Dunstan v Mount Isa Mines Limited [1994] QIRC 83 (1994) 145 QGIG 680
680 QUEENSLAND GOVERNMENT JNDUSTRIAL GAZETTE [25 March, 1994
####################################################
QUEENSLAND INDUSTRIAL RELATIONS COMM ISSION
Jndus cri al Rela1ions Ac1 1990
s. 174 - application for reinstatement
Laura Cecilia Dunstan
AND
Mo unt I sa M in es Limit ed
(No. 86 72 of 1993)
M OUN T ISA M IN ES LI M I TED AW AR D
COM MI SS IONER BECH LY
14 Ma rc h 1994
Termination of Em ployment - Dismi ssal - Re instatemen t -
Internal App eal Process - Ev idence - Em ployee Performance -
N egligen ce (E mp loyee) - Safety Procedures - Counselling -
App lica tion Refused.
DECISION
Ms Lau ra Cecilia Dunstan has, by this application, so ught
reinstatement to her former posi tion of Electrical Fitter Mec hanic
with Mou nt I sa Mines Lim ited (M IM).
Ms Dunstan comp leted an apprenticeship with MIM as an
electric al fitter/mechanic and on 31 Janu ary 1989 commenced
employment as a tradesperson in that trade.
On 14 September 1993 Ms D unstan' s employmen t w as
term inated, the reason giv en be i ng "gross negligence" on her part
i n rhe performance of her dut i es and fol lowed an inc ident
i nvolving the w iring ot a th r ee ph ase motor on 10 September
1993.
M s Dunstan ini tiated an appeal by way of the in te rn al MIM
appeal process and the three stage s of appeal were co nducted on
20 September and 4 an d 8 November 1993. Th e appeal w as
rej ected by th e Company and an application for reins ta tement
under D ivi si on 4 Part 11 of the Act wa s filed on 12 Novemb er
1993. Th is applicatio n was heard i n Mt. Isa on 21 and 22
February 1994.
In addition to her own evidence, su ppo rting evidence w as
given by Stephen George John and Karl Richardson, both
electrical tradespersons employed by MIM.
Ev idence called in support of the Com pa ny's act ion was
drawn from M ichael Jos eph Gi lles, Copper Sme lter Manager;
Barry Jo hn Boyle, Copp er Sme l te r Main te nance Su perin ten dent;
and Terre Charl es Simmons, Registered Electrical Supervisor for
MIM .
Th e argument on behalf of Ms Du nst an was th at the penalty
of te rm inat io n of employment was harsh and unju st i n thal lhe
inc ident oi 10 Sep tember 1993 was not of such a serious nature
as to warrant te rmination. Some reference w as made to other
such similar i nc i de n ts i nvo lving other persons w here ter mi nation
did not ta ke pl ace.
However, the Company argued that this inciden t was 1he l as t
of fo ur recorded incident s, ea ch of whic h in i tse lf was se ri ous and
invo l ve d a breach of safety procedu r es followed by coun sell ing
an d, taken together provi ded a re aso nable basis for termination.
It i s appropriate to summarise, from the evi dence, the
incid en ts referred to by th e Company:-
Cut Off Saw
On Friday 25 June 1992, approximatel y six mon ths prior to
Ms D unstan' s completion of appr en tice sh ip, some employees
us ing a c ut off saw compl ained 10 her of lack of power to the
saw. At that time she was p assi ng the she d hou sin g the saw on
her way to re join her tradesperson.
It appears that electrici ans emp loyed by a subcontractor had
pr ev iously di sconnected various circuits to enable other work to
be performed. Th is i so l ation work was perform ed in an
uns atisfactory manner. The ci rcui t to the cut off saw h ad been
disconnected from i ts l ocal isolator and had i ts three phase
conductors joined together and taped with the conductors sti ll
25 March, I 994] QUEENSLAND GOVERNMENT INDUSTRIAL GAZETTE 681
connected to the ci rcu it breaker, and co il ed adjacent to the
swi tch board.
