Ellis and Anor v Queensland Building Services Authority [2012] QCAT 641
CITATION: Ellis and Anor v Queensland Building
Services Authority [2012] QCAT 641
PARTIES: Shane Ellis
Vicki Ellis
(Applicants)
v
Queensland Building Services Authority
(Respondent)
APPLICATION NUMBER: GAR082-12
MATTER TYPE: General administrative review matters
HEARING DATE: On the papers
HEARD AT: Brisbane
DECISION OF: J Jerrard QC, Member
DELIVERED ON: 24 December 2012
DELIVERED AT: Brisbane
ORDERS MADE: 1. Set aside the decision of 2 February
2012;
2. Return the matter for reconsideration
to the QBSA, with the following
direction:
a. The QBSA is to request the
applicants to provide a statutory
declaration signed by one of them,
describing therein with particularity
the building work performed at 40
Handel Avenue, Worongary by
Michael Eston Homes Pty Ltd, the
dates between which that work was
performed, and the total cost of it;
and of the position of the tiles about
which complaint was made to
QBSA Inspector Campbell on 19
November 2011, specifying whether
or what portions of those are in a
covered area;
3. Upon receipt of that statutory
declaration, the QBSA is to determine
the applicants’ claim for indemnity
under the Statutory Insurance Scheme,
-- 1 of 13 --
2
and advise the applicants of the result,
specifying therein whether the QBSA is
following and applying the reasons and
decision of this Tribunal in Jones v
QBSA [2010] QCAT 563.
CATCHWORDS: Meaning of ―Primary Building Work‖ – What
constitutes a ―Path‖ – Need for agreement on
the facts
Queensland Civil and Administrative Tribunal
Act 2009
APPEARANCES and REPRESENTATION (if any):
This matter was heard and determined on the papers pursuant to s 32 of
Queensland Civil and Administrative Tribunal Act 2009 (QCAT Act).
REASONS FOR DECISION
[1] This is a proceeding for the review, under s 86(1)(h) of the Queensland
Building Services Authority Act 1991 (―the QBSA Act‖), of a decision by
the Queensland Building Services Authority (―the QBSA‖) (communicated
by letter dated 2 February 2012), to disallow a claim by the applicants Mr
Shane Ellis and Mrs Vicki Ellis, made under the Queensland Home
Warranty Scheme (―the Statutory Insurance Scheme‖). The applicants
lodged a claim received on 6 October 2011, in respect of building work
performed in June 2006 at the applicants’ residence at 440 Handel
Avenue, Worongary, Queensland, and the complaint specified that in mid
September 2001 the applicants had noticed that the tiles in a tiled area,
described as being the ―pool and barbeque area‖, were lifting over most of
the area and the tiles were moving, and dangerous. (The complaint is
exhibit ―SOR-5‖ to a document headed ―Statement of Reasons for the
Decision filed in this Tribunal on 9 July 2012 by the respondent QBSA‖).
[2] The applicants submitted, with that complaint, a number of documents,
which are listed in paragraph 25 of that ―Statement of Reasons.‖ They
included a current title search of the property, dated 19 May 2006, a copy
of a letter dated 4 October 2011 from the male applicant to the builder,
advising that because the builder had been placed in the hands of a
receiver and manager, he had lodged a formal complaint with the QBSA,
noting that the builder had already corrected a lot of ―the defective work to
my home, including replacing all water proofing and decks/tiling to the two
balconies, and the associated repair of the rendering and surrounding
works.‖ He advised the builder that the ―major tiling job‖ carried out
around the swimming pool area had become a major safety hazard, due
to tiles becoming loose and lifting in the major portion of areas tiled.
[3] The other documents annexed to the complaint lodged with the QBSA
were 15 invoices, two quotations, and a QBSA certificate of insurance,
-- 2 of 13 --
3
dated 22 June 2006. That certificate of insurance was in respect of the
premises at 40 Handel Avenue, Worongary, and insured residential
construction work (described as ―Alteration and/or Addition and/or
Repairs‖) to a notified contract value of $300,000.00. The
commencement date was recorded as 21 June 2006, and the date of
expiry 21 December 2012.
