Edwards v Central Highlands Regional Council [2013] QPEC 16 (2013) QPELR 469
PLANNING & ENVIRONMENT COURT
OF QUEENSLAND
CITATION: Edwards v Central Highlands Regional Council [2013]
QPEC 16
PARTIES: KIM MAREE EDWARDS
(Appellant)
And
CENTRAL HIGHLANDS REGIONAL COUNCIL
(Respondent)
FILE NO/S: 3914 / 2012
DIVISION: Planning and Environment Court.
PROCEEDING: Hearing of an appeal.
ORIGINATING
COURT: Planning and Environment Court of Queensland, Brisbane.
DELIVERED ON: 28 May 2013
DELIVERED AT: Brisbane.
HEARING DATE: 22, 24 and 26 April 2013
JUDGE: R S Jones DCJ
ORDER: 1. I would allow the appeal subject to the imposition of
appropriate conditions;
2. The appeal is adjourned for one month to allow the
parties to consider an appropriate conditions package.
CATCHWORDS: APPEAL – Appeal against respondents decision refusing
appellants application for a development permit for a material
change of use – Land located in rural residential subdivision
– Land located in Town Zone – Rural Residential Precinct –
Land used for residential purposes and storage and supply of
building materials – Whether use of land conflicts with the
respondents town planning scheme – Whether, in the event
that there was conflict with the planning scheme, sufficient
grounds existed to warrant approval despite the conflict –
Whether noise emanating from the site was capable of being
dealt with by appropriate conditions.
Sustainable Planning Act 2009 Qld
AAD Design Pty Ltd v Brisbane City Council [2012] QCA 44
-- 1 of 23 --
2
Arpedco Pty Ltd v Beaudesert Shire Council [1980] Qd R 88
Broad v Brisbane City Council & Anor[1986] 2 Qd R 317
Brown v Brisbane City Council [2005] QPELR 629
Lewiac Pty Ltd & Anor v Gold Coast City Council & Ors
[2002] QPEC 080
Luke & Ors v Maroorchy Shire Council & Anor [2003]
QPELR 447
Pinjarra Hills & Ors v Brisbane City Council [1995] QPLR
334
Project Blue Sky Inc v Australian Broadcasting Authority
(1998) 194 CLR 355
Webster v Caboolture Shire Council [2009] QPELR 455
Weightman v Gold Coast City Council [2003] Qd R 441
Westfield Management Ltd v Pine River Shire Council and
Anor [2004] QPELR 337
Woolworths Ltd v Maryborough Shire City Council (No. 2)
[2006] 1 Qd R 273
COUNSEL: Mr S Fynes-Clinton for the Appellant.
Mr S Ure for the Respondent.
SOLICITORS: Herbert Geer Lawyers for the Appellant.
King and Co Solicitors for the Respondent.
[1] This proceeding was concerned with an appeal against the decision of the
respondent (Central Highland Regional Council) to refuse the appellant‟s (Ms
Edwards) development application for a material change of use for a bulk store
(building materials). For the reasons set out below:
1. I would allow the appeal subject to the imposition of appropriate conditions;
2. The appeal is adjourned to allow the parties to consider an appropriate
conditions package.
Background
[2] The subject land, described as Lot 2 on RP855957, is located at 8 Campbell Ford
Drive, Emerald. The site is 4061m2 in area and has an extensive frontage to
Campbell Ford Drive of approximately 100m and a side boundary of approximately
40m to Elm Street. Elm Street provides access from Campbell Ford Drive to a rural
residential subdivision of which the subject is a part.
[3] Campbell Ford Drive connects two significant roads, the Gregory Highway to the
east and Riffle Range Road to the west, and carries among the usual suburban and
-- 2 of 23 --
3
commercial traffic, a significant number of heavier commercial and industrial
vehicles associated with Emerald‟s rural and mining activities. Notwithstanding
this strong commercial/industrial influence, Campbell Ford Drive is not subject to
particularly heavy traffic flows. Another interesting feature of this road is that
towards its western end, it has a water pump facility used to fill large water tankers.
And, on the southern side of the road, immediately adjacent to the subject site there
is an unofficial miners pickup and drop off point. As I understand this situation,
miners park their private vehicles on the footpath area in front of the subject and are
then picked up and taken to various mining sites and then returned later in the day
or at the end of their respective shifts.
[4] Constructed on the land is a large house, swimming pool, gardens and a 378m2
shed.
[5] The use of the shed lies at the heart of this controversy. It is located towards the
western end of the site away from the dwelling. It was not in dispute that it is a
lawfully constructed class 10 non-habitable outbuilding associated with the
dwelling house. There is also no issue about the size, location or appearance of the
shed itself. This appeal was concerned solely about the use to which it may be put
and, as a consequence, the shed will remain regardless of the outcome of the appeal.
Further, as at the time of the hearing of the appeal, the shed was being used by the
appellant for both private and commercial purposes. However, in the event that the
appeal was successful, the whole of the shed and its surrounding curtilage could be
used for commercial purposes.
[6] The shed was described by the “noise experts” retained by the parties in the
following terms:1
“The bulk store building serves the dual functions of (i) the provision
of storage for the Appellant‟s building materials and under-cover
storage/shelter for the Appellant‟s forklifts as well as (ii) the
provision of storage for the household effects of the Appellant‟s
family. The bulk store building has been partitioned internally to
divide the building into separate spaces to allow these storage
functions to be carried out in isolation from each other. For the
purposes of drawing a distinction between these functions, the
building materials and forklift storage function is referred to
hereafter as the commercial storage function, while the storage of
household effects as referred to as the private storage function. …”
[7] The commercial use of the shed involves:
1. The receipt, storage, and distribution of building materials associated with
the building business operated by the appellant and her husband. Such
materials include tiles, doors, underlay/carpet, lighting, shelving, timber
joinery and other hardware items;
2. The building materials are delivered by various suppliers once a week
(usually on Thursday) in respect of timber products and less frequently for
1 Exhibit 1, volume 1, D3, page 231; Mr Brown for the Appellant and Mr Savery for the Respondent.
-- 3 of 23 --
4
other materials, which are delivered to replace items as they are used in the
construction of homes;
3. From time to time but not infrequently, larger items including stacks of
timber will be stored on the ground surrounding the shed, typically to the
front of the shed;
4. An employee of the appellant attends the site as required to manage the
arrival, unloading and loading of materials;
5. The loading and unloading of materials from time to time requires the use of
a forklift. Two forklifts are kept on the site for that purpose.
