Dexus Wholesale Property Ltd v Townsville City Council and Ors [2013] QPEC 14 (2013) QPELR 437
PLANNING & ENVIRONMENT COURT
OF QUEENSLAND
CITATION: Dexus Wholesale Property Ltd v Townsville City Council and
Ors [2013] QPEC 14
PARTIES: DEXUS WHOLESALE PROPERTY LTD
(appellant)
v
TOWNSVILLE CITY COUNCIL
(respondent)
and
STOCKLAND DEVELOPMENT PTY LTD
(co-respondent)
and
CHIEF EXECUTIVE, DEPARTMENT OF
TRANSPORT AND MAIN ROADS
(co-respondent by election)
FILE NO/S: 4580/2011
DIVISION: Appellate
PROCEEDING: Adverse submitter appeal
ORIGINATING
COURT: Brisbane
DELIVERED ON: 30 April 2013
DELIVERED AT: Brisbane
HEARING DATE: 12-15, 19 March 2013
Site Inspection: 11 March 2013
JUDGE: Robin QC DCJ
ORDER: Appeal dismissed, subject to imposition of a condition
delaying commencement of new uses
CATCHWORDS: Sustainable Planning Act 2009 s 314, s 326 – rival shopping
centre owner‘s appeal against approval of large expansion of
a shopping centre – whether economic need for the proposal
– whether planning need for it or ―public need‖ – appellant‘s
economic expert‘s analysis was that important retail
-- 1 of 30 --
2
components of the proposal would not achieve ―benchmark‖
performance levels for several years, so long that it would be
inappropriate to grant approval subject to a condition
deferring ―establishment‖ – whether proposal ―too big, too
soon‖ – whether conflict with planning scheme or with a
preliminary approval controlling development on the site
which varied the effect of the Planning Scheme – City of
Thuringowa Planning Scheme 2003
COUNSEL: G Gibson QC with N Kefford for the appellant Dexus
Wholesale Property Ltd
S Ure for the respondent Townsville City Council
D R Gore QC with B D Job for the co-respondent Stockland
Development Pty Ltd
SOLICITORS: Johnson Winter & Slattery for the appellant
Townsville City Legal Service for the respondent
Corrs Chambers Westgarth for the co-respondent
[1] This is another instalment of the Townsville shopping centre wars being waged by
rival operators of successful centres. On the back of Stockland‘s appeal against
Council approval of a large expansion of Dexus‘ facility at Thuringowa city centre
(The Willows)1 comes this appeal by Dexus against approval of a similar expansion
(large in relative terms) at Burdell, Stockland North Shore, which is located a little
over 10 kilometres north-northwest from The Willows. Stockland‘s appeal was
essentially in defence of its twin centres at Aitkenvale, together constituting a
regional centre, located something less than five kilometres east-northeast of The
Willows.
[2] The numbers the court has been given for floor areas, existing and proposed, have
not necessarily been consistent and variations in respect of the proposal have
occurred. Nothing really turns on identifying precise numbers. Stockland North
Shore at present is a supermarket based centre, having a supermarket of 3609 m2,
retail specialties of 1123m2 and non-retail services 1047m2. Under the approval,
these ―GLA‖ (Gross Lettable Area) areas increase to 4611m2, 4223m2 and 1544m2,
to which will be added a discount department store of 7189m2 and ―mini-majors‖
(tenancies exceeding 400m2) of 2479m2. Those details are taken from the expert
economists‘ joint report, and are subject to some variation, as noted. The centre‘s
GLA (retail) would increase from 4732m2 to 18,502m2.
[3] A similar appeal (624/2011) lodged by Bushland Grove Pty Ltd, a company
interested in residential and commercial development at Mount Low, northwest of
the site, has recently been withdrawn. It was listed for hearing with the current
appeal. The range of issues presented to the court for consideration has narrowed;
traffic matters, the bulk and scale of the intended built form and the like have gone
1 Stockland Development Pty Ltd v Council City Council [2012] QPEC 84, currently the subject of an
application for leave to appeal to the Court of Appeal.
-- 2 of 30 --
3
away. Stockland was concerned that reliance not be placed on views of planning
and economic experts engaged by Bushland Grove to be found in joint expert
reports, given inability to test those experts‘ views at the hearing. Those views
coincided in large measure with those of Dexus‘ corresponding experts, who made a
point of indicating their agreement with other aspects, where such agreement was
not set out in joint reports. In the result, therefore, there was nothing which the
court might have been required to disregard.
[4] The appellant Dexus argues that the approved proposal is asking for too much, too
early, is ―too big, too soon‖, in Mr Schomburgk‘s summary. It asserts conflict with
the current planning scheme, the City of Thuringowa Planning Scheme 2003,
which, of course, extends to only part of the Council‘s local government area, and
may be replaced by the end of 2013. That is what the Council envisages. No
information whatever was forthcoming as to what the new planning scheme might
provide. Conflict is asserted, as well, with a preliminary approval covering a much
larger area of land incorporating the site the subject of the present proposal. The
preliminary approval is constituted by a consent order made in this court on 29
March 2007 (filed 24 April 2007) in appeal D2 of 2005, a conditions appeal bought
by Stockland Developments Pty Ltd. The court ordered that the development
application for a preliminary approval pursuant to s 3.1.6 (Preliminary approval
may override a local planning instrument) of the Integrated Planning Act 1997 for a
material change of use for uses in accordance with a Plan of Development (PoD) in
respect of land situated as Burdell Road, Garland Road, Faulkner Street, Griffey
Street and other un-named roads off Burdell, be approved, subject to the conditions
contained in annexure A. Part of the schedule of conditions in turn incorporated
schedule 1, a Plan of Development 1 and schedule 2 Maps. The preliminary
approval, so far as it goes, overrides the planning scheme, so that the scheme‘s
allocation of the site to the Residential Planning Area or the Rural Planning Area
becomes irrelevant.
[5] That development application for a preliminary approval was lodged on 23 May
2003, that is before the current planning scheme commenced on 20 October 2003.
The Council‘s (essentially favourable) decision notice issued on 14 December 2004.
No detailed examination was made of this, but it rather appears that Council
consideration of the development application and work on the new (2003) planning
scheme were going on in tandem. There is some overlapping of matters covered. I
took it to be accepted that if there occurs any conflict, the preliminary approval
would prevail, relevantly, whatever planning scheme was in effect.
[6] The current shopping centre was approved by a decision notice issued for a
shopping centre and commercial premises on 14 August 2008 consequent upon a
development application for material change of use of 8 February 2008. The
present appeal concerns a development application for material change of use for a
shopping centre (discount department store, mini-major and specialty retail shops)
of 23 December 2010 which affects about 6.15 hectares of the overall 1000ha or so
of the Plan of Development Area, where some; 4200 residential allotments are to be
created. The Council‘s decision notice is dated 30 September 2011.
[7] The Sustainable Planning Act 2009 is the governing legislation.
-- 3 of 30 --
4
[8] Although successful before the Council in the first round, Stockland has the onus of
establishing that the appeal should be refused, rather than Dexus bearing an onus to
show it should be allowed: s 493(1). By section 495(1), the appeal is by way of a
hearing anew, so that the court stands in the shoes of the assessment manager.
Because the application would lead to the shopping centre having a GLA in excess
of 5000m2, the application was impact assessable. The submitters were the
appellant, Bushland Grove, and a third company whose interest (if any) was not
disclosed and did not emerge during the appeal, in which it decided not to
participate.
[9] Section 314(2) requires the assessment manager (now the court) to assess ―against
each of the following matters or things to the extent the matter or thing is relevant to
the development –
… (h) a preliminary approval to which s 242 applies;…
(i) a planning scheme‖
Sections 324 and 326 contain rules governing the assessment manager‘s decision.
