Devine Limited v State of Queensland [2004] QPEC 93
PLANNING & ENVIRONMENT COURT
OF QUEENSLAND
CITATION: Devine Limited v. State of Queensland [2004] QPEC 093
PARTIES: DEVINE LIMITED
(Applicant)
v
STATE OF QUEENSLAND
(Respondent)
FILE NO/S: 3350 of 2004
DIVISION: Planning and Environment
PROCEEDING: Originating Application
ORIGINATING
COURT: Planning and Environment Court Brisbane
DELIVERED ON: 22nd November 2004
DELIVERED AT: Brisbane
HEARING DATE: 3rd November 2004
JUDGE: Robin QC, DCJ
ORDER: Declarations made as sought
CATCHWORDS: STATUTORY INTERPRETATION – whether Planning and
Environment Court has jurisdiction to make declarations
sought that s 74(b) of the Vegetation Management Act 1999
exempts clearing of native vegetation from operation of the
Act on land zoned special facilities at commencement of the
section – s 74(b) located under Part heading: “Transitional
provisions” and section heading “Existing development
control plans and special facilities zones” – whether s 74(b)
should be read down to confer exemption only where the
zoning continued in existence and ceased to have effect when
new planning scheme replaced zones, and designated the land
in the “rural” domain.
COUNSEL: Mr Lyons QC and Davies for Applicant
Mr Morris QC and Holyoak for Respondent
SOLICITORS: Deacons for Applicant
C R Lohe Crown Solicitor for Respondent
-- 1 of 18 --
2
[1] This is an originating application seeking the following declarations:
“1. A declaration that by virtue of section 74 of the Vegetation
Management Act 1999, that Act does not apply to the
clearing of vegetation on certain land situated at Currumbin
Creek Road, Piggabeen Road and Hoffshildt Road,
Currumbin in the State of Queensland. Land that is more
particularly described as:
(a) Lot 247 on RP 854934
(b) Lot 1 on RP 854934
(c) Lot 2 on RP 168012
(“the land”).
2. A declaration that the chief executive of the Department of
Natural Resources, Mines and Energy, being the chief
executive administering the Vegetation Management Act
1999, is not a concurrence agency within the meaning of
that term under the Integrated Planning Act 1997 for a
development application, in relation to the land, insofar as
any application concerns the clearing of native vegetation.”
[2] The context in which s 74 appears in the Vegetation Management Act 1999 (VMA)
is important. Part 6 Division 1 is:
“Part 6 Transitional provisions
Division 1 Transitional provisions for Act
No. 90 of 1999
73 Existing development approvals and applications for
development approvals under the Planning Act
(1) Subsection (2) applies to a development approval
under the Planning Act involving the clearing of
vegetation in force immediately before the
commencement of this section.
(2) The approval has effect as if this Act had not been
enacted.
(3) Subsection (4) applies to a development application
under the Planning Act involving the clearing of
vegetation made to the assessment manager that—
(a) has not been decided before the commencement
of this section; or
-- 2 of 18 --
3
(b) has been decided, but is the subject of an appeal
under the Planning Act and the appeal has not
been decided before the commencement of this
section.
(4) The application may be decided as if this Act had not
been enacted and, if a development approval is given
for the application, the approval has effect as if this
Act had not been enacted.
74 Existing development control plans and special facilities
zones
Nothing in this Act affects the clearing of vegetation—
(a) under a development control plan mentioned in the
Planning Act, section 6.1.45A; or
(b) in an area designated, immediately before the
commencement of this section, as a special facilities
zone, or like zone, under a planning scheme under
the Planning Act.”
The “Planning Act” is the Integrated Planning Act 1997 (IPA). Division 2
(Transitional provisions for Vegetation Management and Other Legislation
Amendment Act 2004) follows. The relevant commencement date is 15
September 2000.
[3] The relevant land is the subject of a development application (superseded Planning
Scheme) made to the relevant local government, the Gold Coast City Council, by
the registered proprietor, Co-You Australia Pty Ltd, with the knowledge and
consent of the applicant (which agreed to purchase the land on certain terms and
conditions on 26 September 2003). Development permits to authorise development
of the land including by the clearing of native vegetation are sought.
