasion
for this Court to make an order for the costs of the proceedings in the Land Court.
Conclusion
[45] This Court should make an order that the appellant pay the respondent’s costs of and
incidental to the appeal to this Court, to be assessed on the standard basis until 15
September 2015, and thereafter on the indemnity basis.
ORDERS
1. The appellant pay the respondent’s costs of and incidental to the appeal in this
Court, to be assessed on the standard basis until 15 September 2015, and
thereafter on the indemnity basis.
PETER LYONS J
WL COCHRANE
MEMBER OF THE LAND COURT
WA ISDALE
MEMBER OF THE LAND COURT
-- 11 of 11 --
Official source: https://www.sclqld.org.au/caselaw/QLAC/2016/003