Australian Retirement Homes Limited v Pine Rivers Shire Council & Anor [2009] QPEC 92 [2010] QPELR 148
PLANNING & ENVIRONMENT COURT
OF QUEENSLAND
CITATION: Australian Retirement Homes Limited v Pine Rivers Shire
Council & Anor [2009] QPEC 92
PARTIES: AUSTRALIAN RETIREMENT HOMES LIMITED
(Appellant)
v
PINE RIVERS SHIRE COUNCIL
(Respondent)
and
CHIEF EXECUTIVE DEPARTMENT OF MAIN
ROADS
(Co-respondent)
FILE NO/S: 954 of 2006
DIVISION: Planning and Environment
PROCEEDING: Appeal
ORIGINATING
COURT: Brisbane
DELIVERED ON: 8 October 2009
DELIVERED AT: Brisbane
HEARING DATE: 10 June; 16, 17, 21 July; 15 August 2008 with further
submissions received 16 September 2008.
JUDGE: Rackemann DCJ
ORDER: A condition will be imposed requiring works generally in
accordance with the BMD 70 design subject to minor
alterations to accommodate turning movements by large
vehicles.
CATCHWORDS: ENVIRONMENT AND PLANNING – DEVELOPMENT
CONTROLS – CONDITIONS – conversion of existence
three-way unsignalised intersection to a four lane signalised
intersection – competing designs – appropriate design speed –
appropriate geometry – weight to be given to design manuals
– proper application of design manuals – whether Council’s
preferred design is an unreasonable imposition – exercise of
discretion where Council’s design would involve
substantially more work at about twice the cost without
significant commensurate benefit
-- 1 of 18 --
2
Legislation considered:
Integrated Planning Act 1997 (Qld) s 3.5.11, s 3.5.30
Cases considered:
Bruigom v Council of the City of Rockhampton (1997)
QPELR 418
Grant v Pine Rivers Shire Council [1991] QPLR 160
COUNSEL: B Job for the appellant
A Skoien for the respondent
SOLICITORS: Deacons Lawyers for the appellant
Legal Services Department of Moreton Bay Regional Council
for the respondent
Introduction
[1] The appellant proposes to develop a retirement village at Dohles Rocks Road,
Petrie. Reasons have previously been published which indicated that the appeal
would be allowed and the development application approved, subject to conditions.
The parties have subsequently reached agreement on most of the conditions, but
remain at odds over the scope of intersection works which the developer ought be
required to carry out1 .
[2] The proposal requires construction of an access to/from Dohles Rocks Road at a
point immediately opposite its presently unsignalised intersection with School Road
to the north. That will convert the intersection into a four way intersection. It is
common ground that this will create a need to signalise that intersection. That
upgrade will involve achieving an appropriate proper geometric design for the
intersection. That will have consequent benefits beyond simply providing for the
vehicles generated by the proposal 2 . The developer will bear the cost of that. The
residual dispute is as to the standard to which the intersection, including its
approaches, should be constructed.
[3] In resolving that issue, the Court had the benefit of evidence from two qualified and
experienced traffic engineers, Mr Beard (who was called by the appellant) and Mr
Deller (who was called by the respondent). The areas of disagreement between
them may be described broadly as relating to the choice of the appropriate design
speed and the adequacy of the design of various elements of the intersection
(including its approaches).
1 There has been a regrettable delay in delivering these reasons. That has, in part, been due to my
extended absence on sick leave earlier this year and a period of reduced work capacity since my
return.
2 Benefits are referred to in para 4 of the appellants written submissions of 28 July 2008.
-- 2 of 18 --
3
[4] Four alternative designs were ultimately placed before the Court. The appellant put
forward, as its primary position, a design, supported by Mr Beard, which is based,
in part on a 70 kph design speed but, in part, on something less (the BMD original
design). The respondent put forward, as its primary position, a plan of layout based
upon a design speed of 80 kph (the Council 80 design). Each of the parties
ultimately also put before the Court competing designs for which they contended in
the event that the Court determined that the appropriate design speed is 70 kph.
[5] The differences between the competing designs (even the competing 70 kph
designs) are not trifling in relation to the scope of works which would be required 3 .
That is influenced by, amongst other things, the Council’s adoption of a
substantially greater curve radius and the straightening of the eastbound through
lane, to avoid lateral movement (matters discussed later). That has a consequential
effect on relative cost.
[6] Mr Beard’s evidence, which I accept, is that the BMD 70 design would be about 20
per cent more expensive than the BMD original design and that the Council 70
design would be about twice as expensive again 4 . That is put into some context by
the evidence of Mr Deller, who estimated the cost differential between the Council
80 design and the Council 70 design at $80,000 to $100,000, even though those two
designs are similar in terms of the extent of works required5 .
[7] The appellant contends that its proposals represent a reasonable approach, having
regard to (but not slavishly following) the relevant design manuals (discussed later).
The Council contends that the developer ought be required to undertake a greater
scope of works, consistently with its designs, in order to more strictly adhere to the
relevant standards.
The Conditions Power
[8] Putting to one side concurrence agency conditions, the power to impose conditions
on the approval of an application is expressed in general terms 6 . That must be read
subject to the statutory tests for the lawfulness of conditions7 , but there remains a
relatively broad residual discretion in relation to the (lawful) conditions which may
properly be imposed upon an approval.
