E Cocco & Sons Investments Pty Ltd v Gold Coast City Council [2014] QSC 10
SUPREME COURT OF QUEENSLAND
CITATION: E Cocco & Sons Investments Pty Ltd v Gold Coast City
Council [2014] QSC 10
PARTIES: E COCCO & SONS INVESTMENTS PTY LTD
ACN 001 336 769
(applicant)
v
GOLD COAST CITY COUNCIL
(respondent)
FILE NO: BS 8963 of 2011
DIVISION: Trial Division
PROCEEDING: Application for judicial review
DELIVERED ON: 14 February 2014
DELIVERED AT: Brisbane
HEARING DATE: 23 and 24 September 2013
JUDGE: Margaret Wilson J
ORDER: 1. The decision of the respondent dated 24 June 2011,
whereby the respondent resolved to make and levy a
special charge for the year 2011/2012 pursuant to
section 94 of the Local Government Act 2009 (Qld) on
rateable land described as Lot 1, RP192926 and
situated at 73 Nerang Street, Nerang, in the sum of
$2,157,268, is invalid and of no effect.
2. The rates notice issued by the respondent dated 5
September 2011, so far as it seeks to levy the said
special charge, be set aside.
3. The respondent pay the applicant’s costs of and
incidental to the application to be assessed on the
standard basis.
CATCHWORDS: ADMINISTRATIVE LAW – JUDICIAL REVIEW –
GROUNDS OF REVIEW – ERROR OF LAW – where the
applicant was the owner of land forming the tip of a
peninsula, on which it operated a caravan park – where a
bridge had been constructed in the 1970s, providing access to
the land – where the bridge fell into disrepair and was closed
– where the respondent undertook to rebuild the bridge, and
to recover the costs by levying a ―special charge‖ on the
applicant under s 94 of the Local Government Act 2009 (Qld)
(―the Act‖) and s 28 of the Local Government (Finance,
Plans and Reporting) Regulation 2010 (Qld) (―the
Regulation‖) – where the applicant sought judicial review of
the respondent‘s decision to make and levy the charge –
-- 1 of 31 --
2
where the applicant alleged that the decision was not
authorised by the Act and the Regulation – where the
applicant alleged that the respondent had not adopted an
―overall plan‖ prior to undertaking the work the subject of the
special charge, as required by s 28 of the Regulation –
whether an ―overall plan‖ had been adopted – where the
applicant alleged that the respondent had not adopted an
―annual implementation plan‖ for each financial year of the
overall plan as required by s 28 of the Regulation – whether
an ―annual implementation plan‖ was required – where the
respondent submitted that non-compliance with the
Regulation should not result in invalidity – whether it was a
purpose of the legislation that an act done in breach of the
Regulation should be invalid – whether relief should be
refused on discretionary grounds
Judicial Review Act 1991 (Qld) s 30
Local Government Act 2009 (Qld) s 3, s 4, s 91, s 92, s 94, s
96, s 270
Local Government Act 1993 (Qld) s 971
Local Government (Finance, Plans and Reporting)
Regulation 2010 (Qld) s 28
Collector of Customs v Agfa-Gevaert Limited (1995-1996)
186 CLR 389 at 398, cited
Craig v South Australia (1994-1995) 184 CLR 163,
considered
Lacey v Attorney-General (Qld) (2011) 242 CLR 573, cited
Marrickville Metro Shopping Centre Pty Limited v
Marrickville Council (2010) 174 LGERA 67, considered
Myer Queenstown Garden Plaza Pty Ltd v City of Port
Adelaide (1975) 11 SASR 504, cited
One.Tel Ltd v Australian Communications Authority (2001)
110 FCR 125, considered
Project Blue Sky Inc v Australian Broadcasting Authority
(1997-1998) 194 CLR 355, considered
Whiting v Somerset Regional Council [2010] QSC 200,
considered
COUNSEL: GJ Gibson QC and DP O‘Brien for the applicant
SP Fynes-Clinton for the respondent
SOLICITORS: TVP Law for the applicant
King & Company for the respondent
Introduction
[1] The applicant is the registered proprietor of 4.703 hectares of land at 73 Nerang Street,
Nerang on which it operates a caravan park (―the land‖).
[2] The land is shaped like a peninsula, surrounded on three sides by water. Mooyumbin
Creek flows along one side of the land, and the Nerang River along the opposite side.
The two watercourses meet along the short protruding end of the peninsula (―the top of
-- 2 of 31 --
3
the peninsula‖). The far end of the peninsula (―the bottom of the peninsula‖) adjoins a
residential subdivision.
[3] The land is close to the central area of Nerang, but separated from it by Mooyumbin
Creek. Sometime in the 1970s a bridge over the creek was constructed, providing
access to the land from Nerang Street.
[4] Since about 1983 there has also been a narrow lane at the bottom of the peninsula,
providing access to the land from Nerang River Drive (which is in the residential
subdivision area).
[5] The bridge over the creek fell into disrepair, and was closed in early 2007. The
respondent replaced it with a new bridge, which was opened early in 2010.
[6] To recoup the cost of constructing the new bridge, on 24 June 2011 the respondent
resolved to impose a ―special charge‖ on the land, in the amount of $2,157,268,
pursuant to s 94 of the Local Government Act 2009 (Qld) (―the LGA 2009‖) and s 28 of
the Local Government (Finance, Plans and Reporting) Regulation 2010 (Qld) (―the
Regulation”).
[7] The applicant seeks judicial review of that decision on three grounds –
(i) that the decision was not authorised by the LGA 2009 and the
Regulation;
(ii) that the decision involved an error of law; and
(iii) that the making of the decision was an improper exercise of the power
conferred by the Act, in that the respondent failed to take a relevant
consideration into account – namely, that on its proper construction, s
28 of the Regulation did not authorise the making of the decision.
Counsel for the applicant submitted that each of these grounds turns on whether an
―overall plan‖ within the meaning of s 28 of the Regulation was adopted by the
respondent prior to undertaking the work the subject of the special charge, and
whether, if there was an overall plan, an ―annual implementation plan‖ was adopted by
the respondent for each year of the overall plan.
The legislation
[8] Sections 3 and 4 of the LGA 2009 provide –
―3 Purpose of this Act
The purpose of this Act is to provide for—
(a) the way in which a local government is constituted and the
nature and extent of its responsibilities and powers; and
(b) a system of local government in Queensland that is accountable,
effective, efficient and sustainable.
Note—
The system of local government consists of a number of local governments. See
the Constitution of Queensland 2001, section 70 (System of local government).
4 Local government principles underpin this Act
(1) To ensure the system of local government is accountable,
effective, efficient and sustainable, Parliament requires—
-- 3 of 31 --
4
(a) anyone who is performing a responsibility under this Act to
do so in accordance with the local government principles;
and
(b) any action that is taken under this Act to be taken in a way
that—
(i) is consistent with the local government principles; and
(ii) provides results that are consistent with the local
government principles, in as far as the results are
within the control of the person who is taking the
action.
(2) The local government principles are—
(a) transparent and effective processes, and decision-making in
the public interest; and
(b) sustainable development and management of assets and
infrastructure, and delivery of effective services; and
(c) democratic representation, social inclusion and meaningful
community engagement; and
(d) good governance of, and by, local government; and
(e) ethical and legal behaviour of councillors and local
government employees.‖
[9] The respondent is a local government within the meaning of the LGA 2009.1
[10] Chapter 4 Part 1 of the LGA 2009 deals with rates and charges. Relevantly, it provides
in s 91(2) –
―(2) Rates and charges are levies that a local government imposes—
(a) on land; and
(b) for a service, facility or activity that is supplied or
undertaken by—
(i) the local government; or
(ii) someone on behalf of the local government (including
a garbage collection contractor, for example).‖
[11] By s 92, that there are four types of rates and charges, including ―special rates and
charges‖. Section 92(3) provides –
―(3) Special rates and charges are for services, facilities and
activities that have a special association with particular land
because—
(a) the land or its occupier—
(i) specially benefits from the service, facility or activity;
or
(ii) has or will have special access to the service, facility
or activity; or
(b) the land is or will be used in a way that specially
contributes to the need for the service, facility or activity;
or
(c) the occupier of the land specially contributes to the need for
the service, facility or activity.
Examples—
Special rates and charges could be levied—
1 Local Government Act 2009 (Qld) reprint no 1C, effective 8 April 2011.
-- 4 of 31 --
5
• for the cost of maintaining a road in an industrial area that is regularly
used by heavy vehicles
• for the cost of replacing the drainage system in only part of the local
government area
• on land that is used only by businesses that would benefit from the
promotion of tourism in the local government area.‖
The power to levy rates and charges is conferred by s 94, which provides
(relevantly) –
―94 Power to levy rates and charges
(1) Each local government—
…
(b) may levy—
(i) special rates and charges; and
(ii) utility charges; and
(iii) separate rates and charges.
