Barlow Gregg VDM Pty Ltd v Bundaberg Regional Council [2010] QPEC 89
1-1
[2010] QPEC 89
PLANNING AND ENVIRONMENT COURT
JUDGE ROBIN QC
P & E Appeal No 2568 of 2008
BARLOW GREGG VDM PTY LTD Appellant
and
BUNDABERG REGIONAL COUNCIL Respondent
BRISBANE
..DATE 27/08/2010
ORDER
CATCHWORDS
"Integrated Planning Act 1997 s 4.1.52(2)(b)
Developer's conditions appeal resolved on basis of changes to
proposed subdivision by increasing lot yield (over a larger
"footprint" within the site) and to the road pattern on a
greenfields site - development now to be staged - change held
"minor change"."
-- 1 of 4 --
1-2 ORDER
1
10
20
30
40
50
60
HIS HONOUR: The court makes an order in terms of the
initialled draft, which is acceptable to both the
appellant/developer and the Council.
This was a conditions appeal, essentially, about
infrastructure conditions.
The development application, which seeks subdivision on a 9.19
hectare site in Wearing Road, Bargara was code assessable.
The parties resolved issues but there is now raised for the
Court's consideration an issue whether changes proposed to the
development constitute minor change for the purposes of
section 4.1.52(2)(b) of the Integrated Planning Act 1997.
Redesign of the subdivision, which is to be constructed in
three stages now, has made possible an increased yield of lots
from 66 to 74. That, essentially, is achieved not by reducing
the sizes of lots but by a commensurate increase in the total
area of lots with approval from the 6.4 hectares originally
proposed for stage 1 of a 94 lot development to 7.3 hectares
which will now have three stages within it.
Stage 1 is intended to contain 26 lots. As one would expect,
it includes the lots to be produced with a frontage to Wearing
Road and those with a frontage to a new road running parallel
to it to be constructed within the site. Stage 2 is an
extension further within the site and stage 3 will complete
the development of the whole site in its eastern part.
-- 2 of 4 --
1-3 ORDER
1
10
20
30
40
50
60
The original plans indicated as future development the western
30 per cent or thereabouts of the site. The plans now
proposed do not indicate any intention for future development
but provide two large lots, lot 75 along the western boundary
of the site of slightly under a hectare which may well become
a road reserve, and lot 74 between that area and what is the
subject of the current development application - it is lot 74
- and I think it was said almost two hectares. There may well
be subdivision of that area in the future but this is
speculation.
The current plans suggest a stepped edge to development in
contrast to what is in the approved plans which was
essentially a straight edge, although that was achieved by
edges with slightly different bearings; the northern and
southern ones apparently parallel, the adjoining one slightly
inclined.
There is a change proposed to the road pattern in that the
access from Wearing Road to what was clearly intended as a
road providing connectivity to the undeveloped land to the
south is now moved further to the east. There will be only
one lot to the east of it as opposed to four originally
proposed.
The through road, as it might be called, will essentially be
superimposed on the top of a T-shaped double cul-de-sac to be
reached from the formerly proposed through road.
-- 3 of 4 --
1-4 ORDER
1
10
20
30
40
50
60
The projection westward of the stem of the T will provide a
new east-west road through the development running parallel to
the internal road first described above and also a new road
further to the south, also running parallel through the site
east-west, which had always been proposed.
Those changes, it seems to me, have the beneficial effect of
providing more lots where people can establish homes. They
are potentially concerning in that the footprint of
development increases but that is within the site and unlikely
to have implications outside it because they are on land which
is likely to be turned to residential use anyway.
On a greenfields site such as this, the changes in the road
pattern do not have the effect, in my view, of making a change
other than a minor one. I have not noted above that the
original southern and the newly proposed central roads within
the site are now to be connected, which will have the effect
of dispensing with the third and last of the cul-de-sacs
proposed in the original design. I do not think that has any
effect on the minor change aspect. There will now be three
roads through the site with stubs connecting with lot 74 and
perhaps providing some indication of what one can expect will
happen there.
Order as per initialled draft.
-----
-- 4 of 4 --
Official source: https://www.sclqld.org.au/caselaw/QPEC/2010/089