Falconer v Brisbane City Council & Buck [2005] QPEC 58
PLANNING & ENVIRONMENT COURT
OF QUEENSLAND
CITATION: Falconer v Brisbane City Council & Buck [2005] QPEC 058
PARTIES: STEPHEN FALCONER
Appellant
v
BRISBANE CITY COUNCIL
Respondent
And
DIANN BUCK
Co-Respondent
FILE NO/S: Appeal No. 4167 of 2004
DIVISION: Appellate
PROCEEDING: Adverse Submitter Appeal
ORIGINATING
COURT: Brisbane
DELIVERED AT: 29 July 2005
HEARING DATE: 22 July 2005
JUDGE: Robin QC DCJ
ORDER: Appeal dismissed
CATCHWORDS: Adverse submitter appeal against Council’s approval of
reconfiguration (by subdivision) of a lot in a community title
scheme – whether consent of the body corporate (or of its
members) was required – neither the Body Corporate and
Community Management Act 1997 nor the Council’s
requisitioning evidence of body corporate consent established
any such requirement
COUNSEL: Appellant, self-represented
Miss KR Johnson, solicitor for Respondent
Co-Respondent, self-represented
SOLICITORS: Appellant, self-represented
Brisbane City Council Legal Practice for Respondent
Co-Respondent, self-represented
-- 1 of 20 --
2
REASONS FOR JUDGMENT
[1] Mr Falconer (self-represented) appeals “against the decision of the Brisbane City
Council (Respondent) to approve the application by Diann Buck (Co-Respondent)
for a development permit for making a material change of use and for the
reconfiguration of a lot subject to conditions in respect of land situated at 11C
Scenic Rd, Kenmore, Queensland and described as lot 1 on SP145009 and common
property CTS30012, Parish of Indooroopilly.” The Respondent was capably
represented by Miss Johnston, for whose expert guidance the other parties and the
court are grateful. Ms Buck was self-represented, with some assistance from a
“McKenzie friend1 ”, Mr Ian Gordon. Her development application was for
reconfiguration only, so that considerations relevant to any material change of use
presently have no part to play.
The Land
[2] Lot 6 on RP 87134 Parish of Indooroopilly, County of Stanley was an axe-head
shaped parcel of land whose street frontage to the northern side of Scenic Rd,
Kenmore was represented by the narrow haft end. In 2002 the lot was cancelled,
and there was registered a plan of lots 1-8 and common property. Lots 3-7 (whose
areas ranged from 734 square metres to 781 square metres, except for lot 7 (1103
square metres)) lie side-by-side along the rear (northern) boundary of the original
parcel. They are accessed via a cul-de-sac in the shape of a “T” whose stem extends
to Scenic Rd, the cul-de-sac being common property for purposes of the group title
arrangements established under the Body Corporate and Community Management
Act 1997. The balance of the Scenic Rd frontage is occupied by lot 1, that is Ms
1 See McKenzie v McKenzie [1971] p.33
-- 2 of 20 --
3
Buck’s property, which contains 1637m2 . Across the common property access
described above is lot 8 (1282m2 ), which is roughly triangular in shape, any
“frontage” it may have to Scenic Rd being limited to a point of the triangle. Lot 1
adjoins lot 2 (1929m2 ) for the full length of the latter’s northern boundary. Only lot
1 has any practical possibility of direct access to Scenic Rd. The reconfiguration
under appeal divides it into its northern half (lot 10) and its southern half (lot 11) of
which only the latter will enjoy any possibility of direct access to Scenic Rd. Lot
10’s access, like that of lots 2-8, will be via the common property. It may be
observed that lot 1 would appear to be no less entitled to use common property for
access than lots 2-8.
Issues in the Appeal
[3] The notice of appeal asserts that the “proposed development” conflicts with the
Body Corporate and Community Management Act and sets out the terms of s 54(2),
s 55(1) and s 56(1). It is asserted that “no consent has been given to record a new
community management statement from the Scenic Pocket Body Corporate” and
(correctly, as a matter of fact) that “the co-respondent has not sought an amendment
to the current community management statement before seeking permission for
subdivision from the Respondent.” On 8 July 2005 Judge Rackemann ordered that
the issues in dispute be identified as those outlined in attachment “A”:
“Council has an obligation to consider the opinion of the other
owners before approving the subdivision of a lot in a community title
scheme.
