Elsafty Enterprises Pty Ltd & Anor v Gold Coast City Council [2011] QCA 84 [2011] QPELR 647
SUPREME COURT OF QUEENSLAND
CITATION: Elsafty Enterprises Pty Ltd & Anor v Gold Coast City
Council [2011] QCA 84
PARTIES: ELSAFTY ENTERPRISES PTY LTD
ACN 096 009 371
(first applicant)
SUSTAINABLE INTERNATIONAL PROPERTY PTY
LTD
ACN 142 066 108
(second applicant)
v
GOLD COAST CITY COUNCIL
(respondent)
FILE NO/S: Appeal No 13692 of 2010
DC No 3300 of 2010
DIVISION: Court of Appeal
PROCEEDING: Application for Leave Sustainable Planning Act
ORIGINATING
COURT: District Court at Brisbane
DELIVERED ON: 29 April 2011
DELIVERED AT: Brisbane
HEARING DATE: 3 March 2011
JUDGES: Chesterman and White JJA and Martin J
Separate reasons for judgment of each member of the Court,
each concurring as to the orders made
ORDERS: 1. Application for leave to appeal refused.
2. The applicants pay the respondent’s costs of the appeal
to be assessed on the standard basis.
CATCHWORDS: ADMINISTRATIVE LAW – JUDICIAL REVIEW –
GROUNDS OF REVIEW – PROCEDURAL FAIRNESS –
BIAS – APPREHENSION OF BIAS – where applicants
sought to appeal decision of the Planning and Environment
Court to cease development of a rooftop “public viewing
platform” – where applicants complained that trial judge
interrupted submissions and examination of witnesses, did
not inform applicants that they could present evidence at
close of respondent’s case and refused to allow two witnesses
to give evidence – whether the alleged conduct of the trial
judge constituted a defect in the administration of justice in
the form of pre-judgment
APPEAL AND NEW TRIAL – APPEAL – GENERAL
PRINCIPLES – INTERFERENCE WITH DISCRETION OF
-- 1 of 30 --
2
COURT BELOW – IN GENERAL – FAILURE TO
EXERCISE DISCRETION – where applicants claimed that
trial judge reversed the onus of proof – where applicants
claimed that respondent acquiesced in allowing development
to progress – where applicants claimed they would suffer
hardship as a result of preventing the project to progress –
whether the trial judge erred in exercising his discretion
ENVIRONMENT AND PLANNING – ENVIRONMENTAL
PLANNING – PLANNING SCHEMES AND
INSTRUMENTS – QUEENSLAND – GENERALLY –
where applicants challenged the primary judge’s approach to
the construction of the legislation and planning scheme –
where applicants argued that the use of the rooftop of the
premises was permitted under the Sustainable Planning Act
2009 (Qld) and the Local Government (Planning and
Environment) Act 1990 (Qld) – whether the project
constituted a ‘material change of use’ of the premises –
whether the primary judge erred in his interpretation of the
legislation and planning scheme
Local Government (Planning and Environment) Act 1990
(Qld), s 1.4, s 8.10(8B)
Sustainable Planning Act 2009 (Qld), s 10, s 498, s 578(1)
Bhagat v Global Custodians Ltd [2002] FCAFC 51; [2002]
FCA 223, cited
Boral Resources (Qld) Pty Ltd v Cairns City Council [1997]
2 Qd R 31; [1996] QCA 249, cited
British American Tobacco Australia Services Limited
v Laurie (2011) 85 ALJR 348; [2011] HCA 2, cited
du Boulay v Worrell & Ors [2009] QCA 63
Ebner v Official Trustee in Bankruptcy (2000) 205 CLR 337;
[2000] HCA 63, cited
Forge v Australian Securities and Investments Commission
(2006) 228 CLR 45; [2006] HCA 44, cited
Hills v Chalk [2009] 1 Qd R 409; [2008] QCA 159, cited
Johnson v Johnson (2000) 201 CLR 488; [2000] HCA 48,
cited
Matijesevic v Logan City Council [1984] 1 Qd R 599, cited
Minister for Immigration and Ethnic Affairs v Kurtovic
(1990) 21 FCR 193; [1990] FCA 22, cited
Mudie v Gainriver Pty Ltd [2002] 2 Qd R 53; [2001]
QCA 382, cited
Seymour CBD Pty Ltd v Noosa Shire Council [2002]
QCA 446, cited
Tynan v Meharg (1998) 101 LGERA 255, cited
Vakauta v Kelly (1988) 13 NSWLR 502, cited
Vakauta v Kelly (1989) 167 CLR 568; [1989] HCA 44, cited
Warringah Shire Council v Sedevcic (1987) NSWLR 335,
cited
Webb v The Queen (1994) 181 CLR 41; [1994] HCA 30,
cited
-- 2 of 30 --
3
COUNSEL: N M Cooke QC for the applicants
C L Hughes SC, with N Kefford, for the respondent
SOLICITORS: Cranston McEachern for the applicants
McCullough Robertson for the respondent
[1] CHESTERMAN JA: I agree with the orders proposed by White JA for the reasons
given by her Honour.
[2] WHITE JA: On 15 December 2010 Robin DCJ sitting in the Planning and
Environment Court in Brisbane ordered that the applicants:
“… by their directors, servants, agents or contractors immediately
cease, and until further Order desist from undertaking, or causing or
permitting to be undertaken, any activity involving use by the public
for the consumption of food and beverages, including such uses as
comprise a material change of use as a Café, Tavern, Restaurant,
Reception Room or any other undefined use which is assessable
under the Gold Coast City Plan 2003, on the roof top of the
building known as the ‘Burleigh Beach House’ located at
43 Goodwin Terrace, Burleigh Heads and described as Lot 129 on
Crown Plan WD6680.”1
He gave liberty to apply and costs were reserved.
[3] The applicants, whom it is convenient to refer to by name rather than status in the
proceedings, are Elsafty Enterprises Pty Ltd, the lessee of the land, represented by
its director Mr El Safty, and Sustainable International Property Pty Ltd, represented
by its director Mr Youssef, the proposed operator of the roof top facility. They seek
leave to appeal those orders pursuant to s 498 of the Sustainable Planning Act 2009
(Qld). The reasons which the applicants contend justify granting leave are those
which constitute the grounds of appeal appearing in the amended application and
amended notice of appeal.2 They are, in brief, that:
1. The conduct of the primary judge in dealing with the legally unrepresented
applicants was such as to give rise to a reasonable apprehension of bias in
favour of the respondent Gold Coast City Council (“GCCC”).
2. The primary judge’s exercise of his discretion whether to issue an
enforcement order in the terms sought by the GCCC miscarried because he
gave no proper consideration to issues of acquiescence by the GCCC and the
hardship that the enforcement order would cause the applicants.
3. The primary judge erred in law in his construction of the relevant planning
legislation and ought to have concluded that the increase in “Total Use
Area” was “nil” and the area of the roof was not included in the “Gross
Floor Area” and thus constituted an exempt development.
[4] The applicants had contended below, in response to an application by the GCCC for
an enforcement order to restrain the proposed use of the roof top for the
consumption of food and drink in premises which Elsafty Enterprises operates
a restaurant, that a permit to do so was not required because such a use was
encompassed in the existing permit to operate a restaurant. The proposed operator
of the roof facility is Sustainable International Property Pty Ltd using the business
1 AR 1295.
2 Not filed and no leave to file sought.
-- 3 of 30 --
4
name “Clique”. It had already undertaken considerable work on the roof in
readiness for the enterprise and the festive season. The roof overlooks the beach at
Burleigh Heads with dramatic views north to Surfers Paradise and to the point break
at Big Burleigh in the other direction.
[5] Since the applicants claim that their entitlement to use the roof in the way proposed
is encompassed in the original permit granted in 1986 and that the GCCC has
acquiesced in that understanding over the ensuing years it is necessary to consider,
albeit it selectively, that history.
History
[6] The building known as the Burleigh Beach House is located on Crown leasehold
land at 43 Goodwin Terrace, Burleigh Heads described as Lot 129 on Crown Plan
WD6680 having an area of 1,520m2 (“the land”). The lease is due to expire on
30 June 2030 and was granted for the purpose of “commercial/business purposes
namely for Swimming Pool, Kiosk, Restaurant and associated Health Facility
purpose and for no other purpose whatsoever”.3
[7] Kinami Pty Ltd appealed to the Local Government Court sitting at Southport in
1985 against a refusal by the GCCC to approve an application for permission to
construct a single storey building for the purpose of a restaurant on the land.
Row DCJ, who constituted the court, in his reasons for decision noted that:
“The subject land is the site of the Burleigh Heads swimming pool
and is located on the ocean to the immediate south-east of the
patrolled area at Burleigh Heads surfing beach. The subject land is
presently occupied by a swimming pool complex that was for the
most part constructed a number of years ago. The pool area was
renovated in 1982-83 and the pergola area and bar-b-que constructed.
The Appellant acquired the lease of the property late in 1980. At
present and for some time past, the swimming pool has been closed.
The buildings have severely deteriorated, being the subject of
considerable vandalism. The subject land is zoned Public Open
Space (General) within the relevant Town Planning Scheme. In that
zone the proposed use for the purpose of a restaurant is a purpose for
which buildings or other structures may be erected or used or for
which land may be used only with the consent of the Respondent
under and pursuant to Column IV of the Table of Zones.”4
[8] Objections from 561 persons were received relating, inter alia, to traffic and noise,
particularly to the residents in the apartment blocks behind the proposed building, as
well as objections to the further development of the foreshore. Row DCJ noted that
the proposal included demolishing the dilapidated buildings on the site and erecting
a single storey, sloped roof building. His Honour granted the appeal and adjourned
the further hearing until the parties could settle the detailed conditions to which the
approval would be subject.