[8] Up until recently, other commercial activities were carried out in and around the
shed. These included joinery and the manufacturing of gates. These activities
required the use of equipment such as cutting machinery, power saws, angle
grinders and a compressor. According to the appellant, those activities no longer
take place within the shed and the equipment required to carry them out are in the
process of being sold and/or otherwise removed from the site.
[9] The shed is located behind a solid fence and gates. However, it would be able to be
seen by passers by on many occasions when the gates are open for business
purposes.2
Some characteristics of the site
[10] Reference has already been made to the site‟s extensive frontage to Campbell Ford
Drive and the nature of the traffic on that road. Immediately to the east, on the other
side of Elm Street, is a light industrial development. Activities carried out within
this area include a motor vehicle modification workshop, a supplier of hydraulic
hoses and fittings, a farm equipment and motorcycle supplier, a manufacturer of
packaging, a rental car company, and an interstate trucking company.3 Immediately
to the south of the industrial estate, fronting the Gregory Highway, is a large Motel.
Between the motel and Elm Street is a larger house constructed on a rural residential
allotment. Immediately to the south and west of the site is one rural residential
dwelling and a large drainage area which extends to the west for several hundred
metres until it reaches more residential development. The drainage area is owned
and controlled by the respondent and is unlikely to be developed into the
foreseeable future. To the south of the drainage area is a rural residential sub-
division of a fairly high standard, although, on some blocks commercial activities
inconsistent with the respondents planning scheme are clearly taking place. More
will be said about this issue below. To the north of the subject site, on the opposite
side of Campbell Ford Drive, is a traditional residential sub-division, its access,
Crinum Crescent, is almost directly opposite the shed in question. The subject site
and the site to the immediate south are the only rural residential lots north of the
drainage area and, as already referred to, the subject is the only rural residential Lot
fronting Campbell Ford Drive.4 The site was describe by Mr Fynes-Clinton,
counsel for the appellant, as a rural residential “ugly duckling”.
2 Exhibits 12 and 13.
3 Exhibit 1, volume 1, D3, paragraph 12, Noise experts joint report.
4 Exhibit 1, volume 1, page 222; Exhibit 4 figure 3.
-- 4 of 23 --
5
The application and grounds for refusal
[11] The use of the shed has been the subject of enforcement proceedings brought by the
respondent and a prior development application lodged by the appellant. On or
about 24 April 2012, the appellant lodged the subject development application with
the respondent. The application required impact assessment and accordingly was
publicly notified.5 No adverse submissions were received by the respondent. By
decision notice dated 24 August 2012, the respondent refused the application. The
reasons for the refusal set out in that notice were6:
“1. The development compromises the achievement of Desired
Environmental Outcome (a) of the Emerald Shire Planning
Council Planning Scheme (Amendment 2 – 2011). The
development will set an undesirable precedent, encouraging
industrial activities to occupy rural residential land and shall
negatively impact upon the rural residential amenity and
character of the locality.
2. The proposed development is inconsistent with the overall
outcomes of the Town Zone code. The codes (sic) overall
outcomes states uses in the commercial and industrial use
class are generally not located within the Town - Rural
Residential Precinct and the land is predominantly used for
houses on small rural living lots. The proposal is considered
to be an over development of the site.
3. The proposal to locate industrial uses outside the existing
industrial areas shall have a negative economic impact upon
emerald‟s industrial areas and shall set an undesirable
precedent encouraging industrial development to occur
within Emerald‟s rural residential areas.
4. The council have received a number of complaints from the
Community in relation to industrial and commercial
business operating form residential and rural residential
areas in Emerald. The proposed development would set an
undesirable precedent for other business providers to operate
within residential and rural residential areas.
5. The Council has approved a number of industrial
subdivisions which provide new industrial allotments
serviced with water and sewer truck infrastructures to meet
the market demand.
6. The development will generate negative externalities which
will impact upon the amenity of the existing precinct.”
5 Enforcement proceedings on foot were adjourned pending the outcome of this appeal.
6 Exhibit 1, volume 1, A1, pages 2-3.
-- 5 of 23 --
6
[12] On 4 February 2013, the respondent‟s solicitors wrote to the appellant‟s solicitors
advising as follows7:
“… . In addition to the issues notified in paragraphs 8, 9 and 10 of
the notice of appeal, Council notifies the following issues:
1. The proposed development is in conflict with the IPA
Planning Scheme (Amendment No. 2) for the Shire of
Emerald in force from December 2011, in that –
(a) it involves the location of an industrial use in a
residential area;
(b) it conflicts with desired environmental outcomes (a),
(f), (n), (o) and (s);
(c) it conflicts with overall outcomes 3, 4 and 5 of the
Town Zone;
(d) it conflicts with overall outcomes 6(i) – (i), (ii), (iii)
and (ix) of the Town – Rural Residential Precinct;
(e) it conflicts with specific outcomes S2, S3, S4, S5,
S6, S7 and S9 of the Town Zone Code;
(f) it conflicts with overall outcome (a), (c) and (g) of
the Development Standards Code; and
(g) it conflicts with specific outcomes S2, S3, S5, S6,
S7, S17 and S18 of the Development Standards
Code.
2. There are no sufficient grounds to overcome the conflicts.
3. The proposed development will have unacceptable visual
amenity impacts on the residents of the residential area to
the north of Campbell Ford Drive.
4. The proposed development will have unacceptable amenity
impacts in terms of noise. The industrial activities
associated with the use of the proposed bulk store (building
materials) will result in noise of a level and character that
will adversely impact upon the amenity of the rural
residential area to the south of Campbell Ford Drive and the
residential area to the north of Campbell Ford Drive. The
activities will result in noise that is out of character with the
noise environment of those areas.”
[13] By a way of further and better particulars filed on 12 March 2013, it was contended
on behalf of the appellant that, in the event that there was conflict with the
respondents planning scheme (which was denied), then there were sufficient
grounds to approve the proposal despite the conflict. Those grounds included8:
“(i) The location of such a small operation in a light industrial
precinct or industrial precinct would be contrary to the public
interest because it would result in an underutilisation of
industrial land. And, accordingly, to allow the use to
7 Exhibit 1, volume 1, C1, page 204.
8 Exhibit 1, volume 1, A4, pages 9-10.
-- 6 of 23 --
7
continue on the subject site preserves industrial land for more
appropriate uses;
(ii) The proximity of the subject land to land already designated
for light industrial uses;
(iii) The commercial use of the shed was so modest as to amount
to little more than a home based business;
(iv) The existing use „preserves rather than conflicts with the
residential character of the Rural Residential Precinct‟; and
(v) The existing use „does not result in any adverse impacts on
residential amenity‟.”
