Department of Transport and Main Roads v Blenner's Transport Pty Ltd; Department of Transport and Main Roads v Blennerhassett [2015] QMC 9
MAGISTRATES COURTS OF QUEENSLAND
CITATION: Department of Transport and Main Roads v Blenner’s
Transport Pty Ltd; Department of Transport and Main
Roads v Blennerhassett [2015] QMC 9
PARTIES: DEPARTMENT OF TRANSPORT AND MAIN ROADS
(Complainant)
v
BLENNER’S TRANSPORT PTY LTD
(Defendant)
Tran
AND
DEPARTMENT OF TRANSPORT AND MAIN ROADS
(Complainant)
v
LESLIE JOHN BLENNERHASSETT
(Defendant)
FILE NO/S: MAG-00117310/14(1); MAG-00117347/14(1); MAG-
00117361/14(4); MAG-00117481/14(0); MAG-
00117334/14(7); MAG-00117350/14(2); MAG-
00117477/14(2); MAG-00117485/14(5)
DIVISION: Magistrates Court
PROCEEDING: Application to transfer proceedings
ORIGINATING
COURT: Dalby Magistrates Court
DELIVERED ON: 18 June 2015
DELIVERED AT: Dalby
HEARING DATE: 16 April 2015
MAGISTRATE: K Ryan
ORDER: (a) The application to transfer is refused.
(b) The Complaints and Summonses numbered MAG-
-- 1 of 12 --
2
00117310/14(1); MAG-00117347/14(1); MAG-
00117361/14(4); MAG-00117481/14(0); MAG-
00117334/14(7); MAG-00117350/14(2); MAG-
00117477/14(2); MAG-00117485/14(5) are to be heard
together.
(c) The Complaints are set for pre-trial hearing on 17 and
18 September 2015.
(d) The Complaints are set for hearing on 6, 7, 8 and 9
October 2015.
CATCHWORDS: CRIMINAL PROCEEDINGS – COMPLAINT AND
SUMMONS – Application to transfer; Whether ‘more
convenient’ to transfer; influencing persons; extended
liability offences
JUSTICES ACT 1886 – COMPLAINTS HEARD
TOGETHER – Consent of parties
LEGISLATION:
Justices Act 1866
Transport Operations (Road Use Management) Act 1995
Transport Operations (Road Use Management – Fatigue
Management) Regulation 2008
CASES:
Chief Constable of Norfolk v Clayton [1983] 2 AC 473
Hobler v Francis [1911] St R Qd 17
Hodder v The Australian Workers’ Union (1985) 4 FCR 541
McCready v Bendigo Health [2014] VSC 565
R v Pepperill (1981) 54 FLR 327
R v Yanner [1998] 2 Qd R 208
COUNSEL: Mr M Nicholson for the Complainant
Ms K Mellifont QC for the Defendants
SOLICITORS: Department of Transport and Main Roads for the Complainant
Sparke Helmore for the Defendants
Background
[1] Each defendant is charged by way of separate Complaints and Summonses with
four extended liability breaches of Section 57B of the Transport Operations (Road
Use Management) Act 1995 (“the Act”).
-- 2 of 12 --
3
[2] These breaches arise out of the failure of drivers of the Defendant company
Blenner’s Transport Pty Ltd to comply with fatigue management pursuant to the
Transport Operations (Road Use Management – Fatigue Management) Regulation
2008 (“the Regulation”) as was then in force. Mr Blennerhassett is the managing
director of Blenner’s Transport Pty Ltd and is charged as an “influencing person”.
[3] Section 57B(2) of the Act states –
“(2) If the person in control of a heavy vehicle commits an extended
liability offence, each influencing person is also taken to have
committed the offence.”
[4] For the purposes of Section 57B (and relevant in this case) an extended liability
offence means –
“(c) an offence committed by the person in control of a fatigue regulated
heavy vehicle because there has been a contravention of a fatigue
management requirement in relation to the vehicle;”
[5] An influencing person means –
“(a) (i) the owner of the heavy vehicle…..