[9] On 7 March 1986 Row DCJ made formal orders5 subject to certain conditions.6
Relevant, for this application, are the following as issued by the GCCC:
3 AR 543, 544.
4 AR 902-903.
5 AR 1189.
6 AR 911-14.
-- 4 of 30 --
5
“TOWN PLANNING PERMIT NO. 9/225
In pursuance of a Local Government Court Order dated 7th March,
1986, the Council of the City of Gold Coast hereby approves an
application to erect a Restaurant on land described as … subject to
the following conditions:
(1) Payment to Council of $126,000.00 in lieu of twenty-eight
(28) off-street carparking spaces …
(3) The roof line of the proposed restaurant is to be amended to
reduce its height so as to minimise the visual impact of the
development to the reasonable satisfaction of the Chief
Inspector.
(4) The swimming pool facility is to be maintained for public
use.
…
(6) Submission to and approval by Council of satisfactory
building plans and specifications in accordance with the
Building Act, Council’s By-laws where applicable and the
City of Gold Coast Town Planning Scheme and generally in
accordance with the plan approved in this Town Planning
Permit and the conditions of this Permit. The building is to
be constructed in accordance with the approved building
plans prior to the commencement of the use approved in this
Town Planning Permit.
…
(12) Any lighting device is to be so positioned and shielded as
not to cause any glare nuisance to any nearby residential
occupation or passing motorist.
(13) The premises are to be fully air-conditioned and sound-
proofed to the reasonable satisfaction of the Chief Inspector.
(14) There is to be no interference with the amenity of the
neighbourhood by reason of the emission of noise, vibration,
smell, fumes, smoke, vapour, steam, soot, ash, dust, waste
water, waste products, grit, oil, or otherwise.
…
(28) Restaurant to accommodate no more than 200 people.
...
(36) The approval is only for a restaurant and any discotheque
type activity would be subject to consent for indoor
recreation and would require a Town Planning Application.”
[10] The then developer negotiated amended building plans with the GCCC amongst
other things to change the roof from sloping to flat made of cement. The roof,
comprising some 400m 2 was referred to as an outdoor “viewing platform” from
time to time in the correspondence about the building plans particularly referring to
-- 5 of 30 --
6
a glazed balustrade around the roof edge. The concern was principally safety
because the roof area extended out over the swimming pool and the GCCC were
concerned that glasses should not be able to be balanced on the top of the
balustrade. A totally enclosed 1500mm high glazed balustrade with no ledge on top
was required and is in place. Approval was also given in 1987 for an increase in the
restaurant area to 436.3m2 from 400m2 as stipulated originally (noted to be an
increase of 3.9%)7 for which one further car park space contribution was required.8
A request had been made to extend an outdoor terrace area for restaurant dining.
The GCCC responded:
“… the outdoor terrace area has not been approved for restaurant
seating and as this area is in excess of the 5% allowable a [sic] minor
modification to the Town Planning approval already granted, the use
of the terrace area for restaurant seating will require Town Planning
Consent and a further additional carparking contribution.”9
[11] In 1988 a request to increase the height of the building by one metre to
accommodate high seas was considered to be within the existing permit.10
[12] In 1990 the then Town Clerk wrote to Linkon Design:
“… it is confirmed that the outdoor roof terrace area can be used for
restaurant purposes without Town Planning Approval or car parking
contribution as it does not form part of Total Use Area as defined in
the current Town Planning Scheme.”11
A file note of the same date confirms this (probably first in time):
“P & D Committee and Ald Ganim agreed that outdoor area could be
used for restaurant eating without T.P. approval or additional
carparking.”12
The applicants regard this as a clear intimation that what is proposed for the roof is
within the existing approval.
[13] A separate town planning application was approved in 1993 for an additional
restaurant on the lower ground floor formerly designated for a gymnasium.
The restaurant was to be entirely enclosed by the existing building and similar
conditions concerning noise and amenity control to those imposed originally for the
restaurant were imposed.13 The total use area was 390m2 and required the provision
of 26 car spaces.
[14] In 2003 and 2004 respectively approval was given for a material change of use for
alterations and additions to the kitchen and for outdoor dining around the pool14 and
covered areas near the pool.15
[15] Over the ensuing years the lease changed hands and negotiations were ongoing
between the developer for the time being and the GCCC. On 9 July 2009 new stairs
providing improved access to the roof area were approved.
7 AR 915.
8 AR 917.
9 AR 595.
10 AR 918.
11 AR 1315.
12 AR 1316.
13 AR 920-924.
14 AR 931.
15 AR 942.
-- 6 of 30 --
7
[16] On or about 20 August 2009 Elsafty Enterprises received a Show Cause Notice
dated 14 August 2009 from the GCCC. The GCCC was concerned that the building
height with the balustrade exceeded the height permitted under Town Planning
Permit No. 9/225. This action was likely in response to complaints about the
activity on the roof. At the conclusion of its Show Cause Notice the GCCC
requested Elsafty Enterprises to “advise of the proposed/intended useage [sic] of the
roof top area”.
[17] On 4 September 2009 Mr Martin Roberts, a senior development compliance officer
with the GCCC, attended a meeting at the land with the project manager engaged by
Mr El Safty in relation to an application to work outside the permitted construction
hours of 6.30 am to 6.30 pm Monday through Saturday. The work involved the
demolition of part of the existing roof structure by concrete cutting, jack
hammering, form work and the pouring of concrete to construct the new stairway
located at the main entrance and leading to the roof top. The justification for doing
so was to improve access to the roof top to maintain plant and equipment, the
existing staircase being too narrow and winding for workplace health and safety
purposes. Mr Roberts ordered the work to cease because the intended use of the
additional floor space being created was assessable development and it would
trigger a material change of use of the premises.
[18] By letter dated 4 November 2009 the GCCC notified Mr El Safty that the Show
Cause Notice had been lifted. Mr El Safty replied to the request about “use” by
letter dated 28 January 201016 drawing attention to the letter of 29 August 1990 and
internal memo of the same date, and to the correspondence about the nature of the
balustrade to prevent “beer glasses or similar” falling into the swimming pool as
demonstrating that there was no contravention of the legislation and no planning
permission was required.
[19] After the withdrawal of the Show Cause Notice, the GCCC, through their solicitors,
wrote to Mr El Safty on 22 March 2010:
“Burleigh Beach House – Unlawful use of roof top terrace…
We reiterate to you again that the use of the roof top terrace of the
Premises for any use whatsoever will amount to a development
offence for the carrying out of assessable development without
a development permit [referring to s 578(1) of the Sustainable
Planning Act 2009 (Qld)]. No development approval currently
attaches to the land which permits the use of the roof top terrace as
you allege. Our reasons in support of this view are set out in further
detail below.
Should you proceed to carry out any of the following uses on the
roof top terrace as defined by Council’s Gold Coast Planning
Scheme 2003 (Planning Scheme) for:
(a) either a material increase in the intensity or scale of the
existing first floor Restaurant(s) or a new Restaurant use;
(b) a Reception Room (i.e. for the conduct of receptions or
functions at which food or drink is served); or
(c) a Tavern (which includes bars and non-residential hotels),
16 AR 774.
-- 7 of 30 --
8
without an effective development permit enabling the use to occur,
then we hold instructions to commence proceedings against you and
your company, El Safty Enterprises Pty Ltd. Such proceedings will
likely be two-fold; seeking urgent injunctive relief in the Planning
and Environment Court to immediately cease the use and
subsequently in the Magistrates Court for prosecution of the alleged
offence.”17
The writer advised that proceedings would seek declarations as to the lawfulness of
the use and consequential orders restraining the use in the absence of an effective
development permit and continued:
“Subject to you considering our representations and taking your own
professional advice on the matter, Council encourages you to direct
your resources towards engaging in a pre-lodgement meeting to
consider your preferred use of the Premise’s roof top terrace. If you
choose to lodge a development application it will then be assessed
against Council’s Planning Scheme in accordance with the usual
IDAS process under the Sustainable Planning Act 2009 (Qld).”18
Mr El Safty was reminded that the terms of the Crown lease required the land to be
used in conformity with the Town Planning Schemes, by-laws and requirements of
the GCCC.
[20] Mr Sharpe, a senior planning officer with the GCCC agreed in cross-examination
that couples using the roof for “a kiss and an embrace”19 would not be a material
change of use, nor would accessing the roof for maintenance. During the hearing,
in exchanges with his Honour, it was suggested by counsel and Mr El Safty that
diners venturing up to the roof between courses from the restaurant would not
constitute an unlawful use. At the hearing below and on this application the
position of the GCCC was that there was no absolute opposition to the use
proposed, merely that the applicants were required to go through the usual planning
processes as had occurred in the past, for example, for extended restaurant facilities
around the swimming pool.
[21] Work continued and it became apparent that the roof was to be used for a bar.
Mr El Safty conducted a public inspection of what he proposed with a number
of adjacent residents whose accommodation overlooked the building. On
16 September 2010 Mr El Safty introduced the GCCC officers during a visit to the
site to Mr Youssef as being involved in the project. Details of the proposals were
given about the project: the roof top would be fitted with a bar, lounges, day beds,
high tables and bar stools, planter boxes and sails; an entry fee would be charged to
ensure that only desirable clientele were attracted. Mr El Safty and Mr Youssef
proposed that car parking issues would be resolved by offering valet parking for
patrons by the use of the GCCC’s library car park after hours. In these
conversations Mr El Safty pronounced his belief that approval had been granted to
carry out this work under earlier development approvals relating to the premises.