Council failed to give due consideration to all the information before
it before granting approval. In particular council did not give proper
consideration to an objection to the proposed subdivision which
indicated that the other owners were unanimously opposed to the
subdivision.”
-- 3 of 20 --
4
The issue seems to resolve into whether the Council could give its approval to the
proposed reconfiguration only if the Body Corporate consented and, if so, whether
the Body Corporate had consented. Ms Johnston and Ms Buck (contrary to Mr
Falconer) submitted that the second aspect was satisfied (whether or not there was
any necessity that it be). Ms Johnston submitted that no consent was required.
[4] The Body Corporate has taken no part in the appeal. Mr Falconer was not able to
assert that he spoke for it (although he appears to be a committee member). For that
matter, Mr Falconer established no entitlement to speak for any other lot owner,
even lot owners who, like him, had lodged with the Council submissions in
opposition to the proposed reconfiguration, but who took no part in the appeal.
[5] Ms Johnston’s approach may seem inconsistent with that advised to Ms Buck’s
agent on receipt of the Form 1 Development Application IDAS contained in the
Council’s letter of 5 July 2004:
“Thank you for your development application lodged 30 June 2004.
I wish to advise that the Council is unable to acknowledge this
application as the common property was not included in the
description of the land on Form 1A nor was resolution of the Body
Corporate consenting to the lodging of the application submitted.
As a consequence, the application will be held in abeyance until this
information is submitted.”
The first requisition was responded to by the provision of a replacement part A of
the Form 1 development application adding to the original description of the land as
set out in the Notice of Appeal “and common property of `Scenic Pocket’ Body
Corporate CTS30012.” The requisition may have been made out of awareness of
Australian International Language College Pty Ltd v Gold Coast City Council
[1994] QPLR 102, in which the Appellant had argued that since no reference was
made to common property over which rights of access would have to be exercised
-- 4 of 20 --
5
by those resorting to a particular unit, the application was defective. Judge Quirk
considered that a “Pioneer” point about non-inclusion of all land within a
development proposal was unsound. Also, he declined to require that the
application be accompanied by the written authority of all the co-owners of the
common property, considering that relevant provisions of the Building Units and
Group Titles Act 1980 made it clear that common property did not exist as a
separate and a distinct legal entity, but was appurtenant to the lots, and held by all
proprietors as tenants in common. His Honour considered that provision of the
written authority of the registered proprietor of the relevant lot was sufficient for
purposes of s 4.1(2)(d) of that Act, the written authority of all the co-owners of the
common property being unnecessary, as the proposed use did not involve an
exercise of rights beyond those ordinarily appurtenant to the rights of ownership of
that lot. It was not shown that his Honour’s views would not apply under the
current legislation.
[6] The Council’s second requisition contained in its letter was responded to by
provision under cover of a letter of 8 July 2004 of a copy of minutes of the AGM of
the Body Corporate held on 19 February 2004 (which the evidence shows were
confirmed in due course at a subsequent meeting of the Body Corporate). Those
minutes contained the following:
“MOTION No 10 SUB DIVISION OF A LOT
RESOLVED that the body corporate discuss the possibility of
allowing the sub division of Lot 1 to create two separate titles within
the scheme. Should the meeting consent to this the owner of Lot 1
will need to undertake all legal requirements at that owners cost to be
lodged with the Dept of Titles. The prepared paperwork will need to
be presented to the owners for final consent.
Whilst this was an item of discussion a vote was taken from the floor
and as all lots were represented no person was disadvantaged. The
-- 5 of 20 --
6
persons holding proxies determined that the proxies would not be
used and as such were recorded as an abstaining vote.
