Barooga Projects (Investments) Pty Ltd v Caboolture Shire Council [2004] QPEC 45 [2005] QPELR 91
PLANNING & ENVIRONMENT COURT
OF QUEENSLAND
CITATION: Barooga Projects (Investments) Pty Ltd v. Caboolture Shire
Council [2004] QPEC 045
PARTIES: BAROOGA PROJECTS (INVESTMENTS) PTY LTD
(Appellant)
v.
CABOOLTURE SHIRE COUNCIL (Respondent)
FILE NO/S: 1296/2004
DIVISION:
PROCEEDING: Appeal
ORIGINATING
COURT: Planning and Environment Court Brisbane
DELIVERED ON: 14 September 2004
DELIVERED AT: Brisbane
HEARING DATE: 9 and 10 September 2004
JUDGE: Rackemann DCJ
ORDER: The appeal will be allowed in part.
I will invite the parties to submit appropriate terms of
order in light of my reasons.
CATCHWORDS:
COUNSEL: Mr Cochrane for the appellant
Mr Ure for the respondent
SOLICITORS: Paul Everingham & Co for the appellant
King & Company for the respondent
[1] This appeal is against the imposition of certain conditions upon the Council’s
approval of an application relating to a new residential estate situated off Swann
Road near its intersection with Piggott Road at Bellmere. The approval was for a
development permit for a material change of use, a development permit for
-- 1 of 10 --
2
reconfiguration to create Stage 1 (46 lots) and a preliminary approval for
reconfiguration for future stages (155 lots).
[2] The land, the subject of the application, adjoins land which is primarily included in
the Special Rural Zone (to the south and west) but, in part, in the Rural Zone (to the
north west) and the Rural Residential Zone (to the north).
[3] The Statement of Intent for the Special Rural Zone makes it clear that the purpose of
the zone is to provide for an area of restricted rural activities which are not
detrimental to adjoining or anticipated urban areas and to cater for the expansion of
the urban area in accordance with the Strategic Plan as required. Uses in the zone
are anticipated to be those which do not unduly compromise that future use.
[4] Land to the east of Swann Road and north of Piggott Road is generally included
within the Residential A zone and has been developed as a suburban residential
area. Land east of Swann Road but south of Piggott Road has, at the eastern end,
been developed for suburban residential purposes. The balance of the land to the
south of Piggott Road has not yet been developed for suburban residential purposes,
although its inclusion, in part, in the Residential A Zone and, in part, in the Special
Rural Zone, suggests that reasonable expectations should include the prospect of
future development.
[5] There were numerous conditions which were the subject of the appeal, however the
areas of dispute narrowed significantly both prior to and during the hearing.
Ultimately, the only conditions which remained controversial were those relating to
works required to upgrade Piggott Road (condition 35 of the Development Permit
for stage 1 and condition 27 of the Preliminary Approval for future stages), the
-- 2 of 10 --
3
financial contribution required towards external road and pathway networks
(condition 37 of the Development Permit for stage 1 and condition 29 of the
Preliminary Approval for future stages) and the requirement, in the case of the
future stages, to erect a 1.8 metre timber paling fence, at the developer’s expense,
along the northern, southern and western boundaries, or such alternative that may be
agreed in writing with the adjoining property (condition 4 of the Preliminary
Approval for future stages).
[6] The imposition of conditions is subject to the provisions of Part 5 of Chapter 3 of
IPA. In particular, s.3.5.30 sets out the well known “relevant or reasonable” test
which conditions must meet. Subject to the conditions being lawful, there is a
discretion in the assessment manager, and on appeal, the court in relation to the
imposition of a particular condition. There is, of course, no requirement to impose
each and every condition which could possibly be lawfully imposed.
[7] Of the conditions referred to above, there is one, namely the fencing condition,
which is no longer controversial in the sense that the respondent, via its counsel, no
longer contends for it to remain as a condition of the subject approval. I will
however, say something about how that position has been reached.
[8] An important element of the Council’s case for the imposition of that condition was
the potential for conflict with adjoining land use. At the beginning of the hearing, I
observed that the fencing condition was only imposed on the preliminary approval
for the later stages. Since the preliminary approval does not authorise development
to occur, application will be needed for a development permit or permits at a later
time to authorise that development. I questioned whether, if compatibility was in
-- 3 of 10 --
4
issue, it would not be better to delete the condition from the preliminary approval
and allow the matter to be considered at the development permit stage, on the facts
and circumstances which then apply. That was taken up by counsel for the
respondent.