A fte r attempti ng to ascertain w hy the c ut off saw would not
opera te Ms Dunstan recon nected power which resulted in an
explosion c au se d throu gh the taping together of the bared ends oi
the conductor s.
No di sc iplinary ac ti on was taken aga in st Ms D unstan bu t
employees of contractors who l eft the job in an unsati sfact ory
manner were barred fr om the l ease .
It wou ld be appropri ate to deal w ith the matter of M s
Dunstan perform ing this wo rk alone pri or to the l as t th r ee mon ths
of her apprenticeship.
The Vo cational Education Train ing and Employmen t
Regu lations 199 1, Regu lation 12 dea ls w i th res trictions on the
wo rk el ect rical appren tices may perform duri ng the period of
appren ti cesh ip.
Ms Dunstan by respon di ng to a request from other
empl oyees w ishing to use the cut off saw m ay h ave acted in
breach of th is Regula tio n b ut w ithout the k now ledge or consen t of
the employer.
Thi s matter was al so raised i n the evidence of Mr S. John, a
shi f t electri cian called to give ev idence in support of M s D u nstan.
M r Jo hn's evidence seemed to imply cr itici sm that the
Company fai l ed to provide electri ca l appr en ti ces with adequate
hands on experi ence because of i ts po li cy oi restricting such
apprenti ces ab ility 10 get such experience until the l ast three
mon t hs oi apprenti ces hip.
Ii lhis vi ew is more univer sa l ly held by electrici ans employed
by the Company it n eeds 10 be di spe l led.
The Company's po l icy in lhis matter co mp li es w ith th e
requi rements oi Regulation 12 and no crit ic i sm ca n be directed at
the Company's tr ai ni ng po l icy si mp ly be caus e i t comp li es with the
requirements of th e Reg ul ations.
Cable Repair - F/uro Solids Roas ter Crane
On 16 March 1993 Ms D unstan w i th apprentice J. Cole wer~~
working on a ci rcuit wh ich incorporat ed a lockable lo ca l i so l ator
wh ich had been previously locked and tagged ou t by ano th er
el ec trician. Ms Dunstan co uld not find the key and decid ed to
change the switch plate ra ther than go th rough the lost key
procedur e.
I he repl acemen t pla te wo uld not i it and M s Du n stan
repl aced the origin al plate.
Wh il e thi s was happening app ren tice J. Cole was worki ng on
the other end of the cable ;i short distance away preparing the
exposed en ds oi the cab l e.
Ms Dunstan then attemp ted to prove the cable was isolated
at the l ock ab le local i so lator by turning the switch fr om "off" to
" on".
She did not warn the apprentice of her in tentions and th e
isolator i ailed to function wh ich r es ulted in a l ive cable from the
i so lator to the exposed ends where apprentice J. Cole was
w orki ng. J. Cole received an electri ca l shock an d seve re fl ash
burns w hi ch requ ir ed skin grafts being nece ssary to her left hand.
It is the evid en ce of Mr T. Simmons, the Reg ister ed El ectri ca l
Su pe rvisor appoi nt ed under th e Mines Regulati on Ac t, that in the
first i ns tance the lost key procedure sh ould have b een followed,
rather th an attempting to replace the switch plate but, ha ving
determi n ed to ta ke that course of action the ci rcu it should h ave
been isol ated at th e supplyi ng Maj or Co nt rol Centre. A t the very
least M s Dunst an should have warned apprentice J. Cole that she
w as test ing the isolator by turn ing the sw itch on to see i i the
sect ion of the cable J. Cole was work ing on remained i so l ated.
In mitigation o f seri ous ness of th is event evidence wa s given
that the particu lar ty pes oi isolator i nvolved in this incident is no
!onger u sed by the Com pa ny beca us e so me were discover ed to be
tau lty. Thi s argum ent does not take ,nto account the fa i lure of the
appl i ca nt in these proceed i ngs to apply bas ic saiety procedures
which, on the evidence, were we ll known to her.
