Factory Direct Pools Pty Ltd v Queensland Building Services Authority [2013] QCAT 34
CITATION: Factory Direct Pools Pty Ltd v Queensland
Building Services Authority [2013] QCAT 34
PARTIES: Factory Direct Pools Pty Ltd trading as Atlantic
Pools
(Applicant/Appellant)
v
Queensland Building Services Authority
(Respondent)
APPLICATION NUMBER: GAR039-11
MATTER TYPE: General administrative review matters
HEARING DATE: 12 July and 30 August 2012
HEARD AT: Brisbane
DECISION OF: Michelle Howard, Member
DELIVERED ON: 18 January 2013
DELIVERED AT: Brisbane
ORDERS MADE: 1. Direction to Rectify No 35776 issued by
the Queensland Building Services
Authority to Factory Direct Pools Pty Ltd
is set aside and in its place Factory Direct
Pools Pty Ltd is directed to have the
following defective building work
rectified by a licensed contractor(s)
within 28 days:
‘Installation of the fibreglass pool
which has resulted in deflection
outside of allowable tolerances of the
southern wall resulting in possible
damage to the pool shell.’
2. That any application for costs together
with any supporting material and
submissions be filed in the Tribunal and
served on the other party by 4pm on
31 January 2012.
3. That any material and submissions in
response be filed in the Tribunal and
served on the other party by 4pm on
14 February 2013.
4. That any application for costs be heard
on the papers without an oral hearing on
-- 1 of 14 --
2
the basis of the written material and
submissions not before 18 February
2013.
CATCHWORDS: GENERAL ADMINISTRATIVE REVIEW –
review of Queensland Building Services
Authority decision to issue direction to rectify –
where swimming pool installed without a fully-
piped sub-soil drainage system in non-
compliance with the applicable Australian
Standard – where construction defective
irrespective of Australian Standard – where
contractor submits drainage excluded by
contract
Queensland Building Services Authority Act
1991, s 72, schedule 2
Domestic Building Contracts Act 2000, ss 7, 8,
8(4), 44, 93
Statutory Instruments Act 1992, s 7
Briginshaw v Briginshaw (1938) 60 CLR 336
R v His Honour Judge Miller and Builder’s
Registration Board ex parte Graham Evans and
Co (Qld) Pty Ltd [1987] 2 Qd R 446
Chicco v The Corporation of the City of
Woodville (1990) Aust Torts Reporter 81-028
Riddell v Queensland Building Services
Authority [2012] QCAT 226
APPEARANCES and REPRESENTATION (if any):
APPLICANT: Factory Direct Pools Pty Ltd trading as Atlantic
Pools was represented by Mr D Gardiner of
Counsel instructed by Eatons Lawyers
RESPONDENT: Queensland Building Services Authority was
represented by Mr E Bird, In-house Legal
Officer
REASONS FOR DECISION
[1] On 3 February, 2011, the Queensland Building Services Authority (QBSA)
issued Direction to Rectify and/or Complete Number 35776 to Factory
Direct Pools Pty Ltd in respect of a pool at 31 Satinash Street, Narangba.
The direction was to the effect that installation of the pool did not comply
with the Australian Standard (AS) 1839:1994 in that the southern wall of
the pool had deflected out in excess of reasonable tolerances, resulting in
possible damage to the pool shell.
-- 2 of 14 --
3
[2] Factory Direct Pools applied for review of the QBSA decision.
[3] The matter was heard over two days in July and August, 2012.
[4] Mr Stuart Templeton gave evidence for Factory Direct Pools, together with
Mr Colin Stimpson, a pool installer engaged on the project by Factory
Direct Pools; and Mr Karl Aldrich, an engineer, engaged to provide expert
evidence. Some brief oral evidence was given by Mr Kerstang, solicitor
for Factory Direct Pools.
[5] The QBSA relied on evidence from Mr Gary Stick, QBSA inspector;
Mr Robert Hughes, an engineer engaged to give expert evidence; and the
homeowner, Mr Daud. Mr Daud had separately engaged an engineer,
Garry Wenck, to report about the issues with the pool. His report was also
before the Tribunal, as an annexure to Mr Daud’s witness statement,
although Mr Wenck was not called as a witness in the proceeding.
