Elliott v Queensland Building Services Authority [2010] QCAT 428
CITATION: Elliott v Queensland Building Services Authority
[2010] QCAT 428
PARTIES: Mr Robert Arthur Elliott
v
Queensland Building Services Authority
APPLICATION NUMBER: QR172-08, QR222-08, QR146-09
MATTER TYPE: General administrative review matters
HEARING DATE: 10.05.10, 11-05.10
HEARD AT: Brisbane
DECISION OF: Mr Paul Favell
DELIVERED ON: 31 August 2010
DELIVERED AT: Brisbane
ORDERS MADE: The Tribunal orders that the directions to rectify
building work at 3 Carabeen Court, 2 and 3
Macaranga Court, Melaleuca Gardens Estate at
Laidley by the Queensland Building Services
Authority be set aside.
CATCHWORDS : Building work – whether defective – decision to issue
notice to rectify/complete – sections 72, 86
Queensland Building Services Authority Act 1991.
APPEARANCES and REPRESENTATION:
APPLICANT : Mr. J.P. O’Regan instructed by Maunsell Pennington
Solicitors for the Applicant
RESPONDENT: Mr. D.H. Locke of Forbes Dowling Lawyers for the
Respondent
-- 1 of 5 --
QR172-08, QR222-08, QR146-09 / Page 2 of 5
REASONS FOR DECISION
Introduction
1. Melaleuca Gardens Estate at Laidley unfortunately has “class E” reactive soils. Mr
Elliot, the applicant, in QR172-08, QR222-08 and QR146-09 in 2005 built 16 or more
houses in the estate including three houses in the one street at 3 Carabeen Court, 2
Macaranga Court and 3 Macaranga Court.
2. The houses were built during dry times. Since they have been completed moisture
has caused the reactive soils on which the houses were built to expand with the
consequence that each house has suffered damage to sub surface drains. The
house at 3 Carabeen Court has suffered upward movement in the concrete path
attached to the house and surrounding the house. Because the path is attached to
the house the upward movement has caused the path to pivot at the point it is
connected to the house and thus allowing water falling on the path to be directed
toward the point where the path joins the house.
3. Although the problems with the sub surface drains and the path were noticed in
2005 and 2006, complaints were not made to the Queensland Building Services
Authority (QBSA) until 2007 and 2008. In 2008 and 2009 the QBSA issued
Directions to Rectify/Complete to Mr Elliot.
4. Mr Elliot applies pursuant to section 86(1)(e) Queensland Building Services Authority
Act 1991 (“the Act”) to review the decisions to issue the Directions to
Rectify/Complete. He does so on the basis that there is no defective building work
and alternatively, if there is defective building work, it is not an appropriate exercise
of the discretion given by section 72 of the Act to issue a Direction to
Rectify/Complete because of the circumstances common to each of the three
houses.
5. The applicant argues that those circumstances are novel. In each instance the sub
surface drainage was designed by an engineer and plumbing and drainage plans
were issued in respect of each house. (For example see Exhibit 4 attached “RE
1(b)”). The plumbing and drainage was the subject of certification by an engineer
and the Plumbing and Drainage Inspector of the Laidley Shire Council. The
Inspector certified that “the plumbing and drainage work was found to have been
substantially completed in accordance with the Plumbing and Drainage Act 2002
and AS3500 – National Plumbing and Drainage Code”.
6. There is no serious factual dispute in these three applications. The applicant does
not dispute that the problems described in the Directions to Rectify/Complete have
arisen.
7. The applicant contends that the problems are not a result of defective work and if
they were it would be unfair within the meaning of section 72(14) of the Act to order
the applicant to rectify the problems.
8. It is not disputed that Mr Elliot completed the sub surface drainage and plumbing
work in accord with the engineer’s design and plans. All knew the reactive nature of
the soils. The first thirteen houses were built upon a suspended slab on screw piers
with the soil beneath “ripped” to 600 millimetres deep.