The Issues
[14] The substantive issues raised during the conduct of the appeal were:
(i) Was the proposed use in conflict with the respondent‟s
planning scheme;
(ii) If so, whether there were sufficient grounds to justify
approval despite the conflict;
(iii) In the event that the proposal was found not to be in conflict
with the planning scheme, should the proposal be approved
on a merits assessment basis.
[15] In the event that there was conflict with the planning scheme, I am satisfied that the
appellant could not succeed on the basis of there being sufficient grounds. As much
as was really conceded (quite properly, in my view) by Mr Fynes-Clinton.
Mr Fynes-Clinton, in the appellant‟s opening, acknowledged that in the event that
conflict was found the appellant would have real difficulties in satisfying me that
the appeal ought be allowed. In the appellant‟s final written submissions it was
said:9
“Nothing in the oral evidence has changed the position,
foreshadowed in the opening, that the appellant cannot identify
sufficient grounds to warrant approval if it were the case that a
decision to approve would be in substantial and material conflict
with the planning scheme. If that is to be characterised as a
„concession‟, so be it.”
[16] As a consequence of the joint expert reporting process the substantive issues centred
around the impact on the amenity of the surrounding rural residential and residential
development and, in particular, visual amenity and noise. According to the
respondent, contrary to its planning scheme, the proposed use would present both
visually and audibly as an industrial use within a rural residential area.
[17] In appeals such as this, the appellant bears the onus of satisfying the court that the
appeal ought be allowed.10
9 At paragraph 94.
10 Section 493(1) Sustainable Planning Act (2009).
-- 7 of 23 --
8
The planning scheme
[18] The relevant planning scheme is the Shire of Emerald Planning Scheme forming
part of the pre-amalgamation planning schemes administered by the respondent.
Essentially, the scheme divides the respondent‟s area of responsibility into six
zones: rural, open space, town, village, green fields and special industrial.11 The
urban area of the town of Emerald is contained wholly within the Town Zone.12
Within the Town Zone there are then a number of prescribed precincts which,
generally speaking, identify a number of uses including commercial, industrial,
residential and various public uses.13 The subject site, as already pointed out, is
contained within the Town Zone – Rural Residential Precinct.
[19] The land to the immediate east is contained in the Light Industrial Precinct. The
land to the south within the Rural Residential Precinct and to the north within the
Residential Precinct.
[20] The level of assessment for development for material change of use in the Rural
Residential Precinct is established by Table 4.3.1 of the planning scheme. It is
uncontroversial that the proposed use would fall within the definition of “bulk
store” under the planning scheme.14
[21] Section 4.3.2 of the Planning Scheme relevantly provides15:
“…
(2) The Purpose of the Town Zone Code
…
3. The Precincts each perform a different function within
the Town Zone and represent distinct areas or groupings
of compatible land uses;
4. The availability of land, the amenity, and the operational
needs of different uses in each Precinct are not
compromised by the inclusion or encroachment of
inappropriate development;
5. Land on the boundaries on each of the Precincts is of a
nature, design and appearance that respects the scale and
nature of uses in the adjoining Precinct;
6. The overall outcomes specific to each of the Precincts
within the Town Zone listed below are achieved;
…
(i) The overall outcomes sought for the Town – Rural
Residential Precinct are:
11 Exhibit 1, volume 2, E1, page 377.
12 Exhibit 1, volume 2, Appendix 1, page 633, Town of Emerald Town Planning Scheme Zoning Map
No. 2.
13 Exhibit 1, volume 2, E1, page 439.
14 Exhibit 1, volume 2, E1, page 391 - “bulk store” means any premises used for the bulk storage of
goods, where the goods stored or to be stored, are not required to be used for another use located on
the same site and does not include a warehouse. The term includes storage sheds not ancillary to a
primary use of any premises.
15 Exhibit 1, volume 1, E1, pages 448-452.
-- 8 of 23 --
9
(i) Land is predominantly used for houses on
small rural living lots, yet provided with
appropriate urban services;
(ii) Low population densities in the Precinct
means that people enjoy a rural lifestyle
with accessibility to community facilities;
(iii) The nature of the land within the Precinct is
essentially residential and therefore the size
and scope of rural activities is limited;
(iv) Uses such as animal husbandry, hobby farm
cropping and agriculture are of a scale that do
not result in adverse impacts upon residential
amenity;
…
(ix) Uses in the Commercial and Industrial Use
Classes are generally not located on land
within the Precinct. …” (emphasis added)
[22] On behalf of the respondent, it was submitted that, in particular, the amenity of
residential uses within the Precinct would be compromised by the inclusion or
encouragement of inappropriate development.16 The nature of the use did not
respect the scale and nature of the uses in the adjoining residential Precinct.17 The
size and scope of the activities would adversely impact on residential amenity.18
[23] After referring to various provisions of the planning scheme, the respondent‟s
position was articulated in its written outline of submissions:19
“The subject use will present as an industrial use. Timber will be
delivered to the site on a weekly basis by a large industrial truck.
This will result in noise impacts which will be audible and
identifiable in the rural residential precinct to the south and the
residential precinct to the north. The noise will include air brake
release, engine noise and reversing beepers. The vehicle will reverse
out of the subject premises onto Campbell Ford Road prior to its
departure.
Whilst the vehicle is present at the site a forklift will unload the
timber from the delivery truck. The photographs reveal that when
this occurs, the truck is in the driveway.
There will be audible and identifiable noise from the forklift
including its engine noise, impact noise from the unloading and its
reversing beepers whether those beepers be tonal reversing beepers
or broadband reversing beepers.
Deliveries of building materials other than timber will also take
place. This will result in arrival and departure of other building
16 Respondent‟s submission, page 6 at section 4.3.2.(2).
17 Respondent‟s submission, page 6 at section 4.3.2(2)5.
18 Respondent‟s submission, page 6 at section 4.3.2(2)6(i).
19 Respondent‟s submission, page 7 at paragraphs 21 – 26, and page 9 at paragraph 34.
-- 9 of 23 --
10
construction vehicles and noise associated with the loading and
unloading of those vehicles.
On some five or six occasions per day the timber which is being
unloaded from the delivery truck and other building construction
materials will be loaded onto the appellant‟s vehicles and distributed
to the various work sites.
