BHP Queensland Coal Investments Pty Ltd & Ors v Cherwell Creek Coal Pty Ltd [2009] QLAC 5 (2009) 30 QLCR 140
LAND APPEAL COURT OF QUEENSLAND
CITATION: BHP Queensland Coal Investments Pty Ltd & Ors v
Cherwell Creek Coal Pty Ltd [2009] QLAC 5
PARTIES: BHP Queensland Coal Investments Pty Ltd
(ACN 098 876 825)
- and –
QCT Resources Pty Ltd
(ACN 010 808 705)
- and –
BHP Coal Pty Ltd
(ACN 0101 595 721)
- and –
QCT Mining Pty Ltd
(ACN 010 487 840)
- and –
Mitsubishi Development Pty Ltd
(ACN 009 779 873)
- and –
QCT Investment Pty Ltd
(ACN 010 487 831)
- and –
Umal Consolidated Pty Ltd
(ACN 000 767 386)
(appellants)
v.
Cherwell Creek Coal Pty Ltd
(ACN 063 763 002)
(respondent)
FILE NO: LAC2008/1110
DIVISION: Land Appeal Court of Queensland
PROCEEDING: Appeal
ORIGINATING COURT: Land Court of Queensland
DELIVERED ON: 12 June 2009
DELIVERED AT: Brisbane
THE COURT: White J
Mrs CAC MacDonald, President of the Land Court
Mr RP Scott, Member of the Land Court
-- 1 of 14 --
2
ORDERS: 1. The appeal is allowed.
2. Remit the proceedings to the Member to determine
the quantum of the security to be provided.
3. The respondent to pay the appellants’ costs of and
incidental to the appeal unless the respondent
contends that some other order ought be made in
which case:
(i) the respondent file and serve its submissions
within 21 days;
(ii) the appellants file and serve their submissions
within 14 days of receipt of the respondent’s
submissions;
(iii) the respondent file and serve its reply, if any,
within seven days of receipt of the appellants’
submissions;
(iv) the Court will decide the question of costs on the
written submissions of the parties without the
need for oral argument.
.
CATCHWORDS: Procedure – Costs – Security for costs – other matters –
where the appellants initiated proceedings against the
respondent for compensation pursuant to s.722G of the
Mineral Resources Act 1989 (Qld) – where the appellants
sought an order in the Land Court that the respondent provide
security for its costs in the event that the respondent’s claim
against the appellants is successfully defended – where the
learned Member declined to order security – whether the
learned Member erred in finding it was far from certain that
an order for costs would be made in favour of the appellants –
whether the general rule that costs follow the event applies
Procedure – Costs – Security for costs – other matters –
where the appellants initiated proceedings against the
respondent for compensation pursuant to s.722G of the
Mineral Resources Act 1989 (Qld) – where the appellants
sought an order in the Land Court that the respondent provide
security for its costs in the event that the respondent’s claim
against the appellants is successfully defended – where the
learned Member declined to order security – whether the
learned Member erred in characterising the respondent as in
the position of a defendant on the basis that the respondent
was forced into litigation to protect its rights and entitlements
Central Queensland Coal Associates Agreement Act 1968
(Qld)
Land Court Act 2000 (Qld), s.34, 55
Land Court Rules 2000 (Qld), r.4
Mineral Resources Act 1989 (Qld), s.722F, s.722G
Mineral Resources (Peak Downs Mines) Amendment Act
2008 (Qld)
Uniform Civil Procedure Rules 1999 (Qld), r.671, r.681
-- 2 of 14 --
3
Barns v Director-General, Department of Transport (1997)
18 QLCR 133, applied
Banno v The Commonwealth (1993) 45 FCR 32,
distinguished
Haber v Department of Main Roads [2004] QLAC 0102,
applied
House v The King (1936) 55 CLR 499, applied
Interwest Ltd v Tricontinental Corporation Ltd (1991) 5
ACSR 621, applied
LGM Enterprises Pty Ltd v Brisbane City Council [2008]
QLAC 0231, applied
Maatschappij Voor Fondsenbezit v Shell Transport and
Trading Co [1923] KB 166, cited
Oshlack v Richmond River Council (1998) 193 CLR 72;
[1998] HCA 11, cited
Sykes v Minister for Mines and Energy [2008] QLC 0116,
cited
Sykes v Minister for Mines and Energy [2009] QLAC 0001,
cited
Smeaton Hanscomb & Co Ltd v Sassoon I Setty, Son & Co
(No 2) [1953] 1 WLR 1481, cited
Water Conservation and Irrigation Commission (NSW) v
Browning (1947) 74 CLR 492, applied
