Boral Resources (Qld) Pty Ltd v Gold Coast City Council & Ors [2012] QPEC 53
PLANNING & ENVIRONMENT COURT
OF QUEENSLAND
CITATION: Boral Resources (Qld) Pty Ltd v Gold Coast City Council &
Ors [2012] QPEC 53
PARTIES: BORAL RESOURCES (QLD) PTY LIMITED
ABN 46 009 671 809
(appellant)
v
GOLD COAST CITY COUNCIL
(respondent)
and
CHIEF EXECUTIVE, DEPARTMENT OF
TRANSPORT AND MAIN ROADS
(co-respondent by election)
and
ROBERT BLUCHER
(co-respondent by election)
and
ROBYN BLUCHER
(co-respondent by election)
and
WILLIAM BLUCHER
(co-respondent by election)
and
PETER LEHMANN
(co-respondent by election)
and
TIM GREGG
(co-respondent by election)
FILE NO: 4699/11
DIVISION:
PROCEEDING: Preliminary Hearing
ORIGINATING
COURT: Brisbane
DELIVERED ON: 21 September 2012
-- 1 of 33 --
2
DELIVERED AT: Brisbane
HEARING DATE: 20-21 August 2012
JUDGE: Robin QC, DCJ
ORDER: Preliminary points determined favourably to the
appellant, so that its conditions appeal might proceed to a
hearing on the merits
CATCHWORDS: Integrated Planning Act 1997 s3.2.1(5)
Integrated Planning Regulation 1998 Schedule 10 Items 14,
15
Sustainable Planning Act 2009 s820
Water Act 2000 definitions of “water” and “watercourse”
Conditions appeal by developer quarry operator – co-
respondents raise allegations ordered to be determined as
preliminary issues as to whether development application
“properly made” – Pimpama Creek, a water course,
constituted a boundary of the site – course of creek changed
(apparently imperceptibly) since boundaries surveyed –
“ambulatory boundary” situation that may have existed in
early years did not persist – water course diverted by works
by appellant (or a predecessor) about 1983 – this controlled
the location of the water course as a matter of fact – co-
respondents contended proposal involved State resources, by
taking water and/or quarry material, either under the proposal
or under Council‟s imposed conditions requiring
rehabilitation of Pimpama Creek and surrounds by removal of
large quantities of fill – issues whether certain gullies were
water courses on the site – “lapsing” issue whether failure to
start quarrying on one of two lots pursuant to entitlements
dating from 2004 was fatal to the current development
application for expansion – issues whether existing licences
under the Water Act were appropriate and whether this is
relevant in any event
COUNSEL: Mr D. R. Gore QC and Mr J. G. Lyons for the appellant
Mr T. Law for the respondent
Mr P. Lehmann for the first, second, third and forth co-
respondents by election
Mr T. Gregg for the fifth co-respondent by election
SOLICITORS: Ashurst for the appellant
King & Company for the respondent
Mr Lehmann representing himself and the first, second and
third co-respondents by election
-- 2 of 33 --
3
Mr Gregg representing himself
[1] The appellant wishes to expand its established quarry at Upper Ormeau Road,
Kingsholme. Its development application made in March 2008 resulted in the
desired development permit for material change of use for extractive industry and
environmentally relevant activities (negotiated decision notice dated 20 October
2011), but the Council imposed conditions which the appeal seeks to have changed.
The development application was impact assessable. Adverse submitters included
the five co-respondents by election. Mr Gregg has been self represented. Mr
Lehmann has represented himself and the others. He raised issues in an affidavit
filed on 31 January 2012 which the court decided ought to be determined as
preliminary points. Judge Jones‟ order in that regard, of 12 July 2012 gave
appropriate directions, including ones that the co-respondents be given site access.
No doubt the basis of the order was appreciation that the issues mentioned bore on
whether the development application was (or could be ordered treated) as a properly
made one for purposes of assessment by the Council in the first instance and now by
the court.
[2] The co-respondents have prepared very comprehensive material and demonstrate a
reasonable grasp of potentially relevant considerations. However, things are not
presented in the manner that would be expected of a lawyer. Mr Gore QC,
appearing for the appellant developer, tendered as Exhibit 2 a long list of objections
(with grounds – one or more of irrelevance, argumentative, outside expertise,
swearing to the issue, speculating and matter of law) to the three affidavits of Mr
Lehmann and one of Mr Gregg. Speaking generally, the objections were well taken,
but it has not been necessary to rule on them. The court‟s determination, namely
that what it characterised as preliminary issues must be decided against the co-
respondents, would be the same whether the contentious parts of the affidavits were
taken into account or not.
The co-respondents’ motivation
[3] Although for the moment relying on alleged defects in process to defeat the
development application, the co-respondents present genuine concerns. It is enough
to note their understandable desire that Pimpama Creek be rehabilitated to follow
what would be its natural course, rather than the artificial one dug for it which is
said to be prone to “scour, undercutting, erosion” etc and to offer a disappointing
environment for bush walkers, ramblers and the like minded to “walk the creek”, as
they are entitled to do. The reduction in sinuosity of the watercourse, the exposed
banks and the like presently lead to further erosion and silting up of water holes
important to downstream residents, among them primary producers, as Mr Lehmann
describes himself. He explains his motivation in participating in the appeal in terms
of increasing frustration at what he calls Boral‟s failure to live up to expectations
generated in the course of community consultation that expansion of the quarry
would be accompanied by rehabilitation of Pimpama Creek. His affidavit filed 7
August 2012, after referring to numerous authorities some of which appear to
support him, including Vidler v Fraser Coast Regional Council [2011] QPEC 18,
concludes:
“On the evidence before the Court I believe the Court can only find the
application was not properly made. I would suggest the Appellant needs
now to rebuild the trust of the community it has so long taken for granted
-- 3 of 33 --
4
and that the Appellant should do so by firstly by rehabilitating the natural
alignment [of] Pimpama River and its flood plains. The Appellant should
then work openly and honestly with the community in developing any
future development proposals.”
[4] Certain development conditions dealing with the rehabilitation (not the subject of
appeal) are perhaps seen as inadequate. My understanding is that co-respondent
submitters in an appeal such as this are free to contend that even stronger conditions
ought to be imposed on a development. The court is told that the present co-
respondents do not oppose quarry expansion per se, recognising the community
interests involved – even though it may be presumed that few in the vicinity of a
quarry or haul route would welcome any increase in or extension or intensification
of impacts.
The issues identified
[5] Distilling “the issues set out in the Affidavit of Peter Shane Lehmann filed on
31 January 2012 (the Preliminary Points)” the subject of the order of 12 July 2012
has proved not entirely straightforward, but there has been acceptance (in the court‟s
view) of the summary by the appellant‟s planner, Mr Schneider:
“[47] The allegations that are made by Mr Lehmann in his Affidavit
dated 30 January 2012 broadly relate to six issues and can be
summarised as follows:
(1) paragraphs 4 to 20 inclusive, relating to the allegation that
the gully in the north-western corner of the site is a
Watercourse (as defined by the Water Act 2000) (North-
West Gully allegation);
(2) paragraphs 21 to 41 inclusive, relating to the alignment of
Pimpama Creek and the allegation that the development
application proposes development within Pimpama Creek
(Pimpama Creek allegations);
(3) paragraphs 42 to 45 inclusive, relating to the allegation
that the development application is deficient because it
does not include the requisite resource entitlement
(Resource entitlement allegation);
(4) paragraphs 46 to 58 inclusive, relating to the allegation
that the development application relies on industrial water
Licences for the taking and interfering with water in
Pimpama Creek (Water Licence allegation);
(5) paragraphs 59 to 71 inclusive, relating to the allegation
that other gullies on the site are Watercourses (Other
Gullies allegation); and
(6) paragraphs 72 to 76, relating to the allegation that the
application relied on an earlier development approval that
has lapsed (Existing approval allegation); …”
[6] Item (3) is a key one. It raises the question of whether the development application
fails to demonstrate the “evidence” in support required by s 3.2.1(5) of the
-- 4 of 33 --
5
Integrated Planning Act 1997 (IPA), that being necessary for a “properly made
application” which might proceed to assessment. Practitioners have been
surprisingly late to appreciate this potential rock upon which development
applications may founder. The applicant in Barro Group Pty Ltd v Redland Shire
Council [2010] 2 Qd R 206 has become the most celebrated. The present scenario
is typical in that the point lurked unsuspected until recently unearthed by Mr
Lehmann. The State resources pointed to are water and quarry material, brought
within s 3.2.1(5) by items in Schedule 10 of the Integrated Planning Regulation
1998:
“State resource Department
Administering
Resource
Required evidence
14 Quarry material taken from
a watercourse or lake under
the Water Act 2000
The department in
which that Act is
administered
Evidence of an allocation of, or an
entitlement to, the resource
15 Water taken or interfered
with under the Water Act
2000
The department in
which that Act is
administered
Evidence the chief executive of that
department is satisfied –
(a) the development is consistent with
an allocation of, or an entitlement
to, the resource; or
(b) the development application may
proceed in the absence of an
allocation of, or an entitlement to,
the resource”
As will be seen, the crucial issue is whether, relevantly, a “watercourse” is involved
here.
Although everyone may be taken to know what water is, for present purposes it
must be taken to bear the defined meaning at the time the development application
was made pursuant to Schedule 4 of the Water Act 2000:
“water –
Generally, water means all or any of the following -
(a) water in a watercourse, lake or spring;
(b) underground water;
(c) overland flow water;
(d) water that has been collected in a dam.”
There had been (presently irrelevant) amendments refining the reference to “lake”
and bringing in recycled and desalinated water.