The latter is:
“326 Other decision rules
(1) The assessment manager‘s decision must not conflict
with a relevant instrument unless—
(a) the conflict is necessary to ensure the decision
complies with a State planning regulatory
provision; or
(b) there are sufficient grounds to justify the
decision, despite the conflict; or
(c) the conflict arises because of a conflict
between—
(i) 2 or more relevant instruments of the
same type, and the decision best
achieves the purposes of the
instruments; or
(ii) 2 or more aspects of any 1 relevant
instrument, and the decision best
achieves the purposes of the
Instrument
(2) In this section—
relevant instrument means a matter or thing
mentioned in section 313(2) or 314(2), other than a
State planning regulatory provision, against which
code assessment or impact assessment is carried out.‖
-- 4 of 30 --
5
[10] The planning scheme establishes planning areas, including 3.3 Centres Planning
Area, centres being ―shown‖ mapped (3.3.1(e)); as well as Maps 3.3 and 3.3A, one
might refer to Map 3 Planning Areas. The provision referred to establishes a
centres hierarchy in ascending order of scale: Convenience Centres, Neighbourhood
Centres, District Centres and Sub-regional Centres. The site is not mapped as a
centre or as part of the centres planning area in any way. Events have led to its
being identified as the sub-regional centre in Mount Low-Deeragun, for which it is
conceded to be suitable. The parties agreed about this. Although located on
principal roads rather than on arterial roads, it is appropriately isolated from
residential areas as regards traffic patterns. The intended sub-regional centre might
well have been located elsewhere. There are three shopping centres (an older
Woolworths based one and a new Coles based one included) near to each other at
Deeragun south of the Bruce Highway, one of which is Centro Woodlands and
identified in the character statement for the centres planning area:
“3.3 CENTRES PLANNING AREA
3.31 CHARACTER STATEMENT
(a) At the Commencement Date, premises within the
Centres Planning Area consisted of –
(i) development of varying scale and intensity;
and
(ii) other development that may be inconsistent
with the future intent for the centres Planning
Area described below.
(b) The Centres Planning Area is intended for a mix of
Commercial Development that contributes to the
amenity and landscape of the Centres Planning Area.
In particular –
(i) buildings and structures are sited to protect
the amenity of adjoining premises;
(ii) a high level of visual amenity is provided
through the design of building, landscaping,
Streetscapes and public art that results in a
distinctive character;
(iii) the design layout of development is secure,
safe and legible, and
(iv) development is adequately serviced by
infrastructure.
(c) Public transport, clear pedestrian routes, bikeways,
adequate onsite manoeuvring and on and offsite
-- 5 of 30 --
6
parking are provided to meet the needs of proposed
users, customers and employees.
(d) Development, other than Commercial Development,
and Residential Development, or development that
does not have a nexus with Commercial
Development, is inconsistent with the desired
outcomes for the Centres Planning Area.
(e) A Centres hierarchy based on convenience,
neighbourhood, district and sub-regional functions
has been identified. These centres are shown on
maps 3.3 and 3.3A – Centres Planning Area:
Convenience Centre, Neighbourhood Centre, District
Centre and Sub-Regional Centre. In particular –
(i) Convenience Centre is identified in Schedule
3.3. The development of Convenience
Centres at these locations is consistent with
the desired outcomes for the Centres
Planning Area.
Convenience Centres –
A. provide for the particular needs of a
specifically defined community with
high levels of local accessibility,
B. have a maximum 1,000m2 GLA,
comprised of Commercial
Development and Service Premises;
and
C. Are designed to be sympathetic to the
local environment and Residential
Development in such matters as
overall scale, building height and
boundary treatment and are consistent
with the desired development
outcomes for a particular community.
(ii) At the Commencement Date, the identified
Neighbourhood Centres are located at
Greenwood, Mt View, Parkside and Kirwan
North. The development of Neighbourhood
Centres at these locations is consistent with
the desired outcomes for the Centres
Planning Area.
-- 6 of 30 --
7
Neighbourhood Centres –
A. provide for the everyday local
shopping and commercial needs of
local residents for its immediate
population catchment between 3,500
and 6,000 persons and are easily
accessible to pedestrians, cyclists and
local residential traffic;
B. have a maximum 8,000m2 GLA,
comprised of Commercial
Development not exceeding 5,000m2
GLA and Service Premises not
exceeding 3,000m2 GLA; and
C. are designed to be sympathetic to
adjoining Residential Development in
such matters as overall scale,
Building Height and boundary
treatment.
(iii) The identified District Centres are Upper
Ross Shopping Centre and Woodlands
Shopping Centre.2 The establishment of
additional District Centres within the life of
this Planning Scheme is inconsistent with the
desired outcomes for the Centres Planning
Area.
District Centres are intended to cater for the
needs of their respective residential
catchments.
District Centres –
A. cater for the weekly needs of a
population of up to 25,000 persons
and act as a Neighbourhood Centre
for its immediate population
catchment;
B. have a maximum 15,000m2 GLA,
comprised of Commercial
Development not exceeding 10,000m2
2 The Woodlands Shopping Centre is expected to expand on premises to the south-east of the existing
Centre, on premises identified as Commercial Area in the Concept Plan for the Mt Low Deeragun
Area as shown in the Urban Growth Boundaries Planning Scheme Policy
-- 7 of 30 --
8
GLA and Service Premises not
exceeding 5,000m2 GLA; and
C. are located on arterial roads to
prevent non-local traffic entering
residential areas.
(iv) The identified Sub-Regional Centre in the Mt
Low-Deeragun and the Thuringowa City
Centre.
The establishment of a Sub-regional Centre
in the Mt Low-Deeragun area is intended
beyond the life of this Planning Scheme.
This centre will start as a Neighbourhood
Centre, progress towards a District Centre
and ultimately develop into a Sub-Regional
Centre.
The Thuringowa City Centre is intended as
the primary focus for the City catering for the
needs of locals and visitors. This centre is
completely integrated, directly linked to
Riverway and characterised by five sub-areas
that complement each other – the
Commercial 1 sub-area; the Commercial 2
sub-area; the Commercial 3 sub-area; the
Commercial 4 sub-area; and the Commercial
5 sub-area. These sub-areas are shown on
map 3.3A – Thuringowa City Centre and …‖
Note the references to ―establishment‖ in (iii) and (iv).
[11] In respect of the economy, the relevant desired environmental outcome in the
planning scheme is:
―2.5.1 DEO 5
Economic development in the City is strong, diversified, supports
local employment and enhances quality of life.‖
In my opinion this strongly supports Stockland‘s proposal. One of the specified
strategies is significant, and contended by Dexus to tell against the proposal:
―2.5.2 (v) establishing and supporting a hierarchy of Centres
and preventing ribbon development‖
[12] The importance long ascribed in this court to preserving the integrity of planning for
centres hierarchies was recognised and apparently endorsed by the Court of Appeal
in Australian Capital Holdings Pty Ltd v Mackay City Council [2008] QCA 157 at
[58]:
-- 8 of 30 --
9
―The importance of the hierarchy of retail shopping centres or
precincts established by planning schemes and the necessity of not
acting so as to prejudice the viability of the established hierarchy has
been recognised in a number of planning decisions‖.
A distinction between that case and this is that, here, the Council, which is the
planning authority, supports rather than opposes the developer‘s proposal. The
proposal would bring Stockland North Shore somewhere around the cusp separating
district centres and sub-regional centres, it being largeish for the former but a
minnow for the latter, for which GLA of something like 55,000m2 is contemplated.
[13] As to timing for the Mount Low–Deeragun sub-regional centre, the point was made,
particularly by the Council‘s planner, Mr Perkins, that the planning scheme is
coming to the end of its life, raising the question of whether any good end is served
by waiting for it to finally go. Of course, we do not know what will replace it. The
Council‘s support for the proposal may be a straw in the wind. To the extent that
Dexus was submitting that Stockland North Shore should go through the stages of
neighbourhood centre, district centre, etc, that seems to me totally pointless and no
more than a way of condemning all interests affected to avoidable episodes of
disruption and inconvenience. The question is whether an appropriate time has
come - or looms - for a small sub-regional centre, assuming that is what it is, to be
established. It was accepted, and even by the appellant‘s planner Mr Schomburgk
(in the end), that the time as at which judgements are made is that of
―establishment‖, when a centre is up and running, rather than the time of approval.
There will inevitably be a certain amount of delay in the finalisation of designs and
construction (including detaining further requisite approval or permits) and it was
accepted that conditions of approval may impose a longer (or a defined) delay if
appropriate. Dexus says the delay should be so long that the correct decision is to
refuse approval.