Willey v Synan (1935) 54 CLR 174, cited
APPEARANCES: Mr S L Doyle SC, with Mr A M Pomerenke, for the
appellants
Mr B O’Donnell QC, with Ms J Chapple, for the respondent
SOLICITORS: Allens Arthur Robinson for the appellants
Holding Redlich Lawyers for the respondent
Background
[1] The appellants sought an order in the Land Court that the respondent, Cherwell Creek,
provide security for their costs in respect of proceedings against them in that court in the
event that they successfully defended Cherwell Creek’s claim for compensation. The
learned Member declined to order security. Cherwell Creek’s proceedings in the Land
Court were initiated pursuant to the provisions of s.722G of the Mineral Resources Act
1989 (Qld) (“the Act”). Part 18A of that Act had been inserted by the Mineral Resources
(Peak Downs Mines) Amendment Act 2008 (Qld) (“the Amending Act”) which came into
effect on 9 May 2008. Section 722G provides:
“(1) Cherwell Creek may apply to the Land Court for an order for the payment of
compensation for the loss of its opportunity, because of the enactment of this part, to
commercialise the MDLA364 coal resource.
(2) An application may only be made within 3 months after the commencement day.”
-- 3 of 14 --
4
[2] The appellants are participants in the Central Queensland Coal Associates Joint Venture
(“CQCAJV”). The CQCAJV owns the Peak Downs Coal Mine. It is managed by the
appellants described below by the learned Member as the BHP Group. The members of
CQCAJV in their respective interests are the holders of Mining Lease No. 1775
(“ML1775”) and Special Lease No. 12/42239 (“SL12/42239”). ML1775 was granted in
1984 under the Central Queensland Coal Associates Agreement Act 1968 (Qld) on which
the Peak Downs Mine is located. SL 12/42239 is partly within and partly outside
ML1775. The part which is outside is the location for infrastructure critical to the Peak
Downs Mine. This includes spoil piles, environmental and tailings dams, haul roads and
ramps, mechanical workshops, warehouses, power reticulation structures and a large coal
reject stock pile.
[3] In 1994 Cherwell Creek was granted Exploration Permit for Coal No. 545 (“EPC545”).
Part of EPC545 overlapped a part of SL12/42239 on which the appellants’ mining
infrastructure is located. On 22 August 2003 the Minister renewed the permit for a further
nine years from August 1996 to August 2005. The appellants disputed the validity of the
original grant and filed an application for a statutory order of review of the 2003 decision
in the Supreme Court in November 2003. In 2005 and 2007 Cherwell Creek applied for
and was granted further renewals, each of which was disputed by the appellants. In 2006
Cherwell Creek applied for Mineral Development Licences 364 and 366 (“MDL364”,
“MDL366”) based on EPC545. Those licences related to the northern and southern
regions of EPC545 respectively and in part overlapped SL12/42239.
[4] According to the Explanatory Notes to the Amending Act the dispute between Cherwell
Creek and the appellants has arisen because of the historical split between the mining
tenure (for the mining operations) and the land tenure (for the infrastructure) for the Peak
Downs Mine, all of which pre-dated the tenure regime under the Act. When the Act was
enacted in 1989 it included transitional provisions that expressly covered mining leases
granted under the Central Queensland Coal Associates Agreement Act. Any special leases
granted under the then Land Act pursuant to the authority for that within the Central
Queensland Coal Associates Agreement were similarly transitioned over when the Land
Act 1994 (Qld) was enacted. The Explanatory Note continues:
“Unfortunately, the special leases were never protected to ensure that tenure could not be
granted under the Mineral Resources Act 1989 over them. It is not known whether this was
deliberate or an oversight. However, this lack of protection has certainly proved to be a
costly mistake in the current situation, as it has resulted in uncertainty and lengthy delay in
the resolution of the dispute between [the appellants] and Cherwell Creek.”