The meeting as such voted on allowing consent to Lot 1 to sub
divide. The meeting also determined that a By-Law should be
drafted and conditions set out in place as to the style, construction
and development of the two lots to ensure that the completed fixtures
are within keeping with the scheme and do not in any way detract
from the overall intent of the scheme. Any proposed construction of
development is to be placed before the committee for review as that
will be defined within the proposed By-Law and conditions.
By Ordinary Resolution
VOTE FOR ALL PERSONS VOTE WITHOUT LOT 1 DUE TO THE AN INTEREST
4 YES 3 YES
2 NO 2 NO
2 ABSTAIN 2 ABSTAIN
NOTE: The vote would be carried based on both circumstances”
At the time of that meeting, Mr Falconer was the proponent of the notion of
subdivision of lot 1 and also the owner of lot 1. He is presently the owner
of lot 2, which had been retained by the developer, Intech Properties Pty
Ltd. There has been an exchange of their lots by Intech Properties Pty Ltd
and Mr Falconer.
The Co-Respondent becomes involved
[7] About March 2004, Ms Buck was looking to purchase a block of land “to subdivide
and build two houses on. One to live in and the other to sell.” It is clear that she
purchased lot 1 from Intech Properties Pty Ltd. Her solicitor’s search made shortly
after the 14 day contract dated 17 March 2004 revealed that the property was
registered at the time of search in the names of Mr Falconer and another. Ms Buck
had been provided with a copy of the minutes of the AGM of 19 February 2004,
obviously to provide her with assurance that her plans could be implemented in
relation to lot 1. While different interpretations might be placed upon Mr
Falconer’s apparent change of stance from apparently favouring subdivision of lot 1
-- 6 of 20 --
7
to now opposing it, there is no basis shown for implicating him consciously in any
scheme to deceive Ms Buck. He told the court that his own tentative proposals for
lot 1 had proved (for financial reasons) not to be feasible.
[8] Like others concerned, Mr Falconer received notice of Ms Buck’s development
application. Like a couple of other owners (Mr and Mrs Searls and also Mr Patten
and Ms Abbondanza), he lodged an objection to the proposal with the Council,
writing on 23 August 2004:
“I am of the understanding, as are all the neighbours I have spoken to
and the other members of the affected Community Title
Development (Scenic Pocket CTS 30012) that the original
subdivision (in 2002) of 11 Scenic Road into 8 lots was granted
subject to the condition that the blocks that adjoined Scenic Road
were to be retained as large blocks so that the character of the area
would be maintained (see copy of attached plan). Permitting the
subdivision is contrary to the intention and outcomes of retaining the
larger blocks. I believe that allowing this development will have a
significant impact on the aesthetic and visual amenity of the original
development and of the neighbourhood in general.
Approval of the subdivision will also have a negative impact on the
property values of the existing blocks. Are financial impacts taken
into consideration when council assesses an application?
Most importantly the block in question is, as previously noted, a part
of a community title development and the subdivision is not
supported by the Body Corporate. I have spoken to Landmark
Consulting and they were under the impression that the owners of the
block had the support of the Body Corporate. I informed them of
their misunderstanding and suggested they or the owner that they are
representing contact the Body Corporate Manager (Peter Veal, at R.
Jackson Pty. Ltd. 3862 1868) to clarify the matter. They are yet to
contact Mr. Veal.
The confusion regarding the position of the Body Corporate has
arisen from the minutes of a meeting held on 19/2/04. At that time I
was the owner of 11C Scenic Road and I wanted to clarify the
position of the other members of the Body Corp regarding
subdivision of the lot. What was resolved by vote was that the issue
of subdivision be discussed, which it was. The minutes are perhaps
poorly worded as it gives the impression a vote was taken to allow
consent to the subdivision whereas what was decided was that
consent would be considered given a significant range of conditions.
I felt that it would not be possible for me to satisfy these conditions
-- 7 of 20 --
8
and therefore sold the block and purchased another in the
development.
I have also spoken to a solicitor who said the new owners of 11C
would need to seek their own consent from the Body Corporate, and
as far as I am aware they have made no attempt to discuss their
proposal with the Body Corporate. I would have thought that a
formal letter from the Body Corporate supporting the existing
owner’s proposal would be required by Council as part of the
development application.”
