Emerson v Chief Executive, Primary Industries Corporation [1996] QLC 5
LAND COURT
BRISBANE
7 FEBRUARY 1996
Re: An appeal against a decision to refuse an application to
obtain an irrigation supply from the Johnstone River - Water
Resources Act 1989. (A95-48)
M.L. & I.G. Emerson
v.
Chief Executive, Primary Industries Corporation
(Hearing at Atherton)
DECISION
Mr and Mrs Emerson own land situated at Lake Barrine Road, Malanda, described as
Lot 46 on Plan NR 305, Parish of Malanda.
Following approval by the South Johnstone Local Board and the Queensland Sugar
Corporation, the Emersons were granted an assignment to grow sugarcane on 28 ha of their
land, as part of the 1993 expansion for supply to the South Johnstone Mill. In April 1994,
the assignment was increased to 57 ha.
An Application (No. 56848) dated 14 June 1994 was made by the Emersons for a
Waterworks Licence to take water from the Johnstone River for the purposes of "irrigation -
crop type - sugarcane - area 57.5 ha" together with "domestic" and "stock water".
Lot 46 does not enjoy frontage to the river. The proposed pump site and pipeline
were to be located within a "State-controlled road reserve". The necessary permit was
eventually obtained from Queensland Transport. The Waterworks Licence Application was
advertised in March, 1995. No valid objections were received.
By letter dated 21 June 1995, Mr and Mrs Emerson were advised that their
"application to obtain an irrigation supply from the Johnstone River has been investigated"
but "refused. The grounds for refusal being there is insufficient water to supply your
irrigation requirement, maintain existing licensees entitlements and preserve the physical
integrity of the Johnstone River." (Subsequent advice dated 20 July 1995 was provided to
the applicants' solicitors, however, that a "Waterworks Licence is now being prepared
authorising the use of water ... for stock and domestic purposes.")
An appeal was lodged in the Land Court on 19 July 1995 against the refusal, on seven
grounds. In broad terms the grounds covered the appellants' opinion that sufficient water
was available to supply their requirement, as well as maintaining existing licensees'
[1996] QLC 5
-- 1 of 7 --
2
entitlements whilst also preserving the physical integrity of the river; inability to otherwise
maintain a viable farming operation and the resultant financial hardship and distress.
Included in the grounds were the contentions that it would be just and equitable that the
appellant farmers be granted the licence and that it was unreasonable for it to be refused.
At the hearing of the appeal, barristers Mr D. Smith and Mrs. T. Johnson, appeared for
the appellants and the respondent respectively.
Both Mr and Mrs Emerson gave evidence in support of the appeal and further
evidence was adduced through a Mr J.D. Kidd, a local riparian land owner with many years
experience in the locality, and Dr M.A. Gilbert, an agricultural and environmental consultant.
One witness was called by the respondent - Mr R.P. Walsh, technical officer (Stream
Control).
The Emerson farm is quite small, the cane assignment covering most, if not its total
area. When the South Johnstone Mill Limited found the need for expansion and sought
interest from Tableland land owners to pioneer sugarcane farming in that locality, the
Emersons perceived an opportunity to conduct a self-sufficient and viable primary production
activity on their land. For various reasons other cropping use was not considered viable and
nor was, on past experience, and mainly due to the limited size, grazing activity. It seems
that no initial investigation had been made as to the potential irrigation requirement of the
sugarcane crop on this particular farm. Nevertheless, expense of some significance was
incurred in preparing and establishing plant cane on the assignment as well as for the
acquisition of suitable machinery. Mr Emerson is now convinced that sugarcane on the
property will need to be irrigated during a four month period normally September to
December and unless irrigation is available it is his belief that the venture will fail.
According to Mr Walsh, the majority of the North Johnstone River streamflow occurs
historically in the months of January to April, in response to monsoonal rains. On average
there is insufficient rainfall during the winter and spring months to augment streamflow with
lowest flow rates commonly experienced in October and November "although in extreme
years very low flow can be experienced into January".
As might be expected, maximum water requirement occurs during the period of
lowest yield. Mr Emerson does not see water harvesting during high yield periods for on-site
storage as a practical alternative due to the physical nature of the soils and topography of the
farm.
The real issue in this matter is whether a sufficient supply of water is available in the
Johnstone River to allow further diversion.