[4] The first six of those invoices were from B.P. and K.L. Jorgensen,
addressed to the builder (Michael Easton Homes), and described as being
for the supply of labour, materials and drawings for a job site at 40 Handel
Avenue at Worongary. There was both a quotation, and an invoice, from
an entity trading as Metro Tiles Factory Outlet, to the builder, in respect of
the property at 40 Handel Avenue, invoices from an entity trading as
Stone World Design Centre, two of which were addressed to the builder,
one was to the male applicant, and one had no addressee. Those
invoices from Metro Tiles Gold Coast and Stone World all identified the
point of delivery as 40 Handel Avenue, Worongary.
[5] There were four invoices from the builder to the applicants, bearing dates
ranging from 4 October 2006 through to 7 December 2006, for an amount
totalling $282,410.09, and an estimate dated 31 May 2006, in a total
amount of $285,793.20. The figures appearing on the estimate total
$127,472.00, and the estimate does not explain on its face how the
remaining $132,340.00 cost was calculated.
[6] The ―Statement of Reasons‖ treats the estimate dated 31 May 2006 as a
quote for various items of work to be completed at 40 Handel Avenue,
Worongary, and as the basis of the certificate of insurance issued on
22 June 2006 in the amount of $300,000.00, for the ―Alteration and/or
Addition and/or Repairs‖ at 40 Handel Avenue. That Statement of
Reasons described the statutory insurance scheme provided for in part 5
of the QBSA Act, in sections 67X to 71AA, and how under that Act a
policy of insurance comes into force (because of section 69(2)) if a
consumer enters into a contract for the performance of residential
construction work, and the contract is with a licensed contractor who may
enter into contracts with consumers to carry out residential construction
work covered by the statutory insurance scheme. A consumer is a person
for whom building work is carried out.
[7] The effect of s 70(2) of the QBSA Act is that a person who has applied to
the QBSA for a direction that a builder rectify building work is taken to
have given notice of a claim to indemnity under the Statutory Insurance
Scheme. The relevant insurance policy conditions applicable to contracts
for the performance of ―residential construction work‖ appeared at
annexure SOR-1 to the Statement of Reasons, and clause 2.1 of those
insurance policy conditions, in edition 6, effective from 1 September 2003,
provided that the QBSA agreed to pay the cost of rectifying defects in
residential construction work that was ―primary building work‖. ―Primary
building work‖ was defined in part 9 of the insurance policy conditions to
mean primary building work as defined in section 11 of the Queensland
Building Services Authority Regulation 2003 (―the Regulation‖),
-- 3 of 13 --
4
―associated building work‖ was defined by part 9 of those conditions to
mean associated building work as defined in section 12 of the Regulation,
and ―residential construction work‖ was likewise defined in that part 9 to
mean residential construction work as defined in section 10 of the
Regulation.
[8] Regulation 9 reads as follows:
In this division—
associated building work see section 12.
primary building work see section 11.
related roofed building means a building, other than a residence,
that—
(a) has a roof that is designed to be—
(i) part of the structure of the building; and
(ii) impervious to water or wind; and
(b) is on the site of a residence or proposed residence, or proposed
to be on the site of a residence or proposed residence; and
(c) is used, or proposed to be used, for a purpose related to the use
of the residence, or proposed residence.
[9] The Regulation then goes on to give examples of a related roof building –
a private garage, shed, carport, toilet building or change room on, or
proposed to be placed on, the site of any existing or proposed residence;
and continues: residence means a building or part of a building fixed to
land and designed to be used for residential purposes, whether or not it
is part of commercial or industrial premises, but does not include the
following—
(a) a boat, caravan, manufactured home, motor vehicle, tent, trailer,
train or another similar thing;
(b) a building designed as a temporary building, including, for
example, a demountable building.