[6] It is not controversial that there is a significant bulge in a wall of the pool
shell. No issue was raised about the wall exceeding reasonable
tolerances. It is common ground that the pool has been paid for in full.
The legal framework for the review
[7] The purpose of a review conducted by the tribunal in its review jurisdiction
is to produce the correct and preferable decision1 following a fresh hearing
on the merits.2 The Tribunal must make its decision according to the
applicable law, and based on the evidence presented to it.3 In effect, the
Tribunal stands in the shoes of the original decision-maker, in this case
the QBSA, and makes the decision anew. The relevant facts must be
established to the reasonable satisfaction of the Tribunal.4
[8] Under s 72 of the Queensland Building Services Authority Act 1991
(QBSA Act), a person who carried out building work may be directed to
rectify or complete building work.5 All circumstances which are reasonably
relevant, including the terms of the contract may be considered in deciding
whether to give a direction.6 Whether or not work is defective or
incomplete is to be ascertained objectively.7 A direction may not be given
if it would be unfair to do so.8
1 Queensland Civil and Administrative Tribunal Act 2009, s 20(1).
2 Queensland Civil and Administrative Tribunal Act 2009, s 20(2).
3 CCYPG v Lister [2011] QCATA 87; Queensland Racing Limited v McMahon [2010]
QCATA 73.
4 Briginshaw v Briginshaw (1938) 60 CLR 336, at 361-362 (per Dixon J); Riddell v
Queensland Building Services Authority [2012] QCAT 226.
5 QBSA Act, s 72(1).
6 QBSA Act, s 72(2).
7 R v His Honour Judge Miller and Builder’s Registration Board ex parte Graham Evans
and Co (Qld) Pty Ltd [1987] 2 Qd R 446, 458.
8 QBSA Act, s 72(14).
-- 3 of 14 --
4
[9] The QBSA ‘Rectification of Building Work’ Policy (the Policy) was
gazetted. It is a statutory instrument by operation of law.9 Therefore, it
must be applied in reaching the correct and preferable decision. It is a
guideline policy which provides that a person who carries out category 1
(defined to include structural defects) or category 2 (defined to include
faulty or unsatisfactory work which does not meet reasonable standards of
construction, but does not fall in to category 1) defective building work
should be required to rectify it unless rectification is an unreasonable
remedy. The Policy acknowledges that all reasonably relevant
circumstances are to be considered in deciding whether to issue a
direction to rectify.
[10] The Policy sets out circumstances for consideration in determining
whether to issue a direction. It specifies that the circumstances might
include delay by the homeowner in notifying the BSA of the defect. It
nominates different time frames for category 1 (more than three months
after the defect became apparent) and category 2 (more than six months
after work was completed or left incomplete or exceeds 7 months, if the
owner notified within 6 months) defects, after which delay might be
relevant.
Australian Standard 1839:1994
[11] The AS specifies standards in relation to ‘Pool Drainage’.10 Drainage is to
be provided around pools to prevent damage from things including
hydrostatic pressure.
[12] Where it is required, the drainage, for a particular site shall include surface
drainage11 to intercept water flowing across the pool site and subsoil
drainage12 except where soil conditions make it irrelevant. Sub-soil
drainage shall provide drainage over the whole of the under pool area
through a free draining bedding material and a drain to direct water from
the under pool system to an outlet pipe vented to atmosphere.
[13] Fully piped sub-soil drainage is to be provided on some sites, including
where the surrounding ground level rises above the normal operating
water level. Where this is required, the invert level of the drain shall be at
a depth below the pool water level to prevent external water pressure
developing.13
[14] Figure 3 in the AS indicates when a pool is below natural ground level and
fully-piped drainage will be required. Essentially, this will occur where a
retaining wall or embankment is present from which the pool structure falls
away, in which case natural ground level is taken from the top of the
retaining wall.