-- 2 of 7 --
3
There was no argument that the Department does not possess the legislative powers
necessary to preserve the physical integrity of the river. Although some criticism was
levelled at the methods employed in adopting "best estimates", no technical argument was
mounted against the Department's estimates of "volume of allocable water" at various
"control points". In the Department's investigation process the North Johnstone Catchment
had been considered in terms of six Control Points, defining five Subcatchments. The first
Control Point was at the Malanda Falls. The investigating officer's report contained the
following passage -
"The Instream Requirement at Control Point 1 is 40% of Allocable Volume.
The other 5 Control Points have an Instream Requirement of 25% of Allocable
Volume."
No argument was presented by the appellants against the reasoning behind the Department's
adoption of the instream ratio of allocation as representing "25% of both the mean annual
minimum discharge and the volume determined to be allocable with a 60% annual reliability"
or "to recognise that in some accessible locations there is significant amenity value in the
river system" where the decision was taken to raise the instream flow component to 40% of
the allocable volume.
The investigation report (which was tendered through Mr Walsh) had been compiled
by another officer who came under Mr Walsh's supervision. The report contained the
following passage -
"The pump site and the irrigation area is in Subcatchment 5. However it has
to be treated as within Subcatchment 4 as the pump site is only 500 m
downstream of Control Point 4. The majority of Subcatchment 5's area is
contained in the Malanda/Gardner Creek Catchments. Due to virtually
identical locations and catchment areas, it is my opinion the assessment of
system demand at Control Point 4 be applied to Emerson's proposed pump
site."
It was Mr Emerson's evidence that the investigation report was erroneous in that the
proposed pump site was 700 m downstream and then located at the confluence of a tributary
within Subcatchment 5 which in turn provided permanent flow of water (albeit not of great
volume in low flow periods) into the river and augmenting the flow which was calculated at
Control Point 4. Dr Gilbert (whose professional expertise was related primarily to land use
rather than water resource management) had been provided with the investigation report on
which the refusal had been based. He agreed with Mr Emerson's opinion that the allocable
volume of water at Control Point 4 was not a fair estimate of the allocable volume at the
-- 3 of 7 --
4
pump site within Subcatchment 5. Dr. Gilbert felt that an argument existed for the averaging
of data from Control Points 4 and 5 to determine the streamflow at the pumping site.
I do not accept that an averaging approach would fairly represent that streamflow but
the evidence leads me to the conclusion that the allocable volume at the pump site would, if
capable of being measured, be more likely to be greater than that at Control Point 4.
Adoption of Control Point 4 by the investigating officer, as the basis for the chief executive's
decision, could therefore provide a conservative result.
More important however to the determination of this matter is the approach to the
instream allocation at Control Point 4 which would meet the Department's strategy for
responsible management of the physical integrity of the riverine environment. Dr Gilbert
considered that the investigating officer had miscalculated the instream allocation based on
the strategy of allowing 25% of allocable volume. On the face of the report this perception
of miscalculation would seem to be correct. At Control Point 4 the total allocable volume is
accepted as being 1,105.2 ML/month as contained in the investigation report. Existing
irrigation entitlements are calculated as requiring 662.6 ML, together with a requirement of
92.6 ML for "other purposes". Dr Gilbert and the appellants had no way of disputing those
calculations. The instream allocation adopted in the report was 374.4 ML which Dr Gilbert
correctly calculated as being near 34% of the allocable volume. The allocations as calculated
by the investigating officer meant that the existing system demand exceeded the supply by
24.4 ML per month at Control Point 4. Dr Gilbert pointed out that had an instream
allocation of 25% been adopted, in conformity with the strategy as appeared to be stated, then
that allocation would reduce to 276.3 ML with the total demand reducing to 1,031.5 ML,
leaving a surplus of 73.7 ML per month.
Mr Walsh did not agree that the calculation of the investigating officer had been
incorrect. His explanation was that at Control Point 1 at Malanda Falls, the allocable volume
was 654 ML/month and the instream allocation strategy required 40% of that volume or 261.6
ML. At Control Point 2 the Subcatchment had augmented the allocable volume to 790.9 ML
or an increase of 136.9 ML. As I understood the evidence the Department's interpretation of
the strategy was then to allocate the 25% of augmentation to provide a cumulative volume to
the instream allocation at Control Point 1. In other words, 34.2 ML (25% of 136.9 M) was
added to the 261.6 ML already allocated at Control Point 1 to provide an instream allocation
of 295.8 ML at Control Point 2. This cumulative calculation was then repeated relative to
25% of the downstream Subcatchment augmentation, calculated at the various Control
Points.