[4] Differences have arisen between consultants acting for the applicant and for the
registered proprietor and the Department of Natural Resources and Mines as to
-- 3 of 18 --
4
whether or not s 74 provides an exemption, so far as the VMA is concerned, for
clearing native vegetation on the land.
[5] When I queried the court’s jurisdiction to make the declarations sought, counsel on
both sides submitted there was “no doubt whatsoever” (T p 29-30), s 4.1.21(1) (a),
(b) and (c) of the IPA being invoked. Reliance was placed on Netstar Pty Ltd v.
Caloundra City Council [2004] QCA 296. On the approach taken in this court in
Cornerstone Properties Ltd v Caloundra City Council & State of Queensland
[2004] QPEC 044, in which the State of Queensland disputed jurisdiction (para.
[27]), making the first declaration sought might be problematic, although the second
would not be. (The Judge in Cornerstone Properties expressed his view upon those
matters as to which he held the court lacked declaratory jurisdiction.) I accept the
joint submissions regarding jurisdiction. Persuasive is the reference to Schedule 8
of the IPA which identifies assessable development. Table 4 excludes from
operational works which might otherwise be included in assessable development
“the clearing of vegetation to which VMA does not apply”. As Mr Lyons QC, for
the applicant put it, “one needs to know to apply the IPA whether the Vegetation
Management Act does or does not apply.”
[6] The VMA provides in s.3:
“3 Purpose of Act
(1) The purpose of this Act is to regulate the clearing of vegetation in
a way that—
(a) conserves the following—
(i) remnant endangered regional ecosystems;
(ii) remnant of concern regional ecosystems;
(iii) remnant not of concern regional ecosystems; and
(b) conserves vegetation in declared areas and
(c) ensures the clearing does not cause land degradation; and
(d) prevents the loss of biodiversity; and
(e) maintains ecological processes; and
-- 4 of 18 --
5
(f) manages the environmental effects of the clearing to
achieve the matters mentioned in paragraphs (a) to (e);
and
(g) reduces greenhouse gas emissions.
(2) The purpose is achieved mainly by providing for—
(a) codes for the Planning Act relating to the clearing of
vegetation that are applicable codes for the assessment
of vegetation clearing applications under IDAS; and
(b) the enforcement of vegetation clearing provisions; and
(c) declared areas; and
(d) a framework for decision making that, in achieving this
Act’s purpose in relation to subsection (1)(a) to (e),
applies the precautionary principle that lack of full
scientific certainty should not be used as a reason for
postponing a measure to prevent degradation of the
environment if there are threats of serious or irreversible
environmental damage; and
(e) the phasing out of broadscale clearing of remnant
vegetation by 31 December 2006.”
[7] By s.7(1) the VMA applies (with four specific exceptions not presently relevant) to
all clearing of “vegetation”, which is defined as a native tree or plant other than
special cases (a), (b) and (c). Section 7(2) is:
“This Act does not prevent a local law from imposing requirements
on the clearing of vegetation in its local government area.”
[8] The respondent placed affidavit material before the court which establishes that the
land contains vegetation, and that the purposes of the VMA could usefully be
pursued there.
[9] On the face of things, that is precluded by s 74. At the time of the amalgamation of
the Gold Coast City Council and the Albert Shire Council in March 1995, the
planning regime controlling the land was the 1995 Albert Shire Council Planning
Scheme, which was gazetted the month before. Under it, the land was designated as
a Special Facilities Zone, more precisely a “Special Facilities (golf course and
-- 5 of 18 --
6
associated recreational facilities, accommodation units and dwelling houses
(maximum 645), hotel (maximum 150 rooms)) Zone.”