-- 4 of 14 --
5
[5] The Explanatory Note identified the Peak Downs Mine as a premium coking coal mine
with a large workforce of employees and contractors. Its continuing viable operation was
of considerable benefit to the local economy and to the State, generating many millions of
dollars in royalties. The government therefore regarded as unacceptable the tenure dispute
with Cherwell Creek. It noted that the appellants and their associates were proposing a
major expansion of the Peak Downs Mine and investigating the feasibility of developing
and constructing a new Greenfield mine in the northern part of ML1775 to be known as
the Caval Ridge Mine. The Explanatory Note continued:
“The Government accepts that the land currently held by Cherwell Creek under [EPC545]
and its application for [MDL364] is the optimal location for the infrastructure needed for
the Caval Ridge Mine.”
It was undesirable for the appellants and their associates to be required to place the
infrastructure on top of reserves of premium hard coking coal within ML1775.
[6] By provisions in Part 18A of the Act, Cherwell Creek’s application for EPC545 was
renewed to 9 May 2008, the date the Amending Act commenced, and was ended on that
day. Cherwell Creek’s applications for MDL364 and MDL366 were rejected from 9 May
2008. The area covered by Cherwell Creek’s application for MDL364 was made available
to the appellants and their associates as holders of ML1775 for an application for mining
leases to be lodged within two years. The land comprising SL12/42239 which was not
within a mining tenement or covered by an application for a mining tenement was made
available to the holders of ML1775 for an application for a mining lease to be lodged
within one year.
[7] By s.722F no compensation is payable by the State to Cherwell Creek (or any other
person) for or in connection with the enactment or operation of Part 18A or anything done
to carry out or give effect to that Part. By s.722G, which empowers Cherwell Creek to
apply for an order for the payment of compensation for the loss of its opportunity to
commercialise the MDL364 coal resource, the holders of ML1775 are parties to the
proceeding on the application. By subsection (4):
“On an application under this section, the Land Court must –
(a) decide whether any compensation should be payable; and
(b) if it decides compensation should be payable –
(i) decide the amount of the compensation; and
(ii) make an order for payment of the amount by the [holders of ML1775] to Cherwell
Creek.”
In making a decision under s.722G(4), the Land Court must have regard:
“…to the likelihood that, had this part not been enacted, Cherwell Creek, alone or in
conjunction with another person, would have been able to commercialise the MDLA364
coal resource…”
-- 5 of 14 --
6
The Land Court is required to have regard to a number of matters in reaching that decision
including the extent and quality of the coal resource, its likely mineability, the market for
any coal mined and the likely life of the mine, coal revenue generated, the costs generated,
“…the likelihood of a mining lease, appropriate for Cherwell Creek to commercialise the
MDLA364 coal resource, being granted under this Act”
and any other relevant matter.
Cherwell Creek
[8] Cherwell Creek, as found by the learned Member and not challenged, has a paid up capital
of $2; pays all its debts as and when they fall due; has as a director and, ultimately, sole
shareholder, Mr Christopher Wallin, who is estimated to have personal wealth of
$550,000,000.1 Neither Mr Wallin nor any asset rich corporation which he controls have
made an offer to be responsible for any costs for which Cherwell Creek may become liable
arising out of this litigation.
Quantum of costs
[9] Although Cherwell Creek contends that the appellants’ estimate of their likely costs in the
proceeding for which they seek an order of $1,629,440 is excessive, there was no dispute
that very considerable costs would be incurred because, at the least, by virtue of s.722G(5)
of the Act the Land Court must have regard to:
“(a) the likely extent and quality of the MDLA364 coal resource;
(b) the likely mineability of the MDLA364 coal resource;
(c) the likely market for any coal mined from the MDLA364 coal resource;
(d) the likely life of a mine for the MDLA364 coal resource;
(e) the likely coal revenue generated from the MDLA364 coal resource;
(f) the likely coal revenue generation costs;
(g) the likelihood of a mining lease, appropriate for Cherwell Creek to commercialise
the MDLA364 coal resource, being granted under this Act;
(h) any other relevant matter”
in considering if Cherwell Creek would have been able to commercialise the MDL364 coal
resource.
