Bell v Unimin Australia Pty Ltd (No 6) [2015] QMC 2
MAGISTRATES COURT OF QUEENSLAND
CITATION: Bell v Unimin Australia Pty Ltd (No 6) [2015] QMC 2
PARTIES: Graham Bell
(complainant)
V
Unimin Australia Limited
(defendant)
FILE NOS: MAG 245636/09(1); MAG 245626/09(6)
ORIGINATING
COURT: Brisbane Magistrates Court
HEARING: 22 August 2014
DELIVERED ON: 21 April 2015
DELIVERED AT: Toowoomba Magistrates Court
MAGISTRATE: G. Lee
ORDER: I find the defendant not guilty.
CATCHWORDS: Energy and Resources - Prosecution - Holder of a
mining lease to mine silica sand - Extracting
undifferentiated mass from pit or quarry with a view
to winning mineral Glass Grade sand from it -
Whether activity of extracting that material from the
pit or quarry authorised under the Mineral
Resources Act 1989 - Whether "mining" under the
Mineral Resources Act 1989 - Whether additional
environmental authority required for extraction from
the pit or quarry of that part of the undifferentiated
mass that was not a mineral
Energy and Resources - Prosecution - Holder of a
mining lease to mine silica sand - Extracting
undifferentiated mass from pit or quarry made up of
various material with a view to winning mineral
Glass Grade sand - Material processed offsite,
separated & stockpiled into mineral Glass Grade
sand and by-products including non-mineral B
Grade sand - B Grade sand sold from stockpile -
-- 1 of 45 --
2
Whether additional environmental authority required
in extracting B Grade sand from the pit or quarry
Magistrates- Jurisdiction and procedure generally –
Procedure - Information and complaint – Offences –
Whether activity over time is a continuing offence or
whether separate acts during that time constitute
separate offences - Limitation period – When
limitation period starts to run
COUNSEL: Mr R Devlin QC (with him Mr R Byrnes) for the
defendant
Mr A Glynn QC (with him Ms K Mellifont QC) for the
complainant
SOLICITORS: HWL Ebsworth Lawyers for the defendant
Litigation Unit, Department of Environment and
Heritage Protection (formerly Department of
Environment and Resource Management) for the
complainant
Environmental Protection Act 1994, ss 18, 19, 20, 146, 147, 427;
Schedule 3
Environmental Protection Regulation 1998, s 4; Schedule 1 ERA 20
Environmental Protection Regulation 2008, s 16; Schedule 2
Integrated Planning Act 1997, ss 1.3.2, 1.3.5, 4.3.1and Schedule 8
Table 2
Mineral Resources Act 1989, ss 6, 6A, 234, 236, 319
The following cases were cited:
Allina Pty Ltd v Commissioner of Taxation (1991) 28 FCR 203
Attorney-General v Prince Ernest Augustus of Hanover [1957] AC 436
Cohen v Macefield Pty Ltd & Ors [2010] QCA 95
Commonwealth v Baume (1905) 2 CLR 405
Cooper Brookes (Wollongong) Pty Ltd v Federal Commissioner of
Taxation (1981) 35 ALR 151
De Bray v Cohen; Macefield Pty Ltd v Cohen [2008] QDC 275
Dendy v Brinkworth (2006) 97 SASR 407
Deputy Commissioner of Taxation v Dick (2007) 226 FLR 388; [2007]
NSWCA 190
Environment Protection Agency v CSR Ltd t/a CSR Woodpanels (2001)
114 LGERA 217
Gonzo Holdings No 50 Pty Ltd v McKie [1966] 2 QdR 240
Grain Elevators Board (Vic) v Dunmunkle Shire (1946) 73 CLR 70
Jemison v Priddle [1972] 1 QB 489
K & S Lake City Freighters Pty Ltd v Gordon & Gotch (1985) 60 ALR
509
Lend Lease Real Estate Investments Ltd & Anor v GPT RE Ltd [2006]
NSWCA 207
-- 2 of 45 --
3
Project Blue Sky Inc v Australia Broadcasting Authority (1998) 194
CLR 355
R v Garget-Bennett [2013] 1 QdR 547
R v Industrial Appeals Court ex parte Barelli’s Bakeries Pty Ltd
[1965] V.R. 615
Unimin Australia Limited v State of Queensland [2009] QSC 384
Unimin Australia Limited v State of Queensland (No 2) [2010] QSC 23
Unimin Australia Limited v State of Queensland [2010] QCA 169
1. Unimin Australia Limited (Unimin) is charged with one offence under the
Environmental Protection Act 1994 (EPA) and one offence under the now
repealed Integrated Planning Act 1997 (IPA)1 in respect of its mining
operations of silica sand on Mining Leases 1108 and 7064 on North Stradbroke
Island in Queensland.
2. After a summary trial in which the defendant elected to give evidence in its own
defence I heard final submissions on 22 August 2014 which supplemented
detailed written submissions by the parties2. All evidence proposed to be
adduced has been adduced and legal arguments have now been refined in the
light of that evidence. The current task is to determine whether or not the
prosecution have proved each charge beyond reasonable doubt3. The facts are
substantially not in dispute. Rather, the outcome turns on statutory
interpretation in light of those facts.
3. The principal issue is whether the single activity of extracting sand on Mining
Leases 1108 and 7064 can be both a Chapter 4 EPA activity and Chapter 5 EPA
activity at the one time requiring separate environmental approvals. Chapter 4
as it stood during the charge period dealt with approvals and registration of non-
mining activities. Chapter 5 as it stood during the charge period dealt with
approvals for mining activities.
4. There is a subsidiary limitation issue in respect of the EPA complaint which
will be dealt with before the principal issue4.
5. After amendment Unimin is charged as follows:
Complaint 1
On dates unknown on or between 18 November 2006 and 18 December 2008 at
North Stradbroke Island …Unimin…did, in contravention of section 4.3.1.
1 Repealed 18 December 2009 by the Sustainable Planning Act 2009 but section 831 of that Act
provides that the IPA continues for current purposes;
2 Defendant’s written submissions dated 3 January 2014; prosecution’s written submissions dated 27
February 2014 (including Annexures “A” & “B”); defendant’s written reply dated 27 March 2014;
3 For a detailed history of this matter, refer to my previous judgments published at [2010] QMC 1;
[2011] QMC 24; [2012] QMC 16; [2013] QMC 3 and [2013] QMC 7; see also [2009] QSC 384 (per
Applegarth J.); [2010] QSC 23 (per Applegarth J.); [2010] QCA 169 (de Jersey CJ., Chesterman JA. &
Atkinson J); [2013] QSC 270 (per Dalton J.) ; [2014] QCA 113 (Fraser & Gotterson JJA. , &
Atkinson J.);
4 Paras [88] to [99] submissions for Unimin; paras [28 to [30] submissions for the prosecution; paras
[42] & [43] Unimin’s reply;
-- 3 of 45 --
4
Integrated Planning Act 1997, carry out assessable development without an
effective Development Permit for the development
PARTICULARS
1. Assessable development: Making a material change of use of premises
for an environmentally relevant activity, namely extracting sand (other
than foundry sand) from a pit or quarry using plant or equipment having
a design capacity of 100 000t or more a year ….
Complaint 2
On dates unknown on or between 4 October 2004 and 18 December 2008 at
North Stradbroke Island …Unimin …did, in contravention of section 427(1) of
the Environmental Protection Act 1994, carry out a level 1 chapter 4 activity,
not being a registered operator for the activity and not acting under a
Registration Certificate for the activity
PARTICULARS
1. Level 1 chapter 4 activity: extracting sand (other than foundry sand)
from a pit or quarry using plant or equipment having a design capacity
of 100 000t or more a year
6. Further and better particulars of the EPA charge were provided prior to trial as
follows5:
“It is alleged:
1. The contravention occurred over the period 4 October 2004 until
18 December 2008 and more specifically:
in conjunction with the Defendant’s mining activity on Mining ease
7064, between approximately 4 October 2004 and 18 December
2008, and
in conjunction with the Defendant’s mining activity on Mining
Lease 1108, between a commence date unknown between 11 March
2007 and 12 April 2007, and 18 December 2008.
2. During the offence period, the level 1 chapter 4 activity was
Environmentally Relevant Activity 20, namely extracting sand (other
than foundry sand) from a pit/s and/or quarry/ies using: (a) plant or
equipment having a design capacity of 100 000t or more per year and/or
(b) plant or equipment having a design capacity of between 5 000 and
100 000t per year.
5 Dated 23 November 2012;
-- 4 of 45 --
5
3. The Defendant was not a registered operator for Environmentally
Relevant Activity 20 as it did not hold a registration certificate issued
under section 73F Environmental Protection Act 1994 (“EPA”).
4. The Defendant was not acting under a registration certificate issued
under section 73F EPA to carry out Environmentally Relevant Activity
20.
5. The sand extracted is described variously as ‘B grade silica sand’,
‘construction sand’, ‘building sand’, ‘B grade glass’, ‘brickies loam’,
‘sandy loam’, ‘reject sand’, ‘fill sand’, ‘loam’, and/or ‘white sand’.
6. The pit/s and/or quarry/ies that the B grade silica sand was extracted
from were those used by the Defendant to carry out mining activities on
Mining Lease 1108 and Mining Lease 7064.
7. The plant or equipment used to extract the B grade silica sand was:
A Komatsu WA 480 front end loader; and/or
A Caterpillar 970F front end loader; and/or
A Volvo front end loader; and/or
Other model/s front end loader/s.”
7. For the IPA charge, the further particulars provided before trial were:
“It is alleged:
8. The contravention occurred over the period 18 November 2005 until 18
December 2008 and more specifically:
in conjunction with the Defendant’s mining activity on Mining Lease
7064, between approximately 18 November 2005 and 18 December
2008, and
in conjunction with the Defendant’s mining activity on Mining Lease
1108, between a commence date unknown between 11 March 2007 and
12 April 2007 and 18 December 2008.
9. The assessable development consisted of a material change of use of land
(Mining Lease 1108 and Mining Lease 7064) for Environmentally Relevant
Activity 20.
10. The Defendant did not possess any development permit issued under section
3.5.15 of the Integrated Planning Act 1997 (“IPA”) for the assessable
development that was effective under section 3.5.19 of the IPA.
11. The material change of use of land known as Mining Lease 1108 and Mining
Lease 7064 was the continuation of Environmentally Relevant Activity 20
-- 5 of 45 --
6
where there was no development approval for the activity and it was, at any
time before 4 October 2004, carried out without an environmental authority
as required under the EPA. (Applying definition 1.3.5(c) (ii) of the IPA).
12. The sand extracted is described variously as ‘B Grade silica sand’,
‘construction sand’, ‘building sand’, ‘B grade glass’, ‘brickies loam’, ‘sandy
loam’, ‘reject sand’, ‘fill sand’, ‘loam’ and/or ‘white sand’.
13. The pit/s and/or quarry/ies that the B grade silica sand was extracted from
were those used by the Defendant to carry out mining activities on Mining
Lease 1108 and Mining Lease7064.
14. The plant or equipment used to extract the B grade silica sand was:
A Komatsu WA 480 front end loader; and/.or
A Caterpillar 970F front end loader; and/or
A Volvo front end loader; and/or
Other model/s front end loader/s.”
LEGISLATIVE SCHEME
EPA
8. Relevant to the charge period (4 October 2004 to 18 December 2008) section
427 in Part 1 “Offences relating to environmentally relevant activities” of
Chapter 8 EPA entitled “General environmental offences” (Reprint 5G6)
provided:
427 Only registered operators may carry out chapter 4 activities
(1) A person must not carry out a level 1 chapter 4 activity, unless the
person is a registered operator for the activity or is acting under a
registration certificate
Maximum penalty – 400 penalty units …
(3) This section is subject to section 73T.