Fo l l ow ing an investigation of this i ncident Ms Dun stan was
sus pended for t wo days and counsell ed as to the requi remen t to
comp ly with safety r egu lation s. Ms Dunstan was al so interviewed
by Mr N . Busch, Princi pa l Electrical Inspector of M in es, who later
indi ca t ed to the Company that it was his in ten tion to con fer w ith
the Chief Inspector of M i n es regarding the appar en t leniency of
ac t ion ta ken by the Company against M s Dunstan and w it h the
in ten ti on of initiating a prosecution aga inst Ms Dunstan over this
i nci d en t.
However, because such a prosec ution would have a se riou s
eifect on Ms Dunstan ·s future career, the Company put iorvvard a
proposal for inten si ve retr ai ning an d review w hich was accepted
by the Electric al In spector of M i nes as an alternative to
prosecu ti on.
This retrai ning pro cess in vo lved Ms D un stan wo rking w ith
day sh ift electricians for approx im ately six to eight weeks.
Just prior to this arrangement being i ntroduced Ms Dunstan
was invo lved in another i ncident wh ich re su lt ed in electric al
burns to her face an d hands.
O verhead Crane - Lighting C ircuit
O n 21 June 1993 M s Du n stan was working on a 240 vo lt
DC lighting ci rcu i t on an overhead c ra ne by w ay of tes ting the
circuit to attempt to loc at e the cause of an i noperative light fitting.
She removed the cover of a thr ee way junction box to test
the B.P . co nnections us ing ;i martindale neon vo l tage indicator
and, during the process of te st ing, the exposed metal tip of the
probe contacted the side of the junct ion box causi ng a short
ci rcuit w ith severe arcing w hich caused inj ur i es to Ms Du ns tan.
The evidence is th at the process d esc ribed above is an
acceptable trouble shooting procedure, how ever it is the
Company's op inion that the test me thods used we re i nappropriate.
Ms Dunstan, supported by the ev idence of el ectri cian S.
John, expr ess the v iew th at a sa tisfactory method of t es ti ng was to
l eave the 8.P. connector in place w ith the juncti on box and i ns ert
the probe i nto w hat appears to be a congest ed area wh il e it is the
Company's contention that the 8.P. connectors should have b een
carefu ll y pr i sed from the jun ction box w ith an i ns ulated tool and
then tes te d. Th is method was al so proposed by electrici an K.
Richardson w ho was called to give supporting evidence ior Ms
Du ns tan in rel ation to a later incident.
W hile it was sta ted that there was a certain am oun t oi
vi bra ti on fr om the crane op erations it was not es tablished to my
sa ti sfaction that such vibrat io n was su fficie nt to have ca used the
short c ircui t, particularly as it was indicated for M s Du ns tan that
th e scre w in the B.P. connector to wh ic h she applied the test
probe was facing o ut wards and suffici en tly clear to enable easy
and saie access.
M s Dunstan was clo se ly CO llnsell ed by the Company
io ll ow i ng this i nc id en t and warned that an y further similar
incidents wou ld be regard ed se riously an d wo uld resu lt in her
removal irom the Cop pe r Smelt er. She was informed that the
Governm en t Principal Electric al Inspector arcl the Reg istered
Manager had major concerns about her attitude to safety.
N otw it hs tanding the existen ce of i nternal appeal proceedi ngs,
no such appeal was instigated by Ms Dunstan aga inst any of the
su spe nsions, warn in9s or retrain ing put i n pl ace by the Company
(o th er th an an ap pea , aga i ns t the retra ining being conducted at the
Technical Tr ai ning Centre).
Ca lcine Conveyor - 3 Pha se Motor Connec1ion
On Frida y 10 September 1993 M s Du ns tan was gi ve n the
j ob of ii tting a new mo tor to a calcine conveyor.
It woul d appear from the evidence that th e correct
connec tion of this three ph as e motor is a rel atively elemen tary
electrical pro cess . Ms D unst an was llncertain as to how to
co mp lete the connecti on •-- whether in "Star" or "Del ta" - an d
sought advice fr om electric ian S. John . The evidence on the
matter oi the method of connection is that no choice was
avai lable and this wa s visibl 1' ap parent in that on!y three lead,
we re pr ese nted in the moto r.