9 Statutory Instruments Act 1992, s 7.
10 Exhibit 11, attachment AS/NZS 1839: 1994, paragraph 7.2.
11 Exhibit 11, attachment AS/NZS 1839: 1994, paragraph 7.2.2(d)(i).
12 Exhibit 11, attachment AS/NZS 1839: 1994, paragraph 7.2.2(d)(ii).
13 Exhibit 11, attachment AS/NZS 1839: 1994, paragraph 7.2.3.
-- 4 of 14 --
5
The contract for the pool
[15] Factory Direct Pools trading as Atlantic Pools entered into a contract to
supply and install the pool with Mr Aleem Daud and Ms Kerry Daud for
$24,990.00. Some additional amounts were paid for excavation and crane
costs over and above the specified price.14
[16] The contract between the parties dated 26 April 2009 has specific
exclusions set out in clause 8. Clause 8 commences with ‘Unless
specifically written (not verbal) as part of this contract, the following items
shall not be attended to by the Pool Supplier and are the exclusive
responsibility of the Client.’
[17] Clause 8 exclusions include ‘(j) landscaping work or landscaping design
plans’ and ‘(p) Removal of underground water or above ground water
using whatever method is deemed by the installer on the site. Such
methods include, but are not limited to, spear pumps, submersible pumps,
machine excavation, manual labour and placement of drainage materials.
See Item 12 for charges.’
[18] Item 12 provides for excavation allowances included in the contract, in this
case $880.00. It further provides that the installer may engage any
machinery he deems necessary to complete construction and that ‘Any
money in excess of the allowance are (sic) to be paid by the client and
must be paid in full at the completion of the excavation..’ Clauses 4(a)
and (d) also acknowledge that excavation costs in addition to those in 4(a)
will be charged to the client at the rate specified in Item 12.
[19] Clause 11 provides for client acknowledgements including in 11(c) that
‘The installation foreman has the clients (sic) authority to use any
additional machinery deemed necessary to install and complete
installation of the swimming pool…’ Clause 11(f) provides that costs in
excess of the allowances made in the contract are payable by the
homeowner.
[20] There is no other provision in the contract about the costs of installing and
placing drainage materials that may be required in the particular pool
installation.
[21] The Domestic Building Contracts Act 2000 applies to the contract, as it is
a contract for domestic building work.15 Section 41 of that Act implies
warranties into every regulated contract, which this contract is.16 These
include a warranty that the work will be done in an appropriate and skilful
way, and with reasonable care and skill.17 Contracting out is prohibited.18
14 Exhibit 14, and especially AD3.
15 Domestic Building Contracts Act 2000, ss 7-8, especially s 8(4).
16 Domestic Building Contracts Act 2000, ss 9, and schedule 2 definition of ‘regulated
amount’.
17 Domestic Building Contracts Act 2000, s 44.
18 Domestic Building Contracts Act 2000, s 93.
-- 5 of 14 --
6
[22] The contract clauses discussed above, and in particular, 8(p) provides for
removal of water from the site and associated drainage materials. It
seems to me that the clause is broad enough to encompass full-piped
subsoil drainage to remove water from the site on an ongoing basis,
where site conditions dictate a requirement for it. Clauses 11 and 12
entitle further excavation costs to be charged by Direct Factory Pools.
The costs of drainage materials are not referred to specifically in those
clauses. Nevertheless, having regard to clauses 8(p), 11(c) and (f), and
12, I consider the proper construction of the contract to provide that where
inadequate allowance has been made for excavation and associated
drainage materials that the homeowner can be charged for it.
[23] That said, it might reasonably be expected that the contract price given to
a homeowner for installation is given after a site assessment. The costs
associated with installing any essential drainage system as may be
required having regard to the site conditions, for example, a fully-piped
sub-soil drainage system, would reasonably be expected to be allowed for
in the price.