[9] The exercise of that discretion should have regard to any relevant provisions of the
planning documents. The subject application was made under the Transitional
Planning Scheme. That Planning Scheme contained special requirements in relation
to particular development including “accommodation units, multiple dwellings,
3 Exhibit 40 illustrates the additional pavement areas which would be required as a consequence of the
different options.
4 Day 3 T 13 – note the transcript for Day 1 is from 10 June 2008. I have adopted numbering from
that day, so that Day 5 is 15 August 2008, even though the numbering on the face of the transcript is
different.
5 Day 4 T 48.
6 See s 3.5.11(11)(b) of IPA.
7 See s 3.5.30 of IPA.
-- 3 of 18 --
4
community dwellings and retirement villages”. The relevant provision included a
requirement that the owner or applicant, as the case may be:
“(a) construct concrete kerb and channelling, bitumen pavement construction
and concrete footpaths for the full length of the road frontage or frontages
and reinforced concrete industrial crossings to the Council’s specifications,
plus alterations necessary for public amenity mains and services;
(b) carry out such works as may be deemed by the Council to be necessary to
ensure that the development is readily accessible, and to ensure public
safety and convenience around the site, including the collection of
stormwater drainage from the site and discharging thereof to the
requirements of the Council”.
[10] I was not referred to any provision of the Transitional Planning Scheme which
further particularised the requirements of the Council, nor was I referred to any
policy under the Transitional Planning Scheme which specified relevant standards.
It appears that, under the Transitional Planning Scheme regime, the Council had
regard to a design manual which was adopted as design standards for the purposes
of a certain local law 8 .
[11] With the introduction of the IPA Planning Scheme, the Council’s Design Manual
now forms an appendix to a Planning Scheme Policy (PSP 28). That Design
Manual, in turn, references the Queensland Department of Main Roads Road
Planning and Design Manual (RPDM) as a standard for intersection design.
[12] While the subject application was made under the Transitional Planning Scheme,
the Court is entitled to give weight to the new Scheme. In the circumstances, I am
inclined to give significant weight to the Planning Scheme Policy and the
documents which it references, as being the current documents for the design of
roadworks, including intersection design.
Application of Design Manual
[13] While it is appropriate to give weight to those documents, it would be inappropriate
to strictly and slavishly apply each and every provision of them without due regard
to the particular context and circumstances at hand. In that regard:
(a) the IPA planning scheme and PSP 28 are matters of weight only in
the context of the subject application;
(b) the Council’s Design Manual (which references the RPDM) is part of
a policy document. The existence of a policy does not dispense with
the necessity of considering each application on its merits 9 ;
(c) the policy is referenced in the Infrastructure Works Code (the Code)
which is one of the “Miscellaneous Development Codes”, taken into
8 Local Law No 6 - Roads.
9 See Bruigom v Council of the City of Rockhampton (1997) QPELR 418 at 423.
-- 4 of 18 --
5
account in impact assessment10 . The Code relevantly references PSP
28 in the “probable solution” to Specific Outcome 9, which requires
that “the existing road network is upgraded where necessary to cater
for the traffic impact from the development for a period of not less
than 10 years hence”. The Planning Scheme does not necessarily
require the adoption of the probable solution in order to meet the
specific outcome11 ;
(d) a condition must pass the tests for lawfulness in s 3.5.30 “despite the
laws that are administered by, and the policies that are reasonably
identified as policies applied by, an assessment manager or
concurrency agency”.
[14] Further, intersection design cannot readily or appropriately be carried out in
ignorance of the particular context. Not all intersections precisely conform to the
illustrations in the design manuals 12 . As Mr Deller conceded 13 , an intersection is
not necessarily unsafe simply because it fails to comply in all respects with the
design manual. The process involves assessment and judgment, having regard to
relevant objectives, including economic considerations.
[15] The overall objectives of the Infrastructure Works Code, the stated objective of PSP
28 and the “design philosophy” section of the Council’s Design Manual all
recognize that what is sought is a solution which combines considerations of safety,
amenity, convenience, economy and the environment14 . The RPDM has its own
“Design Philosophy” chapter which is expressly stated to relate to “all of the other
chapters of this manual, which have to be read in conjunction with, and applied in
light of, the philosophy espoused here”. That philosophy recognizes the importance
of judgment and experience and promotes flexibility, to encourage independent
designs tailored to the particular situation.
[16] The introduction to the “Design Philosophy” chapter of the RPDM provides, in part,
as follows:
“All road design is a compromise between the ideal and what is a
reasonable outcome (eg in terms of cost, safety, driver
expectation, economic drivers, environmental impacts and social
issues …)”
10 If a proposed development is self assessable or code assessable, the Zone Assessment Tables identify
the applicable codes for the proposal. A retirement village is not identified as self assessable or code
assessable in the prevailing Service Industry Zone. It is therefore impact assessable, such that the
Code forms part of the provisions of the Planning Scheme which are taken into account when
assessing such development.