[10] The whole system of zoning came to an end from 18 August 2003; on that day the
former Planning Scheme was replaced by the 2003 Gold Coast City Planning
Scheme, the former Albert Scheme attaining the status of the “superseded Planning
Scheme” for the land under the IPA. The designation of the land as a Special
Facilities Zone came to an end with the commencement of the Gold Coast Planning
Scheme which includes it in the rural domain.
[11] According to the originating application, the applicant’s purpose is to develop the
land “in accordance with the Special Facilities designation of the land under the
1995 Albert Shire Council Scheme”; the IDAS Form 1 Development Application
shows the existing use as “Rural, with grazing use”, the proposal as:
“Golf course and residential community – refer to the Gold Coast
Golf Resort Currumbin application material including Volumes 1-5,
Advanced Concept Plan and the staged reconfiguration plans.”
[12] The respondent characterises the applicant’s contention as being that:
“If a parcel of land was designated as a Special Facilities Zone, or
like zone on the day before s.74 commenced – 15 September 2000 –
that parcel is forever exempt from the operation of the VMA,
regardless of whether or not that zoning continues, and regardless of
whether or not the proposed development of the land is consistent
with that zoning.”
Its contention is that s 74(b) only operates to exempt land from the operation of the
VMA for so long as the land remains designated as a Special Facilities Zone or
like zone. It accepts that the opposed contention “has the advantage of according
with the strict and literal wording of s 74(b)”, but says the outcome:
“(a) is manifestly absurd;
(b) plainly does not accord with the legislative intention;
-- 6 of 18 --
7
(c) cannot be reconciled with the contents of s.74; and
(d) must therefore yield to a purposive construction.”
[13] Development of the land now comes within s 3.2.5 of the IPA. Mr Morris QC (for
the respondent) explained the relevance of the IPA section as follows:
“…when someone … seeks to take advantage of a superseded
scheme the relevant local authority … has an election. The Council
can say “Go ahead under the old scheme and as long as you satisfy
the requirements of the old scheme you don’t have to jump over the
hurdles provided in the IPA or under the new scheme … under
paragraph (b) – “A development permit is required for the
application.”
…
… What’s critical … is that if the Council says, “No, we’re not going
to let you go ahead under the old scheme, you have to apply for a
development permit,” then the party who is subjected to that
situation is entitled to compensation if vested rights are taken away.
So much is perhaps obvious.
However, what our learned friends would say is that whilst all of this
applies to every aspect of development approval and planning, apart
from vegetation management, it doesn’t apply to vegetation
management … even though the council has taken away the old
zoning, even though the council is entitled to say, ‘We’re not going
to let you proceed under that old zoning, you have to undertake your
development under the procedures of the new scheme and the IPA,
and if you can’t avail yourself of your vested rights you get
compensation’. Even though all of that is contemplated by the IPA,
nonetheless, that land will still forever be exempt from the provisions
of the Vegetation Management Act.”
[14] The foregoing scenario may explain why provisions like s 73 and s 74 might be
unnecessary to protect the situation of a person who loses the right to “develop”
under certain conditions, although there may be those who consider that
compensation is a poor substitute for the opportunity to develop. That s 74(b) may
be unnecessary on such an approach does not mean it can be ignored or read down.
[15] The respondent’s argument kept returning to the proposition that Parliament could
not have intended by s 74(b) to exempt land referred to in it (which includes the
-- 7 of 18 --
8
land in which the applicant is interested) from the operation of the VMA forever.
The intention to be ascribed, it was asserted (for example at p 22), is to “preserve
existing rights”. Mr Morris said at p.22 that s 74(b):
“… is a transitional provision which protects existing rights. It
doesn’t create new rights. It doesn’t confer rights greater than those
already existing. It is simply to preserve the status quo. But if our
learned friend’s interpretation is correct, s.74(b) travels miles beyond
preserving the right to carry out a development in accordance with
the special facilities zoning as in place at the relevant time. It simply
exempts that land forever from the operation of the Act.”