9. At the direction of the engineer the three houses the subject of the directions were
built on slabs on screw piers with “void formers” immediately below the slab and
above the reactive soil. In all other respects the construction of the first thirteen
-- 2 of 5 --
QR172-08, QR222-08, QR146-09 / Page 3 of 5
under slab work was identical to the under slab work in the house the subject of the
directions.
10. The purpose of “ripping” the soil and using “void formers” was to allow room for the
soil to rise without interfering with the slab or the under slab plumbing work.
11. I accept that Mr Elliot carried out the construction work in accord with the
engineering design and directions.
12. In my view the design provided by M3 Consulting Engineers Pty Ltd would not have
prevented the problems the subject of the directions when the reactive soil
expanded.
13. Mr Eric Fox is an engineer with extensive experience with design and assessment of
residential buildings. He is Chair of the Standards Australia Committees for AS 4349
Inspection of buildings and AS 2870 Residential slabs and footings. He was a
member of the Australian Building Codes Board Committee responsible for writing
Building Code of Australia Volume 2 Housing Provisions. He has provided two
reports which became exhibits 6 and 7 concerning the residences at 2 and 3
Macaranga Court Laidley. The evidence given by Mr Fox was not challenged and I
accept the evidence given.
14. At the beginning of the hearing of these matters the parties agreed that the
determinations with respect to residences at 2 and 3 Macaranga Court should be the
determination with respect to the directions concerning the residence at 3 Carabeen
Court and accordingly the evidence was only in respect of 2 and 3 Macaranga Court.
15. Mr Fox in Exhibit 6 set out the relevant part of the Building Code of Australia
concerned with Sanitary Drainage. That report was concerned with the possible
leakage of water into the habitable areas of the house. Functional Statement F 2.4.1
of the Building Code of Australia Volume Two states:
“A building is to be constructed to avoid the likelihood of –
(a) the creation of any unhealthy or dangerous conditions; or
(b) damage to building elements
caused by dampness or water overflow from bathrooms, laundries and the like.”
16. AS 2870-1996 Residential slabs and footings provides – Construction in a
nominated acceptable construction manual in the BCA and construction in
accordance with the standard is deemed to satisfy the BCA. AS 2870 includes
drainage and plumbing requirements for extremely reactive sites such as trench
backfilling and flexible pipe connections.
17. Alternatively BCA allows the use of alternative solutions certified by a professional
engineer (BCA Volume 2, paragraph 1.2.2(a)(iii))
18. AS / NZS 3500.5-2000 National plumbing and drainage Part 5: Domestic
installations sub-clause 4.30 states:
“Unless otherwise authorised by a regulatory authority, where soil movement may
affect the performance of any drain a plan and specification, together with a soil
report and all calculations showing a proposed method to protect the installation
from excessive soil movement … shall be determined by an appropriately qualified
person.”
-- 3 of 5 --
QR172-08, QR222-08, QR146-09 / Page 4 of 5
19. It is not disputed that in respect of each of the three residences M3 Consulting
Engineers Pty Ltd provided a drawing “Plumbing and drainage layout” detailing
treatment of drainage and plumbing issues on the sites including a specification for a
flexible joint in drainage pipes at or near the external wall of the house and an
“expansion coupling” where vertical waste pipes passed directly through the slab to
the drainage system.
20. The M3 drawing included the following note:
“In reactive clay sites and poorly compacted fill sites, expansion couplings and
knuckle or swivel joints shall be used to articulate the plumbing. Where expansion
couplings cannot be used, stainless steel straps shall be used (e.g. waste gully or
Palazzi system)…”.
21. The Palazzi system was used in each residence and was included in the M3
drawing.
22. The applicant gave uncontested evidence which I accept and which seems
consistent with the note included in the M3 drawings that expansion couplings could
not be used effectively in the Palazzi system because different sized pipes were
used in the system and expansion couplings for the smaller pipes did not have
sufficient movement capacity as those used for the longer pipes used in the Palazzi
system and should there be movement causing the longer pipes to move the smaller
pipes connected to the side of the longer “p” trap pipe would be compromised.
23. Mr Fox gave evidence that in his opinion the applicant was requested to follow the
M3 documents and details and that they were a complete replacement for the
AS2870 requirements. He was of the view that “there was no requirement for the
builder to seek advice regarding detailing of underslab drains from AS2870 and it
would not have been proper for the builder to do so”.
