Bemportato v Queensland Building and Construction Commission [2014] QCAT 464
CITATION: Bemportato v Queensland Building and
Construction Commission [2014] QCAT 464
PARTIES: Augusto John Bemportato
(Applicant)
v
Queensland Building and Construction
Commission
(Respondent)
APPLICATION NUMBER: OCR125-12
MATTER TYPE: Occupational regulation matters
HEARING DATE: 31 July 2014
HEARD AT: Brisbane
DECISION OF: Member R F King-Scott
DELIVERED ON: 15 September 2014
DELIVERED AT: Brisbane
ORDERS MADE: The decision of the Commission, dated
16 March 2012, that Mr Bemportato, was an
excluded individual in relation to events on
14th March 2012 whereby Administrators
were appointed to each of the companies,
Cavalier Homes Brisbane Pty Ltd; Stylebuilt
Homes Australia Pty Ltd; Universal
Steelframing Systems Pty Ltd and Steelbuilt
Kit Homes Australia-Wide Pty Ltd is
confirmed.
CATCHWORDS: Occupational regulation matters – Applicant
Director and shareholder of four companies
placed in administration and subsequently
liquidation. Cause or causes of each company’s
demise examined. Whether a common cause
permitting s 56AC (6) to apply.
Queensland Building and Construction
Commission Act 1991 ss 56AC, 56AD, 58.
Dinsey v QBSA [2013] QCATA 225 followed
-- 1 of 10 --
2
APPEARANCES and REPRESENTATION (if any):
APPLICANT: Mr A J Bemportato in person
RESPONDENT: Mr N Andreatidis of Counsel, instructed by
Messrs Robinson Locke, Solicitors
REASONS FOR DECISION
[1] This matter was heard on the papers by the Tribunal and a decision
delivered on 3 July 2013. The Member relied heavily on a decision of
Dinsey v QBSA [2012] QCA 2690. That decision was reversed on appeal
by Judicial Member Thomas AM QC on 22 July 2013.1
[2] Consequently, Mr Bemportato applied for leave to appeal. The appeal
against the decision of the Tribunal was allowed and the matter was
remitted to the Tribunal for re-hearing.
[3] This is the re-hearing of the matter.
[4] The Queensland Building Services Authority (as it then was) on 16 March
2012 determined that the Applicant, Mr Augusto Bemportato, was an
excluded individual pursuant to s 56AF of the Queensland Building
Services Act 1991 (now the Queensland Building and Construction
Commission Act 1991) as a result of the appointment of Administrators on
14 March 2012 to each of the following companies:
a) Cavalier Homes Brisbane Pty Ltd, (“Cavalier”);
b) Stylebuilt Homes Australia Pty Ltd, (“Stylebuilt”);
c) Universal Steelframing Systems Pty Ltd, (“Universal”);
d) Steelbuilt Kit Homes Australia-Wide Pty Ltd, (“Steelbuilt”).
[5] Mr Bemportato has also brought a separate application to be categorised
as a permitted individual. That proceeding, OCR135-12, is stayed,
pending the outcome of this Application. I am not required to consider that
Application.
[6] The power to review decisions was conferred upon the Tribunal by s 87 of
the Queensland Building and Construction Commission Act 1991 hereafter
referred to as “the Act”. In particular, s 86(1)(k) specifically provides that a
decision under ss 56AF and AG may be reviewed by the Tribunal.
[7] Pursuant to s 19 of the Queensland Civil and Administrative Tribunal Act
2009, the Tribunal has all the functions of the decision-maker for the
reviewable decision being reviewed.
1 QBSA v Dinsey [2013] QCATA 225.
-- 2 of 10 --
3
[8] Section 56AC of the Act provides, inter alia:
56AC Excluded individuals and excluded companies
(1) …
(2) This section also applied to an individual if –
(a) after the commencement of this section, a company, for the
benefit of a creditor –
(i) has a provisional liquidator, liquidator, administrator or
controller appointed; or
(ii) is wound up, or is ordered to be wound up; and
(b) 5 years have not elapsed since the event mentioned in
paragraph (a)(i) or (ii) (relevant company) happened; and
(c) the individual –
(i) was, when the relevant company event happened, a
director or secretary of, or an influential person for, the
company; or
(ii) was, at any time after the commencement of this section
and within the period of 1 year immediately before the
relevant company event happened, a director or secretary
of, or an influential person for, the company.