The pool, retaining wall and landscaping works
[24] It is not controversial that at the time the pool was constructed it was
contemplated that the retaining wall, which runs along two sides of the
pool, and surface drainage would be installed by a landscaper and it was
subsequently installed.19
[25] Mr Daud acknowledges a separate contract for landscaping with PPR
Landscaping, which as he recalls, was recommended to him by Atlantic
Pools.20 The invoices from PPR Landscaping include the construction of a
retaining wall (including drainage to it), together with a ‘Spoon drain and 5
to 6 drains all connected to stormwater’.21 During construction of the pool,
he says that the pool floated up in the hole after rain. Factory Direct then
brought in another excavator, for which he paid additional costs over and
above the quoted price, for the digging of drainage trenches.22
[26] Mr Templeton has a pool builder’s BSA licence which he has held for
some 10 years. He was the nominee licensee for Factory Direct Pools at
the relevant time. He says that the AS has been complied with. He says
that landscaping was not the responsibility of Factory Direct Pools trading
as Atlantic Pools under the contract with the Dauds. He relies upon
clause 8 of the contract between the parties. Also, a representative of
Factory Direct Pools wrote to the Dauds on 23 July 2009 pointing out that
there is a drainage problem around the pool which it says needs to be
‘addressed immediately’ and ‘water …directed away from your pool area.’
19 Exhibit 2, Exhibit 5, Exhibit 7 and Exhibit 14.
20 Exhibit 14.
21 Exhibit 14, Attachment AD5.
22 Exhibit 14, see especially paragraphs 9-13 and Attachment AD3.
-- 6 of 14 --
7
It suggests engaging a plumber/drainer, and states that Atlantic Pools
cannot accept responsibility for any problems caused by this situation.23
[27] In any event, Mr Templeton says that he dug a trench of some 400 x
400 mm, which has been covered over is not in use and was not visible
during the BSA inspection, and that he scraped back the ground so that it
fell away from the pool, thereby draining water away from the pool. He
says he did not install pipes into it as anything he put in would be
destroyed by the landscaping. He did not discuss fully-piped sub-soil
drainage with the owners as it was ‘not necessary’.24 He says that when
he left the site after construction, there was direct fall from the street end
of the pool, to the street.
[28] He suggests that the problems experienced with the pool have occurred
because of the retaining wall and landscaping works have not provided
adequate drainage. He says that the ground level in front of the pool at
the street end of the pool has been built up, so that it now slopes back in
towards the pool and creates a dam, trapping water around the pool.25
[29] Mr Stimpson also has a BSA licence. He was engaged as the pool
installer on the site by Factory Direct Pools. His evidence is that there
were ‘numerous’26 conversations about drainage with Mr Templeton, but
that they did not discuss fully piped sub-soil drainage or consider it.27
Consistently with Mr Templeton, he asserted that this was the case,
because it was ‘unnecessary’ and would not apply because ‘we had
lowered the ground level all the way around the pool, so subsoil drainage
wouldn’t be an issue.’ Further, he said that ‘it was discussed with Mr
Daud and Mr Templeton that drainage would be taken into account whilst
the landscaping works were being constructed.’28
[30] His knowledge about the AS, with which he professed to be familiar, was
tested.29 He was asked to describe fully-piped sub-soil drainage in the
context of the AS. He was unable to do so comprehensively or
convincingly. The best he could manage was, ‘drainage is to go around
the pool underneath the soil to alleviate water problems.’30 He asserted
he knew what it meant in the context of the AS, but was finding it difficult
to describe without having it in front of him.31
[31] Consistent with the evidence of Mr Templeton and Mr Stimpson, Mr Daud
says that at no time was sub-soil drainage discussed with him.32 He says
that handover of the pool occurred on 13 September 2009. He noticed the
23 Exhibit 4.
24 Oral evidence given when Mr Templeton was recalled as a witness on 30 August 2012,
transcript unavailable.