[14] The plan of development incorporates its own delaying mechanisms. As recognised
in s 1.4(1), it functions as part of the preliminary approval which varies the effect of
the local planning scheme for the structure plan area, overriding the planning
scheme by:
―(a) Stating the assessment categories for development in the
structure plan area that are different to the assessment
categories for the developments stated in a local planning
instrument applying to the structure planning area; and
(b) Identifying codes applying to development in the structure
plan area that –
(i) are different to codes in a local planning instrument
applying to the structure plan area; and
(ii) apply to development in the structure plan area
differently to how codes in a local planning
instrument apply due to development in the structure
plan area.‖
By subsection (2) the development to which the plan of development and
preliminary approval apply is to be completed within 25 years of the preliminary
approval taking effect. The structure plan is map 1 which identifies the structure
-- 9 of 30 --
10
plan area and the planning areas within it, also roads and major drainage paths; 2.2
Planning areas indicates the preferred dominant land use of the relevant structure
plan area - the planning areas are: the residential planning area, the open space
planning area and the commercial planning area. The last is located at the south of
the site which has frontage to the Bruce Highway. It is divided into a
―neighbourhood centre‖, being the eastern portion, and a mixed use area.
[15] Section 4.4 Overall outcomes for the structure plan area includes the following:
―(7) The structure plan area is to be developed for community
and commercial facilities to –
(a) service the residents of the structure plan area, residents of
the region, and the travelling public; and
(b) ensure that residential amenity is not detrimentally
affected.‖
Specific outcomes desired for the planning areas follow, including:
―4.7 Specific outcomes for the commercial planning area
(1) The commercial planning area is to be developed for
a mixed use sub-area and a neighbourhood centre
sub-area.
(2) The commercial planning area is to be confined by
defined boundaries which will control points of
access and ensure separation from the residential
planning area while maintaining a linkage between
the adjoining neighbourhood centre sub-area and the
mixed use sub-area.
(3) The commercial planning area is to provide a
transitional buffer from the impacts along the
national highway to the residential planning area to
the north.
(4) The mixed use sub-area is to be developed for uses
that take advantage of its proximity to road and rail
transport infrastructure and accessibility to regional
catchments especially uses that would benefit from a
high level of vehicular access, possible rail access
and visual exposure to a national highway such as
showrooms, warehouses, hardware stores, timber
and building supplies and the like.
(5) The neighbourhood centre sub-area is to be
developed for a supermarket, a range of comparison
and specialty retail uses and commercial uses.
(6) The neighbourhood centre sub-area is to be
developed to satisfy a public need that correlates
with community spending patterns.
-- 10 of 30 --
11
[16] Close to Stockland‘s site, construction is underway of a service station and a
Bunning‘s (due to open in August), adding to facilities already operating, such as a
McDonald‘s restaurant. Dexus asserts conflict with (5) and (6) consistently with the
general ―too big, too soon‖ assertion. At a more specific level, albeit in Division 4
Commercial Planning Area Code under the heading 7.6 Overall Outcomes for the
commercial planning area, one finds:
―7.6 Purpose of the commercial planning area code
The purpose of the commercial planning area code is the
overall outcomes for the commercial planning area.
(1) The commercial planning area is to comprise a range
of retail uses, commercial uses, service industrial
uses and associated activities that will service the
growing development within the structure plan area
and surrounding districts.
(2) The neighbourhood centre sub-area is to maximise
access to facilities and services for the residents of
the structure plan area by encouraging medium to
higher density housing components.
(3) The shops and shopping centre within the
neighbourhood centre sub-area are developed (GLA
greater than 5000m2 retail floorspace) where –
(a) Either –
(i) the population of the suburbs of
Bushland Beach, Mt Low, Burdell,
Deeragun, Shaw and Jensen reaches
20,000 persons; or
(ii) the population of the structure plan
area reaches 1000 households; and
(b) the uses satisfy a public need that correlates
with community spending patterns.
(4) The commercial planning area is to be developed in
an integrated and co-ordinated fashion with priority
placed on safe pedestrian and vehicular movements.
(5) The commercial planning area is designed to achieve
a high level of integration and visual cohesion within
the commercial planning area.
(6) The commercial planning area is to be developed for
visually attractive development which compliments
both the natural and man-made features within the
commercial planning area.
(7) The commercial planning area is developed in a
manner that ensures that the amenity of adjacent
residential uses is not detrimentally affected.
(8) The commercial planning area is to be designed to
take account of the requirements of public transport
operators and pedestrian and cyclist movement to
and within the commercial planning area.‖
-- 11 of 30 --
12
Shopping centre is defined in the dictionary as having the meaning given in the
transitional planning scheme3 (being the 1996 scheme) and including a major
shopping centre development as defined in that planning scheme4. Subsection (3) is
in harmony with the assessment tables for the neighbourhood centre sub-area in 7.4:
Column 1
Use
Column 2
Assessment category
Column 3
Codes
assessable. If code assessable –
(a) Structure plan area
code.
(b) Commercial planning
area code.
(c) Standards.
Shop.
Shopping
centre.
Code assessable if not
impact assessable.
Impact assessable if the total
GLA of shops and shopping
centre existing or approved in
the neighbourhood centre sub
area exceeds 5000m2.
Structure plan area
code.
Commercial planning area
code.
Standards
[17] Finally, there are specific outcomes for the sub-areas which relevantly include:
Specific Outcomes Acceptable solutions – if self
assessable
Probable solutions – if code
assessable
Particular development in the
Neighbourhood centre sub-area
O15 The neighbourhood centre sub-area
is developed for an adequate number and
range of retail uses and commercial uses
to service the structure plan area and
surrounding districts.
S15.1 None applicable.
O16 There is an economic need and a
planning need for development for shops
and a shopping centre in the
neighbourhood centre sub-area.
S16.1 None applicable.
3 ―SHOPPING CENTRE‖ means (a) any shop or group of shops which have a gross floor area of 600
square metres. (b) any shop or group of shops which used wholly or predominantly for the retailing
to the public and which in the opinion of the Council function as an integrated complex due to the
combination and range of goods and services offered and the on-site co-ordination of pedestrian and
vehicular movements. The term includes any of the following uses where such uses are considered
to be a component of the integrated function of the premises Fast Food Outlet, Indoor
Entertainment (Theatre Only), Medical Centre, Restaurant, Showroom.
4 ―MAJOR SHOPPING DEVELOPMENT ‖ means a development or an extension of or part of a
development which development, extension or part is in the form of a shopping centre and is
predominantly or wholly used for retailing to the public and includes - (a) the use, for that purpose,
of land exceeding 2.5 hectares in area (or such other area as the Governor in Council may from time
to time prescribe); or (b) the erection of or use, for that purpose, of an area of a building or structure
or part thereof exceeding 6,000 square metres gross floor area (or such other area as the Governor in
Council may from time to time prescribe). For the purpose of the scheme the term includes a
Shopping Centre that complies with (a) or (b);
-- 12 of 30 --
13
The proposal intrudes a small distance into the mixed use sub-area. About this, no
point was taken. It is asserted that it conflicts with O15 and O16, also 7.6(3).
[18] I reject the argument that ―an adequate‖ in O15 means ―the bare minimum‖ or ―no
more than the essential‖ or something similar. Even without reference to
Stockland‘s authorities indicating that ―adequate‖ may be equivalent to ―ample‖ or
―generous‖ depending on the context, such as Gledhill v Liverpool Abattoir Utility
Co Ltd [1957] 1 WLR 1028, at 1034 and R v Secretary of State for the Environment,
ex parte Gosford Allotments and Gardens Association (1996) 72 P&CR 38, I would
not be inclined to regard the term as intended to limit what is provided unless it be
of a scale would obviously be ridiculously excessive for the structure plan area and
surrounding districts.
[19] O16, however, establishes a real hurdle for the developer which may see its
proposal in conflict with the provision. To avoid a finding of conflict, both an
economic need and a planning need must be shown. In my opinion, O16 is satisfied
if the test in 7.6(3) is satisfied. It is a two part test. I agree with Mr Dimasi‘s
estimate that by around December 2014, a year before the proposed expansion
would be permitted to be ―established‖ or ―developed‖, one can say with a high
degree of confidence that for the purposes of s 7.6(3)(a)(i) the population of the
named suburbs will reach 20,000 persons. That view is based on an increase from
the 2006 census to the 2011 census from 9271 persons to 15,193. There was an
average annual growth of 1184 persons or 10.4%. As regards the number of
households required to satisfy paragraph (a)(ii), Mr Motti, Stockland‘s planner on 1
February 2013 counted 910 completed dwellings in the structure plan area and
another 60 under construction. The court‘s inspection of the area on the first day of
the hearing confirmed that construction is proceeding apace, currently (in particular)
in a sizeable cluster of dwellings of various designs which will doubtless the offered
two potential purchasers very soon, if they have not been already. On the balance of
probabilities, the 1,000 benchmark will be achieved by the end of next year, even
allowing for a reasonable number being excluded as not yet ―households‖
constituting a population. Stockland sells residential lots subject to a covenant
requiring a house to be constructed within three years. St Clare‘s Catholic School is
already operating near the shopping centre (across North Shore Boulevard) and
Townsville Grammar School is expected to open its campus nearby in early 2016.