11 Mr Skoien, for the Council, drew attention to the reference to PSP 28 in SO 10, which relates to the
construction of Council controlled frontage roads. When that specific objective is read in the context
of SO 9, PS 9 and PS 10, it can be seen to relate to the construction of a frontage road itself (its width
etc) rather than to intersection upgradings required to cater for traffic impact to the design horizon
(the matter which is dealt with by SO 9).
12 Mr Beard drew attention to proximate intersections in Dohles Rocks Road and ANZAC Avenue
which do not fully comply with the standards sought by the Council for the subject/intersection.
13 Day 4 T 82.
14 See Infrastructure Works Code para 6.1(2)(e), PSP 28 Objective 1, Council’s Design Manual s 4.2.2.
-- 5 of 18 --
6
…
“What is clear is that design is a complex task. Design can never
be merely the application of numbers from a set of tables
developed from the various theoretical constructs used for that
purpose. There is a need to apply judgment and experience in
arriving at the appropriate design …”
“This manual recognises the importance of judgment and
experience …”
[17] The “design philosophy” chapter of the RPDM also encourages “context sensitive
design” which is defined as:
“a design approach that aims to achieve an appropriate balance
between safety, mobility, community and environmental needs
when developing solutions …”
[18] That is explained more fully in s 2.3 of the RPDM which provides, in part, as
follows:
“… The design cannot be carried out in isolation, but must be
sensitive to the context in which the road will operate.
Context sensitive design is an approach that provides the flexibility
to encourage independent designs tailored to particular situations.
…
Within the discipline of road planning and design the term “fit for
purpose” has also been widely used as a synonym for context
sensitive design. Similarly, the notion that not all roads have to be
designed to the same standard (as encompassed by Main Roads
motto from an earlier era of ‘adequate roads at minimum cost’) is
an example of context sensitive design.
…
Planners and designers should always aim to produce context
sensitive designs.
…
-- 6 of 18 --
7
The design challenge is to develop a solution to the problem at
hand taking account of the competing alternatives and the trade
offs that might be needed to accommodate the budget available and
the circumstances of the project.
…
It is a question of balancing cost against risk rather than simply
attempting to decide which solution is “correct” versus “incorrect”.
Since it is not possible to create a completely safe road (ie a road
that has no crashes on it), each design will be “more safe” or “less
safe” than some other alternative. What the appropriate balance is
depends on the circumstances and the combination of design
elements. Finding the appropriate balance relies on experience and
judgment assisted by objective measurement and research.
This inevitably produces a significant element of variation in the
possible solutions derived from a particular problem ….”
[19] In relation to the application of design criteria and the resulting standard of the road,
the RPDM cautions that context sensitive design is not an excuse for violating the
principles of design and not applying appropriate design criteria but cites, with
apparent approval, the following passage from another source:
“Design dimensions that do not meet standards do not necessarily
result in unacceptable design – dimensions that meet standards
do not necessarily guarantee an acceptable design. In assessing the
quality of a design, it is not appropriate simply to consider a
checklist of standards. The design has to be reviewed with
judgment; standards merely assist the reviewer in making those
judgments”.
[20] While the standards contained in the design manuals annexed to, or referenced in,
the Planning Scheme Policy are deserving of significant weight:
• they ought not be applied slavishly to the exclusion of an
assessment of the merits of the matter at hand; and
• the specific standards set out in various chapters of the RPDM
should be read in conjunction with, and applied in the light of, the
design philosophy in Chapter 2 of the Manual.
-- 7 of 18 --
8
Design Speed
[21] One of the differences between the traffic engineers was as to their choice of design
speed. The design speed is that which is adopted for the calculation of the various
geometric design parameters.
[22] Dohles Rocks Road is a significant Council controlled road connecting to the Bruce
Highway. It serves an arterial function and is identified within Council’s road
hierarchy as an arterial road although, as Mr Deller acknowledged, it is currently
performing at a sub-arterial level, having regard to traffic volumes in the relevant
section adjacent to the proposed development 15 .
[23] Council’s Design Manual provides that16 the minimum design speed for an arterial
road is in the range of 8017 and 100 kph 18 . The range for a sub-arterial road is 60
kph19 to 80 kph. Mr Deller contended for a design speed of 80 kph, being the
“absolute minimum” for an arterial road. The current posted speed limit on Dohles
Rocks Road is only 60 kph.
[24] While Dohles Rocks Road may be classified as an arterial road, it is not constructed
to its ultimate. The Council has long term plans to upgrade Dohles Rocks Road to a
four lane divided configuration with at least a 90 kph design speed and an 80 kph
posted speed limit20 . The upgrading is progressing from east to west. The long
term planning is consistent with work done by the Council on Dohles Rocks Road
east of Ogg Road. However:
(a) the existing speed limit on the whole of Dohles Rocks Road is 60
kph and there is no current proposal to increase the speed limit in this
part of Dohles Rocks Road 21 ;
(b) the section of Dohles Rocks Road within which the subject site falls
(west of Ogg Road, in the vicinity of School Road) consists of a two
way lane two lane road with lesser standard intersections22 , generally
designed to between 60–70 kph23 , as well as commercial and
industrial driveways which do not have right-turn provision24 ;
(c) the upgrading of this part of Dohles Rocks Road is not imminent 25 ;
(d) it is common ground that the development should accommodate the
future upgrading, but that the developer should not be required to
construct this part of Dohles Rocks Road to its ultimate
configuration.