Whilst it is true that the mere fact that a use is characterised as
commercial or industrial does not necessarily result in a conflict with
the Planning Scheme having regard to the amenity impacts generated
by the proposed use here, there is conflict which is significant.
…
The subject land is singularly inappropriate for an industrial use. It
is on the border of a rural residential precinct and is immediately
adjoined by a rural residential development to the south and there is a
residential precinct on the other side of Campbell Ford Drive. The
site is just marginally above the minimum area of 4,000m2 which is
contemplated in the rural residential precinct. It sits at the gateway
to the residential precinct so all vehicles entering and leaving the
residential precinct pass the subject land. In fact, whilst leaving the
residential precinct, all residents directly face the industrial use
component of the subject land whilst they are preparing to enter
Campbell Ford Drive.”
[24] It was uncontroversial that the planning scheme must be construed as a whole and in
a broad, practical and common sense way which best achieves the apparent purpose
and objects of the scheme.20 This approach was articulated by Wilson DCJ (as he
then was) in Luke & Ors v Maroorchy Shire Council & Anor21in the following
terms:
“… The proper method of construction is that adopted in the authorities set
out above, involving identification of those parts of the planning scheme
which are germane to the issues in the case, and their consideration to
discern the tenor of the scheme, as a whole; and, by that process, to
discover whether or not the proposed development accords with the
scheme.”
Noise
[25] The main areas of concern for the noise experts, Mr Brown for the appellant and Mr
Savery for the respondent, were associated with the use of vehicles, including
forklifts, on and adjacent to the subject land. These included engine and breaking
noises and in particular, those associated with reversing alarms.
20 Arpedco Pty Ltd v Beaudesert Shire Council (1980) QDR 88 at 94 per Dunn J; Westfield
Management Ltd v Pine Rivers Shire Council and Anor [2004] QPELR 337 at page 343.
21 [2003] QPELR 447, at paragraph 60.
-- 10 of 23 --
11
[26] Mr Brown and Mr Savery initially seemed to agree that noise related issues would
not of themselves be sufficient to warrant refusal of the application as they could be
dealt with by the imposition of appropriate conditions. However, there was some
dispute about the details of some of the conditions that would need to be imposed in
the event of the appeal being upheld.22
[27] The proposed conditions dealt with matters including23:
(i) Permitted hours of operation of the business;
(ii) Operation or constraints on site (other than vehicle activity);
(iii) Reversing alarm noise;
(iv) Upgrading of driveway;
(v) Vehicle activity on the site; and
(vi) Implementation of a Noise Management Plan.
[28] Mr Brown and Mr Savery were in agreement in respect of how those issues
identified in (ii), (iv) and (vi) were to be dealt with. The level of dispute between
them concerning (i), (iii) and (v) was summarised in their joint report and really
centred around access to the site, the undertaking of commercial activities on
Saturdays, access under emergency situations and the use of forklifts. (Condition 1:
permitted hours of operation of the bulk store). Whether broadband reversing
alarms were mandatory for all vehicles associated with the commercial activities on
the site. (Noise condition 3: audible reversing alarms). And whether specific
conditions constraining the reversing of the vehicles onto and from the site were
necessary. (Noise condition 5: vehicle activity on the site).24 In respect of the last
matter, Mr Brown acknowledged that constraints on reversing would be likely to be
beneficial from a safety point of view but were not warranted from an acoustic point
of view.
[29] At one stage during his oral evidence Mr Savery expressed a view to the effect that
unless all vehicles associated with the site were required to be fitted with broadband
reversing alarms, the application should be refused because of the impact on
amenity. The imposition of such a condition would mean that the appellant would
have to require all delivery vehicles operated by various suppliers to be fitted with
broadband reversing beepers. Such a condition would be virtually impossible to
implement and police. In any event, I do not accept this aspect of Mr Savery‟s
evidence. The number of deliveries made by vehicles not fitted with broadband
reversing beepers could be expected to be relatively infrequent. And, in this
context, the nature of the traffic (albeit relatively at low levels) on Campbell Ford
Road and the industrial activities carried out on the industrial site on the other side
of Elm Street are relevant considerations.
[30] However, that the noise issues associated with the proposed use may be able to be
dealt with at a “technical” level is not the end of the matter. In this context, I accept
Mr Savery‟s evidence to the effect that even with appropriate conditions and the
best of intentions on the part of the appellant, some local residents would still be
22 Exhibit 1, volume 1, D3, pages 225-245.
23 Exhibit 1, volume 1, D3, pages 240-243.
24 Exhibit 1, volume 1, D3, pages 240-243.
-- 11 of 23 --
12
able to hear and be potentially annoyed by noise (particularly reversing alarms)
emanating from the site. In this context I respectfully agree with the observations of
de Jersey J (as he then was) in Broad v Brisbane City Council & Anor:25
“There is no doubt that the concept of amenity is wide and
flexible. In my view it may in a particular case embrace not
only the affect of a place on the senses, but also the resident‟s
subjective perception of his locality. Knowing the use to
which a particular site is or may be put, may affect ones
perception of amenity.
…
In deciding what are the reasonable perceptions of amenity of
the residents I am conscious that I must apply „the standards of
comfort and enjoyment which are to be expected by ordinary
people of plain sober and simple notions not affected by some
special sensitivity or eccentricity”
Evidence of the town planners
[31] It is quite clear from Mr Buckley‟s (town planner relied on by the appellant) written
and oral evidence that he considered the coexistence of the dwelling on the land and
the subject shed to be a significant consideration. In the town planners joint report
he referred to there being a strong link between the residential component of the site
and the use of the shed and pointed out that Rural Residential Zoned land catered
for home based activities.26 This theme is repeated in his court report where Mr
Buckley stated “The planning scheme must have anticipated that there would be
businesses that would be based in association with a residence… .”27
[32] According to Mr Buckley, the relationship between the house and the shed and its
use was an integral part of the planning merits of the subject application.28 Indeed,
the coexistence of the shed and the dwelling on the land was fundamental to his
approach.29
[33] With all due respect to Mr Buckley, I have significant reservations about his
approach. The proposed use cannot in any sensible way be described as a home
based business for the purpose of the planning scheme. It does not involve a
commercial activity, occupation or profession carried out in or on the same site as a
dwelling by any permanent resident of that dwelling. The appellant and her
husband do not live in the dwelling located on the land. They moved to a larger and
quieter rural residential allotment somewhere else in the vicinity. The resultant
situation is: the appellant lives elsewhere, the head office of the business is located
in the town of Emerald, the shed on the land will remain in the ownership and be
operated by the appellant but the house will probably be rented to a third party.