As Mr Gore submits, unless we are concerned with water in a “watercourse” there
is nothing in item 15 to trigger a “State resource” point.
-- 5 of 33 --
6
[7] “Quarry material” is a State resource dealt with in Schedule 10 items other than 14,
notably in item 10 - Quarry material taken under the Coastal Protection &
Management Act 1995 and in item 17 – Quarry material taken under the Forestry
Act 1959. Those two Acts have their own definitions of “quarry material”, an
element of the former being that it be “material on State coastal land”. There is no
definition in the Regulation, but the IPA does have in its Schedule 10 a definition
“for Schedule 8, Part 1, Table 4, Item 5” picking up the Coastal Protection &
Management Act definition. There was at relevant times a definition in the Water
Act, which, being referred to in Item 14 should be taken to provide the meaning for
that item of “quarry material”, even though there may be room for an argument that
“under the Water Act” qualifies only “watercourse”. The Water Act definitions are:
“quarry material –
1. Quarry material means material, other than a mineral within the
meaning of any Act relating to mining, in a watercourse or lake.
2. Quarry material includes stone, gravel, sand, rock, clay, earth and
soil unless it is removed from the watercourse or lake as waste
material.”
“watercourse –
1. Watercourse means a river, creek or stream in which water flows
permanently or intermittently -
(a) in a natural channel, whether artificially improved or not;
or
(b) in an artificial channel that has changed the course of the
watercourse;
but, in any case, only –
(c) unless a regulation under paragraph (d), (e) or (f) declares
otherwise – at every place upstream of the point (point A)
to which the high spring tide ordinarily flows and
reflows, whether due to a natural cause or to an artificial
barrier; or
(d) if a regulation has declared an upstream limit for the
watercourse – the part of the river, creek or stream
between the upstream limit and point A; or
(e) if a regulation has declared a downstream limit for the
watercourse – the part of the river, creek or stream
upstream of the limit; or
(f) if a regulation has declared an upstream and a
downstream limit for the watercourse – the part of the
river, creek or stream between the upstream and
downstream limits.
2. Watercourse includes the bed and banks and any other element of
a river, creek or stream confining or containing water.”
-- 6 of 33 --
7
[8] The site includes lot 43 on W31376 and lot 4 on RP 29989. It is from the former
and other land immediately to its south that quarry products will be obtained. Lot
43 and lot 4 are separated by Pimpama Creek (in many places described as
Pimpama River), which constitutes the boundary as confirmed by plans on the
instruments of title. Section 21(1) of the Water Act (relocated to another Act in
2010) provided that the bed and banks of all watercourses and lakes forming all or
part of the boundary of land are, and always have been, the property of the State.
(Section 19 provides that all rights to the use, flow and control of water in
Queensland vest in the State.) It is unnecessary to go into definitions of “bed and
banks”. The genesis of the issue the appellant now has to face is that Pimpama
Creek in this location provides property boundaries that are or have been
“ambulatory”. See Beames v Leader [2000] 1 Qd R 347 at [36] and Svendsen v
State of Queensland [2002] 1 Qd R 216 at [22] ff. As discussed in MacDonald,
McCrimmon, Wallace and Weir, Real Property Law in Queensland (3rd) at [4.130],
the legal boundary of land “will change if the accretion or the erosion is: (a) slow
and gradual; and (b) caused by natural forces.”
As the authors say, “if these two conditions are not satisfied then generally the
boundary will in law remain where it was before the change in the water course.”
Surveyors‟ plans reproduced in title documents show that from the 1870s when lot
43 was surveyed and 1919 when lot 4 was last surveyed - this being the most recent
registered survey, the course of Pimpama Creek changed slightly. Aerial
photography from time to time suggests that by the early 1980s (by processes of
which may or may not have been slow and gradual, “in a practical sense
imperceptible”, there was a shift or kink towards the west in the area of lot 43
across the boundary where processing occurred, producing what Mr Collins would
have called increasing sinuosity. At that time, however, the quarry operator,
perhaps to create a larger area for processing and storage of quarried materials and
associated movement of vehicles, deposited fill, very likely materials quarried on
site, which covered the creek in that location, significantly straightening out the
kink at the expense of lot 4. A new channel was dug much further to the east than
the surveyed location of the watercourse (Pimpama Creek) in the 1870s. Sometime
subsequently, an additional new channel even further to the east which cuts off the
“kink” entirely was dug for the purpose of accommodating creek flows in times of
high run-off.
[9] In designing its proposal, the appellant has identified what it calls the Disturbance
Area, beyond which it proposes no activity. A sensible reason for doing so will be
to avoid problems associated with State resources, except for a limited aspect of
crossing Pimpama Creek to get product off site to the public road; the expansion
will require some improvement and widening (doubling) the existing culvert. The
disturbance area keeps to the west of Pimpama Creek as surveyed in 1871 and 1879,
indeed further to the west than cadastral boundaries appearing on the Smart Map on
which the development application was based. However, the line of the creek as
arguably divined from an aerial image from 1978 or thereabouts, on plans prepared
by the appellant‟s surveyor, Mr Dalton lies within the Disturbance Area. On Mr
Lehmann‟s workings by means of overlays (Exhibit 14) there are three stockpiles or
the like represented by circles in Exhibit 3 associated with Product Screening
Module No. 1. This all falls within the disturbance area. As matters surrounding
the hearing developed, Mr Dalton had no opportunity to deal with this contention,
or Mr Lehmann‟s contentions in closing submissions that the Pimpama Creek
-- 7 of 33 --
8
watercourse may yet be functioning as an underground flow in something like the
pre-1983 location with the consequence that this is still State owned “bed and
banks” or equivalent. All manner of interesting questions might arise here, such as
whether, for all the appellant‟s apparent efforts to avoid this, it is proposing
development on State land. It is unnecessary to go into these matters, given my
view that Mr Gore is correct in his submission that, for present purposes, the
watercourse is located where the quarry operator‟s actions have got it to be. He
submits that the co-respondents, whose stance appears to be that Pimpama Creek
must be taken to follow its early 1980s course and that the appellant may not rely on
the dramatic artificial change thereafter, confuse issues of title with issues of “use”.
The submission may be more easily appreciated if “use” is read as “function”. It
must not be lost sight of that for the moment we are concerned with the Water Act
definition of “watercourse” which relevantly focuses on a creek in which water
flows “(b) in an artificial channel that has changed the course of the watercourse.”
It would be difficult to proceed on any basis other than that water flows
(permanently or intermittently) only in the present artificial channel. In the
circumstances, it does not matter where the boundary between lots 43 and 4 lies.
The appellant owns both lots. The boundary watercourse presently runs where the
appellant or its predecessors in about 1983 put it. There may be other legal
implications of what has occurred, but these do not concern us presently. If State
authorities are concerned about exactly where their “bed and banks” are located,
they have not shown it in any way to date.
Work outside the “disturbance area”
[10] A further issues emerge arising from condition 12 of the negotiated decision notice,
which provides:
“12. Rehabilitation of Buffer to Pimpama River
a The applicant must undertake the rehabilitation
/revegetation in accordance with the approved
rehabilitation management plan, as required by the
condition titled „Rehabilitation plan to be submitted for
buffer to Pimpama River.‟
b The applicant must give security to Council (in the form
of cash/cheque/unconditional bank guarantee) in the
amount of $400,000 and enter into a bond agreement to
secure compliance with the applicant‟s obligations to
rehabilitate a 60 metre buffer to Pimpama River.
c The bond agreement must be entered into and the bond
given prior to the earlier of the making of any
development application for operational work (inclusive
of change to ground level, works for infrastructure,
vegetation clearing or landscape work) or prior to the
commencement of any works onsite. The bond will be
held until Council is satisfied the condition has been
complied with.
d All soil, sediment or built form sitting above or in
addition to the natural ground level (fill), must be
-- 8 of 33 --
9
removed from the 60 metre buffer to Pimpama River to
the satisfaction of the Chief Executive Officer.”
The plan referred to is by an earlier condition required to be submitted for “all areas
for a distance of 60m to the west of the western top of the high bank of Pimpama
River, excluding any area required for access or the location of structures as
detailed on [a plan identified] with the minimum buffer width not below 30m.”
This is seized upon by the co-respondents as establishing (they say) certain
important features:
(a) The removal of some metres depth of fill will occur outside the
Disturbance Area;
(b) Quarry material (ie the fill to be removed) is involved as a State
resource so as to trigger item 14.
[11] As to (b), my opinion is that the reference to watercourse in item 14 has the effect
that the quarry material (which the fill may otherwise constitute) must be taken
from a location which is a watercourse (as defined) at the time of taking; it is not
enough that the location may have been a “watercourse” historically, or that the
location may be shown mapped in registered plans as a creek or the like. The hurdle
for the co-respondents is the definition of watercourse, which requires permanent or
intermittent flow.
[12] By parity of reasoning, the apparent mapping or other recording of particular
features, even expressly as “watercourse” does not determine anything. The co-
respondents establish such mapping (in relation to the North-west gully in
particular) in what Mr Lehmann calls “Official Federal Government Mapping in
Natmap Topographic 1:100,000 (Exhibit 4) and 1-250,000 by GeoScience
Australia” (Exhibit 5) - which bears an express disclaimer of “accuracy, currency or
completeness”. There is also what he calls “Official State government mapping
such as Regrowth Vegetation Map version 2.1” which he says clearly shows the
North-west gully “and labels this watercourse as a first order stream flowing into a
second order stream” (Pimpama River) to the North-east of the site. His approach is
clear from one of his affidavits:
“It is clearly a significant natural geographical feature in the landscape.
