Doolan Properties Pty Ltd v Council of the Shire of Pine Rivers [1999] QLAC 1 (1999) 20 QLCR 210
IN THE LAND APPEAL COURT
Re: Claim for Compensation -
Acquisition of Land Act 1967.
(REF A96-07).
BETWEEN:
DOOLAN PROPERTIES PTY LTD
and
Appellant/Claimant
COUNCIL OF THE SHIRE OF PINE RIVERS
Respondent
J U D G M E N T
Delivered at Brisbane this first day of February 1999.
Following delivery of judgment by the Land Court in this matter on 24
December 1997, Doolan Properties Pty Ltd filed an appeal in the Land Appeal Court
registry on 4 February 1998 in the name William Doolan as claimant. The appeal is
against the determination by the Land Court of compensation in the sum of $142,000
for the resumption by the respondent Council on 17 August 1995, of an area of 1071
square metres of land described as Lot 6 on RP 881938 (to be registered in the Land
Registry), Parish of Kedron, (the resumed land) for road purposes. Lot 6 on RP
881938 is part of a larger area of land (the parent land) described as Lot 3 on RP
864243, Parish of Kedron, containing an area of 6106 square metres. The retention
area is described as Lot 5 on RP 881938, Parish of Kedron, with an area of 5035
square metres. The resumed land is situated at the corner of South Pine and Queens
Roads, Everton Park.
At resumption date, the resumed land and the retention area were zoned
“Commercial” and “Home Industry” under the provisions of the Council of the Shire
of Pine Rivers Town Planning Scheme. But in March 1994, Mr Doolan lodged with
Council a combined rezoning and Column 3B application, the first component of
which was to have the parent land excluded from the “Commercial” and “Home
Industry” zones and included within the “Special Facilities” (Shop, Late Night Shop,
Craft Shop and Columns 3A and 3B uses in the Commercial Area) zone. In
[1999] QLAC 1
-- 1 of 15 --
2
November 1994, Council advised Mr Doolan that the rezoning and column 3B
components of the application were approved subject to certain conditions including
the following:
“3.04 Future Road Widening
Development shall not be permitted to comprise the area designated
for Future Road Widening on Pine Rivers Shire Council Drawing No
6/00778/A2 adopted by Council on 31 October 1994 (MP 94/4265). This land
is required by the Council for Road Purposes in the future. The Developer
agrees that no development shall occur which would in any way prejudice or
compromise the future widening”.
The rezoning conditions also include the following:
“4.01 If not completed by others, the applicant shall complete interim
frontage roadworks to the South Pine Road frontage of the subject land by
providing:
(a) Kerb and channel on an approved alignment, and
(b) Sealed pavement widening to the new kerb and channel, and
(c) Reinstatement or relocation of the existing pedestrian and bus stop,
and
(d) Any associated drainage, signage, linemarking, and lighting that may
be required to comply with Council’s standards.
4.02 Site Access
The applicant shall construct the accesses to be fully compatible (line and
level) with the ultimate frontage roadworks to the satisfaction of the Director
Works and Services.
The applicant shall note that Queens Road and South Pine Road are
designated as Urban Arterial Roads and that all turns access to the site will
not be permitted ultimately. The applicant shall also note that Council intends
upgrading the intersection of Queens Road and South Pine Road in the future
and it is likely that this upgrading will incorporate a central median along the
full frontage of the subject land to both Queens Road and South Pine Road.
Notwithstanding the above, Council’s Director of Works and Services may
approve temporary or interim ‘all turns’ access to the site having due regard
to Council’s planning for the frontage roadworks upgradings and safety
issues. ”
The retention area land is now included within the “Special Facilities” (Shop,
Late Night Shop, Craft Shop and Column 3A and 3B Uses in the Commercial Zone)
zone.
The notice of appeal contains the grounds that the learned Member erred in
-- 2 of 15 --
3
“(a) failing to conclude that the concept shown in ETS drawings (Exhibit
14) reflected the highest and best use of the subject land before the
resumption;
(b) failing to conclude that the sales evidence should be analysed by
reference to dollar value per square metre of gross floor area achieved at the
time of sale, rather than as a dollar value per square metre of site area;
(c) his treatment of the roadworks conditions in the Council approval of
28 November 1994, as regards:
(i) the development potential of the subject land before the
resumption;
(ii) the value of the subject land before resumption;
(d) assessing the value of the subject land before resumption at too low an
amount ($795,670), in the light of;
(i) ground (1) of ground (2) or both;
(ii) ground (3);
(iii) alternatively to ground (2), a more reasonable assessment of the
value of the land as a dollar value per square metre of site area than the
adopted ($145/m².)