[10] Regulation 10 provides:
10 Classification as residential construction work
For the Act, schedule 2, definition residential construction work, the
following is classified as residential construction work—
(a) primary building work;
(b) associated building work.
[11] Section 11 provides as follows:
11 Meaning of primary building work
(1) Subject to subsection (3), for section 10(a), building work
mentioned in subsection (2) is primary building work if it is—
-- 4 of 13 --
5
(a) carried out by a building contractor; and
(b) for a residence or a related roofed building; and
(c) of a value of more than $3300.
(2) For subsection (1), the following is the building work—
(a) construction of the residence or related roofed building;
(b) building work that affects the structural performance of the
residence or related roofed building;
(c) building work for relocation or replacement of a roof, wall,
internal partition, floor or foundation;
(d) building work for replacement or refitting of fixtures or fittings
in a bathroom or kitchen in the residence or related roofed
building;
(e) building work for an unenclosed, elevated platform or
verandah, including a deck, attached to a residence;
(f) building work that increases the covered floor area of the
residence or related roofed building;
(g) building work for installation or repair of the primary water
supply to, or sewerage or drainage for, the residence or
related roofed building.
(3) The following is not primary building work, but may be associated
building work—
(a) fencing;
(b) landscaping;
(c) painting;
(d) installation, renovation, repair or replacement of any of the
following—
(i) airconditioning;
(ii) driveways, paths or roads;
(iii) units for heating water regardless of the source of
energy for heating, and including units for heating
swimming pools;
(iv) refrigeration;
(v) roller shades and shutter screens;
(vi) security doors and grills;
(vii) solar power units and associated electrical components;
(viii) swimming pools, or spas that are not part of a
bathroom;
(ix) water tanks that are not part of a primary water supply
for the residence or related roofed building.
[12] Section 12 reads:
12 Meaning of associated building work
-- 5 of 13 --
6
(1) For section 10(b), associated building work is the following
building work that is not primary building work, but is other building
work carried out under a contract that includes primary building
work (the other building work)—
(a) if the primary building work under the contract is for a
residence, other building work for anything on the site of the
residence, but only if the other building work is for residential
purposes;
(b) if the primary building work is for a related roofed building,
other building work on the site of the residence or proposed
residence for which the related roofed building is to be used,
but only if the other building work is for residential purposes.
(2) Despite section 5, work mentioned in section 5(1)(b), (q), (r), (w),
(z), (zb), (zg) or (zk) is building work that is associated building
work if it is other building work.
[13] Section 13 provides as follows:
13 Building work that is not classified as residential construction
work
(1) Each of the following is not classified as residential construction
work—
(a) building work on, or on the site of, a building or proposed
building that is or forms part of any of the following—
(i) a multiple dwelling of more than 3 storeys;
(ii) a backpacker’s accommodation, boarding house,
caravan park, guest house, holiday accommodation,
hostel, hotel, lodging house or motel;
(iii) a correctional centre, lockup, prison, reformatory or
watch-house;
(iv) a hospital, nursing home or other health care building;
(v) an orphanage or children’s home;
(vi) a retirement village under the Retirement Villages Act
1999;
(vii) an educational institution;
(viii) group accommodation for persons with a physical or
mental disability;
(ix) commercial or industrial premises, if the building or
proposed building—
(A) also serves the commercial or industrial purpose
carried on at the commercial or industrial
premises; and
(B) is the only residential unit in the premises;
(b) building work carried out by a building contractor for a person
who is the holder of an owner-builder permit covering the
work;
-- 6 of 13 --
7
(c) loading, unloading or transporting a building that, if it were
fixed to land, could be a residence, or a related roofed
building, regardless of whether the transport is within the
boundaries of land where the building is located or otherwise;
(d) off-site prefabrication of the whole of a building that could be
a residence, or a related roofed building, whether or not the
building is in its final form or in parts;
(e) loading, unloading or transporting a completed prefabricated
building that could be a residence or a related roofed building,
whether the building is transported whole or in parts,
regardless of whether the transport is within the boundaries of
land where the Building is prefabricated, or to be located, or
otherwise.