(iii) a person, other than the owner or registered operator, who
controls or directly influences the operation of the heavy vehicle.”1
[6] In this case, it is alleged the “person in control” is each driver, the “owner of the
heavy vehicle” is Blenner’s Transport Pty Ltd and the “person…who controls or
directly influences the operation of the heavy vehicle” is Mr Blennerhassett.
[7] Three of the Complaints and Summonses naming Blenner’s Transport Pty Ltd as
Defendant rely on separate breaches of Section 53(2)(a) of the Regulation by
individual drivers as do three of the Complaints and Summonses naming Mr
Blennerhassett as Defendant.
[8] Section 53 of the Regulation as is relevant to this case provides –
“(1) Schedule 2, table 1 sets out the BFM hours for a solo driver of a
fatigue regulated heavy vehicle.
(2) In any period stated in column 1, the solo driver –
(a) must not work for more than the work time stated in column
2; and Must have the rest of the period off work, with at least the
rest time stated in column 3.
1 Section 57AB, Transport Operations (Road Use Management) Act 1995
-- 3 of 12 --
4
[9] The remaining two Complaints and Summonses (one each against Blenner’s
Transport Pty Ltd and Mr Blennerhassett) rely on a breach of Section 76(1)(e) of the
Regulation.
[10] Section 76(1)(e) (as is relevant to this case) provides –
“(e) Information must be written on a daily sheet in the way stated in the
instructions in the work diary for recording information on daily
sheets.”
[11] I am advised the complainant Department has commenced similar proceedings in 10
other Magistrates Courts districts throughout Queensland, being Bowen,
Bundaberg, Charters Towers, Holland Park, Mackay, Maryborough, Richlands,
Rockhampton, Townsville and Tully. The complainant submits that it is
appropriate that all complaints against both Defendants should be transferred to one
Magistrates Court pursuant to Section 139(2) of the Justices Act (Qld) 1886 so that
the trial of all complaints can be dealt with properly before one court.
[12] Helpfully, the Applicant/Complainant has provided as Attachment A to its original
submissions on this application, a schedule of breaches alleged to have been
committed in different court districts by drivers employed by the Defendant
company, which would give rise to the extended liability sections of the Act. These
are reproduced as follows –
Court Driver Section of the Regulation
Bowen Adam Timothy Burke 48(2)(b)
Bowen Adam Timothy Burke 48(2)(a)
Bowen Bartholomew Paul John
Rolfe
53(2)(a)
Bowen Christopher Glen Creighton 53(2)(a)
Bundaberg Paul Stephen Meredith 53(2)(b)
Charters Towers Jimmy Ristovski 76(1)€
Dalby Brett Leigh Koitka 53(2)(a)
Dalby Jimmy Ristovski 76(1)(e)
Dalby Phillip Stephen Jones 53(2)(a)
Dalby David Richard East 53(2)(a)
Holland Park David Richard East 53(2)(a)
Mackay Bradley Lyle Longman 53(2)(b)
Mackay David Richard East 53(2)(a)
Maryborough John Phillip Membrey 53(2)(a)
Richlands Ian Colin Bray 71(1)
Rockhampton Jason William Phillips 53(2)(b)
-- 4 of 12 --
5
Rockhampton Marcus Donald Koitka 53(2)(a)
Rockhampton Marcus Donald Koitka 53(2)(a)
Rockhampton Stephen Guy Leighton 53(2)(a)
Rockhampton Casey James Alexander
Richards
53(2)(b)
Townsville Bartholomew Paul John
Rolfe
53(2)(a)
Townsville Brett Leigh Koitka 53(2)(a)
Townsville Stephen James Bowen 53(2)(a)
Townsville Jeffrey Allan Timms 53(2)(a)
Townsville Ian Colin Bray 53(2)(a)
Tully Gregory Gordon Moore 53(2)(b)
[13] For criminal liability to attach to each Defendant, the prosecution must prove the
substantive offence was committed by each driver. I also note that each Defendant
has been charged pursuant to section 57B of the Act with the extended liability
offence, resulting in a total of 52 separate Complaints and Summonses being issued,
26 against each Defendant. There is also a stand alone charge against the Defendant
company of a breach of section 140(3) of the Regulation for failing to comply with
fatigue management accreditation.