State mapping is done under the Survey Mapping and Infrastructure Act
2003 and other statutes. A watercourse marked on the map is
representative of its legal status as a State resource. A copy of this map is
Document 7, p 10 of Exhibit PSL 1.” (This is in the affidavit filed 31
January 2012).
It is true that the appellation “watercourse” is used in both Federal and State
mapping, doubtless for sensible purposes. For present purposes, the Water Act
definition governs; it effectively makes issues of the existence, location and
dimensions of watercourses ones of fact, rather than of mapping (or of history): cf
Cornerstone Properties Ltd v Caloundra City Council [2005] QPELR 96 at [55]
and [71]-[102]. See also Karreman Quarries Pty Ltd v Chief Executive under the
Water Act [2008] QPELR 338 at [18].
The Council’s Stance
-- 9 of 33 --
10
[13] The co-respondents are without support from any quarter for their contentions.
Mr Law‟s written submissions confirm that his client Council has considered those
contentions both in the appeal and previously, all along determining that “the
development application was a properly made application having regard to matters
about resource entitlement” and that no additional referral to the then Department of
Natural Resources and Water as a referral agency was triggered. The Council‟s
primary interest in the appeal relates to the disputed conditions, which deal with
monitoring of quarry vehicles, hours of operation and noise attenuation.
[14] More significant than the Council‟s is the stance of the State which owns and
administers everything to do with the State resource of water, the purview of the
current Department of Natural Resources and Mines which now administers the
Water Act 2000 for the purposes of s 3.2.1(5) of IPA. The Chief Executive chose
not to be heard on the preliminary issue, although provided with the relevant
material including the notice of appeal and Mr Lehmann‟s affidavit filed 31 January
2012. The covering letter specifically adverted to “issues relating to the validity of
the development application and whether evidence [of] all relevant resource
allocations or entitlements was included with the development application.” The in-
house legal officer (it appears from Exhibit 7) highlighted the issue and sought
instructions as to participation at the preliminary hearing. The Principal Natural
Resource Officer, Property Services for the South Region responded after further
consultation expressing a view that the Boral development application did not
involve taking quarry material from a watercourse (Item 14) or taking water or
interfering with water (Item 15) under the Water Act:
“Our final position is that the Department considers the application was
NOT deficient regarding any necessary State resource evidence prescribed
by the repealed Integrated Planning Act 1997 and Integrated Planning
Regulation 1998.”
(See Exhibit 7.) The foregoing quotes Terry Fox‟s email of 17 August 2012, which
confirms what he wrote in a letter of 4 May 2012 to the appellant‟s solicitor:
“I refer to your email correspondence dated 29 March 2012, in which you
have requested confirmation on whether a Development Application (DA)
for a Material Change of Use can proceed in the absence of an allocation
of, or an entitlement to interfere with water, or the allocation of, or
entitlement to take quarry material from a watercourse in light of the
General Authority & Chief Executive Consent: State‟s Water Resource (the
General Authority).
As I do not have a delegation under the Water Act 2000, I have discussed
your request with officers from Water Services who hold the relevant
delegations under the Water Act 2000. The General Authority was signed
on 19 July 2011 and took effect from that date.
The advice given is that, providing a DA does not conflict with the
provisos contained in the General Authority, the General Authority will
provide the required evidence to lodge the DA in the absence of an
allocation of, or an entitlement to interfere with water, or the allocation of,
or entitlement to take quarry material from a watercourse.
I have also reviewed the information provided in my earlier letter to
Humphreys Reynolds Perkins, dated 25 January 2008, regarding resource
-- 10 of 33 --
11
entitlement for a DA for a material change of use – replacement of a culvert
in a non-tidal watercourse separating lot 43 on plan W31376 and lot 1 on
RP172507 (refer to Attachment). This letter provided the necessary
evidence that the chief executive of the Department administering the state
resource was satisfied the DA may proceed in the absence of an allocation
of the resource.
I considered that the state resource was described as the bed and banks of
the Pimpama River, separating lot 43 on W31376 and lot 1 on RP172507,
and described in Item 6 of Schedule 10 of the Integrated Planning
Regulation 1998 (IPR) as land that is unallocated State land (USL) under
the Land Act 1994, that is not a canal under the Coastal Protection and
Management Act 1995, and not subject to Items 11, 12, 13, 14 or 15 of
Schedule 10 of IPR.
Prior to granting resource entitlement, I gave consideration to Items 11, 12,
13, 14 and 15 of the IPR. Items 11, 12, 13 related to the Fisheries Act 1994
and were not relevant to the application. The DA made it clear there was
no intention to take or interfere with water in that part of the Pimpama
River. Therefore, I considered that the proposed culvert extension did not
constitute an action where quarry material would be taken from the
watercourse and water would not be taken or interfered with under the
Water Act 2000. On this basis I considered a Riverine Protection Permit
issued under the Water Act 2000 was not required.
The delegation under which I made my decision was the Land Act (Chief
Executive) Delegation (No 1) 2008.
At the time I gave resource entitlement in 2008, I considered the bed and
banks of a non-tidal watercourse were unallocated State land under the
Land Act 1994. However, following the decision handed down in the
Barro quarry case in the Planning and Environment Court, departmental
officers re-considered previously held views on the tenure and ownership
of the bed and banks of non-tidal watercourses forming ambulatory
boundaries.
While section 21 of the Water Act 2000 is still mentioned in Item 6(c) of
Schedule 14 of the Sustainable Planning Regulation 2009, this section was
repealed in May 2010 by the Natural Resources and Other Legislation
Amendment Act 2010. The notation referring to section 13A of the Land
Act 1994 states: “This section effectively replaces the Water Act 2000,
section 21 (beds and banks forming boundaries of land are State property)
... 2010.” Section 13A commenced on 7 May 2010.
The bed and banks of a non-tidal watercourse are not described as USL,
which can be dealt with under the provisions of the Land Act 1994.
Instead, section 13A of the Act states that the bed and banks of a non-tidal
boundary watercourse is the property of the State. Item 6 of Schedule 14 of
the Sustainable Planning Regulation 2009 only relates to land that is
unallocated State land (USL) under the Land Act 1994. Additionally, item
6(c) of Schedule 14 excludes the bed and banks of a watercourse.
It is not appropriate to deal with the bed and banks of a non-tidal boundary
watercourse under Item 15 of Schedule 14 as a State resource, as the
provisions applicable to dealing with USL in the Land Act do not apply to
the bed and banks of non-tidal boundary watercourses. The department
-- 11 of 33 --
12
considers that it is appropriate to deal with the bed and banks of a non-tidal
boundary watercourse as the owner of land that is the property of the State
and would, where appropriate, give owner‟s consent to a DA.
Under section 266 of the Water Act 2000, a person may apply to the chief
executive for a permit to undertake activities in a watercourse, lake or
spring including destruction of native vegetation, excavation of material or
placing of fill. Additional information can also be found on the
department‟s website and I refer you particularly to the department‟s
Guideline – Activities in a watercourse, lake or spring carried out by a
landowner – WAP/2011/4765.
Any enquiries regarding the Water Act should be directed to the Senior
Natural Resource Officer, South on 3896 3212.”
[15] Of course, it is a question for the court, and not one for the Department, whether
s 3.2.1(5) has been complied with or not. Views of the Department (or equivalent
Departments) are accorded great weight when (as might occur here, if the co-
respondents are successful on technical points) there is a question whether relief
ought to be granted to an applicant pursuant to provisions such as s 820 of the
Sustainable Planning Act 2009 (SPA) to permit a development application which
falls foul of the section to proceed to assessment. Even in such a context as the
present, the court can be expected to take note of the relevant Department‟s views,
which I find myself in agreement with. The court should not lightly identify
difficulties where responsible public authorities say there are none. Sending the
appellant back to where it was in 2008 to make its development application all over
again (a course noone but the co-respondents would favour, and which is likely to
result in a future appeal much like the present one) is an unattractive course, and
hardly in the spirit of the philosophy enacted in ss 3, 4, and 5 of SPA (previously ss
1.2.1, 1.2.2 and 1.2.3 of IPA).
The rehabilitation condition
[16] Before dealing in turn with the six issues identified above by Mr Schneider, it is
convenient to deal with condition 12 which raises an additional issue that may be
variously understood. One analysis may be that it involves “development” on land
of an owner whose consent has not been provided. As to the State resource (quarry
material) issue, my opinion is that the reference to watercourse in Item 14 has the
effect that the quarry material (which the fill may otherwise constitute) must be
taken from a location which is a watercourse (as defined) at the time of taking; it is
not enough that the location may have been a “watercourse” historically, or that the
location may be so mapped in registered plans as a creek or the like. The hurdle is
the definition of a watercourse which requires current permanent or intermittent
flows.
[17] By parity of reasoning, the apparent mapping or other recording of particular
features, even expressly as “watercourse” does not determine anything. The co-
respondents establish such mapping, as acknowledged elsewhere, much of it at a
scale that is not fine enough to instil much confidence. This consideration is of
particular potential relevance to the North-western gully issues. The body of
“evidence” that in this matter might be taken as showing a watercourse is aerial
photography (Boral says that photographs alone may not be used for such a purpose,
citing Schmidt v Schmidt [1969] Q113 at 5-6; Blacktown CC v Hocking [2008]
-- 12 of 33 --
13
NSWCA 144 at [167]-[172] and Warren v Gittoes [2009] NSWCA 24 at [2], [55]).