A public sign was displayed at the front of the premises which suggested that the
public viewing platform had been approved by the GCCC. The photographs in the
appeal record show the extensive nature of the proposal for the roof as well as an
artist’s impression of the completed development.20
17 AR 554.
18 AR 555.
19 AR 119, Trial transcript 1-119.
20 AR 713-14.
-- 8 of 30 --
9
[22] On 30 September 2010 the GCCC issued a plumbing compliance notice related to
work on the “Sky Bar Terrace”. The applicants make much of this notice as
indicative of acquiescence but it was conditioned on any other required
development permits.21
The application for injunctive relief
[23] The GCCC filed its application on 11 November 2010 seeking orders against
Elsafty Enterprises, with a return date on 1 December 2010. The GCCC sought
a declaration that the proposed use of the roof top was assessable development for
which there was no effective permit and unless restrained, Elsafty Enterprises
intended to use the roof top for a “Restaurant”, “Café”, “Reception Room” or
“Tavern” within the meaning of those terms in the Planning Scheme.
On 29 November 2010 the GCCC filed an application to join Sustainable
International Property and to amend the original application on the basis that it
proposed to operate the “licensed viewing platform” under the business name
“Clique”.
[24] On 1 December 2010 Searles DCJ ordered that by 6 December 2010 Elsafty
Enterprises file and serve any affidavit material or other statements of evidence on
which it intended to rely and set down the two applications for hearing on
9 December 2010, a Thursday. On 9 December, the GCCC was represented by
senior and junior counsel. Mr El Safty appeared for his company and Mr Youssef
appeared for Sustainable International Property, of which he was the sole director.
Mr Youssef had been served with the GCCC’s material and did not oppose his
company’s joinder.
[25] Because of the complaint of apprehended bias manifested by pre-judgment it is
necessary to consider in some detail the progress of the application. Counsel for the
GCCC read the material on which he proposed to rely after giving an opening.
Mr El Safty had advised that he wished all of the GCCC deponents to be present for
cross-examination but was able to reduce that number to six. Mr El Safty relied on
two affidavits by himself and one by Mr David Ransom, a town planning consultant
who had formerly been employed by the GCCC. Mr El Safty indicated that he
proposed calling his wife and Mr Youssef to give evidence. The primary judge then
asked Mr Youssef:
“HIS HONOUR: Are you going to present a case, Mr Youssef,
or just rely on what Mr El Safty does?
MR YOUSSEF: Depends on the outcome of today, your
Honour.
HIS HONOUR: Well, you’ve got to make a decision.
MR YOUSSEF: Well - - - - -
HIS HONOUR: I mean, if you want to go out and get your
own town planner or something - - - - -
MR YOUSSEF: I’ve got a degree in property and I finished
with Majors and Honours and on the Dean’s list and I’ve got
[indistinct] To the Future Property Leaders Award from the Property
21 AR 500.
-- 9 of 30 --
10
Council of Australia national award this year, your Honour. So
I think I’m pretty - - - - -
HIS HONOUR: Well, if you’re presenting yourself as
something like a planning expert Mr Hughes might possibly object to
that, but I don’t know. We’ll face it when we come to it.
MR YOUSSEF: I think it’s pretty straightforward, your
Honour, if I just pointed it out to Mr Hughes what…”22
[26] Mr El Safty then made a preliminary submission to the primary judge seeking to
have the application dismissed because, he argued, the GCCC had withdrawn its
Show Cause Notice in November 2009. The primary judge explained that although
Mr El Safty could cross-examine on the letter withdrawing the Show Cause Notice,
the GCCC was not precluded for that reason from bringing the present application.
[27] Each of the GCCC witnesses was cross-examined by Mr El Safty at length. In the
course of cross-examination Mr Roberts, a senior compliance officer, was asked
whether what was being done on the roof constituted a material change of use. His
Honour intervened observing that that was a matter for the court. He then said:
“I mean, I don’t want to stop you if this is leading to some useful
outcome... from your point of view, or might.”23
To this observation Mr El Safty responded that he had made his point. After
a further exchange in which Mr El Safty protested that the GCCC was pursuing his
enterprise using public resources on a frivolous and vexatious application, his
Honour asked why, if it got additional information, it could not pursue the matter.
He then added, “I don’t want to throw you off your stride”24, to which Mr Elsafty
replied that he was “Okay”, that he had asked all the questions he needed and that
the witness had been most helpful. After re-examination of Mr Roberts,
Mr Youssef indicated that he wished to ask some questions which his Honour
permitted. Mr El Safty then sought to ask further questions. His Honour conceded
that since he, himself, had asked the witness a question, Mr El Safty could further
cross-examine. That further cross-examination extended for some half dozen pages
of transcript. Whilst that was occurring his Honour sought to summarise the
applicant’s position. In that exchange Mr El Safty explained his purpose to which
his Honour responded, “So there’s some point in this.”25
[28] The court adjourned at 2.00 pm until 3.00 pm. His Honour had expressed some
mild concern that the matter would not finish that day. After lunch Mr El Safty
continued his lengthy cross-examination of a witness. At the end of re-examination
Mr El Safty had one more question which was permitted. During the cross-
examination of Mr Sharp, executive co-ordinator with the GCCC, much discussion
ensued about parking requirements at Burleigh Heads. His Honour suggested to
Mr El Safty that the applicants were seeking to avoid any further contribution to
parking. Mr Youssef then intervened, making reference to certain GCCC internal
memoranda. His Honour suggested that Mr El Safty should return to cross-
examining Mr Sharp.
22 AR 34, Trial transcript 1-34.
23 AR 51, Trial transcript 1-51.
24 AR 52, Trial transcript 1-52.
25 AR 84, Trial transcript 1-84.
-- 10 of 30 --
11
[29] It can be discerned from the transcript that a cordial tone had prevailed in the court
throughout the day and may be exemplified by this exchange after Mr El Safty had
been able to produce to the court the hitherto unavailable order made by Row DCJ
on 7 March 1986, which the GCCC itself had been unable to locate:
“HIS HONOUR: Well, I’m sure they’ve got a dress code that
would keep all the surfers out, haven’t they? [speaking of the casual
dining area]
MR EL SAFTY: Your Honour, I actually surf that point
regularly and I can tell you - - - - -
HIS HONOUR: But you don’t come in in your boardies, do
you? You do?
MR EL SAFTY: Yep. And - - - - -
HIS HONOUR: Even at night?
MR EL SAFTY: Yes. I moved from Brisbane to the Gold
Coast for that reason.”26
After some further light banter his Honour asked Mr El Safty to continue. A little
later Mr Youssef asked if he could be excused to go to the bathroom and his Honour
asked,
“Do you trust Mr El Safty to mind the shop while you’re gone?
I think we’ll break the rules and go ahead without him if you feel
comfortable about that.”27
Mr El Safty explained that Mr Youssef had helped him with research and
his Honour suggested that he could fill him in, to which Mr El Safty responded,
“Promise” and got on with questioning the witness.
[30] In the course of the afternoon it became apparent that the evidence would not finish
that day. Senior counsel for the GCCC indicated that he had a commitment in
Mackay on the following Monday and Mr Youssef said that he would be in Sydney
because he had another development that he wished to attend to. His Honour
warned that if he did not continue to participate in the hearing he might have to
decide whether the GCCC would continue against Mr El Safty’s company and defer
the application against Mr Youssef’s company. The applicants had been clear to the
court that they proposed to continue with their preparations to open the roof for
business and had only been prevented from doing so by the weather the Saturday
before. His Honour indicated that he wished to conclude the GCCC’s evidence that
day and asked Mr Youssef, “[W]ell, can you change your plans?”, to which
Mr Youssef responded, “I’m gonna have to, your Honour”. 28
[31] It then became likely that further evidence could be accommodated that day.
His Honour asked counsel for the GCCC, “can you deal with Mr El Safty?” and
counsel agreed. His Honour said that he was happy to go on “and even Mr Youssef
if it’s going to possibly help with next week but it’s not going to take you long to
put your questions to Mr El Safty.”29 At the end of cross-examination the primary
26 AR 134, Trial transcript 1-134.
27 AR 135, Trial transcript 1-135.
28 AR 143, Trial transcript 1-143.
29 AR 151, Trial transcript 1-151.
-- 11 of 30 --
12
judge invited Mr El Safty to leave the witness box and indicated that the court
would hear from Mr Youssef, adding, “at least, get what he wants to give in
evidence?”, to which Mr El Safty responded, “Unless Mr Youssef has got any
questions for me”.30 Mr Youssef responded that he did not.
[32] Not surprisingly, counsel for the GCCC suggested that Mr Youssef would need to
return because he had given no statement and he had no idea what he would say.
His Honour then suggested that the evidence-in-chief could be adduced and cross-
examination take place on the following Tuesday. Mr Youssef intervened and said
that he would “rather speak to my lawyers” before he gave evidence but made it
clear that he wished to give evidence. His Honour told him that he had tomorrow
and suggested that he should have his evidence in affidavit form like Mr El Safty by
the end of the weekend. Mr Youssef responded that he would do his best.