[14] It would be prudent at this stage to record that on 20 August 2014, an application to
transfer the Dalby Complaints and Summonses to Townsville was refused by me in
this court. In refusing the application at that stage I stated –
“Once proofs of evidence are obtained and provided and the parties have
the opportunity of disclosure and the inevitable discussions and
concessions as to which charges are to be proceeded with or are to be
heard together, then a further application for transfer to one venue can be
made.”
[15] The Applicant/Complainant had submitted in support of its previous application to
transfer (and by extension maintains its submission) that –
“At its highest, the Prosecution case reveals the company was operated by
Mr Blennerhassett to maximise profit, with little regard for fatigue
management legislation. In order to avoid detection, Mr Blennerhassett
attempted to maintain plausible deniability through wilful blindness to
systematic breaches of the Regulation by drivers in order to avoid
personal liability.” (emphasis added)
-- 5 of 12 --
6
[16] It would appear that the reasoning behind the Applicant/Complainant’s application
to transfer is to show evidence of (as put by the Defendants) a ‘culture of non-
compliance’ of the Defendant company and Mr Blennerhassett.
[17] The application before me today is to have the Dalby matters transferred to
Brisbane. Similar applications will then be made in the other Magistrates Court
Districts to have the respective Complaints and Summonses also transferred to
Brisbane. The present application is opposed by the Defendants. Ms Mellifont has
indicated to the court that should the Applicant/Complainant’s application be
granted in the Dalby court, any application to transfer the other matters will not be
opposed by the Defendants.
[18] Ms Mellifont has also advised the court that should the Applicant/Complainant’s
application be refused, the Defendants would consent to the four Dalby Complaints
and Summonses against each Defendant being heard together, that is, there would
be two trials, one regarding the four complaints against the company and the second
regarding the four complaints against Mr Blennerhassett.
Section 139(2) Justices Act 1886
[19] Section 139(2) of the Justices Act 1886 makes clear that any decision to transfer
proceedings remains in the court’s discretion. It states –
“(1) Where a complaint for a simple offence or breach of duty is before
a Magistrates Court at any place at which that complaint may
lawfully be heard and determined and it appears to the court, either
of its own motion or upon the submission of the complainant or
defendant made in writing to or by appearance before the court,
that the hearing would more conveniently take place at another
place in Queensland, the court may, before any evidence is
adduced, adjourn the hearing to such other place and to a time to
be then stated or to be determined as hereinbefore in this Act
provided.” (emphasis added)
[20] This means that even if I were to transfer the Dalby proceedings to Brisbane, there
is no guarantee that any of my fellow magistrates, sitting in their own districts,
would also grant such an application. Further, I note that my brother Magistrate
Strofield, sitting in Holland Park, refused such an application and set the
Complaints and Summonses before his court for pre-trial applications and a multi-
day trial in May 2015.
[21] There were no written reasons for his decision. In any event, I am cognisant of the
fact that I am not bound by his decision. I further note that the Holland Park
complaints have now been withdrawn.
[22] There are no decided cases as to the meaning of “more convenient” as it appears in
Section 139(2) of the Justices Act 1886.
-- 6 of 12 --
7
[23] I have been referred to a number of cases which discuss the considerations which
are relevant to an application for a change of venue. Muir J in R v Yanner [1998] 2
Qd R 208 listed the following –
(a) The cost and inconvenience involved, including disruption to court
schedules and the wast of court resources;
(b) Delay;
(c) Ensuring that a fair trial is had and seen to be had;
(d) The system of administration of justice in Queensland which
establishes court districts and enables the crown to select the district
in which criminal proceedings will be commenced;
(e) That the result of acceding to the application will be to move the trial
from the locality in which the offence was allegedly committed.
