Dawson v Chief Executive, Primary Industries Corporation [1996] QLC 42
LAND COURT
BRISBANE
23 APRIL 1996
Re: A94-86
An appeal against a decision to amend Waterworks Licence G55345 -
North Johnstone River - Lot 4 on Plan NR 7980, Parish of Malanda.
A.W. Dawson
v.
Chief Executive, Primary Industries Corporation
(Hearing at Atherton)
D E C I S I O N
From a statement tendered to the Court through its author, Mr R.P. Walsh, Technical
Officer/Stream Control, Primary Industries Corporation, the following sections are reproduced
here:
"3.0 BACKGROUND
On 6 February 1992, Mr Dawson made application for a waterworks licence for an
existing weir he constructed across the North Johnstone River adjacent to his
property. An objection was recorded against the application by upstream
landowners, RG & ND Rogers.
Previous to that Mr Dawson had approached the Department seeking approval to
reinstate an old causeway. Although approval was given at that time,
subsequent inspection in response to a complaint by the Rogers revealed that the
structure was a weir and therefore constituted 'works' under the Water Resources
Act 1989 (the Act).
After investigation, the application as applied for was granted. Waterworks Licence No
55345 then issued authorising the existence of a 1.5 metre high gravel and rock
weir. Under the Act, 'height' means 'the measurement equivalent to the
difference in level between the natural bed of the watercourse at the downstream
toe of the barrier and the top of the barrier'.
The weir is less than 40 metres upstream from a low level bridge that forms part of Glen
Allyn Road. The bridge is naturally inundated by the river from time to time.
Because of the non-permanent nature of the structure, streambed variability and the
public asset downstream, it was necessary to ensure the crest of the structure
remained at a fixed level. An assumed level datum was established on the
bridge and the crest level determined in relation to that datum. The crest level
was thus fixed at RL 99.52 m ie. 470 mm below the level of datum point. The
water level was effectively raised 700 mm by construction of the weir.
Mr Dawson was issued with Waterworks Licence No. 55345 on 28 August 1992.
[1996] QLC 42
-- 1 of 7 --
2
4.0 APPEAL BY RG & ND ROGERS
Mr & Mrs Rogers subsequently appealed the decision of the Chief Executive. The
hearing of their appeal occurred on 29 November 1993.
On 25 March 1994, the decision of the Court was handed down. The Court ordered the
weir to be lowered 300 mm and directed that Special Condition 2 of the Licence
be amended by deleting the figure '99.52 m' and substituting the figure '99.22 m'.
Effectively the crest of the wall was to be lowered 300 mm and as a consequence, the
water level would be lowered a similar amount.
5.0 AMENDMENT OF LICENCE
In carrying out the court's decision to amend the licence document, two errors were
uncovered.
In the first instance, the elevation of the datum point was mistakenly read from a
computer generated plot of Surveyor J Charles' survey to be 99.89 m. Secondly,
the location of the datum point was inferred to be a bolt on the southwest corner
of the bridge wheelguard.
The reality was that the surveyor had used the top of a pipe cut off at about deck level in
the southwest corner of the bridge as the datum point. He assigned an assumed
value of 99.99 m to this datum point. Based on this survey data, Special
Condition 3 on Waterworks Licence 55345 should have read:
'The datum is a pipe at the southwest corner of the bridge having an
assumed level of 99.99 m.'
Later resurvey by Surveyor Charles established the assumed level of the bolt on the
wheelguard to be approximately 140 mm higher or at RL 100.136.
A permanent mark has now been established by Surveyor Charles as a recorded location
on the right bank. This permanent bench mark has a value of 105.97 which
relates to the original level of 99.99 m.
Licence No. 55345 was amended on 24 October 1994 to reflect the Court decision that
the crest of the weir be no higher than 99.22 m in elevation. A further
amendment was made to Special Condition 3 which specifies the bench mark to
be a steel star picket located on the right bank as mentioned above having an
elevation of 105.97 m. This datum is consistent with that used in Surveyor J
Charles original survey.
The amended licence was issued on 24 October 1994 and received on 26 October 1994."
Mr Dawson, the licensee and appellant, conducted the appeal on his own behalf. Mrs
T. Johnson, Barrister, appeared for the respondent.
-- 2 of 7 --
3
The background to this matter as described by Mr Walsh, is not entirely as Mr Dawson
sees it. In his opinion, the works should not be seen as of "non-permanent" construction. He
felt he had been given written approval by the Department for him to proceed with the actual
work as opposed to "reinstating an old causeway" prior to the need for the initial licence
application. Indeed, in a letter dated 10 February 1992, accompanying the application, are the
following paragraphs:
"I would also like your office to remember when considering my application that I had
previously contacted your office re this work and was subsequently granted
permission for the carrying out of this work in a letter dated 23rd Dec 1991."
......