[10] The learned Member did not make any assessment of costs in the event that his refusal to
grant security was overturned on appeal.
Jurisdiction
[11] It is not disputed that the Land Court has jurisdiction to award security for costs. Rule 4 of
the Land Court Rules 2000 (Qld) provides that if the Land Court Rules do not provide for
a matter in relation to a proceeding in the Court and the Uniform Civil Procedure Rules
1999 (Qld) would provide for the matter, “the uniform rules apply in relation to the matter
1 Mr Wallin may hold some property as trustee.
-- 6 of 14 --
7
with necessary changes”. Since the Land Court Rules do not provide for an application for
security for costs, Chapter 17 of the Uniform Civil Procedure Rules 2 may be utilised. By
r 671(a) if the plaintiff is a corporation and “there is reason to believe the plaintiff will not
be able to pay the defendant’s costs if ordered to pay them” the jurisdiction to order
security for costs is enlivened. Cherwell Creek did not contend that the jurisdiction was
not enlivened.
[12] In deciding whether to order security a court may have regard, relevantly, to any of the
following matters:
“(a) the means of those standing behind the proceeding;
(b) the prospects of success or merits of the proceeding;
(c) the genuineness of the proceeding;
(d) for rule 671(a) – the impecuniosity of a corporation;
(e) whether the plaintiff’s impecuniosity is attributable to the defendant’s conduct;
(f) whether the plaintiff is effectively in the position of a defendant;
(g) whether an order for security for costs would be oppressive;
(h) whether an order for security for costs would stifle the proceeding;
…
(m) the costs of the proceeding.”3
The decision below
[13] Although the learned Member regarded the outcome of the application for security for
costs “as finely balanced”,4 he concluded that security should not be ordered. He said:5
“My reason for so ordering is primarily based on my conclusion that, at this stage of the
proceedings, and in light of the provisions of s.34 of the Land Court Act, it is far from
certain that, even if Cherwell Creek ultimately fails to establish that the BHP Group [the
appellants] is liable to pay it any compensation pursuant to s.722G of the MRA [Mineral
Resources Act], it would necessarily follow that an award of costs in favour of the BHP
Group would be made. Additionally, it is my view that, in light of the provisions of the
MRA as contained within Part 18A, although Cherwell Creek is by name the applicant in
the proceedings, it has commenced its proceedings as the only recourse left available to it in
order to recover what is [sic] sees as proper compensation for the loss of the opportunity to
extract coal from mining tenements that it held or had an expectation that it would be
granted, and therefore its actions can be viewed as responsive to the circumstances thrust
upon it by Part 18A.”
The appellants have labelled these as “the certainty error” and “the really a defendant
error” and those two grounds were the focus of the appeal.
The Certainty Error
[14] The learned Member was much influenced by his approach to costs in the matter of Sykes
v Minister for Mines and Energy & Anor6 to which he was referred by both parties. He
also noted the practice of the Land Court to make no order as to costs in many proceedings
2 Security for Costs.
3 Uniform Civil Procedure Rules, r 672.
4 Reasons [36].
5 Reasons [36].
6 [2008] QLC 0116.
-- 7 of 14 --
8
within its jurisdiction. The power of the Land Court to award costs is contained in s.34 of
the Land Court Act 2000 (Qld) which relevantly provides:
“(1) Subject to the provision of this or another Act to the contrary, the Land Court may
order costs for a proceeding in the court as it considers appropriate.
(2) If the court does not make an order under subsection (1), each party to the proceeding
must bear the party’s own costs for the proceeding.”
[15] There is no provision in the Act which is applicable nor any other Act to the contrary.7
Accordingly, the Land Court is left with a discretion unconfined except insofar as “the
subject matter and the scope and purpose”8 of the legislation does so. It must be exercised
judicially and in accordance with established principles and factors relevant to the
litigation.9 As is well recognised, a significant factor influencing the exercise of the
discretion to award costs is the outcome of the litigation.