The expert surveyor, Mr Dalton gives evidence from the perspective of his
expertise, which the court has no reason to reject, that the photographs available
here ought not be used by a surveyor attempting to comply with the governing
legislation, the Survey and Mapping Infrastructure Act 2003 and proper
professional practice – in the context of “ambulatory” watercourses constituting a
boundary, he offers the particular opinion that the spread of aerial images over the
decades is so poor in quality and so scattered chronologically that no conclusions
can usefully be drawn.
[18] While Mr Lehmann did not clearly spell out his point about condition 12, it is
tolerably clear that he is condemning the development application for its failure to
include any description of relevant land and work within the conditions centred on
condition 12. I accept Mr Gore‟s answer to this charge, which is that these are
things that his client did not apply for, rather requirements of the Council. There is
evidence that Boral might have contemplated imposition of such conditions from an
early stage. Its response to an Information Request by the Council contains the
following:
“Environment and Ecological Assessment
6. Waterway Rehabilitation
Overlay Map 11 (Natural wetlands and waterways) identifies Pimpama
Creek traversing the eastern boundary of the site. The applicant was
advised at the pre-lodgement meeting to undertake some rehabilitation of
this waterway. The applicant has provided details of rehabilitation along
the waterway but the development envelope proceeds to the high bank of
the western side of Pimpama Creek. PC 5 and PC 8 of the Natural
Wetlands and Waterways Code require buffering to waterways onsite. The
applicant is requested to connect the rehabilitation zones to the north and
south of the development area, and rehabilitate along the entire western
bank of the creek.
a) The applicant is requested to provide a plan detailing rehabilitation
of the western side of Pimpama creek with the development
boundary to be outside this area.
RESPONSE
As discussed at the pre-lodgement meeting, the Applicant cannot propose
works of this nature within the Pimpama River as the waterway corridor is
State-owned land and not part of the subject site. Nevertheless, Council
should not overlook the extensive rehabilitation works that are proposed
across the subject site as part of the development proposal. In addition to
the proposed rehabilitation works, the Applicant continues to be actively
involved with the local Landcare community group, including in river bank
restoration activities. For these reasons, the proposal does not include any
additional rehabilitation works on the State-owned land in the Pimpama
River.”
[19] It seems to me immaterial whether the conditions were welcome or unwelcome to
Boral, expected or not expected. The issue is within the principle expressed by
-- 13 of 33 --
14
Gibbs J in Pioneer Concrete (Qld) Pty Ltd v Brisbane City Council (1980) 145 CLR
485, where conditions imposed by the Local Government Court included:
“5(b) The land shown marked in green on Annexure “A” to the Conditions
shall be retained in its present state in order that it may be a buffer area for
the quarry and ancillary operations on the subject land.
(c) Within the land shown in green on Annexure “A” no clearing shall be done
but except for the access road referred to in Condition 10(a) ...” (page
491);”
Noting the argument that “the application and the advertisement were defective
because they failed to show the buffer area and any road frontage to Mount Crosby
Road” (493), he concluded at 494:
“However, in my opinion there was no reason why either the application or
the advertisement should have referred to a buffer area, even though it was
situated in Lots 1 and 2. The appellant did not seek consent to provide a
buffer area; it was imposed as a condition by the Court.”
(Aickin J concurring – see 510). Stephen J (Murphy J agreeing with him) reached a
different conclusion in the case overall, famously confirming the celebrated
“Pioneer principle”, but said at 509:
“I agree that, for the reasons stated by Gibbs J there was no defect in the
application and advertisement resulting from the failure to show the buffer
area.”
The North-west gully issue
[20] Paragraphs 7 and following of the first Lehmann affidavit raise this issue. Mr
Collins is a hydraulic engineer who provided two affidavits in response and gave
oral evidence, supplemented by further material submitted to the court electronically
giving more information about rainfall recorded at stations near the site at specific
dates which might have affected observations at particular times of how much water
was about, bearing on “watercourse or no watercourse” issues. His first report, of
July 2012 responds to Mr Lehmann‟s contention in a letter of 21 December 2011
that “a mapped … watercourse in the North east of the site” was not detailed in the
“Mandatory Part A of the development application” which referred to Pimpama
River as the only watercourse – it appeared the omitted one “will be removed”. It is
clear that Mr Lehmann‟s intended reference was to the “North-west gully” which, as
he says, is mapped as a watercourse. This gully tracks the western most boundary
of the disturbance area (inside it) for some 300 metres then bears North-east to track
the North-western boundary of the disturbance area at an increasingly greater
remove from it before eventually joining the Pimpama Creek. This was Mr Collins‟
assessment:
“5.1 The Subject Gully
Figure 1 shows the extent of the north-west gully and my
reporting/inspection points. Inspections were carried out at sites
A, B & C.
-- 14 of 33 --
15
The gully within the site is at its upstream extremity with the top
of the catchment within the site on the ridge line at an elevation of
RL240M AHD.
The gully is only affected by proposed quarrying activities over a
300 metre length, between 100m and 400m from the top of the
catchment on the ridge line.
The catchment area for the gully to its discharge point from the
site is approximately 6.1 hectares and to the downstream extent of
proposed quarrying activities, less than 5 hectares.
The gully is very steep within the site and is vee shaped within the
lower reaches of the proposed quarrying area and is not
distinguishable at the upstream extent. The average slope across
the site is about 16% or 1 in 6, with the gully falling over 100
metres in height over the 600 metre length from the top of the
ridge.
The gully was dry with no flow at the time of our inspection on
11 January 2012 no springs were detected.
The gully is stream order 1 through the site and well downstream.
The Pimpama Creek at its junction with the gully is stream order
4.
Site inspections were carried out at points A, B & C.
Appendix F contains a series of photographs from the inspection
as follows:
Photograph No. Description
1 Site A looking downstream
2 Site B looking upstream
3 Site B looking downstream
4 Site B from just outside the site looking
upstream
5 Site B from just outside the site looking
downstream
6 Site C looking upstream
7 Site C looking downstream
At Site C, there is no defined bed and no noticeable banks.
At Site B, within the site, the gully is bowl shaped with no
defined bed or banks.
At Site A, there is a defined cobble bed and noticeable banks,
about 1 to 2 metres in height.
5.2 Assessment against Work Practice and other Recognised
Means
My assessment against the Department‟s Work Practice (included
in Appendix E) is as follows:
-- 15 of 33 --
16
a. Defined Bed and Banks
No defined bed and banks at C & B, defined at A.
b. Extended periods of flow
No extended periods of flow at A, B or C
c. Flow adequacy
Very little flow at A, B or C being dry over 99% of time
based on my hydrologic assessment.
d. Any springs?
No springs were observed and appear unlikely within the
site extents of the gully being so elevated with hard rock
base.
e. Is there defined high and/or low banks
at sites A, B & C – no
5.3 Conclusion
Based on my inspection, analysis and interpretation of the Act, I
do not believe that the gully in the north-west section of the site is
a Watercourse within the extents of the site under the Water Act
2000 definition at the date of application.”
His site C lies just within the disturbance area and just before the gully turns North-
east more or less on the boundary of the disturbance area. Site B is some 150
metres further down the gully and of course well outside the disturbance area,
indeed just on the boundary of Boral‟s landholding there. Site A is a similar
(perhaps shorter) distance further down the gully.
[21] Mr Collins sought confirmation of his view from the Department of Environment
and Resource Management. Confirmation was forthcoming from Mr Sciacca,
Senior Environmental Officer, Environmental Services South. He advised on 20
January 2012 that having:
“viewed the onsite images, I am very confident that the drainage feature is nothing
more than an upland gully.
Effectively this is not a „defined watercourse‟ under the Water Act 2000 (the Act).
Therefore there is no requirement and/or jurisdiction under the Act for
authorisation for any proposed activities within this gully.”
Mr Collins followed a “work practice” produced by the Department or a
predecessor for purposes of earlier legislation for the guidance of officers seeking to
confirm or exclude punitive “watercourses”. I was prepared to acknowledge the
usefulness of the work practice in deference to the views of those working in the
field in Vidler at [12]. Mr Lehmann propounded other tests, including by reliance
on provisions inserted in the Water Act only very recently and long after Boral‟s
-- 16 of 33 --
17
development application, of which Mr Collins submitted was inappropriate. As to
the North-west gully, I am persuaded by Mr Collins‟ evidence, even without the
significant support he garnered from Mr Sciacca.
The other gullies issue
[22] The other gullies issue appears to me to be dealt with by Mr Lehmann in paragraphs
20 and following of his affidavit filed 7 August 2012, contending that gullies within
the disturbance area are watercourses. Five other gullies traverse the site, all
leading to Pimpama Creek. On his first inspection, and in respect of the northern
most, only Mr Collins contemplated a possible watercourse. But, overall, on the
basis of his visits to inspect the site and observations he opines that there may be a
watercourse well down gully 5 and clear of the disturbance area. Considerable time
was spent at the hearing ventilating issues such as whether presence of riparian
revegetation indicates a watercourse (Mr Collins saying no) and whether the
observations made by Mr Collins as opposed to those made on different occasions
on the co-respondents‟ side might have been unrepresentative in some way because
of unusual levels of rain (or lack thereof). Accepting now that Boral has the onus of
proof, I find that the evidence of Mr Collins satisfied the responsibility Boral has to
establish that the Pimpama Creek is the sole relevant watercourse. For the record,
Mr Collins‟ assessments of the other gullies were as follows:
“6 ASSESSMENT OF REMAINING GULLIES
My assessment of the remaining gullies of the site as shown on Figure 1
are as follows:
Gully 1
Upper inspection point
Catchment area is approx. 6 hectares
Av stream slope at inspection point is 1 in 4 (steep)
Gully is vee shaped with no defined bed and banks.