25 [1986] 2 Qd R 317, on page 326 at lines 37 – 41.
26 Exhibit 1, Volume 1, D4, at pages 252 - 253, paragraphs 28 and 29.
27 Exhibit 1, Volume 1, D5, at page 289, at paragraph 21.
28 T 1-65: L 27-30.
29 T 1-67: L 31.
-- 12 of 23 --
13
[34] A consistent theme of Mr Buckley‟s evidence was to the effect that those who
resided in the house would have a material degree of control and supervision of
what occurred in and around the shed.30
[35] During the course of Mr Buckley‟s cross-examination, I asked him the following
question31:
“But in paragraph 29 of the joint report, you talk about „residential-
zone Land cables for home-based activities which support‟ etcetera.
This is really along the lines of Mr Ure, but – Mr Ure‟s question. In
this context, where use of the term „home-based activity‟ creates an
image, at least in my mind, of a connection between the owners of
the home and the carrying on of the relevant activity…
Here, we now know, that the owners don‟t live on the land, and I
suppose what‟s puzzling me – maybe this is what Mr Ure perhaps
was about to come to – is here – I‟m struggling with the concept of it
being a home-based activity if there is no connection between the
house, and the residents of the house, and what‟s being carried out on
the land?”
Mr Buckley‟s response was:
“Yeah. I understand the point you are both making in that respect,
your Honour, but the point about that paragraph, and indeed, the –
the paragraphs around it, is that in the rural residential area that‟s –
of which this land forms part, the number of instances where there is
a business or an industry or whatever associated with a residence is
quite substantial, so that‟s the context within which I‟m saying, so I –
I don‟t know, in each case, whether the operator lives in the house or
not, or it‟s an employee – whatever the case may be. So I understand
what you‟re saying, but to me, the – the houses are the given in this
area, and – and it‟s quite clear, by that casual drive around, that the
substance and the scale of non-residential activities associated with
the houses, in the same curtilage of the house, are quite substantial
and – and not without moment.”
[36] There are two fundamental difficulties with Mr Buckley‟s approach in my view.
First, there is no probative evidence that any other commercial/industrial activities
are taking place within the Rural Residential Precinct on land in circumstances
where the operator of the business is not also the owner and occupier of the
dwelling on the land. Second, Mr Buckley has overstated the level of control any
tenant of the house might have over the business operations being carried out in and
about the shed. It is true that the tenant may be able to complain about noise and
business hours, by way of examples, but that is about as far as it goes in reality.
The tenant would have no power to control the business activities being conducted
on the site. Actual control would have to be exercised through the appellant (or
agent) or otherwise by a duly authorised authority. There is, in my respectful view,
30 T 1-61: L 37-50; T 1-62: L 1-15; T 1-63: L 22-32.
31 T 1-63: L 42-47; T 1-64: L 1-15.
-- 13 of 23 --
14
in the circumstances of this appeal, no meaningful relationship between the
proposed use of the shed and/or the dwelling located on the land and/or the residents
of that dwelling.
[37] That Mr Buckley‟s thesis concerning the use/residency relationship is not accepted
is of course not the end of the matter. At first blush, the lack of any such
relationship might be considered to create a genuine conflict with the planning
scheme, but as Mr Perkins (the town planner relied on by the respondent)
acknowledged, neither the overall outcomes sought for the Rural – Residential
Precinct or relevant desired environmental outcomes prohibit a commercial or
industrial activity taking place independently of any residential component. In this
context, Mr Perkins seemed prepared to accept that the planning scheme
contemplated, in appropriate circumstances, the whole of a rural residential lot
being approved for a non-residential use but that such a situation would be “the
exception to the rule”.32 It is not in dispute that the proposed use would fall within
its meaning of “industrial use” for the purpose of Overall Outcome (6)(ix) of the
planning scheme.33
[38] In this context, I also consider Mr Perkins to have erred in construing the relevant
provisions of the planning scheme based on the starting point being a presumption
against non-residential uses. Generally speaking, the words used in a planning
scheme should be given their natural, ordinary and grammatical meaning and it
would be wrong to infer into a planning scheme an unwarranted presumption. In
this context, I respectfully agree with the observation of Chesterman JA (in dissent
but not on this topic) in AAD Design Pty Ltd v Brisbane City Council34 where, after
referring extensively to relevant passages from Project Blue Sky Inc v Australian
Broadcasting Authority35, His Honour said:
“The starting point in the task of construing statutes and like
instruments remains, I think, that explained by Gibbs CJ in Cooper
Brookes (Wollongong) Pty Ltd v Federal Commissioner of Taxation
(1981) 147 CLR 297 at 304 -:
„It is an elementary and fundamental principle that the
object of the court, in interpreting a statute “is to see
what is the intention expressed by the words used”… . It
is only by considering the meaning of the words used by
the legislature that the court can ascertain its intention.
And it is not unduly pedantic to begin with the
assumption that words mean what they say… . Of
course, no part of a statute can be considered an isolation
from its context – the whole must be considered. If,
when the section in question is read as part of the whole
instrument, its meaning is clear and unambiguous,
generally speaking “nothing remains but to give affect to
the unqualified words”… there are cases where the result
of giving words of ordinary meaning may be so irrational
that the court is forced to the conclusion that the ?? has
32 T 2-31: L 7-17.
33 Exhibit 1, volume 2, E1, page 444 “Industrial Use Class”.
34 [2012] QCA 44, at paragraph 37.
35 (1998) 194 CLR 355.
-- 14 of 23 --
15
made a mistake, and the cannons of construction are not
so rigid as to prevent a realistic solution in such a
case…However, if the language of a statutory provision
is clear and unambiguous, and is consistent with
harmonious and other provisions of the enactment, and
can be intelligibly applied to the subject matter with
which it deals, it must be given its ordinary and
grammatical meaning, even if it leads to a result that may
seem inconvenient or unjust. To say this is not to insist
on too literal in interpretation, or to deny that the court
should seek the real intention of a legislature.‟” (Citations
deleted)
[39] That the overall outcomes sought for the Rural – Residential Precinct are that it is to
be “predominantly”, used for housing and that commercial and industrial uses are
“generally” not to be located within the Precinct provides no warrant, in the
assessment of any development application, for a decision maker to proceed on the
basis that there is an underlying presumption that the application ought be refused.