[9] Counsel for the appellant, while content to see the deletion of the condition from the
subject approval, submitted that the deletion should be expressly on the basis
contended for by the appellant, namely that it would not be justified in any event
given, amongst other things, that the proposed land use was a compatible one given
the zoning pattern and, as the Council officer responsible for the report and
recommendation to Council had observed, fencing will occur in any event as part of
the ongoing development. While acknowledging that the reasoning for deletion of
the condition at this stage could only be, at the most, persuasive in relation to the
Council’s decision, at a later time, of a subsequent application for a development
permit in the context of the facts and circumstances which then apply, counsel for
the appellant urged me to give his client some greater certainty as to the
requirements which would be imposed in subsequent stages.
[10] While I appreciate the position of the appellant and consider that there is some force
in its stated basis for opposition to the condition, I remain of the view that, in the
context of this case, it would be appropriate for me to delete the condition on the
basis that that, on either view, it should not remain as a condition of the subject
permit.
[11] The conditions requiring a financial contribution towards the external road and
pathway network initially sought a financial contribution of $1,760 per lot. That
-- 4 of 10 --
5
level of contribution was not supported by the respondent on the hearing of the
appeal. The level of contribution which was ultimately urged, on behalf of the
respondent, was $697 per lot comprising $750 per lot for those 20 lots which will
use a future residential connection west of Swann Road to/from Bellmere Road in
lieu of Piggott Road and $692 per lot for the remaining lots.
[12] The $750 per lot contribution is not referrable to any particular works nor any
particular calculation. The respondent was unable to point to any specific works,
the need for which would be caused or contributed to by the relevant 20 lots or was
relevant to them. The imposition of a $750 contribution was sought to be justified
on the basis that it is a “standard” Shire wide contribution which is otherwise
levied on new lots. While Mr Pollock, the traffic engineer called by the respondent,
said that he had been told certain things about the way in which the sum of $750
had been arrived at by Council officers, he was not party to any such exercise and
was not in a position to give any detailed justification of the quantum of the
contribution sought. While it was asserted that the contribution was sought on a
Shire wide basis, neither Mr Pollock nor counsel for the respondent was able to
point to any relevant document which related to the imposition and quantification
of the contribution. In the circumstances there seems to be little, if any,
justification for the imposition of $750 contribution and I am satisfied that, in this
case, no contribution should be levied with respect to the relevant 20 lots.
[13] The contribution of $692 per lot was calculated having regard to specified works,
namely the construction of “deflected T” treatments at the Piggott Road/ Cisticola
Court and Piggott Road/ Plover Court intersections, the provision of a two metre
wide shared pedestrian/bike path on the northern side of Piggott Road and an
-- 5 of 10 --
6
upgrade to the Bellmere Road/Piggott Road intersection. The appellant accepts the
contributions now sought in respect of the deflected T treatments and the
intersection upgrade but disputes that it should make any contribution to the
construction of a two metre shared bikeway/pedestrian path.
[14] The contribution sought by the Council towards the two metre shared
pedestrian/bikeway along Piggott Road, is a contribution towards the differential
cost of providing a two metre wide facility rather than a 1.2 metre wide standard
pedestrian footpath. Notwithstanding the residential development which has
occurred on the northern side of Piggott Road, there is no footpath on that side of
the road, the Council has not previously taken any contribution towards that and
counsel for the respondent was not able to point to any plan or program pursuant to
which Council currently proposes to provide a two metre footpath/bicycle way.1
[15] While the provision of bikeways is, of course, generally beneficial and no one
would discourage the Council from providing such a facility, the question is
whether it would be reasonable or relevant in accordance with s.3.5.30 of IPA and
the appropriate exercise of discretion to require the appellant to make a
contribution towards such facility as a condition of the subject development
approval.
[16] In that regard, I accept Mr Viney’s evidence to the effect that a road such as
Piggott Road can operate acceptably, from a traffic engineering perspective, with
cyclists using the carriageway. His view, in that regard, is consistent with
published guidelines. The respondent nevertheless expressed a concern that
1 Although I accept that if a condition was otherwise warranted, it could be formulated in such a way
that the contribution is refunded if no facility is developed within a specified time.
-- 6 of 10 --
7
provision be made for, in particular, young riders who might wish to travel from
the new estate to the shopping facilities at the end of Piggott Road or the
educational establishments further to the north.
[17] While there may be young persons who would wish to ride to such facilities, it
must be recognised that residential development has, to date, occurred in the
locality without an “off carriageway” cycle provision along Piggott Road. Further,
the educational establishments located to the north are a significant distance away
for younger riders2 and, it would seem, not linked to Piggott Road by any
continuous system of bikeways otherwise. While there is a bikeway facility on the
opposite (eastern) side of Bellmere Road, there is no evidence that extends beyond
its intersection with King Street. Any young rider who is entrusted by his/her
parents to travel, unsupervised, from the subject development to school must travel
more than three kilometres to even the nearest educational establishment. This
would involve the crossing of King Street before travelling a further distance
negotiating topography which was unexplained in the evidence in an area where it
was not suggested that there is any bikeway provision for younger riders. One
would have thought that those factors would affect the number of young children
wishing to and the number of parents of younger children prepared to allow their
children to, ride to their local school unsupervised.