9. “Chapter 47 activity” is defined in Schedule 3 EPA from Reprint 5G:
chapter 4 activity means an environmentally relevant activity, other
than a mining activity or a petroleum activity.
6 EPA reprinted as in force on 4 October 2004; s 427 remained unchanged throughout the charge
period;
7 Chapter 4 is entitled “Chapter 4 Development approvals and registration (other than for mining or
petroleum activities)”;
-- 6 of 45 --
7
10. “Environmentally relevant activity” is defined in sections 18 & 19 EPA from
Reprint 5G8:
18 Meaning of environmentally relevant activity
An environmentally relevant activity is—
(a) a mining activity; or
(b) another activity prescribed under section 19 as an
environmentally relevant activity.
19 Environmentally relevant activity may be prescribed
A regulation may prescribe an activity, other than a mining activity, as
an environmentally relevant activity if the Governor in
Council is satisfied—
(a) a contaminant will or may be released into the
environment when the activity is carried out; and
(b) the release of the contaminant will or may cause
environmental harm.
11. Section 20 EPA provided for two levels of chapter 4 activities – level 1 and
level 29. It relevantly provided:
20 Levels of environmentally relevant activities
(1) An environmentally relevant activity, other than a mining
activity, must be prescribed under a regulation as a level 1 or level 2
environmentally relevant activity, depending on the risk of
environmental harm. …
12. Section 4 and of the Environmental Protection Regulation 199810 in force
during the charge periods provided:
4 Levels 1 and 2 prescribed environmentally relevant Activities
(1) An activity mentioned in schedule 1, column 1, is an
environmentally relevant activity of the level set out opposite the activity
in schedule 1, column 2. …
13. Schedule 1 of those regulations provided for a number of environmentally
relevant activities (ERA’s). Of relevance is ERA 20 under the heading
“Extractive activities” which provided:
20 Extracting rock or other
Material —extracting … sand (other than foundry sand), …
from a pit or quarry using plant or equipment having a
design capacity of—
8 In Part 3 “Interpretation” of Chapter 1 “Preliminary” EPA;
9 In Part 3 “Interpretation” of Chapter 1 “Preliminary” EPA;
10 These regulations were repealed and replaced by the Environmental Protection Regulation 2008 with
effect from 1 January 2009 which is outside the charge periods;
-- 7 of 45 --
8
(a) not more than 5000t a year . . . . . . . . . 2b
(b) 5000t or more, but less than 100000t, a
year . . . . . . . . . . . . . . . . . . . . . . . . . . 1
(c) 100000t or more a year . . . . . . . . . . . . 111
14. “Extracting” is not defined in the EPA or those regulations but the regulations
provided for what is not “extracting”:
extracting, for schedule 1, item 20, does not include –
(a) Extracting material from land if –
(i) The primary purpose of the extraction is not to gain the material;
and
(ii) Less than 1500 m3 of materials is extracted of the surface area
of the land is less than 5200 m2; or …
15. “Pit” and “quarry” are not defined in the EPA or regulations. Dictionary
meanings have been provided by the defence: "pit" - a hole or cavity in the
ground, formed either by digging or by some natural process; an open deep hole
or excavation made in digging for some mineral deposit; "quarry" - an open air
excavation from which stone for building or other purposes is obtained by
cutting, blasting, or the like; a place where the rock has been, or is being, cut
away in order to be utilized12.
16. The phrase “mining activity” in the above provisions is defined in section 147
Chapter 5 “Environmental authorities for mining activities” in Part 1 Division
2 “Key definitions for ch 5” EPA. For completeness sections 146 & 147
provide:
146 Purpose of ch 5
(1) The purpose of this chapter is to provide for environmental
authorities for mining activities.
(2) An authority issued under this chapter for a mining activity is
called an environmental authority (mining activities).
147 What is a mining activity
(1) A mining activity means an activity mentioned in
subsection (2) that, under the Mineral Resources Act, is
11 For the purposes of these proceedings only Unimin has formerly admitted the design capacity of
equipment was 100000t or more per year (exhibit 84);
12 Para [53] submissions for the defence;
-- 8 of 45 --
9
authorised to take place on—
(a) land to which a mining tenement relates; or
(b) land authorised under that Act for access to land
mentioned in paragraph (a).
(2) For subsection (1), the activities are as follows—
(a) prospecting, exploring or mining under the Mineral
Resources Act or another Act relating to mining;
(b) processing a mineral won or extracted by an activity
under paragraph (a);
(c) an activity that—
(i) is directly associated with, or facilitates or
supports, an activity mentioned in paragraph (a)
or (b); and
(ii) may cause environmental harm; ...13
17. The phrases “registered operator” and “registration certificate” which appear in
section 427(1) are defined in Schedule 3 EPA (Reprint 5G):
registered operator means the holder of a registration
certificate, for a chapter 4 activity, issued under section 73F
and in force.
registration certificate see section 73F.
18. Section 73F in Part 2 “Registration” of Chapter 4 “Development approvals and
registration (other than for mining and petroleum activities)” EPA provides for
the granting of authorities for activities other than for mining or petroleum
activities. Section 147 EPA above defines “mining activities”.
19. Finally, section 427(1) is subject to section 73T which deals with activities that
are not Chapter 4 activities but which become Chapter 4 activities because of a
change in the law. It provides that section 427 does not apply to a person
carrying out that activity for 4 months after that activity becomes a Chapter 4
activity. ERA 20 came into force 6 July 1998. ERA provisions for approvals
and authorities for activities other than mining activities were not inserted into
Chapter 4 EPA until 2 January 2001. This sufficiently predates the periods of
the current charges so section 73T does not apply14.
20. In its submissions the prosecution referred to section 619 EPA which deals with
the carrying over of certain environmental authorities in place under a former
13 Paras [d], [e] & [f] are not relevant;
14 Annexure B pages 8 & 9 prosecution’s submissions. This is not contested by the defendant.
-- 9 of 45 --
10
system of approvals to remain in force as if they were registration certificates
under the current system of approvals15. It was concluded that section 619 does
not apply. The defence have not disputed this.
LEGISLATIVE SCHEME
IPA
21. For the charge period (18 November 2006 to 18 December 2008) section 4.3.1
IPA provided16:
4.3.1 Carrying out assessable development without permit
(1) A person must not carry out assessable development unless
there is an effective development permit for the development.
Maximum penalty – 1665 penalty units
22. “Development” is defined in section 1.3.2 IPA17:
1.3.2 Meaning of development
Development is any of the following—
…
(e) making a material change of use of premises.
23. “Material change of use” is relevantly defined in section 1.3.5 IPA18:
material change of use, of premises, means—
…
(c) the continuation of an environmentally relevant activity
on the premises if—
…
(ii) there is no development approval for the activity
and it was, at any time before 4 October 2004,
carried out without an environmental authority as
required under the Environmental Protection Act 1994.
15 At pages 12 to 20 Annexure B to Prosecution’s submissions;
16 In Part 3 “Development offences, notices and orders” Chapter 4 (Appeals, offences and
enforcement); taken from Reprint 9F as in force on 11 December 2008 (from folder of statutes and
authorities provided by the parties); the remaining subsections to section 4.3.1 IPA do not apply;
17 Division 2 “Key definitions” of Part 3 “Interpretation” IPA;
18 Division 3 “Supporting definitions and explanations for key definitions” of Part 3”Interpretation”
IPA;
-- 10 of 45 --
11
24. The meaning of “environmentally relevant activity” in the IPA has the same
meaning as in section 18 EPA cited at [10] above: see schedule 10 IPA
definitions.
25. “Premises” is defined in Schedule 10 IPA:
premises means—
(a) a building or other structure; or
(b) land (whether or not a building or other structure is
situated on the land).
26. “Assessable development” is relevantly defined in Schedule 10 IPA (dictionary)
assessable development—
1 Generally, assessable development means development
stated in schedule 8, part 1, ….
27. Schedule 8 IPA “Assessable development and self-assessable development”
Part 1 “Assessable development” Table 2 “Material change of use of premises”
relevantly provides:
Table 2: Material change of use of premises
For an environmentally relevant activity
1 Making a material change of use of premises for an
environmentally relevant activity, other than—
(a) a mining activity; or
…
28. The meaning of “mining activity” in the IPA imports the meaning in section
147 EPA cited at [16] above: see Schedule 10 IPA (dictionary).
29. “Development approval” is defined in Schedule 10 IPA:
development approval means a decision notice or a negotiated decision
notice that—
(a) approves, wholly or partially, development applied for
in a development application (whether or not the
approval has conditions attached to it); and
(b) is in the form of a preliminary approval, a development
permit or an approval combining both a preliminary
approval and a development permit in the one approval.
30. Sections 3.5.15 and 3.5.17 IPA provide for a decision notice or negotiated
decision notice respectively to be given to the applicant for approval.
31. Relevantly, section 3.1.5 (3) IPA provides that a development permit authorises
assessable development subject to conditions therein. Although there is no
-- 11 of 45 --
12
definition of “effective development approval” or “effective development
permit” as per the wording in section 4.3.1 IPA, section 3.5.19 IPA provides for
when an approval takes effect.
BACKGROUND
32. A convenient summary, which accords with the evidence in this case, is partly
set out at paragraphs [9] to [21] in Unimin v State of Queensland [2009] QSC
384 per Applegarth J. and adopted by the Court of Appeal at [2010] QCA 169.
33. Relevantly, at all material times Unimin conducted mining operations under
mining leases 1108, 7064 and 1124 on North Stradbroke Island. Mining
operations had been running since 1969 by Unimin’s predecessors19.
34. Mining Lease 1108 was originally granted to Unimin as lessee from
10 November 1973 for 10 years for the purpose of mining garnet,
ilmenite/leucoxene, monazite, platinum, rutile, tin ore and zircon. The lease
was renewed from time to time the last being for 21 years from 23 November
2006. The purpose of the lease was amended to include mining for “silica sand”
on 26 November 2003.
35. Mining Leases 7064 and 1124 were granted to Unimin’s predecessor ACI
Operations Pty Ltd (ACI) as lessee for the purpose of, among other things,
mining for silica sand. Lease 7064 was for 10 years from 1 June 2001. Lease
1124 was originally for 13 years commencing 1 May 1975. It was later renewed
on 17 March 1988 for 21 years commencing 1 May 1990. ACI had contracted
Unimin to conduct mining operations on these leases.
36. Briefly, the mining process adopted by Unimin commenced with the removal
of topsoil at the mine face on Mining Leases 1108 and 7064 followed by the
digging up of an undifferentiated mass from the mine face on those leases. It is
a dry mining operation above the water table. This undifferentiated mass is
loaded into a hopper to remove organic objects. Water is then added to the sand
to form a slurry which is pumped to a processing plant on Mining Lease 1124
to undergo gravity separation resulting in the separation of high quality silica
19 Exhibit 30 - Record of Interview at page 3, response number 30;
-- 12 of 45 --
13
sand for glass manufacture, heavy metals, and reject material which has been
called many things including B Grade sand20. They were stockpiled separately
on Mining Lease 1124. The processing plant on ML 1124 had always been set
up specifically for glass grade sand.