Mr El Safty explained that Mr Youssef was his second mortgagee and agreed that
Mr Youssef should obtain separate legal advice. His Honour observed “I’m not
sure whether you’re giving evidence for yourself or for Mr El Safty or for both”.31
Mr Youssef indicated that he was unsure and that was the reason he wished to speak
to his lawyers. His Honour then directed:32
“…if there’s going to be evidence by you that it be provided as
a written statement or affidavit by lunch time Monday. I mean,
you’ll be able to deal with it then. So that gives you tomorrow and
the whole weekend and Monday morning …”
[33] Mr Youssef responded that he was busy and would do his best to get it done by
Monday. His Honour extended time to 5.00 pm Monday and adjourned until
10.00 am on 14 December 2010. He directed that any evidence from Mr Youssef
be made available in writing by 5.00 pm on 13 December 2010. The court
adjourned at 6.00 pm.
[34] The matter continued on Tuesday, 14 December 2010 at 11.00 am.
Mr NM Cooke QC announced his appearance for the two applicants and sought an
adjournment. He told the court that he and his instructing solicitors had received
instructions about midday the previous day and they were not prepared to embark
on a hearing without proper preparation. Mr Cooke told his Honour that there was a
deal of work to be done: obtaining the transcript, documents, approval permits,
witness statements, and conferences with witnesses to prepare themselves and their
clients for the rest of the trial. Mr Cooke said his client was somewhat “intimidated
by the team that he had opposed to him”33, and thought he should get some legal
assistance. His Honour observed that Mr El Safty did not do “too badly”.
Mr Cooke urged that the status quo be maintained but, on questioning from
his Honour, what that entailed was not particularised. After some discussion about
the issues his Honour said:
“I have no idea what the answer is yet. I think it’s half a question,
Mr Cooke, what use rights come out of the approval in the 1980s.”34
Mr Cooke responded that the photographs showed that the roof was to be used as
“a public viewing area”.35 He said it would not be possible to be prepared for the
30 AR 167, Trial transcript 1-167.
31 AR 168, Trial transcript 1-168.
32 AR 168, Trial transcript 1-168.
33 AR 172, Trial transcript 2-3.
34 AR 173, Trial transcript 2-4.
35 AR 173.
-- 12 of 30 --
13
balance of the hearing within a week with the pressures of Christmas but offered
undertakings in terms of the restraint sought in the application. The application
sought to restrain the use of the roof for a restaurant, café, reception room or tavern
as defined in the planning scheme.
[35] It had become apparent that the applicants proposed to permit the consumption of
food and beverages on the roof in a way which did not appear to contradict the
planning definitions in any direct way – a cover charge would be imposed for those
who wished to go to the roof and that charge would include food and beverages
catered for by an external caterer and the licence would be that of the restaurant
below. Numbers of up to 250 were mentioned. The applicants were not prepared to
give an expanded undertaking not to engage in that kind of activity in return for an
adjournment. His Honour was not persuaded that the undertaking offered would
provide any assurance to the GCCC that there would not be a large scale use of the
roof area associated with the consumption of alcohol and food which would
generate substantial noise and demand on parking. His Honour declined to grant the
adjournment, noting that the applicants had had adequate notice of the GCCC’s
attitude since March 2010.
[36] On the refusal of the adjournment Mr Cooke and his solicitor withdrew. His
Honour indicated that the matter would proceed. Mr Youssef had not provided any
statement as directed. His Honour then said:
“Well, I think it’s reasonable to assume that the evidence is
completed, isn’t it?”36
His Honour invited Mr Youssef to “say something”. He said:
“I would like to, your Honour. I would just like to say that I don’t
think I was given enough time to sort out my legal representation,
and I told you I was in Sydney. The first I heard of this was only
a few days before we came to Court last week. We were here until
late, 6 – after 6 on Thursday evening. I wasn’t able to source my
legal representation until – getting all my paperwork and that ready
for him, I couldn’t get it done before the weekend so the earliest
I could see Mr Cooke was Monday. So I don’t – I would like to say,
your Honour, I’m going to appeal it, whatever the outcome is,
because I don’t feel that I’ve had a fair go at this. And I have known
of this case for – I’ve known of it for less than a week. So I don’t
think it’s fair. I don’t think I’m getting a fair go at it.”37
[37] His Honour asked Mr Youssef whether he intended to give evidence as Mr El Safty
had done earlier. Mr Youssef said that he did not know because he had no
opportunity to take legal advice about whether he should give evidence.
He contended that it was “overwhelming” for him and that the courts were
overwhelming - “I usually have legal representation to sort this out for me”. 38
Mr Youssef again said that he would appeal the decision not to adjourn the
application. Again, when his Honour asked him whether he wished to give
evidence, Mr Youssef responded that he did not know what he wanted to do.
His Honour said he took that as meaning “no” but Mr El Safty indicated that he was
relying on evidence that Mr Youssef might give.
36 AR 197, Trial transcript 2-28.
37 AR 197, Trial transcript 2-28.
38 AR 198, Trial transcript 2-29.
-- 13 of 30 --
14
[38] Counsel for the GCCC mentioned that it had been made plain on the previous
Thursday, at the conclusion of the proceedings, that if Mr Youssef wished to give
evidence a statement was to be provided. Mr Youssef responded that he did not
know what evidence the court required of him. His Honour remarked that while he
appreciated the time was short, he understood that arrangements had been made
which Mr Youssef had accepted as sufficient. The following exchange took place:39
“MR YOUSSEF: I told your Honour that – well, if that’s what
you’re saying, I’m going to have to accept it. I didn’t say I believed
it was fair. I made it clear to the Courts that I did not believe it was
fair. And if that’s what you think, I can’t overrule your judgment,
can I?
HIS HONOUR: Well, I haven’t made a judgment yet - - - - -
MR HUGHES: Well, your judgment was - - - - -
HIS HONOUR: - - - - - except – except that it’s going to be
decided today.
MR YOUSSEF: Yeah, well, your judgment was that I had to
have an affidavit in to the other party by Monday, five o’clock. That
was your judgment, and I didn’t think that was fair.”
[39] Mr El Safty complained that Mr Ransom had to leave and he wished to clarify
further matters with him. His Honour responded:
“HIS HONOUR: All right. Well, I know nothing about these
legal planning aspects. Mr Hughes will be having to address the
Court on that to persuade me that he’s got a compelling enough case
to take the serious step which he would like the Court to take of
stopping a significant commercial activity. I do appreciate the
seriousness of what the council’s seeking and I’m going to take
a properly cautious approach. The mere fact that I refused the
adjournment doesn’t indicate what final outcomes would be today.”40
After some further discussion about the terms of the undertaking his Honour said:
“So there’s no point in talking about whether it’s going to be
adjourned or not, because it isn’t. Mr Hughes wants the matter dealt
with finally, so if it is and if it goes against you, then as Mr Youssef
clearly knows, and I’m sure you do, your remedy is to appeal or seek
leave to appeal from the Court of Appeal. And you can apply to the
Court of Appeal if things go against you this afternoon to have any
injunction that this Court might impose stayed or set aside until the
Court of Appeal decide what ought to happen.”41
[40] His Honour suggested that counsel should make his submissions as it was legal
argument and that Mr El Safty and Mr Youssef should listen carefully to see if they
could “pick some holes in things he says”.42 Mr Youssef said:
“Your Honour, I would just like to make a record for the Courts.
I don’t think this is fair. I disagree with it, and I will be appealing if
I don’t like what – the outcome of it all.”43
39 AR 199, Trial transcript 2-30.
40 AR 200, Trial transcript 2-31.
41 AR 201, Trial transcript 2-32.
42 AR 202, Trial transcript 2-33.
43 AR 202, Trial transcript 2-33.
-- 14 of 30 --
15
After counsel was invited to commence his submissions Mr El Safty interrupted to
understand “where we are in proceedings now”.44 His Honour answered:
“We’re where we were last Thursday at six o’clock with Mr Hughes
about to make the legal argument in support of a proposition that he
ought to get the order that he seeks.”45
[41] The court adjourned at 12.48 pm until 2.30 pm. After counsel had completed his
submissions his Honour said, “Yes, Mr El Safty? The floor is yours now.” 46
Mr El Safty indicated that he wished to call Mr David Ransom. His Honour
demurred because it seemed as though Mr Ransom was to be called to give his
interpretation of the provisions in the legislation. His Honour permitted Mr Ransom
to give evidence over objection. Before he was called Mr El Safty indicated that his
evidence would occupy between 20 minutes and half an hour. Mr El Safty raised
his concern that on issues of law the applicants were disadvantaged but his Honour
was concerned that Mr Ransom’s evidence should be confined to facts. His Honour
invited Mr El Safty to call Mr Ransom to give evidence for 20 minutes. Mr El Safty
responded that he would appreciate the opportunity to be able to finish his
sentences.47
[42] When Mr Ransom was employed by the GCCC he had some involvement in the
subject building plans. He was involved in the Show Cause Notice proceedings and
was asked a number of questions. After some 11 pages of transcript his Honour
observed that Mr El Safty had had twice “your 20 minutes” and asked him how
much longer he proposed to be. He said that he would be another 10 minutes.
His Honour observed, “And you won’t go a second after that. All right? Go on”.48
His Honour indicated that many of the observations made by Mr El Safty could
appropriately be left to submissions. Mr El Safty indicated that he just needed to
ask Mr Ransom three more questions regarding critical matters. The first question
was long and his Honour said of that, “Was that one question?”49 His Honour
thought Mr El Safty was wasting time and that he did not want a speech.
The applicants complain about this exchange where his Honour appears to be
irritated at the meandering style of Mr El Safty against the pressures on time and,
against the long examination-in-chief that had already occurred. After an exchange
between his Honour and Mr Ransom about matters going to use, Mr El Safty said,
“Strictly speaking, I can’t ask any more questions, your Honour” 50 to which
his Honour responded, “Yes, all right, good”. His Honour then indicated that he
was going to stop Mr El Safty at that point.