(2) A local government must decide, by resolution at the local
government‘s budget meeting for a financial year, what rates
and charges are to be levied for that financial year.‖
[12] The Regulation was subordinate legislation made under the LGA 2009.2 A general
regulation-making power was conferred on the Governor in Council by s 270, and a
non-exhaustive list of matters that a regulation for rates and charges might provide for
was contained in s 96 –
―96 Regulations for rates and charges
A regulation may provide for any matter connected with rates
and charges, including for example—
(a) concessions; and
(b) the categorisation of land for rates and charges; and
(c) the process for recovering overdue rates and charges,
including by the sale of the land to which the rates and
charges relate.‖
[13] Section 28 of the Regulation3 provided –
―28 Levying special rates or charges
(1) This section applies if a local government decides to levy
special rates or charges.
Note—
See the Act, section 92(3) (Types of rates and charges), definition special
rates and charges.
(2) For levying rates under subsection (1), the local government
may fix a minimum amount of the rates.
(3) The local government‘s resolution to levy special rates or
charges must identify—
(a) the rateable land to which the special rates or charges
apply; and
2 The Local Government (Finance, Plans and Reporting) Regulation 2010 (Qld) was repealed by the
Local Government Regulation 2012 (Qld). The wording of the relevant provisions relating to special
rates and charges has remained the same, but is now contained in Chapter 4 Part 6 of the 2012
Regulation.
3 Local Government (Finance, Plans and Reporting) Regulation 2010 (Qld) reprint no 1E, effective 11
March 2011.
-- 5 of 31 --
6
(b) the overall plan for the service, facility or activity to which
the special rates or charges apply.
(4) The overall plan is a document that—
(a) describes the service, facility or activity; and
(b) identifies the rateable land to which the special rates or
charges apply; and
(c) states the estimated cost of carrying out the overall plan;
and
(d) states the estimated time for carrying out the overall plan.
(5) The local government must adopt the overall plan before, or at
the same time as, the local government first resolves to levy the
special rates or charges.
(6) Under an overall plan, special rates or charges may be levied for
1 or more years before any of the special rates or charges are
spent in carrying out the overall plan.
(7) If an overall plan is for more than 1 year, the local government
must also adopt an annual implementation plan for each year.
(8) An annual implementation plan for a financial year is a
document setting out the actions or processes that are to be
carried out in the financial year for the service, facility or
activity to which the special rates or charges apply.
(9) The local government must adopt the annual implementation
plan before or at the budget meeting for each year of the period
for carrying out the overall plan.
(10) The local government may at any time, by resolution, amend—
(a) an overall plan; or
(b) an annual implementation plan.
(11) To remove any doubt, it is declared that a local government may
make and levy a special rate or charge for a service, facility or
activity whether or not supplied or undertaken by the local
government itself, including a service, facility or activity
supplied or undertaken by another local government—
(a) in the other local government‘s local government area; and
(b) conducted as a joint government activity by the local
governments.‖
Earlier legislation
[14] The LGA 2009 repealed the Local Government Act 1993 (Qld) (―the 1993 Act‖).
Provisions having similar effect to ss 92 and 94 of the LGA 2009 and the Regulation
had been introduced in 1999 by amendment of s 971 of the 1993 Act. According to the
Explanatory Notes relating to the amendment bill –
―The intention of introducing an overall plan is twofold, namely:
• to provide transparency and accountability commensurate
with the broadened taxation powers introduced by these
amendments; and
• to articulate the basis/information on which council has
formed its opinion under subsection (1)(b) concerning
benefit, access or contribution‖.
(Emphasis added.)
-- 6 of 31 --
7
The second of these referred to an amendment to the precursor to s 92(3) of the LGA
2009.
[15] The LGA 2009 was shorter than the 1993 Act, and, relevantly, some of the provisions
in the amended s 971 of the 1993 Act found their way into the LGA 2009 and some
into the Regulation. According to the Explanatory Notes relating to the bill for the LGA
2009 –
―The streamlined size of the Bill is primarily due to a number of
provisions being incorporated into other, more relevant statutes or
being omitted altogether due to redundancy or duplication. The Bill
will be supplemented by regulations that govern essential but
subordinate operational and administrative issues.‖
The facts
[16] When the bridge across the creek ceased to be trafficable, caravan park residents began
using the lane at the bottom of the peninsula as the sole entry and exit point for
vehicles travelling to and from the caravan park. Local residents complained to the
respondent about the substantial increase in traffic on Nerang River Drive.
[17] After trying unsuccessfully to have the applicant repair or replace the bridge, the
respondent considered itself constructing the bridge and recovering the costs from the
applicant through a special charge.
[18] On 5 August 2008 one of the respondent‘s officers provided a report (―the report‖) to
the Engineering Services Committee (―the ES Committee‖). In paragraph 5.2 of the
report, he proposed that the respondent allocate funds ―to construct a new bridge to
access the Caravan Park from Nerang Street‖, and that it seek to recover costs from the
caravan park owner through a special charge. He continued –
―For this to occur, it is necessary for the design, approvals and
construction to take place. For a normal capital works project these
phases occur in series over a number of years. Given the length of
time that the current bridge has been closed, it is proposed to
complete these works within 12 months.
Initial investigations suggest the following:
Approvals to damage marine plants will be required;
Negotiations with NRW are required to arrange the land
owner‘s consent;
Design work can start immediately following Council
resolution but this will impact on the existing works program
and will delay the Syndicate Rd project;
Initial estimates for the cost of works range from $400,000 to
$700,000 dependent on the requirements of the caravan park
and the scope of design; and
Further design work is required to provide more robust cost
estimates. This is most appropriately done following the
Council resolution.‖ 4
(Emphasis added.)
4 Report of Andy Stewart dated 5 August 2008, contained in affidavit of John Edward McGrath
affirmed 17 August 2012 (court doc 10), exhibit ―JEM 17‖ at Para 5.2.
-- 7 of 31 --
8
Later in the report, he wrote –
―10 BUDGET/FUNDING
Funding of $400,000 is available to undertake the design and
construction of bridge access to the Nerang Caravan Park from
Nerang Street. Should Council resolve to proceed with these works
funding is available from within Bridge and Culvert Replacement
(R623) in Major Roadworks (cost centre 257 function 6893). Once
the detailed design is completed, additional funding will be allocated.
A more detailed estimate of construction costs will be available after
further design work is undertaken.‖
―12 TIMING
It is proposed that the owner of the Nerang Caravan Park be advised
of the Council decision immediately following the Council decision.
Removal of the existing bridge and the approvals, design and
construction of its replacement is expected to take at least 12
months.‖
(Emphasis added.)
The report concluded with a recommendation that the respondent resolve as follows
–
―1 That the Council notes the owner‘s delay and unwillingness to
perform bridge replacement or repair work.
2 That initial funding of $400,000 be allocated from Bridge and
Culvert Replacement (project R623) within Major Roadworks
(cost centre 357 function 6893) to undertake the design and
construction of bridge access to the Nerang Caravan Park from
Nerang Street. If additional funding is required it can be
allocated from within the same cost centre and function.
3 That Council recoup all relevant expenditure from the benefited
lands (the Nerang Caravan Park) through a special charge in line
with Section 971 of the Local Government Act 1993 (Chapter
14, Division 2, Part 2).
4 That the Director Engineering Services notify the residents of
Nerang River Drive of Council‘s decision to construct a new
bridge, and outline the expected timeframe for the bridge to be
completed.‖
[19] The ES Committee met on 27 August 2008, when it considered (inter alia) the report.
Relevantly, the committee recommended –
―1 That Council notes the owner‘s delay and unwillingness to
perform bridge replacement or repair work.
2 That initial funding of $400,000 be allocated from Bridge and
Culvert Replacement (project R623) within Major Roadworks
(cost centre 357 function 6893) to undertake the design and
construction of bridge access to the Nerang Caravan Park from
Nerang Street. If additional funding is required it can be
allocated from within the same cost centre and function.
3 That Council recoups all relevant expenditure from the
benefited lands (Lot 1 RP 192926, 73 Nerang Street, Nerang),
-- 8 of 31 --
9
including interest charges, through a special charge in line with
Section 971 of the Local Government Act 1993 (Chapter 14,
Division 2, Part 2), within a four year period or upon
redevelopment, whichever comes first.
4 That the Director Engineering Services notifies the residents of
Nerang River Drive of Council‘s decision to construct a new
bridge, and outlines the expected timeframe for the bridge to be
completed.
5 That the City Solicitor seek Supreme Court determination of
Council‘s ability to recover funds through the mechanisms
outlined in Point 3 of the recommendation and a report on this
be brought back to Council.
6 That the CEO take whatever action necessary to achieve
restricted access through Nerang River Drive following
construction of the new bridge.
7 That the Corporate Communications Branch be asked to put an
information leaflet together and that they be involved in this on
an ongoing basis to ensure a good level of communication with
the residents of Nerang River Drive.‖
(Recommendation ES08.0827.008)
[20] There was a Council meeting on 1 September 2008, when one agenda item was ― 9 -
Reception & Consideration of Committee Reports‖. The Council passed two
resolutions, numbered G08.0901.013 and G08.0901.014, in these terms –
G08.0901.013
―1 That Council notes the owner‘s delay and unwillingness to
perform bridge replacement or repair work.
2 That initial funding of $400,000 be allocated from Bridge and
Culvert Replacement (project R623) within Major Roadworks
(cost centre 357 function 6893) to undertake the design and
construction of bridge access to the Nerang Caravan Park from
Nerang Street. If additional funding is required it can be
allocated from within the same cost centre and function.