37. Unimin’s principal purpose in mining silica sand on Mining Leases 1108 and
7064 was to extract high grade silica sand suitable for glass manufacture. As
part of the treatment process, a by-product of a lower purity silica sand referred
to as B Grade silica sand has always been produced as a direct consequence of
the production of glass grade silica sand by gravity separation. During the
charge periods this treatment process occurred on Mining Lease 1124. High
grade sand is sold off for glass manufacture. B Grade sand was sold being
removed from the stockpile on Mining Lease 1124. There is evidence that B
Grade silica sand had been sold off a stockpile at least as early as 1985-86 by
ACI and later, by Unimin21. Although Unimin stopped selling the B Grade sand
after the execution of the warrant by Deanne Caruso (then an officer of the
Environmental Protection Agency) on 16 December 2008, it did not change its
mining operation in the way it removed the undifferentiated mass from the mine
face on Mining Leases 1108 and 7064.
38. There is no dispute that Unimin was entitled to ultimately sell high grade sand
for glass manufacture after gravity separation on ML 1124 pursuant to its
mining leases under Chapter 5. This constituted the majority of the sand
obtained. Unimin also sold B Grade sand from stockpiles on Mining Lease
1124 for other purposes. In respect of the B Grade sand the issue is whether it
was required to hold a Chapter 4 approval in addition to its mining lease
approval under Chapter 5 for digging up that part of the undifferentiated mass
made up of B Grade sand from the pit or quarry.
39. Originally, the then Department of Mines collected royalties from ACI for the
B Grade sand and glass grade sand for many years. When Unimin took over, it
paid royalties on B Grade sand as well as glass grade sand from June 2001 until
20 See paras [12], [18], [62], [65] submissions for Unimin; para [15] submissions for prosecution;
21 Para [116] submissions for Unimin citing evidence from various witnesses;
-- 13 of 45 --
14
the last quarter in 2008 after the search warrant was executed on 16 December
200822. This is clearly itemised in each quarterly royalty return in which
royalties for B Grade sand were paid at the same rate as for high grade sand23.
It is also clear from those royalty returns that at least 80% of the royalties were
for Glass Grade sand supporting the view that Unimin's principle purpose was
to win the mineral, Glass Grade sand24.
40. The issue as to whether royalty for B Grade sand should have been paid was
said to be addressed in 1995 when Ministerial approval was given to continue
to collect royalties for B Grade sand25. Also, in 1993 the regulator at relevant
times, the Redland Council, regarded the selling of by-product sand as
"incidental to the current extraction of resources" and did not require an
additional permit26. The prosecution disputes this but says this does not make
the extraction of B Grade sand from ML 1108 and ML 7064 lawful in any
event27.
41. In 2009 Unimin launched civil proceedings in the Supreme Court of Queensland
seeking certain declarations. Applegarth J. summarized the nature of the dispute
before him in Unimin Australia Limited v State of Queensland [2009] QSC 384
at [2]:
[2] The parties are in dispute over whether the B Grade silica sand
can be sold by [Unimin] for use in white mortar and white renders.
[Unimin] contends, and the respondent disputes, that silica sand that is
mined for such a use, or which is a by-product of the mining of Glass
grade sand, is a “mineral” within the meaning of the Mineral Resources
Act 1989 (MR Act). Section 6 of the MR Act is to the effect that silica
sand is only a mineral “if it is mined for use for its chemical properties”.
The declarations in the form proposed by Unimin were not made.
22 Exhibit 116 – Unimin’s royalty returns;
23 For example, for the quarters ending 30 September 2007, 30 June 2008 and 31 December 2008 the
rate per tonne was $0.90;
24 Transcript dated 22 August 2014: p 1 - 18 (from line 5) to p 1 - 19 (to line 47);
25 Exhibit 117 – email from Johnson (officer of then Department of Mines and Energy) to Harris
(Unimin);
26 Paras [196] to [200] submissions for Unimin;
27 Para [32] submissions for the prosecution;
-- 14 of 45 --
15
42. An appeal by Unimin to the Court of Appeal was unsuccessful: Unimin
Australia Limited v State of Queensland [2010] QCA 169. The parties have
relied on passages in the judgements at first instance and on appeal in this case.
43. I shall deal firstly with the limitation point with respect to the EPA charge.
TIME LIMITATION FOR THE EPA COMPLAINT
44. Section 497 EPA provides for statutory time limits for commencing proceedings
for an offence under the EPA:
497 Limitation on time for starting summary proceedings
A proceeding for an offence against this Act by way of
summary proceeding under the Justices Act 1886 must start—
(a) within 1 year after the commission of the offence; or
(b) within 1 year after the offence comes to the
complainant’s knowledge, but within 2 years after the
commission of the offence.
45. The EPA complaint alleges an offence under section 427(1) between
4 October 2004 and 18 December 2008. It was averred in the complaint that
the offence came to the complainant’s knowledge on 1 December 2009. The
complaint was made on 1 December 2009.
46. The thrust of Unimin’s submission is that the complaint alleges a course of
conduct occurring on unknown dates during the alleged period. The particulars
refer to conduct of extracting sand from a pit or quarry from day to day which
constitutes a separate and distinct offence each day the conduct continues so
that the limitation period runs from each day the conduct continues. It is not
conduct of a passive character which can constitute a continuing offence. The
submission continues that it is incorrect for the prosecution to allege the offence
as a continuing offence to enable it to charge for the entire period provided that
one day of it falls within the time limit28.
47. It was submitted for Unimin that the complaint should be amended to restrict
the start of the charge period to 1 December 2007. This is the date of the earliest
commission of an EPA offence in the two year period referred to in section
28 Paras [88] to [99] submissions for Unimin;
-- 15 of 45 --
16
497(b) i.e. the complaint must be made within two years after the commission
of the offence. The complaint was made on 1 December 2009.
48. This submission is similar to submissions made by the defence in
Environmental Protection Authority v CSR Ltd t/as CSR Woodpanels [2001]
NSWLEC 217 at [32]-[41] (‘Woodpanels’) in respect of a charge of negligently
causing a substance to leak in an manner which harmed or was likely to harm
the environment without lawful authority29. In that case an application was
brought by the prosecution to amend its pleadings before trial. Pearlman J said
the question of whether the offence was a continuing one depended on findings
of fact after a trial. In referring to a decision of the New South Wales Court of
Criminal Appeal at [33], he noted that the offence “may’ be a continuing one;
and if so, time would run for limitation purposes from when the continuing
conduct ceased30.
49. A passage from the judgment of O’Bryan and Gillard JJ in R v Industrial
Appeals Court; Ex Parte Barelli’s Bakeries Pty Ltd [1965] V.R. 615 at 620
(Barelli) giving a general ex pose of continuing offences was cited in support of
Unimin’s submissions31:
A continuous or continuing offence is a concept well known in the
criminal law and is often used to describe two different kinds of crime.
There is the crime which is constituted by conduct which goes on from
day to day and which constitutes a separate and distinct offence each
day the conduct continues. There is, on the other hand, the kind of
conduct, generally of a passive character, which consists in the failure
to perform a duty imposed by law. Such passive conduct may constitute
a crime when first indulged in but if the obligation is continuous the
breach though constituting one crime only continues day by day to be a
crime until the obligation is performed. In such a case in measuring the
period of limitation, if one is applicable, the right to lay an information
is not barred if the breach has continued up to the day the information
was laid or if the breach was cured before the information was laid, time
counts from the day when the obligation was satisfied. The question
whether an offence is of a continuing or continuous nature generally
arises in the case of statutory offences, and the question is solved by
ascertaining what is the precise nature of the charge. (my emphasis)
29 Section 6(1) Environmental Offences and Penalties Act 1989 (NSW);
30 At [35] per Pearlman J;
31 At [92[ submissions for Unimin; A decision of the Full Court of Victoria with Smith J agreeing;
-- 16 of 45 --
17
50. In De Bray v Cohen; Macefield Pty Ltd v Cohen [2008] QDC 275 (Wall QC
DCJ) (‘De Bray’)32, the complaints alleged that the defendants “damage[d]” or
“permit[ted] to be damaged” certain trees contrary to vegetation laws33. The
complaints were held duplicitous because they alleged two separate offences in
contravention of the pleading rules in section 43 Justices Act 1886: see paras
[66], [67], [85]-[87] in De Bray34. This is not alleged in this case.
51. After referring to paras [61] to [64] of the judgment, Unimin submitted that
De Bray, which was upheld on appeal in Cohen v Macefield Pty Ltd [2010]
QCA 95, confirmed the position in Queensland that for an offence comprising
a number of acts, each capable of being a separate offence, time runs from the
commission of each of those acts and not from the last of those acts35.
52. For reasons that follow, I do not agree that this conclusion applies in this case.
53. Wall QC DCJ dealt with this issue at paras [54] to [65] under the heading
“Duplicity” in considering the pleading rules in section 43 Justices Act 1886.36
The applicable limitation period was 12 months to start proceedings from the
commission of the offence37. The question was when does the limitation period
start to run? The complaint was made 12 February 2004 alleging an offence “on
a date between December 2000 and November 2003”. His Honour ultimately
found that the limitation period ran from 13 February 2003 being 12 months
from when the complaint was made: at [12], [16] & [65].
54. In citing Woodpanels, the prosecution in De Bray submitted that this was a
continuing offence so that the limitation period started to run from when the
offending ceased (at [62] & [63]) undoubtedly in an attempt to capture the
32 Also at [2009] QPELR 479; there were three complaints against three defendants;
33 Section 24(1) of Local Law 6 provided “A person must not damage or permit to be damaged
protected vegetation”;
34 Walsh v Tattersall [1996] ALR 27 per Kirby J at 47-50 and 52-53 was referred to;
35 Para [95] submissions for Unimin;
36 Section 43 (1)(b)(ii) & (iv) Justices Act 1886 provides to the effect that every complaint shall be for
one matter only, and not for two or more matters except, for non-indictable offences, the matters of
complaint “(ii) are alleged to be constituted by a series of acts done or omitted to be done in the
prosecution of a single purpose; or … (iv) are, or form part of, a series offences or matters of complaint
of the same or a similar character”.
37 Section 1080 (a) Local Government Act 1993;
-- 17 of 45 --
18
activity over the entire period pleaded38. Wall QC DCJ considered that the
offence “could possibly be” a continuing offence “but only if confined to a
series of acts done in the prosecution of a single purpose or a series of offences
or matters of complaint …of the same or a similar character as required by s
43(1)(b) Justices Act” (at [63]). However, he appeared to have distinguished
the offence in Woodpanels i.e. permitting a substance to leak over time without
authority, to the offence before him39.
55. In doing so, His Honour characterised the charge of “damage” as the act which
causes the destruction or interference with the natural growth of the vegetation.
The definition of “damage”40 focussed on “the act” causing the destruction or
interference (at [8], [13] & [14]). That is, there is the “act” followed by the
consequence of that “act”. The act there was poisoning. The gravamen of the
charge was the “act” and not the subsequent consequence of that “act”: at [14],
[15]. Contrary to what would constitute a continuing offence, His Honour
concluded at [65] that the allegations in that case were the poisoning of trees
“by many separate acts” so that the limitation period commenced to run from
13 February 2003 i.e. 12 months prior the making of the complaint. The
question then was whether there was evidence of any “act” of damaging i.e.
poisoning etc. as opposed to the ultimate consequence of that “act” occurring
within the limitation period: at [64]. There was not in that case: see also [2010]
QCA 95 [33].