[16] It seems to me that this approach depends upon characterising s 74(b) as a
transitional provision and upon some principle that a provision so characterised
ought not to be accorded any inappropriately far-reaching effect. Belby J expressed
such a notion in The Corporation of The City of Adelaide v The City of Salisbury
[1998] SASC 6914 at [75]-[77]:
“It would be an odd and, I suggest, unintended result if the effect of
the 1993 transitional provisions was to preserve earlier consents to
land use but to do away with any conditions attached to them at all.
…
… the plaintiff’s interpretation would lead to the conclusion that
s24(8) enlarged pre-existing rights rather than preserving accrued
rights. Plainly, that was not intended.
Therefore, if condition (6) was valid, it survived the relevant
transitional provisions of the planning legislation.”
[17] The respondent’s characterisation of s 74(b) as transitional gains significant support
from its position in the VMA. Further, the respondent’s contention that the
provision should be construed as if it enacted that:
“Nothing in this Act affects the clearing of vegetation –
…
(b) in an area designated, immediately before the commencement of
this section, as and which continues to be designated as a special
-- 8 of 18 --
9
facilities zone, or like zone, under a Planning Scheme under the
Planning Act.” (italicised words added)
arguably gains support from the section heading: “Existing Development Control
Plans and Special Facilities Zones” in which “existing” is capable of referring to
zones, as well as to development control plans. On this approach, when one comes
to consider how s.74 works as at the relevant date (being 30 April 2004, when the
development application was made), one finds that the land is no longer
designated as a Special Facilities Zone, with the consequence that s 74(b) has no
application and that the VMA controls clearing of vegetation, as defined. The IPA
provides the management mechanisms. Had the legislators of the State of
Queensland enacted what the State of Queensland now contends they meant, it
would have been a perfectly defensible enactment. It fits neatly into the structure
of ss 73 and 74 considered together. Section 73(1) and (2) protect existing
approvals. Section 73(3) and (4) protect interests of those who have existing
development applications as at their commencement. Section 74(a) protects
clearing of vegetation pursuant to development control plans mentioned in
s 6.1.45A of the IPA (being development control plans made under the Local
Government (Planning and Environment) Act 1990). Section 74(b) would protect
those in a position to effect clearing of land zoned Special Facilities immediately
before commencement of this section but only if that zoning continues. Here, not
only have all zonings disappeared, the designation of the land had become, by
30 April 2004, “rural”, which is inconsistent with the former Albert Shire zoning.
[18] Nothing in particular was said regarding the significance of the word “existing” in
the section heading, but I apprehend reliance was placed on it.
-- 9 of 18 --
10
[19] I do not propose to say much about the many authorities relating to statutory
interpretation cited by Mr Lyons QC, for the applicant. They tended to urge caution
upon courts invited to take the bold course urged by the respondent. One I found
helpful (as well as the passage in Gibbs CJ’s judgment in Cooper Brookes infra, at
304-05) is Lloyd Steel Co (Aust) Pty Ltd v Jade Shipping SA (1985) 1 NSWLR 212,
which concerned a time limitation in the Hague Rules and provisions in the New
South Wales Supreme Court Rules directly under the heading “Statutes of
Limitation” authorizing the court to permit amendments inter alia “where any
relevant period of limitation expires after the date of filing of the statement of claim
and after that expiry an application is made”. Clarke J said at 216-7:
“The proposition that Pt 20, r 4, applies to statutory and not
contractual time bars is supported in essence by two considerations.
Firstly, the headnote ‘Statutes of Limitation’ and secondly the
undoubted fact that this rule supersedes, to the extent of any
inconsistency, the provisions of the Limitation Act 1969, indicates a
legislative intention that the force of the Limitation Act be modified
to the extent shown in the rules. This indication is strengthened, so it
was said, by reference to the headnote.
The first submission, which requires hat the words of the rule be read
down so as to limit or modify the apparently unqualified words ‘any
relevant period of limitation’, focussed on authorities dealing with
the permitted use of headnotes in the construction of statutes. A
good example is Ombudsman v Moroney [1983] 1 NSWLR 317
where Street CJ (with whom Moffitt P agreed) adverted to the right
of courts to have regard to headnotes in resolving the interpretation
of doubtful or ambiguous sections. But I do not read the Chief
Justice as ascribing to headnotes any greater role than that in the
construction process. In particular he denied the headnote the power
to control the section or rule under consideration. His Honour’s view
was that the headnote was of assistance in showing the drift of the
section.