(3) …
(4) If this section applies to an individual because of subsection (2), the
individual is an excluded individual for the relevant company event.
(5) …
(6) An excluded individual for a relevant company event (the first event)
does not also become an excluded individual for another relevant
company event (the other event) if the first event and the other event
are both consequences flowing from what is, in substance, the one set
of circumstances applying to the company.
(7) …
[9] The parties have agreed the following facts:
a) the Applicant has been a builder, registered with the Queensland
Building Services Authority, since 1 July 2004 under Licence
No 47661;
b) at all material times the Applicant has been a director of:
i) Cavalier Homes Brisbane Pty Ltd (“Cavalier”);
ii) Stylebuilt Homes Australia Pty Ltd (“Stylebuilt”);
iii) Universal Steelframing Systems Pty Ltd (“Universal”); and
iv) Steelbuilt Kit Homes Australia-Wide Pty Ltd (“Steelbuilt”);
c) at all material times, Cavalier, Stylebuilt, Universal and Steelbuilt
have had the same shareholders and directors and have traded from
the same address;
-- 3 of 10 --
4
d) on 14 March 2012, Brad Morelli and Andrew Spring of Jirsch
Sutherland were appointed Administrators of Cavalier, Stylebuilt,
Universal and Steelbuilt;
e) on 16 April 2012, at concurrent second meetings of creditors,
Cavalier, Stylebuilt, Universal and Steelbuilt were placed into
liquidation.
[10] As Judicial Member Thomas AM QC said in Dinsey v Queensland Building
Services Authority,2 ‘Exclusion is prima facie automatic upon (the
happening of any relevant company events). The occurrence of the event
brings about the exclusion. Causation is not an element…’.
[11] If an individual has been categorised as an excluded individual for more
than one relevant event then he is liable to be categorised as a
permanently excluded individual under s 58 of the Act subject to the
requirements of that section. An Applicant can avoid the effect of the
section under s 56AC(6) of the Act by limiting the occasions upon which
additional exclusions may be counted.
[12] Without that provision, a person with more than one event arising from the
same circumstances will be permanently disqualified from holding a
Builder’s Licence.3
[13] Judicial Member Thomas AM QC held in Dinsey v Queensland Building
Services Authority4, having regard to the fact that acts of a director may
consist of acts in relation to a group of companies, there is nothing odd or
contextually awkward in reading the final reference in s 56AC(6) to ‘the
company’ as including ‘companies’.
[14] Mr Bemportato deposed in his affidavit that the four companies referred to
above were inter-related. They had the same directors, shareholders,
employees and financial controller. Each shared the other’s cash
resources and inter-company loans. They had the same bank and
overdraft facilities. Cavalier and Stylebuilt operated out of Springwood
offices. Steelbuilt and Universal operated out of Clontarf.5
[15] They all shared the same suppliers and the same suppliers’ credit. If any
one of the companies was placed on a credit hold, the other three would
be similarly affected.
[16] On 2 February 2012, the Commission imposed a special condition on the
Builder’s Licence of Cavalier. That was to the following effect:
Cavalier Homes Brisbane Pty Ltd must not provide tenders or quotes, or
enter into any contracts, for the performance of building work as defined in
the Queensland Building Services Authority Act 1991 until it is notified in
2 Ibid [36].
3 Section 58(1) of the Act.
4 [2013] QCATA 225 [46].
5 See paragraph 18 of the Applicant’s affidavit.
-- 4 of 10 --
5
writing by BSA that BSA is satisfied it has the financial capacity to
undertake new work.
[17] That suspension was stayed by the Tribunal on 1 March 2012.
The Administrators were appointed on 14 March 2012.
[18] Mr Bemportato submitted that when the suspension was imposed, that
had the effect of the suppliers placing credit holds on accounts. It slowed
the building operations, supplies were not delivered and contractors did
not attend at the sites.
[19] In the course of the hearing, Mr Bemportato appeared to place weight on
the decision of the Westpac Bank to stop Cavalier’s credit as the principal
cause, that had the domino effect. He agreed that Cavalier could not keep
trading when all of its credit was stopped. Once the credit dried up, all
four companies being interlinked, fell down. He maintains that it was when
Cavalier lost its credit that it triggered the events and the domino effect.
[20] The Commission conceded that if all the companies were interlinked and
all fell over because of the demise of Cavalier, then that would fall within
s 56AC(6). It flows from that, that if that was the case, Mr Bemportato
should succeed in his Application.