15 See Ex 30, pg 2, para 3.7.
16 Section 4.9.3.
17 That is expressed as an absolute minimum.
18 Which is the minimum design speed which would generally be provided for.
19 60 kph is the absolute minimum.
20 Ex 35 – preamble.
21 Ex 35 – preamble.
22 Deller Day 3 T 82.
23 Deller Day 4 T 46-47.
24 Dellder Day 4 T 61.
25 Deller Day 3 T 79, 97; Day 4 T 47.
-- 8 of 18 --
9
[25] Surveys of the existing speed environment in this part of Dohles Rocks Road
establish that:
(a) the existing average speed is just in excess of the posted
speed limit of 60 kph 26 ; and
(b) the 85th percentile speed is 68 kph.
[26] The RPDM provides that the design speed must be equal to or greater than the
operating speed which, in turn, is taken to be the 85 th percentile speed. This would
require a design speed of at least 68 kph.
[27] As the RPDM provides 27 and Mr Deller confirmed28 , it is common for the operating
speed (and the design speed) to be equal to the posted speed plus 10 kph. That
suggests that a design speed of 70 kph is appropriate in this part of Dohles Rocks
Road at this time.
[28] It is not necessarily a case of the higher the design speed the better. Artificially low
posted speed limits relative to design and operating speed can be problematic. The
traffic engineers agreed 29 that it is desirable that there be an appropriate co-relation
between posted speed limits, 85th percentile speeds and design speed. Mr Beard
was opposed to adopting a design which could unduly encourage higher operating
speeds 30 .
[29] Mr Deller’s support for an 80 kph design speed was based, in part, on his view that
it would be appropriate for the posted speed limit to be increased to 70 kph, but that
is not something which would be required as a result of the subject development31
and it is common ground that there is no current proposal for that to occur.
[30] Mr Beard continued to hold a professional view that the design speed ought not be
required to be at or above the operating speed at all. However, he acknowledged
that the RPDM and industry standard design practice takes a different approach32 .
[31] In the circumstances, I am satisfied that the appropriate design speed for the
intersection upgrading works required by this development in this part of Dohles
Rocks Road, at this time, is 70 kph.
[32] I was referred to the decision in Grant v Pine Rivers Shire Council [1991] QPLR
160 where it was said that “the nature and function of Dohles Rocks Road is
indicative that it should, for the purposes hereof, be regarded as having a design
speed of 80 kph”. It was submitted that nothing had occurred since that decision
26 The mean is 62.9 kph and the median is 62.3 kph – see Annexure to Ex 35; Deller Day 3 T 99.
27 Page 6-14
28 Deller Day 4 T 60.
29 Ex 35 pg 1.
30 Day 3 T 9, 10-11, 18.
31 Beard Day 3 T 10.
32 Ex 35 pg 2-3.
-- 9 of 18 --
10
which would persuade the Court to a different conclusion. That case, however, was
concerned with a different part of Dohles Rock Road and was determined on the
basis of different evidence. It does not change the conclusion in this case.
Elements of the Design
[33] The difference between the traffic engineers in relation to the extent of works which
should be required is explained more by their interpretation and application of the
RPDM than their choice of design speed. There is little difference between the
extent of works required in the Council 80 design and Council 70 design, but the
Council 70 design involves considerably more works, at greater cost, than the BMD
70 design.
[34] Mr Deller advocated the strict application of the detailed provisions of the RPDM,
given that there was no insurmountable constraint which would prevent their
adoption. Mr Beard, on the other hand, placed a greater emphasis upon the
RPDM’s promotion of context sensitive design. He had regard to efficiency. He
was not in favour of spending twice as much money, by adopting higher standards,
to achieve the same outcome 33 . He remained of the view that the BMD original
design represented quite a high standard of design for the situation 34 and the best
design overall, having regard to the combination of relevant considerations, but saw
some benefit in the longer right turn lane for vehicles turning north into School
Road, which is provided in the BMD 70 design35 . In my view the BMD 70 design
is the more appropriate of the two.
[35] Mr Deller contended that the BMD designs are deficient in a number of respects.
That is considered below36 . It should be noted however, that each of the elements
are part of an overall design. As Mr Deller explained, every design element is
sensitive to the others 37 . Consequently, it is necessary to look at the merits of the
competing proposals. It is impractical (and probably undesirable) for the court to
endeavour to embark upon its own re-design of those options in this case. Given
my conclusion in relation to the appropriate design speed, the relevant competing
plans are the BMD 70 and the Council 70 designs.
(i) Intersection Performance
[36] The evidence establishes that, with each of the competing designs, the intersection
will operate within capacity and without undue delay or queuing (east bound or
west bound) at the design horizon. The performance of the intersection at the
design horizon was modelled by Mr Beard using SIDRA38 . His modelling did not
show any difference in performance for the options modelled.
33 Day 3 T 13.
34 Beard Day 1 T 43.
35 Beard Day 3 T 22-23.
36 Mr Deller’s report also raised an issue about pedestrian paths. That was not a focus of attention in
the appeal. It was dealt with in Mr Beard’s evidence (Day 1 T 46). The BMD designs are acceptable
in this respect.