56. After referring to the various provisions in section 43(1) Justices Act 1886 at
[22] on appeal, Holmes JA41 explained the context of comments by Wall QC
DCJ at [23] (footnotes omitted):
“Having said that, I do not think that the learned judge did conclude
(as the applicant asserted) that the complaint was bad because a series
of acts was charged in one count. What he said was that, depending on
appropriate findings (not made by the Magistrate in this case) it might
be possible to charge a series of acts as a single offence, which
―could possibly be described as ‘continuing’. In the passages in the
38 There was no evidence of any “act” of damage from 13 February 2003 to 12 February 2004. There
was some evidence from experts of possible acts of damage from December 2000 which, as Wall QC
DCJ found, did not discharge the prosecution’s onus of proof in any event: at [52];
39 The difficulty was that there were no findings of fact at first instance as to whether the offence was a
continuing one;
40 Section 3 Local Law 6;
41 With whom Chesterman JA & Daubney J agreed;
-- 18 of 45 --
19
judgment with which the applicant took issue, his Honour
distinguished Environment Protection Authority v CSR Ltd t/as CSR
Woodpanels, in which it was held that the limitation period commenced
to run from the last day of a continuing offence, of negligently causing
a substance to leak. His Honour‘s reasons in this regard concerned,
not questions of duplicity, but whether the limitation period should be
approached as it was in that case, given the different nature of the
offence involved there. It was duplicity in the allegation of damaging
or permitting to be damaged which caused the learned judge to find
that the complaint and the conviction were bad. The Magistrate had
drawn no distinction between the two, and it was uncertain of what
criminal act each had been convicted.”
57. It is clear that Wall QC DCJ distinguished the nature of the charges in
Woodpanels to the charges before him: at [64] & [65]. He did not apply the
limitation period applicable to continuing offences as in Woodpanels because
he appears to have rejected the submission that the charges before him were
continuing in nature. The upshot was that he treated the charges as separate
offences “by many separate acts” because he determined that the limitation
period ran from 12 February 2003 and not from November 2003 when the
conduct ceased. Contrary to Unimin’s submissions, in my view His Honour did
not state a general proposition of law that for all offences comprising separate
acts in Queensland, each capable of being a separate offence whether or not
constituting a course of conduct, time runs from the commission of each of those
acts in all cases. His Honour allowed the appeal on the basis of duplicity and
that there was no evidence of acts causing damage within the limitation period
he applied in that case: see also paras [13] & [33] of the judgment of Holmes
JA (with whom Chesterman JA and Daubney J agreed) in Cohen v Macefield
Pty Ltd [2010] QCA 95.
58. For the EPA charge in the present case, the evidence supports the view that what
is alleged is a series of similar acts done in the prosecution of a single purpose
of a mining operation by the digging an undifferentiated mass of sand out of the
ground on Mining Leases 1108 and 7064 and not “many separate acts” as in De
Bray.
59. The prosecution in this case submitted that the EPA offence is continuing
offence. If so, the activity over the period pleaded would be appropriate. They
are not limited to breach of duty constituted by continuing omission. The EPA
-- 19 of 45 --
20
offence is constituted by a series of acts in the prosecution of a single purpose
i.e. the extraction of sand. It is a continuing offence and time runs from the last
date in the charge period. If it were not a continuing offence, “the prosecution
would have to proffer a charge for each scoop of the bucket of the front end
loader”42.
60. It was submitted this is not a case where a number of acts are each capable of
amounting to separate offences. The submission follows that the offence
provision permits the charging a course of conduct as an offence.
61. The prosecution submit that the offence is in taking the sand without proper
authority. The activity here is the carrying out of the activity without the
required certificate i.e. it is an active/passive type of offence. It was submitted
that until Unimin obtains a registration certificate, it continues to commit the
offence. When it obtains a registration certificate, it ceases to commit the
offence43. Characterised in this way, it falls within the description in Barelli.
62. In Jemmison v Priddle [1972] 1 QB 489 where it was held that the shooting of
two deer without a licence44 was properly charged as a single activity of killing
game, Lord Widgery CJ45 (with whom Ashworth and Griffiths JJ agreed) said
at 495:
“…it is legitimate to charge in a single charge one activity even though
that activity may involve more than one act. One looks at this case and
asks oneself what was the activity with which this man was being
charged. It was the activity of shooting red deer without a game licence
…”
63. The prosecution also referred to Dendy v Brinkworth [2006] SASC 179 (per
Duggan J) in which the defendant was charged with clearing 7.32 hectares of
native vegetation contrary to legislation from 27 sites on the same land between
42 Paras [28] to [30] submissions for prosecution;
43 Transcript 1-41 lines 7 – 24 (22 August 2014);
44 The Game Licences Act 1860 (UK) required a licence to take and kill game; the defendant was
charged “That he on February 6, 1971, at [the location] unlawfully did take and kill and pursue certain
game, to wit two red deer without having …a licence…”;
45 Adopting comments by Lord Parker C.J. in Ware v Fox [1967] 1 WLR 379 at 381;
-- 20 of 45 --
21
the 22 March 2002 and 1 November 2002. After citing numerous authorities46
on what constitutes a continuous offence, it was concluded that it was open for
the defendant to be charged in a single count on the basis that the act of clearing
was a continuous offence in relation to the same parcel of land over a period of
time.
64. A number of environmental cases were cited in Dendy. In Cullen v Jardine
[1985] Crim LR 668 the defendant was convicted of one statutory offence of
felling 90 trees over a three day period without a licence. On appeal, May LJ
said47:
“…The mere fact that a number of issues may arise in the course of a
trial does not turn one activity into two or more activities and thus
render the information bad for duplicity … the question of duplicity is
one of fact and degree.”
65. In Bentley v BGP Properties Pty Ltd (2005) 139 LGERA 44948 the defendant
was charged with a statutory offence of causing damage to the habitat of a
threatened species of vegetation between 1 August 2001 and 7 December
200149. It was an appeal against a primary judge’s decision to allow the
prosecution to amend its summons by including a number of alternative acts
that caused the damage. An appeal ground, ultimately successful, was that the
amendments made the allegation duplicitous. It included a discussion about
continuing offences. In this respect, Smart AJ in the New South Court of
Appeal said at [56]:
“I would adhere to the statements of principle that for continuing
offences and facts so related that they amount to one activity and that
where an offence is defined in the terms of a course of conduct or state
of affairs, the prosecution can rely on a series of closely related acts (or
omissions) and is not confined to relying on one act. Nor would I
question that the acts or omissions relied upon by the prosecution may
take place continuously or intermittently over a period of time. These
46 For example, statements of Hunt CJ in R v Hamzy (1994) 74 A Crim R 341 at 344; R v Firth (1869)
11 Cox CC 234 (stealing gas over a period of some years); R v Giretti (1986) 24 A Crim R 112
(trafficking drugs a continuous activity could be charged as one offence although involving a number
of finite incidents);
47 Cited in Dendy at p 411; Court constituted by May LJ and Kennedy J;
48 Cited in Dendy at p. 413;
49 Section 118D(1) National Parks and Wildlife Act 1974 (NSW) – “A person must not, by an act or an
omission, do anything that causes damage to any habitat ….”
-- 21 of 45 --
22
principles are of appreciable importance in relation to environmental
offences. Damage caused by one act may be inconsequential. …”
66. In the present case, the evidence is that Unimin used front end loaders to remove
an undifferentiated mass of sand from the mine face on Mining Leases 1108 and
7064 as part of its ongoing mining operations. As described above, green
material is removed, water added and then it is conveyed to another Mining
Lease 1124. The sand is then processed to extract glass grade sand, B Grade
sand and heavy metals which are stockpiled separately on that Mining Lease.
The glass grade sand is sold off for glass manufacture. The B Grade sand was
sold off for other purposes. This activity by Unimin and its predecessor,
undisputedly, has been going on for years. In my view this activity constitutes
a single activity in the prosecution of a single purpose even though involving
separate acts of digging the sand out of the ground on various days within the
period pleaded.
67. Further, in creating the offence, section 427(1) EPA speaks in terms of
prohibiting a course of conduct or activity of “not carry[ing] out” a level 1
Chapter 4 activity. It is not framed as a separate offence each time an extraction
of sand is performed. Compare, for example, section 474.19(1) Criminal Code
1995 (C’th)50 considered by the Court of Appeal in R v Gargett-Bennett [2010]
QCA 231. There the defendant was charged with using a carriage service to
access child pornography between 1 March 2005 and 14 September 2008. The
defendant used the internet every day accessing child exploitation material and
downloading material paid for by credit card at different times over that 3.5 year
period. Those actions were not considered to have “such an immediate
connection in time, place and purpose of the offences as to warrant a single
charge”51.
50 It provided that “A person is guilty of an offence if: (a) the person: (i) uses a carriage service to
access material; … and … (b) the material is child pornography material”.
51 At para [20] of the joint judgment of Holmes JA & Applegarth J;
-- 22 of 45 --
23
68. After citing a number of authorities52, and rejecting the prosecution’s
submissions that it was proper to charge in a single count an activity consisting
of a number of those acts53, it was held by majority that section 474.19(1) as it
then stood “contemplated a discrete offence committed on every occasion a
carriage service was used” and did not create an offence “defined in terms of a
course of conduct”54.
69. I find the EPA offence to be a continuing offence. The limitation period runs
from when the offending ceased i.e. 18 December 2008. Accordingly, it is in
order for the prosecution to allege in the complaint the activity of “carry[ing]
out” the Level 1 Chapter 4 activity from 4 October 2004 to 18 December 2008.
I decline to amend the pleadings.
THE PRINCIPAL ISSUE
70. The prosecution submits that the activity of digging the undifferentiated mass
from the pit or quarry on Mining Leases 1108 & 7064 were concurrent Chapter
4 and Chapter 5 activities. The legislation contemplates this. When reading the
legislation in context55, sections 18 & 19 EPA do not exclude the possibility that
an activity undertaken pursuant to a Chapter 5 authority might also at the same
time require regulation under Chapter 4 EPA56. Thus, a Chapter 4 authority was
required in this case in addition to a Chapter 5 authority already held by the
defendant. This is reflected in the wording of the particulars where it is alleged
the contraventions occurred “in conjunction with” the defendant’s activities at
the pit or quarry.
71. Likewise, it was submitted for the prosecution that section 319 Mineral
Resources Act 1989 (MRA)57 does not exclude the possibility that an activity
52 At paras [19] & [20]. Including those cited above and R v Wilson (1979) 69 Cr App R 83 (stealing
separate items from different departments of the same store); R v Morex Meat Australia Pty Ltd and
Doube [1996] 1 Qd R 418 (attempting to pervert the course of justice);
53 Para [19] of the joint judgement;
54 At para [20] of the joint judgment of Holmes JA & Applegarth J citing Walsh v Tattersall (1996) 188
CLR 77, 91 per Gaudron and Gummow JJ.;
55 Citing a number of authorities such as Cooper Brookes (Wollongong) Pty Ltd v FCT (1981) 35 ALR
151, 156-7, 169; Attorney General v Prince Ernest Augustus of Hanover [1957] AC 436, 461, 473;
56 Paras [7], [8] & [12] prosecution's submissions;
57 In then Part 8 MRA entitled “Relationship with Integrated Planning Act 1997;
-- 23 of 45 --
24
can be, at the same time, a mining activity and assessable development under
the IPA58. Section 319 MRA (Reprint 10C) provides59:
319 Effect on development
(1) Subject to subsections (2) and (3), the Planning Act does not apply
to development authorised under this Act.
(2) For administering IDAS for the Heritage Act, the Planning
Act applies to a Queensland heritage place under the Heritage
Act even if development of the place is authorised under this
Act. … (emphasis added)60
72. The prosecution disagrees with the defence's case that the legislation does not
permit the possibility of requiring separate authorities for the same activity at
the pit or quarry. It disagrees that, in this case, the activity was firstly a Chapter
5 activity only at the pit or quarry followed possibly by a Chapter 4 activity later
on Mining Lease 1124 where the undifferentiated mass had been conveyed to
and separated into the different classes of sand61.