[43] Mr Hughes was then invited to cross-examine. After a relatively brief cross-
examination his Honour told Mr Ransom he was excused but Mr Youssef
intervened and said that he had “a couple of questions for Mr Ransom”, to which his
Honour responded, “Well, two questions”.51 Mr Youssef said that he was not going
to take long but felt that he had the right to ask those questions and his Honour
repeated, “Two questions”. With complaints from the GCCC counsel his Honour
44 AR 203, Trial transcript 2-34.
45 AR 203, Trial transcript 2-34.
46 AR 232, Trial transcript 2-63.
47 AR 234, Trial transcript 2-65.
48 AR 246, Trial transcript 2-77.
49 AR 250, Trial transcript 2-81.
50 AR 252, Trial transcript 2-83.
51 AR 255, Trial transcript 2-86.
-- 15 of 30 --
16
observed that it was not helpful to ask questions of Mr Ransom who had not been
employed by the Council for 10 years about their processes. Mr Youssef seemed to
suggest that he would not waste the court’s time by asking any further questions
about the balustrade52 and his Honour excused Mr Ransom.
[44] His Honour invited Mr El Safty to make a closing address “as counsel for the
GCCC had done” but Mr El Safty responded that he still wanted to call his wife.
His Honour said that he would not permit any more evidence, that it was
“absolutely ridiculous”. His Honour then said:
“You know the system. The evidence is called first then we have the
legal addresses. You were here last Thursday when it couldn’t have
been more clear that if Mr Youssef was going to give evidence the
Council was entitled to know in advance roughly what he was going
to say. You can’t just bring surprise witnesses on people like this.
I’m not going to allow it. So if you want to make submissions to the
Court now is your chance to do that. I’m not going to allow anymore
evidence.”53
[45] Mr El Safty sought a five minute recess which was granted. The court adjourned at
4.51 pm and resumed at 4.59 pm. Mr El Safty commenced his submissions, and as
often occurs with final submissions, his Honour probed the propositions being
advanced by Mr El Safty. There can be no doubt from reading the transcript that
Mr El Safty was confident in his mastery of the material and in the vigour of his
belief in his entitlement to use the roof in the way in which he and Mr Youssef
wished it to be used based upon the original approval as modified by the GCCC.
He demonstrated familiarity with the planning scheme. Mr El Safty’s submissions
were a long complaint about the perfidy of the GCCC in allowing the lessee of the
land, incrementally, to think the objective of a “viewing platform” with the supply
of food and drink for up to 250 people could be achieved. His Honour said:
“HIS HONOUR: Well, you know what they perceived. They
perceived you ought to make a development application and - - - - -
MR EL SAFTY: Your Honour, at a cost of a million dollars.
HIS HONOUR: You disagree and now we’re working out
who’s right.”54
In the course of submissions, his Honour said:
“No-one – no-one’s saying it’s not a good and unusual idea – that
there wouldn’t – wouldn’t produce a useful attractive new attraction.
No-one is saying that.”55
[46] Mr El Safty managed to give, without objection, extra evidence about what was
proposed for the site in the course of his submissions. After a long exchange
his Honour said that Mr El Safty was departing from the issue before the court -
whether to grant an injunction. His Honour suggested that Mr El Safty could not
take the matter much further:
“It’s essentially what Mr Ransom says. There are two questions,
really. Has the Council got a case that there’s going to be
52 AR 257, Trial transcript – 2-88.
53 AR 258, Trial transcript 2-89.
54 AR 273, Trial transcript 2-104.
55 AR 275, Trial transcript 2-106.
-- 16 of 30 --
17
a development offence? Well, that depends on what the existing
permits authorise. I’ve got to make a decision about that. If the
Council wins, then the next question is, ‘Do I stop you from doing
what you want to do because rightly or wrongly, I think it’s
a development offence?’ And there are all sorts of other
considerations there about the staff you’ve engaged and how much
money you’ve spent and whether you appear to be doing the right
thing over the years, all that sort of thing. And one – you are
spending most of your time, really, saying ‘The Court needn’t have
any concern that if it operates, it would operate in an undesirable
way. It would sort of be quiet, peaceful, orderly, and only upset the
most unreasonable people’.”56
Mr El Safty commenced to respond but was interrupted by his Honour:
“Yes, I know. Well, there’s no point in going around and round in
circles, saying that again and again. I know that’s your case and I
have to think about who is right about that, you or the Council.”57
Mr El Safty concluded his submissions shortly after. His Honour invited
Mr Youssef to make submissions. He commenced by saying that he felt that he was
not represented properly and had not had enough time to deal with the case: “So
I have nothing else to say”.58 His Honour explained to Mr Youssef that if there
were an order against Mr El Safty’s company only it would be unwise of
Mr Youssef to assist in any way in breaching the injunction. When counsel had
completed reply his Honour said that he would give judgment at 10 o’clock the
following morning and the court adjourned at 6.30 pm.
The decision below
[47] The primary judge gave ex tempore reasons the following morning mindful that
both sides were concerned for an early decision. There is no complaint that
his Honour overlooked any relevant fact in his careful recital of the history and of
the issues. He noted the efforts of Mr El Safty in assembling the necessary
documents and added:
“As it happens they [the applicants] have had greater success in this
area than the council; ‘freedom of information’ possibilities have
been resorted to.
This consideration is not solely the reason for an accolade to those
gentlemen, it also has an obverse side of giving the court some
satisfaction that the respondents – or Mr El Safty’s company, at least
– are very much on top of the issues, legal and factual, which
concern the court.”59
His Honour dealt with the Show Cause Notice fully and noted:60
“It’s true there was some mention in the 2009 events and documents
of what might be permissible uses. One can understand the
56 AR 292, Trial transcript 2-123.
57 AR 293.
58 AR 298, Trial transcript 2-129.
59 AR 1256.
60 AR 1273.
-- 17 of 30 --
18
respondents’ – Mr El Safty’s company in particular – taking from the
2009 outcome that the council had no issues respecting uses.”
But, he added:61
“Any understanding along those lines ought to have dissipated in
March 2010 when the council’s solicitors sent a detailed letter clearly
asserting that the use that appeared to be proposed of the rooftop area
was unapproved and unlawful.”
His Honour set out passages from that letter. He noted that as a matter of common
sense, law and practise in planning it was accepted that there was usually no
objection to occasional uses of premises incidental to some authorised use. Thus,
“… the occasional resort of restaurant patrons to the roof for some
satisfying activity while they waited for their next course, for
example,”62
would be acceptable. His Honour continued:
“What’s proposed for the roof now is, in my view, a totally different
case. Mr Sharpe’s [sic] evidence was useful in establishing the
legitimacy of council concerns as to the impacts of what appears to
be proposed for the roof. The specific categories mentioned by him
are noise, traffic, demand on parking in Burleigh Heads and light
nuisance. I accept that his expertise as a planner and experience in
the council qualify him to depose to there for being such legitimate
concerns.”63
[48] Mr El Safty had provided a noise expert’s report which acknowledged that what
was proposed for the roof, even absent any discotheque, would generate noise at
levels of concern to sensitive receptors located across Goodwin Terrace.
That expert had proposed that noise attenuation barriers 2.4 metres high could be
erected. Mr El Safty claimed some expertise in the area, which his Honour noted,
and his assertion that there were alternative means of noise attenuation which would
not require such a high barrier. His Honour made reference to the balustrades on
which a great deal of reliance was placed by the applicants to indicate permission by
the GCCC from the earliest times for roof top activity. He said:64
“Apropos the balustrades, it might be noted that when, over the
years, the council has given thought to them, it was determined that
for safety reasons the balustrades ought to be narrow at the top so
that any patrons there could not place glasses on them which might
fall to the injury of persons below.
I agree with Mr El Safty that that is an indication that some use of
the roof area which might give rise to those proper concerns was
envisaged by council officers, and indeed the council officially.
Again, in my opinion, that’s a very different thing from saying that
the council has in some way become committed to a proposition that
it has approved the large-scale use of the roof now envisaged,
effectively – doubling of the restaurant … immediately below and of
its capacity.”65
61 AR 1273.
62 AR 1275.
63 AR 1275.
64 AR 1276.
65 AR 1276-7.
-- 18 of 30 --
19
[49] His Honour noted that even if a permit had in some fashion been granted in the past
for outdoor activities including what was proposed, provisions in the Local
Government (Planning and Environment) Act 1990 (Qld) caused any such permit to
lapse not later than four years after the commencement of the Act if no use had
commenced. His Honour was persuaded that the GCCC was entitled to the relief
sought to prevent threatened development offences being committed on the roof.
[50] The primary judge considered the discretionary matters noting the appropriate
principles referring to Mudie v Gainriver Pty Ltd:66
“The Court’s function in determining what is to be done in such
cases [where work has been commenced or performed without
planning approval] is to perform a balancing exercise with a view to
matters of both private and public interest. It is a discretionary
power … Certain “guidelines for the exercise of discretion” were
formulated by Kirby P. in Sedevcic’s case, and it is enough to refer
to pp. 339-341 of that case and to pp. 259-260 of Tynan’s case as
useful checklists of points that will often need consideration in such
matters. Among potentially relevant matters is the aspect of
discouraging potential developers from thinking that planning
requirements may lightly be disobeyed.