[20] Does Stockland satisfy 7.3.1(b)? I took the parties to be in agreement, as am I, that
―public need‖ would equate to ―planning need‖ in O16. No guidance has been
available as to what is involved in ―community spending patterns‖; this is probably
another way of requiring ―economic need‖, and I approach it in this way.
Effectively, 7.6(3)(b) replicates 4.7 (6).
[21] The crucial issue in this appeal is whether the developer satisfies the twin tests of
need. As can be seen, in my view, that replicated provision and O16 have been
shown to be satisfied. I accept that development proposals that are premature ought
not to be approved. See Adam v Gold Coast City Council [2007] QPEC 025; [2007]
QPELR 379. In a context such as the present, however, prematurity ought to be
approached as it was in Westfield Ltd v Gold Coast City Council [2002] QPELR
-- 13 of 30 --
14
542. I am grateful for the reference, as the following views accord with those I was
inclined to reach in any event:
―Prematurity
[63] Westfield has alleged that approval of the Pacific Pines
centre is premature, apparently on the basis that the total
population which the facilities will ultimately serve is not
yet in place.
[64] Prematurity is usually only a reason for refusing an
application if it involves some substantial public disbenefit.
The classic example is where the provision of infrastructure
(such as water and sewerage) to a development will
prejudice or make more expensive the provision of such
services throughout a locality. This circumstance is not
present here.
[65] There is no principle that a commercial facility cannot be
provided until population of its catchment is all in place.
There are authorities to the contrary. See for example
Cairns Real Estate Pty Ltd v Cairns City Council [1996]
QPELR 319 at 327) where Daly DCJ said:
‗I should say that I accept the submission that it is not
necessary for it to be established that either stage be
immediately viable upon opening. It must be a rare investor
who thinks a capital investment of this kind would give an
immediate return.‘
[66] In reality a growing population enjoys early benefits if
developers are prepared to provide them with facilities
sooner rather than waiting for the catchment population to be
filled. It is not good planning to allow a population to be
created without any facilities, forcing it on to the arterial
road system to obtain, for example, its convenience
shopping. Furthermore it is difficult to see prematurity
when the DCP specifically locates a shopping centre at the
site. The people of Pacific Pines will benefit from the
facilities and even if the developers (Westfield and perhaps
Stockland and Hospitality too) do not immediately enjoy
large profits from their developments that is of no real
importance in considering the planning merits.
Conclusion
[67] There is no express conflict with the provisions of the
Strategic Plan or the DCP in the development proposed by
Stockland and Hospitality. Even were it to be the case that
some technical conflict can be established, there are
sufficient planning grounds (particularly need) to justify the
-- 14 of 30 --
15
approvals notwithstanding that conflict. The appeals are
therefore dismissed.‖
Although those views are attributed to me in the report (at page 543L) the credit
belongs to Senior Judge Skoien.
[22] The quoted passage is not applicable here in its entirety. In particular, the lack of
controls referred to in the first sentence of [65] is inconsistent with the plan of
development requirements of minimum population and/or number of households. I
accept the opinions of the developer‘s economic expert, Mr Dimasi, as to impacts of
the proposal, that:
The proposed development will not have any inappropriate
impact on existing centres
The proposed development will not prejudice the delivery of
lower order centres within the catchment.
The joint economic report includes his table produced in support of his conclusions:
Table TD6
Stockland North Shore: Estimated Impact on Specific Centres*
Projected 2014/15
Estimated Without With Est.Impacts
Centres Unit 2011/12 Expansion Expansion $M %
Within
MTA $M 41.1 44.9 95.9 51.0 113.60%
Stockland North
Shore
Other MTA centres
Bushland Beach
Plaza $M 6.0 7.7 7.6 -0.2 -2.0%
Centro Woodlands $M 38.3 49.2 46.8 -2.5 -5.0%
Deeragun (Coles) $M 31.5 40.5 35.8 -2.0 -5.0%
Mt Louisa SC $M 13.8 15.6 15.3 -0.3 -2.0%
Total other MTA
centres $M 89.6 113.1 108.2 -5.0 -4.40%
Beyond MTA
Hyde
Park $M 216.6 236.7 221.3 -15.4 -6.50%
Aitkenvale $M 350.0 360.5 316.1 -14.4 -4.0%
Thuringowa Central $M 384.2 395.8 381.5 -14.2 -3.60%
Total Beyond MTA $M 950.9 993.0 948.9 -44.1 -4.4%
Total other centres $M 1,040.40 1,106.10 1,057.10 -49.0 -4.4%
Other retail floorspace $M -2.0
Total $M -51.0
* Consistent 2011/12 dollars &
including GST
Source: Stockland; MacroPlan
Dimasi
[23] Mr Owen was the economist engaged by Bushland Grove. For what it is worth,
given that company‘s withdrawal of its appeal, his views on this aspect as set out in
the joint economic report were:
-- 15 of 30 --
16
―Mr Owen considers
3.73 Owen concurs with Dimasi that the proposed development
will not have an inappropriate impact on any existing centre.
3.74 The primary impact will be on the specialty retailers within
the subject centre for the reasons stated previously. While
this may seem inconsequential as it only affects private
business, it is important for the following reasons:
An underperforming centre with numerous
vacancies can actively deter shoppers as a lack of
activity can leave a centre with the reputation for
being unsafe or unpopular. These shoppers in turn
will seek out other more active and attractive retail
destinations. Consequently, the centre may fail to
fulfil its intended function.
The lack of activity will deter business and social
investment within the general centre precinct
needed to support the emerging community and
create local jobs.
3.75 An underperforming retail centre is often used as a reason to
defer or stop new retail centres even though the new centre
may not have any material connection with the reasons for
underperformance. Consequently, the subject site (as a
premature development) may prejudice the delivery of lower
order centres in the catchment.
3.76 The proposed centre (with a 289% increase in floor area)
does not conform with the centres strategy as it is premature
when considered against the population of the catchment.‖
Mr Brown‘s views were:
―3.77 Brown agrees that the impacts of the proposed expansion of
the North Shore centre would not be of sufficient scale to
undermine the viability of any existing sub-regional or higher
order centres within the Townsville region.
3.78 Brown considers it likely that the expansion of the
supermarket at the North Shore centre is likely to have some
impacts on the trading performance of the Woolworths and
Coles supermarkets located at Deeragun. While these
impacts may make the operational environment of these two
supermarkets challenging there would remain some scope for
competitive responses providing centre owners had sufficient
access to capital.
3.79 Brown agrees with Owen that the expansion of the North
Shore centre is premature, with Brown estimating the extent
of prematuring to be between five and eight years. Brown
agrees with Owen that the presence of a large
underperforming sub-regional centre would suppress the
perceived need for additional centre facilities within the PTA.
-- 16 of 30 --
17
Brown agrees with Owen that this would undermine the
delivery of lower order centres that meet convenience needs.‖
It was asserted (without contradiction) that ―sufficient access to capital‖ was
enjoyed by the Deeragun owners on the basis of their presumed identities.
[24] Nothing from Mr Owen or Mr Brown dissuades me from accepting Mr Dimasi‘s
view, which, on this aspect of lack of adverse impacts, they appear to share. It
might be noted that economists apply a fairly robust concept of acceptable impacts
from new competition in the range of 15%, with which one would not necessarily
expect existing players in a market to be happy. The impacts here are well inside
the economists‘ benchmark.
[25] The notion that planned convenience centres may not eventuate because of
Stockland‘s expansion at North Shore is entirely hypothetical. I think it should be
disregarded. One of the centres mapped in the 2003 planning scheme under the title
Carinya will never eventuate, the developer having elected (long before Stockland‘s
current development application) to use the mapped area for residential
development. The court heard of another centre which had an approval that the
developer allowed to run out (before expansion at North Shore was mooted). The
Deeragun centres, partly shown on the ―Carinya‖ map, are the ones I would have
thought might struggle, especially as there is currently a high vacancy rate in at least
a couple of them. I defer to the economists‘ lack of serious concern about them. As
to Mr Owen‘s thought that the real strugglers will be operators of the new specialty
stores envisaged at North Shore, resulting in a depressed centre that will turn
shoppers off, I think it reasonable to place some weight on Stockland‘s apparent
confidence. Stockland is an outfit which knows how to operate shopping centres.
