Fernkiln Pty Ltd v Australian Building Industries Pty Ltd [1998] QSC 23
'", .,.
! {
l.
(
( :
I
IN THE SUPREME COURT
OF QUEENSLAND
TOWNSVILLE
BETWEEN: FERN KILN PTY LTD
Plaintiff
AND: AUSTRALIAN BUILDING INDUSTRIES PTY LTD
No 119 of 1997
Defendant
REASONS FOR JUDGMENT - CULLINANE J.
DATED THE FOURTH DAY OF MARCH 1998.
This action rises out of dealings between the plaintiff and the defendant and the
construction by the plaintiff of a substantial building which it had been contemplated
would be occupied by the defendant pursuant to a lease.
The issue which arises is whether there was any concluded agreement for a lease
and secondly, whether, if there was not, an estoppel arises which precludes the
defendant from denying either that there was such a lease or alternatively denying
that it was bound to conclude such a lease.
The land upon which the building was constructed is owned by the plaintiff and it is
the plaintiff's case that the lease relates to a part of that land.
-- 1 of 15 --
(
(
i ( )
, "\.
2
The plaintiff argues that an agreement was reached between the parties in mid July
1996. It is contended that a proposal submitted by the plaintiff to the defendant
dated 17 July 1996 constituted an offer which was accepted by the forwarding of a
letter of intent on 19 July by the defendant to the plaintiff. In addition the pleading
alleges a conversation between a Mr Hastie on behalf of the plaintiff and a Mr Irwin
on behalf of the defendant on or about 19 July 1996 although I think it is fair to say
that the plaintiff primarily relied upon the two documents I have referred to.
The first document is headed "Design and Construct" and was prepared by Ferry
Real Estate for the plaintiff or an associated company which carried out the building
work.
It is exhibited to the first affidavit of Mr Aylward. The real property description
contained in the proposal and the area described referred to the whole parcel
rather than the part ont upon which the building was to be constructed.
Under the heading, "Lease" the following appears:
"Seven year term certain plus similar option of five years. The terms and
conditions of the lease shall be normally acceptable terms and conditions as
prevail in the North Queensland region. The Lease is obviously varied to suit
the circumstances of the particular development."
The document referred to gross rental of $82,200 per annum and under the
reference to rental appears: "Note; gross rental includes all outgoings."
However, it went on to provide that the Lessee was to pay increases in rates, fire
-- 2 of 15 --
(
(
(
3
levy, air conditioning, maintenance, and building insurance over the lease year.
It concludes with the following:
"Provided that the proposal is accepted by 25 July, it is envisaged that
handover would be approx 18 December 1996. The move in could then be
instigated over the Xmas break for set up by 2 January 1997. Lease
payments would then commence 1 February 1997."
There was a detailed description of the building to be constructed, which was to be
custom built for the defendant's business.
Mr Hastie, an employee of the plaintiff or an associated company, and who had
previously been an employee of the defendant was aware of the fact that the
defendant was seeking to have premises constructed at which it could conduct its
business, a~d knew that the plaintiff owned suitable land. He held a meeting with
Mr Irwin, an employee of the defendant who was at the time described as "general
manager-branches." This led to the preparation of the document that I have
referred to.
Mr Hastie says that he indicated to Mr Irwin the area of land which would be
subdivided off, something which Mr Irwin says he does not recall although he says
that he did go to the site with Mr Hastie.
Mr Hastie says that Mr Irwin asked that he (Mr Hastie) arrange for a proposal to be
prepared and forwarded to him and said that it would be considered by a board
meeting on 19 July if it was to hand by that date, and a letter of intent would be sent
-- 3 of 15 --
,---
(
4
on that day if the proposal was approved. According to Mr Hastie, Mr Irwin said that
once the letter of intent had arrived the building work could start immediately and
occupation was required by 2 January 1997. Mr Irwin denies making any statement
about the commencement of the building work.
The defendant, under cover of a letter dated 19 July 1996, forwarded a document
headed "Letter of Intent."
The covering letter stated that there were some changes to the proposal, the major
one being the desire to have a separate lease agreement for overhead cranes
which were to be included in the construction.
The initial rental was shown at $76,000 per annum gross and the document went on
later to relate that there would be included two six tonne full travel cranes at an
approximate lease cost of $6,200 per annum. Under the heading "Outgoings" the
word, "Nil" appeared. Under "Reviews" the words, "Annual increases at Brisbane
CPI rate to a maximum of 6%" appeared.
The Letter of Intent contained the following paragraph:
"Legal costs - the roofing centre would prefer that each party pay their own
legal costs and outlays in relation to preparation of lease documents (with the
exception of stamp duty and registration fees.)"