73. On the other hand the defence goes further. The activity of digging the
undifferentiated mass from the pit or quarry on Mining Leases 1108 & 7064
remained a Chapter 5 activity i.e. mining as defined in section 6A MRA and
therefore a "mining activity" under section 147 EPA, up until the
undifferentiated mass was processed into its constituent parts on Mining Lease
1124. This is supported at paragraphs [20] to [24] in the judgement of de Jersey
CJ (as he then was) for the Court of Appeal in Unimin v State of Queensland
[2010] QCA 169 where he said62:
“[20] All of the sand, embracing the glass grade sand and the B grade
sand, is “mined” within the meaning of s 6A, because it is won or
extracted from the place where it occurs. The question the primary
Judge answered in the negative was: is the component of B grade sand
mined for its chemical properties?
[21]On the basis of the facts agreed before His Honour, the appellant
knows that it is mining both glass grade and B grade sand. It must mine
58 Para [9] submissions for the prosecution;
59 Section 319 was relocated to Chapter 1 Part 3 MRA and renumbered as section 4A by the Mines
Legislation (Streamlining) Amendment Act 2012 (No 20 of 2012), s 304;
60 “Development” in the MRA imports the definition s 1.3.2 IPA, relevantly in (e) making a material
change of use of premises which is an ERA “other than a mining activity”;
61 Pages 1 -26 (lines 20 - 25) & 1- 27 (lines 1 - 10 ) transcript 22 August 2014; paras [1(a)], [5] to
[7],[11], [12], [24] to [27] prosecution's submissions;
62 With Chesterman JA & Atkinson J concurring;
-- 24 of 45 --
25
the latter in order to recover the former. It then turns the latter to a
worthwhile commercial use.
[22] While the separation of the B grade from the glass grade occurs
subsequently to the “dry mining” operation, it is not right to say that at
the earlier time the appellant intends all of the sand to be used in the
manufacture of glass. At that time, the appellant knows that a portion of
the sand won will not be used in the manufacture of glass, but in the
production of mortars and renders.
[23] That the B grade sand is only subsequently separated out does not
mean, in terms of the “use” (s 6(3)(b)) intended at the time of extraction,
all of the sand must be treated in the same way.
[24] In any case, the mining operation, as defined by s 6A of the Act,
extends to the separation of the two grades of material. Sub-section (2)
provides that the extraction includes the “separation of a mineral”: on
His Honour’s approach the separation of the glass grade silica sand
from the B grade silica sand and other material.” (Emphasis added).
74. In saying so, His Honour considered the expanded definition of "mine" in
section 6A of the Mineral Resources Act 1989 (MRA) which had been amended
to widen its scope after the decision of the Court of Appeal63 in Gonzo Holdings
No 50 Pty Ltd v McKie [1996] 2 Qd R 240 which had read down its precursor64.
Therefore, it was submitted, the only authorisation required for the activity at
the pit or quarry was a Chapter 5 authority for the EPA charge. The activity at
the mine face was a single activity so authorised and that the B Grade sand was
a necessary by-product of the lawful mining of silica sand. There was no
additional activity at the pit or quarry, the subject of the charges, requiring a
Chapter 4 authority. The question of “intention” referred to in [21] to [23] of
His Honour’s judgment was in relation to whether or not the B Grade sand was
a “mineral”, not whether it was “mined”. Further, the defendant's right to deal
with any by-product is beyond the scope of the charges65.
63 Macrossan CJ, McPherson JA & Thomas J (as he then was); Macrossan CJ dissenting;
64 The Mineral Resources Amendment Act 1997 (No 14/97); see also page 5 of the Explanatory
Memorandum to the Bill where it said "The intention of the [MRA] has always been that the extraction
of mineral from its natural state, whether carried out on the land where it was mined or not, is mining";
essentially, "extracting" was given as expanded meaning in new subsections (2) & (3);
65 Paras [8], [11], [44], [64], [65] defendant's closing submission; paras [7], [35] to [38] defendant's
written reply;
-- 25 of 45 --
26
75. It was submitted for the defence that the prosecution’s major premise is flawed
in extrapolating the findings of Applegarth J66 and the Court of Appeal67 that B
Grade sand is not a mineral when not used for its chemical properties into a
finding that it was not "mined" at the pit or quarry on ML 1108 & 7064. In fact,
it was submitted, both courts found that, in terms of section 147 (1) (a) & (2)(a)
EPA, Unimin was carrying out the activity of “mining” under the MRA
authorised to take place on “land to which a mining tenement relate[d]”. If this
is so, then it is a “mining activity” which extended to the separation of the
undifferentiated mass on ML 1124 pursuant to section 147 (2)(b) EPA.68
76. In respect of the IPA charge, it was submitted for the defence that the activity
at the pit or quarry was “mining” within the meaning of the MRA and therefore
"mining activity" as defined in section 147 EPA. Therefore it is not "assessable
development" as defined in the IPA and, by virtue of section 319 MRA, the IPA
does not apply69.
77. The resolution of these competing positions requires an examination of the
legislative provisions and in particular sections 18, 19 & 147 EPA, sections 6A
and 319 MRA, and sections 1.3.2, 1.3.5 & Schedules 8 & 10 IPA.
78. The prosecution submits that an activity can only be a "mining activity" as
defined in section 147 EPA if it is authorised under the MRA. If it is not
"mining" within the MRA then it is not a “mining activity” under section 147.
In support, various statements made in the Supreme Court during a civil
application and on appeal were relied on where it was found that B Grade sand
was not a mineral if not used for its chemical properties (as is the case here).
The submission continues that as B Grade sand is not a mineral (as in this case),
it’s extraction at the pit of quarry is not authorised under the MRA and does not
constitute “mining”70. This is so even when the simultaneous extraction of that
part of the undifferentiated mass made up of glass grade sand at the pit or quarry
66 Unimin Australia Ltd v State of Queensland [2009] QSC 384 at, for example [92], [107];
67 Unimin Australia Ltd v State of Queensland [2010] QCA 169;
68 Paras [11], [45] to [50] submissions for Unimin;
69 Paras [28] to [35] submissions for the defendant;
70 Transcript dated 22 August 2014: 1-31(lines 42 – 46), to 1- 32 (lines 1 – 46), 1-32 (lines 1 – 17);
-- 26 of 45 --
27
is “mining”, authorised under the MRA, and is a "mining activity" under section
147 EPA.
79. Section 6A Mineral Resources Act 1989 (MRA) defines “mine”:
6A Meaning of mine
(1) Mine means to carry on an operation with a view to, or for the
purpose of—
(a) winning mineral from a place where it occurs; or
(b) extracting mineral from its natural state; or
(c) disposing of mineral in connection with, or waste
substances resulting from, the winning or extraction.
(2) For subsection (1), extracting includes the physical, chemical,
electrical, magnetic or other way of separation of a mineral.
(3) Extracting includes, for example, crushing, grinding,
concentrating, screening, washing, jigging, tabling,
electrowinning, solvent extraction electrowinning (SX–EW),
heap leaching, flotation, fluidised bedding, carbon-in-leach
(CIL) and carbon-in-pulp (CIP) processing. …(emphasis added)
80. “Operation” is not defined in the MRA. Dictionary meanings give it a wide
scope e.g. “active process, activity, performance, discharge of function”71 and
“the act, process, or manner of operating …a process of a practical or
mechanical nature in some form of work or production … a course of productive
or industrial activity”72.
81. So, as I understand it, the crux of the prosecution’s case is that section 6A means
to win a mineral, extract a mineral or to dispose of a mineral or waste. B Grade
sand is not a mineral as defined and is not waste in this case as it has been sold.
Therefore, the activity of "winning" that part of the undifferentiated mass made
up of B Grade sand "from a place where it occurs" i.e. the pit or quarry, is not
“mining” under the MRA (s 147(2)(a) EPA) and is not an activity that is
associated with or facilitates or supports that activity
(s 147 (2)(c)(i) EPA). Accordingly, it is not “mining activity” under section
147 EPA, so that ERA 20 in the regulations made pursuant to section 19 EPA
applies requiring a Chapter 4 authority for the EPA charge and is also
“assessable development” for the IPA charge. The prosecution further submits
that, even if the activity at the pit or quarry was a "mining activity", section 19
71 Concise Oxford Dictionary;
72 The Macquarie Concise Dictionary;
-- 27 of 45 --
28
EPA does not preclude prescribing a “mining activity” as an ERA by
regulation73.
82. The prosecution relies on a passage from de Jersey CJ’s judgement in Unimin
Australia Ltd v State of Queensland [2010] QCA 169 at [4] in support of its
submissions that if B Grade sand is not a “mineral” as defined in the MRA, then
further approvals are required to dig up that portion of the undifferentiated mass
made up of B Grade sand from the pit or quarry. It is said the statement “could
not be clearer”74:
“[4] The principal issue before the learned primary judge was whether
the lower grade sand is a “mineral” within the meaning of the [MRA].
If it is then, as with the higher purity sand, it may be extracted without
the need for permits and approvals under the [IPA] …, and lawfully
sold, if not, the contrary position applies.” (Emphasis added)
83. This, it was submitted, is “entirely consistent with the prosecution’s
submissions” and that it also demonstrates the relevance of purpose at the time
of "winning" or "extraction"75. At the time of "winning" or "extraction", the
ultimate purpose for B Grade sand was for a non-mineral use. Therefore, the
process of "winning" at the pit or quarry constituted at once a Chapter 5 mining
activity for the glass grade sand and a Chapter 4 activity for the B Grade sand76.
The approach to the above quote, it was submitted can be gleaned from para [7]
of Applegarth J’s judgement in Unimin Australia Ltd v State of Queensland
[2009] QSC 38477:
“[7] The practical significance of the resolution of these issues is that a
determination that B Grade silica sand is a “mineral” within the meaning
of s 6 of the MR Act, and may be lawfully sold, is that there is no
requirement for a permit for extraction or other permits and approvals
under the Integrated Planning Act 1997 (Qld) in respect of the mining,
treatment and sale of B Grade silica sand.”
84. It must be remembered that the "winning" takes place "from the place where
[the mineral] occurs" being the pit or quarry. The "extraction" may begin at the
pit or quarry but mostly occurred on ML 1124. The "extraction", as defined in
73 Paras [24] to [27] submissions for the prosecution;
74 Transcript dated 22 August 2014: 1 – 38 (line 4);
75 Para [9] submissions for the prosecution;
76 Paras [16] & [17] submissions for the prosecution;
77 Transcript dated 22 August 2014: 1 – 38 (from line 33) to 1 – 39 (to line 5);
-- 28 of 45 --
29
section 6A MRA, is the process of getting the mineral "from its natural state"
being the separation of the glass grade and B Grade sand from the
undifferentiated mass on ML 1124. Then, the B Grade sand was sold off a
stockpile from ML 1124 after the "extraction" had finished. In my respectful
view, Applegarth J in [7] was speaking in general terms when using the words
"mining, treatment and sale" of B Grade sand. Of course that may be the
ultimate effect in certain circumstances but the defendant is charged with a
criminal offence of extracting from the pit or quarry on ML 1108 and ML 7064.
Similar remarks can be made in respect of the Court of Appeal judgment at [4].
Upon reflection, and after consideration of all of the evidence, the remarks by
those courts do not advance the prosecution's case on the questions now before
this court. I agree with submissions for the defence that "the precise question
of what combination of permits and approvals would be required was never
argued nor determined …"78.