(2) In this section—
completed prefabricated building includes a prefabricated
building—
(a) that has not been placed on land where it is to be used; or
(b) to which services have not been connected, including, for
example, electricity or plumbing and drainage.
[14] The complaint by Shane and Vicki Ellis received 6 October 2001 advised
the QBSA that the builder (Michael Easton Homes Pty Ltd) had had
receivers and managers appointed, and annexed a copy of the QBSA
certificate of insurance for those premises. The QBSA satisfied itself that
the builder’s ―Medium Rise‖ license had been cancelled, and that
liquidators had been appointed. The QBSA then asked the applicants to
provide a copy of their building contract and on 31 October 2011 Shane
Ellis emailed the QBSA advising that he did not have a copy of any
contract, he believed that the builder had done the work on a ―cost plus
basis‖, he had spoken to the liquidator who had no copy of the building
contract, and he had already supplied a copy of the insurance certificate
with his complaint documents, together with a copy of all invoices paid by
him.
[15] On 19 December 2011 Mr Peter Campbell, a building inspector employed
by the QBSA, conducted an inspection at 40 Handel Avenue in the
company of Mr Shane Ellis and a Mr Steve Webb. Mr Campbell provided
a report dated 19 December 2011, remarking by way of background that
the complaint item related to floor tiling to the covered wet bar and pool
area and that ―This work was undertaken as part of the building contract
that involved major extensions to the dwelling‖. His report observed that
visual inspection had noted that several areas to the floor tiles had
detached from the substrate and tented. He described feeling movement
under foot when walking on the surface, and that approximately 60% of
the floor tiles had detached from the substrate. An affidavit from him, filed
by the respondent, records that he had determined that the complaint item
was ―category one‖ as defined in the Defects Policy, and was defective
building work, as defined in the QBSA Act. His report recorded that he
had advised the parties attending the meeting that he would refer the
-- 7 of 13 --
8
matter to a QBSA file manager for assessment of a possible insurance
claim, under the QBSA home warranty scheme. On 21 December 2011
the QBSA advised both the applicants and the liquidator that because the
builder was liquidated, the QBSA would not be issuing a Direction to
Rectify to the builder, and that the complaint will now be assessed as a
claim under the BSA home warranty insurance policy.
[16] On 2 February 2012 the QBSA sent the applicants a letter stating that the
tiles lifting around the pool and the barbeque area, which was the subject
of the complaint, fell under the definition of ―associated works‖ (within the
meaning of the policy and the Regulation) and not ―primary building work‖
(within the meaning of the policy and the regulation).
[17] The provisions of the Regulation were considered by a Senior Member of
the Tribunal in the matter Jones v Queensland Building Services Authority
[2010] QCAT 563, decision published 10 November 2010. The judgment
in that matter records that the applicant there, Sandra Jones, had
contracted in July 2004 with a builder for the building of a house at Harron
Close, Cashmere, which building works were completed in March 2005.
In May 2009 problems began to develop with the tiling around an outside
pool area at the rear of the house, which was on the same level as the
living area. The pool area in those premises was adjacent to a main living
area, and there was direct access to the tiled pool concourse area from
the main bedroom, rumpus room, family room and entertainment area, in
fact from the whole of the back of the house.
[18] There was a distance of approximately 4-5 metres from the back wall of
the house to the edge of the pool coping, at those premises. The
judgment records that the plans showed that the area under the patio roof,
and the eave or deck, as it was described on the plan, was tiled but there
was no detail of the finished surface of the area between the notional line
dropping down from the roof gutter to the edge of the pool. However one
plan described the area as ―external slab on ground and part of pool
paving‖, with an arrow pointing to under the patio and under the eaves. In
addition, the area described as a deck had a gazebo type structure, which
protruded into that open concourse space between the house and the
pool.
[19] The reasons for judgment in that matter further record that at the time of
construction, the pool shell was poured first, followed by the house
footings over the slab upon which the house frame was constructed, and
that when the house structure was completed, a second slab was poured
between the footings/slab of the house to the coping around the pool.