[9] The planning report prepared by the Council’s officer contains the following:
“PLANNING SCHEME AND PLANNING SCHEME POLICIES
Emerging Community Area
The intent of Emerging Community Area is to provide for residential
development at some time in the future. The sites have scenic or
environmental values and/or infrastructure requirements that may
limit or influence the extent of development that is possible on the
site.
The development comprises infill development within an established
residential subdivision all matters concerning infrastructure and
environmental value have been previously investigated.
This decision does not compromise the achievement of the desired
environmental outcomes of the Emerging Community Area and it
has been demonstrated that there are sufficient planning grounds to
justify this decision.
Subdivision Code
It is considered that the development meets the performance
solutions of the Code with respect to road design, provision of
pedestrian and public transport, size of the lot and infrastructure
provisions.
Secondary Codes
Council engineer undertook assessment of servicing requirements
and has assessed the conditioned compliance with relevant secondary
codes relating to services, stormwater and access.
With the original subdivision no structure plan was requested and
none appears to exist over the subject land. Given low-density
residential nature of locality and established pattern of surrounding
development a structure plan was not required to assess this
subdivision’s suitability.
-- 8 of 20 --
9
SUBMISSIONS, REPRESENTATIONS AND PUBLIC
CONSULTATION
The Notice of Compliance has been submitted and 3 properly made
and 1 late submission has been received.
Summary of Submissions
Objections/Concerns Response
1. Request that current
building covenant and
body corporate rules to
be adhered to
This is a matter for the existing
Body Corporate to administer.
2. New driveway should
be via Scenic Rd
Driveway will only be allowed via
existing common road. This strict
requirement will be conditioned
for vehicle safety.
3. Request that the
positioning of new
dwellings faces south
Dwelling position is not
controlled by subdivisional
approach but via Building
Approval.
4. Open fencing or no
fencing at all.
Not an issue identified in original
subdivision, nor relevant to this
application. Surrounding
residential development has
standard timber fencing.
5. Driveway not to be
directly opposite
existing driveway to
avoid collisions.
To be investigated by Council
officers during driveway permit
application.
6. Building envelope for
Lot 11 to be 12m from
front.
No envelope required. Trees
conditioned to be retained.
Setbacks administered via
Building Approval.
7. Building envelope for
Lot 10 to be 6m from
front.
Setbacks to road controlled by
Building Approval.
8. All costs to be incurred
by the developer.
This requirement is standard and
will be conditioned.
9. Blocks to issued with
half a body corporate
vote.
This is a matter for the existing
Body Corporate to administer.
10. Modification of letter
boxes at cost to
developer.
Existing letter box numbers will
be retained.
11. Developer to proceed
only when all
properties have
individual water meters.
New meters to new lots, will be
conditioned to be installed at cost
to developer.
12. Proposal will destroy
street appeal.
The area is of post 1970
development with large brick
housing. The addition of a single
house within a recent subdivision
will not destroy the streetscape of
Scenic Road. Existing trees have
been conditioned to be retained.
13. Cause traffic issues One new dwelling unit will not
cause traffic issues onto Scenic
Road.
-- 9 of 20 --
10
14. Cause environmental
issues.
Retention of existing trees on site.
No significant environmental
issues are apparent.
15. Existing services can’t
cope with increases in
use & consumption.
All services existing to cope with
service requirements.
16. Decrease value of
land.
Not a valid planning issue.
17. Owner consent has not
been obtained.
Misunderstanding
with Body Corporate
Minutes.
Owner consent has been obtained
by an ordinary resolution of the
body corporate.
[10] Whether or not the officer’s responses to the objections are wise or open to
challenge, it appears that due consideration was given to the interests involved in
the adverse submitter points, as required by Bartlett v Brisbane City Council (2003)
133 LGERA 340; [2003] QCA 494, whose headnote indicates what was decided:
“(1) The purpose of s 3.2.1 of the IPA was limited. It simply
identified the requirements for the first stage of the Integrated
development Assessment System (IDAS) process referred to in
Chapter 3 of that Act.