It also provided:
"The lessor should complete the construction of the building no later than 18
December 1996, failing which The Roofing Centre Pty Ltd will be entitled to
-- 4 of 15 --
(
(
5
terminate or renegotiate the agreement of the lease."
At the back of the document was a sheet which was headed "This agreement dated-
------" and which made provision for signature by the lessee and the lessor and
witnesses. The defendant signed by a Mr Webb but the exhibit does not have any
signature on behalf of the plaintiff although Mr Aylward says that he in fact signed
the document at some time.
All of the dealings up to this time had been between Mr Hastie and Mr Irwin.
Mr Hastie says that Mr Irwin contacted him on 19 July and told him that the project
had been approved. He says that he told Mr Irwin that he would commence work
straight away.
( ) According to Mr Irwin, whilst he told Mr Hastie that the board had approved the
project, he did not regard that as being a final agreement but thought that a lease
( would have to be prepared and executed by the parties. He cannot recall if Mr
Hastie said that they would commence work straight away but acknowledged in
evidence that some steps would have had to have been taken fairly quickly to meet
the timetable. He suggested that since no approval had been obtained from the
local authority it would be necessary for steps to be taken quickly because of the
time that these usually take to be granted although he suggested that there was
ample time for the actual construction.
-- 5 of 15 --
6
The steps which were taken upon the receipt of the letter of intent are set out in the
affidavit of Mr Aylward.
These included, apart from the preparation of plans and the lodging of application
for approval, the ordering of two internal cranes costing approximately $63,000.
On about 7 October 1996 Mr Hastie requested advice from the Townsville manager
of the defendant on machine layout and layout of the three phase power in the slab.
Earthworks commenced on 8 October 1996.
(' Mr Aylward, a director of the plaintiff, consulted solicitors in August 1996 and as a
result a letter dated 15 August was written to the defendant in the following terms:
"We advise we act for the Directors of Fernkiln Pty Ltd who have instructed
us to act in relation to the proposed Lease of the above property.
We have been handed a copy of your letter of the 19th July and in respect of
the Letter of Intent enclosed therewith we are instructed to comment as
follows:-
(a) The rental of $76,000.00 per annum gross is agreed. However, your
company will be responsible for all outgoings in respect of the demised
• \_ premises;
(b) The annual increases in line with the CPI with a maximum of 6% is
agreed. However, the increase is to apply to the whole rental with no
concession for the value of the cranes;
(c) OUfclients are prepared to waive the usual requirement for Directors
Guarantees if we can be provided with a reference from the
Company's Bank;
(d) In relation to the payment of costs and outlays we advise our clients
are prepared to meet their own costs in all matters leading up to the
preparation and registration of the final Lease.
In other words each party will meet their own costs in respect of the
negotiation preparation and execution of the initial agreement to Lease, but
-- 6 of 15 --
i (
7
you will be responsible for our clients costs and all outlays in respect of the
Final Lease.
We advise that all other matters referred to in your letter of Intent are agreed.
We look forward to receiving your acceptance of the matters referred to
above at your earliest convenience so that we can proceed with the
preparation of the necessary documents."
By a letter of 5 September 1996, solicitors engaged for the defendant responded
and as can be seen, agreement was reached about the matters raised by the
plaintiff's solicitor. This letter concluded:
"Would you please proceed with the preparation of lease documentation and
submit a draft of the agreement for lease and lease to this office for perusal
on our client's behalf."
On 9 September 1996 the plaintiff's solicitors replied that they would now proceed
with the preparation of the agreement to lease once the plan had been finalised.
A lease and agreement for lease were forwarded by the plaintiff's solicitors to the
solicitors for the defendant by letter of 11 November 1996. Reasons for the delay
(, were not fully explained in evidence although Mr Aylward suggested that one
difficulty which arose was that the defendant's solicitors wanted separate leases for
the cranes and the building and this led to some delay before matters were
resolved. There is no correspondence before the Court on this subject. The
matter had been raised in the letter of 19th July.
It would seem that the defendant at some time determined to change the nature of
its operations in Townsville which would have made the use of the premises to be
-- 7 of 15 --
(
(
8
constructed unnecessary although there would still have been a need for some
smaller building.
Mr Irwin arranged to meet Mr Hastie and Mr Aylward some days prior to 11 October.
Mr Hastie suggested it was on 9 October. At this meeting, Mr Irwin raised the
question whether the building could be made smaller and Mr Aylward said that in
view of the monies that had been spent it would not be possible to do so. It was left
on the basis that Mr Irwin would contact his superiors in Brisbane and that a letter
would be written. It would also seem that somewhat earlier than this Mr Irwin had
contacted Mr Hastie raising the possibility that one of the cranes could be deleted.
Mr Hastie says that he told Mr Irwin this was not possible and Mr Irwin said "All right.
