Badov & Anor v Queensland Building Services Authority [2013] QCAT 161
CITATION: Badov & Anor v Queensland Building Services
Authority [2013] QCAT 161
PARTIES: Mr David Badov & Ms Lena Benett
(Applicant)
V
Queensland Building Services Authority
(Respondent)
APPLICATION NUMBER: GAR288-12
MATTER TYPE: General administrative review matters
HEARING DATE: On the papers
HEARD AT: Brisbane
DECISION OF: Kate Buxton, Member
DELIVERED ON: 9 April 2013
DELIVERED AT: Brisbane
ORDERS MADE: 1. Decision of the QBSA refusing the
applicant’s claim under the Statutory
Insurance Scheme is affirmed.
CATCHWORDS: Decision of the QBSA in relation to the statutory
insurance fund – review under section 86(1)(h)
and 87 QBSA Act – whether fixed price or cost
plus contract – contract validly terminated –
claim refused by Authority as contract
determined to be on a “cost plus” basis
APPEARANCES and REPRESENTATION (if any):
This matter was heard and determined on the papers pursuant to s 32 of the
Queensland Civil and Administrative Tribunal Act 2009 (QCAT Act).
REASONS FOR DECISION
[1] The applicants, Mr Badov & Ms Benett, wish to erect a substantial
dwelling on their property in Sovereign Island, Paradise Point. In around
June or July 2011 they contracted with Vitto Ulliana Constructions Pty Ltd
for the construction of a dwelling on that site. The sum of $99,000 was
paid to the builder by way of deposit and insurance with the Queensland
Building Services Authority was transacted.
-- 1 of 6 --
2
[2] On 7 November 2011 Mr Badov and Ms Bennett terminated the contract
with the builder, pursuant to clause 29.1 of the contract, because the
builder’s financial difficulties required it to enter into external
administration. Apparently the builder was without funds to return the
deposit monies. At the same time Mr Badov and Ms Benett advanced a
claim against the insurance fund for recovery of the sum of $99,000.
[3] There is no evidence or suggestion by either party that, at this point, the
builder had commenced work or undertaken any work either for the sum
of $99,000 or otherwise. It is therefore the position of Mr Badov and Ms
Bennett that, if they are unable to recover the deposit from the insurance
fund, that sum of money will be lost.
Decision of the Authority
[4] The Authority notified Mr Badov and Ms Bennett, by letter dated 21
November 2011, of its decision to disallow the claim under the statutory
insurance scheme. It is against that decision that the applicants seek
review under sections 86(1)(h) and 87 of the QBSA Act.
[5] It is common ground between the parties that a contract of insurance was
entered into in relation to the proposed construction work and that a
certificate of insurance was issued by the Authority providing conclusive
evidence that the work was covered by the statutory insurance scheme.1
[6] The details of the claim made by Mr Badov and Ms Bennett, through their
agent Mr Poole, are set out in the Authority’s statement of reasons for
decision filed on 8 October 2012. It is sufficient here to recount that on 7
November 2011 Mr Poole notified the Authority that the contract had been
terminated and made a “non completion” claim upon the fund. The
Authority reviewed this claim and rejected the claim pursuant to clause 1.2
of the insurance policy conditions on the basis that the building contract
was not for a fixed price. This decision was notified to Mr Badov and Ms
Bennett by letter dated 21 November 2011.
[7] Following exchanges between the Authority and the applicants solicitors
the Authority agreed to reconsider the decision rejecting the claim. On 16
July 2012 the respondent (through Mr Peter Jacques) wrote a letter to the
applicants solicitor outlining the refusal to allow the claim against the fund
and setting out the reasons for that refusal. The applicants then filed their
review application, within time, on 13 August 2012.