85. The prosecution further relies on the following passages by Applegarth J in
[2009] QSC 384 at [29] to [32] to support the view that extraction from the pit
or quarry of that part of the undifferentiated mass made up of B Grade sand was
not mining as it was not a mineral because, at the time of extraction, the B Grade
sand had an ultimate purpose of non-mineral use (footnotes omitted)79:
“[29] Reliance is placed by the applicant upon the fact that there is one
mining operation, and it is only at the end of the process that silica sand
is graded and separately stockpiled. This is not a case where there is a
separate mining operation for Glass Grade silica sand and another
mining operation for B Grade silica sand. Section 6(3)(b) looks at the
use for which silica sand is mined and the focus is on the use
contemplated by the miner at the time of mining, not the use to which
some of the sand is put at a later time by a purchaser. The
undifferentiated mass of silica sand is mined for the principal purpose
of extracting Glass Grade silica sand for use in glass manufacturing,
and, as a consequence, the applicant submits that both the Glass Grade
silica sand and “the balance of silica sand” is a mineral to which title
passes.3 The consequence of the submission is that the applicant submits
that it is entitled to sell the balance of the silica sand, being the B Grade
sand for whatever purpose its purchaser wishes to use it. Subject to the
possible application of s 6(3)(d)(i) to be considered in connection with
78 Para [84] submissions for the defence;
79 Transcript dated 22 August 2014: 1 – 36 (from line 23) to 1 – 38 (to line 15); paras [16], [17]
submissions for the prosecution;
-- 29 of 45 --
30
“the sand issue”, the applicant submits that it acquires title to and is
entitled to sell the B Grade silica sand for any purpose, including use
with cement, as sand for a sandpit, as landfill or to create a private
beach.4
[30] I accept the applicant’s submission that the focus of s 6(3)(b) is on
the use for which the silica sand is mined by the applicant, not on the
purpose of an eventual purchaser of any by-product of lawfully mined
silica sand. However, the lawfulness of the mining operation in which
an undifferentiated mass of silica sand is mined with a view to grading
the silica sand into a portion that is suitable for use in glass
manufacturing, and a portion that is not, does not mean that all of the
silica sand that is extracted is a “mineral”. The terms and statutory
context of s 6(3)(b) means that silica sand is only a mineral if it is mined
for use for its chemical properties. On the agreed facts, not all of the
silica sand that is mined is mined for use in glass manufacturing. Only
that part of the silica sand that is subsequently graded as Glass Grade
silica sand is mined for such a use. The balance, whether described as
B Grade silica sand or by-product, is not mined for use in glass
manufacture. The fact that the principal purpose of mining and treating
all of the silica sand is to extract silica sand that is suitable for use in
glass manufacturing does not alter this conclusion.
[31] At the time the silica sand is extracted from its natural state as part
of the applicant’s mining operation, the applicant knows that part of the
silica sand will not be suitable for use in glass manufacturing. The terms
of the Act indicate that this sand is not a mineral unless it is mined for
use for its chemical properties. The construction of the legislation for
which the applicant contends would result in the applicant acquiring
title to this “by-product” provided that some small part of the silica sand
of which it originally formed part was suitable for use in glass
manufacturing. This result would follow even where the Glass Grade
silica sand constituted only a tiny fraction of the silica sand that was
mined. Neither the terms nor purpose of the Act indicate an intent to
define such a by-product as a mineral and for property in it to pass to
the holder of the mining lease unless the by-product is mined for use for
its chemical properties.
[32] I conclude that the principal purpose for which the undifferentiated
mass of silica sand is mined, namely for use in glass manufacturing,
does not mean that all of the silica sand, including the by-product or B
Grade silica sand that is not suitable for glass manufacturing, is a
mineral. The B Grade silica sand that is stockpiled at the end of the
applicant’s mining operation will be a “mineral” if it is mined for use
for its chemical properties and if s 6(3)(d)(i) does not apply to it. It does
not qualify as a mineral because earlier in the mining operation it
formed part of an undifferentiated mass of silica sand that included
Glass Grade silica sand.” (Emphasis in complainant’s submissions)
-- 30 of 45 --
31
86. The prosecution sought comfort from Applegarth J’s use of the words “mining
operation” instead of “mining activity” in the above passages80. As I
understand it, this was to support the proposition that His Honour did not
consider this activity to be “mining activity” as defined in section 147 EPA.
However, I note the focus of that discussion was whether B Grade sand was a
“mineral” as defined in the MRA. Section 147 EPA, which provides the
definition for “mining activity” as it applies to Chapter 5 EPA authorities, was
not the subject of discussion in that part of the judgment. Section 147 EPA was
only considered in a general way under the "passing of property" issue discussed
below.
87. A point was also made by the prosecution that Applegarth J declined to make
the following declaration sought by the defendant in that civil application and
the refusal is “entirely consistent” with the prosecution’s case here81:
“Carrying on the activity of mining and disposal of silica sand by
[Unimin], comprised in part of lower B Grade silica sand, is lawful and
does not require any further approvals under the [IPA] and not a
registration certificate under the [EPA].”
88. Applegarth J described four issues for determination before him. First, there
was “the by-product issue” in which it was contended for Unimin that B Grade
sand as a by-product of winning and extracting glass grade sand which is a
mineral, is also a mineral. He found that it was not a mineral82.
89. The second issue before His Honour was “the chemical properties issue” where
Unimin’s alternative argument was that B Grade sand was a mineral in its own
right. After extensive analysis, he found that B Grade sand mined for use in
white mortars etc. is not a mineral because it is not mined for its chemical
properties83.
90. The third issue before His Honour was “the sand issue” where he had to
determine whether the use of B Grade sand as a colourless inert filler in white
80 Transcript dated 22 August 2014; 1 – 37 (lines 16, 17);
81 Transcript dated 22 August 2014: 1 - 38 (lines 16 – 47) & 1 – 39 (lines 1 – 5);
82 Paras [3] & [32] of the judgment;
83 Paras [4] & [92] of the judgment;
-- 31 of 45 --
32
mortar etc. entails its use “as sand” so as to fall within section 6(3)(d)(i) MRA84.
His Honour found that sand for use for its chemical properties does not entail
sand to be used as sand so as to engage section 6(3) (d) (i). If he had found that
B Grade sand was mined for use for its chemical properties, and thus a mineral
under section 6(3)(b) MRA, then section 6(3)(d)(i) would not necessarily
provide a ground to conclude it was not a mineral85.
91. The fourth ground before Applegarth J was “the passing of property issue”
where he had to determine whether any condition of leases, any environmental
authority, or any legislative provision operated to pass property to Unimin of
anything that is not a mineral. His Honour concluded that they don’t86. He
noted that he was not asked to determine property rights in the B Grade sand
that was sold over the years87 which lends support for the defence’s submissions
that this case was commercial in nature and about what was to occur in the
future88.
92. That was the context of His Honour’s comments in paragraph [7] cited earlier.
He declined to make the declarations sought “in the form proposed by
[Unimin]”89. However, after the parties had the opportunity of considering his
judgment and then hearing their submissions, he made the following
declarations he described as being “appropriate to determine the dispute
between the parties”90:
“1. On the proper construction of section 6 of the Mineral Resources Act
1989, the lower purity B Grade silica sand by-product, that is obtained by
the applicant in the course of mining higher purity A Grade silica sand, is
not a “mineral” within the meaning of s 6 of the Mineral Resources Act
1989 unless mined “for use for its chemical properties”. (my emphasis91)
2. On the proper construction of s 6(3)(b) of the Mineral Resources Act
1989, the lower purity B Grade silica sand by-product that is mined for
84 Generally, it excludes sand if used as sand or supplied for use as sand from being a “mineral”;
85 Paras [5] & [103] of the judgment;
86 Paras [6] & [124] of the judgment; section 310 MRA provides for the passing of property in minerals
lawfully mined subject to royalty payments;
87 Para [119] of the judgment;
88 Transcript dated 22 August 2014: 1 -12 (line 3); a discussion on the nature of declaratory relief is
beyond the scope of these proceedings but generally, a declaration must be of some utility to the parties
i.e. to be of use in the future and not issues that are now spent: see Young, Croft & Smith On Equity
(Lawbook Co 2009) at pp1075 et seq.;
89 Para [125] of the judgment;
90 Unimin Australia Ltd v State of Queensland (No 2) [2010] QSC 23; see [2009] QSC 384 at [126];
91 The word “mining” replaced the words “winning and extracting” which were proposed at trial;
-- 32 of 45 --
33
use in white mortars and white renders is not mined “for use for its
chemical properties” within the meaning of s 6(3)(b) of the Mineral
Resources Act 1989.” (My emphasis)
In contrast to this case, those declarations further highlight the focus of
proceedings before His Honour which relate to the meaning of “mineral” in
section 6 MRA and the relevance of “purpose” in determining whether or not
B Grade sand is “mineral”.
93. I note that Applegarth J was not specifically called on to consider the effect of
sections 18, 19 EPA, ERA 20, the relationship between Chapter 4 and Chapter
5 EPA and whether or not the activity at the pit or quarry constituted “mining”
as in the definition of “mine” in section 6A MRA or “mining activity” as defined
in section 147 EPA. I agree with the defendant’s submissions on this point92.
His consideration of section 6A MRA focussed on the disposal of waste under
“the passing of property issue” and not, as is the question in this case, whether
the extracting of the undifferentiated mass from the pit or quarry is “an operation
with a view to, or for the purpose of winning mineral” etc. His Honour’s
reference to section 147 EPA at [121] was again in the context of “the passing
of property” issue. It appears that he was giving an explanation of the legislative
scheme in coming to the view that there were no provisions as to the passing of
property of non-mineral material.
94. Given the focus of the questions for determination before Applegarth J and the
Court of Appeal, and the discretionary nature of declaratory relief93, I do not
accept the prosecution’s submissions that the statements relied on materially
advance its case in these criminal proceedings.
95. It should be further noted that there is no express reference in Applegarth J’s
judgement delivered 30 November 2009 to possible criminal proceedings
against Unimin in respect of past conduct. The complaints initiating these
92 Para [82] submissions for Unimin;
93 See for example Ainsworth v Criminal Justice Commission (1992) 175 CLR 564 at 581 -582; see
also Gibbs J in Forster v Jododex Australia Pty Ltd (1972) 127 CLR 421 at 438: “After all, it is
doubtful if there is more of principle involved than the undoubted truth that the power to grant a
declaration should be exercised with a proper sense of responsibility and a full realisation that judicial
pronouncements ought not to be issued unless there are circumstances that call for their making.
Beyond that there is no legal restriction on the award of a declaration”;
-- 33 of 45 --
34
proceedings against Unimin were made the next day, 1 December 200994. On
reading that judgment, it appears His Honour was not appraised of contemplated
criminal proceedings. Whilst noting the declarations sought were refused on
different grounds, the fact of contemplated criminal proceedings may
nevertheless have been a relevant factor as to whether or not the discretion to
grant declaratory relief should be exercised95. This further supports Unimin’s
submissions that the focus of those proceedings related to future activity and
was of a commercial nature and not concerned with the issues confronting this
court96.