(2) The respondents’ proposal was very significant to the use of
the subject lot (Lot 28) but had no significance whatsoever to the use
of the other lots. Each owner of the other lots would continue to
have the same interest in the land constituted by the lot, and the same
interest in the common property as that owner had prior to the
application.
(3) Any concerns on the part of another lot owner about the
change in amenity or the integrity or aesthetics of the building were
simply matters to be agitated in the decision process. They were not
factors of use which determined the identification of the land.
(4) To adopt the construction contended for by the Appellants
would, in practice, have the effect of a lot owner in a large
development rarely, if ever, being able to make a development
application. One could not conclude that the legislature intended
such a result.
(5) Moreover, such a construction was only arrived at by a
technical and strained application of the terms of the legislation with
an undue focus on interests allied to lot ownership rather than the
purpose of identifying the land itself.
-- 10 of 20 --
11
(6) The other lot holders and the body corporate each had the
opportunity to have their respective interests considered through the
submission process provided for by s 3.4.9 of the IPA.
(7) The approach of the respondents of simply applying to the
terms of s 3.2.1 the ordinary meaning of the words as contemplated
by the statutory definitions, gave rise to no real difficulty. By this
approach a construction of the section was arrived at which was
functional and which did not interfere with the generally accepted
rights of the owners of lots in a community title scheme.
(8) This was so whether one was considering the position of the
lot owner as an applicant for a development approval or as an owner
entitled to notification.
(9) There was no warrant for construing the terms of s 3.2.1 of
the IPA as requiring the consent of other lot holders.”
In the leading judgment, Jones J said:
“[13] The second point is raised in support of that contention, by
highlighting one of the characteristics of group or community titles
schemes. Section 35 (formerly s 37) of the Body Corporate and
Community Management Act 1997 provides that “(1) Common
property for a community titles scheme is owned by the owners of
the lots included in the scheme, as tenants in common,...” and that
“(3) An owner’s interest in a lot is inseparable from the owner’s
interest in the common property”. Counsel for the appellant argues
that, as a consequence, all owners have an interest in the maintenance
of the appearance and in the integrity of the whole building with the
result that all the lots fall within the scope of the land the subject of
the application and this is why all the lot owners are, to use his
words, “legally connected”.
[14] The purpose of this section of BCCM is not to bring about a
connection between separate lots of the scheme or between owners
of such lots. Its function is to create interests in common property
and to tie the ownership of those interests to the ownership of lots so
as to make the interests indisseverable. Whilst this has the effect of
linking those interests it does not, in my view, create interests for
other lot owners in the lot of an individual owner. No part of the
common property was involved in or impacted upon by the
respondents’ proposal.”
[11] Within the Body Corporate, steps have been taken with a view to ensuring that
Motion 10 is not taken as a consent of the Body Corporate to subdivision of lot 1.
The Body Corporate’s professional manager has generated correspondence, some of
-- 11 of 20 --
12
which went to the Council, asserting that Motion 10 embodies only discussion, no
consent. A new motion was proposed for an EGM on 12 November 2004 as
follows:
“MOTION No 2 NO APPROVAL FOR SUBDIVISION
Person Proposing: Committee
Lot No: Not Applicable
Resolution Required: Ordinary Resolution
That the body corporate clarify that Motion 10 of Annual General
Minutes dated 19/02/04 does not give approval for subdivision of lot
1. This motion was out of order and not able to be approved as all
owners were not given the legislative requirement of 21 days to
consider their voting options.”
Purportedly Motion No 2 was passed; its validity may be doubted, given that Ms Buck
(who took the point immediately) seems able to demonstrate that the requisite 21 days’
notice was not given in respect of Motion No. 2. It does not seem necessary or even
appropriate at present to canvass the validity of Body Corporate resolutions, which is,
one would think, something best resolved under the arrangements established by the
Body Corporate and Community Management Act 1997.