Ms D u ns tan connected three powe r leads to the th ree mo tor
leads but also Joi n ed across each oi th e three circuits w ith br as s
bridges wh ic h were packa qed wit h the motor b ut for another
purpose. Thi s caused a a ead sho rt in the m oto r wh ich, the
io ll mv ing day, blew th ree 10 amp iuses at a substa tion whe n the
7 1
-- 1 of 2 --
682 QUEENSLAND GOVERNMENT INDU STRIAL GAZETTE
circuit was en erg i sed by another electrici an who completed t he
remainder of the installa ti on.
Fo llow ing an investigation of th is incident Ms Dunstan' s
em ployment was terminated.
It is the Com pa ny' s evi dence t ha t each of these inc id en ts
considered in isolation would not necessarily have warranted
di sm i ssa l, but collec ti vely, and having reg ard to th e dangers of
el ectricity to Ms D un stan and other employees and th e potenti al
damage to plant and equipment, the dism issal w as warranted.
Ms Dun stan ac knowledged tha t she h ad been given what I
would rega rd as extensive training in electrical safe ty reg ulations
and safety tag and l oc k out procedu re s as we ll as general
i nstruction in sa fety and occup at ional hygiene. At the time ot the
l ast incident Ms Dunstan was th e safety represen ta ti ve for the
section in which she wo rked.
I have taken into account the high level of results achi eved
by Ms Dunstan dur ing each st age of her apprenticeship (Honours
and Credit s) and various other awards received by her. Wh ile
th ese results are commendable they do not appear to be reflected
in the standard of performance on the job.
Each of the incid ents has been fu lly investigated by the
Company an d Ms D unstan h as not been deni ed an opportuni ty oi
responding or providin g an explanation of he r ac tion s.
None of t he incidents could be regarded as being of a triv ial
or le ss than se rious nature. Indeed the l ast incident, w hil e it did
not c ause serious injury to th e applicant or to another employee
as did the prev io us two incidents, was de sc ribed, in the evidence
of Mr Simmons, as having the po ten ti al for a catastrophic end
result should there have been in place a different protective
mecha nism than HRC fuses .
I am sati sfied that appropriate investi gat ion an d co un se lling
has occurred after each incident and th at t he applicant has been
given appropriate opportunity t_o respond. The counselling _given
follow ing the second l as t incident should have left her in no
doubt that her continued employment was in se ri ous je opardy.
I have considered all of t he evidence and submissions made
by each of the pa rti es but I can find no reason to intervene in the
Company's decision to te rminate Ms Dun sta n 's empl oy ment.
In rea ching th is conclusion I have ta k en in to account th e
submi ss ions made by the Un ion regarding t he effect that thi s
decision might have on future employment prospects of Ms
Dunstan in Mt. Isa. The evidence clearly indica tes that the
Company 's intervention in favour of Ms Dunstan to avoid a
prosecution in connecti on with the inc ident of 16 March 1993
was done to preven t repercuss i on on her futu re career but was
followed by two further incid ents which are of such a na ture as to
overri de such considerat ion by me.
R.E. BECHL Y, Commissioner.
Appearances:-
M r W . Threl fa ll, w ith him Mr S. Sodervi k, for The Electrica l
Trades Union of Emp loyees of Austral i a, Q uee nsl an d Branch, fo r
the appli ca n t.
M r N. Hasti e, w ith him Mr S. Beach and M r J. Burton, for Mou nt
Isa M in es Li mi t ed.
Operative Dat e: NIA
Decision - Reinstatement
Rel eased : 14 March 1994
[25 March , I 994 25 March, 1994] QUEENSLAND GOVERNMENT IND USTRIAL GAZETTE 683
-- 2 of 2 --
Official source: https://www.sclqld.org.au/caselaw/QIRC/1994/083