An Amended Notice of Appeal dated 25 November 1998 was filed in the Land
Appeal Court Registry. It seeks to amend the original Notice of Appeal in the
following particulars:
1. The name of the appellant to be changed from William Doolan to
Doolan Properties Pty Ltd ACN 061 428 724.
2. (d)(i) Deletion of ground 1 and ground 2 and inclusion of ground (a)
or ground (b) or both;
(d)(ii) Deletion of ground 3 and the inclusion of ground (c);
(d)(iii) The deletion of ground (2) and the inclusion of ground (b).
The application for leave to amend was opposed by the respondent. It gives
rise to two separate issues, namely –
a. whether it is open to the Court to give leave to amend the
notice of appeal to permit the name of the appellant to be changed
from William Doolan to Doolan Properties Pty Ltd and, if so, whether
leave should be granted; and
-- 3 of 15 --
4
b. whether there is power to permit the appellant to amend the
notice of appeal to include an appeal from the decision of the Land
Court in this matter on 22 July 1998 and, if so, whether leave should
be granted.
Doolan Properties Pty Ltd was the claimant in the matter under appeal. There
was no suggestion in the proceedings before the learned Member that Mr Doolan,
rather than Doolan Properties Pty Ltd, was the appropriate party. After the
conclusion of the hearing at first instance the appellant changed its solicitors. Mr
Doolan, a director of the appellant, gave oral instructions to the new solicitors to
lodge an appeal on behalf of the appellant. For a reason which the solicitor who has
had the conduct of the appeal throughout is unable to explain, the name of the
appellant was erroneously stated in the notice of appeal as William Doolan.
Mr O’Regan QC, who appears for the respondent, drew the Court’s attention
to the fact that the identity of the appellant was raised at a directions hearing on 6
August 1998. That was within 42 days of the decisions of 6 July 1998 and 22 July
1998. However, it was not until 3 November 1998 that an amended notice of appeal
was lodged which sought to change the name of the appellant to Doolan Properties
Pty Ltd. It is submitted on behalf of the respondent that as the mandatory appeal
requirements have not been complied with, the Court has no jurisdiction to proceed
with the appeal notwithstanding the purported amended notice of appeal filed in this
Court on 3 November 1998.
In our view, the notice of appeal filed on 4 February 1998 was defective in
that the name of the appellant was incorrectly described. But this is not a case in
which an appeal was commenced by an incorrect party and the correct party seeks to
be substituted as appellant. That being the case, the appeal is properly constituted and
this Court has power under section 44(11)(d)(ii) of the Land Act 1962 to allow the
amendment sought. If authority for this conclusion is required, it may be found in a
passage in the reasons of Donaldson LJ in Evans Constructions Co Ltd v. Charrington
& Co Ltd [1983] QB 810 at 821, referred to with approval by McHugh J in Bridge
Shipping Pty Limited v. Grand Shipping S.A. (1991) 173 CLR 231. It was not
suggested by Mr O’Regan QC, quite properly, that the respondent had suffered any
prejudice through the appellant’s error.
-- 4 of 15 --
5
We turn now to the second preliminary issue. On 25 November 1998 a further
amended notice of appeal was produced which sought to appeal against the learned
Member’s decision of 22 July 1998 in respect of disturbance costs. Mr O’Regan QC
submitted that the appeal in relation to disturbance is incompetent as it was not lodged
within time and no reasonable explanation has been given for the appellant’s non-
compliance. Mr Gore QC, for the appellant, contended that no decision of the Land
Court was relevantly pronounced until the matter was finally disposed of by the
learned Member on 22 July 1998. It was then, it was submitted, that time commenced
to run for the purposes of section 44(11). The original notice of appeal was lodged on
4 February 1998. It is submitted that this notice can serve as the notice of appeal
from all three decisions, even though it preceded those handed down in July 1998.