Just let it go." Mr Irwin generally agrees with what is said about this conversation
although he says that he cannot recall being told that the cranes had been ordered.
By a letter of 11 October 1996, the defendant wrote to the plaintiff in the following
terms:
"I regret to inform you that due to a major policy change in our company's
manufacturing division, we no longer require the building you have proposed
to us at 608 Ingham Road Townsville.
Please instruct your Solicitors not to go ahead with lease documents to avoid
unnecessary costs. We do however still require new premises and would be
happy to occupy the office area and shed of 20 x 15 with front access only.
We do not require a crane but under the circumstance we could accept one
only.
We would be prepared to pay $2,800-00 per calendar month for the above
with the crane or $2,300-00 without. Please accept my apologies for this
change and notify me as soon as possible if this is acceptable."
-- 8 of 15 --
(
'.
(
9
At this time excavation works had been under way for only a few days.
The plaintiff replied to the letter by a letter of 16 October 1996;
"We refer to your letter of the 11 th October advising that you no longer
require the building we have commenced constructing on your behalf.
Unfortunately, we advise that it is too late for you to change your
requirements at this stage. Our respective Solicitors have concluded the
terms of the Agreement for Lease and the Lease, and our Solicitors have
prepared a" documents ready for signature. There is, accordingly, a binding
Agreement already in existence.
On the basis of that Agreement our Company has entered into a Contract for
the sale of the property, and that Contract is, of course, subject to the Lease
we have agreed to. If the Lease does not proceed that Contract will fail, and
our Company wi" be faced with the prospect of legal proceedings and/or
substantial financial losses.
In addition to these matters we have ordered a" building materials; ordered
both cranes; prepared and had passed a" plans; prepared and lodged a"
necessary sewerage, survey, power, workplace and safety and building
applications. The cranes are in transit, the pre-fabrication works underway
and the earthworks commenced.
Accordingly, we advise it is not possible to change the construction in the
manner referred to in your letter, and the project must proceed in the manner
agreed.
Kindly confirm that the agreement wi" be complied with as a matter or
urgency."
A further meeting was arranged between Mr Aylward and Mr Hastie on one side and
on the other side, Mr Irwin and this took place on 23 October 1996. Also present
was the Townsvi"e manager of the defendant.
According to Mr Hastie Mr Irwin apologised for the way matters were proceeding but
said that a business decision had been made to cease production of roofing and
-- 9 of 15 --
10
tiling. Mr Hastie says that Mr Irwin stated that until a final decision had been made
by the defendant the plaintiff would have to continue building the complex. Mr Irwin
denies saying this although he suggested in cross-examination that what may have
.happened was that Mr Hastie and/or Mr Aylward had pointed out the position the
plaintiff was in and the fact that considerable monies had been expended and works
carried out, and that in its position, the plaintiff had no option but to proceed and
that Mr Irwin may have acknowledged the difficulty of the plaintiff's position and said
that he understood why the plaintiff considered it had no option but to proceed.
find it difficult to accept that Mr Irwin would have used language of the kind. Mr
Hastie says he did in view of the letter of 11 October and his own statement, th~t the
defendant had changed its operations and would no longer be carrying out the
production of roofing in Townsville.
After this, the plaintiff on occasions wrote to the defendant about the progress of the
building.
Upon the receipt by the solicitors for the defendant of the draft agreement for lease
and lease (which came under cover of a letter dated 11 November 1996) those
solicitors wrote to the plaintiff's solicitors denying the existence of any binding
agreement stating that it was always the defendant's intention that a concluded
lease would only be effected by the execution of the formal agreement.
There was some contact between representatives of the plaintiff and the
defendant's local manager about the nature of the floor and the location of power
-- 10 of 15 --
(
11
points after this but I do not regard these as matters of any significance on the
evidence I have before me which is relatively limited.
The plaintiff contends that the defendant, by the letter of intent, concluded an
agreement with the plaintiff by accepting the offer contained in the design and
construct document.
Whilst it might readily be accepted that a substantial level of agreement was
reached, it is clear from the letter to the defendant on 15 August 1996 that some
matters were outstanding. These were of some significance in relation to the rent,
the dispensation with directors guarantees and costs and outlays.
I do not accept that an agreement had been concluded as the plaintiff contends.
It is also clear that in consulting solicitors the plaintiff did so for the purposes both of
negotiating the outstanding matters in relation to the lease and to prepare the
formal documentation.
It is clear that the solicitors could not conclude an agreement on behalf of the
parties. See Pianta v. National Finance and Trustees Limited (1964) 180 CLR 146.
I think that the proper conclusion to be drawn from the dealings between the parties
is that it was intended that they would be bound only upon the execution of the
formal agreement.