-- 4 of 7 --
5
While this explains that there was no mathematical miscalculation, as suggested by Dr
Gilbert, there is left open an argument as to whether the principle adopted is correct. It is
understandable why an instream allocation at the natural amenity at Malanda Falls should be
higher than the normal riverine environment requirement. It seems to me however that once
that allocation has, in theory, served its purpose, there is a valid argument that the
Department's downstream instream allocation strategy is erring excessively on the side of
caution, to the detriment of other potential usage requirements. Whether, in the interests of
responsible management once an allocation is in the system, that increased volume should be
reallocated is probably another argument. However, it seems to me that if the instream
allocation of 261.6 ML at Control Point 1 was maintained at that volume until the 25%
strategy came into effect at some point downstream, then the riverine environment should not
be disadvantaged. At Control Point 4 there would be the need for a relatively minor increase
to 276.3 ML. If that approach was taken to providing the instream requirement then there
would be an existing surplus of 73.7 ML rather than the deficit of 24.4 ML as calculated by
the investigating officer.
Indeed, if there was further augmentation by any volume at the pump site, through the
downstream tributary's contribution at that point, then the physical integrity of the stream
would be further enhanced.
Mr Emerson had, in the first instance, estimated that the sugarcane crop would require
an irrigation application of 33.4 mls per week. He intended irrigating by centre pivot in two
sections, and would effectively irrigate only 52 ha. This estimate was converted to a volume
of 70.4 ML/month. In later discussions with the investigating officer and at the time
believing there was, from his observations, more than adequate water available (as the
neighbour Mr Kidd also believed from his observation of river levels over the years) Mr
Emerson had suggested that application of up to 40 mls per week would eliminate any risk of
crop stress. Such application would increase the volume requirement to 83.2 ML/month.
This estimate was adopted by the Department. With no cane having been previously grown
in the district, Mr Emerson had not been in a position to draw on the experience of other
farmers. In the meantime however sugarcane had been grown in the Tolga/Kairi area which
he said was accepted as being drier than the subject farm, and sugarcane growers there were
finding that an application of 25 mls per week based on modern farming techniques including
trash blanketing, was sufficient. Such an application would equate to 55 ML/month for the
area of 52 ha covered by the centre pivot irrigation proposed. Rather than be denied a
licence, Mr Emerson indicated that he was prepared to take the risk associated with an
-- 5 of 7 --
6
application of 55 ML/month if he was limited to that entitlement. While it would no doubt
be a far more precise management practice to meter water usage, water allocations from this
source and application estimates are dealt with by the Department on the basis of the area to
be irrigated and the crop to be grown. It seems that to in any way control the volume of
water to be applied under licence the period of pumping would need to be considered in
relation to the licensed pump capacity.
Conclusion
It seems to me that in the circumstances of this particular licence application the
Department's approach to the available volume of water has been overly cautious in favour of
the instream requirement. The importance of responsible water management could not be
overstated yet, if a strategy is devised and adopted, it should in my opinion be applied in a
manner which is seen to be equitable to all competing interests.
The application was refused on the grounds that there is insufficient water to supply
the applicants' irrigation requirement, maintain existing licensees' entitlements and preserve
the physical integrity of the Johnstone River. If there was insufficient water then it would be
irresponsible for this Court to override that refusal. However, if there remains doubt that the
appellants have carried the burden of proving that sufficient water is available for allocation
in terms of their application then I am influenced to resolve that doubt in their favour for I am
not convinced that the respondent's methodology of assessment of insufficiency of supply is
reasonable in terms of the stated strategy.
I have decided that the appeal should be allowed, the decision of the chief executive
be revoked and that a Waterworks Licence should be issued to the applicants. There was no
evidence given or submissions made to this Court as to the specific terms of a licence which
might issue, should I come to this conclusion.
It is therefore decided that the chief executive should grant the application in
accordance with s.43(2)(ii) of the Water Resources Act 1989 but on the assumption that a
minimum allocable volume of 73.7 ML/month is available at Control Point 4. It has already
been observed that on Mr Emerson's initial advice it would have been proposed to irrigate 52
ha by dual centre pivot design when irrigation applied at 33.4 mls per week would require a
volume of 70.4 ML/month. It is intended that the licence should issue in terms of s.44 of the
Act and the applicants' rights under s.51 of the Act be preserved.
-- 6 of 7 --
7
RE WENCK
MEMBER OF THE LAND COURT
-- 7 of 7 --
Official source: https://www.sclqld.org.au/caselaw/QLC/1996/005