"In light of these facts, I wish to make it known that in 'no way' do I consider in making
the enclosed application for 'Water Works Licence' that such application makes
'Null & Void' the approval as granted to me on the 23rd 12th 91." (That letter
stated that it was a notice to serve as an authority for Mr Dawson "to carry out
minor works").
Mr Dawson tendered a photocopy of what he said was the original licence application
and did not accept that the application contained a measurement indicating the height to the
"bywash" or "spillway", on the downstream side of the structure. The original application was
produced by the respondent. I have no doubt that the photocopy did not include part of the
margin on which the figure "1.5m" was written. It may be relevant, however, that the
application was clearly intended as describing the existing work and the "1.5m" indicated the
height to the "spillway" or "bywash" and "top water level".
As stated by Mr Walsh, the amendment to Special Condition 2 in the original licence, as
contained in Special Condition 2 of the amended licence, is in accordance with the decision of
the then President of the Land Court, Mr D.M. White, delivered on 25 March 1994 in the matter
R.G. & N.D. Rogers v. Chief Executive, Department of Primary Industries.
Mr Dawson claims that prior to the hearing of the Rogers appeal, he had already
lowered the height of the "crest" of the "spillway" in an effort to appease those appellants. Part
of the thrust of this appeal was initially directed towards the outcome of that appeal. Mr
Dawson was not included as a party to the proceedings in that appeal and was not called to give
evidence. He seems convinced that the Land Court decision was based on some unreliable
evidence which he believed he could have rebutted had he been called to give evidence. He
obviously sees himself as a "person aggrieved" by the decision, because he interprets the
specified "crest level" as amended and reduced from the original structure, to be inconsistent
with the then adopted benchmark and its assumed datum level. He says that he passed on that
information prior to the hearing of the Rogers appeal.
Mr Dawson has experience as a "construction engineer - registered builder" and he is
well-versed in matters relative to construction works, benchmarks and levels. He quite
-- 3 of 7 --
4
correctly argues that if an original benchmark and its level are altered, then no reliance can be
placed on other levels obtained from that original benchmark.
The original licence, with which the Rogers appeal was concerned, contained five
Special Conditions, Nos. (2) and (3) of which are relevant to this matter as follows:
"(2)The crest level of the dam is not to exceed 99.52 (assumed datum).
(3)The datum is a bolt on the southwest corner of the bridge having an assumed level of
99.89 m.
Mr Dawson had found at the time when initial survey work had been carried out, a bolt
in the south-west corner of the bridge, covered by a red plastic cap (which he had
photographed). He assumed (not unnaturally) that bolt was the benchmark referred to. There
were no other identified marks. The survey information which he said he passed on to the
respondent was obtained from the Mr and Mrs Rogers' surveyor but not, according to him,
included in evidence in that appeal. Because of pending alterations to the bridge (Glen Allyn),
the Department's surveyor had established another more permanent benchmark in another
location. That had a stated assumed elevation of 105.97 m, based on the datum of the original
bridge benchmark. Mr Dawson had accepted (from comments made by Mr and Mrs Rogers'
surveyor), that the elevation of the new benchmark would have been incorrect, based on the bolt
(which the surveyor apparently also accepted as the original benchmark) having an elevation of
99.89 m. The new benchmark, on his assessment, should have been 105.723 m. Otherwise,
for the level of 105.97 m to have been correct, the original bridge benchmark could not have
been the bolt as stated but instead the top of a "sawn-off" 2-inch galvanised pipe in close
proximity to the bolt.
This, in Mr Dawson's reasoned opinion, resulted in the original levels for the crest of the
dam being inaccurate as well as the reduced level of 99.22 metres ordered by the Court.
However, in the amended licence the ordered crest height was "not to exceed 99.220
metres" and the original Special Condition (3) was amended to the following:
"The datum is the top of a steel star picket driven to ground level and located as shown
on form SS2 held in the Mareeba District Office. The Bench Mark is numbered
923234 and has an assumed elevation of 105.970 m."
The grounds of Mr Dawson's appeal referred to the potential effects of the Land Court
decision associated with the alleged erroneous levels. Also included were allegations of
"non-existent" consultations emanating from the Mareeba DPI. Mr Dawson claimed that the
wording in Special Condition (2) should read crest level of "spillway" and not "dam".
In this matter, Mr Dawson was specifically refused attempts to give evidence as to
matters relating to the Rogers appeal, except to the extent that the decision was alleged to affect
the validity of the specified levels. It is clear to me that the decision in that matter required the
crest level of the dam structure licensed originally, based on its original construction, to be
lowered by 300 mm. If the reduced level as specified was found to be based on erroneous
-- 4 of 7 --
5
levels then the specified "crest level" would be, in my opinion, subject to review in this appeal -
but not the reference to 300 mm. In my opinion, jurisdiction does not lie with this Court to
hear an appeal against the decision in Rogers. Now, if Mr Dawson has, since its original
construction and survey, already reduced the "crest level of the dam" then he may have, by his
own efforts to resolve that appeal, already complied with the order. That is not a matter which
I can decide,. but would need to be proved by survey. It seems to me that Mr Dawson's
suggestion that "crest" should, in practical terms, relate to "spillway" has in this case, some
technical support. It might well be that the spillway should be contained within the middle
section of the structure while the wings or other sections might be of higher elevation and still
serve the best interests of all concerned. For example, there was a suggestion (in
correspondence from the Department to Mr Dawson) that directing the low flow to a central
"spill" section of the structure would have the effect of reducing the ponded water height whilst
also reducing or preventing downstream river bank erosion.