Bock v. Don-Rex Furniture (Qld) [1981] Qd R 326 is cited as authority for that
proposition. Having regard to the view we take of the decision of 22 July, it is
unnecessary for us to consider whether the requirements of section 44(11) can be
satisfied by a notice of appeal which precedes the decision appealed against. We
remark in passing that it is difficult to understand how the principle of construction
applied in Don-Rex could operate so as to authorise the filing and service of a notice
of appeal at a time before the handing down of the decision the subject of the appeal.
We are unable to accept the submission that there was no decision to appeal
against until the decision of 22 July 1998. The decision of 24 December 1997 plainly
determines the amount of compensation payable by the respondent to the appellant
and finally disposes of the matter except for –
“ a. the rate of interest payable on the amount of compensation;
b. what amount should be awarded to items of disturbance;
c. whether any of the disturbance costs have been paid by the
claimant, and, if so, when they were paid and the rate or rates of
interest payable in relation to the various costs; and
d. any application for costs. ”
The document which contains the Member’s decision is described in it as a
“JUDGMENT”. After the reasons for the decision have been set out there appears, on
-- 5 of 15 --
6
p.70, the heading “Conclusion and order”. The Member’s conclusions are then
summarised and it is provided –
“Compensation payable by the respondent Council to the claimant is
determined in relation to the value of the land taken, injurious
affection and severance in the sum of one hundred and forty-two
thousand dollars ($142,000).”
The determination was not expressed to be provisional and it is therefore a
decision within the meaning of section 44(11) of the Land Act.
For the sake of completeness, we should incorporate within this decision brief
details of the assessment of compensation made by the valuers called before the Land
Court and of the Land Court’s determination of compensation. For the claimant,
Registered Valuer Kevin Patrick Walsh of the valuation firm, Taylor Byrne, assessed
compensation for the loss of land as follows:
Value before resumption -
3295m² GFA (Gross Floor Area) @ $780/ m² $2,570,100
Less Value after resumption -
2132m² GFA @ $700/m² $1,492,400
Compensation $1,077,700
It is to be noted that the original claim for compensation for loss of land and
injurious affection filed in the Land Court registry on behalf of the claimant in the
sum of $1,556,000 was amended during the hearing below to accord with Mr Walsh’s
assessment of compensation.
For the respondent Council, Registered Valuer John Richard Wood of John
Wood & Associates assessed compensation for the loss of land as follows:
Value before resumption -
6106m² @ $80/m² $ 488,480
Less Value after resumption -
5035m² @ $80/m² $ 402,800
$ 85,680
Mr Wood adds to his valuation the comment that the value of enhancement
should be deducted from this figure. This is equivalent to the unquantified cost of
-- 6 of 15 --
7
carrying out development approval roadworks - found by the Land Court to be
$89,700.
It follows that Mr Wood’s assessment of compensation is NIL due to what he
believed was the factor of enhancement.
The basis of the Land Court determination of compensation in the sum of
$142,000 for the value of the land taken, injurious affection and severance is set out in
a subsequent and separate decision by the learned Member on disturbance items and
costs dated 6 July 1998. It reads:
“Subject land - 6106m² @ $145/m² $ 885,370
Less cost of external roadworks $ 89,700
$ 795,670
Less remaining land - 5,035m² x $130/m² $ 654,550
$ 141,120
Adopt $142,000. ”
Now the allowance made for the cost of external roadworks (rezoning
conditions 3.04, 4.01 and 4.02) in the sum of $89,700 is the result of the adoption by
the Court of an engineering cost estimate by consulting engineers Gutteridge Haskins
and Davey Pty Ltd. No challenge is made to the determination of the cost of external
roadworks but the appellant submits that application of the Pointe Gourde principle
requires that the cost of the roadworks be ignored in assessing compensation. It was
further submitted that the approach of the Member to the application of the Pointe
Gourde principle was erroneous as it, in effect, confined its application to
circumstances in which the resumption scheme altered the type of development rather
than its scale. The passages in the reasons which were the subject of these complaints
are as follows-
“In my opinion, the claimant’s submission on the reverse Pointe
Gourde principle cannot succeed. In this case there is not a change in
kind to the highest and best use of the land which is referrable to the
road widening scheme. At all material times South Pine Road and
Queens Road existed. The potential for the subject land to be re-
zoned to achieve its highest and best use was not influenced by the
road widening. This is not a case where, say, a new expressway or
dam through or on the land completely changed its potential or
-- 7 of 15 --
8
assisted it to achieve its potential. With or without the road widening
the potential for the highest and best use of the land remained the
same. Rather it is the area of land which can be developed for that
highest and best use which is affected by the roadworks. The extent
to which the land can be used for that purpose will be influenced by
conditions on rezoning. Those matters can be taken into account in
determining the before and after value of the land.