There is much to be said for leaving them to it, in the circumstances of lack of
adverse impacts anywhere else, in line with the Westfield case.
[26] As typically encountered, even under the current rules defining the responsibilities
of experts, the views of the economic and planning experts engaged by the parties
happened to coincide with what might be thought be relevant party‘s preferred
outcome of this appeal. That comment does not imply any criticism of the experts,
collectively or individually. The appellant‘s planner, Mr Schomburgk, provided
some helpful comments regarding the unusual appearance in a single planning
instrument, being the plan of development forming part of the preliminary approval,
of the ―need‖ for proposed development to be ―economic‖, ―planning‖ and ―public‖.
There are yet more references using other terms that would appear to deal with the
same concept. In respect of specific outcome 15, considered unusual (at least if it
were a planning scheme) for lacking more specificity, for example as to maximum
GFA or GLA limits, Mr Schomburgk said at T5-59 lines 35 to 55:
―… an adequate number must relate, in my opinion, to the issues of
economic need and, I suppose, public need, planning need to that
extent as well, but would relate to what amount of – what number
and range of retail uses was considered by particularly the
economists to be appropriate. That translates then similarly into
specific outcome 16, the economic need. We‘ve seen the economic
reports. Planning need is a slightly different subset but relies very
heavily on economic need, but also throws into the mix, if you like,
-- 17 of 30 --
18
issues of competition and convenience and choice. It may or may
not be dealt with in the same extent in an assessment of economic
need.
HIS HONOUR: I thought economists cared about convenience and
choice, too?-- They do, your Honour, but I suppose planning need
takes those elements usually further than what the economists might
do on a strictly mathematical assessment.
Are you suggesting planners might be keener on competition than
economists are?-- Arguably, but certainly I think we‘re more keen
on convenience than economists necessarily are.‖
Those views are consistent with ones expressed in the court. In Westfield Ltd v
Gold Coast City Council [2002] QPLR 542, 549, reference was made to what was
said in Elfband Pty Ltd v Maroochy Shire Council [1995] QPLR 290:
―Planning need is no doubt a more general issue than economic need,
but it seems to be obvious in cases such as this that unless there is an
economic need there will be no planning need. It is therefore
essential that the evidence establish … that there is an economic
need for a shopping centre such as Maroochydore Marketplace
within the Sunshine Coast Retail Network. The issue of planning
need then focuses upon the question whether the particular
development proposed should be permitted, involving as it does an
amendment to the planning scheme. This involves a consideration of
planning principles, and in particular the provisions of the strategic
plan and draft strategic plan.‖
Stockland‘s submissions note that the decision was ―reversed on other grounds: Yu
Feng Pty Ltd v Maroochy Shire Council [2000] 1 Qd R 306‖.
Economic need
[27] Stockland‘s written submissions in paragraph 38 conveniently collect features of the
agreed main trade area (MTA) served by its North Shore centre now proposed to be
expanded:
―(a) the forecast population in 2016 of the MTA is 34,000
(increasing by more than 4% per annum for the 10 years to
2026 to 52,400);
(b) the average household income level for MTA households
($99,621) is ‗significantly higher‘ than the benchmarks for
the total Townsville metropolitan area ($90,541) and
Australia ($88,205), and even higher within the primary
sector ($104,141), which contains most of the MTA
population (e.g. 66% in 2016);
(c) the population of the MTA is relatively young, with the
dominant family type being couples with dependent
-- 18 of 30 --
19
children, consistent with the area being ‗a rapidly growing
outer suburban location‘;
(d) over the inter-censal period 2006-2011, the MTA population
has become ‗generally wealthier‘;
(e) between 2012 and 2016, the retail expenditure capacity
within the MTA will increase by $91M;
(f) there are various significant developments occurring or
proposed in the primary trade area, including Stockland
North Shore (c.5,000 dwellings), Greater Ascot (c.2,200
dwellings), Bushland Beach (c.3,000 dwellings), Sanctum
(c.1,300 dwellings), Kingston Park (c.1,000 dwellings),
Brendale (c.1,500 dwellings).‖
Reference to p 13 of the joint report shows that the comparison in (d) is not between
the population of the MTA ―then‖ and ―now‖ but between that population and
national benchmarks.
Mr Dimasi‘s opinion (joint economic report 3.38) was:
―
The scale of the proposed development is not excessive given
the size in population of the catchment and particularly given
the growth outlook. The scale of the proposed development is
appropriate.
The proposed development is not premature if it is to be
completed in order that 2014-2015 will be its first full year of
trade. Indeed, there is a strong and rapidly growing need and
demand for the development.‖
Stockland‘s proposal now is that 2015-2016 would be the first full year of
operations, indeed that the opening not occur before December 2015. Mr Dimasi,
as an economist, further considered that catchment residents‘ needs could not
properly have be met by facilities existing or approved or likely to emerge within
the main trade area, the residents being compelled to travel significant distances
(greater than 10 kilometres) to access one of the higher order shopping centres
located generally to the east to satisfy needs that would be met by the proposed
expanded Stockland North Shore.
[28] Dexus‘ economic expert Mr Brown presented a competing view that there exists at
present no sufficient need for the expansion, indeed that it will be several years
before a need exists for all elements of the proposed expansion. As the joint report
reveals:
―3.45 Brown summarises his market share assumptions in Table 5
below. Table 5 outlines the anticipated market penetration
of the various retail drivers of the expanded North Shore
centre. Assumptions have also been made regarding the
-- 19 of 30 --
20
proportion of trade anticipated to be sourced from outside
the identified trade areas. Normally, this represents between
10% and 20% of centre turnover, however given the
location of the North Shore centre on the fringes of
Townsville and the geographically expansive trade areas
identified, Brown anticipates the centre would draw a lower
proportion of its trade from outside the identified trade areas
than a more centrally located centre (e.g. Castletown,
Stockland Townsville, etc).
Table MB5: Centre performance assumptions for expanded North Shore Centre.
Supermarket DDS Mini-
Major
General
retail
specialty
Specialty
food
Food,
catering
& retail
services
Floor
space
4.611 7,189 2,479 2,100 1,050 1,050
Market
shares
PTA 32.5% 12.0% 5.0% 5.0% 12.5% 12.5%
STAE 20.0% 7.0% 3.5% 3.5% 7.5% 7.5%
STAW 25.0% 10.0% 4.0% 4.5% 10.0% 10.0%
% of
trade
from
non-TA
sources
5.0% 5.0% 5.0% 5.0% 5.0% 5.0%
Note: Specialty retail has been apportioned based on industry experience. Totals may not directly
sum due to rounding.
3.46 The anticipated performance of the expanded North Shore
centre by retail driver (as estimated by Mr Brown) is outlined
in the tables below.
Table MB6: Anticipated supermarket performance in expanded North Shore
Centre, 2014-2021
PTA STAE STAW
NON-
TA TOTAL $/sqm
2014 $26.9 $4.4 $8.1 $2.1 $41.4 $8,986
2015 $29.3 $4.5 $8.3 $2.2 $44.3 $9,611
2016 $31.9 $4.7 $8.3 $2.4 $47.3 $10,250
2017 $34.5 $4.9 $8.5 $2.5 $50.4 $10,935
2018 $36.9 $4.9 $8.7 $2.7 $53.1 $11,522
2019 $39.5 $5.0 $8.7 $2.8 $56.1 $12,161
2020 $42.2 $5.0 $8.9 $3.0 $59.1 $12,809
-- 20 of 30 --
21
2021 $45.1 $5.2 $9.1 $3.1 $62.5 $13,554
Table MB7: Anticipated DDS performance in expanded North Shore Centre, 2014-
2021.
PTA STAE STAW
NON-
TA TOTAL $/sqm
2014 $10.8 $1.8 $3.3 $0.8 $16.6 $2,315
2015 $11.8 $1.8 $3.3 $0.9 $17.8 $2,472
2016 $12.7 $2.0 $3.4 $0.9 $19.0 $2,636
2017 $12.5 $2.0 $3.3 $0.9 $18.8 $2,617
2018 $14.6 $2.1 $3.3 $1.1 $21.1 $2,933
2019 $15.7 $2.1 $3.4 $1.1 $22.4 $3,112
2020 $16.6 $2.1 $3.6 $1.2 $23.5 $3,270
2021 $17.8 $2.1 $3.6 $1.2 $24.8 $3,450
Table MB8: Anticipated mini-majors performance in expanded North Shore
Centre, 2014-2021.