3 That Council recoups all relevant expenditure from the
benefited lands (Lot 1 RP 192926, 73 Nerang Street, Nerang),
including interest charges, through a special charge in line with
Section 971 of the Local Government Act 1993 (Chapter 14,
Division 2, Part 2), within a four year period or upon
redevelopment, whichever comes first.
4 That the Director Engineering Services notifies the residents of
Nerang River Drive of Council‘s decision to construct a new
bridge, and outlines the expected timeframe for the bridge to be
completed.
5 That the City Solicitor provide legal advice in relation to
Council‘s ability to recover funds from the landowners who
benefit from such works and report back to Council prior to any
construction taking place.
6 That the CEO take whatever action necessary to achieve
restricted access through Nerang River Drive following
construction of the new bridge.
-- 9 of 31 --
10
7 That the Corporate Communications Branch be asked to put an
information leaflet together and that they be involved in this on
an ongoing basis to ensure a good level of communication with
the residents of Nerang River Drive.‖
(Emphasis added.)
In other words, resolution G08.0901.013 was in terms of the ES Committee‘s
recommendation, subject to an amendment to paragraph 5 as to instructions to the
City Solicitor.
G08.0901.014
―That the Report of the Engineering Services Committee‘s
Recommendations of Wednesday, 27 August 2008, numbered
ES08.0827.001 to ES08.0827.009, be adopted with the exception of:
Recommendation Numbers ES08.0827.005 and
ES08.0827.008
which were specifically resolved.‖
In the minutes, resolution G08.0901.014 is preceded by the subheading ―Adoption of
the Engineering Services Committee Report‖. (Emphasis added.)
[21] The minutes of the Council meeting appear several times in the material before the
Court on this application – as exhibit 26 to Mr Cocco‘s affidavit, as exhibit JEM-19 to
Mr McGrath‘s affidavit and at pages 31-38 of Exhibit 1 (which was tendered by the
respondent).
(i) The relevant pages of Exhibit 1 all bear the header –
―495th Council Meeting 1 September 2008
Engineering Services Committee Meeting 27 August 2008 Adopted Report
ITEM 8 ENGINEERING ASSETS &
PLANNING
BRIDGE THAT PROVIDES ACCESS TO NERANG CARAVAN PARK
PN147378/16/-(P1); RD132810/16/-(P2)‖
(Emphasis added.)
The material reproduced there seems to be a compilation of apparently
relevant material – the officer‘s report of 5 August 2008, ES Committee
recommendation ES08.0827.008 under the subheading ―Committee
Recommendation Changed at Council 1 September 2008 – Changed
Recommendation‖, and Council resolution G08.0901.013 under the
subheading ―Changed at Council 1 September 2008.‖
(ii) The exhibit to Mr Cocco‘s affidavit contains the report and the ES
Committee recommendation (pages 134-141) under a header similar to that
in Exhibit 1, except that it, in the second line, ―Report‖ rather than ―Adopted
Report‖ appears. The page numbering in the top right hand corner is also
-- 10 of 31 --
11
different. The Council‘s resolutions G08.0901.013 and G08.0901.014 are
reproduced at pages 142-143 under the header –
―9 RECEPTION & CONSIDERATION OF COMMITTEE REPORTS
9.3 ENGINEERING SERVICES
ITEM 8
BRIDGE THAT PROVIDES ACCESS TO NERANG CARAVAN PARK
PN14378/16/-(P1); RD 132810/16/-(P2)‖
(iii) The exhibit to Mr McGrath‘s affidavit contains only two pages, which are
the same as pages 142-143 of the exhibit to Mr Cocco‘s affidavit.
(iv) It is anomalous that the header to the material in Exhibit 1 contains
―Adopted Report‖, while the header to the corresponding exhibit to Mr
Cocco‘s affidavit contains only ―Report‖. This was unexplained. The pages
in Exhibit 1 may be the product of sequential reproduction by means of a
word processing program after the minutes of the Council meeting on 1
September 2008 had been adopted at a subsequent Council meeting – but
that is speculation. Suffice it to say, the anomaly provides good reason not to
take the header into account in the interpretation of the resolutions.
[22] In November 2008 the respondent‘s Technical Services Branch prepared a Concept
Options Report (―COR‖), in which the advantages and disadvantages and estimated
costs of three different types of bridge5 were considered, as well as those associated
with strengthening and repairing the existing structure. The costings for these options
ranged from $715,000 to $1,060,000. The COR was finalised by February 2009. Its
authors recommended a new two-span bridge with a single vehicle lane (Option 1B), at
an estimated construction cost of approximately $840,000 including GST for the
bridge alone, or $1.2 million including road approaches. There was no estimated time
frame for the work included in the COR.
[23] On 18 February 2009 the respondent‘s Corporate Governance and Financial Service
Committee recommended that Option 1B be implemented, subject to the City Solicitor
considering that course to be appropriate. At the Council meeting on 23 February 2009
the respondent resolved to treat the report as a confidential document, noted the report,
and noted that the Engineering Services branch was proceeding with construction.
[24] In its budget for the financial year 2009-2010 the respondent allocated an additional
$900,000 to the project.
[25] According to the respondent‘s Senior Project Manager, Mr Rootes, design plans were
issued for construction on 24 July 2009, and construction commenced on-site in late
July 2009.
[26] On 31 August 2009 the respondent reallocated a further $300,000 from other projects.
The material placed before the Council meeting noted that design had commenced in
the 2008-2009 financial year and that the project had been fast-tracked to be completed
in the 2009-2010 financial year.
[27] At the Council meeting on 14 September 2009 the respondent adopted the following
recommendation of the Engineering Services Committee –
5 There were two versions of the first option.
-- 11 of 31 --
12
―1 That the 2009/2010 Capital Works Programme – Approvals,
included in the report, be adopted by Council and construction
of those works with estimates in excess of the preliminary
allocations, be authorised.
2 That Council note that those projects having estimates within
the preliminary allocations have been issued for construction.‖
(Recommendation ES09.0909.001)
Those approvals included the bridge replacement and associated works, for which
$1,598,000 was recorded as both the ―preliminary allocation‖ and the ―final estimate‖.
[28] The work was practically complete by approximately February/March 2010, and the
bridge was opened to traffic. There were some minor ongoing issues concerning bank
revegetation, but nothing occurred on-site for about 12 months after practical
completion, until funding for the revegetation was sourced.
[29] The final cost was $2,157,268, which included the design work, the construction of the
bridge and associated works.
[30] In June 2010 the respondent resolved to levy a special charge to recoup the cost. The
applicant commenced a proceeding for judicial review of that decision.
[31] At the special Council meeting on 24 June 2011 the respondent made its budget
resolutions for the 2011-2012 financial year. Relevantly, it resolved to repeal the
special charge levied in June 2010, and –
―3 Nerang Caravan Park – Access Bridge Special Charge
Council resolves to levy a special charge under section 94 of the
Local Government Act and section 28 of the Finance, Plans and
Reporting Regulation to be known as the Nerang Caravan Park –
Access Bridge Special Charge (‗special charge‘) as follows:
a Council directs the Chief Executive Officer to place a
notification text and rates flag on the land record of lots levied
with the special charge to alert both Council officers and
potential purchasers undertaking due diligence of the special
charge‘s existence.
b Council makes and will levy a special charge on the rateable
land described in paragraph (6) to defray the costs of removing
the pre-existing bridge and replacing it with a temporary
pedestrian access and more permanent replacement bridge for
vehicular traffic (including design and ancillary costs), details of
which are set out in the schedule.
c The rateable land to which the charge applies is the land
specified and described in paragraph (6).
d The overall plan for the supply of the facility to which the
special charge applies is as per the Report adopted by Council
on 1 September 2008 titled ‗Item 8 Bridge That Provides Access
to Nerang Caravan Park‘, amended as follows:
-- 12 of 31 --
13
i The rateable land to which the special charge applies is the
land described in paragraph (6).6
ii The facility for which this overall plan is made is removing
the pre-existing bridge and replacing it with a temporary
pedestrian access and a more permanent replacement bridge
for vehicular traffic (‗the infrastructure works‘), together
with design work associated with the infrastructure works.
A more detailed description and itemisation of the
infrastructure works is set out in the schedule.
iii The estimated time for carrying out the overall plan is from
1 September 2008 until 1 September 2012. The facility was
effectively established by February 2010, and minor bank
restoration works are to be carried out until September
2012. (The cost of such future works have [sic] already
been incurred, and are included in the schedule.)
iv The cost of the overall plan is $2,157,268.
e The land identified in paragraph (6) has special access to the
facility and is the only land that does.
f A special charge in the amount specified in the following table
is made, and is to be levied on the rateable land specified in the
table for the year 2011-12:
Nerang Bridge Special Charge
Lot Description Special Charge
Lot 1 RP 192926 at
73 Nerang St
Nerang
$2,157,268
…
5 Annual Implementation Plan
a Council resolves to adopt the following annual implementation
plan for the financial year 2011-2012:
Most works are complete. Bank restoration works will be
carried out through the course of the financial year.‖
[32] On 5 September 2011 the respondent issued a rates notice which included the amount
of the special charge.