[40] I respectfully agree with the submission made by Mr Fynes-Clinton to the effect
that the subject application, being impact assessable in the Rural – Residential
Precinct, required the actual impacts of the proposed use to be assessed on an
objective basis and not on the basis of any generic or abstract notion or perception
of what constitutes a “bulk store” or industrial activity. And, in this regard, it is
relevant that Outcome 6(ix) contemplates commercial and industrial uses not just
limited to home based businesses. Had the drafters of the planning scheme intended
to limit commercial activity in the Rural – Residential Precinct to home based
businesses they could have easily had done so.
[41] By reference to the conclusions set out in Mr Perkins‟ court report36, it would seem
that noise issues were of a greater concern to Mr Savery than to him. That said,
there is no doubt that noise remains a relevant consideration. In his conclusions, Mr
Perkins stated:
“The council have received a number of complaints from the
community in relation to industrial and commercial business
operating from residential and rural residential areas in Emerald.
Objections have been made in the past against the industrial
operations from the site, which resulted in Council initiating a
number of enforcement proceedings against the Applicant. It is my
view that Council‟s pursuit of enforcement proceedings against the
unlawful operations is a strong indication that Council is rightly
concerned with the current site operations.
The proposed development is also contrary to the future land use
directions conveyed for this locality by the publicly notified Strategic
Framework document (which will be used to inform Council‟s new
planning scheme for the Region).
36 Exhibit 4, page 21, paragraphs 130-134.
-- 15 of 23 --
16
I consider that the current activities significantly adversely impact on
the amenity of the surrounding area, exacerbated through my
observation that the extent of the activity is not contained to within
the curtilage of the site but instead extends out into the road reserve.
The use of allocated on-site parking areas for storage activities
together with the inadequate on-site space available to accommodate
the manoeuvring, loading and unloading of trucks appears to have
resulted in the need to rely on land outside of the property to form
part of the day to day operations – especially to provide for required
vehicle parking.
As a result, both the site in the industrial operations are very visible
from the residential area (and residential traffic), given that on-site
activities are visible through both the opening in the boundary fence
and from the side operations (spill) out onto the road reserve.
It is apparent to me that the proposed development / current activities
on the site are industrial in nature, and far beyond what could
reasonably be categorised as a home industry or home business.”
[42] Addressing each of these matters in turn, it is relevant to note that there were no
adverse submissions made in respect of the current application. It would appear that
the “objections” and “complaints” mainly refer to other properties and, more
particularly, to a previous application lodged by the appellant in 2009 concerning
the same land and shed. Four adverse submissions were received.37 However, that
application involved joinery/manufacturing activities (and therefore the use of plant
and equipment, which would not be used under the current proposal). Accordingly,
in my view, it would be wrong to proceed on the basis that the subject development
application, or for that matter, the current use of the site, has been the subject of a
number of complaints and/or objections. The contrary is in fact the reality.
[43] In this regard, the respondent carried out “door knock” exercise of those residents
located in the residential subdivision on the northern side of Campbell Ford Drive.
It is unclear just how many residents were canvassed, but it would be fair to say I
think, that the response was relatively unconvincing and underwhelming. Of the 19
people questioned, 11 had no issues and no concerns regarding either the proposed
use or the application. Four of those had their rear boundary facing Campbell Ford
Drive. Three residents expressed no particular concerns about the current use of the
property, but expressed concerns about future expansion and more intensified
activities than are currently taking place. Arguably, five residents expressed more
genuine concerns. Four of the five had their rear boundary on Campbell Ford
Drive. However, only three of the 19 people interviewed were apparently prepared
to go beyond answering “yes: or “no” to the questions posed in the questionnaire.
Those that did expressed concerns about noise and lighting, but expressed them in
terms, not so much about the current use of the site, but about future expansion of
that use.38
37 Exhibit 8.
38 Exhibit 11.
-- 16 of 23 --
17
[44] I am uncertain as to whether any residents in the rural residential development were
also canvassed, but there is no evidence of any complaints or concerns form the
residents in that area. In fact the evidence is that, notwithstanding that business
operations have been carried on, sometimes to a greater extent than at present, for a
number of years now, there have been no complaints from the rural residential
neighbour immediately to the south. There was some hearsay evidence to the effect
that the owner or at least one of the owners of that property was a council employee
and therefore “did not want to get involved”. I do not find that evidence particularly
persuasive.
[45] On balance, I consider that Mr Perkins had proceeded on an erroneous assessment
about the real level of community objection or more precisely, lack of objection to
the current use and the development application. That the proposed development
has not attracted any significant level of compliant and/or objection is of course not
determinative but is, as Mr Perkins acknowledged, a relevant consideration.
[46] Under the respondent‟s draft Strategic Framework document, the subject land is
located within the “suburban neighbourhood” Precinct. This document has yet to
reach the public display stage. On balance, I do not consider that it adds in any
material way to the respondents‟ case. In any event, it would appear that Mr
Perkins‟ primary reliance on this document was to refute a “suggestion” by Mr
Buckley that the respondent had in some way implicitly accepted a change in the
land use policy in the location of the subject land. While I accept that the draft
Strategic Framework document tends to support Mr Perkins‟ view on that particular
matter I do not think it takes things much further.
[47] As to Mr Perkins‟ opinion that the current activities “significantly adversely impact
on the amenity of the surrounding area”, it seems tolerably clear by reference to
paragraphs 132 and 133 of his court report (exhibit 4) that Mr Perkins was
particularly concerned with the visual aspects of the current use.
[48] In respect of the issue of visibility, it seemed that two particular aspects concerned
Mr Perkins. First, the overall visibility of the site from those travelling east or west
along Campbell Ford Drive and more particularly, those entering into or coming out
of Crinum Crescent.39 And, in this context, an exacerbating aspect was the fact that
operations associated with the current use could not be contained within the shed
and its immediate curtilage.40 Mr Perkins accepted that this matter was one he
mentioned up to eight times in his report and was an “important” part of his
considerations.
[49] Campbell Ford Drive runs parallel to the site and, accordingly, it would be only
those persons who turn to their left or right (depending on which direction they are
travelling) that would be able to get any meaningful view of what was occurring on
the site which is enclosed by a solid fence and a significant solid gate, although the
gate would be expected to be opened for significant periods during business hours.
39 T 2-21: L 33-45.
40 T 2-24: L 30-47; T 2-25; T 2-26: L 1-12.
-- 17 of 23 --
18
That said though, the visibility of the site for those travelling east and/or west would
be limited.