I am prepared to accept that it is permissible to have recourse to the
headnote for that limited purpose (see also Director of Public
Prosecutions v Schildkamp [1971] AC 1) but I caution myself that, as
Stephen J said in Dugan v Mirror Newspapers Ltd (1978) 142 CLR
583 at 594 it is ‘at most only a quite minor aid, ‘a most unsure
guide’’.
-- 10 of 18 --
11
In my opinion the first defendants seek to invoke the headnote to
control the section. Reduced to simple terms the submission is that
the words ‘any relevant period of limitation’ should be read as
though they are followed by ‘imposed by statute’ and this rather
dramatic qualification is said to result from the text of the headnote.
It seems to me that the words are clear and unambiguous and the
headnote provides no reason for cutting down their effect”.
[20] The respondent’s difficulty here is that s 74(b) is so clear about the land it applies
to, by way of excluding clearing of vegetation from any effect of the VMA. To take
up Mr Morris’ graphic illustration, it applies (and apparently forever) to exempt any
land in Queensland enjoying the “magic” zoning immediately before 15 September
2000, with the degree of permanence that used to be associated with splashes of red
on the globe identifying parts of the British Empire. He argued there are problems
with that concept of going on forever. One (which I think involves ‘taking a
different tack), posited a situation where the development ultimately proposed for
land was completely different from that contemplated by the Special Facilities
zoning (not shown to be the case here). A powerful argument is open that where the
developer departs completely from the use which provided the very reason for the
Special Facilities zoning, there is no reason at all for continuing the exemption
under the VMA which was appropriate solely because of that Special Facilities
zoning. The zoning covered a curious “grab bag” of potential uses (examples
mentioned at the hearing included wharves, hospitals, railway marshalling yards,
eco-tourism resorts, some vegetation-friendly, some not). It is odd to contemplate
allowing a developer to preserve the exemption by moving from one kind of
“special facility” to another – even odder if the development ultimately proposed
would never have come within any reasonable understanding of “special facilities”.
Section 74(b) itself leaves room for other terminology; it was suggested that, for
Brisbane, the relevant zone was “Particular Development Zone”. The court must
not be taken as deciding anything about Brisbane or zones differently described.
-- 11 of 18 --
12
[21] It can hardly be suggested that the legislature was in some way at risk of being
taken by surprise in enacting a provision about special facilities zones. All of them
would have come about by zoning arrangements approved by the Governor-in-
Council and gazetted. In the end, I am unable to avoid the conclusion that
Parliament should be taken as having proceeded quite deliberately, and intending
the ordinary meaning of s 74(b) when it passed that provision.
[22] There are instances of courts deciding that Parliament did not mean what some
enactment in terms says. A leading statement may be found in the joint judgment of
Mason and Wilson JJ in Cooper Brookes (Wollongong) Pty Ltd v Federal
Commissioner of Taxation (1981) 147 CLR 320-21:
“The rules, as D.C. Pearce says in Statutory Interpretation, p.14, are
no more than rules of common sense, designed to achieve this object.
They are not rules of law. If the judge applies the literal rule it is
because it gives emphasis to the factor which in the particular case he
thinks is decisive. When he considers that the statute admits of no
reasonable alternative construction it is because (a) the language is
intractable or (b) although the language is not intractable, the
operation of the statute, read literally, is not such as to indicate that it
could not have been intended by the legislature.
On the other hand, when the judge labels the operation of the statute
as “absurd”, “extraordinary”, “capricious”, “irrational” or “obscure”,
he assigns a ground for concluding that the legislature could not
have intended such an operation and that an alternative
interpretation must be preferred. But the propriety of departing from
the literal interpretation is not confined to situations described by
these labels. It extends to any situation in which for good reason the
operation of the statute on a literal reading does not conform to the
legislative intent as ascertained from the provisions of the statute,
including the policy which may be discerned from those provisions.