24. The applicant gave uncontested evidence that the construction of the plumbing and
drainage system was carried out in accordance with the M3 design where applicable
and otherwise in accordance with normal practice and the directions of the Council
plumbing inspector.
25. The plumbing installations were inspected by the Council inspector and approved.
26. An In-drain inspection by Drain Vision was carried out and the results of those
inspections were examined by Mr Fox. Based on those observations and the
matters referred to above Mr Fox was of the opinion that the under slab plumbing
and drainage systems, and specifically the shower waste pipes in the ensuite and
bathroom were constructed generally in accordance with the Engineer’s requirement
and the Australian Standards. Nevertheless Mr Fox was of the opinion that the
leaking of the elbows in the waste pipes beneath the showers as identified by Drain
Vision was because there had been movement of the shower waste pipes resulting
in damage to the pipe integrity in both showers. He said that “the damage to waste
pipes from the showers was as a result of heaving of the ground beneath the house
relative to the house slab thereby pushing the shower waste pipes vertically upwards
relative to the floor slab. On the evidence I accept that is correct.
27. Mr Fox was of the opinion that the reason for the damage that has been suffered to
the waste pipes from the showers was failure of the engineer to provide plumbing or
drainage details that were adequate to protect the drains against damage resulting
from heaving of the natural ground on the site. In my view that is correct.
-- 4 of 5 --
QR172-08, QR222-08, QR146-09 / Page 5 of 5
28. As 2870 in clause 6.6(f) provides:
“Joints in plumbing pipes within 3m of the house under construction shall be
articulated to accommodate ground movements without leakage…”
29. The direction given on 23 October 2008 relied upon that portion of AS 2870 and
contended that “the installation of the sub surface sewer drainage system … was not
in accordance with AS 2870-1996 section 6.6 in that pipe work has not been
articulated to accommodate ground movement…”
30. AS2870-1996 is a nominated acceptable construction manual in the BCA and
construction in accord with that standard is deemed to satisfy the BCA as does the
use of alternative solutions certified by a professional engineer (BCA Volume 2,
paragraph 1.2.2(a)(iii)).
31. In my view in the circumstances the applicant has satisfied the requirements of the
BCA with respect to the drainage issue and in my view there is no defective building
work in that regard.
32. What was defective is the engineering design not the building in accord with that
design.
33. The other issue identified in these applications was whether the rising of the outer
edges relative to the inner edge of pathways around one of the houses was because
of defective work by the builder.
34. Mr Fox gave evidence that putting pathways around houses built on extremely
reactive soil is good building practice because such pathways assist to prevent
moisture from getting to the soil under the slab and thus minimise soil movement
under the slab. That is also reflected in a brochure entitled ‘A simple “How To”
Guide to preventing structural damage to your home’ (ex 1 page 4) when it states: “A
sound plan for a reactive clay site is to provide a consistent moisture regime around
the building by installing paths and patios against the house”.
35. The evidence is that the paths were built appropriately with a fall away from the
house to ensure appropriate drainage.
36. I accept that the problem is not a consequence of defective building work. In my
view building work as defined by schedule 2 of the QBSA Act done by the applicant
is not faulty or unsatisfactory and not defective.
37. Section 72 of the QBSA Act allows the Authority to direct the person who carried out
the building work to rectify the building work if it is of the opinion that the building
work is defective or incomplete. It may take into consideration all the circumstances
it considers are reasonably relevant.
38. Both parties have made oral submissions and provided written submissions. I have
taken those matters into account. There is nothing controversial in the submissions
as to the applicable law. The real difference is whether the building work done by
the applicant is defective. In the circumstances which exist here in my view that
building work is not defective and in my view the directions to rectify under review
should be set aside.
39. If the building work done by the applicant was defective, in my view, in the
circumstances I have set out herein it would be unfair to the applicant to give a
direction to rectify.
-- 5 of 5 --
Official source: https://www.sclqld.org.au/caselaw/QCAT/2010/428