No base flow or riparian vegetation
Stream order 1
No springs detected
Opinion; not a Watercourse at this location
Lower inspection point
Catchment area approx 11 hectares
Av stream slope at inspection point is 1 in 10
No discernible bed or banks; wide (20m plus) flat base with sheet
flow
No base flow or riparian vegetation
Stream order 2
No springs detected
Opinion; not a Watercourse at this location
Gully 2
-- 17 of 33 --
18
Upper inspection point
Catchment area approx. 4.5 hectares
Upper catchment is bowl shaped and no incised channel or bed and
banks
Av stream slope at inspection point is 1 in 3 (very steep)
No base flow or riparian vegetation
Stream order 1
No springs detected
Opinion; not a Watercourse at this location
Lower inspection point
Catchment area approx. 6 hectares
Av stream slope at inspection point is 1 in 13
No discernible bed or banks; wide (20m plus) flat base with sheet
flow
No base flow or riparian vegetation
Stream order 2
No springs detected
Opinion; not a Watercourse at this location
Gully 3
This currently discharges into the main quarry pit approx. 400 m from
the tope of the catchment on the ridge line.
Catchment area to inspection point at discharge to pit approx. 6
hectares
Av stream slope at inspection point is 1 on 4 (steep)
Gully is vee shaped with no defined bed and banks
No base flow or riparian vegetation
Stream order 2
No springs detected
Opinion; not a Watercourse at this location
Gully 4
This currently discharges into the main quarry pit approx. 400 m from
the top of the catchment on the ridge line.
Catchment area to inspection point at discharge to pit approx. 5.5
hectares
Av stream slope at inspection point is 1 on 3 (very steep)
Gully is vee shaped with no defined bed and banks
No base flow or riparian vegetation
Stream order 1
No springs detected
Opinion; not a Watercourse at this location
-- 18 of 33 --
19
Gully 5
Upper inspection point
Catchment area is approx. 4.5 hectares
Av stream slope at inspection point is 1 in 4 (steep)
Gully is vee shaped with no defined bed and banks
No base flow or riparian vegetation
Stream order 1
No springs detected
Opinion; not a Watercourse at this location
Mid inspection point (downstream of final proposed quarry pit
footprint)
Catchment area is approx. 12 hectares
Av stream slope at inspection point is 1 in 10
Gully is vee shaped with defined low flow channel. Low banks are
starting to form.
Some base flow and riparian vegetation
Stream order 2 or 3
No springs detected
Opinion; stream starting to form a low bank but still poorly defined
at this location. No quarrying is proposed affecting this mid-section
of gully 5 in any case. Further upstream, the gully is vee shaped
with no low banks. It is not a Watercourse in this location or
upstream of this location.
Lower inspection point
Catchment area approx 18 hectares
Av stream slope at inspection point is 1 in 14
Discernible low flow channel with bed and low banks
Some base flow and riparian vegetation
Stream in this location has been impacted by existing quarry
stockpiles on its southern side and previous quarrying activities.
Stream order 3
Opinion; stream may be a Watercourse at this location; further
investigations would be required. No new quarrying is proposed
affecting this lower section of gully 5 in any case, and the gully has
been affected by previous quarrying activities.
The above opinions are consistent with the DERM Officers
opinions on his recent assessment of the gully in the NW corner of
the site.”
It should be noted that Council mapping of “waterways” which may include some
or all of the gullies, does not assist on this issue because more than “watercourses”
are included. The Council defines the extent of waterways by its mapping. See
section 8 of Mr Collins‟ report of July 2012.
-- 19 of 33 --
20
The Pimpama River issue
[23] One way in which Mr Lehmann covers this issue is as follows:
“24. As a watercourse, the Pimpama River is allocated land having
ambulatory boundaries that allows the banks of the watercourse to
adjust as the watercourse moves through natural accretion and
erosion. Ambulatory boundary principles are explained in the
Cadastral Survey Requirements section 4.2. A copy of this section
is Document 17 Page 36 of Exhibit PSL1.
25. Official State Government 1973 and 1978 aerial photos show the
natural alignment of the Pimpama River watercourse. Relevant to
this issue is the section of the River marked as A-B. A copy of
these photos is Document 18 Pages 37-38 of Exhibit PSL1.
26. Through natural processes over the years the Pimpama River has
moved out is its surveyed boundaries and onto the surrounding
lots.
27. Current State Government Regional Ecosystem mapping indicates
the amount of ambulatory movement of the Pimpama River
watercourse away from the previously surveyed boundaries. In
instances like this, where the river has changed slowly through
natural processes, it is normal to resurvey the natural watercourse
and adjust the land title to suit. The watercourse is „at law‟ where
it has naturally shifted to. A copy of this map is Document 19
Page 39-40 Of Exhibit PSL1.
28. As seen on the 1983 and 1990 aerial photos major earthworks
were conducted as part of the quarry operation that filled the
natural Pimpama River channel and an artificial waterway was
created to the east which discharged the water onto the eastern
flood plain as overland flow. The result is that the Pimpama River
now flows within Lot 4 RP 29989 approximately 50m east of its
ambulatory boundary „at law‟. A copy of these photos is
Document 20 Page 41-42 of Exhibit PSL1.
29. A photo taken from a light plane on 13 January 2010 shows the
quarry processing area more clearly. A copy of this photo is
Document 21 Page 43 of Exhibit PSL1.
30. I am awaiting documents through RTI but it appears that the
quarry operator, without approvals, filled the Pimpama River to
increase the available area for processing and storage of quarry
products.
31. Cadastral Survey Requirements section 4.1.1 explains that the
artificial changing of a watercourse is not considered an
ambulatory movement and boundaries cannot be shifted in
response to such interference. As a result, the boundaries „at law‟
stay at the previous natural alignment. A copy of this section is
Document 22 Page 44-45 of Exhibit PSL1.
32. The land is required as watercourse land for the watercourse and
natural processes of the Pimpama River to be complete. A general
-- 20 of 33 --
21
principle is that water flowing in a river down from the hills loses
energy as it wears the creek bed and hence the further it flows the
more energy is lost. The straightening on site of this meander in
the watercourse has shortened the River and increased the energy
in the River which is reportedly causing problems downstream.
The River is currently mobilising sediment as it erodes it‟s bed
and banks onsite in an attempt to re-establish itself. To resolve this
issue the River needs to be returned to its natural alignment.”1
(affidavit filed 31.1.12)
The question here is whether the development application proposes work whether or
not in part of the “watercourse” comprised by the Pimpama River so as to require a
resource entitlement under the Regulation. Surveying is an arcane field in which
the court is grateful to have the expert evidence of Mr Dalton. Mr Dalton provides
a persuasive case for adopting the 1919 survey which I am grateful to set out
extensively:
“4. Review of Source Material
A review of the source material reveals that:
a) From the Deeds of Grants, the feature that defines the portions on
either side of the creek are the Left & Right Banks of Pimpama
Creek as the case may be.
b) From the survey plans and associated survey records, in the
periods from 1871 to 1879 to 1919 there has been some
movement in the position of the creek banks and that the
surveyors at those times considered the movement to be natural,
slow and imperceptible.
c) From the aerial photos we can see that there is some movement
from 1944 to 1982 and that in 1983 there is a sudden change in
the creek position.
d) There is no source material available for the period from 1919 to
1944.
e) The consequence of this is that in the vicinity of the sudden
change, the ambulatory boundary remains in the “location
according to the law” it was prior to that change. This is not to be
interpreted as the “physical location” immediately prior to the
sudden change.
f) It is still necessary to demonstrate that any movement up to the
time of the sudden change has been natural, slow and
imperceptible.
g) The challenge then becomes determining the “physical position”
of the “location at law” from the source material.
5. Choosing Authoritative Source Material
1 Paragraph 32 is included as an illustration of the raising of concerns that have no relevance in the
present restricted enquiry as to whether there is a properly made development application.
-- 21 of 33 --
22
Mr Harden‟s comments (30/7/2012)2 referred to in paragraph 19 are quite
correct, but are taken out of context. In practice there are severe
limitations upon using aerial photos as an authoritative source. By their
very nature, photographs cannot be simply scaled from. Scale within a
photo changes constantly from the photo centre and is further distorted by
changes in the distances various objects are from the camera (in an aerial
photo this is the differing height of the terrain). Especially with aerial
photos, the photo scale and resolution is usually such that determining the
same feature as the previous surveyor is very difficult. Furthermore,
photos are merely a snapshot in time. There is no ability to inspect on site
and make an informed judgement as to whether any movement has been
natural, slow and imperceptible. Although aerial photograph stereo pairs
may be used to produce scaled 3D computer models and rectified
(properly scaled) images, there is limited ability to correctly orientate
these to cadastral survey data, and there is still the questionable
determination of whether or not any movement has been natural, slow and
imperceptible.
For these reasons the CSR3 in section 3.27 (Photogrammetric Surveys) &
3.31 (Remote Area Surveys) outline the requirements for the use of aerial
photos in cadastral surveys and limit their use. This survey does not meet
these requirements and hence in this case the use of aerial photos as an
authoritative source for the boundary determination is not permitted. I
have discussed this matter further with the Registrar of Titles‟ Surveying
Delegate and was given an unequivocal „No‟ to any attempt to utilise the
aerial photos in this situation for a boundary definition.
Furthermore, I cannot categorically state that in the period from 1919
through to 1983 prior to the sudden change that any and all movement in
this section of the creek was by natural, slow and imperceptible means. I
would venture that given the wholesale clearing of the eastern part of
Portion 43 evident in the 1944 photos and the continual degradation of the
riparian vegetation in the subsequent photos that some movement may be
due to human activity.