The applicant was informed
6 The land referred to in the schedule in paragraph (f) – that is, the applicant‘s land referred to in
paragraph 1 of these reasons for judgment.
-- 13 of 31 --
14
[33] Under cover of a letter dated 18 September 2008, the City Solicitor gave the
applicant‘s solicitors a copy of the report presented to the ES Committee meeting on
27 August 2008 and a copy of the Council resolution of 1 September 2008.
[34] On 14 January 2009 the City Solicitor provided the applicant‘s solicitors with a copy
of the COR. He advised that the respondent had decided to proceed with Option 1B,
but invited the applicant to enter into a dialogue about some different form of
construction which might better suit its long term plans. The applicant‘s solicitors
responded by asking the respondent to proceed with the selected option ―at its earliest‖.
[35] In July 2009 the respondent gave the applicant notice of when work would commence
and the then current estimated construction time.
The issues
[36] By s 28(3) of the Regulation, a local government‘s resolution to levy a special charge
had to identify the rateable land and the ―overall plan‖ for the facility to which the
special charge applied. It was common ground that the local government had to adopt
the overall plan before commencing work on the facility.7 And it was common ground
that a special charge could be levied in respect of work already carried out.8
[37] In this case, the bridge that was ultimately constructed was a ―facility‖ within the
meaning of the LGA 2009 and the Regulation. The critical issue is whether an overall
plan was adopted before the work was carried out.
[38] The respondent identified the overall plan for the facility in paragraph 3(d) of the
resolution of 24 June 2011 in these terms –
―as per the Report adopted by Council on 1 September 2008 titled ‗Item 8
Bridge That Provides Access to Nerang Caravan Park‘, amended …‖
[39] Senior counsel for the applicant submitted –
(i) The special charge which the respondent resolved to levy on
24 June 2011 was invalid by reason of the respondent‘s non-
compliance with the requirement to adopt an overall plan
before the work commenced.
(ii) The respondent did not adopt the report of the ES Committee
at its meeting on 1 September 2008, but merely that
committee‘s recommendations.
(iii) Even if the respondent did adopt the report at that meeting, it
was not an ―overall plan‖.
a. The resolution made no reference to the adoption of an
―overall plan‖.
b. There was no specification of the facility or work actually
to be undertaken as required by s 28(4)(a): something
more than a bland description of design and construction
of bridge access was required.9
7 See Whiting v Somerset Regional Council [2010] QSC 200 per PD McMurdo J – a decision on s 971
of the 1993 Act.
8 T 1-22.
9 T 1-38.
-- 14 of 31 --
15
c. There was no statement in the resolutions of the estimated
costs of carrying out the overall plan as required by s
28(4)(c), which was not surprising because the respondent
did not obtain the draft COR with costings for the various
options until two months later.
d. There was no estimated time for carrying out the overall
plan as required by s 28(4)(d).
(iv) The objects of transparency and accountability would not be
met by a conclusion that the resolution of 1 September 2008
constituted or adopted an overall plan, because of the
vagaries and uncertainties of the proposal as it then stood.
(v) Work commenced no later than November 2008, with work
on the first COR, which was before an overall plan was
adopted.10
(vi) The resolution of 14 September 2009 did not amend an
overall plan previously adopted.
(vii) The resolution of 24 June 2011 did not refer to the resolution
of 14 September 2009 as required by s 28(3).
(viii) Even if the resolution of 14 September 2009 could be
construed as amending the purported overall plan of 1
September 2008, the amendments would have had the effect
of bringing an overall plan into existence after the works had
been substantially completed
(ix) The resolution of 24 June 2011 could not be relied on as an
overall plan on which to base the special charge because it
was made 19 months after the work was finished.
(x) The resolution of 24 June 2011 was an ineffectual attempt to
bring the resolution of 1 September 2008 within the net of an
overall plan. The amendment of the estimated time for
carrying out the overall plan was an artifice: the work had
been completed by February 2010, and there could not be an
amendment of an overall plan in respect of work already
completed.
[40] Counsel for the respondent submitted –
(i) The respondent adopted the report of the ES Committee at its
meeting on 1 September 2008.
(ii) The report of the ES Committee was an overall plan within
the meaning of s 28.
(iii) The overall plan was amended by the resolutions of 14
September 2009 and 24 June 2011.
(iv) Alternatively, the overall plan was comprised of the separate
resolutions made on 1 September 2008 and 14 September
2009, and it was amended by the resolution on 24 June 2011.
(v) The respondent was able to amend the overall plan on 24
June 2011 because at that time the work was only
substantially complete, but not wholly so.
(vi) Even if the respondent did not adopt an overall plan before
the work commenced, the special charge the respondent
resolved to levy on 24 June 2011 was not invalid by reason of
10 T 1-47.
-- 15 of 31 --
16
the non-compliance with the requirement to adopt an overall
plan before the work commenced.
[41] By s 28(7) of the Regulation, if an overall plan was for more than one year, the local
government also had to adopt an ―annual implementation plan‖ for each year.
[42] Counsel for the applicant submitted –
(i) The respondent did not adopt an annual implementation plan
for any of the financial years 2008-2009, 2009-2010 or 2010-
2011.
(ii) The special charge was invalid by reason of the non-
compliance with the requirement to adopt annual
implementation plans.
[43] Counsel for the respondent submitted –
(i) The requirement to adopt an annual implementation plan
arose only when a special charge had been levied.
(ii) Even if there was a requirement to adopt an annual
implementation plan for any of those financial years and the
respondent did not comply with that requirement, the special
charge the respondent resolved to levy on 24 June 2011 was
not invalid by reason of that non-compliance.
[44] Finally, counsel for the respondent submitted that relief should be refused on
discretionary grounds.
Overall plan
[45] The parties are at odds as to whether the respondent Council adopted ―the Report …
titled Item 8 Bridge that Provides Access to Nerang Caravan Park‖ on 1 September
2008, and whether that report satisfied the requirements of an ―overall plan‖ as
prescribed in s 28.
[46] Counsel for the applicant submitted that the respondent did not adopt the report at its
meeting on 1 September 2008, but merely the ES Committee‘s Recommendation
ES08.0827.008, albeit with the amendment to paragraph 5 as to instructions to the City
Solicitor. They submitted that the respondent‘s resolution G08.0901.013 did not
amount to the adoption of an overall plan, for the following reasons:
(i) The resolution made no reference to the adoption of an overall plan, and
did not adopt any other document as constituting the overall plan. The
respondent conceded that express reference to the adoption of an overall
plan was not critical in the determination of whether one was adopted.
(ii) The resolution did not contain a description of the facility or work to be
undertaken that met the requirement in s 28(4)(a).
(iii) The resolution did not state the estimated cost of carrying out the overall
plan as required by s 28(4)(c).
(iv) The resolution did not state the estimated time for carrying out the
overall plan as required by s 28(4)(d).
[47] Further, counsel for the applicant submitted, even if the respondent did adopt the report
at that meeting, it was not an ―overall plan‖. They submitted that it contained nothing
-- 16 of 31 --
17
more than a mere proposal, and that something more specific was required for it to be a
―plan‖. It could not be more than a proposal at least until the respondent considered a
COR, and probably not until later. They made the following submissions.
(i) While conceding that the bridge ultimately constructed was a ―facility‖
within the meaning of the LGA 2009 and the Regulation, they
submitted that the report did not ―describe the … facility‖ as required
by s 28(4)(a). It referred merely to ―a new bridge to access the Caravan
Park from Nerang Street‖; indeed, it could have done no more because
it was putting forward no more than a broad concept which did not
amount to a ―facility‖.
(ii) ―The estimated cost of carrying out the overall plan‖ was not stated as
required by s 28(4)(c). They pointed to statements in the report that
initial estimates for the cost of works ranged from $400,000 to
$700,000 dependent on the requirements of the caravan park and the
scope of design, that further design work was required to provide more
robust cost estimates, and that a more detailed estimate of construction
costs would be available after further design work was undertaken as
indicating that there was no estimate of the cost of carrying out any
overall plan. The figure of $400,000 was no more than a shot in the
dark, as shown by the costings in the first COR ranging from $715,000
to $1,060,000.
(iii) ―The estimated time for carrying out the overall plan‖ was not stated as
required by s 28(4)(d). In paragraph 5.2 it was proposed to complete
works ―within 12 months‘, while in paragraph 12 this was expected to
take ―at least 12 months‖.
[48] Counsel for the respondent submitted that a ―realistic approach‖ ought to be taken to
the respondent‘s resolution of 1 September 2008. In his submission the Council officer
put forward a proposal to construct a bridge, and then the ES Committee recommended
to the Council that it take up that proposal as its own. The Council‘s decision was, he
submitted, to take up and act upon what was contained in the report; it decided to build
a bridge – the bridge referred to in the report, on the basis set out in the report. He drew
attention to paragraphs 2 and 4 of resolution G08.0901.013: the allocation of initial
funding for the design and construction of a bridge, and notification to residents of
Nerang River Drive of Council‘s decision to construct a new bridge and the expected
timeframe for it to be completed. In his submission that constituted adoption of the
report.
[49] Counsel for the respondent submitted that, in considering whether the report
constituted an overall plan as defined in s 28(4), the Court should look at the substance
of what was adopted. He made the following submissions.