The Need for Body Corporate Consent
[12] The authorities mentioned above, to which the court was taken by Ms Johnston, are
suggestive that no consent of the Body Corporate or of the members of it is
required. The proposed reconfiguration is development as defined in s 1.3.2 of the
Integrated Planning Act 1997 (IPA), (d) of which is “reconfiguring a lot”. There is
-- 12 of 20 --
13
a definition of “lot” in s 1.3.5 as including “(a) a lot under the Land Title Act 1994”,
schedule 2 of which, as noted in the IPA, provides:
“Lot means a separate, distinct parcel of land created on –
(a) the registration of a plan of subdivision; or
(b) the recording of particulars of an instrument;
and includes a lot under the Building Units and Group Titles Act
1980.”
It appears that the Council’s task, by reference to the IPA, is to assess the application
for reconfiguration. There is no indication in the IPA that reference need be made
by Council as assessment manager to the Body Corporate and Community
Management Act 1997, notwithstanding that it contains in part 6 Community
Management Statements provisions that may have to be complied with in respect of
subdivisions affecting a lot in, or the common property for a scheme. See s 56 in
particular, and other references to subdivision, for example in s 57 and s 62. I set out
in an appendix ss 55, 56, 57, 62 and 63, the last couple of which draw attention to
the important matter of the costs of preparation and recording of a new community
management statement, which subdivision of a lot may require. The members of the
Body Corporate may wish to revise Motion No. 10 to fix Ms Buck with
responsibility for certain costs. The ultimate incidence of such costs and other
issues, such as the formulation of a new community management statement, which
must deal with significant matters such as lot entitlements, may create real issues in
a context like the present one. The court was told that the present lots are a single
consumer of water. Unless there is separate metering introduced, there may be
issues to do with the share of water charges to be borne by lots 10 and 11, as to
whether they must pay one or two shares. The dispute resolution procedures
included in the Body Corporate and Community Management Act 1997 may or may
not be available to achieve resolution of issues here. The decision the court makes,
-- 13 of 20 --
14
however, is that there is no requirement that prior consent to subdivision of a lot be
given by the Body Corporate or by the members of it.
It is clear that subdivision of lot 1 will trigger obligations in respect of changing the
community management statement. It does not follow that the Council should delay
deciding on an application for reconfiguration until those obligations are wholly or
partly attended to. There is no proscription against the Council’s granting approval
in the absence of consent of the kind that is found in s 58 of the Standard Building
Regulation 1993, for example.
[13] Mr Falconer did not present any argument that any statutory requirement existed
that consent of the Body Corporate or any of its members be forthcoming. It
seemed he may have been relying on some kind of legitimate expectation of the
kind desribed in Halsbury’s Laws of Australia in the section devoted to
Administrative Law in [10-1880] and [10-1883]:
“[10-1880] Legitimate expectation: representations In special
circumstances, a legitimate expectation may be generated by an
administrator’s having given an undertaking, which good
administration requires ought to be honoured, provided that
honouring the undertaking is not inconsistent with the
administrator’s statutory duty.”
“[10-1883] Legitimate expectations: regular practices and
government policies As an extension of the notion that a
representation may generate a legitimate expectation, the existence of
a regular practice which the person affected could reasonably expect
to continue may also give rise to a legitimate expectation that the
practice will continue, or in any event that it will not be discontinued
without the person affected being given a hearing.”
(downloaded from www.lexisnexis.com on 22/07/2005). Authorities cited in Halsbury
include Haoucher v Minister for State for Immigration and Ethnic Affairs (1990)
169 CLR 648. Although the court inquired, nothing was forthcoming to suggest that
the Council has any relevant general practice. There is, however, specifically
-- 14 of 20 --
15
directed to the present development application, the Council’s letter of 5 July 2004.
It was addressed to Ms Buck (or her agent); it is difficult to see how it could give
rise to any legitimate expectation on the part of Mr Falconer. He was entitled to
expect (and he got it) that his views and interests would be considered in the
submission process. I am quite unable to see how the Council’s letter, by making a
requisition that appears on examination to be without warrant (although doubtless
made in a well intentioned attempt to discover the Body Corporate’s attitude), could
place some additional hurdle in the way of Ms Buck’s development application.