[21] However, the Commission’s submissions are that each of the companies
had its own separate problems, although, clearly interlinked, their
individual problems did not necessarily influence the other.
The Commission’s references to the documentary evidence and its
commentary are contained in the footnotes. In most instances,
Mr Bemportato did not dispute the emails, although in some cases he was
not aware of the events taking place or was not a party to them.
CAVALIER
[22] This company was in business of constructing residential homes as a
franchisee of Cavalier Homes Australia Pty Ltd (“Cavalier Australia”).
Mr Bemportato was a director of both companies. Cavalier’s problems
arose prior to the Commission imposing its conditions. Reference is made
to the following:
a) an inability to service debts and a worsening debt position. Counsel
for the Commission spent some time taking Mr Bemportato through
email correspondence involving Mr O’Dare, a director of both
companies, and other officers of the company and creditors;6
6 06.06.11, email Commission to Mr Bemportato and another confirming the
Commission’s request for internal management accounts ‘in order to alleviate [the
Commission’s] concerns over recent complaints regarding payment by’ Cavalier
Brisbane (Exhibit 1, Consolidated Bundle of Documents hereafter referred to by
reference to the page as follows “CBOD/658”); 16.06.11, email Commission to
Mr Bemportato and others requesting advice in relation to the outcome of enquiries into
unpaid invoices to Citispec Constructions discussed on 10.06.11 (CBOD/658);
08.09.11, email Mr O’Dare to Mr Bemportato and others attaching a cash flow based
on actual creditors in the computer and debtor forecasts and stating that Cavalier
-- 5 of 10 --
6
b) inability to pay creditors, the need to enter into payment plans or
arrangements made with creditors and inability to meet those
arrangements;7
c) poor management of cash flow resulting in an inability to keep bank
facilities within credit limits;8
d) being on ‘stop’ with suppliers of goods and services as a
consequence of those suppliers not being paid;9
e) poor sales;10
Brisbane ‘is getting deeper into debt with no way out if this is not rectified URGENTLY’
(CBOD/795); 29.09.11, being email from Mr Washbourne to Mr O’Dare and
Mr Bemportato expressing concern about the level of debt associated to Cavalier
Brisbane, reporting that he is ‘receiving daily communications with staff, trades,
franchisees and suppliers with questions about the financial condition of this company,
identifying that ‘all’ income from Cavalier Australia is being taken to pay for the
Brisbane office and stating that he is ‘aware’ that there is serious debt in the Brisbane
office and other companies like Steelbuilt… I have seen and heard of an escalation of
these debt issues and I am seriously concerned’ (CBOD/482 and 482); 19.10.11, email
Commission to Mr Bemportato where it is recorded that the Commission required an
explanation for ‘another complaint of non-payment’ by Cavalier Brisbane (CBOD/665);
01.02.12, email from Mr O’Dare where he writes ‘now the issue I have is that $73K
from two weeks ago and another $36K last week for Cavalier. Stylebuilt certainly can’t
pay this and its bills due to its small cash flow’ (CBOD/411) 09.02.12, email from
Mr Zauner stating that Cavalier Brisbane’s contractors are complaining that they are
not being paid in accordance with their contract terms at the Broken Hill project
(CBOD/423).
7 11.01.12 and 13.02.12, email chain in respect of debt of $60,000 to be paid by Cavalier
Brisbane in respect of the Broken Hill project between 16 – 20 January 2012 and that
by 9 February 2012 only a little under $21,000 had been paid and that sum was not
paid until 9 February 2012 (CBOD/418); In a letter of demand dated 25.07.12, the
liquidator of Cavalier Brisbane asserted that that company had been trading whilst
insolvent and cited, as a basis for the allegation the fact that ‘A review of the books and
records of the Company indicate that there were a significant amount of creditors that
were outside the ordinary trading terms of 45 days. This is reflected in the number of
Letters of Demand issued by Creditors’. The demand further asserts that ‘… the books
and records of the Company indicate that a significant number of payment
arrangements were entered into by the Company for the repayment of outstanding
accounts’.
8 30.11.11, minutes of meeting of Cavalier Directors, where they were advised that
Westpac ‘has expressed…concern and annoyance that the accounts are going over
the over-draft limit without even a courtesy call or arrangement. If this continues to
happen it will leave [Westpac] with no choice but to change the account set up so this
option is removed’ (CBOD/819); 01.02.12, email Westpac (by Ms Brown) to Mr O’Dare
and Mr Bemportato demanding that payment be made immediately to bring three
Cavalier Brisbane Accounts back within limit. Whilst the extent to which the limit had
been exceeded cannot be described as substantial, it is observed that two of the
facilities allowed for almost $1 million dollars to be available to Cavalier Brisbane and
that had been used to beyond that limit (CBOD/822).