PTA STAE STAW
NON-
TA TOTAL $/sqm
2014 $4.5 $0.9 $1.3 $0.35 $7.0 $2,837
2015 $4.9 $0.9 $1.3 $0.38 $7.5 $3,029
2016 $5.3 $1.0 $1.3 $0.40 $8.0 $3,232
2017 $5.2 $1.0 $1.3 $0.40 $8.0 $3,210
2018 $6.1 $1.1 $1.3 $0.45 $8.9 $3,595
2019 $6.5 $1.1 $1.4 $0.47 $9.4 $3,810
2020 $6.9 $1.1 $1.5 $0.50 $9.9 $4,000
2021 $7.4 $1.1 $1.5 $0.52 $10.5 $4,218
Table MB9: Anticipated general retail specialties performance in expanded North
Shore Centre, 2014-2021.
PTA STAE STAW
NON-
TA TOTAL $/sqm
2014 $4.5 $0.9 $1.5 $0.4 $7.2 $3,430
2015 $4.9 $0.9 $1.5 $0.4 $7.7 $3,657
2016 $5.3 $1.0 $1.5 $0.4 $8.2 $3,899
2017 $5.2 $1.0 $1.5 $0.4 $8.1 $3,874
2018 $6.1 $1.1 $1.5 $0.5 $9.1 $4,327
2019 $6.5 $1.1 $1.5 $0.5 $9.6 $4,584
2020 $6.9 $1.1 $1.6 $0.5 $10.1 $4,813
2021 $7.4 $1.1 $1.6 $0.5 $10.6 $5,070
-- 21 of 30 --
22
Table MB10: Anticipated specialty food performance in expanded North Shore
Centre, 2014-2021.
PTA STAE STAW
NON-
TA TOTAL $/sqm
2014 $3.19 $0.51 $1.00 $0.2 $4.9 $4,706
2015 $3.47 $0.53 $1.03 $0.3 $5.3 $5,031
2016 $3.78 $0.54 $1.03 $0.3 $5.6 $5,363
2017 $4.09 $0.56 $1.05 $0.3 $6.0 $5,721
2018 $4.38 $0.56 $1.08 $0.3 $6.3 $6,028
2019 $4.69 $0.58 $1.08 $0.3 $6.7 $6,360
2020 $5.00 $0.58 $1.10 $0.4 $7.0 $6,698
2021 $5.34 $0.60 $1.13 $0.4 $7.4 $7,086
Table MB11: Anticipated food, catering and retail services performance in
expanded North Shore Centre, 2014-2021.
PTA STAE STAW
NON-
TA TOTAL $/sqm
2014 $3.25 $0.60 $0.90 $0.3 $5.0 $4,762
2015 $3.50 $0.60 $0.90 $0.3 $5.3 $5,013
2016 $3.75 $0.60 $1.00 $0.3 $5.6 $5,363
2017 $4.13 $0.68 $1.00 $0.3 $6.1 $5,815
2018 $4.38 $0.68 $1.00 $0.3 $6.4 $6,065
2019 $4.75 $0.68 $1.00 $0.3 $6.8 $6,441
2020 $5.00 $0.68 $1.00 $0.4 $7.0 $6,692
2021 $5.50 $0.68 $1.00 $0.4 $7.6 $7,193
3.47 Based on the above analysis and a first full year of trade
being 2014 for the expanded centre, Brown considers:
The expanded supermarket would achieve benchmark
sales rates for recently established supermarkets (i.e.
~$8,000-$9,000/sq.m) with trade approaching
benchmark trading levels for well-established
supermarkets (>$10,000/sq.m) within two to three years
of expansion;
The proposed DDS will perform well below benchmark
trading levels (i.e.~$3,000-$3,500/sq.m) until 2019 at
which time it will perform at the lower end of the
performance spectrum;
The proposed mini-majors are anticipated to perform at
better levels than the proposed DDS, but will perform
below benchmark trading (i.e.~$4,000-$5,000/sq.m)
levels until 2020; and
-- 22 of 30 --
23
The proposed specialty tenants are anticipated to
perform better than the mini-majors and DDS, but
likely to trade below benchmark trading levels which
are typically between $4,000/sq.m to $7,000/sq.m, until
around 2016-2018.
Hence, it is Brown‘s view that the proposed development in its
entirety is between five to eight years premature.‖
[29] In the end, Mr Brown‘s work does not dissuade me from a view that concerns to do
with possible prematurity can be overcome by imposing a condition to preclude
commencement of operations in the expanded shopping centre before December
2015. There was no suggestion, and none has been made by me, that the numbers
selected for inclusion in the MB tables were selected with an eye to ensuring a
desired outcome of prematurity in the proposal, to be based on a demonstration of
non-viability of retail components of it for greater or more modest periods of years
after opening, as growth of the spending population occurs. The tables contain
errors, for example the drops in 2017 in MB7, MB8 and MB9, when one would
expect increases. There is no reason for those drops to occur, suggesting that some
mistake was made. Such carping is by the by. Mr Dimasi‘s work was criticised for
lacking transparency, lacking detail that might either confirm or discredit assertions
in the overall analysis. But as Mr Dimasi pointed out, quantifying important
elements of the ―inputs‖ is very much a matter of professional judgment. He
considered that the 5% figure percentage of trade from non-Trade Area sources (for
which reasons were given) was inadequate, Mr Brown having acknowledged
(Exhibit 10 3.45) that ―normally this represents between 10% and 20% of centre
turnover‖. If Mr Brown turns out to be right, the plan of development notion of the
centre serving ―residents of the region, and the travelling public‖ (PoD 4.4(7)(a))
will be proved sadly misguided. The components of the expanded centre will not
necessarily experience the shares of total expenditure assigned to them. Mr Brown
expects the expanded supermarket to achieve higher earnings from the outset and
continuing than does Mr Dimasi, leaving less for other retail categories, and
conducing to more pessimistic forecasts about their performance.
[30] Mr Owen came down somewhere in the middle. His predictions for the discount
department store year by year (Table WO1) are higher than Mr Brown‘s in Table
MB7, as are those for the mini-majors (Table WO2, cf. Table MB8) and the
supermarket (Tables WO3, MB6) and specialties retail (Tables WO6 and MB11),
but his figures for specialities food-based (Table WO4) and specialties catering
(WO5) are lower (compare Tables MB10 and MB11). Assumptions have to be
made about the floor areas available to the categories, which may well be belied by
future events, although the supermarket and DDS areas may be unlikely to change.
The point is that estimates made today can be juggled, and the breakdown of retail
categories can be adjusted in the real world in the future, with a view to achieving
whatever trading benchmarks are aimed at.
[31] The other important area of disagreement is what those benchmarks are. The
economists have access to reported data from many shopping centres nationally
showing the trading results for the categories of retailers operating in established
-- 23 of 30 --
24
centres discussed above organised in various ways (for example, metropolitan or
non-metropolitan, single DDS-based centres as opposed to multiple DDS-based
centres, and top quartile as opposed to bottom quartile).
[32] All of the data is brought down to expenditure in the outlets per square metre. It
seemed to me that there might be other ways than focussing on customer
expenditure achievable per square metre as the be-all and end-all of the viability of
a new facility; if the aggregate expenditure achievable is quantified (which may or
may not depend on the floor area) and the operating costs are predicted, I would
expect those concerned to be well-placed to determine whether it was a good idea to
proceed with a project, whether to establish a complete shopping centre, or to enter
into a lease for a humble retail tenancy within it from both private and public
standpoints. It is not for the court to gainsay the experts, however. 5
[33] Accepting the ―per m2‖ approach and the ―Urbis‖ numbers (which the parties asked
to be accorded ―Fielder Gillespie‖ confidentiality), Mr Brown might have appeared
to make his point, that some of the retail categories in an expanded North Shore will
fall short of the ―Urbis‖ benchmarks for a few years, even with the ―discounts‖ he
thought appropriate for new enterprises, or setting sights on the lowest quartile
performance. One must ask, lowest quartile of what? It may be accepted that those
in the business, like the commercial parties in this appeal, are aware of and anxious
to access the Urbis data; however, we do not know which shopping centres reported
to Urbis, and in my opinion issues of viability in particular locations have to be
tested against the factors operating in their areas. There was evidence that there are
retailers out there anxious to move early into a market to secure a foothold in it;
they would not expect ―benchmark‖ results from the outset. Local residents could
be expected to welcome the additional facilities made available to them. Another,
perhaps minor, consideration is that the ―mini-major‖ category has undergone
redefinition in recent years. The earlier practice of identifying the products/services
provided has been supplanted by focus on floor area of 400m2 – a large range of
performance in financial terms may be anticipated: a gymnasium, for example, not
performing as would a large liquor outlet, per square metre.
