Eliza Creek Mines Pty Ltd & Anor v Stanbroke Pastoral Company Pty Ltd [2005] QLRT 111
LAND AND RESOURCES TRIBUNAL
QUEENSLAND
CITATION: Eliza Creek Mines Pty Ltd & Anor v Stanbroke
Pastoral Company Pty Ltd [2005] QLRT 111
PARTIES: In the Matter of Mining Lease 90157 – Referral by
Mining Registrar for determination of
compensation payable by Eliza Creek Mines Pty
Ltd & Exco Resources N.L. to Stanbroke Pastoral
Company Pty Ltd.
FILE NO/S: MLC36/05
PROCEEDING: Application for determination of compensation
DELIVERED ON: 23 August 2005
DELIVERED AT: Brisbane
HEARING DATE: Heard on the papers
PRESIDING MEMBER: Kingham DP
ORDER/S: 1. I determine compensation under s. 281(3) in the
sum of $9,176.50 (at [15]).
2. In accordance with s. 281(4)(e), I award an
additional amount of $917.65(at [15]).
3. I direct that the miners pay the total
compensation of $10,094 to the landowner
within 1 month of the grant of the mining lease
(at [16]).
CATCHWORDS: MINING LEASE – DETERMINATION OF
COMPENSATION – AREA – TERM –LAND
VALUE - CIRCUMSTANCES OF THE MINING
LEASE
Mineral Resources Act 1989, ss 276, 281(3)&(4);
283B
Environmental Protection Act 2000, s162
Code of Environmental Compliance for Mining Lease
Projects
Bakhash v Monize [2003] QLRT 133 referred to
Brown v Armstrong & Anor [2005] QLRT 18 referred
to
COUNSEL: N/A
SOLICITORS: N/A
-- 1 of 5 --
Background
Constitution of Tribunal
[1] On 17 March 2005, the Mining Registrar for the Mt Isa District referred the
question of the compensation payable by Eliza Creek Mines Pty Ltd & Exco
Resources N.L. (“the miners”) to the Stanbroke Pastoral Company Pty Ltd (“the
landowner”) in relation to mining lease No 90157 to the Tribunal for determination.
The lease was recommended for grant by the Tribunal on 10 December 2004. It is
over a 181.7ha area of land situated 40km north-east of Cloncurry for the open cut
mining of gold, copper ore, silver ore, cobalt ore, fluorite/fluorspar, molybdenum
and rare earths. A draft environmental authority has been issued by the
Environmental Protection Agency (EPA) (MIM400142203). It requires
compliance with the Code of Environmental Compliance for Mining Lease
Projects. The lease cannot be granted until compensation has been agreed or
determined.
[2] The application was heard on the papers pursuant to the Tribunal’s practice
direction 1 of 2003. The landowner filed no material other than a submission that it
would “accept ten per centum (10%) of any income whatsoever earned or derived
from the land”. Although the parties are able to reach such an agreement, in my
view the Tribunal cannot make a determination in those terms. The Tribunal is
required to determine “the amount of compensation an owner of land is entitled to
as compensation for” the matters set out in s.281(3) of the Mineral Resources Act
1999 (the Act). This necessitates a specified amount, not a per centum rate of
payment. Accordingly, I have not made a determination in the terms requested by
the landowner.
[3] The miners filed an affidavit by Alasdair Cooke, a Director of the Eliza Creek
Mines Pty Ltd. They also lodged some submissions and a bundle of material that
their corporate solicitor asked me to consider. Included in the material were
documents that would appear to attract privilege against disclosure because they
were “without prejudice” communications apparently made for the purpose of
attempting to settle the matter between the parties. The landowner was not asked
whether it consented to me taking such material into consideration. I raised this
matter with the corporate solicitor at a directions hearing, but she indicated there
was nothing she could say in relation to the privilege. In the absence of any
evidence that the landowner waived privilege, I did not take into account any
material to which the privilege appears to attach. That leaves only Mr Cooke’s
affidavit and some parts of the submissions prepared by the corporate solicitor.
[4] Neither party submitted any evidence, expert or otherwise, regarding the value of
the land or the impact of the proposed mining on that value. Mr Cooke made some
speculative statements about value (“Property sales in Mt Isa may value the highest
echelon of stocked land…” para (i)) but produced no evidence to support his
statements. In 2003, Deputy President Smith of this Tribunal determined
compensation payable for a lease in the Mt Isa Mining District.1 On the basis of
evidence tendered in that case, the Deputy President accepted the actual value of
that land was $150 per hectare. I have taken his conclusion into account in making
this determination. I have taken into account all of the material referred to above
1 Bakhash v Monize [2003] QLRT 133.
-- 2 of 5 --
and the maps and documents provided to the Tribunal by the Mining Registrar. In
considering the likely impact, I have drawn upon my personal observations of open
cut mining operations. I have also considered the environmental and mining
conditions with which the miner will be required to comply.2 In these reasons I
refer to the salient points but not all the evidence that I relied upon in making my
findings.
Compensation claims
[5] The landowners’ proposal for compensation has already been canvassed. The
miners proposed compensation of $15,000 plus $100 per ha for areas outside the
mining lease affected by the mining activity. The basis for calculating these sums
was not evident from the miners’ material. Nor is it possible to identify what, if
any, areas outside the mining lease, but within the landowners’ property, may be
affected by mining. Mr Cooke made a number of statements about the nature and,
therefore, the impact of the mining operation which, presumably, determined the
amount proposed.
[6] Those statements are:
(a) The proposed mining activities will significantly impact on only 10 ha of the
project area.