“Also relevant to the discretion is the ‘orderly enforcement’
of a ‘public duty’ to comply with the requirements of
planning laws … Another way of putting this is that there is
a public interest in upholding the law and seeing that it is
obeyed. As Kirby P said in Sedevcic (at 340; 365), ‘Unless
this is done, equal justice may not be secured. Private
advantage may be won by a particular individual which
others cannot enjoy’.”67
[51] His Honour referred to the applicant’s argument that the GCCC, over many years
had done much to generate the belief that the roof (which it allowed to be built as
a flat roof) could be used for the purposes of the kind now proposed. He outlined
the argument that the GCCC had given every appearance of abandoning concerns
about use when it withdrew the Show Cause Notice. His Honour referred to the
argument that the letter of 30 September 2010 in the form of a compliance permit
approving plumbing and drainage work on the roof area and the sinks for the bars,
had led to the “inescapable implication” that the GCCC was approving the activities
proposed for the roof, or, accepting that appropriate planning permission existed.
But his Honour noted that the approval was subject to any other necessary
development permits and concluded:
“I do not accept, at all, the contention that the council has been
blowing hot and cold, at least since March 2010 when the solicitor’s
letter went. It’s absurd, in my opinion, to suggest that the
compliance permit of 30 September 2009 [sic] can be taken as
overriding the council’s persistent approach since the letter of
22 March 2010 or before. The letter records the reason for it is
Mr El Safty’s withdrawal of an undertaking that had been given.
The latest demonstration of the council’s determination to prevent
the threatened use is its representations by the solicitors to the Office
66 [2002] 2 Qd R 53 at [13].
67 Per Stein J in Tynan at 259-260.
-- 19 of 30 --
20
of Liquor and Gaming Regulation – a detailed letter was sent on
15 October 2010 [sic] urging the Office to withhold any co-operation
by way of facilitating what’s proposed by Clique on the rooftop.”68
[52] The primary judge concluded, correctly with respect, that any statements by GCCC
officers that what was contemplated by the applicants fell within the original
planning permit or was otherwise not opposed, could not prevent the GCCC from
performing its statutory duties.69 His Honour recognised that any representations
beyond power could not operate as an estoppel against the GCCC, although he
added:
“I do not doubt that a clear statement by council officer with relevant
responsibilities and apparent authority to the effect that, say, no
development approval was necessary to implement a use frankly and
fully described could well stand in the way of the Council’s
obtaining from a court with a discretion in the matter orders of the
kind sought here.”70
[53] His Honour noted that the GCCC was late in joining Mr Youssef’s company and
said:
“The points made by the respondent which may be seen as relevant
to the discretion issue include delay, in particular lateness in respect
of the second respondent’s joinder. I attempted to explain to
Mr Youssef that even if no order were made against his company but
one was made against Mr El Safty’s, there would be considerable
risk in his proceeding to do anything on the roof through Clique
which undercut the Court’s order against the other respondent.”71
[54] His Honour paid due regard to what he describes as the “huge amount of money”
that had been spent in furthering the roof plans noting that there was no evidence as
to what expenditure might have been made before the letter in March was received.
He mentioned that Mr Youssef had said that large numbers of staff had been
engaged and were ready to start on the day of judgment. His Honour recognised
that the injunction, if it went, would lead to a loss of an excellent activity and venue.
He observed that some polling had indicated strong community support for the
venture; that the applicants had assured the court there was no need to fear that
nuisance or disturbance might occur - it would be an orderly operation; and that any
complaints ought to be left to the general law about noise abatement and sale of
liquor. His Honour acknowledged that Mr El Safty contended that the proposal
“ticked every box”. The question was not whether the use ought to be successful
but whether, without a permit, there should be no use.
[55] His Honour concluded:
“… there’s no ambiguity72 in the approval which is for a restaurant
inside the principal building and not for any large-scale similar
activity on the roof of it, approval for any such activity, if there ever
had been one, having lapsed in any event.
68 AR 1280.
69 Minister for Immigration and Ethnic Affairs v Kurtovic (1990) 21 FCR 193 per Gummow J at 208;
Seymour CBD Pty Ltd v Noosa Shire Council [2002] QCA 446 at [22] per Cullinane J.
70 AR 1281.
71 AR 1281.
72 Matijesevic v Logan City Council [1984] 1 Qd R 599 at 605.
-- 20 of 30 --
21
I would be among the first to be extremely reluctant to prevent
a worthwhile activity or development, to which considerable
resources had been devoted, prevented. Like the community, the
court abhors waste. I would be amenable to interim arrangements
being made that might permit the activity to go ahead within
appropriate parameters if steps were in train to regularise it which, in
my view, would certainly be necessary here.”73
But, his Honour concluded, the applicants were determined to do what they planned
and there was no prospect of the parties reaching accommodation. His Honour
referred to the sign which was outside the premises on Goodwin Terrace describing
what was to take place on the roof as “The GCCC approved Burleigh Beach House
public viewing platform …” to enjoy the views “over a relaxing drink and/or light
meal between the hours of 10.00 am and 10.00 pm weekdays and to midnight on
Fridays and Saturdays” 74 , as “blatant” in their confrontation with the GCCC.
Mr Cooke complains that this is an example of bias. It is no more than a correct
statement given that the applicants were well aware of the GCCC’s views that
a permit was required.
[56] The primary judge considered the relevant provisions in the legislation and
concluded that the proposed use was not a minor change in the scale or intensity of
an existing use and the restraint order should be made.
Apprehension of bias complaint
[57] The applicants contend that the primary judge’s conduct of the hearing was such as
to give rise to a reasonable apprehension of bias in that:
(a) he constantly interrupted the applicants’ submissions and
examination of witnesses;
(b) he did not inform them at the close of the GCCC’s case that they
were entitled to present evidence to advance their case;
(c) he refused to allow Mrs El Safty and Mr Youssef to give evidence,
and those defects were such as to constitute a defect in the administration of justice.
The complaint is not the refusal to grant an adjournment or a denial of procedural
fairness in not giving the applicants an opportunity fairly to put their case (although
both Mr El Safty and Mr Youssef made complaint to the court about those matters),
but that the conduct of the hearing gave rise to a reasonable apprehension of bias in
the form of pre-judgment.
[58] There was no application to the primary judge that he should disqualify himself
from continuing to hear and, in due course, to determine the application or, even, at
the close of the second day, to disqualify himself from proceeding to determine the
matters in dispute between the parties. Mr Youssef possibly came close to doing so
when he expressed his discontent at how the hearing had proceeded and determined
to appeal any decision. In the grounds of appeal and submissions in support, the
applicants make an allegation of pre-judgment. That is because, in refusing the
application for an adjournment, interjecting, limiting cross-examination and
refusing to allow further witnesses to give evidence in the applicant’s case, the
applicants contend the primary judge demonstrated a determination not to be
persuaded to the applicants’ cause.
73 AR 1284-5.
74 AR 1287.
-- 21 of 30 --
22
[59] There was no disagreement about the principles to be applied when one party
alleges that a judicial decision is vitiated by the appearance of bias on the part of the
pronouncing judicial officer. The test to be applied in Australia:
“… is whether a fair-minded lay observer might reasonably
apprehend that the judge might not bring an impartial and
unprejudiced mind to the resolution of the question the judge is
required to decide.”75
[60] The plurality76 in British American Tobacco Australia Services Limited v Laurie
observed, citing Ebner v Official Trustee in Bankruptcy77 and Forge v Australian
Securities and Investments Commission,78
“It is fundamental to the administration of justice that the judge be
neutral. It is for this reason that the appearance of departure from
neutrality is a ground of disqualification.”79
[61] In Johnson, which concerned remarks made in the course of the trial by a Family
Court judge about credit, Gleeson CJ, Gaudron, McHugh, Gummow and Hayne JJ
stated:
“The hypothetical reasonable observer of the judge’s conduct is
postulated in order to emphasise that the test is objective, is founded
in the need for public confidence in the judiciary, and is not based
purely upon the assessment by some judges of the capacity or
performance of their colleagues. At the same time, two things need
to be remembered: the observer is taken to be reasonable; and the
person being observed is ‘a professional judge whose training,
tradition and oath or affirmation require [the judge] to discard the
irrelevant, the immaterial and the prejudicial.’”80
They then said:
“Whilst the fictional observer, by reference to whom the test is
formulated, is not to be assumed to have a detailed knowledge of the
law, or of the character or ability of a particular judge 81 , the
reasonableness of any suggested apprehension of bias is to be
considered in the context of ordinary judicial practice. The rules and
conventions governing such practice are not frozen in time. They
develop to take account of the exigencies of modern litigation. At
the trial level, modern judges, responding to a need for more active
case management, intervene in the conduct of cases to an extent that
may surprise a person who came to court expecting a judge to
remain, until the moment of pronouncement of judgment, as
inscrutable as the Sphinx.”82
Their Honours further explained:
75 Johnson v Johnson (2000) 201 CLR 488 at [11], 492; [2000] HCA 48.
76 (2011) 85 ALJR 348; [2011] HCA 2, per Heydon, Kiefel and Bell JJ.
77 (2000) 205 CLR 337 at 344-345, [6]-[7].
78 (2006) 228 CLR 45 at 77, [66]; [2006] HCA 44.
79 At [139].
80 At [12] citing Vakauta v Kelly (1988) 13 NSWLR 502 at 527, per McHugh JA, adopted in Vakauta v
Kelly (1989) 167 CLR 568 at 584-585 per Toohey J.
81 Webb v The Queen (1994) 181 CLR 41 at 73, per Deane J.
82 At [13].
-- 22 of 30 --
23
“Judges, at trial or appellate level, who, in exchanges with counsel,
express tentative views which reflect a certain tendency of mind, are
not on that account alone to be taken to indicate prejudgment.