[34] There should be noted Mr Brown‘s and Mr Owen‘s reservations about a population
estimate of 48,000 in 2009 for the ―North Shore Catchment‖ in a Centres Hierarchy
Strategy prepared by consultants for the Council dated August 2011; 28,000 is
suggested to be the correct figure. The Strategy appears to offer strong support for
the current proposal for Stockland North Shore. Unsurprisingly, Mr Dimasi quotes
from it at length, including the population estimates. He disavowed any reliance on
it, stating that he had reached his opinion independently. Although Mr Gore was
able to demonstrate a process that showed how the ―unexplained‖ 48,000 might
have been arrived at, the estimate for the moment remains under a cloud. Mr
Dimasi‘s summary (Exhibit 10, 3.21) quotes estimates of population for the ―Major
Centres Catchment Areas‖, being Hyde Park (Castletown), Aitkenvale, Thuringowa
Central and North Shore. The first alone is said to be reduced by the influence of
North Shore. The reduction is estimated at 19,500, it being unclear whether the
5 Intriguingly, in a following appeal before me involving rival shopping centre proponents in another
city, evidence was given that a particular retail outlet, long established, which traded far ahead of
benchmarks for its category, was trading unprofitably.
-- 24 of 30 --
25
67,500 given is the before or after case. If the latter, then the four catchments would
appear to overlap. I understand Dexus‘ case to be that the 48,000 appeared to be
based on counting locations south of the Bruce Highway which the economists had
not included in their agreed main trade area.
[35] Returning to the prematurity issue, it is intriguing to note that while Mr Dimasi
considered the proposed expansion of the Woolworths supermarket not likely to
produce any great increase in sales immediately (Exhibit 10, 3.35 – no doubt
because the present supermarket already satisfies the supermarket needs of those
who choose Woolworths), Mr Brown (and Mr Owen even more-so) opined that the
expanded supermarket would perform 7 to 10 percent better than did Mr Dimasi.
Mr Brown I took to support expansion of the supermarket, even with its
concomitant threat to convenience centres in the main trade area. They had the
discount department store doing as well or better. It was in respect of the other
components that their assessments of performance fell wildly short, in Mr Owen‘s
estimates by almost 20 percent, in Mr Brown‘s by factors exceeding 27 percent and
33 percent. The greater discrepancies arise from Mr Brown‘s estimate of total
expanded centre performance being less than 92 percent of Mr Dimasi‘s ($95.886
million on opening in 2014-15). Mr Owen‘s was within 3 percent of Mr Dimasi‘s, a
difference without much significance. (The foregoing analysis is based on Table 3
in Exhibit 12). It is unsurprising that the judgments or predictions of experienced
professional economists vary. I have found Mr Dimasi‘s opinions persuasive.
[36] Apropos struggling specialty retailers, it should be noted that some of the space
attributed to them (Mr Dimasi estimated 1,500m²) is expected to be taken up by
non-retail/commercial uses, for example personal services, financial services and
real estate agencies. In the final wash-up, I have gained little assistance from the
descent into detail recommended by Mr Brown for what seemed to be sound
reasons. It turned out that as detail waxed, confidence in it waned. All experts
agreed that ―lumpiness‖ is a feature of the establishment and expansion of shopping
centres. Thus Mr Dimasi thought expansion of the supermarket was not urgently
required, but was an advisable course if the centre were to be expanded at all, as it
should be, if only to provide the discount department store. The population required
for one to be sustainable has probably been reached by now. The benchmark
indicated in the Joint Economic Report (3.29) was in line with what I have heard
from other experts in other appeals, for example Bird v Logan City Regional
Council [2011] QPEC 145, [2012] QPELR 502 ([46]).
[37] As to the viability of the discount department store, in this context of disagreement
as to the number of years to elapse before a national (or some notional) benchmark
in trading is achieved, Stockland has contended that the court should take comfort
from the interest shown by Woolworths Ltd in establishing a Big W, referring to
cases such as Westfield Ltd v Gold Coast City Council [2002] QPELR 542, 550 and
CPT Manager Ltd v Central Highlands Regional Council [2010] QPELR 201, 202.
There is some merit in this approach, but perusal of the agreement executed by that
company, which presumably wants to secure for itself the ―inside running‖, shows
that it is far from being committed. I place no reliance on Exhibit FG1 in rejecting
the argument that ―there is no economic need for the proposal because the
components will not achieve benchmark performance for some years.‖
-- 25 of 30 --
26
[38] A further point dividing the economists concerned the benefits by way of
employment generation that the proposed expansion could be expected to bring.
These would be relevant if, contrary to my view, there was conflict with a relevant
planning instrument, and the familiar quest was embarked upon to identify grounds
of public interest that might justify approval in face of the conflict. The benefit by
way of employment opportunities for the North Shore community is obvious.
Mr Dimasi estimated that at 432 persons, based on $51 million in new retail
expenditure. The real contest was about his estimating that job losses in the other
centres attributable to trade they will lose would be only 22. Mr Brown‘s individual
report states:
―24. On Mr Dimasi‘s figures:
a. The proposed expansion will result in an increase in
trading at Stockland North Shore of $51 million (see
Table TD6 at page 48 of the JER);
b. An additional 432 will be employed at the centre
(see Table TD4 at page 44 of the JER);
c. Other centres in the Townsville region will suffer a
$51 million impact; but
d. The loss of employment opportunities at other
centres will be 22 employed persons (the 5% impact
referred to in Footnote 2 to Table TD4 at page 44 of
the JER).
25. On Mr Dimasi‘s approach, for every million dollars lost in
turnover at a given centre, there will be a loss of only 0.4
employed persons. On the other hand, again on Mr Dimasi‘s
approach, for every million dollars increase in turnover at
Stockland North Shore, retail employment opportunities are
created for over 8 persons.
26. I disagree with this approach given the highly responsive nature
of employment in the retail industry and the fact that the
increase in turnover at Stockland North Shore would be a
consequence of redirected expenditure. It is my view that the
operational employment effects of the expanded North Shore
centre are largely transfers of employment from other centres,
as opposed to a significant net increase in retail employment
across the Townsville retail sector.‖
[39] Mr Dimasi stuck to his guns, explaining this stark discrepancy in terms of
difficulties that reductions in staff levels pose for retailers, who usually cannot cut
them with the abandon or mechanical approach suggested by Mr Brown. Selling
staff aside, a shopping centre may be unable to terminate administrative, cleaning or
security staff in line with declining turnover. (In any event, no one suggested that
decline in any centre would be concerning. The proposal will, in large measure,
-- 26 of 30 --
27
involve North Shore‘s appropriating the retail opportunities offered by growth in the
locality.) I am satisfied that the employment benefits contended for are a ―ground‖
and something desired by the planning instruments. That would remain the case
even if Mr Dimasi‘s 22 lost positions were increased by multiples in an exercise of
focussing on a wider ―public‖ or ―community‖ than North Shore. It would seem
that productivity in the other major centres will suffer a decline. However, I am in
no doubt that the greater public good lies in the generation of new employment.
That and the provision of conveniently located higher order and more varied retail
facilities to the growing and presently relatively isolated North Shore community
lead me to the view that sufficient grounds are established to override any conflict
with planning instruments that might be contended or thought to arise from the
proposal, once its starting date is held back to December 2015 or later.