[14] I repeat an observation made during the hearing of the appeal, that, while the
informality of Motion No 10, which seems to represent no more than a “straw poll”,
may be noted, it would be undesirable for the Council to be required, where some
expression of a Body Corporate’s views is called for, in circumstances like the
present, to adopt any strict, legalistic approach, where a clear attitude is found
apparently expressed. Doing so might compel inconveniences such as the holding
of new meetings to achieve a resolution in some technically correct way. As for
contests about such matters, they are surely better handled using the provisions and
processes of the Body Corporate and Community Management Act 1997.
-- 15 of 20 --
16
APPENDIX
55 Requirements for motion to change community management
statement
(1) Subject to subsection (2), a motion proposing to change an
existing community management statement for a community titles
scheme may be submitted by only--
(a) the committee for the body corporate; or
(b) the owner of a lot included in the scheme; or
(c) the body corporate manager.
(2) The body corporate manager may submit the motion if the body
corporate manager may, under the regulation module applying to the
scheme, submit the motion.
56 New statements and subsequent plans of subdivision
(1) A request to record a new community management statement for
a community titles scheme must be lodged when a new plan of
subdivision affecting the scheme (including affecting a lot in, or
the common property for, the scheme) is lodged.
(2) A request to record a new community management statement for
a community titles scheme may be lodged, and the new statement
may be recorded for the scheme, even though a plan of
subdivision is not lodged, if all plans of subdivision relating to the
scheme, and the new statement, will still be consistent after the
new statement is recorded.
57 Other matters about new statements for schemes developed
progressively
(1) This section applies--
(a) only to a community titles scheme intended to be
developed progressively; and
Examples for paragraph (a)--
1. The subdivision of scheme land to create further lots
for the scheme or to establish a subsidiary scheme.
2. The excision of a lot from, or the addition of a lot to,
scheme land.
(b) if the circumstances stated in subsection (2) or (3) also
apply to the scheme.
(2) For subsection (1)(b), the circumstances are--
(a) a new plan of subdivision proposed to be lodged for the
scheme--
(i) is consistent with all statements about proposed
future subdivision contained in the existing
community management statement for the
scheme; or
(ii) is inconsistent with the existing community
management statement only to the extent the
-- 16 of 20 --
17
development of a stage is to be done out of order;
and
(b) the difference between the existing statement and a new
community management statement required under section
56(1) is limited to ensuring that, after registration of the
new plan of subdivision and recording of the new
statement, the scheme's community management
statement will--
(i) be consistent with all plans of subdivision for the
scheme that are registered under the Land Title
Act; and
(ii) contain the statements about proposed future
subdivision that are contained in the existing
statement, changed only to the extent necessary to
take account of the registration of the new plan of
subdivision.
(3) Alternatively, for subsection (1)(b), the circumstances are that a
new plan of subdivision proposed to be lodged for the
development is inconsistent with the existing community
management statement for the scheme because the plan changes
the scheme in a way that affects the nature of the development or
1 or more stages of the development.
Examples of changes affecting the nature of a development for
subsection (3)--
1. A development for a scheme intended to be a resort is changed
to a development comprising only standard format lots for
residential purposes.
2. A stage of a development comprising standard format lots for
residential purposes and a marina is changed to a stage
comprising only standard format lots for residential purposes.
(4) For subsection (2)(a)(ii), the development of a stage is done out of
order if it is not consistent with the order of the development of
the stages stated in the development approval or existing
community management statement for the scheme.
(5) The developer must--
(a) prepare the new community management statement
required under section 56(1) for the scheme; and
(b) give the new statement to the body corporate.
(6) The body corporate must, within 30 days after receiving the new
statement, endorse its consent on the statement.
Maximum penalty--50 penalty units.
(7) However, if this section applies because of the circumstances
stated in subsection (3), the body corporate is not required to
endorse its consent on the statement unless--
(a) the developer has--
(i) given the body corporate a notice as required
under section 29(2)(a); and
(ii) obtained development approval for the changed
scheme; and
(b) the new community management statement is consistent
with the development approval for the changed scheme;
and
-- 17 of 20 --
18
(c) the local government has endorsed a community
management statement notation on the new community
management statement.