Quite obviously questions of degree arise. If the choice is between
two strongly competing interpretations, as we have said, the
advantage may lie with that which produces the fairer and more
convenient operation so long as it conforms to the legislative
intention. If, however, one interpretation has a powerful advantage
in ordinary meaning and grammatical sense, it will only be displaced
if its operation is perceived to be unintended.” (italics added)
-- 12 of 18 --
13
[23] Assigning a ground, Byrne J said in Hawthorne v Thiess Contractors Pty Ltd [2002]
2 Qd R 157, at 166 in the course of reasons in which the other judges of the Court of
Appeal agreed:
“[37] It seems most unlikely that a statutory regime with those
objects and incidents, and which so clearly and fundamentally affects
damages claims where there is a substantial causal relationship
between features of employment and complaints, was designed to
exempt from its operation claims involving a tenuous employment
connection. For such an arrangement would function as an incentive
to injured staff of wealthy employers to avoid the rigours of the
statutory regime by setting up a case that the connection with
employment, though sufficient to attract liability, is remote where in
fact it is considerable. The Parliament is unlikely to have wished to
encourage such a fiction. Perhaps more to the point, an employer
sued in such proceedings is in economic peril. Although WorkCover
may also insure employers in respect of claims by non-PAYE staff,
such additional insurance "must not exceed the cover available under
this Act for ... damages", which appears to mean that the extra cover
cannot extend to cases where employment is not "the major
significant factor ...". So the employer - or where the employer
procures cover from another insurer in respect of claims involving
insubstantial connection between employment and injury, that
insurer - could be expected to defend the case on the different basis
that the connection between employment and symptoms is
substantially greater than that asserted; and to advance such a case
against WorkCover in an attempt to secure indemnity under the
compulsory policy. Predictable complications such as those are not
easily to be reconciled with the expressed intention of "ensuring
reasonable premium levels" and "the protection of employers'
interests ...". In short, the consequences which would attend
acceptance of the interpretation for which the appellant contends
seem so peculiar that it is scarcely to be supposed that Parliament
could have intended them.
[38] The notion the Act was intended to extend to all instances in
which a PAYE employee seeks damages from an employer for work-
related symptoms accords with the Minister's second reading speech,
where Parliament was informed:
"By requiring employment to be `the major significant contributing
factor' causing the injury, the legislation will exclude those injuries
which have only a minimal work-related component. The new
definition will require the link between employment and the injury to
be stronger. This is intended to ensure that employers are held liable
only to the extent that their employment of the worker contributed to
the injury, or aggravation or acceleration of a pre-existing non-work
related condition."”
-- 13 of 18 --
14
[24] While it is proper to respect the purposes of the VMA and to be uneasy at the
prospect (if indeed it is the prospect) that important native vegetation on the land
may be razed while the authorities look on, helpless, the present task for the court is
a straightforward one of interpreting s 74(b) in its context, by which I refer to the
whole of the VMA, in particular the provisions set out above and those which
control clearing to which the VMA does apply. I am unable to give effect to the
respondent’s argument. The ordinary grammatical meaning of the provision being
examined is intractable. It does not matter that, with hindsight, it appears that
something more readily acceptable for the appropriate purpose of preserving
existing rights to develop land could have been drafted. That is not how things
happened. Indeed, there is nothing particularly wrong with the way in which the
VMA works, considered on its own. Relevantly, it does no more than exempt
clearing of “vegetation” on particular land (which, in principle, could have been
readily identified) to the extent of freeing the developer from controls established by
the VMA. Section 7(2) deliberately leaves open a field of operation for local laws.
The real problem in the difficult situation that has been revealed may well lie not in
the VMA, but in the IPA which, as has been seen, effectively abandons interest in
clearing of vegetation where the VMA does not apply. Is the respondent now to
mount arguments that relevant parts of the IPA are manifestly absurd, do not accord
with the legislative intention, must yield to a purposive construction, etc? It is
drawing a long bow to impose a strained construction on the VMA because of
perceived difficulties or anomalies in the way the IPA works out.