The statutory insurance policy
[8] Insurance policy conditions (edition 8, effective 1 July 2009), were
incorporated into the contract of insurance relevant to the contract for the
relevant construction. Part 1 of the policy deals with claims in the event of
non completion. Clause 1.2 provides as follows:
1 Sections 68(3) and 69(1) QBSA Act.
-- 2 of 6 --
3
1.2 termination of contract
The BSA is only liable to pay for loss under this part when the contract is
for a fixed price and when the insured has properly terminated the contract
with the contractor.
[9] The Authority has maintained that the contract entered into between Mr
Badov and Ms Bennett on the one hand and the builder on the other hand
was not a “fixed priced” contract but, rather, was a “cost plus contract”. In
this case, clause 1.2 of the policy would not respond to a claim following
termination of that contract.
[10] The essential question to be determined in this review application is
whether the contract entered into between Mr Badov and Ms Bennett on
the one hand and the builder on the other was a “cost plus” contract as
contended for by the Authority or whether, in fact, it was a “fixed priced”
contract therefore attracting the indemnity offered by clause 1.2 of the
statutory insurance policy.
[11] The determination of whether the contract is a “cost plus” or “fixed price”
contract depends upon a proper construction of the document itself. It is
only in the event that the contract cannot be construed by reference to its
plain words that in extrinsic issues such as the intention of the parties can
be relied upon by this Tribunal.
[12] The essential and most compelling piece of evidence relied upon by Mr
Badov and Ms Bennett appears on page 3 of the 44 page document. At
item 5 on page 3 the parties are invited to fill in details as to the “contract
price”. The contract price is nominated as $8million plus GST. In
addition, there is a handwritten notation immediately adjacent to the
reference to $8million, on all of the copies of the contract provided to the
Tribunal, as follows, “the actual cost of the works plus the builder’s
margin.” There is conjecture as to whether this endorsement appeared on
the version of the documents signed by Mr Badov and Ms Bennett.
However, Mr Badov and Ms Bennett have not been able to produce a
copy of the contract without that endorsement or any sworn evidence
compelling the conclusion that endorsement did not appear on their
version of the document when signed.
[13] Even if the endorsement which is handwritten on page 3 of the 44 page
document was not present at the time of signing the contract price
nominated in the sum of $8million plus GST is the only reference to a
fixed price or contract price. However, for the reasons set out below, the
plain intent of the document, derived from a reading of it as a whole,
indicates that this was a “cost plus” contract. The nomination of the
contract price at item 5 on page 3 is insufficient to displace that plainly
expressed intent.
[14] At page 5 of the 44 page contract reference is made to various
appendices including appendix 2, customised progress payment schedule
and appendix 3, builders fees. The prescribed progress payment
schedule which one would expect to see in a fixed price contract at part
-- 3 of 6 --
4
(a) on pages 6 and 7 has been struck through and in part (b) at page 7 the
following notation appears, “this is a cost plus contract due to incomplete
documentation. Upon receipt of finalised plans and specifications a
contract amount will be provided. Please refer to appendix two (2).” The
progress payment table on page 8 is also not completed and a
handwritten reference is made to appendix 2 rather than nominating stage
payments as might be possible if a fixed price had been arrived upon and
a percentage of that price could be extrapolated. On page 11 where
special conditions can be incorporated the words “see attached cost plus
special conditions” appear. On page 12 there is an opportunity for the
owner and builder to apply their signatures to the document. Those
signatures do not appear on page 12. However, each of the 44 pages of
the document has been initialled by each party. The failure to sign this
contract may have other consequences but it is immaterial to the
interpretation and application of the statutory insurance fund and to the
claim made against it in the circumstances.
[15] Appendix 2 was described as a customised progress payment schedule.
There was reference to a deposit which was to be used as a retainer and
retained for use to settle the final invoice for works completed as per
appendix 3 there was also reference made to payments as per invoice.
The payments were described as “the actual cost of works as per invoice”.
Invoices will be every 14 (fourteen) days from the date of commencement,
invoices are due and payable 5 working days from the date of the invoice.
The payment schedule for the builder’s fees is a set stage payable in
addition to the invoices referred to herein, see attached appendix 3.
