Barry v Queensland Building Services Authority and Ors [2011] QCAT 451
CITATION: Barry v Queensland Building Services
Authority and Ors [2011] QCAT 451
PARTIES: Brett Matthew Barry
(Applicant)
v
Queensland Building Services Authority
Clinton Graham
Mia Graham
(Respondents)
APPLICATION NUMBER: GAR086-11
MATTER TYPE: General administrative review matters
HEARING DATE: 29 August 2011
DECISION OF: Susan Gardiner, Member
REASONS DELIVERED ON: 21 September 2011
DELIVERED AT: Brisbane
ORDERS MADE: 1. Clinton Graham and Mia Graham
each be joined as a respondent in
this proceeding.
2. The application to join Wayne
Maitland is dismissed.
CATCHWORDS: Building matter – direction to rectify by
authority for defective workmanship –
where contractor seeks to join property
owners and sub-contractor – where
allegations actions by property owners
affected work – where direction issued to
applicant as head contractor
Queensland Civil and Administrative
Tribunal Act 2009, s 42(1)
McNab Constructions Australia Pty Ltd v
QBSA [2010] QCA 380 followed
-- 1 of 2 --
2
APPEARANCES and REPRESENTATION (if any):
The application was heard and determined entirely on the basis of documents
in the absence of the parties.
REASONS FOR DECISION
[1] Brett Barry filed an application with this Tribunal in March 2011 to review a
direction to rectify issued by the Queensland Building Services Authority.
This direction concerns work at the property owned by Clinton Graham
and Mia Adams.
[2] Mr Barry filed a further application on 27 May 2011 seeking that the
property owners and Wayne Maitland be joined as parties to the review
application.
[3] On 29 August 2011 a decision was made that Clinton Graham and Mia
Graham be joined as respondents in this proceeding and that the
application to join Wayne Maitland be dismissed. Mr Barry requested
reasons for this decision be provided.
[4] Section 42(1) of the Queensland Civil and Administrative Tribunal Act
2009 allows the Tribunal to make an order joining a party if the Tribunal
considers that the person should be bound by or have the benefit of a
decision in the proceeding; or that the person’s interests may be affected
by the proceedings; or that for another reason it is desirable for the person
to be joined.
[5] As property owners, Clinton Graham and Mia Adams stand to benefit from
a decision to rectify. There are allegations that the use by them of scaling
products affected the steel and steel coating the subject of the direction to
rectify. These allegations are yet to be tested but, as it is alleged that
potentially some direct action by them had an effect on the building work, it
is appropriate that they be joined in this action.
[6] In an affidavit filed in support of the joinder application, Mr Barry deposes
that Mr Maitland installed steel framing in the building work “as a
subcontractor to me”.
[7] In any build work, the head contractor is generally responsible for the
actions of his sub-contractor (see McNab Constructions Australia Pty Ltd v
QBSA [2010] QCA 380). On that basis, any notice to rectify is
appropriately addressed to Mr Barry. If Mr Barry’s review application is
successful, the Authority can make another decision to direct rectification
by any other person found to be responsible.
[8] As Mr Barry is the head contractor, the application to join Mr Maitland, an
acknowledged sub-contractor, is refused.
-- 2 of 2 --
Official source: https://www.sclqld.org.au/caselaw/QCAT/2011/451