37 Day 4 T 20.
38 Ex 39.
-- 10 of 18 --
11
[37] Mr Deller subsequently carried out comparative modelling with different inputs for
the Council’s design. Those differences included different assumptions about
parking restrictions in School Road. That showed a somewhat improved
performance for the Council’s design. The difference could have narrowed, had the
same assumptions about School Road (which assumptions could readily be
incorporated in the BMD Design) been used for modelling the BMD Design. In any
event, Mr Deller accepted 39 that even the original BMD Design would have
satisfactory intersection performance, based on SIDRA analysis, including in terms
of capacity, queue lengths and delays. That is, the adoption of the Council’s
preferred design is not required in order to secure satisfactory intersection
performance.
(ii) Turning Movements for Large Trucks
[38] The width of the intersection in the BMD design appears inadequate to allow for the
turning movements of large trucks. As Mr Beard pointed out 40 and Mr Deller
conceded 41 , that is an issue which could be overcome with a minor adjustment to
the design.
(iii) Inadequate Horizontal Curve Radius
[39] Another criticism of the BMD design was the adoption of what was said to be an
inadequate horizontal curve radius. Dohles Rocks Road currently features a curve
at this intersection with a radius of 180 metres. The BMD 70 design would increase
that to 300 metres. That would, as Mr Deller acknowledges, be consistent with the
requirements of the RPDM for a design speed of 70 kph. Mr Deller’s initial
criticism was based upon his adoption of an 80 kph design speed, which would have
required a radius of some 500 metres. Given my conclusion about the appropriate
design speed, the radius of the BMD 70 design is appropriate.
[40] It may be noted that the Council’s 70 design retains a radius of 500 metres. That
has an effect upon the extent of works required. Mr Deller did not pretend that a
radius of 500 metres would ordinarily be required by the adoption of a 70 kph
design speed. His evidence was that the 500 metre radius was what happened to be
required in order to appropriately provide for other requirements. I accept Mr
Beard’s evidence 42 that adopting a radius which is appropriate for a design speed of
80 kph, carries some risk of encouraging greater speed, relative to the posted speed
limit of 60 kph, but I would not regard the Council 70 design as unacceptable for
that reason alone.
(iv) The Eastern Approach
[41] Mr Deller’s most serious concerns in relation to the BMD 70 design related to the
western side of the intersection. He confirmed that the requirement for works on
39 Day 4 T 70.
40 Day 1 T 45, T 65-67.
41 Deller Day 4 T 45.
42 Beard Day 3 T 20.
-- 11 of 18 --
12
the eastern side was related to achieving an appropriate transition from the works
required on the western side of the intersection 43 .
[42] The existing right turn movement into School Road does not come close to
compliance with the standards 44 . The development does not generate additional
right turn movements into School Road, but the works will signalise the intersection
where the turn is made. The BMD original design lengthened the existing right turn
lane (from Dohles Rocks Road to School Road) from 50 to 92 metres, but was still
less than that calculated by reference to the RPDM. The provisions of the manual
dealing with the length of right turn lanes are discussed later, in the context of the
western approach.
[43] The BMD 70 design provides an overall length of 120 m, which provides for
deceleration to the end of the queue of vehicles stored in the right turn lane45 . Mr
Beard saw that as the primary advantage of the BMD 70 design over the BMD
original design. It does not exceed the 95 percentile queue in the through lane.
Consequently, there will be times when the queue in the through lane blocks
entrance to the right turn lane, but the SIDRA analysis demonstrates that there will
be satisfactory intersection performance and I am satisfied that no significant safety
risk is involved.
[44] Mr Deller did not have the same level of concern about the potential for vehicles to
stray into the right turn lane to School Road as he held for the right turn to the
subject site (discussed later). A vehicle trying to cut the inside of the corner would
not stray into the lane46 . There is no difficulty concerning sight distance for
vehicles approaching the intersection in this direction47 .
[45] I am satisfied that the BMD 70 design is adequate and appropriate in relation to the
eastern approach.
(v) The Western Approach
[46] Mr Deller remained critical of aspects of the design, on the approach from the west
which, he said, posed unnecessary safety risks. He was particularly critical of:
A. the length of the right turn lane into the site;
B. the lateral shift in the through lane and the lack of a full width protection
for stationary vehicles waiting to turn right.
A. Length of the right turn lane
[47] The RPDM provides that:
43 Day 4 T 21.
44 Deller Day 4 T 43.
45 95% queue was 45m (Ex 35 pg 12) to which is added up to 75m for diverge/deceleration.
46 Day 4 T 85 – Mr Beard said he would have no difficulty in providing a raised median as far back as
Clyde Street, if the Council so required; Day 4 T 55.
47 Beard Day 4 T 56.
-- 12 of 18 --
13
“a correctly designed right turn lane will provide a deceleration
length and a storage length long enough to accommodate the
maximum expected queue of right turn vehicles. If the deceleration
length cannot be achieved (as is often the case in urban areas) the
lane should be at least long enough to accommodate the stored right
turn vehicles so that they do not overflow and block the adjacent
through lane”.