[40] On that basis, economic need is established by Stockland. As to planning need or
public need, which I think must be accounted the same thing, I proceed on the
footing that it adds into the mix or places additional focus on considerations of
competition, convenience and choice. In each respect, the proposal qualifies. Mr
Schomburgk thought that planning need had not been demonstrated for the entirety
of the proposal (T5-60), that one had been demonstrated for a smaller proposal, but
not enough ―to get them across the line yet for the full 20,000m²‖ (T5-61). He did
not consider the trade area population disadvantaged by their location over 10km
from the nearest discount department store, volunteering that he would be happy to
drive such a distance to a discount department store himself (as apparently he is
compelled to do from his residence). The insult or ―cost‖ to the planned hierarchy
of centres that he perceived outweighed in his thinking the convenience benefit he
accepted the expansion ought bring. For reasons apparent elsewhere, in my opinion
there is no (or only a purely technical) conflict with the centres hierarchy provisions
in the planning scheme, because their focus is on the time of establishment of an
expanded centre, rather than the time of application or approval. Mr Schomburgk
understandably in the circumstances discusses in a commingled way planning need
from the twin perspectives of whether a planning need is shown, other things being
equal, and in an immediately adjacent sentence whether (rather grudgingly
conceded) disadvantage to the local community yet produces an ―overriding
planning need‖ (T5-60) – bespeaking an approach that there is a conflict that needs
to be overcome. It is convenient to note here my rejection of suggestions, whether
by any planner or any economist, that offering a single discount department store in
a centre is no real benefit for consumers, because those wanting the lines carried are
engaging in ―comparison shopping‖ and will want to go to one of the larger centres
where multiple discount department stores compete. I would expect shoppers to
think carefully before committing to an additional 20 or 30 kilometres‘ driving in
the interests of safety on the roads and a reduction of their carbon footprints/fuel
consumption, not to mention the saving of time.
[41] I accept Mr Motti‘s reason for the conclusion that a ―public need‖ has been
established. See Exhibit 11:
“6.1.2 Mr Motti says that the development will result in a facility
that serves the residents of North Shore (the structure plan
area), the region and the travelling public as expected by the
Overall Outcome 4.4(7)(a) for the structure plan area. It
offers a retail and commercial mix that will satisfy a public
-- 27 of 30 --
28
need by providing convenient access to facilities not
otherwise found in the locality and it will provide an
expanded range and choice of offer. It also offers local
employment opportunities to assist in creating a cohesive
and identifiable community.”
[42] One could add to the considerations he mentions that of increasing competition.
The tests for the proposal set by the plan of development are satisfied; there is no
conflict with the preliminary approval.
[43] As to the planning scheme, limited conflict is conceded. Stockland‘s planner,
Mr Motti, in his individual report Exhibit 13 at 46.0.2, accepts that there is conflict
with the planning scheme in that the proposal is inconsistent with the Rural and
Residential Planning Areas. In the joint planners report Exhibit 11 at 7.0.1, the
town planning experts agreed there was a reasonable expectation that the Rural
Planning Area and the Residential Planning Area provisions applying to the site as
per the planning scheme had been overtaken by the preliminary approval and the
plan of development. There was disagreement as to whether the later planning
instrument supported the scale or timing of the proposal. Mr Perkins (the Council‘s
planning expert) says at Exhibit 11, 6.2.30 there is conflict with the planning
scheme because the site is not in the Centres Planning Area, perhaps the obverse of
its being in the Rural and Residential Planning Areas. Of course, the character
statement contemplates that to the mapped areas will be added an important centre
in the Mount Low – Deeragun area. In my opinion the proposal provides the basis
of the ―identified Sub-Regional Centre [] … Mt Low Deeragun. That it may come
about earlier than ―intended‖ cannot convincingly be presented as conflict: this is a
case of intended expansion occurring earlier than envisaged, consistently with the
rapid growth of the locality, and with no adverse consequences whatever. Dexus‘
submissions in paragraph 61(c) draw attention to s 2.16.3 of the 1996 Planning
Scheme, confirming long-standing expectations of development along the lines of
the proposal somewhere in the general locality (―somewhere‖ that has come to
correspond with the site):
“2.16.3 Shopping and Commercial
While the Townsville Central Business District contains a significant
concentration of commercial, administrative, service and cultural
activities, the shopping function has changed and weakened with the
advent of large suburban drive-in shopping centres. Stockland
Nathan Plaza with a floor area of about 48,000 sqm, which includes
the K-Mart Plaza, has the regional shopping role.
Within Thuringowa City the Willows Shoppingtown is the dominant
centre and has a sub-regional role. With residential development of
land further south along Ross River Road, the Willows
Shoppingtown will remain the dominant retail centre in Thuringowa
for some considerable time.
With urban development of the areas generally referred to as the
Bohle Plains and Mt Low-Deeragun, the need for shopping centres in
-- 28 of 30 --
29
that area will arise. The establishment of a further sub-regional
centre, in that area, is indicated on the Development Control Plan.
…
A sub-regional centre in the Bohle Plains area would be required by
about 2020 or when the regional population reaches about 150,000.
Initial construction will commence before that time with the centre
growing to meet the needs of the population. In the long term, these
centres would compliment each other with neither centre
dominating.”
[44] The complimentary centres are Dexus‘ at the Willows and, as events have turned
out, Stockland North Shore. Of course the 1996 Planning Scheme is no longer the
planning scheme, although its concept has clearly been carried over into the current
one. If it mattered, the 150,000 regional population, taken to be that of Townsville-
Thuringowa, has been reached, and some years before 2020.
[45] Mr Schomburgk‘s opinion about conflict with the Planning Scheme was that (as
assessment against its provisions would confirm) it arose starkly with the Rural
Planning Area and the Residential Planning Area; he thought they became relevant
because the plan of development in the preliminary approval was not satisfied. My
opinion is that those Planning Area designations are overridden by the preliminary
approval for relevant purposes. Otherwise, Mr Schomburgk says:
― Centres Planning Area
6.2.13 As discussed above, it is my opinion that a centre of the
scale being proposed is in direct conflict with the stated
intentions for the Centres Planning Area (section 3.3.1(e)).
A centre of this size in this location is not intended within
the life of the current Planning Scheme, and I have seen no
material to suggest these provisions of the Planning Scheme
have been ‗overtaken by events‘ as that term is used in town
planning terminology. Indeed, the PoD for this site sets its
own criteria for expansion, which, based on the material I
have seen, have not been reached.
6.2.14 The scale of the proposed centre is at least District, if not
Sub-Regional, as described in the Centres Planning Area
Character Statement (section 3.3.1). Section 3.3.1(e)(iii)
provides that ‗the establishment of additional District
centres, other than those identified in the Schedule 3.3, is
inconsistent with the desired outcomes for the Centres
Planning Area‖. There seems little doubt that the
establishment of this particular proposal, regardless of what
Centre classification it might best fall within, is inconsistent
with these provisions.
6.2.15 The Centres Planning Area Code provides that the GLA of
a centre is to be ―appropriate for (that centre‘s) function
-- 29 of 30 --
30
within the centres hierarchy‖ (P1 of the Code). By
reference to the provisions of the Character Statement
mentioned above, this proposal exceeds that GLA by a
substantial factor, given that, within the life of this Planning
Scheme, a centre at this general location is not intended to
reach Sub-Regional scale, which this proposal does. In
doing so, the proposal also offends P20 which seeks to
maintain that hierarchy.
6.2.16 P22 of the Code is raised as an issue, and deals with CPTED
principles (Crime Prevention Through Environmental
Design). I do not consider that the subject proposal offends
that Criterion, or at worst can be conditioned to ensure
compliance.
6.2.17 In my opinion, then, the proposal conflicts with provisions
of the Centres Planning Area. That conflict is acute,
principally as a result of the scale of the proposed
development when compared with the Planning Scheme‘s
stated intentions.‖
[46] It comes down to the combined effect of scale and timing. Even if satisfaction of
the ‗PoD‘ requirements did not do away with the ‗conflict‘, it is one that disappears
if establishment is delayed to the end of the year after next.
[47] Accepting that matters identified are conflicts with the planning scheme, they are
outweighed by the proposal‘s conformity with the preliminary approval, which may
be summed up as need being satisfied in a fashion identified as suitable. Other
―grounds‖, for section 326 purposes might be relied on; it is necessary to mention
only employment creation.
[48] Dexus‘ case was that the proposed development‘s prematurity was so gross that
approval should not be given at all, the relevant application ought to be rejected out
of hand. Stockland‘s approach was that this was simply a conditions appeal:
conditions could be imposed to ensure that the proposal as developed satisfies the
relevant planning instruments. That is the approach which the court has found
persuasive.
[49] The appeal should be dismissed, subject to a condition being included in the
approval (consistently with an approach of all of the planners thought open)
delaying the commencement of operations in the expanded centre until December
2015 or later.
-- 30 of 30 --