[16] It is appropriate to recall the source of the broad discretion to award costs which was
discussed by McHugh J in Oshlack v Richmond River Council:10
“At common law, courts had no jurisdiction to award costs. The jurisdiction is statutory
and has evolved gradually. It was regarded as necessary in order to avoid injustice. In
modern times, the statutory language typically confers on the court a broad discretion to
award costs, rather than declares that costs automatically follow the event. The origin of
this broad statutory discretion is O 55 of the Rules of Court in the First Schedule to the
Supreme Court of Judicature Act 1875 (UK) which commenced with the words:
‘Subject to the provisions of the Act, the costs of and incident to all proceedings in the High
Court shall be in the discretion of the Court.’
… The statutory provision at issue in the present case is s 69(2) of the Land and
Environment Court Act which similarly provides that costs are in the discretion of the Court
…”
His Honour noted the observation of Devlin J in Smeaton Hanscomb & Co Ltd v Sassoon I
Setty, Son & Co (No 2)11 referring to an arbitration, that to deprive a successful party of his
costs or to require him to pay part of the costs of the other side “is an exceptional
measure”. His Honour noted that the principle is grounded in reasons of fairness and
policy and operates whether the successful party is the plaintiff or the defendant. To be
deprived of all or part of his costs, a successful party must have been guilty of some sort of
misconduct relating to the litigation.12
[17] The learned Member, after discussing his approach in Sykes, said:13
“Accordingly, applying the reasoning that I set out in Sykes [relating to the practice of the
Land Court], at this stage I am unable to say with any certainty at all that, at the end of the
day, if Cherwell Creek fails in its application for compensation, that it would necessarily
follow that an award for costs would be made in favour of the BHP Group. Of course, in
7 For example, the Acquisition of Land Act 1967 (Qld) in s 27 and the Valuation of Land Act 1944 (Qld) in s 70 are provisions
about costs to the contrary.
8 Water Conservation and Irrigation Commission (NSW) v Browning (1947) 74 CLR 492 at 505 per Dixon J.
9 LGM Enterprises Pty Ltd v Brisbane City Council [2008] QLAC 0231 at [9].
10 (1998) 193 CLR 72 at [63]–[70]. Although dissenting with Brennan CJ, his Honour’s analysis of the jurisdiction to award
costs is regularly cited as offering guidance. See McIntosh & Anor as Trustees of the Estate of Camm (A Bankrupt) v Linke
Nominees Pty Ltd & Anor [2008] QCA 410 at [14].
11 [1953] 1 WLR 1481 at 1484.
12 (1998) 193 CLR 72 at [69]; Oldfield & Ors v Gold Coast City Council [2009] QCA 124 at [71]–[72].
13 Reasons [35].
-- 8 of 14 --
9
exercising my discretion, an award for costs may be made in those circumstances, but the
issue is far from certain.”
[18] There are two things to say about this. In the first place the learned Member in Sykes was
required to consider whether s 50 of the Land and Resources Tribunal Act 1999 (Qld) or
s.34 of the Land Court Act applied to the question of costs. Section 50 provided that
“special circumstances” had to be found to make an award of costs and the usual position
was that each party “must” pay its own costs in that Tribunal. Whilst the learned Member
concluded that s.34 did apply, he found “special circumstances” in Mr Sykes’ conduct in
prolonging the litigation. On appeal,14 the Land Appeal Court found that s.50 governed the
question of costs but did not interfere with the learned Member’s application to the facts.15
There is no present likelihood of misconduct, as the learned Member found, in the conduct
of this litigation.
[19] The second matter concerns the learned Member’s approach to an application for security
for costs insofar as he considered that the practice of the Land Court suggested a different
approach than one where a successful party can expect an order for costs of the
proceedings to be made in its favour. This is the basis for his conclusion that it is not
“certain” that any orders would be made.