[50] Turning then to the issue of those accessing Crinum Crescent, again I think Mr
Perkins significantly overstated the problem. Those entering Campbell Ford Drive
from Crinum Crescent would of course be able to see the subject site and no doubt
be able to see what was occurring through the open gates. However, the driver (and
for that matter probably the passengers) would also be concerned with the east and
west bound traffic along Campbell Ford Drive. It is not as if the activities being
carried out on the site would be visible for any extensive periods of time, except in
circumstances where a person was interested in parking and observing what was
going on. On this issue, I prefer the evidence of Mr Buckley to the effect that for
most vehicles entering or exiting Campbell Ford Drive via Crinum Crescent would
only have a relatively fleeting and sweeping view of the site and, for a number of
those travellers, the view would also encompass the industrial area to the east.41 Mr
Buckley‟s opinions are largely borne out by other evidence on this issue. First, as
already mentioned, none of the residents “door knocked” expressed any strong
views concerning this issue. Second, Ms Hooper, who lives in Crinum Crescent
accepted that from her property which backs onto Campbell Ford Drive, she had
only a very limited view of the upper part of the shed and part of the forklift when it
was operating on the site. And, as to her everyday observations of what was
occurring on the site, they would appear to have been very fleeting indeed. In this
regard, notwithstanding that, she travelled regularly past the site, Ms Hooper had
even failed to observe the proposed development signage immediately to the east of
the access gate to the site.
[51] As to the offsite activities considered important by Mr Perkins, it is tolerably clear
that to a material extent his views were coloured by vehicles parked within the
Campbell Ford Drive reserve, but which in reality had no connection with the
appellants business.
[52] In paragraph 32 of the joint planners report, Mr Perkins stated:42
“What is also evidence is that the extent of the activity is not
contained to within the curtilage of the site but instead extends out
into the road reserve. This is illustrated by photographs contained in
Appendix C – Respondent’s Photographs. The use of allocated
on-site parking areas for storage activities together with the space
required to accommodate the loading and unloading of trucks
appears to have resulted in the need to rely on land outside of the
property to form part of the day to day operations – especially to
provide for required vehicle parking.”
[53] Appendix C included a photograph showing a number of vehicles including trucks
and utilities parked on verge of Campbell Ford Drive. The appellant‟s largely
unchallenged evidence in respect of those vehicles could be summarised as follows:
A number of miners parked their vehicles adjacent to the site in order to be picked
41 T 1-74: L 20-45; T 1-75: L 1-27.
42 Exhibit 1, volume 1, D4, page 253, paragraph 32.
-- 18 of 23 --
19
up by the bus which then transports them to and from the mining areas located
outside of Emerald.43 Of the other vehicles shown, only two, the Isuzu truck and a
utility would ordinarily be associated with the business. The other vehicles shown
were not a part of the day to day operations of the business but were there, generally
speaking, present on a “one off” occasion.44 The best evidence is that the
photograph relied on by Mr Perkins, seriously overstated the amount of
vehicles/traffic associated with the business being conducted on the land. That said,
it is tolerably clear that from time to time, large delivery trucks from various
suppliers will access and leave the site and that from time to time it would be
reasonably likely, if not regulated, that the appellants‟ Isuzu truck and other
employee vehicles would be parked on the verge of Campbell Ford Drive. In order
to address these concerns, the appellant accepted that it would be appropriate that a
condition be imposed to the following effect:
“Vehicles used by the appellant or employees for the transport of
materials to or from the site must be parked wholly within the site
when not in use.”45
There was no serious suggestion that provided this condition was able to be
complied with that it would not go a long way to addressing the offsite concerns of
Mr Perkins.
Conclusions
[54] There are a number of features of the subject land which distinguish it in a material
way from the vast majority of the other lots within the immediate rural residential
area. These include its extensive frontage to Campbell Ford Drive, it being
separated (save for one other lot) from the rest of the rural residential subdivision by
a significant drainage area, its adjacency to the industrial estate to the east and the
open space/drainage area to the west. I agree with Mr Buckley‟s evidence to the
effect that the physical characteristics of the subject site distinguish it in a material
way from the other rural residential lots making up the estate.46
[55] In this regard, Mr Perkins seemed prepared to accept that the drain to the south of
the subject might have provided a suitable boundary to separate the industrial
precinct from the rural residential precinct, but that Elm Street was a preferable
physical boundary. According to Mr Perkins, Elm Street provided a more definitive
boundary between the uses and prevented road access to the rural residential
precinct being bounded on both sides by industrial development. 47 While I accept
this explanation, it is relevant that the western side of Elm Street will retain its rural
residential character.
[56] Having regard to the unique principal characteristics of the subject site, approval of
the proposed use would not, in my opinion, establish an undesirable precedent.
43 Exhibit 1, volume 1, A7, pages 18-20.
44 Exhibit 1, volume 1, A7, page 22.
45 Exhibit 6.
46 T 1-48: L 17-47; T 1-49: L 1.
47 T 2-34: L 1-30; T 2-39: L 12-25.
-- 19 of 23 --
20
[57] In this context, it is also appropriate to deal with the evidence that established that
some other lots within the rural residential area were being used for commercial
and/or industrial purposes without approval by the respondent. This evidence
neither strengthens the appellant‟s case nor weakens the respondent‟s case. This
evidence does not establish a tolerance or48 implicit approval of those uses by the
respondent. And, that other unlawful uses might be occurring, provides no
foundation for the approval of the subject application.
[58] The next issue is that concerning the negative impacts on amenity associated with
the proposed use. The evidence concerning the past public reaction to the use has
already been referred to. Also as already addressed, noise associated with the use is
not of itself a sufficient reason to refuse the appeal. And, on balance, I am satisfied
on the evidence that the operational impacts and, in particular, the visual impacts are
not, of themselves or together with noise, sufficient to refuse the appeal.
[59] I agree with Mr Buckley and Mr Brown that the negative impact on amenity can be
addressed by the imposition of an appropriate suite of conditions dealing with the
types of issues identified in paragraph 27 above and exhibit 6.
[60] On behalf of the respondent, it was submitted that the court would be reluctant to
allow the appeal subject to the types of conditions identified by the noise experts as
they would require “regular and faithful observance” of conditions of a person with
a “long history of ignoring planning law”.49 Pinjarra Hills & Ors v Brisbane City
Council50 and Lewiac Pty Ltd & Ors v Brisbane City Council & Ors51 were cited in
support.
