Elsmore v Dundowran Blue Metal Quarries Pty Ltd [2013] QCAT 269
CITATION: Elsmore v Dundowran Blue Metal Quarries Pty
Ltd [2013] QCAT 269
PARTIES: Mark Elsmore
(Applicant)
v
Dundowran Blue Metal Quarries Pty Ltd
(Respondent)
APPLICATION NUMBER: BDL127 – 12
MATTER TYPE: Building matters
HEARING DATE: 2 May 2013
HEARD AT: Hervey Bay
DECISION OF: John Milburn, Member
DELIVERED ON: 19 June 2013
DELIVERED AT: Hervey Bay
ORDERS MADE: 1. The Applicant’s application is dismissed.
2. Mark Elsmore is ordered to pay
Dundowran Blue Metal Quarries Pty Ltd
the sum of $3729.70.
CATCHWORDS: BUILDING MATTERS - Claim for compensation
as result of the supply of alleged faulty concrete
APPEARANCES and REPRESENTATION (if any):
APPLICANT: In person
RESPONDENT: Dundowran Blue Metal Quarries Pty Ltd
represented by Ian Ridoutt
REASONS FOR DECISION
[1] Mr Elsmore was contracted to build a concrete path and driveway to a
residence1 he constructed for a client. The residence was directly opposite
where Mr Elsmore lives.
1 Situated at Louise Street, Burrum Heads
-- 1 of 4 --
2
[2] Mr Elsmore employed a concreter, Danny Millane, to lay and finish the
concrete. He bought the concrete from the Dundowran Quarries.
[3] The concrete cracked. It was replaced. Mr Elsmore brought this
application alleging the concrete supplied by Dundowran Quarries did not
comply with certain specifications. He seeks an order for compensation.
Dundowran Quarries seeks an order for payment of its outstanding invoice
issued to Mr Elsmore.
[4] In support of his claim, Mr Elsmore engaged Soonlai Leong, a consulting
engineer from VDM Consulting, Hervey Bay.
[5] In his report,2 Mr Leong noted numerous cracks on the driveway and
footpath slabs. He concluded that the crack patterns and early cracking
“indicate that the most probable cause of the cracking was due to drying
shrinkage3. This shrinkage occurs when there is a volumetric reduction of
the slab when excess water needed to hydrate the cement, leaves the
hardened concrete after setting has occurred." He continued, "factors that
influence drying shrinkage include the concrete mix, water content of the
mix, cement content, compaction, weather and curing conditions”.
[6] Mr Leong did not state specifically that the concrete itself was faulty4.
[7] Before replacing the concrete, Mr Elsmore had it tested. He did so by
taking core samples. Mr Elsmore ordered 20 MPa5 concrete and had four
samples tested by Geotechnical Testing Services Pty Ltd6. The report
writer7 noted that "Core Compressive Strength” varied between 18.2 and
23.7 MPa and the "Corrected Compressive Strength” varied between 16.5
and 20.6 MPa. Suncoast Concrete Testing8 was engaged to test two
samples and the report writer9 concluded the strength of one sample to be
15.0 MPa and the other to be 19.5 MPa.
[8] Given the results, Mr Elsmore argues that the concrete failed to reach the
20 MPa standard as ordered.
[9] Ian Ridoutt represented Dundowran Quarries. Mr Ridoutt called structural
engineer John Reid who referred to his 19 December 2012 report during
his evidence. Mr Elsmore called Mr Leong to give evidence. The tribunal
found the evidence of the experts to be consistent.
[10] Both Messrs Reid and Leong concluded that when testing concrete it is
better to do so when the concrete is fresh by a process of compression
rather than by taking core samples after the event.
2 A single page report dated 23 November 2012
3 During the course of the hearing, Leong said drying shrinkage is the same as plastic
shrinkage.
4 Either in his written report or during the provision of oral evidence at the hearing.
5 The Pascal (Pa) is a basic management of strength. Megapascal (1 MPa ≡ 1,000,000
Pa).
6 Noosaville.
7 J.J.Boykett signed the report dated 19 December 2011 as an "approved signatory".
8 Kunda Park.
9 Mick O'Keeffe in a one-page report dated 21 November 2011.
-- 2 of 4 --
3
[11] Mr Reid wrote that, "once the concrete dries, it stops gaining strength, so
the concrete in a typical driveway, which is only lightly compacted and is
not kept wet at all, will fall short of the standard test specimens for
compressive strength. …. Thus the question of whether or not the
concrete complies with Australian Standards10 can only be judged by
preparing and testing samples of the fresh concrete, either that actually
delivered to a site (project testing) or regular samples of the same grade
of concrete produced by the batch plant (production testing). Compliance
cannot be judged by testing core samples of the hardened concrete at a
later date. It is hardly surprising that the cores taken from the driveway at
17 Louise Drive did not have a compressive strength of 20 MPa, since
they were representative of concrete placed on site, not carefully
produced laboratory samples. The accredited (Geotechnical Testing
Services) core test results seen were, in fact, within the range I would
expect to see for site samples at an early age, based on my experience of
concrete usage."