9 30.11.11, minutes of meeting of Cavalier Directors, item 3 which records that
Mr Osborne advised the directors that ‘he is on stop with just about every supplier and
a lot of the subbies are at the stage where they are looking to use BCIPA to get
payment before Xmas’. The board were also advised that ‘Karen and Peter are
avoiding dealing with calls from suppliers and subbies so the end result is that those
concerned are going direct to letters of demand because their calls are not returned
and there is minimal communication’ (CBOD/819).
-- 6 of 10 --
7
f) poor controller of jobs Cavalier had contracted to be performed;11
g) management issues.12
[23] I should interpolate here that in many instances, Mr Bemportato claimed
that he was not present at meetings when certain decisions were made
and was not party to a number of decisions which significantly influenced
the company. However, he was at all times a director, and in that respect
he has to assume liability, whether he was aware of the decisions or not,
and I note that in many instances he was copied into the correspondence
and could have expressed his concern and/or disassociated himself from
the decision. That would not have led to a different result in his
categorisation as an exclusive individual but may have assisted him in his
application to become a “permitted individual”.
[24] In addition, it was submitted that Cavalier was insolvent well before the
condition was imposed. One of the liquidators of Cavalier, Andrew John
Spring, made that assertion in a report dated 25 July 2012 addressed to
Mr Bemportato.13 The allegation was that the company had been trading
whilst insolvent since 2010. Further, on 31 January 2011, Van Blinds Pty
Ltd, a creditor of Cavalier, had served a Statutory Demand on Cavalier.
That Demand was not paid or otherwise satisfied. No application was
made to set it aside and consequently on 28 February 2012 an application
to wind up Cavalier was filed in the court.
STYLEBUILT
10 27.02.12, email Mr O’Dare to Mr Bemportato where Mr O’Dare notes that sales are
‘well short’ of target (CBOD/451).
11 07.02.12, email from Mr O’Dare where he writes that ‘unfortunately no one from
Cavalier has ever been privy to discussions with the clients or MGMB as to the
specifications or obligations in completing [Cinderella Street project]. This is a mess’
(CBOD/416); 09.02.12, email Mr Zauner identifying that the Broken Hill project is ‘well
behind program’ (CBOD/423); 13.02.12, email from Mr Zauner stating that Cavalier
Brisbane was 13 weeks behind program at the Broken Hill project (CBOD/421);
13.02.12, email from Mr Zauner stating that contrary to statutory declarations provided
on behalf of Cavalier Brisbane to certify payments, a list of contractors have all advised
that they have outstanding arrears with Cavalier Brisbane in respect of the Broken Hill
project (CBOD/420); 15.02.12, email to Mr O’Dare identifying debt against the
Cinderella Street project, the $1.2 million dollar loss incurred with Steelbuilt and how
these weren’t taken into account in relation to the Broken Hill project and those issues
have ‘stretched our cash flows to breaking point’ (CBOD/427).
12 18.10.11, email Mr Garis being report to directors of the Cavalier Group in which he
identifies issues involving the CFO, Mr Gale, acting in a quasi-general managers role
which has led to his role as the financial officer being sadly neglected and expressing a
view that the group requires a financial manager whose sole role is to manager all the
internal accounting requirements of the Group (CBOD/479); 10.11.11, business plan –
which identifies that weaknesses include lack of direction, poor systems internally, the
business being divided, too many office directors having different ideas and staff
members having differing allegiances (CBOD/810); 19.11.11, business plan noting that
Cavalier Brisbane has ‘become separated by name, opposite visions and management
styles of the directors, too many separate entities in name and control but with the
same finances and financial manager’ (CBOD/407).
13 Exhibit 7.
-- 7 of 10 --
8
[25] Stylebuilt was in the business of constructing residential hillside and
transportable dwellings. It is submitted by the Commission that Stylebuilt
was in financial difficulties prior to the Commission imposing the condition
on Cavalier. The following were submitted as causes for its financial
difficulties:
a) poor management of finances resulting in an inability to pay a tax
liability of $142,000 which was payable in March but the company
was aware well beforehand;14
b) inability to service debts;15
c) inability to keep bank facilities within credit limits;16
d) poor sales and poor cash flow.17
[26] In addition, the Commission relied upon evidence of insolvency well before
2 February 2012. Applications to wind up Stylebuilt have been made by
Crane Limited on 16 December 2011 (dismissed) and a subsequent
application by Build Safe Qld Pty Ltd on 24 January 2012.