There is no suggestion that there would be any “overflow” on the BMD 70 design.
[48] The length of the right turn lane, calculated in accordance with the RPDM, is the
sum of the diverge/deceleration length (D) and of the storage length (S). The
diverge/deceleration length is the greater of the diverge length and the deceleration
length. At a design approach speed of 70 kph, that is, at most, 75 metres48 . The
length of the lane in the BMD design is 85m. Mr Deller accepted that the BMD 70
design would provide storage for a couple of vehicles in addition to the appropriate
diverge/deceleration length 49 .
[49] Mr Deller’s criticism was based, in part, on his understanding that the required
storage length for vehicles wanting to turn was much greater (30 or 60 metres).
That would appear unlikely, given that the estimated peak hour demand for right
hand movements is only 20 vehicles (ie, on average, one every three minutes) set
against a model cycle time for the lights of one cycle every 70 seconds (ie on
average one vehicle every 2.5 cycles). There is likely to be very little queuing.
That is confirmed by Mr Beard’s SIDRA analysis which calculated the 95 th
percentile queue length, at the designed horizon, for the right turn from west to
south at six metres (one vehicle)50 . The confusion seems to have arisen from
reference to lengths which were inputs into the SIDRA program, 51 rather than to the
length calculated by the SIDRA analysis52 .
[50] I am satisfied that the right turn lane appropriately provides for both
diverge/deceleration and storage for vehicles waiting to turn right.
[51] It was pointed out however, that the RPDM also seeks turning lanes which are “long
enough to allow the right turn vehicles to enter the right turn lane without becoming
blocked by the queue of vehicles in the adjacent through lane”.
[52] Mr Beard’s modelling shows that the 95 percentile queue in the westbound through
lane is 175 metres in the AM peak 53 . That would extend back sufficiently to block
48 Table 13.11 of the RPDM specifies 75 metres as the comfortable deceleration distance. The
distance for maximum deceleration is 55 metres while the diverse length is between 60 and 70
metres, depending upon the width of the lane
49 Deller Day 4 T 40-41.
50 Ex 35 pg 12 – Note on the same page the “upper limit of RPDM design domain” for the right turn
lane from west to south was specified as 85 metres which was said, in note 2 to be based on
“deceleration from 70 kph to the tail of the 2018 peak hour 95 th percentile queue”.
51 See Exhibit 34 and Exhibit 50
52 See Beard Day 1 T 103 l 20, T 104 l 50; Deller Day 4 T 38.
53 It is 146 metres for the eastbound through lane in the PM peak (see Ex 35 pg 6).
-- 13 of 18 --
14
the entrance to the right turn lane54 . Providing for that produces a required length
which Mr Beard regarded as “mindboggling”55 , given there will not even be one car
wanting to undertake that manoeuvre in most cycles of the lights, even in peak hour
at the design horizon 56 . Mr Deller suggested that failing to provide a turning lane
extending back beyond the 95 th percentile queue in the through lane could create
inefficiency, but, as Mr Beard pointed out, the SIDRA modelling shows satisfactory
performance.
[53] I accept Mr Beard’s evidence, to the effect that the potential for vehicles in the
through lane to queue beyond the entrance to the turning lane is unlikely to cause
any significant efficiency or safety issue in this case 57 .
[54] Significant safety issues can arise if an auxiliary turning lane overflows into the
path of through traffic, however that is not the case here. Instead, a driver in the
through lane might be delayed in reaching the point where they can divert into the
auxiliary lane. Mr Deller suggested that this might cause an element of frustration
or angst on the part of the delayed driver but, as he agreed, it would be reasonable
for a user to expect that there might be some delay at the intersection in peak times
and that they might not be able to immediately move into the right turn lane on each
and every occasion during those peak periods 58 .
[55] There was some suggestion that people approaching the back of the queue might
delay decelerating, by reason of wrongly assuming that they would be able to move
immediately into the right hand auxiliary lane. That potential scenario would relate
to a peak period in which vehicles would be approaching from the west in a
“platoon” 59 , which would be likely to be progressively decelerating as it approached
the tail of the queue at the subject intersection. It would be happening in a
congested period, where vehicles are likely to be travelling slower than at
uncongested times 60 and in circumstances where there is adequate sight distance.
For the reasons explained by Mr Beard61 , the risk is not significant in the subject
circumstances.
B. The lateral shift and lack of full width protection
[56] Mr Deller’s primary concerns, as he confirmed in his oral evidence62 , are the lateral
shift in the through lane and lack of full width protection to guard against vehicles
in the through lane drifting into the right turn lane to the site. Chapter 18 of the
RPDM deals with signalised intersections. It refers back to Chapter 13 and provides
that any changes in geometry, consequent upon signalisation, should be in
accordance with Chapter 1363 . Chapter 13 deals with a number of different turn
54 And vehicles waiting to turn left as well; Beard Day 3 T 70-71.
55 Beard Day 2 T 26.
56 The Council’s plan incorporates an additional through lane at the intersection; Deller Day 4 T 15.
57 Beard Day 3 T 71.
58 Day 4 T 58-59.
59 Having come from the previous signalised intersection.
60 Deller Day 4 T 63.
61 Day 3 T 74-76.
62 Day 4 T 20.
63 Ex 33B pg 18-3.
-- 14 of 18 --
15
treatments for urban conditions. Of those, channelised intersections (CH) are the
most expensive form of an at-grade intersection. The manual provides for
channelised right turn treatments (CHR) and channelised right turn treatments with
short turn lengths (CHR(S)). It states that CHR(S) treatments were developed
because “…Rear-End-Major vehicle accident rates at CHR turn treatments with
short lengths of turn lane were not significantly higher than for full turn lengths”64 .