25 Transcript 12 July 2012, 46-47.
26 Transcript 12 July 2012, pages 89-90.
27 Transcript 12 July 2012, page 89.
28 Transcript 12 July 2012, page 89.
29 Transcript 12 July 2012, pages 88-91.
30 Transcript 12 July 2012, page 90.
31 Transcript 12 July 2012, page 91.
32 Oral evidence in cross-examination on 30 August 2012, transcript not obtained.
-- 7 of 14 --
8
bulge in the pool on 25 July 2010, and reported it to Atlantic Pools the
following day.33 Atlantic Pools’ representatives inspected the pool over
the next 2 months and on 3 October 2010, wrote to him advising that the
issue was not covered by their warranty and suggesting he contact his
household insurer about it.34 After his claim was rejected by his insurer on
26 October 2010, he subsequently complained to the QBSA on
21 December 2010.35
[32] The evidence about the events that occurred of Mr Daud, Mr Templeton
and Mr Stimpson as discussed above is not inconsistent. I accept each as
truthful about those matters discussed, although as will become clear, I do
not accept Mr Templeton’s opinions about why the bulge in the pool has
developed.
The expert evidence about the cause of the ‘bulge’ in the pool wall,
drainage and the AS
[33] Mr Aldrich has been practicing as an engineer for about 10 years.36 He
blames the retaining wall which has subsequently been constructed within
the ‘zone of influence’ surrounding the swimming pool, leading to a larger
than expected amount of stormwater runoff being deposited in the area
where damage to the pool has occurred, instead of being directed away
from the structure.
[34] He considers the retaining wall may be leading to surcharge pressure on
the swimming pool wall. He does not consider that an engineer has
designed the retaining wall, and nor that it was constructed in accordance
with the manufacturer’s requirements37 for the type of wall constructed.
He also says the field gully drain does not appear to be draining to the
street, compounding the problem.
[35] He opines that it was reasonable for Factory Direct Pools to expect
landscaping works to direct water away from the structure. He
recommends removal and reconstruction of the retaining wall and
reshaping of the ground in front of the pool. He described the 400 x
400 mm trench dug by Mr Templeton as sub-soil drainage and an
alternative solution to fully piped sub-soil drainage indicted by Figure 3 of
the AS.38
[36] Mr Hughes is a very experienced engineer who has been consulting about
swimming pools since about 1973/1974, designed and constructed them
and reported on defects many times.39 He opines that as the surrounding
ground level rises well above the normal operating water level of the pool,
to comply with the AS a fully-piped sub-soil drainage system should have
33 Exhibit 14, especially AD 7.
34 Exhibit 14, especially AD 8.
35 Exhibit 1, SOR 5.
36 Transcript 12 July 2012, 94-95.
37 He refers to the Adbri Masonry Segmental Wall Systems Technical Specifications.
38 Oral evidence in cross-examination on 30 August 2012, transcript not obtained.
39 Transcript 12 July 2012, 110 and Exhibit 12.
-- 8 of 14 --
9
been provided. He further says that whether or not surface drainage was
inadequate, it was inevitable that ground water seepage would
substantially saturate the surrounding soil or backfill of the pool.
[37] In his opinion, Figure 3 in the AS, which requires full-piped sub-soil
drainage system below the level of the pool shell,40 applies on the site,
because it applies on sites where the surrounding natural ground level
rises above the operating water level as it does on this site.41 In his
opinion, it has not been complied with.42 He says that, irrespective of
whether or not the retaining wall was in place,43 and irrespective of
whether the sub-soil drainage had been working adequately,44 the
deflection of the pool shell would still have occurred.45 In his view, even if
the AS did not require fully-piped sub-soil drainage, the site required it in
any event and without it the construction is defective.46
[38] In response to questions about whether, if the 400 x 400 mm trench
referred to by Mr Templeton, had it been left in place it would have
constituted fully-piped subsoil drainage, he responded that it was not
subsoil drainage, whether piped or not, and was, because it was ‘at the
surface’, surface drainage.47 He opined that it could not be an adequate
alternative solution to the fully-piped sub-soil drainage required by the AS.
[39] He also rejects the suggestion that a surcharge loading could transfer
from the retaining wall to the pool. He explained that because of the
granular fill, the weight of the retaining wall footings could not reach the
point of the swimming pool where deflection has occurred.48 His report
recommends fully-piped drainage and rectification of surface drainage.