[12] Mr Reid continued,11 "When concrete is ordered by strength, such as 20
MPa, the strength referred to is the concrete potential strength, not the
final strength in situ. The potential strength (or Grade Strength, or
Characteristic Strength) is measured by taking a careful sample of the
fresh concrete in the prescribed manner, compacting it fully in standard
cylindrical moulds and then keeping the resultant cylinders of concrete in
tanks of water at 27°C (in Queensland). The cylinders are removed from
the water, measured, and tested for compressive strength at an age of 28
days, although some may be tested at earlier ages for particular
purposes.”
[13] The concrete was poured in stages, as cement trucks arrived. In doing
so, they would drive over the mesh used to support the next stage of the
concrete. Mr Reid comments12 "this is poor practice, in that the weight of
the truck causes deformation of the mesh and the bedding material (both
of which can make cracking problems worse) and can also cause some
dislocation of the steel within the nearby fresh concrete. The resulting
deformations and shear planes can have a significant influence on the
later formation of cracks, generally promoting more cracking than might
otherwise have occurred.”
[14] In doing so, it is clear the trucks were pouring from the top of the driveway
to the bottom, which although of moderate gradient is not the preferred
option13.
[15] It is possible that the concrete trucks deformed the steel mesh to the
extent that it was eventually located too deeply in the concrete. Mr Reid
states14, that the steel mesh must be located in the top one third of the
concrete thickness. One core sample located the steel at a depth of 81
10 Standards Australia International Ltd is the copyright owner of the Australian Standards
brand and standards developed by Standards Australia.
11 At page 1.
12 At page 4.
13 Reid, at page 5.
14 At page 4.
-- 3 of 4 --
4
mm from the concrete surface and another at 67 mm from the concrete
surface. In his oral evidence, Mr Leong said that to be effective in
minimising cracking, the steel should be approximately 30 mm from the
concrete surface.
[16] Mr Reid also gave evidence that an incorrect procedure might have been
used when establishing control joint, in that steel mesh continued across
joint lines, thereby exacerbating obvious cracking. Hence, random
cracking would have occurred in the original driveway, had the steel been
left in place across joints, in spite of the joints provided15.”
[17] I am of the view that the concrete cracks were not symptomatic of a
structural problem. I accept the evidence16 of Mr Reid in this regard.
[18] One of the factors which may cause cracking in fresh concrete of any
strength is the rate of evaporation of water from the concrete surface17. I
accept from the evidence18 that it is necessary to ensure an appropriate
rate of evaporation from the concrete surface to avoid an incidence of
cracking. In his evidence concretor, Mr Millane, said that in this instance
upon noticing surface cracking he applied Sika Film19. It was also referred
to as a moisture retardant.
[19] Mr Reid suggests that Sika Film was not used properly. It was sprayed
onto the concrete and floated in. He asserts that dissipation of the film by
trowelling or floating would render it ineffective20.
[20] Mr Elsmore suggests the problem came about as a result of the
inexperience of the Dundowran Quarry duty batch operator. There is no
evidence given to suggest this was a cause of any problems encountered.
[21] It was not disputed that rain interfered with the concrete pour but
conflicting evidence as to the extent and duration of the downpour. It
appears that heavy rain fell during the early part of the pour. If the added
water content affected the potential strength of the concrete mix, this
cannot be the responsibility of Dundowran Quarry.
[22] Mr Elsmore bears the onus of proof in this matter. I am not persuaded
that problems encountered at the construction site came about as result of
the product supplied by Dundowran Quarry. Mr Reid states "once the
customer takes delivery of the fresh concrete, however, the way it is
treated is out of the concrete producer’s control”21.
[23] I find in favour of Dundowran Quarries. I dismiss the Applicant’s
application. I order Elsmore pay to Dundowran Quarries an amount
outstanding in the sum of $3729.70 as per invoice. I make no order as to
costs. I make no other order.
15 Reid at page 4.
16 Oral evidence given by Mr Reid at trial and by reference to his report at page 4.
17 Reid at page 2.
18 Mr Reid at page 2.
19 Sika Film was described at trial as a product that helps avoid concrete surface
shrinkage.
20 at page 3.
21 at page 1.
-- 4 of 4 --
Official source: https://www.sclqld.org.au/caselaw/QCAT/2013/269