Judges are not expected to wait until the end of a case before they
start thinking about the issues, or to sit mute while evidence is
advanced and arguments are presented. On the contrary, they will
often form tentative opinions on matters in issue, and counsel are
usually assisted by hearing those opinions, and being given an
opportunity to deal with them.”83
[62] Would, then, a fair-minded lay observer in possession of all the relevant facts have
thought that the primary judge was demonstrating that he had pre-judged the issue
which he had to decide? It was abundantly clear that the judge had not reached any
conclusion on the construction point when he adjourned proceedings on the evening
of 14 December 2010. He said so several times and recognised the analysis to be
difficult. But did his management of the proceedings tend to gainsay his statements
to that effect? Much of the evidence which Mr El Safty (and, in a more limited
sense, Mr Youssef) wanted to place before the court went to the discretionary issue
as to whether the relief sought ought to be granted. From the applicants’
perspective it bordered on arguing that the GCCC were estopped from seeking the
relief because of past dealings over the use to which the roof area might be put.
[63] His Honour was appreciative of the industry of Mr El Safty in obtaining the
historical documents relative to the application to develop the land. He permitted
a lengthy exploration by Mr El Safty of these matters with the GCCC witnesses.
The interruptions complained of, when they occurred, were towards the end of
cross-examination and, if Mr El Safty explained his purpose in seeking to continue
and which appeared to his Honour relevant to the matters in issue, he was permitted
to continue. The limitation on Mr Ransom’s evidence was an attempt to have
Mr El Safty focus his questions on what was relevant. In any event, it was
Mr El Safty who said he would be 20 minutes to half and hour not the judge who set
that time initially. Mr Ransom had sworn an affidavit as his evidence-in-chief.
He was permitted to respond to a great many leading questions which went to the
construction of the planning scheme and to give answers about the GCCC practice
long before his employment there, an indulgence which would unlikely have been
extended had the applicants been legally represented.
[64] The refusal to permit Mrs El Safty to be called when she had sworn no affidavit nor
given a statement of her evidence did not speak of pre-judgment. Her evidence
would likely only have supported and, perhaps, added to, the evidence already
before the court going to the discretionary issues.
[65] The complaint that Mr Youssef was not permitted to be called is, in reality,
a complaint about the refusal to grant an adjournment. Mr Youssef did not want to
give evidence until he obtained legal advice. Notwithstanding two full working
days and a weekend he apparently had not done so until half a day before the
resumed hearing. His Honour respected that intimation.
[66] With one or two exceptions, towards the end of the hearing where some mild
exasperation at lengthy and unfocussed cross-examination is discernible from the
primary judge, the interventions were directed to exposing the issues which had to
be decided. His Honour was plainly drawing out the facts and circumstances of
83 At [13].
-- 23 of 30 --
24
relevance with Mr El Safty and seeking to probe the construction point. There can
be no doubt, after reading the whole transcript of the proceedings, that Mr El Safty
had detailed knowledge of the relevant planning scheme and supporting legislation
as well as of the long history of this site. Mr Youssef’s self-proclaimed expertise in
property matters at the commencement would have conveyed to a fair minded
observer that he did not think that he required legal assistance. These men were
tertiary educated, commercially astute and experienced developers who, no doubt,
from a past course of dealings with local authorities, thought that a satisfactory
outcome could be negotiated rather than retaining lawyers when the application was
served on them.
[67] Mr El Safty had been on notice for almost nine months that the GCCC had
a particular view about the need for a further permit to use the roof in the manner
contemplated. At what point Mr Youssef became aware is not clear, but since he
(or his company) was, apparently, the source of funds for the fit out on the roof and
the proposed operator of the facility it is highly unlikely that he was surprised by the
application or, at least, was aware of the issues. That Mr El Safty sincerely held the
opinion that the original permit granted in 1986 allowed the use which he and
Mr Youssef contemplated does not appear a sound reason for not being adequately
prepared to meet the GCCC’s case; that Mr Youssef had other developments to
consider which distracted him from focussing upon this one was a choice that he
made.
[68] Generally, the courts afford self-represented litigants a degree of indulgence and
assistance84 but, as Muir JA observed in du Boulay v Worrell & Ors85, they are as
much bound by the rules of court as the represented litigant and those rules seek to
facilitate efficient, fair and cost effective litigation. The directions made on
1 December 2010 directed that evidence was to be in affidavit or statement form so
far as concerned Mr El Safty. When the proceedings adjourned on the evening of
9 December, if there was any doubt about the issues, and that seems highly unlikely
in view of the letter of March 2010 and Mr Youssef’s presence at the GCCC
officers’ meeting at the premises in September 2010, it was made clear that any
further evidence was to be in some written form. There was no sense that
Mr Youssef did not understand that requirement nor that he did not give these
matters any high priority. No lay observer could have doubted that both counsel for
the GCCC and the judge afforded an appropriately regulated opportunity to be
prepared for the resumed hearing four days later.
[69] Finally, the earnest attention to the issues by the primary judge set out very fully in
a lengthy ex tempore judgment given the following morning after a late sitting
demonstrates appropriate even handedness. A fair minded lay observer would not,
at any point in the proceedings, have thought that the primary judge did not bring an
impartial and unprejudiced mind to the resolution of the question which he was
required to decide.
[70] There is no prospect of success on this ground.
Discretion
[71] The appellants assert that the primary judge did not perform the balancing exercise
required.86 The applicants contend that his Honour reversed the onus of proof,
84 Bhagat v Global Custodians Ltd [2002] FCA 223.
85 [2009] QCA 63.
86 Mudie v Gainriver Pty Ltd [2002] 2 Qd R 53 at [13].
-- 24 of 30 --
25
requiring the applicants to satisfy the court that the relief sought by the GCCC ought
to be refused and gave “overwhelming influence” to the respondent’s submissions.
It is the case that at the very end of his Honour’s reasons he said:
“The respondents haven’t satisfied the court that relief ought to be
refused to the council on a discretionary basis.”
That was said in the context of his Honour’s conclusion that the GCCC had adduced
sufficient evidence to demonstrate that approval was required and, therefore, issues
of acquiescence and hardship were evidentiary matters for the applicants to raise
sufficiently.
[72] A diligent consideration of the primary judge’s reasons demonstrates plainly that
his Honour did engage in weighing the relative arguments advanced by the parties
and, indeed, gave particular prominence to those of the applicants. And it was not
want of balance which caused his Honour to describe the applicant’s sign outside
the premises as “blatant” in their confrontation with the GCCC. The sign was
a very strong assertion that they had GCCC approval in the face of the very firm
view that a further approval was necessary.
[73] His Honour dealt carefully with the issue of acquiescence, a matter of primary
importance to the applicants. His Honour acknowledged that the withdrawal of the
Show Cause Notice might have led Mr El Safty to think that the GCCC would no
longer pursue his company about the proposed use of the roof. But, as his Honour
noted, by March 2010 the applicants, or at least Mr El Safty, could have been under
no illusions about the GCCC’s attitude. And that was nine months before the
application was brought.
[74] The applicants’ allegation of disregard for the hardship they would suffer if they
were compelled to give up their project was acknowledged. The applicants criticise
him for refusing to allow Mrs El Safty or Mr Youssef to be called at the end of the
hearing, who, it is speculated, might have provided some figures about expenditure
prior to March 2010. That evidence was not opened and no schedule was offered to
the other side which would justify that submission.
[75] The primary judge approached the balancing exercise carefully and appropriately.
Throughout he was open to the parties negotiating about terms which did not
include the serving of food and drink to a large number of patrons on the roof.
Construction
[76] The applicants criticise the primary judge’s approach to the construction of the
relevant legislation and planning scheme. They contend that “the premises, namely
the building, was approved pursuant to an Order of Judge Row for restaurant use
under the 1982 Planning Scheme”87, and that
• the building approvals envisaged the ancillary use to the restaurant of
the roof for serving drinks and cocktail food because building
includes the roof;
• on 29 August 1990 the Planning and Development Committee of the
GCCC resolved that the roof top could be used for restaurant eating
without town planning approval or additional car parking and this
was a correct view; and
87 Written outline para 5.1.
-- 25 of 30 --
26
• the “Total Use Area” definition was the same in the superseded
scheme as at present and excludes an open roof.
[77] By Town Planning Permit No. 9/225 the GCCC approved the application “to erect
a Restaurant” on the land subject to conditions including satisfactory building plans.
The primary permit was not a building approval in which a restaurant would be
housed. As submitted by Mr Hughes, the building plans, eventually approved,
provided a place for a restaurant in a completely enclosed area of approximately
400m2 immediately below the roof, air conditioned and sound proofed.
(i) Ancillary use
[78] “Use” is defined in the Sustainable Planning Act 2009 (Qld) as:
“in relation to premises, includes any use incidental to and
necessarily associated with the use of the premises.”
“Premises” is defined as “(a) a building or other structure; or (b) land, whether or
not a building or other structure is situated on the land”. In Boral Resources (Qld)
Pty Ltd v Cairns City Council88 it was contended that gravel crushing was a use
incidental to and necessarily associated with the lawful use of gravel extraction.