[20] Cherwell Creek in support of the learned Member’s approach contends that within the
structure of the Land Court Act there is a presumption against an order for costs which
would, in turn, militate against the likelihood of an order being made. This is said to be
because the ‘fall back’ position in s.34(2) provides that in the absence of an order each
party will pay its own costs. This, so the argument goes, is to be contrasted with r.681 of
the Uniform Civil Procedure Rules where, although costs are in the discretion of the court,
they will follow the event unless otherwise ordered. However, s.34(2) of the Land Court
Act does not detract from the unconfined discretion in s.34(1) so as to make less likely that
an order for costs will be made. In Haber v Department of Main Roads16 the Land Appeal
Court accepted the approach of the Land Appeal Court in Barns v Director-General,
Department of Transport:17
“The general rule that costs will usually follow the event is one which is deeply embedded
in our law.”
[21] This litigation is between significant commercial interests who have retained large firms of
specialist solicitors who in turn have briefed leading counsel. It is highly unlikely that the
14 Sykes v Minister for Mines and Energy & Anor [2009] QLAC 0001.
15 The Court of Appeal in Sykes v Queensland Gas Company & Anor [2009] QCA 163 at [72]-[83] concluded that s.34 did
apply to the exercise of the discretion as the issue of costs was procedural and the amending legislation applied.
16 [2004] QLAC 0102.
17 (1997) 18 QLCR 133 at 134.
-- 9 of 14 --
10
considerations which are present when a self-represented litigant (or modestly represented
litigant) appears against an agency of government in the Land Court and which guide the
exercise of the discretion will be present here.18 The observations by Wilcox J in Banno v
The Commonwealth19 and relied upon by Cherwell Creek are not, therefore, apt. This
litigation is not akin to the land resumption cases of which Banno was one.20 Furthermore,
there is an important difference from the acquisition of land cases here in that, contrary to
those cases, Cherwell Creek does not start as the land owner. One factor which may be
determinative of whether an order for costs would be made in the subject litigation may
depend on the success of the appellants’ argument that the original grant to Cherwell
Creek was void which would be an aspect of the likelihood of a mining lease being
granted as provided for in s.722G(5)(g). It is accepted by both parties that that is an issue
which cannot be profitably ventilated on this application or appeal.
[22] When the learned Member said that it was far from certain that an order for costs would be
made in favour of the appellants he pronounced the wrong test and thereby fell into
appellable error.
Really a Defendant Error
[23] The learned Member concluded21 that Cherwell Creek was forced into the litigation by the
Amending Act and was, in truth, a defendant. The learned Member referred to and relied
on the propositions enunciated by Scrutton LJ in Maatschappij Voor Fondsenbezit v Shell
Transport and Trading Co:22
“…Where the person against whom security is sought is really defending himself against
attack, even if he be nominally plaintiff, but really defending himself against defendants’
previous actions against him,”
security will not be ordered.
18 Those considerations were mentioned by the Land Appeal Court in Bowden v The Valuer-General (1980) 7 QLCR 138 at
144–148 when it spoke of “the ease of access” to the Land Court particularly in cases between “the citizen” and a
“government instrumentality”.
19 (1993) 45 FCR 32 at 51.
20 In Haber the Land Appeal Court noted that the general rule should be applied flexibly in land compensation cases at first
instance because it “is the only way in which a dispossessed owner can obtain an independent determination of the value of
the land taken”.
21 Reasons [36].
22 [1923] KB 166 at 177.
-- 10 of 14 --
11
[24] It is unnecessary to elaborate greatly on the facts of that decision23 save that the then
English rules required a foreign plaintiff (as was the plaintiff) with no assets within the
jurisdiction to give security for costs, but not a defendant. The Court of Appeal in
Maatschappij characterised the proceedings as essentially interpleader proceedings where
the court will look at the substance rather than the form of the dispute and order security if
appropriate and might have ordered security but for the fact that the moving party was not
prepared to do so.