96. The next major submission for the prosecution with a view to showing that the
activity at the pit or quarry is not “mining activity” as defined in section 147
EPA is the application of the rule of statutory interpretation noscitur a sociis in
relation to the words “directly associated with” and "facilitates or supports" in
section 147 (2) (c) (i) EPA97. Passages from two authorities were cited
explaining that rule: Lend Lease Real Estate Investments Ltd v GPT RE Ltd
[2006] NSWCA 20798 and Deputy Commissioner of Taxation v Dick [2007]
NSWCA 19099. For example, at paras [12] & [13] in Dick:
“The relevant principle of statutory interpretation is noscitur a sociis
which has been imaginatively translated by Lord McMillan as ‘words of
a feather flock together’. As his Lordship went on to explain the
principle: “The meaning of a word is to be judged by the company it
94 The complaints were filed in court on 4 December 2009 returnable in the Cleveland Magistrates
Court 22 January 2010;
95 See for example Crane v Gething [2000] 97 FCA 45 at [31] per French J (as he then was):
“What emerges from the case law generally is a spectrum of responses to claims for declaratory or
consequential relief where such relief is based upon the proposition that the conduct at issue is or is not
a contravention of the criminal law. At one end of the spectrum is the case involving a claim for a
declaration based upon undisputed facts and a question of law such as the construction or validity of a
statute or delegated legislation or a statutory instrument. Where there are no pending criminal
proceedings the probability of such a claim being entertained is at its highest, albeit subject to
discretion informed by the well-established reluctance of civil courts to enter into criminal jurisdiction.
Where a prosecution is pending the prospect of obtaining relief is less. Where the claim is sought
during a trial the prospect of obtaining relief are probably negligible. Where the claim is made after a
trial it will ordinarily be seen as subverting established appeal processes albeit it may be entertained in
exceptional circumstances - Biggs v DPP (supra)”.
96 See also para [128] Applegarth J’s judgment where he said it was inappropriate to make declarations
which “determine rights and liabilities in respect of the past supply of sand made with knowledge of
the respondent and in respect of which it received royalties”;
97 Transcript dated 22 August 2014: 1 -33 (from line 17) to 1 – 36 (to line 22);
98 Per Spigelman CJ, McColl & Basten JJA agreeing;
99 Spigelman CJ, Santow & Basten JJA;
-- 34 of 45 --
35
keeps”: Lord McMillan, Law & Other Things (Cambridge University
Press, Cambridge, 1937), p 166.
…As Lord Kenyon CJ once put it, where a word “stands with” other
words it “must mean something analogous to them”. …
97. Having regard to dictionary meanings of the words “facilitates or supports”100
that follow “directly associated with” in section 147 (2) (c) (i), it was submitted
they should be interpreted as something that promotes and advances an activity
in section 147(2) (a) or (b) EPA. That is, it promotes or advances the removal
of glass grade sand being a mineral that is mined under the MRA. The words
should not be interpreted to promote or advance something in conjunction with
it, namely the removal of B Grade sand that is not a mineral under the MRA101.
98. In my view, the difficulty with that is its characterisation. The approach is too
narrow having regard to the facts of this case and the definition of “mine” in
section 6A MRA. The facts, as already stated, are that the undifferentiated mass
comprising a mixture of glass grade sand, B Grade sand and other material must
be dug out of the ground in the one action in order to get the glass grade sand.
After the undifferentiated mass has gone through a process, the glass grade sand
is “extracted” i.e. separated out at a different location and at a different time to
the "winning" from the pit or quarry. The B Grade sand is a by-product of that
process. If anything, the activity of digging the whole undifferentiated mass out
of the ground “is directly associated with” or “facilitates or supports” the
activity of mining glass grade sand authorised under the MRA to take place “on
the land to which a mining tenement relates”. If such is the case, then it is
“mining activity” under section 147(2) (c) (i) EPA. However, the defence’s
primary submission outlined earlier, is that this is “mining” itself which
constitutes “mining activity” under section 147(2) (a) EPA.
99. The prosecution submitted that to be a "mining activity" in section
147(2)(c)(i) EPA, the activity that is directly associated with or facilities or
supports an activity under section 147(1)(a) or (b) must also satisfy the
requirement that it "may cause environmental harm": section 147 (2)(c)(ii). If
100 The Macquarie Dictionary, 3rd Edition at 754 & 2127 respectively;
101 Transcript dated 22 August 2014: 1 -36 (lines 13 – 23);
-- 35 of 45 --
36
not, it is not "mining activity" and therefore, it was submitted, the legislation
contemplates by necessary implication that such activity may be a Chapter 4
activity102. No authorities were referred to.
100. In response, it was submitted for the defendant that this may be theoretically
possible although unlikely but is irrelevant as such an activity would not then
be a mining activity. The question in this case is whether a single activity at the
pit or quarry can simultaneously be a Chapter 4 and Chapter 5 activity103. That
is, does section 19 EPA authorise the making of regulations for an ERA that is
a "mining activity"? In any event, it was submitted there is an abundance of
evidence that the activity at the pit or quarry causes environmental harm, for
example exhibit 50 (Environmental studies report for the extension of ML
1108), and provisions on the various mining leases and authorities in exhibits
14, 54 & 108104. Further, it was for the prosecution to “nominate” the activity
at the pit or quarry that does not cause environmental harm105. It has not done
so. I agree with those submissions.
101. The submission for Unimin reasserts the view that the single activity at the pit
or quarry was "mining" under the MRA as per section 147 (2) (a) in any event
without the need to resort to section 147 (2) (c).
102. Another submission for the prosecution was that a construction of the legislation
urged by Unimin would deprive the definition of "extraction"106 in the
Environmental Protection Regulation 1998 of any meaningful operation. That
is, the definition suggests that "extracting" will include extracting material if
both conditions do not apply "irrespective of whether the particular material is
the primary purpose of the process of extraction"107. It will be recalled that the
definition of "extraction" is phrased in terms of what is not extraction if two
conditions are met.
102 Para [10] submissions for the prosecution;
103 Para [27] submissions for the defence;
104 Transcript dated 22 August 2014: p 1 -20 (lines 26 to 45);
105 Transcript dated 22 August 2014: p 1 – 20 (lines 26 to 46);
106 See para [14] herein;
107 Paras [13] to [15] submissions for the prosecution;
-- 36 of 45 --
37
103. In response, it was submitted for Unimin that on the facts of this case the
definition is irrelevant. I understand this submission to mean that whether or
not the activity at the pit or quarry is extracting within that definition, it is
extracting for the purposes of the regulation made pursuant to section 19 EPA
which does not authorise making a regulation prescribing a “mining activity” as
an ERA. The definition of extraction is directed at excluding from ERA 20
those extraction activities that are relatively small such as the construction of a
dam and in those circumstances, a permit is not required. In any event, the
primary purpose of the extraction at the pit or quarry was to gain all of the
material and there is clear evidence that more than the prescribed amount of
material has been extracted. Therefore, if ERA 20 applied, the activity at the
pit or quarry may be "extracting" for the purposes of the regulations only108. I
agree with those submissions.
104. In its submission, the prosecution has referred to "the particular material is the
primary purpose of the process of extraction". It introduces a concept of
"process" at the point of extraction. The first condition of what is not
“extraction” within the definition of “extraction” refers to "The primary purpose
of the extraction is not to gain the material" (emphasis added). Unimin’s
primary purpose at the pit or quarry on ML 1108 & ML 7064 is to gain all of
that material in order to process it on ML 1124 to gain Glass Grade sand.
Processing mainly occurs on ML 1124. “Material” is not defined in the EPA or
the regulations. Dictionary meanings relevantly include “Matter from which
thing is made (raw material)”109 and “anything serving as crude or raw matter
for working upon or developing”110. In my view it is significant that the
definition of “extraction” uses the word “material” and not “mineral”.
Consistently with Unimin’s construction of section 19 EPA, it seems to me that
“material” connotes something different to “mineral” and has broader
application. This supports the view that “material” more comfortably fits with
digging the whole undifferentiated mass from the pit or quarry rather than that
part of it which constitutes either Glass Grade sand only or B Grade sand only.
108 Transcript dated 22 August 2014: p1 -21 ( from line 24) to p 1 - 22 (to line 20);
109 The Concise Oxford Dictionary;
110 The Macquarie Concise Dictionary;
-- 37 of 45 --
38
Thus, the primary purpose of extracting the undifferentiated mass from the pit
or quarry was to gain all of this "material" from there. Apart from that, I cannot
see how the construction of the EPA agitated by Unimin deprives the definition
of "extraction" of a meaning in the regulations. However, the definition of
“extraction” applies for the purposes of the regulations and Unimin submits that
section 19 EPA does not authorise the making of an ERA by regulation that is
a “mining activity”. For reasons given herein, I accept that submission.
105. Another reason which tends to militate against the "necessary implication"
agitated by the prosecution in order to show that the activity at the pit or quarry
requires dual authorisation is that there are other express provisions in the EPA
dealing with the issuing of more than one registration certificate under certain
circumstances. Section 73F (Registration Certificates) in Part 2 (Registration)
of Chapter 4 EPA111 entitled "Registration certificates" provides that an
administering authority may issue two or more registration certificates if
"satisfied the activities will not be carried out as a single integrated operation".
Subsection 73F(3) then provides that activities are a single integrated operation
if a number of factors are satisfied including whether the activities are
"operationally interrelated" or whether "the activities are ... carried out at two
or more places at or about the same time, and the places where they are carried
out are separated by distances short enough to make feasible the integrated day
to day management of the activities". Thus, the legislature has expressly
provided for circumstances where more than one authority may be required
under Chapter 4 and yet is silent on whether Chapter 4 and Chapter 5 authorities
are concurrently contemplated where there is the one activity at the pit or quarry.
Interestingly, if the factors above were employed to the facts of this case, they
would tend to support a requirement for one authority only.
106. It was further submitted for the defence to support the view that the activity at
the pit or quarry is authorised under the MRA to take place on “land to which
the mining tenement112 relates” as per section 147(1) (a) EPA is the power in
111 Entitled "Development Approvals and Registration (other than for mining and petroleum activities);
112 “Mining tenement” is defined in Schedule 2 MRA to include a “mining lease”; it is not defined in
the EPA;
-- 38 of 45 --
39
section 234(1) (a) MRA to grant a mining lease113 “to mine the mineral or
minerals specified in the lease and for all purposes necessary to effectually carry
on that mining”114. There is no dispute here that Unimin held mining leases on
ML 1108 & ML 7064 to mine for silica sand. One would have thought that
digging the undifferentiated mass from the pit or quarry with a view to winning
a mineral, namely Glass Grade sand, which forms the major part of that mass,
falls within the description "for all purposes necessary to effectually carry on
that mining”.
107. The facts are distinguishable from those In Re Clark [2005] QLRT 118 where
the miner had a mining lease to mine sand in block form for building purposes.
However, separate and discrete overburden had to be removed to get to the
blocks. Thus, both categories of material were on the same site but the activity
of moving them were at different times. The Tribunal held the removal of the
overburden i.e. quarrying, was not an essential precursor to the mining115 and
that the statutory scheme clearly contemplated a separate scheme of
authorisation116. A Chapter 4 quarry authorisation in addition to a Chapter 5
mining authorisation was required to remove the overburden. In this case, the
mineral (the glass grade sand) is inextricably mixed in with the undifferentiated
mass which had to be removed and processed in order to separate the glass grade
sand from the B Grade sand and other material. The removal of the
undifferentiated mass from the pit or quarry is a necessary precursor to the
mining of the “mineral” i.e. the glass grade sand. In my view, on the facts of
this case, the activity of digging the undifferentiated mass from the pit or quarry
falls within the definition of “mine” i.e. to carry on an operation with a view to
..” and therefore is authorised under the MRA at that point.