[24] The Defendants also rely on the decision of Lukin J, in Hobler v Francis2 where it
was held that the defendant (who was the applicant seeking transfer) ‘had not shown
that there was a manifest preponderance of convenience” to transfer the
proceedings; the case of Hodder v The Australian Workers’ Union3, where the
court followed Hobler v Francis in applying the ‘preponderance of convenience’
test; and the case of McCready v Bendigo Health4 where the consideration was the
‘balance of convenience’.
[25] The Applicant/Complainant submits the following factors support a ‘balance of
convenience for transfer’ –
(a) Cost and inconvenience
The cost in transferring all applications to one court would result in
one trial, as opposed to 53 identical trials across the State. Court
resources required would likely be 53 times greater if the application
to transfer was not granted.
(b) Delay
It is likely the various Courts across the state will be unable to hear
53 separate trials immediately, including applications to exclude
evidence. There will likely be much less delay if the application to
transfer is granted.
(c) Ensuring a fair trial is had and seen to be had (including fairness to
the Prosecution)
There is likely to be no unfairness to the Defence in one hearing.
However, refusing the application would make the Prosecution job in
having numerous witnesses attend 53 separate hearings much more
difficult (both in terms of cost and actual attendance – for example,
various warrants in the event witnesses don’t attend).
2 [1911] St R Qd 17
3 (1985) 4 FCR 541
4 [2014]VSC 565
-- 7 of 12 --
8
(d) Result of acceding to the application will be to move the trial from
the locality in which the offence was allegedly committed.
The only connection with each relevant locality is that the relevant
driver was driving through the District when the offence occurred.
The majority of evidence adduced will focus on reasonable steps,
with witnesses giving evidence of events that occurred in Tully or
Brisbane.
[26] However, I refer to the decision of Muirhead J in R v Pepperill (1981) 54 FLR 327,
which followed Re Thomas [1928] SASR 210, when His Honour considered the
question of transferring proceedings pursuant to Section 139(2) of the Justices Act
1886. He held –
“the principle of an impartial and unimpeded hearing was of the highest
importance, to which consideration of inconvenience and added expense
were secondary; the object is not only the protection of the individual
affected, but prevention of interference with the administration of justice.”
(emphasis added)
Cost and inconvenience
[27] As previously noted, there is no guarantee, despite no opposition by the Defendants,
that my fellow magistrates would exercise their discretions in transferring the
respective Complaints and Summonses to Brisbane for hearing.
[28] It is unfortunate that the Holland Park Complaints have been withdrawn as any
decision on pre-trial applications made by Magistrate Strofield in the Holland Park
proceedings would have been persuasive and, if appealed, would have been binding
on those that followed. This would have resulted in the truncating of the ’53
identical trials across the State’ referred to by the Applicant/Complainant, by
clarifying the issues to be decided by the court.
[29] This then, would have reduced the allocated time required with an equivalent
reduction in cost.
Delay
[30] The Complaints and Summonses in the Dalby proceedings were filed on the 12 June
2014 and first mentioned in this court on 5 August 2014. Eight months has already
elapsed (to the date of the hearing of this application), pending the delivery of the
prosecution brief, which I now understand has been provided.
[31] The Dalby proceedings are therefore ready for trial. Should the application to
transfer be granted, this would lead to further delay whilst applications to transfer
are made in the remaining Magistrates Court jurisdictions for transfer, followed by a
hearing in Brisbane (should those applications be acceded to and which is not
guaranteed), to decide whether all Complaints and Summonses should be heard
together, arguments about admissibility of evidence and other pre-trial issues.
-- 8 of 12 --
9
[32] I consider that, on balance, the transfer of the Dalby proceedings to Brisbane would
likely lengthen the period of delay before the several Complaints and Summonses
are heard in Brisbane, if indeed it is ultimately found by the deciding Magistrate
that the matters be heard together.