[25] The learned Member also referred to and was assisted by Willey v Synan24 in reaching his
conclusion that Cherwell Creek was, effectively, a party defending its proprietary rights
and forced into litigation by the Amending Act. Briefly, in Willey the plaintiff was a
member of the crew of a ship travelling from New Zealand to Australia and not ordinarily
resident within Australia. He allegedly found on board the ship English silver coins. On
arrival, officials of the Customs Department took possession of the coins. The plaintiff
made a claim for the coins under s 207 of the Customs Act 1901–1934. The Collector of
Customs thereupon gave notice to the plaintiff requiring him to commence an action for
the recovery of the coins and in default the coins would be condemned without further
proceedings. It appears from the judgments that both the ship owners and the New
Zealand government claimed the coins. The plaintiff commenced an action against the
Collector of Customs for the recovery of the coins and the Collector of Customs applied
for security for costs pursuant to Order XXVIII, r 9 of the High Court Rules in that he was
not ordinarily resident in the jurisdiction. The court by reason of the defendant’s notice
requiring him to commence proceedings and the statutory forfeiture which would have
resulted from his failure to do so, held that the plaintiff was, in substance, in the position
of a defendant and security for costs should not be ordered.
[26] The approach in Willey has been mentioned in many subsequent cases. In Interwest Ltd v
Tricontinental Corporation Ltd25 Ormiston J reviewed the authorities in relation to
23 It is plain that Banks and Scrutton LJJ were unsympathetic to the plaintiff company (seeking security from the joined
defendant) as this summary by Scrutton LJ at 178 reveals:
“In this case, considering that a Dutch company is bringing the question of the effect of a Dutch assignment and a Dutch
attachment to English Courts to decide, though its claim is against a Dutch principal debtor, and the dispute had much
better be settled in Dutch Courts, I think this Court should use its discretion by declining to order security from a Dutch
company in whose favour the Dutch attachment has been issued, and who reasonably comes to England to protect itself
against the proceedings which the other Dutch company has started in England, to which this Court has joined it as
defendant.”
24 (1935) 54 CLR 175.
25 (1991) 5 ACSR 621.
-- 11 of 14 --
12
counterclaims and cross-claims in the context of an application for security and
concluded:26
“Perhaps it may be said that the authorities support the proposition that security will only
ordinarily be ordered against a party who is in substance the plaintiff, and that an order
ought not to be made against parties who are defending themselves and thus forced to
litigate: cf Accidental & Marine Insurance Co v Mercati (1866) 3 Eq 200. That would
appear to be an overstatement, but the fact that a plaintiff, or counterclaimant, has instituted
essentially defensive proceedings, must be a significant factor in the exercise of the court’s
discretion.”
And “Principally it would appear necessary to characterise the proceedings in respect of which
security is sought. If they are ‘defensive’ proceedings, either directly resisting proceedings
already brought or seeking to ‘halt self-help procedures’, it would seem that to require
security would be oppressive, or at least would provide serious grounds for refusing to
make an order. At the least, it is a factor to be considered in the exercise of the discretion.”
[27] It is, therefore, necessary to look more closely at the facts. The appellants dispute the
validity of the original grant of EPC545 and subsequent renewals. Cherwell Creek applied
for MDL364 and MDL366 in respect of EPC545. By operation of Part 18A of the Act,
Cherwell Creek’s applications for mining tenements were, relevantly, rejected.27 Only the
appellants were entitled to apply for and be granted a mining lease of the land the subject
of MDL364 and EPC545. The appellants applied for a mining lease of that land on
16 October 2008, well after Cherwell Creek commenced these proceedings for
compensation on 8 August 2008, so it could not be said, if relevant, which is doubtful, that
the appellants’ application prompted Cherwell Creek’s proceedings in the Land Court.
[28] Although, as the Explanatory Notes and the Minister’s Second Reading Speech made
clear, the State has a real interest in the exploitation of the coal reserves in the subject
lands and it would not be liable for compensation to Cherwell Creek for extinguishing any
entitlement which it might have and any loss which it might have sustained as a
consequence of the extinguishment. Instead, presumably because they will benefit from
the successful exploitation of any mineral resource found, the appellants are to be liable if
Cherwell Creek can establish and quantify the loss of its opportunity to commercialise the
coal resource. Once Cherwell Creek determined to proceed in the Land Court pursuant to
s 722G of the Act, by operation of the provisions of the Act the appellants were the
opposite party. If Cherwell Creek proves successful in its claim then the appellants will be
liable for whatever amount the court quantifies as its loss. There is no previous action
against Cherwell Creek by the appellants of the kind discussed in the cases which has
forced Cherwell Creek to commence these proceedings.