Accordingly, it is appropriate to consider the constraints on the
potential development of the subject land as including conditions
restricting work where road widening may occur.
Rather than provide enhancement of that land, I consider that the
undertaking of the works was a condition of rezoning and 3B approval
and the cost of carrying out those works is a cost which would
probably have been borne by the owner of the subject land as the cost
of consent to develop that land for its highest and best use.
Accordingly, I have concluded that the cost would (be) taken into
account by a prospective purchaser of the subject land who would
have factored that into the purchase price. Consequently, if the land
was ripe for development but the price of achieving that potential was
$89,700 then that amount would be deducted from the amount which a
purchaser would otherwise have paid for the subject land. ”
Mr O’Regan QC, correctly in our view, did not attempt to uphold the
Member’s conclusion that, in the circumstances under consideration, the impact of the
road widening condition upon the development potential of the land ought be ignored.
He argued that the Member was correct though in taking the cost of roadworks
into account on the basis that -
“The roadworks requirement although a step in anticipation of resumption
was one of many rezoning conditions. He correctly characterised it as ‘a cost
which would probably have been borne by the owner of the subject land as the
cost of consent to develop the land for its highest and best use’ and ‘the cost
would [be] taken into account by a prospective purchaser of the subject land
who would have factored that into the purchase price’. Thus the Member
found that the cost was one which would have to be incurred regardless of the
resumption scheme and therefore should be brought into account. ”
In Housing Commission of NSW v. San Sebastian Proprietary Limited (1978)
140 CLR 196, Jacobs J, with whose reasons the other members of the Court agreed,
said that section 124 of the Public Works Act (NSW) states in statutory form the
-- 8 of 15 --
9
principle expressed in Pointe Gourde Quarrying and Transport Co Ltd v. Sub-
Intendent of Crown Lands [1947] AC 565 at 572. The section was paraphrased by his
Honour in the following terms –
“… s. 124 of the Public Works Act … so far as is material, provides
that the assessing tribunal shall assess the compensation according to
what they find to have been the value of resumed lands at the time of
publication of notification of the resumption without reference to any
alteration in such value arising from the establishment of railway or
other public works upon or for which such land was resumed.”
In Director of Buildings and Lands v. Shun Fung Ironworks Ltd [1995] 2 AC
111 the principle was explained in the following terms in the advice of the Judicial
Committee of the Privy Council –
“A landowner cannot claim compensation to the extent that the value
of his land is increased by the very scheme of which the resumption
forms an integral part. That principle applies also in reverse. A loss in
value attributable to the scheme is not to enure to the detriment of a
claimant: see Melwood Units Pty. Ltd. v. Commissioner of Main Roads
[1979] A.C. 426. The underlying reasoning is that if the landowner is
to be fairly compensated, scheme losses should attract compensation
but scheme gains should not. Had there been no scheme those losses
and gains would not have arisen.”
As the above passage makes plain, the principle applies in respect of any
change in value of the land caused by a scheme of which the resumption forms part.
In The Crown v Murphy (1990) 64 ALJR 593, it was said in the Judgment of the
Court at 595 –
“One purpose of this principle is to ensure that a resuming authority
does not employ planning restrictions to destroy the development
potential of the land and then assess compensation for its resumption
on the basis that the destroyed potential had never existed: Melwood
Units Ltd v Main Roads Cmr [1979] AC 426 at 434. The principle
applies in cases where there is a direct relationship between the
planning restriction and the scheme of which resumption is a feature
and extends to cases where there is merely an indirect relationship,
provided that the planning restriction can properly be regarded as a
step in the process of resumption: Housing Commission of NSW v San
Sebastian Pty Ltd, at 206-207. ”
It was accepted on behalf of the respondent that a road widening scheme came
into existence in about March 1993 when the respondent first took steps towards the
-- 9 of 15 --
10
planning and implementation of a widening of South Pine Road. In April 1994 the
respondent advised the appellant that a proposed road widening would affect the
appellant’s March 1994 application. In our view, the evidence demonstrates a direct
relationship between the road widening requirement imposed by the Council and the
scheme. The imposition of the road widening requirement can properly be “regarded
as a step in the process of resumption”. In those circumstances, we can see no
justification in principle for the restrictive approach urged by the respondent.