[18] The respondent was not able to point to any provision of the Planning Scheme or
any planning policy or other document which suggested that the provision of an
offroad bicycle provision along Piggott Road was something which was required
or planned.
2 Mr Pollock’s evidence was that the closest school is approximately 3 kilometres from the Bellmere
Road/Piggott Road intersection which, in turn, is at the opposite end of Piggott Road from the proposed estate.
-- 7 of 10 --
8
[19] In the circumstances, while no one would discourage the Council from providing
offroad bicycle facilities, I am satisfied that it would be unreasonable to impose a
contribution as a condition of the subject approval and I would, in any event, not
be prepared to do so as a matter of discretion in this case.
[20] The final contentious condition relates to works required towards the widening of
Piggott Road.
[21] Piggott Road falls within the “collector road” category within Council’s adopted
road hierarchy. The Council’s adopted standard for such roads calls for a 12 metre
constructed carriageway consisting of two 3.5 metre wide lanes with a 2.5 metre
wide dedicated parking lane on either side. Piggott Road, which currently carries
relatively low traffic volumes, is not fully constructed to that standard. The section
between Cisticola Court and Swann Road has a pavement width of 10 metres of
which only six metres is a full depth pavement with the remaining four metres
being a light dust seal.
[22] Council’s condition required the upgrading of the southern side of Piggott Road in
that section. It was accepted that the appellant should not have to construct Piggott
Road to its ultimate form. That will probably not occur until development takes
place on the southern side of Piggott Road. While Mr Viney contended that the
existing six metre wide construction was adequate, he was prepared to agree to a
widening to 7.5 metres full depth construction with the existing 2.5 metre dust seal
for the balance, with the appellant to meet a proportion of the costs. Mr Pollock,
on the other hand, contended that the full depth construction should be widened to
-- 8 of 10 --
9
10.5 metres with the full cost of widening to be met by the appellant as
representing a fair contribution to the ultimate 12 metre construction.
[23] Much of the difference between Mr Viney and Mr Pollock is explained by Mr
Viney’s opinion that the Council’s adopted standards for collector roads are too
high and that, consistently with published and widely referenced guidelines such as
Queensland Streets, a carriageway width of 7.5 metres is sufficient. He pointed
out that a requirement for a wider construction can have detrimental consequences
in terms of encouraging higher speeds and is not, in his view, an appropriate use of
resources.
[24] Mr Pollock, on the other hand, was clearly influenced by the fact that Queensland
Streets had not been adopted or, more importantly, implemented by this Council.
[25] Counsel for the appellant, in contending for the adoption of Mr Viney’s approach,
drew attention to s.3.5.30(2) of IPA which provides that:
“The requirement for a condition to be relevant to, but not an
unreasonable imposition on, the development or reasonably required
in respect of the development applies despite the laws that are
administered by, and the policies that are reasonably identifiable as
policies applied by, an assessment manager or concurrence agency.”
[26] While I am conscious of the provisions of s.3.5.30(2), Mr Pollock’s view was not
determined simply because the Council had published and adopted certain
standards. Rather, it was his contention that, before applying guidelines such as
Queensland Streets in relation to a particular road, one should sensibly look at the
hierarchy into which that road falls in the local network.
-- 9 of 10 --
10
[27] His evidence which, in this respect, I accept, was that the requirements for which he
contended were consistent with the road hierarchy in the locality in relation to what
presently exists in the Piggott Road catchment and what is proposed to be
developed within the present estate. In that regard it should be noted that, pursuant
to Condition 30 of the conditions of the Development Permit for Stage 1, some
minor collector roads within the estate are to be constructed to 8.0 metres kerb to
kerb and the east/west road between Swann Road and Lot 196 is to be constructed
as a 10 metre kerb to kerb residential minor collector road. As Mr Pollock attested,
in a properly planned legible road hierarchy one expects to move progressively from
narrower roads at the lower end of the hierarchy towards wider roads at the higher
end. Piggott Road sits within the local hierarchy at a higher level than the roads
referred to in condition 30 and the requirements contended for by Mr Pollock are
consistent with the existing and developing hierarchy in the locality.
[28] In those circumstances, notwithstanding the merit, in a general sense, of the
guidelines in Queensland Streets, it is at least relevant to the appropriate planning of
a proper road hierarchy in the subject locality to adopt the widening recommended
by Mr Pollock. I also accept his evidence to the effect that it would be appropriate
for the cost of that widening to be borne by the appellant as a fair contribution
towards the development of road, given the proposal’s contribution to traffic
volumes. Although the cost implications for the appellant are significant, I do not
regard it as an unreasonable imposition in the circumstances.
[29] I will invite the parties to submit appropriate terms of order in light of my reasons.
-- 10 of 10 --