(b) The operation may (my emphasis) have minimal impact on the viability of the
pastoral operation other than those 10 ha.
(c) The term of mining will be between 5 and 10 years from commencement of
mining, although the exact time frame is incapable of any certainty.
[7] In relation to area, the lease covers an area of 181.7 ha. Neither the mining lease,
as recommended by the Tribunal, nor the draft environmental authority confines the
miner to an area of only 10ha. The reference to 10ha limit may arise from a
criterion used by the EPA in determining the level of assessment for a mining lease
project under the Environmental Protection Act 2000. One of the criteria, set out in
the Code of Environmental Compliance for mining lease projects, is whether the
activity will significantly disturb more than 10ha at any one time. If it will, it may
require a higher level of environmental assessment.3 However, there is no
condition in the Code that limits the miners to disturbing only 10ha. Rather, the
condition requires land disturbance to be minimised. It is worth noting that the
application for this mining lease includes a plan showing the area of disturbance
proposed is some 28.1ha, not 10ha as stated by Mr Cooke. If there was a change to
this application, it has not been provided to the Tribunal.
[8] Further, in determining compensation for mining leases, this Tribunal has
consistently applied the approach that, unless there is a condition that limits land
disturbance,4 a hypothetical prudent purchaser would consider they were effectively
deprived of the use of the entire lease area for the term of the lease. The possibility
that the landowner may be allowed some access to some of the lease area during the
term of the lease, may lesson the impact on value but will not necessarily negate it.
2 Section 276 MRA, draft environmental authority no. MIM400142203 and Code of Environmental Compliance for
Mining Lease Projects.
3 Section 162 Environmental Protection Act 2000.
4 As was the case in Brown v Armstrong & Anor [2005] QLRT 18.
-- 3 of 5 --
[9] In relation to the term of the lease. The lease is for a 15 year term. Mr Cooke
indicated that the duration of active mining may be only 5 to 10 years but this was
not certain. Even after active mining has ceased, the miner retains rights over the
lease area for its full term and may be engaged in remediation activities that would,
nevertheless, prevent the landowner enjoying the full use of the land.
Compensation principles
[10] Section 281(3) & (4) of the Act define the landowner’s entitlement to compensation
and list a number of matters that must be considered by the Tribunal in assessing
compensation. I have adopted the approach generally taken by the Tribunal in such
matters. That is that the matters set out in the section are concepts to be taken into
account in determining compensation, rather than heads of compensation requiring
separate and discrete treatment to arrive at an accumulated figure. In determining
compensation, the overriding principle is of equivalence, ensuring that, so far as
money can do it, the landowner is placed in the same position as if the mining lease
was not granted.
Discussion of compensation
[11] As indicated above, the parties produced no evidence as to the value of the affected
property. In the absence of any other evidence I have adopted Deputy President
Smith’s determination of the value of the property in Backhash v Monize as a
guide, accepting that there is no other evidence that would allow me to assess the
relative values of the two properties. On that basis, and applying a discount factor
of 30%, given the 15 year term of the lease, I assess the diminution in value of the
land covered by the mining lease (including deprivation of possession, diminution
of value of land and diminution of the use which may be made of the land) to be
$8,176.50 ( 30% (discount factor) x [181.7ha x $150/ha] = 8,176.50). There is no
evidence to suggest severance of any part of the land from other parts of the land
and, therefore, no compensation for severance is included in the determination.
[12] I accept that the impact on the land will extend beyond the lease area. The miners
have offered $100 per ha for land outside the lease area affected by mining
activities. There is no evidence to indicate with any precision what that area might
be or how it might be affected. There is no evidence before me as to the total area
of the land owned by the landowner and, therefore, I cannot assess the proportion
the mining lease area bears to the property as a whole. Unless it is included in the
$100 per ha offer referred to above, the miners have not included any amount for
access to the lease through the landowners’ property. In the circumstances, I have
determined a figure of $1,000.00 should be paid in order to compensate the
landowner for the impact of the mining activities and access across land outside the
mining lease area.
[13] Neither party has submitted that there is any other loss or expense that should be
considered and, therefore, the determination makes no allowance for this.
However, Mr Cooke has stated that the following representations or offers have
been made to the landowners. Whilst the Tribunal cannot specify these as
conditions that bind the miners, I have taken them into account as circumstances
that are relevant to the determination of compensation. It is worth noting that, if
-- 4 of 5 --
there is a material change in the circumstances for the mining lease, the parties can
renegotiate compensation or, failing agreement, the Tribunal can review the
compensation determination.5 The circumstances that Mr Cooke has stated and that
I have taken into account are:
b) The miners will minimise disturbance to pastoral infrastructure off the mining
lease.
c) The miners will minimise disturbance to the landowner’s normal pastoral
activities.
d) The miners will provide alternative access by the landowner’s livestock to water
troughs where this is required because of the erection of a stock proof fence.
e) The miners will provide a replacement water storage facility with a capacity no
less than that of Turkey Nest dam (which is now located on the mining lease) if
that dam becomes inaccessible to the landowner’s livestock.
[14] Neither party made an application for the costs of these proceedings, and no order
is made.
Determination of compensation
[15] Taking into account the matters set out above, I determine compensation under
s. 281(3) in the sum of $9,176.50. In accordance with s. 281(4)(e), I award an
additional amount of $917.65, which is 10% of the compensation determined
above, to reflect the compulsory nature of the grant of the mining claim. The total
compensation payable for the full term of the lease is $10,094 (rounded down from
$10,094.15). I direct the miners to pay that sum to the landowner within 1 month
of the grant of the mining lease.
5 Section 283B.
-- 5 of 5 --