The result was that from the patio to the master bedroom, adjacent to the
main living area, was all concreted around the pool shell. Tiles were then
laid on the concrete slab abutting the main house footing under the patio
deck and veranda out to the waters edge of the pool. The end result was
that one walked from the house directly onto a tiled area, which was then
continuous from the house to the rear boundary.
-- 8 of 13 --
9
[20] At those premises, the tiles began lifting around the pool area and the
Member concluded, consistent with the evidence of Mr Clayton, a QBSA
Inspector who had undertaken an inspection after complaints, that the
cause of the tiles lifting was as a consequence of the failure to install a
control joint in the tiles. In that matter, as in this one, the QBSA wrote to
the applicant Jones advising that it was the Authority’s decision to disallow
a claim under the Statutory Insurance Scheme on the basis that the work
the subject of the application to rectify (the lifting tiles, considered to
represent a safety issue) was not ―primary building work‖ within the
definition in the Regulation, but rather ―associated building work‖ to which
the Statutory Insurance Policy did not respond.
[21] The reasons for judgment in that matter record a definition in the
Regulation of ―primary building work‖ in section 11 which is in the same
terms as the Regulation now. Those reasons record that the QBSA
contended to the Senior Member that in that case the tiling work from the
perimeter of the roof area namely from the gutter of the house to the back
boundary, was associated building work, as defined in section 12 of the
regulation. Those reasons for judgment describe section 12 and what
constituted ―associated building work‖, and it appears that the identical
matters which section 12 then inclusively defined as ―associated building
work‖, now appear in section 11(3) of the Regulation as a definition of
matters that may be associated building work, providing that those fall
within the definition of ―other building work‖, as now defined in section 12.
That section identifies as ―associated building work‖ building work that is
not ―primary building work‖ but is other building work carried out under a
contract for a residence, providing that ―other building work‖ is for
―residential purposes‖.
[22] That last expression is not defined in the Regulation.
[23] The reasons for judgment in Jones record that the QBSA conceded that
any defective work associated with the tiles from a notional line
perpendicular from the edge of the gutter and back to the house footing
would be ―primary building work‖ covered by the policy, even though that
area was described on the plans as the external slab and part of the pool
area paving. Beyond that notional line, that is to the swimming pool
coping, the QBSA contended that the tiling work changed from being
―primary building work‖ to ―associated building work‖.
[24] The QBSA also submitted in Jones to the Senior Member that the
concourse area was a path. The Senior Member disagreed, concluding1
that ―if it is a path it is a path going nowhere.‖ The Member added that
―Such a proposition is not maintainable in my view because clearly it is an
open usable space for the benefit of the occupants of the house.‖
[25] The Senior Member derived assistance from considering the definition in
regulation 9 of residence as meaning ―a building or part of the building
fixed to land and designed to be used for residential purposes.‖ The
1 At paragraph 20 of the reasons in Jones.
-- 9 of 13 --
10
Member then repeated that the QBSA had conceded that the section of
the tiled area which was under the eave was part of the residence, and
remarked that the tiled slab was constructed as part of the ―construction of
the residence‖, as was evident by the plans, and was included in the
contract price for the construction of the residence. He added that while
those construction plans only showed tiles under the eaves the fact was
that the contract provided that the builder, when constructing that tiled
surface, continued it out to the pool. The Senior Member considered it
somewhat artificial to contend that the continuous surface started off as
primary building work and then at some notational line became associated
building work, unless it clearly fell within the definition of associated
building work. He concluded that the tiled surface area around the pool
was quite obviously part of the living space of the residence.
[26] The Member held that since that area was a usable living space of the
residence, and was included in the ―construction of the residence‖, it was
therefore part of the building within the definition of ―residence‖ and it had
to be primary building work, because it was clearly not ―associated
building work‖. The Member came to that conclusion because he
considered that the tiling work did not fit comfortably with any of the
descriptions of work that was defined as ―associated building work‖, being
those appearing in section 12 as quoted in the judgment (and now listed
in section 11(3) as matters that may constitute ―associated building work‖).