108. The scenario in Clark was posited by the defence in recognition of the fact that
"on different facts … there could be a Chapter 4 activity operating 'in
conjunction with' a Chapter 5 activity" where the holder of a gold mining lease
removes granite overburden in order to expose the gold117. However, unlike in
113 Section 6D MRA provides that a mining lease is one of a number of authorities under that Act;
114 Paras [72] of Unimin’s submissions & para [23] Unimin’s reply;
115 Para [7] on page 3 (austlii report);
116 Paras [9] to [12] on page 4 (austlii report);
117 Paras [8] & [9] submissions for the defence;
-- 39 of 45 --
40
the present case, the activity of removing the overburden occurs at a different
time to the "winning" of the gold. They are two separate activities.
109. After Gonzo, the expanded definition of “mine” of which “mining” is a
derivative, in my view includes digging the undifferentiated mass out of the
ground right up to its separation. In Gonzo, the miner had a gold mining lease.
He extracted quantities of material from that land comprising various substances
mixed together including gold. There was no question that that constituted
mining on the land the subject of the mining lease. However, he transported it
to other land not the subject of the mining lease and processed it there to extract
the gold. While the majority of the Court of Appeal concluded that the activity
on the other land was not mining, the legislature reversed that decision by
amending the section 6A MRA definition of “mine” into its current form. This
further supports the defence's submission that the activity of removing the
undifferentiated mass from the pit or quarry was "mining" in terms of section
6A MRA which was authorised to take place on the land to which the mining
tenements relate under section 147 EPA.
110. In summary, the defence's case is that the activity at the pit or quarry on ML
1108 and ML 7064 is "mining" as per section 6A MRA and is therefore a
"mining activity " as defined in section 147 EPA being an activity authorised to
take place on land to which the mining tenements relate. As it is a "mining
activity", section 19 EPA does not authorise the making of regulations for
ERA's that are mining activities as defined. Even if the activity at the pit or
quarry was not "mining", it is an activity "directly associated with or facilitates
or supports" the activity of mining with the same result.
111. In this regard, the defence firstly dealt with the legislative history of sections
18 & 19 EPA which were inserted into the EPA by the Environmental
Protection and Other Legislation Amendment Act 2000 (No 64 of 2000). The
regulation of the mining industry was transferred from the Department of Mines
and Energy to the Environmental Protection Agency118. The EPA was further
118 The Explanatory Memorandum to the Bill stated the objects were to transfer the environmental
regulatory provisions from the MRA administered by Department of Mines and Energy to the EPA
administered by the then Environmental Protection Agency;
-- 40 of 45 --
41
amended by the Environmental Protection Legislation Amendment Act 2003
(No 95 of 2003) which took effect from 4 October 2004. It was submitted that
from 4 October 2004 ERAs were governed by Chapter 4 EPA and mining
activities were governed by Chapter 5 EPA119.
112. Thus, it was submitted, it was beyond the power in sections 18 & 19 EPA to
prescribe by regulation a "mining activity" as an environmentally relevant
activity (ERA) and that ERA 20 in the Environmental Protection Regulation
1998 made pursuant to section 19 should be read as excluding a mining activity.
That is, the collective effect of these provisions is that if the activity at the pit
or quarry on the facts of this case is a mining activity, then it cannot at the same
time be a Chapter 4 activity. This is consistent with the legislative intent that
mining be governed by Chapter 5 EPA and non-mining activities be governed
by Chapter 4 EPA. This is supported in the definition of "chapter 4 activity"
which provides for an ERA "other than a mining activity"120.
113. On the other hand the prosecution says that those provisions should not be so
read having regard to the overall legislative scheme and that section 19 EPA
does not exclude the possibility that something undertaken in order to conduct
a mining activity might also be regulated under an ERA. Different
considerations may apply to different aspects of the one activity121. Reference
was then made to the various extracts from the judgments of Applegarth J and
the Court of Appeal referred to earlier in which I had concluded do not advance
the prosecution's case.
114. On the facts of this case, I accept that the single activity at the pit or quarry is
"mining" authorised under the MRA on the land to which the mining tenements
relate and therefore is "mining activity": ss 147(1) (a) & (2) (a). I accept the
submissions for the defence that, on a plain reading of words in sections 18 &
19 EPA, section 19 EPA only authorises ERAs by regulation that are not
"mining activities". Section 18 EPA clearly separates " a mining activity" in
paragraph (a) from "another activity prescribed under section 19.." in paragraph
119 Paras [13] to [19] submissions for the defence;
120 Transcript dated 22 August 2014: 1 – 36 (from line 23) to 1 – 38 (to line 15);
121 Paras [7], [8], [24] to [27] submissions for the prosecution;
-- 41 of 45 --
42
(b). Then, the words "other than a mining activity" in section 19 EPA must be
given some meaning and effect and that they are not either superfluous or
insignificant: Project Blue Sky Inc v Australia |Broadcasting Authority (1998)
194 CLR 355 at [71]122. Consistently, section 20 EPA then provides that an
ERA “other than a mining activity” must be prescribed as a Level 1 or Level 2
ERA by regulation made pursuant to section 19 EPA123. In my view, it is not
open to imply a power in section 19 EPA to make regulations for a "mining
activity" and ERA 20 should be read as not including a “mining activity”. The
activity at the pit or quarry is what Unimin has been charged with and this is
"mining" authorised by the MRA and thus "mining activity".
115. The prosecution have relied on extracts of judgments before Appelgarth J and
the Court of Appeal and that by "necessary implication" that the single activity
at the pit or quarry can be concurrently a Chapter 4 and Chapter 5 activity124.
Put another way, it was submitted that sections 18 & 19 EPA “do not exclude
the possibility that an activity under Chapter 5 might also be an activity under
Chapter 4”125. Whilst it is said sections 18 & 19 EPA do not exclude that
possibility, on the other hand there is nothing in the context of those sections
warranting the possibility of a concurrent requirement of Chapter 4 & Chapter
5 activities either. These are criminal proceedings.
116. The words of a statute “must first be read in the context provided by the statute
as a whole … and if so read, the meaning of the section is literally clear and
unambiguous, nothing remains to but to give effect to the unqualified words”126.
The language in sections 18 & 19 EPA are clear enough. ERAs by regulation
are for activities that are not mining activities. The language in section 6A MRA
as to what constitutes “mining” is also clear enough. The activity at the pit or
quarry was authorised under the MRA. In my view the necessary implication
122 Citing Commonwealth v Baume (1905) 2 CLR 405 per Griffith CJ; See also D C Pearce & R S
Geddes Statutory Interpretation in Australia (Butterworths, 8th ed. 2014) at [2.26] citing a number of
cases since; also cited by Applegarth J at [2009] QSC 384 at [45] in construing the meaning of
"chemical properties" in section 6(3)(b) MRA entitled "Meaning of mineral";
123 At para [11] herein;
124 Para [10] submissions for the prosecution;
125 Para [7] submissions for the prosecution;
126 K & S Lake City Freighters Pty Ltd v Gordon & Gotch Ltd (1985) 60 ALR 509 at 512 per Gibbs CJ
citing cases including Attorney –General v Prince Ernest Augustus of Hanover [1957] AC 436 at 461,
473 and Cooper Brookes (Wollongong) Pty Ltd v FC of T (1981) 35 ALR 151 at 156-7;
-- 42 of 45 --
43
urged by the prosecution is not warranted. Further, the EPA in Chapter 4 has
expressly provided for the issuing of two or more concurrent Chapter 4
authorities under certain circumstances: s 73F. However, apart from the clear
words in sections 18 & 19 EPA referred to earlier, the EPA is otherwise silent
on the question before this court.
117. As a matter of statutory construction, I was invited by the defence to consider
subsequent legislation, namely the Environmental Protection Regulation 2008
effective 1 January 2009, in order to assist in interpreting the Environmental
Protection Regulation 1998 applicable in this case. The charge periods end
18 December 2008. The definition of "extractive activity" was changed to
include "extracting … from an area". In referring to the examples given in the
new regulation which form part of the regulation127, the defence says this
broadens the law so as to encompass extracting from a stockpile and highlights
the narrowness of the old regulation128. It was also conceded that taking from a
stockpile from 1 January 2009 may constitute a Chapter 4 activity if not directly
associated with, facilitating or supporting an activity in s 147(2) (a) or (b).
118. The effect of the cases cited in support of this exercise is that subsequent
legislation can only be taken into account if there is some ambiguity in the
former legislation: Grain Elevators Board (Vic) v Dunmunkle Shire (1946) 73
CLR 70; Allina Pty Ltd v Commissioner of Taxation (1991) 28 FCR 203. I note
the approach taken by Dixon J in Grain Elevators (at 86) where he considered
the subsequent amendment to assist in interpretation on the grounds that to give
the prior legislation a wider meaning than that expressly given by the
amendment would render the amendment "unnecessary" and "futile". However,
although this approach has been applied in some cases to a provision of doubtful
meaning, the Full Federal Court in Allina cautioned against this approach that
little assistance will be gained by looking at the amending statute where the
words of the former provision are clear and that care should also be taken to
127 See section 14(3) Acts Interpretation Act 1954;
128 Paras [58] to [63] submissions for the defence;
-- 43 of 45 --
44
ensure that the amending words were not included to remove possible doubts as
to the meaning of the former provision129.
119. However, I find there is no ambiguity in the former regulation which, in its
terms says "Extracting … sand … from a pit or quarry". This is what Unimin
has been charged with. The subsequent regulation cannot be considered to
interpret the former. I agree with the prosecution's submissions on this point130.
The court does not know and cannot speculate as to the reasons why the
definition was changed.
120. In conclusion, in respect of the EPA charge, Unimin had a Chapter 5 authority
to dig the undifferentiated mass from the pit or quarry on ML 1108 & ML 7064.
A Chapter 4 authority was not required.
121. For the IPA charge, Unimin was not carrying out a material change of use as it
had the appropriate environmental authority under the EPA. It was carrying out
a mining activity at the pit or quarry on ML 1108 & ML 7064. By virtue of
Schedule 8 Table 2 IPA, that was not assessable development which did not
apply in any event due to section 319 MRA. I accept those submissions.
Summary
122. I find that the activity at the pit or quarry was "mining" bearing the same
meaning as "mine" defined in section 6A MRA.
123. That activity is "mining activity" as defined in section 147 (2) (a) EPA.
124. In the alternative, the digging of the undifferentiated mass from the pit or quarry
is an activity "directly associated" with the activity of “mining” a mineral,
namely, Glass Grade sand under section 147 (2)(c)(i) EPA and is therefore
"mining activity".
129 See also Pearce & Geddes Statutory Interpretation in Australia (Butterworths, 8th ed. 2014) at [3.33]
& [3.34] and cases cited therein;
130 Transcript dated 22 August 2014: p 1 - 42 (from line 13) to p 1 - 43 (to line 19);
-- 44 of 45 --
45
125. Section 19 EPA authorises the making of a regulation prescribing an ERA that
is not a "mining activity". Accordingly, the scope of ERA 20 does not include
a “mining activity” as defined in section 147 EPA.
126. As Unimin was undertaking a “mining activity” at the pit or quarry, ERA 20
does not apply on the facts of this case.
127. For the EPA charge, a Chapter 4 authority was not required to dig the
undifferentiated mass from the pit or quarry.
128. For the IPA charge, I find that Unimin was not carrying out a “material change
of use” as it had an appropriate environmental authority under the EPA.
129. Unimin was carrying out a “mining activity” as defined in section 147 EPA,
which, by virtue of Schedule 8 Table 2 IPA, was not “assessable development”
under the IPA.
130. The IPA does not apply to the activity at the pit or quarry by operation of section
319 MRA.
131. I find the defendant not guilty on both charges.
132. I will refrain from making formal orders at this point to enable the parties to
consider these reasons.
-- 45 of 45 --