26 (1991) 5 ACSR 621 at 626–627.
27 Section 722C of the Act.
-- 12 of 14 --
13
[29] As Ormiston J observed, whether a party against whom security is sought is to be
characterised as an aggressor or as a defender of its rights and entitlements is but one
factor to be weighed in deciding whether to order security. It may, in some cases, be
decisive, but here the learned Member accorded that factor greater weight than, on a close
analysis of the facts, it can bear.
Review of the discretion
[30] The appellant has contended that s.55(b) of the Land Court Act, which requires the Court
to:
“… act according to equity, good conscience and the substantial merits of the case without
regard to legal technicalities and forms or the practice of other courts”,
precludes the restraint which appellate courts exercise when the appeal is from a
discretionary decision on matters of practice and procedure.28 There is, however, good
reason for following that guidance and it is in keeping with the spirit of s.55(b) to do so
and not expose litigants to the threat of re-litigating the merits of a discretionary judgment.
In House the plurality said:29
“If the judge acts upon a wrong principle, if he allows extraneous or irrelevant matters to
guide or affect him, if he mistakes the facts, if he does not take into account some material
consideration, then his determination should be reviewed and the appellate court may
exercise its own discretion in substitution for his if it has the materials for doing so.”
[31] The learned Member misdirected himself about the proper approach to an application for
security for costs when he said that it was “far from certain” that an order for costs would
be made in favour of the appellants, if successful, because of s.34 and proceeded on a
wrong understanding of the ambit of that provision.
[32] The learned Member equated the appellants with those whose conduct had forced a party
into litigation to protect its rights or entitlements when the situation was rather more
complex. Having failed to recognise that complexity, the learned Member characterised
Cherwell Creek as a defendant and then gave that factor too much weight. It needed to be
balanced against the extensive and expensive nature of the proceedings in the Land Court30
and that Cherwell Creek had no assets of value against which an order for costs could be
executed, with a very wealthy individual standing behind the corporation unwilling to be
exposed to any costs order. That the appellants are substantial corporations with
significant financial resources is not here a relevant consideration because Cherwell
Creek’s litigation will not be stifled by an order for security.
28 House v The King (1936) 55 CLR 499 at 505.
29 (1936) 55 CLR 499 at 505 per Dixon, Evatt and McTiernan JJ.
30 The quantum of costs sought by the appellants, if nothing else, demonstrated this.
-- 13 of 14 --
14
[33] Accordingly, the learned Member’s decision was outside the exercise of a sound
discretionary judgment and security ought to have been ordered.
Quantum
[34] The learned Member did not assess the quantum of the appellants’ costs. It is not
appropriate that this Court should attempt to do so and, if the parties cannot agree on a
suitable sum and method for securing it, the application should be remitted to the learned
Member for his determination.
Costs
[35] Unless there are submissions to the contrary, the respondent should pay the appellants’
costs of and incidental to the appeal to be assessed on the standard basis. If the respondent
contends that some other order ought be made then:
(i) the respondent file and serve its submissions within 21 days;
(ii) the appellants file and serve their submissions within 14 days of receipt of the
respondent’s submissions;
(iii) the respondent file and serve its reply, if any, within seven days of receipt of the
appellants’ submissions;
(v) the Court will decide the question of costs on the written submissions of the parties
without the need for oral argument.
Orders
1. The appeal is allowed.
2. Remit the proceedings to the Member to determine the quantum of the security to
be provided.
3. The respondent to pay the appellants’ costs of and incidental to the appeal unless
the respondent contends that some other order ought be made in which case:
(i) the respondent file and serve its submissions within 21 days;
(ii) the appellants file and serve their submissions within 14 days of receipt of the
respondent’s submissions;
(iii) the respondent file and serve its reply, if any, within seven days of receipt of
the appellants’ submissions;
(iv) the Court will decide the question of costs on the written submissions of the
parties without the need for oral argument.
WHITE J
CAC MacDONALD
PRESIDENT OF THE LAND COURT
RP SCOTT
MEMBER OF THE LAND COURT
-- 14 of 14 --