2 The reference is to an apparently hypothetical approach set out in the following email:
“Dear Carol Lehmann,
Thank you for your phone call regarding questions on how to deal with ambulatory
boundaries.
Your main question was - does aerial photography sourced from the Department of
Natural Resources and Mines come under the category of “searchable registered, or
otherwise authoritive information” as described in the the Survey and Mapping
Infrastructure Act 2003 (SMIA)?
The answer is yes. I refer you to the Guidance of Writing Survey Reports, page 18,
paragraph d), which states “other data or imagery with sufficient metadata so that it can be
related to a state dataset.”
http://www.derm.qld.gov.au/property/surveying/pdf/guidance_survey_reports.pdf
This imagery is used among other things to compile ambulatory boundaries. Hope this has
been useful.
Please contact me if you have any further questions.
Regards,
Stewart Harden
Registered Surveyor (Cadastral)
Survey Services …
Department of Natural Resources and Mines”
3 Cadastral Survey Requirements of the Department of Natural Resources and Mines invoked by Mr
Lehmann as authoritative in paragraph 18 of his affidavit filed 31 July 2012.
-- 22 of 33 --
23
In practice, the use of aerial photography in these situations may be
limited to determining:
a) If the watercourse has or has not moved.
b) If there has been movement, whether the movement has been by
sudden change.
For this reason I am resorting to RP29989 as the most recent
authoritative source for the ambulatory boundary position (as
opposed to watercourse position) prior to the sudden change, not
from any bias toward the use of survey plans, but because there is
no ability to use aerial photos for this purpose in these
circumstances.
6. RP29989
It is disappointing that the field notes for RP29989 are unable to be
located in the Department‟s archives. This is not without precedence and
the accepted practice in these situations has been to scale from the face of
the plan. I would not disparage either the measurements or the
penmanship of my predecessors in the profession. As a surveyor I am
consistently amazed at the high level of accuracy of both achieved by
early surveyors considering the relatively low level of technology and
high level of hardship endured by them. In attachment BVD-1 to this
report I have used the recorded measurements of the surveyors traverse to
control the scale of the drawing. From that it can be seen that there is
only a minor error at point 15 equal to about 2 metres and although
measurements to both sides of the creek are lacking, one could say with a
level of confidence that the LHS bank passes through or nearly through
point 14, that the creek is relatively central about points 12, 13, 17, 18, 20
& 21, and the RHS bank passes through or nearly so, points 16 & 19.
Given this and the general width shown for the creek of around 5 to 10
metres, I am satisfied that I have represented the ambulatory boundary of
RP29989 as near as practicable to the original surveyor‟s intent.
I trust this in some measure helps all concerned understand my
reasoning‟s behind my choices in this regard, in particular that the
physical creek position prior to a sudden change is not necessarily the
location at law of the boundary as Mr Lehmann supposes in paragraphs
17, 24, 25 & 27 nor is the use of aerial photographs to define the location
at law permitted as supposed in paragraphs 17, 18, 19, 24 & 27.
7. Interpretation of Aerial Photographs
The above discussion on the interpretation of aerial photographs has
relevance in regard to Mr Lehmann‟s comment in paragraph 13.
Interpretation of a single aerial photograph, without on-site
inspection is questionable. As a professional surveyor, dealing with
aerial images on a consistent basis, I would hesitate to allege that the
photograph is proof of levee failure, and that the levee failure is
ongoing to this day. I originally surveyed the levee in 2007 and I
suspect that the nominated location is the site of a rock scour
protection and detention basin forming part of the water quality
management system. In this case an oblique photograph, rather than
a direct overhead shot would be more conclusive one way or another.”
-- 23 of 33 --
24
Mr Dalton proposes to resolve the matters and get the boundary situation in order
by a new survey which would of course require cooperation and consent of the
Department of Natural Resources and Mines. He predicted some years ago that that
would be a protracted exercise, and so it has proved. In the circumstances, taking
the approach indicated throughout the reasons, I take the view that this issue creates
no problem under section 3.2.1(5) for the appellant.
[24] Speaking generally, Mr Lehmann‟s evidence and submissions are replete with
material that is irrelevant in the present limited enquiry which comes down to
whether some technical or legal defect made the development application fatally
flawed. The judge hearing the substantive appeal may take a similar view of that
material. I am referring in particular to assertions that Boral should act “openly and
honestly” (the implication being that it has not done so in the past), that Boral has
acted illegally in respect of Pimpama Creek in various ways, including “illegally
filling” (for example in Mr Lehmann‟s affidavit filed 31 July 2012 paragraph 10).
The assertions are said to be supported by letter of the Queensland Water Resources
Commission of 7 October 1986 describing installation of a submersible pump in an
excavation in the creek bed to provide a sump to draw water from as works that “are
unlicensed and therefore illegal” and a later letter (11 December 1987) referring to
the licences duly obtained and a need for a levee bank that had been constructed
adjacent to the left bank of Pimpama Creek to be licensed. Mr Lehmann requests
that the court “not reward the appellant for illegal activities resulting in the
destruction of a natural system” (paragraph 28). This approach misconceives the
role of the court in an appeal like the present. So much is well understood from
situations where a use applied for is already occurring unlawfully. See the
discussion and authorities in Serbian Orthodox Church School v Brisbane City
Council [2012] QPEC 22 at [5]. As it was said Sci-Fleet Motors Pty Ltd v Brisbane
City Council [1982] QPELR 231, there are remedies available, some in other places,
to deal with unlawful use of land and development and environment offences
generally. This appeal should not be used to punish or reward bad or good
behaviour. Assuming (without considering whether) Boral has done the wrong
thing, that would be irrelevant for present purposes. What matters in the appeal will
be the merits and impacts of the current proposal. For our present purposes, even
those do not matter.
[25] Mr Lehmann‟s last word on this issue appears from his affidavit filed 7 August
2012 and is typical of his thorough and “hard-hitting” approach:
“3. THE PIMPAMA RIVER, as shown on 1983 aerial photo, was
filled to increase the area available to the quarry for processing
quarry materials. The Appellant‟s consultant, Mr Schneider, on
page 12 of his report makes the statement that this was done with
approval under the Water Act 1926. The Appellant was required
by Court order 12/7/2012 to provide any evidence they wished to
rely on for the determination of the preliminary issues but
supplied no evidence to substantiate Mr Schneider‟s statement. A
copy of page 12 of Mr Schneider‟s report is Document 2 page 3
of Exhibit PSL3.
4. A right to information (RTI) request for documents from 1975 to
2012 with the Department of Environment and Resource
Management did not find any approvals in relation to the filling of
the river. However this RTI did reveal documents that show the
-- 24 of 33 --
25
sump excavated in the river at the same time and a subsequent
levee bank were illegally constructed without licence to do so as
shown on Document 4 Page 7 of Exhibit PSL2. I can only
conclude that Mr Schneider‟s statement in relation to this issue is
false. A copy of the RTI scope is Document 3 page 4 of Exhibit
PSL3.
5. I refute Mr Schneider‟s statement at [62] (3) that “the entire
processing area of Disturbance Footprint is wholly inside the
boundary of Lot 43 on CPW31376”. A copy of [62] (3) is
Document 2 page 3 of Exhibit PSL3.
6. Mr Schneider bases this statement on a draft plan of survey
compiled by the Appellant‟s surveyor in 2007 using information
in part from 1871, 1879, 1919, and 1981 survey plans. I strongly
disagree that this survey represents the last known, at law,
ambulatory boundary of the Pimpama River. This draft survey
plan has not been authenticated on ground and has no legal
standing until a signed survey plan has been registered with the
titles office. My understanding is that the Crown is unlikely to
agree that the survey represents the at law boundary of the
Pimpama River and is currently investigating the issue as advised
by letter on 10 April 2012 to Mr Tim Gregg, President of the
Ormeau Progress Association. A copy this letter is Document 4
page 5 of Exhibit PSL3.
7. I believe the Disturbance Footprint of the proposed development
includes the at law alignment of the Pimpama River. The
Appellant was notified by their own surveyor‟s report.
Preliminary Advice on Riparian boundary of Lot 43 on W31376,
30 August 2007 that their quarry operations encroached on the
Pimpama River and that they were required to issue an
encroachment notice to the Department of Natural Resources and
Water. The Appellant shelved this surveyors report and ignored
recommendations that they either purchase the affected land from
the State or reinstate the creek (Pimpama River) bed and banks to
its former position. A copy of the relevant page of this report is
Document 18 page 40 of Exhibit PSL2.
8. In the face of their 2007 surveyors preliminary report the
Appellant proceeded at their own risk with their proposed
development knowing that the onus was on them to prove any
changes in the ambulatory boundary and that their proposed
alignment would be subject to acceptance by the Department of
Natural Resources and Water. The last know (sic) authoritive
data as to the ambulatory boundary of the Pimpama River is on
aerial photos held by the former the Department of Natural
Resources and Water. The Appellant has recently received a 22
June 2012 surveyor‟s report, Review of Preliminary Advice on
Riparian (Ambulatory) Boundary of Lot 43 on W31376. This
report contains 1944, 1974, 1978 aerial photos showing the
natural ambulatory movement of the watercourse. A 1983 aerial
photo included in this report shows a section of the natural
watercourse has been artificially filled by the quarry and a new
artificial watercourse crated to the east. Attention is drawn to the
remaining section of the natural watercourse in 1983 just to the
-- 25 of 33 --
26
north of the filled area. I have overlaid the proposed development
disturbance foot print onto this 1983 aerial photo and it can be
clearly seen that the processing stockpiles and conveyors
associated with Product Screening Module #1 are over the top of
the 1983 alignment of the Pimpama River which is the „at law‟
alignment.