The definition of “Use” in s 1.4 of the Local Government (Planning and
Environment) Act 1990 (Qld) was relevantly the same as in the Sustainable
Planning Act 2003 (Qld) (and in the Local Government Act 1936-1985). The court
said:89
“The present case should be distinguished from one where
a challenged process could be regarded as inevitably involved in
a permitted use. Also, there could be a case of a different kind where
there exists only one significant use and a further use only arguably
and insignificantly present so that it might be regarded as no more
than merely technically in existence. The process of screening and
crushing which the appellant voluntarily proposes to conduct as an
additional process here, has a character quite different from those
just described. It would be a process difficult to place within the
ambit of use embraced within the definition in s. 1.4 as one
“necessarily associated” with another use of extraction even if it can
properly be described as “incidental” to it.”
[79] The applicants contend that the proposed roof top use is “necessarily associated
with” the Break Point Restaurant to provide the drinks and pre-prepared snack food
in an extended liquor licensing area. In the 1982 Town Planning Scheme for City of
Gold Coast a “Restaurant” was defined as:
“Any premises used or intended for use as a restaurant for the regular
supply to the public of substantial meals at which the persons
partaking thereof are seated at a table.”
It is not materially different in the 2003 Planning Scheme except the meals served
are no longer to be “substantial”90 and the patrons need not be seated. There is
nothing about the proposal for upwards of 250 people on the roof engaging in the
consumption of food and liquor purposes with music91 which is incidental to the
88 [1997] 2 Qd R 31.
89 At 35.
90 AR 815.
91 Mr El Safty’s evidence was that those who booked the roof top for, for example, a wedding reception
would provide their own DJs.
-- 26 of 30 --
27
operation of the restaurant. Nor is it necessarily associated with the restaurant.
What is proposed is a separate facility, not the stroll up to the roof with a glass of
wine (with or without the plates of tapas) to look at the view between courses from
the restaurant below mentioned by Mr Cooke.
[80] There had been some suggestion that what was envisaged as a viewing platform
was, in truth, within the concept of “Outdoor Recreation”. Under the Planning
Scheme in 1982 such a use was assessable and had not been included in the
application before the Local Government Court. A “Reception Room” was defined
in 1982 as:
“Any premises used or intended for use for the holding of receptions
or functions at which food and/or drink is served;
The term does not include a restaurant, indoor recreation or hotel as
herein defined.”92
Such a use also required the consent of Council. It was not sought or granted in the
1985 application.
(ii) Material change of use
[81] “Material change of use” is defined in s 10 of the Sustainable Planning Act 2009
(Qld) in relation to premises:
“(a) generally –
(i) the start of a new use of the premises; or
(ii) the re-establishment on the premises of a use that has
been abandoned; or
(iii) a material increase in the intensity or scale of the use
of the premises.”
Mr Hughes contends that what is proposed falls within s 10(a)(i) or (iii).
[82] The Burleigh Local Area Plan Table of Development for Precinct 6 – Public Open
Space93 under “A: Material Change of Use” provides as exempt “Minor Change in
the scale or intensity of an existing lawful use” and as “Impact Assessable”:
“Cafe
Car Park
Caravan Park
Child Care Centre
Community Purposes n.e.i
Ecotourism Facility
Indoor Recreation Facility
Outdoor Sport and Recreation
Restaurant”
[83] In Part 6 Division 1 Chapter 2 s 7.6.1 under “Material Change of Use” is:
“…Any use, not listed in Section A of the Table of Development,
should be considered undesirable or inappropriate in the LAP or LAP
precinct to which the Table of Development applies.
Any Material Change of Use not individually listed in the relevant
Table of Development will be treated as an impact assessable
development …”94
92 AR 889.
93 AR 858.
94 AR 847.
-- 27 of 30 --
28
The intent for Public Open Space in Precinct 6 contains the following:
“The intent for these areas in public ownership is to maintain and
enhance the existing recreational, environmental and community
service uses accommodated in these reserves. It is intended to better
integrate the public reserves with surrounding areas in terms of
landscaping and built form. However, no further intrusion of
commercial uses into this precinct will be supported.”
[84] In Part 4 “Minor Change in the Scale or Intensity of an Existing Use” means:
“Minor Change in the Scale or Intensity of an Existing Use
A change in the intensity or scale of an existing use that does not
exceed any of the following:
• the limits expressed in the approved Plan of Development (or
approved Management Plan) for the premises, where
applicable;
• an increase of 25m2 of total use area;
• an increase in the number of separate tenancies occupying the
premises; and
• any extension of commercial operating hours on the
premises, into and within the period between 7pm and 7am
on any day.”
“Total Use Area” is defined as:95
“The sum of all the areas (exclusive of all walls and columns) of all
storeys of a building which are used or intended for use for
a particular purpose, plus any other area of a site which is used, or
intended to be used, for the same purpose. The term does not include:
• areas (inclusive of all walls and columns) of any lift wells, lift
motor rooms, air conditioning and associated mechanical or
electrical plant and equipment rooms;
• areas of any staircases;
• areas of any common foyer where these are not being used
for commercial or retail purposes;
• areas of any public toilets;
• areas of any staff toilets, washrooms, recreation areas and
lunchrooms, provided that such areas are not open to persons
other than staff; and
• areas used for the access, parking and associated
manoeuvring of motor vehicles.”
[85] “Storey” is defined:96
“That space within a building which is situated between the floor of
one level and the floor of the next level above, or if there is no level
above, the highest point of any impermeable ceiling above. The term
includes any useable space on the roof area covered by impermeable
material. For the purposes of calculating the number of storeys to
determine compliance with the Planning Scheme, or sections which
95 Chapter 3 Explanatory Definitions, AR 836.
96 Chapter 3 Explanatory Definitions, AR 834.
-- 28 of 30 --
29
control the height of any building, the number of storeys (excluding
the ground floor storey) shall be determined either as:
• the actual number of spaces between levels;
• the number of storeys calculated by dividing the distance in
metres or part thereof between the top of the floor of the first
storey and the top of the ceiling of the topmost storey by:
(a) three metres in the case of a residential use;
(b) four metres in the case of a non-residential use;
whichever is the greater plus the ground floor storey. Any fraction,
which results from the above calculation, shall constitute a storey
…”
[86] For the purpose of the application, the area of the roof is understood to be 400m2 .
The allowable extra area to fall within the description “minor” is 25m2 . The
applicants contend that on a proper construction of the Planning Scheme and its
definitions the flat roof of the building would not be included in the calculation of
the Total Use Area. It is not a “storey” because it is not covered. If it is relevant,
“Gross Floor Area”, excludes “roof” from its calculation. Accordingly, they argue,
the proposed use of the roof would fall within the definition of “Minor Change” and
is exempt from development approval. Mr Hughes directs attention to the balance
of the definition of “Total Use Area” – “plus any other area of a site which is used,
or intended to be used, for the same purpose”. “Site” is97 “Any land on which
development is carried out, or is proposed …” It is not immediately attractive to
include the roof of a building as “any other area of a site”. I would conclude that
the applicants are correct in arguing that the roof area does not exceed the allowable
margin of total use area. But that is not the true issue.
[87] What is proposed is the start of a new use of the premises.98 It may be characterised
as a “reception room”99 or as a “restaurant”. If the latter, it is a new restaurant.
It would be an absurd result from a planning perspective if there were an existing
lawful use of an area in a building as a restaurant, that that approval extended to any
other restaurant which may be commenced subsequently in another part of the
building. In the past, in this building, approval has been obtained to start a new
restaurant.
[88] If the proposed use is as a “Public Viewing Platform” that would not be a change in
the intensity or scale of an existing permitted use of the premises but “the start of
a new use of the premises”. The plan to have the restaurant provide the food and, in
the interim, liquor for reward would involve a change in the scale of the existing
restaurant use that exceeded “the limits expressed in the approved Plan of
Development”.100 Because Mr Youssef’s company is to operate the roof facility
this would increase the number of separate tenancies occupying the premises. As to
the latter, the applicants submit that they would make other arrangements if that
were an impediment. There was no evidence as to whether the proposed hours of
operation aligned with the restaurant.
97 Chapter 3 Explanatory Definitions, AR 834.
98 Sustainable Planning Act, s 10(a)(i) – material change of use.
99 “Any premises used, or intended to be used, for the conduct of receptions or functions at which food
or drink is served. This term does not include a Restaurant, Indoor Recreation, Tavern, Resort Hotel
or Cafe” – 2003 Planning Scheme.
100 AR 813.
-- 29 of 30 --
30
(iii) The 1990 “approval”
[89] The applicants contend that the permit granted to them in 1986 sufficiently
encompassed the activity and the use contemplated on the roof. If the letter of
29 August 1990101 constituted approval it has lapsed because there was no use of
the roof in the four years after the commencement of the Local Government
(Planning and Environment) Act 1990, and by virtue of s 8.10(8B) of that Act since
no relevant use had commenced it had lapsed.
[90] On the construction issue, there are no prospects of success.
Conclusion
[91] There are no prospects of the applicants succeeding on any of the grounds which
they have raised in their amended notices. An appeal would be fruitless and thus
the application for leave to appeal should be refused.
[92] Had the applicants established a reasonable apprehension of bias in the primary
judge, even if their other grounds were likely to be successful, the proceedings
would likely have been restored to the Planning and Environment Court for
consideration anew before another judge.102 This is because the appearance of
neutrality in the judge is fundamental to any system of justice and any departure
from it will undermine any reliance on any part of that hearing and especially
where, as here, there is complaint that the applicants were not permitted to put their
case fully.
Orders
[93] The orders I would make are:
1. Application for leave to appeal refused.
2. The applicants pay the respondent’s costs of the appeal to be assessed on the
standard basis.
[94] MARTIN J: I agree, for the reasons given by White JA, with the orders proposed
by her Honour.
101 AR 1315.
102 Hills v Chalk [2008] QCA 159.
-- 30 of 30 --