[61] This submission raises a number of issues. First, in my respectful opinion, the types
of conditions contemplated by the noise experts in this appeal bear no resemblance
to the nature of the condition considered by Newton DCJ in Lewiac. The condition
under consideration there was:52
“The 10,0002m of shop defined in the plan of development are to
function as outlet stores. For the purposes of this condition, outlet
stores are defined to man premises primarily or substantially used for
the sale of surplus and/or out of season or discontinued, seconds, end
of run, superseded, outlet specific, factory direct, discounted or like
merchandise.”
[62] Newton DCJ commenced his consideration of this condition by expressing grave
doubts as to whether it could be lawfully imposed in any event.53
[63] The passage in Lewiac54 set out in the respondents written submissions has to be
read in the context of the town planning evidence to the effect that the condition
48 Exhibit 4, figure 3.
49 Respondents written submissions, paragraphs 35 – 38.
50 [1995] QPLR 334, at 344.
51 [2002] QPEC 080.
52 Lewiac Pty Ltd & Anor v Gold Coast City Council & Ors [2002] QPEC 080, at paragraph 62.
53 Lewiac Pty Ltd & Anor v Gold Coast City Council & Ors [2002] QPEC 080, at paragraph 63.
-- 20 of 23 --
21
would essentially require the local authority to assume the role of stock controller
for the extensive Harbour Town Shopping Centre.55 That situation bears no
resemblance whatsoever to the nature of conditions under consideration in this
appeal. The same can be said, in respect of a condition designed to control
domestic pets so as to minimise threats to wildlife as was the situation in Pinjarra
Hills.
[64] The second issue is that the draft conditions put forward and considered by the noise
experts were published in their joint report the contents, which would have course
been known to the respondent. No evidence was led by an officer of it to say that
the types of conditions being considered by the noise experts would impose an
unacceptable financial and/or burden on manpower. Further, unlike the situation in
Lewiac where there was town planning evidence as to the potential ramifications of
the imposition of the condition under consideration in that case, the situation in this
appeal is that neither of the town planners expressed any fatal or near fatal concerns
about the acceptability of the conditions proposed. Mr Buckley expressed no
reservations at all. Mr Perkins in the town planners joint report said this:56
“DP (David Perkins) also says it is unwarranted to be discussing
draft conditions given his view about the intrinsic unsuitability of the
proposed development in this location. However, in the event that
the matter were to proceed to consideration of a conditional approval
the following observations would then be relevant:
The draft conditions provided in the Joint Report of Noise
Experts are a starting point. I note that there is some
disagreement between the experts in respect of the details of
those conditions. In my view it is important that the
conditions be readily enforceable without the need for undue
vigilance by Council or nearby residents. By way of
example, the cabinet making equipment and gate fabricating
equipment should be removed from the site as they cannot
reasonably be claimed to be domestic in scale or use.
Any bin storage should be screened from view form the
public domain.
A limit on the extent of machineries stored on the site.
DP agrees with CB that there should be a condition requiring
that the use, at all times, operate in conjunction with the
residential use of the balance land. That would at least
provide some semblance of a home based activity and
provide a form of self-governing of the activity.
With respect to the road reserve / shoulder, it is apparent to
me that the activity is of a scale that cannot be contained
within the confines of the site and it is fundamental to any
conditional approval that the operations be capable of taking
place wholly within the site. In that scenario the road reserve
should be landscaped and not used for commercial parking or
loading/unloading or vehicle cleaning operations.
Accordingly, the on-site parking area would need to be
54 Ibid, at paragraph 71.
55 Ibid, at paragraph 70.
56 Exhibit 1, volume 1, D4, pages 257-258, paragraph 49.
-- 21 of 23 --
22
cleared of the various obstructions and be reserved for its
proper purpose. All storage should be within the sheds and
site operations screened from public view. This would, I
expect, also entail the reestablishment of the aesthetically
acceptable front gate which would remained closed except
when vehicle movements are required.”
[65] In considering the matters raised by Mr Perkins it needs to be borne in mind that he
was acting under the mistaken belief that all of the vehicles he observed on the
southern side of Campbell Ford Drive were associated with the subject use.
Further, in addition to the evidence of the appellant concerning the sale of plant and
equipment associated with the joinery and gate manufacturing business which had
been carried out on the site, exhibit 6 would go along way to meeting most of Mr
Perkins‟ concerns.
[66] It is inescapable that the appellant conducted her business on the land knowing it to
be an unlawful (unapproved) use. Such behaviour ought to be condemned.
However, the scope of the non compliance, particularly in circumstances where
there is no evidence of any material history of complaints, does not provide a
sufficient basis for refusing the appeal in circumstances where it has been found that
there is no genuine conflict with the planning scheme.
Merits assessment
[67] On behalf of the respondent it was submitted that if it were found that the proposed
use was not in conflict with the planning scheme then the court would conclude, on
a merits assessment basis of the amenity impacts on the land to the south in the rural
residential precinct and on the residential land to the north and to the residents on
the subject that the appeal ought be dismissed. In this context a number of the
physical characteristics of the land were also pointed out. These included its size,
its location at the “gateway” to the rural residential precinct and its visual presence
on Campbell Ford Drive, particularly in respect of its proximity to the intersection
or Crinum Crescent and Campbell Ford Drive.
[68] These matters have been sufficiently addressed above when dealing with the issue
of conflict with the planning scheme and I do not consider it necessary to revisit
them. Suffice to say that for the reasons already given I am satisfied that the appeal
should not be refused on a merit based assessment basis.
[69] By way of final conclusion, I am satisfied that the proposed use is one contemplated
within the Rural Residential Precinct provided that the amenity of residential and
rural residential residents are not compromised beyond an unacceptable level. There
is a significant difference between planning schemes that reveal a clear intention to
discourage inconsistent uses occurring in a precinct and those, while recognising
they will not be the norm, also recognise that, in appropriate circumstances,
apparently inconsistent uses might occur. The subject scheme falls into the latter
category. I am also satisfied that the proposed use is not in conflict with the
-- 22 of 23 --
23
respondents planning scheme in any material way and that the reasonable
expectations of residents would not be unacceptably compromised.
[70] For the reasons given the orders of the court are:
1. I would allow the appeal subject to the imposition of appropriate conditions;
2. The appeal is adjourned to allow the parties to consider an appropriate
conditions package.
-- 23 of 23 --
Official source: https://www.sclqld.org.au/caselaw/QPEC/2013/016