He concludes his report by saying that if the surface and subterranean
drainage work he recommends is installed that the pool would be safe,
and he would not expect structural deterioration. If this drainage is done,
then the bulge (which may or may not be amenable to being pushed out)
reverts to being a cosmetic defect only.49
[40] Although he considers the surface drainage was generally well done,50 he
refers to a blocked or dislodged surface drain which is not working,
allowing water to pond51 which he considers is the home owner’s
responsibility under the contract and which must also be attended to.
[41] If rectification does not occur including installation of sub-soil drainage, he
considers that it is possible that the bulge in the pool wall will increase,
40 AS 1839: 1994 Figure 3 and Transcript 12 July 2012, 117.
41 Transcript 12 July 2012, 112-114.
42 Transcript 12 July 2012, 120.
43 Transcript 12 July 2012, 116.
44 Transcript 12 July 2012, 117.
45 Transcript 12 July 2012, 117-118.
46 Transcript 12 July 2012, 114.
47 Transcript 12 July 2012, 118-119.
48 Transcript 12 July 2012, 115.
49 Exhibit 11, paragraph 6.4.
50 Oral evidence in cross-examination on 30 August 2012, transcript not available.
51 Exhibit 11 and Transcript 12 July 2012, 116.
-- 9 of 14 --
10
and that the pool wall might crack where it meets the floor, as he has seen
occur in another pool.52 He estimates the cost of rectification by installing
the fully-piped sub-soil drainage from hundreds of dollars to several
thousand dollars and considers that it is practical to do.53
[42] The recommendations of Mr Wenck broadly coincide with views proposed
by Mr Hughes, and include installation of a permanent piped drainage
system. Although Mr Hughes disagrees with his suggestion that water
may percolate through rock,54 he opined that the conclusions of Mr Wenck
are sound.55
[43] Mr Aldridge considers the proposed rectification impractical, and
estimated it may cost some $5,000.00 to $10,000.00 or if done with a
rock-saw, maybe $20,000.00.56 It is worth noting at this point that
Mr Templeton gave evidence that he considered full-piped sub-soil
drainage as described by Mr Hughes ‘utterly impracticable’ and the
financial burden on customers too great, asserting that was why he dug
the 400 x 400 trench.57 He thought the costs would be $3,000.00-
$5,000.00 plus an operator, likely totalling about $10,000.00.58
[44] In relation to the Australian Standards generally, Mr Hughes says that they
are produced by industry bodies with expertise. Acknowledging that
some, including AS 1839:1994, are not mandatory, he says they represent
the distillation of knowledge in an area.59
[45] I consider Mr Hughes’ evidence was compelling. He has considerable
experience of swimming pools and the problems that may arise over
almost 40 years of practice. He also had impressive knowledge of the AS
and gave his evidence in a coherent, straightforward manner. His
conclusions are consistent with those of another engineer, Mr Wenck,
which is also reassuring.
[46] Mr Aldridge, on the other hand was considerably less experienced, having
been an engineer for about 10 years, and gave his evidence in a more
qualified and apparently changeable way, suggesting that he agrees with
Mr Hughes in relation to some matters when their evidence is quite at
odds in many important respects. With one qualification, where the two
disagree, I accept Mr Hughes’ evidence.
[47] In relation to the costs of the rectification as suggested by Mr Hughes, he
had not costed the work and his expressed view was an off-the-cuff
estimate. The same can be said of the estimates given by Mr Aldridge
52 Transcript 12 July 2012, 119-120.
53 Oral evidence in cross-examination on 30 August 2012, transcript not available.
54 Oral evidence in cross-examination on 30 August 2012, transcript not obtained.
Mr Hughes opines that the rocky ground at Satinash Street is relatively impervious.