A copy of this 1983 photo plan with overlay is Document 5 page
6 of Exhibit PSL3.
9. This watercourse land is physically required by the river for
environmental processes and must be returned to the watercourse.
The Appellant did not gain permission to use this State resource
and therefore the development application the subject of this
appeal is a not properly made application.”
[26] For the reasons given by Mr Dalton, it is not possible to identify any ambulatory
boundary location as the “legal” boundary so as to supplant surveyed boundaries in
registered plans. Even in this regard there are (slightly) conflicting boundaries;
Mr Dalton‟s justification for relying on the later (1919) one is persuasive. I confess
to finding the situation confusing. Once again the State authorities‟ standing mute
seems to me significant. The letter to Mr Gregg (which it is convenient to
reproduce in a footnote)4 cannot be taken to reveal any disquiet given the
authorities‟ failure to take up the invitation offered to participate in the hearing.
Although this consideration may strictly be irrelevant, Mr Dalton has investigated
implications for his work in 2007 of amendments to the Water Act 2000 made in
2010 to introduce new ambulatory boundary provisions. If the new principles
applied they would “have not significantly altered our previous boundary
determination, especially in the area of concern”; he confirmed that the entire
processing area disturbance footprint falls completely inside the boundary of lot 43.
No development is proposed within any of the three potential Pimpama Creek
alignments acknowledged by Mr Dalton – which, of course, do not include the one
contended for by Mr Lehmann, which may (but has not been shown to) have had
relevance in the early 1980s.
Resource entitlement issue
4 “The Department of Environment and Resource Management (the department) has received your
letter of complaint in regards to modifications made by Boral Resources (Qld) Pty Ltd (Boral) to the
natural alignment of the Pimpama River, in addition to carrying out operational activities within the
registered boundary position of the Pimpama River. These activities have allegedly taken place on
land adjacent to the Boral Ormeau Quarry located at located at (sic) Upper Ormeau Road Ormeau,
4208 on land described as Lot 43 W31376 and Lot 1 RP29989.
Please be advised that the department have commenced investigation into these allegations and will
keep you informed of the outcomes of the investigation. Any supporting information in regards to
this matter is appreciated.
Following recent discussions with the department, you advised that there were a number of
environmental nuisance concerns relating to the operation of the Ormeau Quarry, such as sediment
and dust leaving the site due to vehicle movements. If these matters are still of concern, you are
invited to provide written notification to this office so that the department can investigate these
matters.
Should you have any further enquiries, please do not hesitate to contact …”
-- 26 of 33 --
27
[27] The resource entitlement issue is dealt with in this way in Mr Lehmann‟s final
affidavit:
“10. NEW ACCESS CULVERTS are to be constructed in the
Pimpama River to replace the existing structure as seen in photos.
A copy of these photos is Document 6 page 7 of PSL3.
11. I note from the culvert plans that the eastern half of the structure
consists of culverts whereas the western half of the structure is a
deck constructed on fill within the watercourse. A copy of culvert
plan and an enlargement of the entry design is Document 7 pages
8 and 9 of Exhibit PSL3.
12. In his email to Mr Schneider on Saturday 3/11/2007 at 9.54 am
Mr Fox gives a final answer in relation to the culvert within the
watercourse that all that is required is a Riverine Protection
Permit from Water Services. However by email Saturday
3/11/2007 at 4.44 pm Mr Fox supplies an answer to a subsequent
question that resource entitlement is required as you are using a
State resource. Copies of the 3/11/2007 emails are Document 8
pages 10-12 of Exhibit PSL3.
13. I can only speculate that a request had been made to Mr Fox for
permission to place the culvert on the fill that had been placed in
the watercourse against the west bank of the river. The active
width of the culverts specified is only 5 metres where the
ambulatory boundaries would be closer to twice that. The
culverts and fill as specified will block part of the watercourse
and will interfere with the flow of water. A licence to interfere
with the flow of water was required to be submitted with the
development application and therefore the application has not
been properly made. The correct process would have been to
notify the Department of Natural Resources and Water of the
encroachment of fill into the watercourse so that the actual
ambulatory boundaries could be determined and appropriately
sized culverts specified to suit the river boundaries after the fill
was removed. Appropriately installed culverts would have a
width of around 10 metres and be fitted to the ambulatory
boundaries of the watercourse so as not to interfere with the flow
of water.
…
28. The General Authority quoted by Mr Schneider [91] (2) does not
give authority as implied as it does not cover operational works
for the taking or interfering with water. It really only covers
overland flow and in any case was not current at the time of this
application. A copy of [91] (2) and the General Authority is
Document 15 page 26-27 of Exhibit PSL3.”
[28] The difficulty is that the problems paragraph 12 may be thought to give rise to have
been overcome or appreciated not to represent difficulties at later dates, as is
confirmed by Mr Fox‟s subsequent detailed letter of 4 May 2012 set out extensively
in paragraph [14] of these reasons. The continued appropriateness of the contents of
that letter (relevantly for present purposes) is affirmed by subsequent
-- 27 of 33 --
28
communications from departmental officers. The allegation is understood to be one
that although relevance of a State resource entitlement has been obtained for the
culvert crossing, it was the wrong type of entitlement. The appellant understood the
suggestion to be that item 14 or item 15 of Schedule 10 (or both) applied, a
contention disposed of elsewhere. The “evidence” in relation to State resources is
supplied by the Department‟s letter of 25 January 2008 included in the
Development Application:
“Consent to take or interfere with a State resource - section 3.2.1(5) of
the Integrated Planning Act 1997 (IPA)
The State resource subject to this proposal is described as part of the bed
and banks of the non-tidal watercourse, separating lot 43 on W31376 and
lot 1 on RP172507, and described in item 6 of Schedule 10 of the
Integrated Planning Regulation 1998 as land that is unallocated State land
(USL) under the Land Act 1994, that is not a canal under the Coastal
Protection and Management Act 1995, and not subject to Items 11, 12, 13,
14, or 15 of Schedule 10.
Under s.3.2.1 (5) of IPA and Schedule 10 of the Integrated Planning
Regulation 1998, an applicant is required to obtain evidence that the chief
executive of the relevant department is satisfied that the development is
consistent with an allocation of, or entitlement to, the resource; or the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource.
The Department of Natural Resources and Water is the Department
administering the State Resource of USL on behalf of the State of
Queensland
This letter may be taken as providing the necessary evidence that the chief
executive of the Department administering the resource is satisfied the
development application may proceed in the absence of an allocation of the
resource.
In accordance with section 3.2.1(5A) of IPA, which allows for an expiry
date for the “evidence of resource entitlement”, the evidence regarding
resource entitlement may not be used under 3.2.1(5) after 29 August 2008.
It this development application has not been lodged by that date, the
applicant will need to seek further evidence of resource entitlement from
this Department.
The Department‟s consent does not remove the obligation on the applicant
to obtain all necessary development approvals from other relevant
regulatory authorities.”
It is inappropriate that such communication to an applicant apparently setting out in
a serious way to obtain relevant “evidence” be denied affect by being analysed too
critically: cf WAW Developments Pty Ltd v Brisbane City Council [2011] QCA 47.
[29] It is true that the General Authority & Chief Executive Consent in respect of the
State‟s Water Resource issued from the Department of Environment and Resource
Management on 19 July 2011 (a copy of which is at p 247 of Mr Schneider‟s long
report) which expressly satisfies the requirements corresponding with those of
concern here under the SPA and Sustainable Planning Regulation 2009 regime,
-- 28 of 33 --
29
does not help, as it comes too late. However, it is an indication that if the appellant
were to start again, it would not encounter the resource entitlement evidence the
court is concerned with now.
[30] Although the appellant made no application for non-compliance to be excused
under s 820 of SPA, electing to await the court‟s determination that relief might be
necessary, I am prepared to say that the present represents a clear case for
favourable application of the section. The circumstances are hardly distinguishable
from those in Neilsens Quality Gravels Pty Ltd v Brisbane City Council [2011]
QPEC 101. The developer there had proceeded consistently with advice from the
relevant State department that no “evidence” to satisfy s 3.2.1(5) was required.
Then a different view was taken. Both State and local government authorities were
supportive of the development application being allowed to proceed, even if the
section had not been satisfied. That appellant, like Boral, was shown to have taken
reasonable steps to identify what was needed by way of evidence as to any State
resource entitlement. It cannot be said that rights or entitlements of members of the
public have been limited or adversely affected by any shortcoming of the kind
complained of here. A successful outcome for Boral on these preliminary points
does not stand in the way of a full examination of the merits of its proposal
generally, and in relation to matters to do with Pimpama Creek and the crossing in
particular, when the appeal proper comes before the court for hearing. Finally, a
significant waste of public and private resources would be entailed here, as it would
have been there, had a whole new development application and assessment process
been forced on the developer.
The water licence issue
[31] Mr Lehmann says:
“16. INDUSTRIAL WATER LICENCE No. 47506C to interfere with
the flow of water in the Pimpama River by impounding water on
or adjoining land described as Lot 43 on W31376 was renewed by
the Appellant 2 December 2009 and remains current until 2
December 2014. The licence is attached to the land the quarry is
on and allows for a sump/dam to be constructed in the river. A
copy of this licence is Document 31 page 67 of Exhibit PSL1.