(i) ―A new bridge to access the Caravan Park from Nerang Street‖
described the facility within the meaning of s 28(4)(a). Those words
identified sufficient qualitative characteristics of the proposed facility to
indicate what it was and what it did. It would be wrong to read into s
28(4)(a) a need for some level of specification going beyond a
qualitative description when the legislature had provided no guide on
how far it was necessary to go.
(ii) The statement in the report that initial estimates for the cost of works
ranged from $400,000 to $700,000 was sufficient to satisfy the
requirement in s 28(4)(c) that it state ―the estimated cost‖ of carrying out
the overall plan. An estimate is a judgment or opinion formed in
-- 17 of 31 --
18
advance of knowing what something will actually be. It would be wrong
to read into s 28(4)(c) some extra quality of the estimate, such as that it
be a final estimate, or a reliable estimate or an advanced estimate, when
the legislature had provided no guide on the degree of advancement or
reliability required.
(iii) While the report did not state the estimated time for carrying out the
overall plan in those terms, it said that it was proposed to complete
―these works‖ (design, approvals and construction) ―within 12 months‖
and that removal of the existing bridge and the approvals, design and
construction of its replacement was expected to take ―at least 12
months‖. On any ordinary reading, it was saying that the estimated time
for the project was 12 months.
Discussion
[50] The objective of statutory construction is to give the words of a statutory provision the
meaning which the Legislature is taken to have intended them to have.11 By s 14A of
the Acts Interpretation Act 1954 (Qld), the interpretation that will best achieve the
purpose of an act is to be preferred to any other interpretation.
[51] The purpose of an act is to be gleaned from the act as a whole. The LGA 2009 contains
an express statement of its purpose in s 3, and by s 4 it expressly requires any action
taken under the Act to be taken in a way that is consistent with stated local government
principles. Transparency and accountability are recurring themes. That one of the
purposes of the Act is to provide transparency and accountability in the conduct of
local government is confirmed the Explanatory Notes relating to the bill for the LGA
2009.12
[52] The Regulation was in force on 24 June 2011 when the respondent resolved to levy the
special charge. Part 6 (ss 28-32) was headed ―Special rates and charges‖, and s 28 was
headed ―Levying special rates or charges‖
[53] In Collector of Customs v Agfa-Gevaert Limited13 the High Court said –
―The general principles relating to the interpretation of Acts of
Parliament are equally applicable to the interpretation of delegated
legislation.14 To use the words of Dixon J, ‗subordinate or delegated
legislation…[stands] on the same ground as an Act of Parliament and
[is] governed by the same rules of construction‘.‖15
[54] More recently, in One.Tel Ltd v Australian Communications Authority16 the Full Court
of the Federal Court considered the proper approach to the validity and interpretation
of regulations. Emmett J said in relation to validity –17
―129 The objects of the Act are important in that they inform of
the proper construction of the Act generally and s 147 in
11 Lacey v Attorney-General (Qld) (2011) 242 CLR 573 at 591; Project Blue Sky Inc v Australian
Broadcasting Authority (1998) 194 CLR 355 at 384.
12 Acts Interpretation Act 1954 (Qld) s 14B(1)(c).
13 (1995-1996) 186 CLR 389 at 398.
14 Pearce, Delegated Legislation in Australia and New Zealand (1977), p 286.
15 King Gee Clothing Co Pty Ltd v The Commonwealth (1945) 71 CLR 184 at 195.
16 (2001) 110 FCR 125.
17 Ibid at 154.
-- 18 of 31 --
19
particular — see CIC Insurance Ltd v Bankstown Football
Club Ltd.18 The validity of the Regulations must be
considered against the objects of the Act and the objects and
purpose of the Regulations in achieving the objects of the
Act. The power to make regulations under s 594 of the Act
by reference to s 147 must be purposive. Accordingly, the
power must be interpreted as being so confined that it
cannot be exercised in a manner that is disproportionate to
the attainment of the purpose for which it is conferred —
Minister for Resources v Dover Fisheries Pty Ltd.19‖
Hill J said in relation to interpretation –20
―64 It is not in dispute that regulations, like the enactments
under which they are made, are to be construed both by
reference to the context in which they appear (the word
‗context‘ being used in the widest sense of that term) and by
reference to the legislation under which they are enacted.
Subject to any specific indication to the contrary regulations
(or, at the least, regulations dealing with a common topic,
for often regulations may deal with quite diverse subject
matters) are to be read as a whole and in a way which
promotes their purpose: CIC Insurance Ltd v Bankstown
Football Club Ltd;21 Cooper Brookes (Wollongong) Pty Ltd
v Commissioner of Taxation (Cth).22 A construction which
produces absurdity by reference to the ‗context‘ will,
obviously, be rejected. The present Regulations form,
together with Pt 7 of the Act pursuant to which they were
proclaimed, a coherent code for the assessment of the levy
dealt with in Pt 7. Without the Regulations calculation of the
levy would be, if not impossible, at the least attendant with
great uncertainty.‖
[55] Under the LGA 2009 special rates and charges may be levied for services, facilities and
activities that have a special association with particular land.23 While there is no
express definition of ―facility‖ in the act, the word is used in one of its ordinary senses
– namely, something that makes the performance of an action easier.24 Here, a bridge
over the creek would make access to the caravan park land from Nerang Street easier.
Would such a broad concept be a ―facility‖ within the meaning of the Act? Section
91(2) refers to ―a… facility… that is supplied or undertaken by the local government‖,
and s 92(3) refers to ―facilities that have a special association with particular land
because the land or its occupier specially benefits from the … facility … or has or will
have special access to the … facility‖ or the use of the land or its occupier ―specially
contributes to the need for the … facility.‖ (Emphasis added.) Rates and charges may
be imposed for a facility that ―is supplied or undertaken‖, and a special charge may be
18 (1997) 187 CLR 384 at 408.
19 (1993) 43 FCR 565 at 582-584.
20 One.Tel Ltd v Australian Communications Authority (2001) 110 FCR 125 at 141.
21 (1997) 187 CLR 384.
22 (1981) 147 CLR 297.
23 Sections 92 and 94.
24 Macquarie Dictionary Online (2014) Macmillan Publishers Group Australia; see also Oxford
English Dictionary Online (2014) Oxford University Press.
-- 19 of 31 --
20
made for a facility that ―is supplied or undertaken‖ and that ―[has] a special association
with particular land‖. Consistently with the goals of transparency and accountability,
and in the context in which ―facility‖ is used in the Act, it is clear that the Legislature
intended ―facility‖ in ss 91 and 92 to mean more than a broad concept such as ―a
bridge over the creek‖ or ―a new bridge to access the Caravan Park from Nerang
Street‖. I conclude that a ―facility‖ within ss 91 and 92 is an amenity or service which
a local government has supplied or undertaken to supply and which can be described
with sufficient specificity for the local government to levy a special rate or charge to
recoup its expenditure in doing so.
[56] There was no express statement of legislative purpose in s 28 of the Regulation. In
divining the purpose of the Regulation, regard must be had to the purpose of the LGA
2009 under which it was made, and the principles underpinning the Act.25 Counsel for
the applicant and counsel for the respondent agreed that ensuring local governments
exercised the power in s 94 of the LGA 2009 in a transparent and accountable manner
was a purpose of s 28. This is confirmed by the Explanatory Notes relating to the bill
for the LGA 2009, as well as the Explanatory Notes relating to the 1999 bill for the
amendment of s 971 of the 1993 Act.
[57] By s 28(5) of the Regulation, a local government which decided to levy a special
charge had to ―adopt‖ an overall plan before, or at the same time as, it first resolved to
levy the special charge. It was common ground that an overall plan had to be in
existence, ie to have been adopted at least in its initial version, before the work
commenced.26 As Starke J said in City of Camberwell v Woolf –27
―Adopt is not a technical word. Any corporate act of the Council
taking up and approving the scheme will suffice. But … the act of
adoption must be clear and precise, and … determinate, fixed and
final‖.
[58] By s 28(3), the resolution to levy the special charge had to identify the rateable land to
which the special charge applied and ―the overall plan for the facility‖ to which it
applied. (Emphasis added.)
[59] In its ordinary meaning, a ―plan‖ is a scheme for accomplishing a purpose or project,28
and an ―overall plan‖ is one that deals with the whole process of accomplishing that
purpose or project, from beginning to end.29 As design, approvals and construction are
different phases of a normal capital works project, an overall plan for such a project
would include each of them.
[60] By s 28(4), the overall plan was a document that described ―the … facility‖, identified
the rateable land to which the special charge applied, stated the estimated costs of
carrying out the overall plan, and stated the estimated time for carrying out the overall
plan. That cannot have been intended as an exhaustive definition of an overall plan, if
25 See LGA 2009 ss 3 and 4.
26 Whiting v Somerset Regional Council [2010] QSC 200 at [29] – [31].
27 (1932) 48 CLR 547 at 561.
28 Macquarie Dictionary Online (2014) Macmillan Publishers Group Australia; see also Oxford
English Dictionary Online (2014) Oxford University Press.