(8) The developer must, within 30 days after receiving the endorsed
statement, lodge a request to record the statement.
Maximum penalty for subsection (8)--300 penalty units.
(9) Within 14 days after the new statement is recorded, the developer
must give to the body corporate--
(a) a copy of the new statement; and
(b) evidence of its recording.
Maximum penalty for subsection (9)--300 penalty units.
(10) The developer is responsible for the costs of preparing and
recording the new community management statement.
62 Body corporate to consent to recording of new statement
(1) This section provides for the form of the consent of the body
corporate for a community titles scheme to the recording of a new
community management statement for the scheme in the place of
the existing statement for the scheme.
(2) The consent must be in the form of a resolution without dissent.
(3) However, the consent may be in the form of a special resolution if
the difference between the existing statement and the new
statement is limited to the following--
(a) differences in the by-laws (other than a difference in
exclusive use by-laws);
(b) the identification of a different regulation module to
apply to the scheme.
(4) The consent to the recording of a new community management
statement need not be in the form of a resolution without dissent
or special resolution if the new statement is different from the
existing statement only to the extent necessary for 1 or more of
the following--
(a) compliance with a provision of this Act under which the
body corporate is required to lodge a request to record a
new statement for a purpose stated in the provision;
(b) compliance with the order of an adjudicator or the District
Court made under this Act for the lodging of a request for
the recording of the new statement;
(c) changing the community titles scheme to give effect to an
approved reinstatement process;
(d) changing the community titles scheme to reflect a formal
acquisition affecting the scheme;
(e) recording the details of allocations of common property
or body corporate assets made under an exclusive use by-
law;
(f) implementation of development proposed under the
existing statement or under the provisions of a
community management statement to which the existing
statement is subject;
-- 18 of 20 --
19
(g) showing the location of a service easement for the
community titles scheme by including a services location
diagram;
(h) amalgamating or subdividing lots included in the
community titles scheme;
(i) reproducing the existing statement without any change of
substance.
(5) However, subsection (4)(h) applies only if the associated plan of
subdivision--
(a) does not affect the common property; and
(b) does not change--
(i) the contribution schedule lot entitlements, or
interest schedule lot entitlements, for lots
included in the scheme (other than the lots being
amalgamated or subdivided under the plan); or
(ii) the total of the contribution schedule lot
entitlements for the lots included in the scheme;
or
(iii) the total of the interest schedule lot entitlements
for the lots included in the scheme.
(6) Also, the consent to the recording of a new community
management statement need not be in the form of a resolution
without dissent or special resolution if the consent is required to
be endorsed under section 57.
(7) A consent to which subsection (4) or (6) applies must be given by
ordinary resolution if, under the regulation module applying to the
scheme, the body corporate has engaged a body corporate
manager to carry out the functions of a committee, and the
executive members of a committee, for a body corporate.
(8) In this section--
“associated plan of subdivision”, for a proposed new community
management statement, means the plan of subdivision proposed to
be lodged with the request to record the statement.
63 Responsibility for preparing, and for costs of preparing, new
statement
(1) This section applies if the body corporate for a community titles
scheme consents to a new community management statement,
other than a statement to which section 57 applies, being recorded
for the scheme.
(2) The new community management statement must be prepared by-
-
(a) if the body corporate manager may, under the body
corporate manager's engagement, prepare the statement--
the body corporate manager; or
(b) if paragraph (a) does not apply to the scheme--the
committee for the body corporate.
-- 19 of 20 --
20
(3) The body corporate is responsible for the costs of preparing and
recording the new community management statement, unless this
Act provides otherwise.
(4) Despite subsections (2) and (3), if the difference between the new
community management statement and the existing statement is
limited to changes to reflect a formal acquisition affecting the
scheme, the constructing authority for the acquisition--
(a) must prepare the new statement; and
(b) is responsible for the costs of preparing and recording the
new statement.
-- 20 of 20 --
Official source: https://www.sclqld.org.au/caselaw/QPEC/2005/058