It is observed that the subject licence was (apart from appeal provisions in the
legislature) due to expire on 31 March 1996. If "works" are to remain, or be altered, Mr
Dawson would be required under the provisions of the Water Resources Act 1989 to make
application for a fresh licence. The time now appears to have arrived for such application to be
made and to include a description of the works which might be more complete and technically
correct, if for example, the "crest" should apply to a section of "spillway" to remove any doubt -
in the interests of all concerned. As I see it, it would be open for the applicant to seek a new
licence for whatever "works" he requires. The application then must be investigated and no
doubt the decision of the Land Court in Rogers would not be overlooked by those responsible
for the investigation. If evidence is available to warrant alteration to the Rogers decision, either
favourably or otherwise to the applicant, then that evidence would need to be sought and
considered. The decision of the chief executive on any new application, would be open to
appeal to the Land Court, under presently existing legislation, by any person who is deemed to
be "a person aggrieved" by that decision. In my opinion, the Land Court in such a situation
would not be bound by the decision in Rogers, but would be unlikely to exclude from
consideration the reasons for that decision.
This matter cannot be determined on the basis of what might occur in the future. The
evidence of Mr Walsh provided an understanding of the position of the Department and his
version of the history of the licensing of the works. What has been crucial to my decision
however has been the evidence of Mr J.B. Charles, an Engineering Surveyor, Water
Commercial Unit of the Department of Primary Industries. He informed the Court with what is
accepted as frank and honest evidence, of the background of the alleged surveying inaccuracies.
He had established the original bridge benchmark. It was never anything else than the
sawn-off pipe, although that had not been marked for identification by others (e.g. by painting).
He had nothing to do with the reference to "bolt" in the licence. A copy of his field notes dated
27 March 1992 referred to the "TBM" (temporary benchmark) as "Top of Cut of signpost
-- 5 of 7 --
6
SWCNR Johnstone R Bridge ..." He explained how a computer-orientated adjustment had
resulted in that level (which was intended to be an assumed datum of 100.000 m) becoming
99.995 m and then, to two decimal places, 99.99 m. On the survey "plot" for which he had
been responsible, the benchmark notation caused that elevation value figure to be partially
obscured, resulting in an incorrect translation by others to 99.89 as had been entered on the
licence. Mr Charles had not placed any marking on the bolt on the bridge because it did "not
come into it" and he had no knowledge of the plastic container top referred to by Mr Dawson.
Mr Charles had established all levels including that of the more recently established benchmark
and of various stations on the "crest of the dam" which was then given an average elevation of
99.52 m - as constructed at that time. On his evidence, it is clear that Mr Dawson's fears as to
incorrect levels having been adopted in the Rogers case and potentially influencing the future
level of the structure, have no substance. His fears were perfectly understandable however
based on the incorrect but somewhat crucial information transposed to the actual licence on
which he relied.
In fact, Mr Dawson's fears should have been allayed to some extent after Mr N.J.
McKenna, the Principal Technical Officer in the Resource Management Business Group of the
Department in Brisbane, took an active on-site interest in the matter in an endeavour to resolve
the problem. Mr McKenna was called as a witness for the respondent. He had been able to
carry out what he described as a "rough bush survey" and took some levels in company with Mr
Dawson, starting at the new benchmark, traversing down to the dam (or "weir" as he described
it) and the lower level bridge and eventually back to the benchmark - successfully closing off
the survey.
If it was practical it would seem to me to be desirable for Mr McKenna to have some
over-viewing role if (but more likely when) the expiry of this licence causes another round of
investigations and deliberations. He impressed me as having reintroduced some technical
common sense and desirable "public relations" communication into dealing with a problem
which requires solution, to allow the interests of all concerned to be best served - based on the
facts of the matter.
Mr Dawson went to considerable trouble in introducing a wide range of evidence
including some historical data as to the establishment of, and the location of the original
causeway. His reasons for constructing the works were clearly not selfish. He believed the
riverine environment had been enhanced. However he was concerned to create a safe water
activity facility in the wider public interest, and particularly for supervised district children, and
youth generally. No doubt issues such as safety and the wider community interest will be
matters which are capable of full consideration in any future licence application.
In summary however, while I am satisfied that Mr Dawson has some valid grievances,
those cannot be accepted as constituting successful grounds of appeal in this matter.
The appeal is therefore dismissed and the decision of the chief executive, in amending
the licence, is confirmed.