[25] There is surprisingly little writing regarding transitional provisions in legislation.
One exception is Bennion on Statute Law (3rd). That one reads at 327:
“Since an Act changes the law, it often has to include what are called
transitional provisions. It cannot be brought fully into force with
-- 14 of 18 --
15
immediate effect, but must spell out precisely how its substantive
parts are modified for pending cases and other transactions already in
train. The Act also has to specify relevant dates. Usually these
transitional provisions are quickly spent. Thereafter, their dead
words cumber the Act, obscuring its substance.
Later on, the Act is likely to be amended by a further Act. Let us
hope this is done by direct textual amendment, and not indirectly.
The original Act can then be reprinted as amended, and endures as
one coherent text. Even if the amendments are textual however,
there is still a transitional problem. It is the same problem as arose
with the original Act – of dealing with pending cases (and other
transactions already in train) and specifying relevant dates. It means
that further transitional provisions are needed to deal with the
amendments made by the new Act.
Each time the original Act is amended, the same thing happens.”
[26] There follows an illustration of the complications that can ensue as further
amendments are enacted, with accompanying transitional provisions of their own.
One is used to transitional provisions being impermanent or transitory, and likely to
be themselves repealed in the short term. Reading s 74 by itself, one does not gain
the impression that it is intended to have only transitory effect; nothing about the
language adopted suggests that. Its location in the Act, bracketed with s 73, may be
an indication to the contrary.
[27] Provisions may be identified as transitional, and limited in their scope accordingly,
although they are not identified as such. An illustration may be found in Vepa P
Sarathi, The Interpretation of Statutes (2nd) at 27:
“In M. Pentiah v. Veeramallappa1, the respondents were elected
members of a municipal committee under the Hyderabad Municipal
and Town Committees Act, 1951. The Act was repealed by Section
320 of the Hyderabad District Municipalities Act, 1956, which
provided that the committee constituted under the repealed
enactment was deemed to have been constituted under the 1956-Act
and that the members thereof should hold office till the first meeting
of the committee elected under the 1956-Act was called under
Section 35 of the Act. No election was held and the old committee
1 [1961] 2 SCR 295 : AIR 1961 SC 1105 : [1963] 1 SCJ 768.
-- 15 of 18 --
16
continued to function. In a petition for the issue of a writ of quo
warranto by the appellant, it was contended that the old committee
became functus officio on the expiry of three years, the term
prescribed under Section 34 of the 1956-Act. It was held accepting
the contention that : One of the established rules of construction is
that every clause of a statute should be construed with reference to
the context and that the other clauses of the Act, so as, so far as
possible, to make a consistent enactment of the whole statute or
series of statutes relating to the subject matter2 …. The
establishment of construction are : (1) If the choice is between two
interpretations, the narrower of which would fail to achieve the
manifest purpose of the legislation, we should avoid a construction
which would reduce the legislation to futility and should rather
accept the bolder construction based on the view that Parliament
would legislate only for the purpose of bringing about an effective
result. Maxwell on the I INTERPRETATION OF STATUTES, 10th Ed.,
p.7. (2) Manifest absurdity or futility, palpable injustice or absurd
inconvenience or anomaly is to be avoided. Craies on STATUTE
LAW , 5TH Ed., p 7. (2) Manifest absurdity or futility, palpable
injustice or absurd inconvenience or anomaly is to be avoided.
Craies on STATUTE LAW , 5th Ed., p.82. (3) Every clause of a statute
should be construed with reference to the context and the other
clauses of the Act, so as, so far as possible, to make a consistent
enactment of the whole statute or series of statutes relating to the
subject-matter. In the present instance the legislature, in enacting the
law not only assumed but also expected that the Government would
issue the requisite notification under Section 17 of the 1956-Act
within a reasonable time from the date when the Act came into force.
The scheme of the Act should be judged on that basis; if so judged,
the sections disclose an integrated scheme giving Section 320 a
transitory character.”