[27] In the instant matter, the QBSA advised the applicants on 2 February
2012 that it had concluded that the tiles ―lifting around the pool and
barbeque area‖ fell under the definition of ―associated building work‖. The
affidavit of Glen Pring, who is employed as a Senior Assessment Officer in
the Gold Coast office of the QBSA, filed in this Tribunal on 28 August
2012, advises in paragraph 23 that the QBSA determined that the
applicants’ claim was disallowed in full, and that was certainly the effect of
the letter sent to the applicants. It was signed by Mr Pring.
[28] The wording of that letter dated 2 February 2012, and the affidavit of Mr
Pring, convey the impression that the QBSA considered the complaint
made to it, which it had appropriately treated as a request for an indemnity
under the Statutory Insurance Scheme, was confined to a complaint that
the tiles were lifting ―around the pool and barbeque area‖.
[29] An application to review that decision, dated 28 February 2012, and
received on 1 March 2012, annexed to it photographs numbered ―A1‖,
―A2‖, and ―A3‖ and an examination of those photographs, and of the report
of BSA Inspector Campbell, attached to the application, shows that the
applicants appeared to be describing that the builder had constructed a
two storey addition to the house, with an upstairs roofed area and
balcony, with a security fence, and an open downstairs area which
covered and a bar and barbeque area, and the tiles the subject of the
complaint included tiles underneath the newly constructed roofline, as well
as those external to it. A large area was tiled when the work was
performed, and the tiling extends from the edge of the building under the
newly built roof line through that roof line and to the edge of the pool. All
-- 10 of 13 --
11
of the tiles appear to be of the same type, and their positioning and size is
as such that if a line were dropped from the ―eaves‖ area of the newly
constructed roof, a substantial number of tiles would fall partly on the
inner, an partly on the outer, side of that line. This makes it rather artificial
to consider that it is only the tiling work underneath the roofed area which
is ―primary building work‖ and that the rest of the tiling is ―associated
building work‖, because it would mean that part of a number of tiles fall
within the ―primary building work‖, while the remainder of those individual
tiles were ―associated building work‖. If the QBSA have maintained the
same approach in this matter as they argued for in the Jones matter, then
the tiling under the newly roofed area (the area underneath the balcony)
would be ―primary building work‖.
[30] Photo ―A3‖, submitted by the applicants to the QBSA, has written
notations on it which include the following, ―defective external floor and
tiling work is substantially under new roof line and covered areas as well
as external.‖
[31] The Statement of Reasons filed on 9 July 2012 (in compliance with a
direction given on 17 May 2012), signed by Mr Pring for the QBSA,
contended in paragraph 35 that the QBSA had ―determined that the
Applicants’ claim was disallowed in full‖, and in paragraph 48.2 that Mr
Pring had determined that ―the tiled area surrounding the pool and
barbeque was considered to be a path‖, and therefore considered to be
―associated building work‖ pursuant to section 11(3)(d)(ii) of the
Regulation. The contention that that area was properly considered a
―path‖ repeated the position advanced by the QBSA in Jones, and was not
a matter asserted in the letter by the QBSA dated 2 February 2012,
although it may have been the basis of that decision.
[32] The written submission of the QBSA, filed in this Tribunal on 28 August
2012, contends in paragraph 7.17 that the external tiled area is
―considered to be a path‖, and in 7.19 the following appears:
―The Authority notes that the question of whether an external tiled area is a
―path‖ was ventilated in Jones and was not accepted by the Tribunal.‖
[33] It is not quite clear to me what the QBSA mean by that submission. It may
mean that it is inviting a reconsideration of the reasoning in Jones, which
decision it did not appeal. In paragraph 7.24 of those submissions the
QBSA argues that in Jones, ―the Tribunal determined that external tiling
work would have been included within the Authority’s Statutory Insurance
Scheme if the external tiling had been completed at the same time as the
construction of the dwelling‖, and that this was not the case in this
proceeding. In similar vein, in paragraph 7.23, the QBSA argues that the
external tiling was installed as part of a separate quotation when the
applicants were the owners, after the residence had been originally in
approximately 1993, and that the external tiling area was not ―roofed‖.