Appendix 3 then set out the way in which the builder’s fee of $385,000
would be paid in staged payments over a 24 month period. A further
reference was made to a deposit in the sum of $440,000 there was no
explanation from the parties as to why this figure differed from the amount
paid by the applicants. However, it is common ground that the sum paid
was $99,000 as at the date of termination of this contract. An information
sheet is then annexed, signed by each party and, I am satisfied,
incorporated into the contract. It was described as “QC1 cost plus special
conditions” where hourly rates are nominated for various services together
with a “cost plus contract supplement” where further terms of the cost plus
contract are set out.
[16] A reading of this contract from beginning to end leaves no doubt that it is
a contract requiring the owner to pay the actual invoices incurred together
with the nominated builder’s margin. The only reference in the 44 pages
that is inconsistent with this is on page 3 where a contract price is
nominated as $8 million. However, it is a requirement of a cost plus
contract that the contract must state a fair and reasonable estimate of the
total costs. A reasonable interpretation of the nominated contract price on
page 3 is that it is a fair and reasonable estimate of the total costs. If that
figure had not appeared an issue may have arisen as to whether the
builder complied with the requirements of section 55(1) of the Domestic
Building Contracts Act 2000. In the circumstances, it is sufficient and
proper to regard that figure as an estimate in the context of the contractual
-- 4 of 6 --
5
provisions as a whole. It is also worth mentioning that the terms referred
to above have been typed into the standard HIA QC1 construction
contract. Where each of those terms and references are made to a cost
plus contract they had been added in and could clearly have been read by
all the parties prior to the application of their initials or signature to the
document.
[17] The statutory obligations prior to entering into a cost plus contract appear
to have been adequately discharged. There is a statement within the
words of the contract that a substantial part of the work cannot be
reasonably be calculated. There is also a suggestion that the contract
may have been varied some time in the future once “finalised plans and
specifications” were received by the builder (see page 7 of the contract).
There is no evidence that these plans or specifications were ever
received. I find no basis for asserting that the cost plus contract falls short
of compliance with the statutory regime or that any part of the contract is
illegal, void or unenforceable. There is therefore no basis upon which any
of its terms ought to be severed. The submissions of Mr Badov and Ms
Bennett to that effect are rejected. Mr Badov and Ms Bennett also stated
that they were unaware of why various clauses had been added or why
they were there. It is a matter for Mr Badov and Ms Bennett to obtain any
advice they wish prior to entering into such an agreement. Once the
contract was entered into, and indeed partly performed on their evidence
by the payment of $99,000 to the builder, they are bound by its terms and
have not demonstrated any circumstances here which would displace that
position.
[18] Finally, the fact that a term of a contract would cause financial hardship is
not of itself a basis for establishing that it is an unfair contract term. In any
event, it is not the term of the contract but the failure of the BSA policy to
respond which has placed Mr Badov and Ms Bennett in what they
describe as a position of “financial hardship”. Clause 1.2 of the statutory
insurance scheme is perfectly explicable. If parties have made scheduled
payments pursuant to a fixed term contract one would expect that they
had received the benefit of the work up to the stage which that payment
becomes due. On a cost plus contract one would expect that costs had
been incurred and work had been undertaken by the builder before
payments were made. The fact that Mr Badov and Ms Bennett chose to
make a payment by way of a deposit in the clear circumstance of a cost
plus contract is a matter for them and there is no compelling evidence that
there are any terms to which they have agreed which could be described
as unfair.
[19] The result, no doubt, is disappointing to Mr Badov and Ms Bennett. As I
indicated at the outset of these reasons the policy not responding leaves
them in a position where they cannot recover the $99,000 paid by way of
a deposit or retainer to a building company which is now no longer
operating, that is the effect of the operation of the contract they have
signed and the limitations within the statutory insurance scheme available
by the Authority.
-- 5 of 6 --
6
[20] For the reasons set out above the Tribunal affirms the decision of the
Authority under review.
-- 6 of 6 --