55 Oral evidence in cross-examination on 30 August 2012, transcript not obtained.
56 Oral evidence in cross-examination on 30 August 2012, transcript not available.
57 Oral evidence in cross-examination on 30 August 2012, transcript not obtained.
58 Oral evidence in cross-examination on 30 August 2012, transcript not obtained.
59 Oral evidence in cross-examination on 30 August 2012, transcript not obtained.
-- 10 of 14 --
11
and Mr Templeton. I do not make any finding about the costs of the
proposed rectification. Suffice it to say, that there are a variety of
estimates which range from several hundred to $20,000.00 dollars.
Is the pool construction defective?
[48] Factory Direct submits that the contract was not a stand-alone contract for
a pool, as it was being done in tandem with landscaping works, which
were the subject of a separate contract. It submits, and I accept, that the
responsibility for connecting ‘surface drainage’ lay with the owner or the
landscaper. It further contends that when it left the site, the pool coping
was above ground level but that ground level is now below the level of the
coping.
[49] However, I do not accept that was the case, because the ground level
Factory Direct Pools refers to is not natural ground level and ignores the
surrounding natural ground level. Photographs before the Tribunal clearly
support Mr Hughes’ evidence that natural ground level was considerably
higher. Hence the need for a retaining wall. Having accepted Mr Hughes
evidence, I am satisfied that the surrounding natural ground level is well
above the normal operating level of the pool, and it is this level which is
relevant. Natural ground level has not changed.
[50] Factory Direct Pools says that the need for a fully piped sub-soil drainage
system under the AS only arose because of the works subsequently done
by the homeowner and the landscaper. Again, on the basis of Mr Hughes’
evidence, I do not accept this is so. Site conditions required installation of
fully-piped sub-soil drainage.
[51] Factory Direct Pools submit that the AS has no legislative force, that
nothing prohibits contracting out of it and the landscaper was to provide
the drainage. It relies on the decision in Chicco v The Corporation of the
City of Woodville,60 a personal injuries case in which members of the
Court remarked that the Australian Standard referred to in that proceeding
was a hearsay expression of opinion61 and did not have legal force, at all62
or in the context of the case.63 While acknowledging that it does not have
legislative force, the QBSA says that the AS, which embodies expert
opinion on the subject matter, should be applied and was not complied
with.
[52] While the contract for the pool does not include surface drainage, and
there is no controversy that the landscaper was to attend to surface
drainage, there can not be, and in any event, has not been, a contracting
out of the implied warranties in the Domestic Building Contracts Act 2000.
These warranties include that the work will be done in an appropriate and
skilful way.64 I accept that the construction is defective, because having
60 (1990) Aust Torts Reporter 81-028.
61 (1990) Aust Torts Reporter 81-028, per Cox J at 67,895.
62 (1990) Aust Torts Reporter 81-028, per Millhouse J at 67,897.
63 (1990) Aust Torts Reporter 81-028, per King CJ at 67,895.
64 Section 44.
-- 11 of 14 --
12
regard to the site conditions a fully-piped subsoil drainage system, or other
suitable engineering solution, was required but was not installed at the
time of the construction of the pool.
[53] The AS has not been imported into law, but embodies expert views about
competent practice. While failure to comply with it may not result in a
breach of a legal requirement of the installer, it may indicate that
construction was not undertaken in an appropriate and skilful way, unless
an alternative engineering solution was employed in the particular
circumstances. Again, on the basis of Mr Hughes evidence that no
adequate alternative engineering solution was employed, therefore I am
satisfied that the pool was not constructed in an appropriate and skilful
way, which has resulted in a defect, namely the bulge in the pool.
[54] Neither Mr Templeton nor Mr Stimpson recognised and accounted for the
circumstances of the site when installing the pool at Satinash Street.
I accept that had they done so and complied with the AS, it would not
have failed as it has, resulting in the bulge.
Should I exercise the discretion to issue a direction to rectify?
[55] The QBSA submits that there are no discretionary factors which militate
against issuing the direction to rectify. It submits that its decision should
be confirmed requiring rectification of this defect which it considers a
category 1 defect because of the risk identified by Mr Hughes of the pool
wall splitting.