29 ―Overall‖ is defined in the Macquarie Dictionary as ―covering or including everything‖: Macquarie
Dictionary Online (2014) Macmillan Publishers Group Australia; and in the Oxford English
Dictionary as ―operating or having effect over the whole range of components, features, or aspects;
total, inclusive of all‖: Oxford English Dictionary Online (2014) Oxford University Press.
-- 20 of 31 --
21
only because it was in some respects circular: an overall plan was a document that
stated (inter alia) the estimated cost of carrying out the overall plan and the estimated
time for carrying out the overall plan. Rather it was a requirement that the overall plan
be contained in a document and a requirement that certain matters be stated in that
document.
[61] In its ordinary meaning, an ―estimate‖ is an approximate calculation or opinion,
formed in advance of knowing what the ―actual‖ will be.30
[62] By s 28(10), the local government might amend an overall plan at any time, by
resolution. It was common ground that it might do so at any time until the work was
complete.31
[63] The Council resolution of 1 September 2008 should be construed in its factual
context.32 The old bridge was no longer trafficable, and access via the lane at the
bottom of the peninsula was unsatisfactory. A Council officer had prepared a report
recommending the construction of a new bridge, and the allocation of initial funding
for its design and construction. The ES Committee had considered the report and made
a recommendation to Council which was an amended version of the officer‘s
recommendation. The officer‘s report and the committee‘s recommendation were
received and considered by the Council, which made a resolution in the same terms as
the committee‘s recommendation (but for paragraph 5 about instructions to the City
Solicitor).
[64] The report covered matters such as advising the applicant and the residents of Nerang
River Drive of the decision to construct a new bridge over the creek, having initial
funding of $400,000 allocated, proposing to start design work immediately, having
more robust cost estimates prepared after further design work was completed, having
further funding allocated, obtaining necessary approvals, removing the old bridge and
constructing the new bridge, and recouping the expenditure by a special charge on the
benefited land.
[65] Although not drafted with the precision that characterises good legislative drafting, the
Council resolution was in substance a decision to construct a new bridge, to allocate
initial funding of $400,000 for its design and construction, and to recoup the
expenditure by a special charge levied on the benefited land (which was identified). In
context, the bridge referred to was that in the report. It dealt also with important
ancillary matters, such as notification to residents of Nerang River Drive, and
obtaining legal advice about recovering funds from landowners who benefited from the
works. Although it referred to a timeframe for completion of the bridge, it did not state
what it was.
[66] The resolution covered the principal matters canvassed in the report and its
recommendations. In all the circumstances, I accept counsel for the respondent‘s
submission that the respondent Council adopted the report.
30 Macquarie Dictionary Online (2014) Macmillan Publishers Group Australia; see also Oxford
English Dictionary Online (2014) Oxford University Press.
31 T 1-54 – 1-55, 1-73.
32 See generally Myer Queenstown Garden Plaza Pty Ltd v City of Port Adelaide (1975) 11 SASR 504
at 520-521 per Wells J.
-- 21 of 31 --
22
[67] However, neither the resolution nor the report satisfied the requirements of an overall
plan.
[68] At that stage what was envisaged was no more than a broad concept, and the
description of it was necessarily very general. It was too early to estimate the cost of
building a new bridge, because the type of bridge had not been determined: indeed, the
different options had not even been explored. Similarly, it was too early to estimate
how long the construction would take. Reading the requirements of s 28 of the
Regulation as a whole, and in the context of ss 91 and 92 of the LGA 2009, I consider
that ―a new bridge to access the Caravan Park from Nerang Street‖ was not a
description of a facility within the meaning of s 28(4)(a), and there was no ―overall
plan for [a] … facility‖ within the meaning of s 28.
[69] The rateable land to which the special charge applied was identified as ―the benefited
lands (the Nerang Caravan Park)‖. This would have been sufficient to satisfy the
requirements of s 28(4)(b) if there had been an overall plan: there would have been no
need to identify it by its real property description.
[70] It was not possible to provide an estimate of the cost of carrying out an overall plan
when the facility to be provided had not been determined. According to the report, the
initial estimates of the cost of the work ranged from $400,000 to $700,000 dependent
on the requirements of the caravan park and the scope of design. That statement
reflected the fact that the facility to be constructed had not yet been determined.
Further, the range was too wide to be an approximate calculation of what the actual
cost would be. In short, the report did not state the estimated cost of carrying out an
overall plan within the meaning of s 28(4)(c).
[71] The report was internally inconsistent about how long it would take to construct a new
bridge. In paragraph 5.1 it proposed that the works be completed ―within 12 months‖,
while in paragraph 12 the works were expected to take ―at least 12 months‖. The report
did not state the estimate time for carrying out an overall plan within the meaning of s
28(4)(d).
[72] It may be, as counsel for the applicant submitted, that an overall plan evolved over
time. In my view the evolution could not have begun until a ―facility‖ was able to be
described in consequence of the respondent‘s having adopted a design option. That
seems to have been in February 2009. I infer that detailed design work was undertaken
between February 2009 and the end of the 2008-2009 financial year, as construction
work commenced in July 2009. Work began with that detailed planning, rather than
with the drawings necessary for the COR, and it continued with the physical
construction work undertaken from July 2009. There was no purported adoption of an
overall plan before the Council resolution of 14 September 2009. However, by then it
was too late for it to be an overall plan for the purposes of s 28.33
Amendments to the overall plan
[73] Having rejected counsel for the respondent‘s submission that the Council adopted an
overall plan on 1 September 2008, it is not necessary for me to consider his further
submission that the overall plan was amended by resolution G09.0914.012 on 14
33 Whiting v Somerset Regional Council [2010] QSC 200 at [30]-[31].
-- 22 of 31 --
23
September 2009 and the resolution of 24 June 2011, which was made before the charge
was actually levied.
Annual implementation plans
[74] By sub-ss (6), (7), (8) and (9) of s 28 of the Regulation –
―(6) Under an overall plan, special rates or charges may be levied for
1 or more years before any of the special rates or charges are
spent in carrying out the overall plan.
(7) If an overall plan is for more than 1 year, the local government
must also adopt an annual implementation plan for each year.
(8) An annual implementation plan for a financial year is a
document setting out the actions or processes that are to be
carried out in the financial year for the service, facility or
activity to which the special rates or charges apply.
(9) The local government must adopt the annual implementation
plan before or at the budget meeting for each year of the period
for carrying out the overall plan.‖
[75] If, contrary to my view, the respondent did adopt an overall plan at the Council
meeting on 1 September 2008, it did not adopt an annual implementation plan (―AIP‖)
for either the 2008-2009 financial year or the 2009-2010 financial year.
[76] The respondent did not resolve to levy the special charge until 24 June 2011. I shall
consider the parties‘ submissions upon whether it was required to adopt an AIP for the
years in question, given that it did not resolve to levy any special charge in either of
those years. It is convenient to begin with the submissions for the respondent.
[77] Counsel for the respondent submitted –
(i) An AIP was required when a special rate or charge was to be
levied for a financial year, and the proceeds were to be
expended in that financial year for part but not the whole of the
facility for which the charge was made, or were to be carried
forward into a future financial year.34
(ii) An AIP was required where a special rate or charge was to be
levied for a financial year for work not yet carried out or at least
not yet complete, and where the work under the overall plan
would not be completed within that financial year.35
(iii) For s 28(8) to apply, there had to be a confluence of three
factors – a particular financial year, actions or processes to be
carried out in that financial year, and a service, facility or
activity to which the special rates or charges applied. The third
factor was absent in a financial year in which no special rate or
charge existed or was to be made.36
(iv) Section 28(8) described an AIP as a document setting out
matters to be done in a financial year for the facility ―to which
the special rates or charges apply‖. (Emphasis added.) It was
34 Written submissions of the respondent para 80.
35 Written submissions of the respondent para 82.
36 T 2-11 – 2-12
-- 23 of 31 --
24
expressed in the present tense: ―apply‖ referred to something
which then existed, or was immediately about to exist.37
(v) Similarly, s 28(9) required an AIP to be adopted before or at the
budget meeting for each year. There would have been no point
to such a requirement unless a special rate or charge was
proposed to be made at that budget meeting: otherwise, neither
the project nor any associated plan would be on the budget
meeting agenda.38
(vi) The expression ―to which the special rates or charges apply‖
appeared in s 28(3) and (4)(b), as well as in s 28(8). In each of
those three subsections, it meant a special rate or charge just
about to be made.39
[78] Counsel for the applicant submitted –
(i) As defined in s 28(8), an AIP was not limited to details relating
to the raising of the special charge. All of the ―actions or
processes that [were] to be carried out in the financial year for
the service, facility or activity to which the special rates or
charges apply‖ were to be set out in it.
(ii) An overall plan had to be adopted before work commenced.
(iii) The resolution to levy the special rates or charges might have
been made before the work commenced, while the work was
proceeding, or after it was finished.40
(iv) The expression ―to which the special rates or charges apply‖
should be construed in the same way in each of s 28(3), s 28(4)
and s 28(8).
(v) The use of that expression in s 28(8) cannot suggest that an AIP
was required only when the local government had resolved to
levy a special rate or charge.41
Discussion
[79] By s 91(2) of the LGA 2009, rates and charges are levies that a local government
imposes on land ―for a service, facility or activity‖.