[34] That submission ignores the fact that, as the photographs submitted by
the applicants demonstrate, part of the tiled area (about which there was a
-- 11 of 13 --
12
complaint that tiles are lifting) is roofed, and the report by BSA Inspector
Campbell (dated 19/12/2011) describes the building contract as one that
―involved major extensions to the dwelling.‖
[35] An affidavit from Peter Campbell (the building inspector) remarks at
paragraph 20 upon plans sent to the QBSA, on 14 August 2012, by Shane
Ellis, and on how Mr Campbell has endeavoured to draw on the plan
marked ―PC-5‖, annexed to his affidavit, the position of the pool relative to
the balcony. It is apparent to me, when one compares his notation with
the photographs submitted by Mr Ellis with his application of 1 February
2012, that Mr Campbell has mistaken the position of the pool, which is in
fact closer than Mr Campbell realized or remembered to the (apparently)
newly constructed balcony.
[36] The applicants’ written submissions received 3 September 2012
repeatedly refer to the tiled areas as ―part of the works performed on the
whole building contract for the residential extensions including a major
roofed and undercover tiled extension to the usable living space of the
residence.‖ They repeatedly state that, ―The tiling was never part of a
separate contract.‖ Unsurprisingly, the applicants contend that the case of
Jones should be applied to the facts in this matter, and the QBSA should
―apply it as merely supporting the applicants’ claim.‖
[37] An affidavit by a Stephen Roy Webb, received at this Tribunal on
3 September 2012, describes Mr Webb as now being a licensed builder,
who in 2006 was employed as a leading hand/project manager for the
builder, at the time the ―defective‖ building work was performed at the
applicants’ site at 40 Handel Avenue. In paragraph 3 of that affidavit, the
deponent refers to the photographs marked ―A1, A2 and A3‖, annexed to
the application for review filed 1 March 2012, and says about them that,
―as can clearly be seen the building works performed were for major
residential extensions including a large roofed area, an external living
space including an undercover tiled extension of the residence.‖
[38] It appears to me that the applicants and respondent may have acted on a
different understanding of the facts in this matter, perhaps resulting from
the applicants’ failure to describe with clarity, in their original complaint to
the QBSA, the building work which had been performed at the site by the
builder, as distinct from complaining about the defective performance only
of some of it. That may have resulted in the applicants asking for
indemnification in respect of all of the tiled area (both covered or roofed
and uncovered), without making it clear that portion of tiles were
undercover, and the QBSA originally rejecting the application for
indemnity simply because it did not grasp that some of the allegedly
defective tiles were underneath a roofed area. It may be that the QBSA at
all times considered the external tiles constituted a ―path‖, but I do not
understand them to be arguing that the roofed or covered tiles are a path.
[39] I consider it appropriate to exercise the power given in section 24(1)(c) of
the QCAT Act 2009, and
-- 12 of 13 --
13
(1) Set aside the decision of 2 February 2012;
(2) Return the matter for reconsideration to the QBSA, with the following
direction:
o The QBSA is to request the applicants to provide a statutory
declaration signed by one of them, describing therein with
particularity the building work performed at 40 Handel Avenue,
Worongary by Michael Eston Homes Pty Ltd, the dates between
which that work was performed, and the total cost of it; and of the
position of the tiles about which complaint was made to QBSA
Inspector Campbell on 19 November 2011, specifying whether or
what portions of those are in a covered area;
(3) Upon receipt of that statutory declaration, the QBSA is to determine
the applicants’ claim for indemnity under the Statutory Insurance
Scheme, and advise the applicants of the result, specifying therein
whether the QBSA is following and applying the reasons and
decision of this Tribunal in Jones v QBSA [2010] QCAT 563.
-- 13 of 13 --