[56] Factory Direct Pools argues that it is a cosmetic defect only on the basis
of comments of Mr Hughes in his report, where reference is made to a
‘cosmetic defect’, and that it is therefore a category 2 defect.
Category 1 or category 2 defect?
[57] Under the Policy, Category 1 defects are defects which are structural, and
category 2 defects are not structural. Mr Hughes’ reference in his written
report to a ‘cosmetic defect’ must be considered in the context of his
report and oral evidence.
[58] His report is clear that the defect would only revert to being ‘cosmetic’
once the subterranean drainage has been installed.65 In oral evidence, he
spoke of a present risk of the pool wall splitting. Accepting this evidence,
I am satisfied that the defect is a category 1 structural defect.
Delay
[59] The Policy suggests that delay might be relevant if the homeowner did not
notify the QBSA of a category 1 defect within 3 months of its becoming
evident. Mr Daud notified Factory Direct Pools immediately on
discovering the bulge. They took from 26 July until 3 October 2010, and
various inspections to inform him that they did not accept liability and
65 Exhibit 11, paragraph 6.4.
-- 12 of 14 --
13
suggest he claim on his household insurance. That claim process then
occurred over October and was rejected in late October 2010. Mr Daud
then made a complaint to the BSA on 21 December 2010.
[60] The reasons for the delay in complaining to the QBSA after Factory Direct
Pools denied responsibility, and after the rejection of the insurance claim
was received are not explained. However, I do not think that delay, of less
than 2 months, is of consequence in the circumstances of this matter. Mr
Daud took immediate steps to notify Atlantic Pools, who have therefore
been on notice of the problem from the time of its appearance. There is
no evidence to suggest that they have been prejudiced in any way by the
delay in the complaint ultimately being made to the QBSA.
[61] In light of the serious structural nature of the defect, and the failure by
Factory Direct Pools to construct the pool in an appropriate and skilful
manner, I do not consider that the brief delay in the complaint being made
to the QBSA militates against the making of a direction to rectify.
The circumstances and the contract between the parties
[62] Installation of the subterranean drainage at the time of construction, when
the area in which it must be inserted was more readily accessible than it is
now, may likely have been considerably less expensive. Although it
appears the homeowner was not charged for the necessary sub-soil
drainage because it was not recognised as necessary, he was charged
additional costs for surface drainage (following the floatation of the pool
shell after rain) which I accept on the basis of Mr Hughes’ evidence was
inadequate for the site.
[63] This is not a case where the homeowners refused to accept the advice of
the builder to install the required drainage. Installing the appropriate sub-
soil-drainage was not raised with or recommended to them. Indeed, the
failure by Factory Direct Pools to construct the pool in an appropriate and
skilful way contrary to the warranties implied into the contract from the
operation of the DBCA, weigh in favour of exercising the discretion to
issue a direction.
[64] There are no circumstances related to the contract or terms of the contract
which in my view weigh against issuing a direction to rectify.
Is rectification an unreasonable remedy?
[65] If the rectification is not done, there may be very serious consequences
resulting from the risk of the pool shell splitting.
[66] Mr Templeton considers Mr Hughes’ suggested remedy to be ‘utterly
impracticable’. This statement is based on the cost of it. There is
significant variation in the likely costs as suggested by Mr Hughes,
Mr Aldridge and Mr Templeton. Despite this variation, the evidence of Mr
Hughes, Mr Aldridge and Mr Templeton each confirms that rectification
can be done, although the costs may not be insignificant.
-- 13 of 14 --
14
[67] On the evidence before me I accept that rectification is reasonable, and
indeed necessary, to avoid further damage to the pool. The cost is
uncertain but I do not consider that this uncertainty makes rectification
unreasonable.
[68] I am satisfied that it is appropriate to exercise the discretion to issue a
direction to rectify. It remains for me to consider whether the direction to
rectify should be in the terms issued by the QBSA. In my view the
direction made by the QBSA should be set aside, and a substituted
direction issued requiring rectification because the pool is defective, rather
than because it is non-compliant with the AS. Orders are made
accordingly.
-- 14 of 14 --