UNIVERSAL
[27] Universal was in the business of manufacturing steel frames and trusses
for the other three companies. It had financial problems which it was
submitted by the Commission were as follows:
a) failing to pay suppliers of goods and services in accordance with
payment plans or arrangements made with them;18 and constantly
being put on ‘stop’ by its suppliers;19
b) poor cash flow;20 and
14 CBOD/829.
15 01.02.12, email from Mr O’Dare where he writes ‘now the issue I have is that $73K
from two weeks ago and another $36K last week for Cavalier. Stylebuilt certainly can’t
pay this and its bills due to its small cash flow’ (CBOD/411).
16 01.02.12 – email Westpac (by Ms Brown) to Mr O’Dare and Mr Bemportato demanding
that the Stylebuilt Homes facility which had a limit of $360,097 be brought back within
the limit – whilst the extent to which the limit had been exceeded is not significant, it is
worth noting that this was a substantial limit and Stylebuilt Homes was clearly having
trouble keeping within that limit (CBOD/822).
17 01.02.12, email from Mr O’Dare where he writes ‘now the issue I have is that $73K
from two weeks ago and another $36K last week for Cavalier. Stylebuilt certainly can’t
pay this and its bills due to its small cash flow’ (CBOD/411).
18 15.12.11 to 01.02.12, email chain with One Steel Distribution. A promise was made for
$25,000 to be paid by the end of January however that did not happen. A promise was
made on 1 February 2012 to pay by presumably 3 February 2012 but Mr O’Dare makes
it clear that there are serious financial pressures on the Cavalier Group companies by
that date when he writes ‘now the issue I have is that $73K from two weeks ago and
another $36K last week for Cavalier. Stylebuilt certainly can’t pay this and its bills due
to its small cash flow. Note this bill to One Steel is for Steelbuilt’s last five kits and coil
used’ (CBOD/411 to 413).
19 30.09.10, email from Ms O’Dare stating that she is in a position where she has to ‘send
money every month chasing why we’re on stop yet we should have a great cash flow’
(CBOD/364); 30.09.10, email from Ms O’Dare where she write in the context of an
exchange over cash flow issues and being constantly put on stop by suppliers that ‘it is
becoming a common problem for Universal’ (CBOD/363).
-- 8 of 10 --
9
c) insufficient income to pay its trade expenses.21
STEELBUILT
[28] This company, as its name suggests, provided kit homes, particularly to
people in rural areas. It had financial difficulties which were manifested by
the following:
a) questionable utilisation of money received from clients. As at 23 July
2010, it had been paid $390,000 as ‘100% pre payment by clients’
but was trading this as a debt it could not repay.22 By 6 February
2011 ‘the debt’ owed to the clients had increased to $800,000 by
which time one of its directors, Mr O’Dare, stated that the company
was ‘in serious trouble’.23 [I should interpolate here that
Mr Bemportato was unaware of this state of affairs and was very
angry to find out that the company was using pre-payment by clients
as a debt. My comments at paragraph [23] above are equally
applicable here as well.];
b) had insufficient income to pay its trade expenses;24
c) the company was in such a financial mess25 that in about October
2011 the directors caused it to stop trading;26
d) inability to pay its debts;27
20 30.09.10, email from Ms O’Dare indicating that she is in a position of having to ‘send
money every month chasing why we’re on stop yet we should have a great cash flow’
(CBOD/364).
21 For the year ending 30.06.11 it had income of $738,642 with cost of sales of $646,484
and trading expenses of $356,701 suffering a net loss of $264,543 (CBOD/328).
For the period to 29.02.12 it had income of $241,467 with cost of sales of $107,553 and
trading expenses of $180,713 suffering a net loss of $46,779 (CBOD/328).
22 23.07.10, minutes of meeting of Directors of Cavalier in which it is recorded that the
directors were advised that Steelbuilt Kit Homes had approximately $700,000 of
outstanding debt which included ‘$310,000 of forecast costs for kits that had been
100% prepaid by clients. Steelbuilt has $23,000.00 available on their overdraft limit of
194,000.00’ and it was proposed that the solution for this included invoicing new
franchisees, selling 8 new franchises in the next 12 months and generating $1 million
dollars from ‘future kit sales that will be used to cover the creditors from previous kit
sales’ (CBOD/779).