Ensuring a fair trial is had and seen to be had
[33] The Applicant/Complainant has provided a table of witnesses5, their locations and
the distance those witnesses would need to travel to appear in the Dalby Magistrates
Court on the hearing of the subject Complaints and Summonses. This table is
misleading, in that were the present proceedings not to be transferred to Brisbane,
then only seven of those 40 witnesses appear to be required to establish the
substantive offences.
[34] Six of the seven appear to reside or are located under 250 km from Dalby, whilst the
seventh, does not appear on the Applicant/Complainant’s list of distances at all. Of
the remainder of those shown on that list, many appear to be located some thousand
or more kilometres from Dalby and I expect from Brisbane.
[35] The Applicant/Complainant submits that apart from those seven required to
establish the substantive offences in the Dalby proceedings, expert evidence will be
called from MT Data and My Fleet with regard to GPS and vehicle monitoring,
separate evidence from a witness relating to automatic numberplate recognition
pictures and five investigators, I presume from the Department of Transport and
Main Roads. These latter persons, I further presume are located in Brisbane,
although this is not altogether clear.
[36] For the purposes of the present application, I am satisfied that the costs associated
with having all relevant witnesses appear in the Dalby Magistrates Court would not
be an onerous one on the prosecution.
Result of acceding to the application will be to move the trial from the locality in which
the offence was allegedly committed
[37] The Applicant/Complainant submits that the only connection to the location in
which the Complaints and Summonses were filed is that that each driver was
travelling through that location at the time of the alleged offences.
[38] They further submit that “the majority of evidence adduced will focus on
‘reasonable steps’, with witnesses giving evidence of events that occurred in Tully
or Brisbane.” In referring to “reasonable steps”, the Applicant/Complainant is, I
understand, referring to the defence contained in Section 57B(2AA)(b) of the Act
which provides –
5 Attachment A to the Applicant/Complainants Reply filed on 17 March 2015
-- 9 of 12 --
10
(a) If the influencing person was in a position to influence the conduct of
the person in control of the vehicle, it is a defence for him to
establish that:
(i) He did not know of the contravention; and
(ii) He could not reasonably be expected to have known of the
the contravention;
And
(iii) He took all reasonable steps to prevent the contravention; or
(iv) There were no steps the person could reasonably be expected
to have taken to prevent the contravention.
[39] In ‘(a)nticipating that the defendants may raise this defence’, the
Applicant/Complainant has included in its submission on this application, evidence
it proposes to call from eleven witnesses who are employed or were formerly
employed by the Defendant company, an auditor and recruitment officer and driver
assessor to rebut the “anticipated” defence.
[40] This evidence will go to whether there was a “culture of non-compliance” by the
Defendant’s company and/or Mr Blennerhassett. It is submitted that in order to
prove this “culture”, all Complaints and Summonses should be heard together in
one place.
[41] As a result, the Applicant/Complainant has also made submissions relating to the
jurisdiction of the court to order that a number of complaints be heard together. As
noted above, this court is unable to determine the outcome in the proceedings
currently before the diverse Magistrates Court jurisdictions throughout Queensland.
It is only able to determine the application as it pertains to the Dalby proceedings.
[42] Further, other than “compliance” being listed as one of the objectives set out in
Section 4 of the Act, there appears to be no specific offence relating to a “culture of
non-compliance” under the Act. The Defendants in the Dalby proceedings have
been charged pursuant to section 57B of the Act with extended liability offences as
“influencing persons” arising out of alleged breaches by drivers. There are no
provisions in the legislation allowing the introduction or proof of other similar
offences in determining liability or penalty in the Dalby proceedings.
Section 43, Justices Act 1866
[43] I have received a number of submissions with regard to the operation of Section 43
of the Justices Act 1866, which provides –
(1) Every complaint shall be for 1 matter only, and not for 2 or more matters,
except—
(a) in the case of indictable offences—if the matters of complaint are
such that they may be charged in 1indictment; or
(b) in cases other than cases of indictable offences—if the matters of
complaint—
(i) are alleged to be constituted by the same act or omission on the
part of the defendant; or
-- 10 of 12 --
11
(ii) are alleged to be constituted by a series of acts done or omitted
to be done in the prosecution of a single purpose; or
(iii) are founded on substantially the same facts; or
(iv) are, or form part of, a series of offences or matters of complaint
of the same or a similar character; or
(c) when otherwise expressly provided.