[57] The RPDM states that the “most desirable treatment” for right turns is a CHR turn
treatment as shown in Figure 13.50. That figure does not show a lateral shift. It has
a full width protection for queued vehicles in the right lane. Mr Deller relied upon
the appropriateness of the use of a CHR treatment, rather than a CHR(S) treatment
(which is depicted with a lateral shift and a partial median in Figure 13.49).
[58] The RPDM states that a CHR(S) treatment is suitable where there are low to
moderate through and turning volumes. Dohles Rock Road, at this location does
not have low through volumes, although the turning volume into the site would be
very low65 . The RPDM also states that, for higher volume sites, a full length CHR
turn treatment is preferred.
[59] Reference was made to Figure 13.23 of the RPDM, which is for use in determining
the warrants for unsignalised intersection turn treatments for roads with a design
speed of less than 100 kph. Notwithstanding the references to Chapter 13 in
Chapter 18 of the RPDM, Mr Beard did not consider the figure to be relevant to
signalised intersections, since he said it was based on “gap acceptance”66 . The
figure, if applied, suggests that the right turn into the site is at or about the boundary
between a CHR and a CHR(S) treatment 67 .
[60] Mr Beard’s support for the BMD Design was not based on an asserted applicability
of a CHR(S) design, but on his opinion that strict conformity Figure 13.50 was not
necessarily required 68 and that the BMD design was appropriate in context, in
advance of the Council’s ultimate upgrading 69 . He pointed out 70 that this part of
Dohles Rocks Road, while an urban road, currently has a more rural configuration
(in that it is a 2 way, 2 lane undivided road), such that the geometry shown in Figure
13.5071 does not provide the best guidance in his opinion.
[61] The incorporation of a lateral shift does not, of itself, make an intersection
inappropriate. Both the RPDM and Council’s Manual otherwise depict lateral shifts
on CHR intersections on major roads 72 . Mr Deller acknowledged that lateral shifts
64 Ex 33 pg 13-27.
65 Deller Day 3 T 104.
66 Beard Day 1 T 36; Day 3 T 66.
67 It places the right turn into School Road within the warrant for a CHR treatment.
68 In his view the through traffic lane does not have to be straight in all CHR treatments – Day 1 T 88;
Day 3 T 63, 66.
69 Day 3 T 64.
70 Day 3 T 64, 66-67.
71 CHR treatment for a 2 land rural road.
72 Day 4 T 80
-- 15 of 18 --
16
occur in the road network and that they can be included in road design 73 , although
he said that the Council does not now put a lateral shift in an arterial or higher order
road if that can be avoided 74 . Mr Deller’s point was that there is not, in his view, an
appropriate transition in the BMD designs75 .
[62] It might be noted that there is a lateral shift for east bound traffic at the existing
intersection, which does not have a poor traffic accident history 76 . There was some
suggestion that the lateral shift might affect the efficiency of the intersection, but I
am satisfied, on Mr Beard’s evidence77 , that it would not do so.
[63] Attention was drawn to s 11.5 of the RPDM which provides that at small angles
greater than 1 degree, the appearance of a kink must be avoided. This is achieved
by use of long curves as shown in Table 11.17. The lateral shift or “kink” in this
case is at an angle of about 4 degrees78 which, applying Table 11.7, would require a
long curve with a radius of 2,600 metres. Those lengths are said to be “more
applicable to important and high speed roads than to minor roads”. Mr Beard did
not consider that applied to Dohles Rocks Road 79 . Mr Deller pointed out that
Dohles Rocks Road is an important road in the context of the Shire. I prefer Mr
Beard’s evidence that it is not high speed 80 .
[64] Mr Beard’s evidence81 is that this is an appearance issue, rather than a safety issue.
That is supported by the notes to Table 11.6 in the RPDM which expressly state that
“desirable minimum curve length is for appearance”. Mr Deller acknowledged that
the note supported Mr Beard’s proposition 82 .
[65] Mr Beard pointed out that where an intersection design includes a lateral shift, it is
beneficial for that to be legible 83 . As he acknolwedged, the existence of the lateral
shift makes it important that there is appropriate line marking and median
construction, to guide the vehicles through the lateral shift. As he pointed out
however, the turns in the subject design are very gentle and, with the treatment
proposed, will present “absolutely no problem” 84 . I accept that evidence.