23 06.02.11, Steelbuilt restructure proposal prepared by Mr O’Dare, see discussion under
the heading ‘current position of Steelbuilt’ (CBOD/369).
24 For the year ending 30.06.11 it had income of $136,838 with cost of sales of $677,617
and trading expenses of $161,855 suffering a net loss of $701,434 (CBOD/326).
25 06.02.11, Steelbuilt restructure proposal prepared by Mr O’Dare where he states ‘note
if this company in its current state does not change the way we operate it will only incur
more debt and see it accumulate and we will be in the same position in 12-14 months’
(CBOD/373).
26 10.10.11, email from Mr Washbourne noting that it has ceased to trade (CBOD/387).
27 06.02.11. Steelbuilt restructure proposal prepared by Mr O’Dare stating ‘currently,
unfortunately, we are in serious trouble a debt exceeding 45 days of $400,000 owed to
creditors and $800,000 owing in kit material to clients in future kit deliveries’
(CBOD/369); 11.02.11, email from Mr Plotkin identifying that the Cavalier Group needs
to pay back ‘the $190,000 owed to Trilink once they have got the Steelbuilt debt under
control’ (CBOD/367); 11.04.11, email from contracts administrator at Steelbuilt
-- 9 of 10 --
10
e) poor sales;28
f) having a bad reputation in the marketplace;29
g) being on ‘stop’ with suppliers of goods and services as a
consequence of those suppliers not being paid;30
h) lack of control and direction;31
i) overspending on expenditure;32
j) poor management of finances resulting in inability to pay tax
liability.33
[29] It is readily apparent from the above history and the documents supporting
the Commission’s submissions that the demise of the four companies
cannot be contributed to just one or two events. It is also readily apparent
that the demise is due to poor financial systems, sales neglect and
essentially poor management. Mr Bemportato, in the course of his cross-
examination, made concessions to that effect.
[30] I agree with the Commission’s decision. It follows that Mr Bemportato is
an excluded individual in relation to the events, being the liquidation of the
four companies. I find that the winding up of each company was due to
separate and distinct financial difficulties they were undergoing at the time,
although there is some inter-relationship between the causes. In particular,
the problems associated with Steelbuilt were quite distinct from the actions
of the Commission or of the Westpac Bank.
[31] I confirm the decision of the Commission made on 16 March 2012.
Australia trying to organize purchase of kit on a COD basis but indicating concern as to
where the money can come from in writing ‘then I’ll try and arrange payment (????)
from somewhere so I obtain a date for the client’ (CBOD/376); 11.04.11, email from
Ms O’Dare identifying that ‘the problem is now money. With no sales currently apart
from one from the internal sales team, we’re struggling to keep the COD payments
going’ (CBOD/375).
28 24.07.10, email from Mr O’Dare to Mr Bemportato and other stating ‘we have fell well
short of sales cash income’ and also states ‘sales need to be improved, we have to
achieve an income of $450K per month not the $252K we are presently averaging’
(CBOD/781).
29 06.02.11, Steelbuilt restructure proposal prepared by Mr O’Dare in which he proposes
a change to its name ‘this is due to Steelbuilt having a bad name in the market place,
and its stale’ (CBOD/370).
30 09.04.11, email from Steelbuilt Parkes with the subject ‘problems with kits just getting
worse’ and advising that Boral has put them on stop (CBOD/377).
31 24.07.10, email from Mr O’Dare to Mr Bemportato and others where he stated ‘let me
stress this is not attacking Rowhan but as a director…I am concerned at the direction
and lack of control we have with this company’ (CBOD/781).
32 24.07.10, email from Mr O’Dare to Mr Bemportato and others where he writes ‘at our
meeting in Parkes and budget put forward and accepted last year and adopted again
for this year, we…have overspent in nearly every area’, he also writes ‘we have spent
$28,422.00 in travel since January with our budget being $25,000 for the year’ and also
‘if we combine the staff’s wages inclusive of Rowhan’s is in the area of $400k with our
budget being $290,000’ (CBOD/415).
33 07.02.12, email from Ms O’Dare identifying that payroll tax of $189,504 was
outstanding and had been brought to everyone’s attention in October 2010
(CBOD/415).
-- 10 of 10 --
Official source: https://www.sclqld.org.au/caselaw/QCAT/2014/464