[28] Another illustration occurs in Bennion at 121:
“There is another type of distinction to be drawn. A component of
one kind, for example a section of an Act, may be used in different
ways and thus have different functions. Thus a section or similar
item may be one of the substantive provisions of the Act, or it may
be purely concerned with the machinery of bringing the Act into
operation. Difficulty is caused by the fact that under our system
provisions of the latter type (known as commencement and
transitional provisions) are not clearly differentiated in the
arrangement of the Act.
That internal distinctions of this kind may be relevant in
interpretation is illustrated by the following dictum of Nourse J in
relation to the Development Land Tax Act 1976, s 45(4) and (8):
One thing which is clear about sub-ss (4) and (8) is that the former is a
permanent provision and the latter is a transitional one. On a superficial
2 Per Lord Davey in Canada Sugar Refining Co. v. R., (1898) AC 735 : 67 LJPC 126 : 79 LT 146.
-- 16 of 18 --
17
level I can see the attractions of the argument which appealed to the Special
Commissioners. But I think it would be very dangerous, in trying to get to
the effect of the permanent provision, to attach too much weight to the
particular wording of the transitional one. (IRC v Metrolands (Property
Finance) Ltd [1981] 1 WLR 637, 649.)”
[29] Transitional provisions, typically, are there to ensure that changes in a legislative
regime come into operation in an acceptable way. Often they are there to protect
existing rights, which explains statements to the effect that they “should be
construed as widely as [their] terms will permit”: Cooper v Comcare (2002) 118
FCR 157, 161 in [22], which Mr Lyons cited. This is, on the face of it, a different
approach from that in the South Australian case relied on by Mr Morris, of
confining the operation of provisions identified as transitional to ensure that they do
not enhance rights.
[30] It appears to me that no statement can confidently be made regarding how
provisions identified as transitional should be construed. I do not think that the
designation of s 74 here as transitional (which in principle would have pleased
Francis Bennion, although be may have thought it belonged more with s.7
application of Act) means that it must be read as if it contained some “sunset”
aspect. The problem is that different solutions are open as to what circumstances
would lead to s 74’s ceasing to apply to land described in it. Suggestions placed
before the court included (a) the land’s ceasing to have the indicated (or any)
“zoning” in the strict sense of being allocated to an area that is “zoned”; and (b)
abandonment of any proposal contemplated by the particular use specified under the
special facilities zoning and the proposing of a different use. Variants were
suggested in relation to (b) according to whether the new proposed use might itself
have come under “special facilities” or otherwise.
-- 17 of 18 --
18
[31] Assuming the word “existing” in the section heading in some way supports the
notion that some change after the commencement of the section would defeat its
operation in respect of particular land, it is again totally unclear precisely what
changes would have that effect. The word “existing” is likely to be used in
provisions enacted to regulate changes in legislation. Indeed, this appears in s 20(2)
of the Acts Interpretation Act 1954:
“The repeal or amendment of an Act does not –
(a) revive anything not in force or existing at the time the repeal or
amendment takes effect …”
[32] That provision’s operation depends on identification of what is “existing” at an
identified date. The natural meaning of “existing” to the extent that it forms part of
s 74 is the same. One is directed to the state of affairs pertaining when the section
commences. I am not persuaded that a gloss is appropriate to the effect that for s 74
purposes, something that is existing at its commencement must continue to exist,
failing which the statutory exemption is lost. (Compare the use of “existing” in the
definition of de facto relationship in s 36 of the Acts Interpretation Act, which does
not focus on a date when some legislative change comes into effect.)
[33] In principle, there is no reason why “transitional” arrangements, intended and
designated as such, should not in some instances (although not in all) have a
permanent effect, permanent in the sense that the operation of the provision would
not change unless and until there is legislative change.
[34] The declarations sought ought to be made. Declaration 2 follows from Declaration 1.
-- 18 of 18 --
Official source: https://www.sclqld.org.au/caselaw/QPEC/2004/093