[66] Mr Deller’s primary concern relates to the fact that the right turn lane is proposed to
be protected by a partial (rather than full width) median, around which the through
traffic lane would deviate. His concern was for the potential, particularly at night
time, for vehicles in the through lane to drift into the right turn lane (with the
potential for a rear end collision) if they drove directly towards the eastern side of
73 Day 4 T 81.
74 Deller T 85.
75 Day 4 T 18.
76 Deller Day 4 T 75.
77 Beard Day 3 T 60.
78 Beard Day 3 T 44, 49, 60.
79 Beard Day 3 T 59.
80 Beard Day 3 T 60.
81 Beard Day 3 T 44, 52.
82 Day 4 T 79.
83 Beard Day 3 T 52.
84 Day 2 T 35.
-- 16 of 18 --
17
the intersection, rather than continue on the designated curve for through traffic85 .
He acknowledged that the incidence of queued vehicles in the right turn lane at
night would be very low86 , but saw the potential for collision as an unnecessary risk
which was obviated in the Council’s design.
[67] As the RPDM notes 87 , hazardous situations can occur where through and right turn
vehicles share a lane. Exclusive right turn lanes are therefore desirable on all
intersection approaches where traffic volumes are sufficiently high. Both the BMD
design and the Council design provide protection for right turning vehicles by
removing potentially stationary vehicles from the through traffic lane and into a
dedicated right turning lane. Both designs also provide protection to the auxiliary
lane, by a median and signage. The Council design provides an added element of
protection, by straightening the through lane and utilising a full width median.
[68] The approach taken in the BMD design is itself a common treatment 88 . It is shown
as an element in other designs in the RPDM, but is not shown in the Figure 13.5089 .
Mr Beard considered it to be an appropriate treatment for upgrading this part of
Dohles Rock Road in advance of Council’s ultimate upgrading. He did not consider
that it involved a significant additional safety risk.
[69] With the BMD design, eastbound vehicles would already be on a 300m radius curve
with the result that a driver who did nothing to alter course through the intersection
would end up on the left hand side of the road rather than in the right turn lane. 90 Mr
Beard’s evidence was that there is no reasonable risk of through traffic becoming
confused about the alignment and ending up in the right turn lane, given the
treatments proposed (a painted median, lighting to the nose of the median, a “keep
left” sign, reflectorised pavement markers and lighting to the intersection), the
gentle curve radius through which the through traffic would be moving and the
adequate sight distance. He described the risk of through traffic colliding with a
clearly visible stationary vehicle in the right turn lane, by driving directly towards a
point on the eastern side of the intersection (instead of following the curve in the
through lane) as so low as to be negligible 91 .
[70] I accept that the Council’s design affords a level of greater protection, but I also
accept that the additional risk inherent in the BMD 70 design is minimal in the
circumstances.
85 Deller Day 3 T 84.
86 Day 4 T 63.
87 18-7.
88 Beard Day 4 T 54.
89 See Ex 42; It was pointed out that the Council accepted a CHR(S) treatment at the Dohles Rocks
Road/McClintock Drive intersection, as an interim layout albeit that the Council’s upgrading was
following almost immediately.
90 Day 4 T 53.
91 Day 4 T 50, 51, 53-55.
-- 17 of 18 --
18
Conclusion
[71] The difference between the traffic engineers reflects their different approaches to
the interpretation and application of the design manuals. Mr Deller takes a
relatively strict approach to the application of the detailed provisions of the
documents, in the absence of insurmountable constraints to doing so. Mr Beard
takes a more flexible approach.
[72] For the reasons previously stated, the design manuals are deserving of significant
weight, but should not be applied slavishly, to the exclusion of an assessment of the
merits of the competing proposals considered in context.
[73] The Council’s design may achieve a higher degree of compliance with the design
manuals, but it requires significantly more works at something like twice the cost,
without achieving a corresponding significant increase in operational efficiency or
safety.
[74] Counsel for the respondent urged me to place greater weight on safety than
economic considerations. He pointed out that, in speaking about economy, the
RPDM was concerned with public expenditure, not that of a private developer. He
submitted that the Court could not find that the Council’s design would be an
“unreasonable imposition” on the development, within the meaning of s 3.5.30 of
IPA, in the absence of evidence about the total costs involved and their relationship
to the cost/profitability of what is a substantial development.
[75] I am not sure that a finding of an “unreasonable imposition” is necessarily
unavailable in the absence of that evidence. The evidence satisfies me that the
condition favoured by Council would involve substantially more work at about
twice the cost 92 , without significant commensurate benefit. It also satisfies me that
the BMD 70 design would operate with appropriate levels of efficiency and safety.
[76] Even if the Council’s preferred condition could be said to be within the bounds of
lawfulness, as passing the tests in s 3.5.30, it does not follow that the Court must
impost it. There is a residual discretion. Mr Skoien did not cavil with the
proposition that a significant differential in costs relative to improved safety would
be relevant to the exercise of discretion93 .
[77] I am satisfied that the BMD 70 design is, in context, an adequate, reasonable and
appropriate response to the traffic impacts of the proposed development. I will
impose a condition requiring works generally in accordance with that design,
subject to minor alterations to accommodate turning movements by large vehicles.
92 Which would not be a trifling amount, given the evidence of Mr Deller about the cost differential
between the similar Council designs.
93 Day 5 T 29-30.
-- 18 of 18 --
Official source: https://www.sclqld.org.au/caselaw/QPEC/2009/092