-- 11 of 15 --
12
The parties each desired to get the project underway. The defendant wished to
enter into possession by the end of the year and the plaintiff it seems wished to sell
the building tenanted.
It is in the circumstances perhaps not surprising that the plaintiff with the
defendant's knowledge commenced to get the project under way. It is clear that the
defendant was aware that at least some of these steps had been taken, particularly
( .. \
so far as the obtaining of approval, permits and the like are concerned. The
evidence does not satisfy me that the defendant was aware that substantial
(' expenditures had been made or obligations incurred in relation to the cranes prior to
the discussion to which I have referred. Nor am I satisfied that Mr Irwin told Mr
Aylward that work should commence once the approval of the board of the
defendant was obtained. However, I am satisfied both parties proceeded on the
basis that the project would get under way after the Notice of Intent was forwarded.
The defendant was at all times aware that the plaintiff was proceeding with the
project. I am satisfied that the time-frame allowed was fairly tight although the
evidence does not permit a conclusion as to the least time the building would have
taken to complete
The preparation of the formal documents took a considerable time which is not
wholly explained by the evidence. As already mentioned, Mr Aylward suggested
some difficulties associated with the defendant's wish for separate leases arose but
the evidence on this subject is relatively scanty and it is not possible to draw any
-- 12 of 15 --
i (
13
conclusions as to why the delay occurred.
Brennan J(as he then was) said in Walton Stores (Interstate) Limited v. Maher
(1987-88) 16 CLR 387 at 423:
"Parties who are negotiating a contract may proceed in the expectation that
the terms will be agreed and a contract made but so long as both parties
recognize that either party is at liberty to withdraw from the negotiations at
any time before the contract is made, it cannot be unconscionable for one
party to do so. Of course, the freedom to withdraw may be fettered or
extinguished by agreement but, in the absence of agreement, either party
ordinarily retains his freedom to withdraw. It is only if a party induces the
other party to believe that he, the former party, is already bound and his
freedom to withdraw has gone that it could be unconscionable for him
subsequently to assert that he is legally free to withdraw."
I am satisfied that no agreement was concluded by the Letter of Intent. As is
obvious by the plaintiff's letter of 15 August there were still outstanding matters of
some importance.
The plaintiff's solicitors were engaged to negotiate the outstanding matters and
prepare the formal documents for execution. As I have said earlier, in my view the
appropriate conclusion is that the parties did not intend to be bound until this
occurred.
For the plaintiff to succeed on the issue of estoppel the Court has to be satisfied:
(a) That the plaintiff acted to its detriment in performing construction work
believing either that there was a concluded lease or that the defendant was
bound to conclude a lease.
-- 13 of 15 --
• <
(
14
(b) That the defendant by word or conduct induced such a belief and that it
would be unconscionable to allow the defendant to act contrary to the belief
so induced.
Here at least until 5 September the plaintiff could not justifiably have believed that
any lease had been concluded and from at least the receipt of the letter of 11
October was aware that the defendant denied the existence of any agreement or
any obligation to proceed to an agreement. There is, in my view, nothing in the
evidence of the defendant's conduct during the relevant period which would support
a finding of the unconscionability necessary if the claim is to succeed. Both parties
it seems to me proceeded in the belief that all would be well but I do not think that
the evidence justifies a finding under (b) above.
Much preparation work was done before terms had been agreed upon and virtually
all of the construction work was carried out after the defendant asserted that no
contract existed. I am not satisfied that the defendant ever resiled from this
position. From the time of the defendant's assertion that no contract existed the
evidence would suggest Mr Aylward took the view on behalf of the plaintiff that the
defendant had been bound by a contract concluded by the Notice of Intent. In this I
find that he was mistaken.
The plaintiff's claim therefore must fail.
It is necessary to assess damages. The damages are claimed on the basis of one
-- 14 of 15 --
(
15
year's rental in the figure of $82,200 together with rental for the period which would
bring it up to the hearing of $12,169.09 together with interest at 5% over the period
producing a figure of $5,504.39.
Whilst it is accepted that the relevant date as of which the contract was rescinded
was 15 December 1997, it is suggested that the plaintiff has failed to mitigate
damages by not accepting an offer which was made by a prospective lessee. The
evidence did not bear this out.
(
\,. . I think that the amount contended for by the plaintiff is not unreasonable and that is
the sum to which I have already referred together with an amount of $80,950
representing the present value of one year's rent together with a discounted present
value of $12,200 for the next six years representing the difference between the
contractual rental and $70,000, a figure which, on the evidence, there is a high
likelihood the plaintiff will achieve by way of rental.
l I therefore assess damages in the sum of $193,023.48. There will be judgment for
the defendant with costs to be taxed.
-- 15 of 15 --
Official source: https://www.sclqld.org.au/caselaw/QSC/1998/023