[80] By s 92(3) of the LGA 2009, special rates and charges are for services, facilities and
activities ―that have a special association with particular land‖, and by s 93(1), rates
(including special rates and charges) are levied on ―rateable land‖.
[81] By s 28 of the Regulation, the local government had to adopt an ―overall plan for the
service, facility or activity to which the special rates or charges apply‖ before it
commenced work, and before or at the same time as it first resolved to levy the special
rates or charges. The special rates or charges might be levied for one or more years
before any of the money raised was spent in carrying out the overall plan. If an overall
plan was for more than one year, the local government also had to adopt an AIP for
each year, before or at the budget meeting for the relevant year.
37 Written submissions of the respondent para 78.
38 Written submissions of the respondent para 79.
39 T 264 – 2-65.
40 Regulation s 28(6), Whiting v Somerset Regional Council [2010] QSC 200 at [30].
41 Applicant‘s outline of submissions para 61.
-- 24 of 31 --
25
[82] The expression ―to which the special rates or charges apply‖ appeared four times in s
28 of the Regulation: in s 28(3)(a) and (b), which dealt with matters which must be
identified in the resolution to levy the special rates or charges; in 28(4)(b), which dealt
with what must be stated in the document containing the overall plan; and in s 28(8),
which defined an AIP. In s 28(3)(a), it qualified ―rateable land‖, while in each of the
other instances it qualified ―service, facility or activity‖.
[83] The ―service, facility or activity‖ referred to in each of s 28(3)(b), s 28(4)(b) and s
28(8) was the one ―to which the special rates or charges apply‖ – that is, the one
described in the overall plan. I do not accept counsel for the respondent‘s submission
that the words ―to which the special rates or charges apply‖ referred to special rates or
charges that had been made or were about to be made for the relevant financial year.
[84] What was to be done toward the provision of that service, facility or activity in a
particular financial year had to be set out in an AIP for that year. There is no reason to
limit the obligation in s 28(7) to adopt an AIP to a year in which special rates or
charges were made.
[85] In failing to adopt AIPs for the financial years 2008-2009 and 2009-2010, the
respondent failed to comply with s 28 of the Regulation.
Did non-compliance with s 28 invalidate the special charge?
[86] In Project Blue Sky Inc v Australian Broadcasting Authority42 McHugh, Gummow,
Kirby and Hayne JJ said –
―91 An act done in breach of a condition regulating the exercise of a
statutory power is not necessarily invalid and of no effect.
Whether it is depends upon whether there can be discerned a
legislative purpose to invalidate any act that fails to comply with
the condition. The existence of the purpose is ascertained by
reference to the language of the statute, its subject matter and
objects, and the consequences for the parties of holding void
every act done in breach of the condition. Unfortunately, a
finding of purpose or no purpose in this context often reflects a
contestable judgment. The cases show various factors that have
proved decisive in various contexts, but they do no more than
provide guidance in analogous circumstances. There is no
decisive rule that can be applied; there is not even a ranking of
relevant factors or categories to give guidance on the issue.‖
(Emphasis added; reference omitted.)
[87] Counsel for the applicant submitted –
(i) The special charge is invalid because the respondent did not
adopt an overall plan before commencing the work.
(ii) Further, it is invalid because the respondent did not adopt
AIPs for the financial years 2008-2009 and 2009-2010.
(iii) The same test of invalidity applies whether the provision not
complied with is in a statute or a regulation.
(iv) Compliance with the requirements of s 28 for an overall plan
was a prerequisite to the exercise of the power to levy a
42 (1997-1998) 194 CLR 355 at 388-389.
-- 25 of 31 --
26
special charge. That was a strong indicator that the
Legislature intended non-compliance to result in invalidity of
the special charge.
(v) Each provision of s 28 had a rule-like quality which could
easily be identified and applied. This indicated that it was a
purpose of the Regulation that non-compliance should result
in invalidity.
(vi) Section 28 specified with particularity what requirements
were to be satisfied in the exercise of the power. This was a
further indicator that it was a purpose of the Regulation that
non-compliance should result in invalidity.
(vii) It is unhelpful to seek to draw a distinction between
substantive and procedural provisions.
(viii) It is unhelpful to seek to draw a distinction between
substantial and absolute compliance.
(ix) Transparency and accountability were intended to result from
adherence to the requirements of the Regulation, and not
from some other factual scenario that may have actually
occurred.
[88] Counsel for the respondent submitted –
(i) It was not a purpose of the Regulation that any non-
compliance with its provisions necessarily and inevitably
result in invalidity of a special charge.
(ii) The power to levy a special charge was conferred by s 94 of
the LGA 2009. There was no need for the Regulation to make
the power workable.
(iii) The Legislature neither expressly nor impliedly required the
making of the Regulation, which was concerned with the
procedure for exercising that power. This was an indicator
that it did not intend non-compliance with the Regulation to
result in invalidity.
(iv) The argument in favour of invalidity would have been
stronger if what was in s 28 of the Regulation had been in the
LGA 2009 rather than in subordinate legislation.
(v) It was not a purpose of the legislation that non-compliance
with a regulation about procedure in the exercise of a power
fully granted by the Act should result in the exercise of the
power being invalid.
(vi) Non-compliance, other than total non-compliance, would not
necessarily have led to invalidity. It is for the Court to assess
the degree of departure from the Regulation, and whether it
was sufficient to lead to invalidity. The non-compliance
would have been insufficient to lead to invalidity if the
respondent had done everything required by the Regulation,
even though not in the form or the time prescribed.
(vii) In fact, the respondent provided great transparency and
accountability to the applicant. It cannot have been the
purpose of the legislation that a ratepayer be given a windfall
benefit at public expense because of non-compliance with s
28(3) and (4) of the Regulation in circumstances where the
-- 26 of 31 --
27
ratepayer was actually given far more transparency and
accountability than it would have been given had the
respondent merely complied with s 28(3) and (4).
Discussion
[89] In Whiting v Somerset Regional Council43 PD McMurdo J considered the validity of a
local government‘s resolution to impose a special charge under s 971 of the 1993 Act.
The relevant work was performed without an adopted overall plan. His Honour
concluded that the resolution to make the special charge did not comply with s 971(4)
and (4A), which were statutory precursors of s 28(3), (4) and (5) of the Regulation in
the present case. He continued –
―[32] Although the Council did not argue that its resolution could
stand if there was a failure to observe these requirements, it is
necessary to consider whether it was the purpose of this statute
that a rate or charge imposed without compliance with these
requirements should be invalid: Project Blue Sky Inc v
Australian Broadcasting Authority. Sub-ss (4) to (4D) of s 971
were inserted by amendments to the LGA in 1999. It was by
those amendments that this requirement for an overall plan was
introduced. The intention of the amendments, according to the
explanatory note, was to:
• provide transparency and accountability commensurate
with the broadened taxation powers introduced by these
amendments; and
• articulate the basis/information on which the Council has
formed its opinion under sub-section (1)(b) concerning the
benefit, access or contribution.
Having regard to that intention, and the broader purpose of s 971
to limit the levy of a special rate or charge according to a
transparent correlation with certain work at a certain cost, the
adoption of an overall plan in accordance with s 971 must be
seen as a prerequisite to the validity of the rate or charge.
[33] It follows that the Council‘s resolution to make these charges
upon Mr Whiting‘s land was invalid and he is entitled to some
relief.‖
(References omitted.)
[90] Counsel for the respondent stressed that in the present case s 28 of the Regulation was
not part of the statutory conferral of power. He submitted that the power to levy the
special charge was completely conferred by s 94 of LGA 2009, and that s 28 of the
Regulation was concerned with the procedure to be adopted in exercising a power fully
granted by the LGA 2009. He did not challenge PD McMurdo J‘s conclusion that there
had been non-compliance with the relevant provisions of s 971 of the 1993 Act.
However, he urged this Court not to follow his Honour‘s reasoning and conclusion as
to invalidity. He was also counsel for the respondent in Whiting, and he informed the
Court that his Honour did not receive detailed submissions about the consequence of
non-compliance with the requirement for a prospective overall plan.
43 [2010] QSC 200.
-- 27 of 31 --
28
[91] In Project Blue Sky Inc the majority of the High Court formulated the test of whether it
was a purpose of the legislation that an act done in breach of a statutory provision
should be invalid in the context of non-compliance with s 160(d) of the Broadcasting
Services Act 1992 (Cth). By s 158(j) of that Act, a primary function of the Australian
Broadcasting Authority (―ABA‖) was to develop program standards relating to
broadcasting in Australia. By s 122(1)(a) the ABA was required to determine standards
to be observed by commercial television broadcasting licensees. Section 122(2)(b)
provided that those standards were to relate to ―the Australian content of programs‖,
and s 122(4) provided that the standards must not be inconsistent with the Act or the
regulations. By s 160(d) the ABA was required to perform its functions in a manner
consistent with Australia‘s obligations under any agreement between Australia and a
foreign country. The ABA determined an Australian Content Standard. Clause 9 of that
standard was inconsistent with a protocol made under a trade agreement between
Australia and New Zealand. The High Court had to consider whether the standard was
invalidated by the breach of s 160(d). The majority concluded that it was not.