17. As seen in photos of the dam/sump the water is stagnant and
green with algae growth indicating the combination of sunlight,
weeds and rotting vegetation are having an obvious negative
effect on water quality. The Appellant did not properly make the
application by declaring the State resource licenses and
entitlements associated with the land at Mandatory Part A
Question 10 Table J of the development application. The onus of
proof is on the Appellant to prove that the water licence is
meeting the desired environmental outcomes of the Gold Coast
City Council but the Appellant did not inform the Council of this
licence or the issues associated with it. A copy of these photos is
Document 10 page 16 of Exhibit PSL3.
18. INDUSTRIAL WATER LICENCE No. 47505C to take water
from the Pimpama River was renewed by the Appellant 2
December 2009 and remains current until 2 December 2014. This
licence is obviously being held for a reason. While the Appellant
-- 29 of 33 --
30
included in their application to Council that they will use water
from on site they legally can at any time start pumping water from
the Pimpama River under their State licence and Council would
be powerless to act as the State licence over-rides local
government conditions. The Appellant did not properly make the
application by declaring the State resource licences and
entitlements associated with the land at Mandatory Part A
Question 10 Table J of the development application. The local
government had the right to knowledge of the environmental
impacts of the proposed development and Council has denied the
right to properly assess the application and place conditions on
the development. A copy of this licence is Document 31 page 66
of Exhibit PSL1.”
I agree with Mr Gore that the contention appears to be that the development
application relies upon industrial water licences for the taking of or interference
with water in Pimpama Creek. That is a misrepresentation of the proposal, which is
that all water to be used on the site as part of the development will be taken from an
on-site dam, as has happened in existing operations, after that water has been
captured on site. See Appendix P (pp 251 ff) in Mr Schneider‟s report. Even if the
allegations are correct, they are irrelevant to the present question, which is whether
the development application was properly made. The concern really seems to be
that the appellant will proceed in a different fashion. There is no basis on which the
court can anticipate such a scenario. One would assume that the licensing regime
would prove capable of responding appropriately to any abuse of it.
The existing approval issue
[32] An issue as to whether the appellant‟s present proposal is in some way dependent on
an earlier approval was raised by Mr Lehmann in his first affidavit in this way:
“72. The Integrated Planning Act 1997, October 2004, Section 3.2.5
“Acknowledgement notices for applications under superseded
planning schemes”, directs in section 3.2.5(5) that the applicant
must start a development under a superseded planning scheme
within the specified time. A copy of this section is Document 42
Page 91-93 of Exhibit PSL1.
73. Section 3.5.21 directs when development approval lapsed. A
copy of this section is Document 49 Page 116-118 of Exhibit
PSL1.
74. As can be seen by the Ormeau Quarry Site Layout and Area of
Disturbance Plan no substantial development occurred on Lot 1
RP164904. A copy of this plan is Document 8 Page 11 of Exhibit
PSL1.
75. The appellant makes the statement in 2.1.2 of the development
application that the existing quarry operation is largely contained
within Lot 43 on CPW31376 however, the approved extent of the
quarry pit also extends into Lot 1 on RP164904. The
development was not started within the specified time and
therefore the approval on this lot has lapsed. A copy of this paper
is Document 25 Page 50 of Exhibit PSL1.
-- 30 of 33 --
31
76. The appellant relies on this previous lapsed approval as the basis
for the current development application and in this respect the
application is not properly made as it relies on a lapsed approval
of Lot 1 RP 164904.”
and brought up to date in his third and final one:
“27. I contest that the aerial photo provided by Mr Schneider on behalf
of the Appellant shows substantial development on Lot 1 RP
164904. While they have obviously been recently redone when
this photo was taken it shows no more than the existing fire
trails/breaks that have existed on the property since it was a farm.
I refer to DNR&W78QAP36073755 taken 28/8/78 which shows
these fire trails in 1978. I also refer to Sun Map, Qld Gov,
Department of Natural Resources and Water, Beenleigh 2009,
DIG70034668 taken 8/7/2009 only some months after the
Appellant‟s photo showing the fire trails a lot less bare than the
Appellant‟s photo. Current imagery of the site such as
nearmap.com 14 June 2012 show there is still only fire
trails/breaks on this land. I also refer to photos that I am told
were taken on the fire trails this year. The onus of proof is on the
developer who had not proved there was any substantial
development within the required time on Lot 1 RP164904. A
copy of these photos is Document 14 pages 22-25 of Exhibit
PSL3.”
[33] Section 3.5.21 is in terms of an approval lapsing “if the first change of use under” it
does not happen within the relevant period, here four years starting the day the
approval took effect. All that s 3.2.5 requires is that a developer “start the
development”. This, in my opinion, is satisfied if, where a development is approved
for two lots, it is started on one of them. Boral contends that the approval which it
had secured by way of a Development Application (Superseded Planning Scheme)
of 29 October 2004 could be implemented by development being started on either
lot 43 (as it was before the deadline of 24 December 2008) or on lot 1. In my
opinion Boral did preserve its existing use rights over both lot 43 and lot 1 by
starting its development on lot 43. Mr Schneider‟s report in paragraph [100]
contains the following explanation, which is coincident with my views:
“[99] The earlier „development approval‟ to which Mr Lehmann refers
is, in fact, not a development approval.
[100] The existing Extractive Industry operations on Lot 43 on
CPW31376 and Lot 1 on RP164904 are carried out as Self
Assessable development under the superseded 1995 Albert Shire
Council Planning Scheme and pursuant to a Development
Application (Superseded Planning Scheme) that was made by
Boral on 29 October 2004.
[101] By way of background, the current Gold Coast City Council
Planning Scheme 2003 superseded the 1995 Albert Shire Council
Planning Scheme on 18 August 2003. Within the statutory two
year period then provided by the Integrated Planning Act 1997,
Boral lodged a Development Application (Superseded Planning
-- 31 of 33 --
32
Scheme) for Extractive Industry: Methods of Staging of Quarry
Operations (2004 DA(SPS)).
[102] The 2004 DA(SPS) advised Gold Coast Council that Boral
proposed to carry out development under the superseded planning
scheme and submitted a Final Pit Design Plan.
[103] On 22 December 2004, the Council, through its delegate, resolved
that ‘the development be assessed under the superseded planning
scheme’ and went on to advise that ‘the development can proceed
without any further planning approvals provided that it complies
in full with the provisions of the superseded planning scheme.’
Thereby, Gold Coast City Council approved Boral to proceed, as
proposed, to quarry the full extent of the final pit design as if the
development were to be carried out under the superseded planning
scheme and the provisions thereof, pursuant to which Executive
Industry was Permitted (i.e. Self Assessable) Development in the
Extractive Industry Zone.
[104] A copy of Council‟s Acknowledgment Notice in respect of the
2004 DA(SPS) is attached at Appendix Q.
[105] The Final Pit Design Plan that formed part of the 2004 DA(SPS)
is attached at Appendix R.
[106] Pursuant to sections 3.2.5(4) and 3.2.5(5a) of the Integrated
Planning Act 1997, Boral was obligated to start the development
that was the subject of the 2004 DA(SPS) before 24 December
2008.
[107] Boral have provided me with an aerial photograph of the site that
I am advised was taken in November 2008. The aerial
photograph clearly shows that works had commenced on both Lot
43CPW31376 and Lot 1 on RP164904. A copy of the photograph
is attached at Appendix S.
[108] It is my opinion that the development that was the subject of the
2004 DA(SPS) was started on both Lot 43CPW31376 and Lot 1
on RP164904 prior to the 24 December 2008.
[109] I dispute Mr Lehmann‟s allegation on this basis. In my opinion,
there is no need to further investigate this issue.”
It is difficult, in any event, to discern the relevance of this issue to whether the
appellant‟s present development application was a properly made one.
Mr Gregg
[34] Mr Gregg‟s submission, made as President of the local Progress Association
focused on concerns about traffic and water (disturbance of underwater aquifers and
discharge into Pimpama Creek) in consequence of an apprehended trebling of
quarry production. The Council determined that the submission was out of time and
thus not a properly made one – in which case Mr Gregg would lack any entitlement
to participate in this appeal. However, the parties were content to allow him to
participate at the hearing of the preliminary points.
-- 32 of 33 --
33
Opinions of people not giving evidence
[35] The appellant‟s case has been served well by the various experts engaged by it to
respond to the co-respondents‟ points. Their views have proved persuasive,
notwithstanding the challenges that were made to the evidence and opinions (by
means other than competing expert evidence). The court should be careful about
acting on assertions or opinions by or attributed to various people who could not be
questioned. There are instances of the appellant‟s experts invoking apparently
coinciding opinions of others and of Mr Lehmann invoking certain thoughts and
opinions of persons holding relevant official positions that he considered helpful (in
some respects contradicted by later thinking). In the end, I have treated this
material with reserve. These comments do not gainsay the reliance reasonably
placed upon final expressed views of the State authorities (taken to be appropriately
informed), the burden of which is that, representing the responsible entities, they
consider that the development application was properly made, that further input by
them was not required.
Conclusion
[36] The present decision establishes no more than that the appellant‟s conditions appeal
may proceed to a hearing, that it arises from a development application that was
properly made which the Council, and now the court could assess and decide. Mr
Lehmann‟s contentions might have defeated the appellant totally by requiring it to
begin again with a new development application, this time a “properly made” one.
His failure in this respect does not limit his or any co-respondent submitter‟s ability
to argue against Boral‟s proposal on relevant planning grounds, whether by
reference to conditions that have been or should be imposed in any approval or by
arguing that there should be no approval at all: cf Morgan v Toowoomba Regional
Council [2011] QPEC 61; [2011] QPELR 620 at [5].
-- 33 of 33 --