(2) When 2 or more matters of complaint are joined in the 1 complaint each matter
of complaint shall be set out in a separate paragraph.
(3) At the hearing of a complaint in which 2 or more matters of complaint have
been joined but which does not comply with the provisions of this section—
(d) if an objection is taken to the complaint on the ground of such
noncompliance—the court shall require the complainant to choose 1
matter of complaint on which to proceed at that hearing; or
(e) if no such objection is taken to the complaint—the court may
proceed with the hearing and may determine the matters of
complaint, and may convict or acquit the defendant in accordance
with such determination.
(4) If, at the hearing of a complaint, it appears to the court that a defendant may be
prejudiced or embarrassed in the defendant’s defence because the complaint
contains more than 1 matter of complaint or that for any other reason it is desirable
that 1 or more matters of complaint should be heard separately, the court may
order that such 1 or more matters of complaint be heard separately.
[44] In its submissions filed in the Court on 27 March 2015, the Complainant states at
paragraph 17 –
“The Prosecution make application for the hearing of all 8 offences against
both Defendants to be joined in one hearing.”
[45] It is noted that the Application filed in this Court on 3 December 2014 does not seek
such an order, but seeks the following –
(a) All Complaints are transferred to the Brisbane Magistrates Court;
(b) Any further order the Court deems appropriate.
[46] Both parties have referred me to the decision in R v Davidson6, in which Williams J
expressed the view that Magistrates, “in such cases and in similar situations” should
be guided by the observations of Lord Roskill in Chief Constable of Norfolk v
Clayton7. In summary those observations are –
6 [1985] 1 Qd R 332
7 [1983] 2 AC 473
-- 11 of 12 --
12
(a) If consent to a joint hearing is not forthcoming, the justices should
consider the rival submissions and rule as they think right in the
overall interests of justice.
(b) The absence of consent is not a complete and automatic bar to
hearing more than one information at the same time, when the facts
are sufficiently closely connected to justify this course and there is
no risk of injustice to the defendant.
(c) Justices should consider whether it would be fair and just to the
defendant to allow a joint trial, and “only if the answer is clearly in
the affirmative should they order joint trial in the absence of consent
by the defendant”.
[47] In this case, however, the Defendants, through Ms Mellifont, have indicated they
would agree to joint trials being held with regard to each Defendant. Nevertheless,
Williams J (in Davidson) warns that when there is to be a joint hearing of separate
charges –
“the magistrate should exercise great care to ensure that there is no
confusion of issues or any misapplication of the evidence admissible on
only one charge to another or others.”
[48] Having considered the factors placed before me, I am satisfied that the
Applicant/Complainant has not satisfied the court that it would be ‘more
convenient’ for the Dalby proceedings to be heard in Brisbane. The application to
transfer is refused.
[49] With regard to the issue as to whether the Dalby Complaints should be heard
together, I am satisfied that the matters of complaint are sufficiently connected and
that it would be “fair and reasonable” for the Complaints to be heard together.
Further, there has been consent by the Defendants to this course.
Orders
[50] The orders of the court are –
(a) The application to transfer is refused.
(b) The Complaints and Summonses numbered MAG-00117310/14(1);
MAG-00117347/14(1); MAG-00117361/14(4); MAG-
00117481/14(0); MAG-00117334/14(7); MAG-00117350/14(2);
MAG-00117477/14(2); MAG-00117485/14(5) are to be heard
together.
(c) The Complaints are set for pre-trial hearing on 17 and 18 September
2015.
(d) The Complaints are set for hearing on 6, 7, 8 and 9 October 2015 at
Toowoomba court house.
(e) Leave to apply with three (3) days’ notice.
-- 12 of 12 --
Official source: https://www.sclqld.org.au/caselaw/QMC/2015/009