Consequently, by application of the Pointe Gourde principle, the value of the
parent land before resumption must be assessed without reference to the cost of the
external roadworks. An additional consequence of rejecting the Member’s approach
to the application of the Pointe Gourde principle is discussed later.
Apart from the reverse Pointe Gourde submission, the decision of the Land
Court was placed under attack by the appellant in other areas. Counsel submitted that
it is clear from the transcript that the learned Member misinterpreted the evidence of
valuer Walsh when he said in his decision that Mr Walsh suggested that, if he valued
the land on a per square metre basis, then he would have applied a value in the range
of $100 to $150 per square metre. But reference to the transcript reveals that Mr
Walsh did qualify this opinion when he said that “I would have thought that,
assuming that the capability aspect has nothing really to do with it, I would have
thought that, looking at the sales, the rate should be more like between $100 and $150
a square metre from the sales we have”. (Transcript p.78). (The underlining is ours).
It is also clear that Mr Walsh was firmly of the opinion that the development
capability of the subject land should be taken into account, and he sees it as being
superior to most of the sales introduced in evidence with the possible exception of his
sale No. 7 (AR 414).
It is further contended by the appellant that the learned Member should have
placed more weight in his decision on the use of the “Gross Floor Area” method of
valuation and sales comparisons. He found that “there are weaknesses in both the
GFA and the rate per square metre approach to determining the “before” and “after”
value of the land”. Before us, Counsel for the appellant company submitted that it is
open for this Court to determine compensation using the GFA method of assessment.
-- 10 of 15 --
11
He suggests we could reduce Mr Walsh’s GFA of 3295m² before resumption by a
factor of 25% given the Member’s conclusion that “there are commercial reasons
why, in my opinion, the highest and best use of the subject land would not be realised
in the form proposed by the ETA Group”.
The appellant urges us to determine compensation for loss of land using the
GFA method as follows:-
Value before resumption - 2470m² GFA
(3295m² less 25%) @ $780m² $ 1,926,600
Less value after resumption -
2132m² GFA @ $700m² $ 1,492,400
Compensation $ 434,200
In the event that this Court does not favour the use of the Gross Floor Area
method of valuation, Counsel for the appellant submitted that, using a value per
square metre method of assessment, viewed in the light of Mr Walsh’s sales and in
particular his sale No. 7 (AR 414) and his remarks that “that’s a superior location and
a superior position, it shows as a price per square metre of land at $338. If I were to
work on a value of land - a value of dollars per square metre of land I would have to
be taking cognisance of the $338 as shown in that sale” (Transcript p.117), it is open
for us to make the following finding on a per square metre valuation basis:
Value before resumption - 6106m² @ $200/m² $1,221,200
Less value after resumption - 5035m² @ $150m² $ 755,250
Compensation $ 465,950
A further attack was launched by the appellant against a remark of the learned
Member that Counsel for the claimant submitted that he should make a separate
assessment of compensation for severance by reference to the difference of $121,524
in construction costs in the proposed “before” and “after” developments. We note
-- 11 of 15 --
12
there was no separate allowance made for severance. But Counsel submits that he
was not talking about a separate allowance for severance. He was merely talking
about additional development costs in the “before” resumption scenario, but dealing
only with the cost penalty in the “after” scenario ($57 per m² additional cost on
“after” resumption Gross Floor Area of 2132m²) of $121,524 (2132m² GFA x $57).
We agree that some allowance should be made in the “before” and “after” land values
for the additional development costs in the “after” resumption scenario but not to the
extent of $121,524, and Counsel for the appellant submits “he (the Member) hasn’t
given this factor, whether it’s $121,000 or something less than that - but plainly he
hasn’t given it enough weight”.
But the learned Member identified, correctly in our view, that the “before” and
“after” method (of compensation assessment) which he had adopted effectively takes
up any severance and injurious affection suffered by the dispossessed owner.