[92] In my view, there is no reason in principle why the same test of invalidity should not
be applicable regardless of whether the provision breached is in a statute or a
regulation, and no reason in principle why there should be some different approach to
the application of that test according to whether it is in a statute or a regulation.
[93] In Project Blue Sky Inc the majority drew a distinction between a provision regulating
the exercise of functions already conferred on the ABA and a provision imposing
essential preliminaries to the exercise of its functions. Their Honours said that the fact
s 160 regulated the exercise of functions already conferred strongly indicated that it
was not a purpose of the Act that a breach of s 160 was intended to invalidate any act
done in breach of the section.44
[94] In Whiting PD McMurdo J held that the adoption of an overall plan in accordance with
s 971 of the 1993 Act was a prerequisite to the validity of the rate or charge.45 In
reaching that conclusion his Honour had regard to the intention of the 1999
amendments as expressed in the Explanatory Notes and ―the broader purpose of s 971
to limit the levy of a special rate or charge according to a transparent correlation with
certain work at a certain cost.‖
[95] In the 1993 Act (as amended) provisions similar to s 92(3) of the LGA 2009 and s 28 of
the Regulation were all contained in the Act, and in the same provision of the Act. I
can see no reason in principle why prerequisites to the exercise of a power conferred
by an act may not be contained in a regulation made pursuant to the act rather than in
the act itself. Whether provisions are prerequisites to the exercise of a power must
depend on their purpose rather than their location.
[96] In Project Blue Sky Inc the High Court disclaimed reliance on whether compliance
with a provision is mandatory or directory and, if directory, whether there has been
substantial compliance with it.46 Nevertheless, in considering the nature of the
obligations imposed by the relevant provision, the majority observed –
―Not every obligation imposed by the section has a rule-like quality
which can easily be identified and applied.‖47
44 Project Blue Sky Inc v Australian Broadcasting Authority (1997-1998) 194 CLR 355 at 391.
45 [2010] QSC 200 at [32].
46 Para [93] at page 390
47 Project Blue Sky Inc v Australian Broadcasting Authority (1997-1998) 194 CLR 355 at 391.
-- 28 of 31 --
29
[97] In the present case, sub-ss (3), (5), (7) and (9) of s 28 concerned matters to be
identified in the local government‘s resolution to levy special rates or charges, the
adoption of an overall plan and the time for adopting it, the adoption of an AIP, and the
time for adopting an AIP. They all had a rule-like quality which could easily be
identified and applied. Their requirements were specified with some particularity. The
consistent use of ―must‖ in those provisions is to be contrasted with the consistent use
of ―may‖ in sub-ss (2), (6), (10) and (11) which had a facultative quality. Further,
what was required to be done by the local government by sub-ss (3), (5), (7) and (9)
was objectively ascertainable, and compliance or non-compliance could be objectively
assessed. This can be contrasted with an obligation to act in accordance with a policy
or in accordance with some international convention or agreement.48
[98] The legislative scheme in the present case is quite different from that considered by the
New South Wales Court of Appeal in Marrickville Metro Shopping Centre Pty Limited
v Marrickville Council.49 In that case the local government had power to levy a
differential rate. It failed to comply with a requirement under the relevant legislation
that it give a certain form of notice about the categorisation of the land the subject of
the rate. However, it gave that notice under another statutory provision, in a way that
was equally efficacious. Applying the Project Blue Sky Inc test, the New South Wales
Court of Appeal held that the failure to give the notice did not invalidate the
categorisation of the land.50 It did not place reliance on the procedural, as opposed to
substantive, character of the provision in question.
[99] According to the Explanatory Notes relating to the bill for the LGA 2009 the bill was to
be ―supplemented by regulations that govern[ed] essential but subordinate operational
and administrative issues.‖ (Emphasis added.) The Regulation was part of an overall
legislative scheme intended to provide transparency and accountability in the conduct
of local government. Section 28 was expressed to apply if a local government decided
to levy special rates or charges.51 Like s 971 of the 1993 Act, it was intended to limit
the levy of a special rate or charge according to a transparent correlation between
certain work at a certain cost.
[100] Strict compliance with sub-ss (3), (5), (7) and (9) of s 28 was a prerequisite to the
exercise of the power to levy a special rate or charge. Accordingly, I reject counsel for
the respondent‘s submission that non-compliance with s 28 of the Regulation would
not necessarily lead to invalidity and that it was for the Court to assess the degree of
non-compliance and whether it was sufficient to lead to invalidity.
[101] On the facts, the respondent went to some lengths to inform the applicant of the report
proposing a new bridge that was presented to the ES Committee in late August 2008,
the Council resolution of 1 September 2008, the COR, and the date for commencement
of construction work. Its counsel submitted that it could not have been the
Legislature‘s intention that a ratepayer should receive a windfall benefit at public
expense because of non-compliance with s 28, in circumstances where the ratepayer
was actually given more transparency and accountability than it would have been given
had the respondent done no more than comply with s 28(3) and (4). However, as
counsel for the applicant submitted, transparency and accountability were intended to
48 See Project Blue Sky Inc v Australian Broadcasting Authority (1997-1998) 194 CLR 355 at 391-392.
49 (2010) 174 LGERA 67.
50 See para [182], [187] – 194] per Tobias JA, para [214] – [222] per Basten JA.
51 Regulation s 28(1).
-- 29 of 31 --
30
result from adherence to the requirements of the Regulation, not from what occurred in
fact.
[102] In summary –
(a) Compliance with the requirements of s 28 of the Regulation was a
prerequisite to the exercise of the power in s 94 of LGA 2009 to levy a
special charge.
(b) The respondent‘s decision of 24 June 2011 to levy the special charge
was not authorised by the LGA 2009 and the Regulation.
(c) It was a purpose of s 28 to invalidate the levying of a special charge
when there had been non-compliance with the prerequisites to the
exercise of the power to do so.
(d) The decision involved an error of law.
Discretion
[103] Section 30(1) of the Judicial Review Act 1991 (Qld) (―JR Act‖) provides –
―30 Powers of the court in relation to applications for order of
review
(1) On an application for a statutory order of review in relation
to a decision, the court may make all or any of the
following orders—
(a) an order quashing or setting aside the decision, or a
part of the decision, with effect from—
(i) the day of the making of the order; or
(ii) if the court specifies the day of effect—the day
specified by the court (which may be before or
after the day of the making of the order);
(b) an order referring the matter to which the decision
relates to the person who made the decision for further
consideration, subject to such directions (including the
setting of time limits for the further consideration, and
for preparatory steps in the further consideration) as
the court determines;
(c) an order declaring the rights of the parties in relation to
any matter to which the decision relates;
(d) an order directing any of the parties to do, or to refrain
from doing, anything that the court considers necessary
to do justice between the parties.‖
[104] Counsel for the respondent submitted that, if the Court found there had been non-
compliance with the requirements of s 28 of the Regulation, it should nevertheless
decline to grant relief in the exercise of its discretion under s 30 of the JR Act. He
submitted –
(i) Any relevant error of law did not result in a substantial
miscarriage of justice as between the parties.
(ii) If there was an error, it was procedural rather than substantive in
nature. All of the factual elements necessary to found an overall
plan existed: the formulation of a proposal, the development of a
budget and costings over time, and the evolution of the design.
The error did not lie in failing to do what was required by an
overall plan; it lay in failing to do it in the particular form, at the
-- 30 of 31 --
31
particular time and in the particular sequence required by the
legislation.
(iii) The same result would have been achieved if the proper
procedure had been followed.
(iv) In reality, the applicant was afforded a greater level of
transparency and accountability than it would have been
afforded had the respondent followed the prescribed procedure.
(v) To overturn the rating resolution and the rates notice would
provide the applicant with a windfall benefit, at public expense,
for infrastructure which it would otherwise have had to provide
and fund itself.
(vi) By analogy with principles of restitution, the Court should
conclude that the applicant would be unjustly enriched by an
outcome whereby it received and retained the benefit of the
bridge construction without paying anything for it.
(vii) In those circumstances, especially where the error was
procedural rather than substantive in character, the Court should
decline to grant relief on the ground that its refusal would do no
injustice between the parties.
[105] Counsel for the applicant made the following submissions.
(i) Even if the error was procedural, its consequences were
substantive.
(ii) This was a case of non-compliance with prerequisites to the
exercise of the power to levy a special charge.
(iii) The principles relating to restitution are not relevant to this
application, which is not concerned with merits review.
(iv) The construction work has been completed: it is too late to adopt
an overall plan, and so there would be no point in sending the
matter back to the decision-maker to proceed according to law.
Discussion
[106] The respondent‘s submissions are premised on the error being procedural rather than
substantive in character, a distinction which has been frowned upon by the High Court.
[107] I have concluded that there was non-compliance with provisions which were
prerequisites to the exercise of the power to levy a special charge. It is not to the point
that the same construction may have been undertaken had the respondent done what
was required by s 28 of the Regulation. Nor is it to the point that the respondent may
have in fact afforded the applicant a high level of transparency and accountability.
[108] As the Court is not engaged in a merits review, there can be no meaningful analogy
with principles of restitution.
[109] In short, I am unpersuaded that the Court should exercise its discretion to refuse relief.
Disposition
[110] I will hear the parties on the form of the order and on costs.
-- 31 of 31 --