It is submitted by Counsel for the respondent that the adoption of a Gross
Floor Area method of valuation to the exclusion of a “per square metre” basis would
be to adopt the primary method of valuation used by Mr Walsh and to exclude the
opinions expressed by three other valuers called in the case that the preferable method
of valuation is the per square metre basis. For this reason, the respondent says that
the learned Member’s approach to compensation assessment, being based on the
respondent’s method of valuation and on its evidence, should not be disturbed
because no error of law has been demonstrated.
We do not favour the use of a “Gross Floor Area” method of valuation to the
exclusion of a “per square metre” method when the task at hand is to value
commercial-type properties. The obvious weakness in using a “Gross Floor Area”
method is that it makes the underlying assumption that the subject land and the sales
evidence parcels will ultimately be developed to the maximum permissible gross floor
area within the particular commercial zoning. But this may not, and often is not,
achieved upon the development of a vacant commercial site for any of a number of
reasons - e.g. site topography, building design, economic feasibility studies of the
building design etc. We prefer the use of the “per square metre” method of valuation
but emphasise that valuers must take care when valuing commercial land on a “per
-- 12 of 15 --
13
square metre basis” to carefully consider all aspects of the application of basic sales
evidence, including giving proper weight to development potential and/or capability.
We should add the comment that there is simply no evidence upon which we could
adopt the appellant Counsel’s submission that the GFA used by Mr Walsh in his
before valuation should be reduced by a factor of 25%. He has taken the liberty of
selecting a reduction factor in the GFA since the Land Court was satisfied that the
development on the subject land would have been larger than that on the retained land
but not 54% larger. It seems to us that the only evidence which could be used to
nominate a percentage reduction factor in the GFA would be the pre-resumption
Development Plan (SK02 - Part Exhibit 14) prepared by Rhonan O’Brien Pty Ltd in
February 1994 for rezoning application, and this plan provides a GFA of 2768m² - or
a factor of 16% less than the GFA used by Mr Walsh in his valuation exercise. But it
seems these plans prepared by Rhonan O’Brien Pty Ltd were not considered by the
client at that time (Seymour Developments) to have been commercially viable - vide
Report E.T.S. Group (AR 263 Pt 6).
The values per square metre submitted for our consideration by Counsel for
the appellant have no support in the evidence in the Record. But we are convinced
that Mr Walsh would have applied a higher value than “$100 per square metre to
$150 per square metre” in valuing the subject land before resumption having regard to
its “development capability”. We are also satisfied that the value of the parent land
should be marginally higher than that found by the learned Member, mainly because
of its better topography and consequent greater development capability when the road
widening is to be ignored because of the application of the Pointe Gourde principle in
reverse. Another factor is that the development costs pre-resumption are lower per m²
GFA than they are post-resumption. But the value of the parent parcel is to be
determined in the light of the notional restoration of the pre-resumption access to the
site which is considered satisfactory by Mr Walsh but not looked upon so favourably
by Mr Wood.
The appeal is allowed, and the determination of compensation in the sum of
$142,000 by the Land Court is set aside. We make the following compensation
determination:
-- 13 of 15 --
14
Value of land before resumption -
6106m² @ $150/m² $915,900
Less Value of land after resumption -
5035m² @ $130/m² $654,550
Compensation for land resumed and for
severance (additional development costs
on retention area) $261,350
This determination of compensation is rounded off to $261,500.
Costs:
The appellant/claimant has succeeded in the appeal to the extent that the
compensation determination by the Land Court has been increased from $142,000 to
$261,500. It is entitled to recover its costs of the appeal. Accordingly, in accordance
with the provisions of section 44(16) of the Land Act 1962, we ORDER that, in
addition to compensation payable, the respondent Council of the Shire of Pine Rivers
pay the claimant’s/appellant’s (Doolan Properties Pty Ltd) costs incurred in relation
to this appeal, such costs to be ascertained and fixed by the Taxing Officer of the
Supreme Court at Brisbane according to the scale of costs prescribed by law for the
time being in respect of proceedings in the Supreme Court and the Taxing Officer is
authorised and required to ascertain and fix such costs in accordance with this order.
J.
Justice of the Supreme Court
President of the Land Court
-- 14 of 15 --
15
Member of the Land Court
-- 15 of 15 --
Official source: https://www.sclqld.org.au/caselaw/QLAC/1999/001