By Proclamation published in the Government Gazette on 14 August, 1992, the
following land was taken for "road" purposes:
County of Canning, Parish of Maroochy
an area of about 5.174 hectares (including about 1415 square metres from
Easement A on RP 27021) being part of Lot 1 on RP 27021 contained in
Certificate of Title Volume 5627 Folio 14
and
an area of about 2.610 hectares being part of Lot 2 on RP 27021 contained in
Certificate of Title Volume 6388 Folio 200.
As from 6 November, 1992, a further area of about 881 square metres was
taken from Lot 2 above, for "future road requirement" purposes.
Mr JT and Mrs LJ Barns are the registered proprietors of Lots 1 and 2 on RP
27021. They also own Lot 3 adjoining to the west. Their total aggregation contained
an area of 52.55 hectares before the resumption. The land fronted the original
Yandina-Coolum Road, near opposite the Coolum State School, on the western
outskirts of Coolum, about 2 kilometres from the beachfront.
The land comprises original ti-tree flood plain, flat to very gently sloping in
elevation and subject to periodic flooding. The property was originally developed as a
sugar cane farm with an assigned area of 44.9 hectares. About 8 hectares in Lot 1
was used for the grazing of angora goats, llamas, alpacas and guanacos.
Dwellings were sited along the road frontage on each of the surveyed lots with
original farm buildings on Lot 1. One structure had been converted and rented for
use as a retail stockfeed outlet and another in association with a plant nursery
business. At the date of resumption the sugar cane lands were subject to a lease
until 31 January, 1994.
[1994] QLC 63
-- 1 of 22 --
2
The whole of the land is zoned Rural A. On 5 July, 1991, Maroochy Shire
Council had granted consent for use of Lot 1 for a "Catering Shop and Tourist
Attraction and Facilities".
A plan which follows indicates the shape of Lots 1 and 2 and the total area
resumed. The initial and major resumption was for the purpose of the Sunshine
Motorway, which at this location includes the roundabout intersection of the relocated
Yandina-Coolum Road. The second smaller resumption involved a relatively minor
widening of the initial resumption in Lot 2 to provide access to the southern severance
of Lot 1.
Lot 1 originally contained an area of 20.204 hectares. The north-eastern
severance, after the resumption, contains about 6.662 hectares and accommodates
the residential and farm buildings. The southern severance contains about 8.385
hectares.
Lot 2 originally contained an area of 19.139 hectares. The north-eastern
severance, after the resumption, accommodates a dwelling and contains an area of
about 3280 square metres and the southern severance about 16.022 hectares.
Separate titles will not issue for the severance areas.
No land is resumed from Lot 3 which contains an area of 13.213 hectares.
Claim for compensation
Individual claims for compensation were served on the constructing authority in
the amounts of $1,900,000 for the first resumption of 7.784 hectares and $35,000 for
the second of 881 square metres.
At the commencement of the hearing leave was sought and granted for the
claims for compensation to be amended to the amount of $1,525,116 in amalgamation
together with legal and valuation fees of $6,417.80, the latter amount being agreed
between the parties.
The amended claim was in accordance with a valuation carried out by Mr R.R.
Henderson, Registered Valuer, and was made up as follows:
"Values "before" $1,133,500
Values "after" $ 816,000
Compensation $ 317,500
plus severance and disturbance items $1,207,616
Total compensation $1,525,116"
Constructing Authority's Valuation
The respondent relied on a valuation carried out by Mr A.F. Carrick, Registered
Valuer, as follows:
"Value before acquisition $ 600,000
Value after acquisition $ 505,000
-- 2 of 22 --
3
Loss of land, severance and injurious affection $ 95,000"
Background
While it can be seen that the valuers were some significant quantum apart in
the results of their before and after exercises, the contentious aspect of this matter
was the claim for severance and disturbance items.
The claimants had exclusively used the aggregation of property for the growing
of sugar cane until 1979. At that time what proved to be a successful venture - the
breeding and farming of angora goats - was commenced in conjunction with the cane
farming operation. In 1988 the "sugarcane operations" were leased out. By that
time, being also involved with deer farming activities in New Zealand, the claimants
became interested in llamas, alpacas and guanacos (which animals will be referred to
henceforth, for convenience, as llamas). Twenty animals originally imported to New
Zealand from Chile, were then imported to Australia and quarantined in Victoria.
Three cria were born in quarantine which extended for a period of 9 months. After
experiencing "extreme difficulty obtaining the relevant Government approvals" the
claimants eventually brought 11 female adults, 3 male adults and the 3 cria to the
Coolum property. The animals arrived in January 1991 and a successful breeding
program commenced. By natural increase, there were a total of 32 llamas on the
property by late 1992, when the initial construction phase of the Motorway roadworks
commenced.
Effective husbandry of the llamas had required the provision of an artificial
cooling facility in the form of a pond. This pond ("the llama dam") had been
excavated in 1990 in preparation for the arrival of the llamas. Apart from cooling
themselves, the llamas drank from the dam although, in the absence of the dam,
plentiful alternative stock water was available.
In January 1993 an outbreak of what was first thought and then later confirmed
to be blue-green algae occurred in the llama dam. The algal bloom was treated with
a degree of success. However stock losses of both llamas and goats occurred
through death and physical deformities. The claimants' llamas and angora goats, in
healthy condition, were and remain extremely valuable.
It is the claimants' case that the algal bloom was caused by construction
activities and the stock losses resulted from the algae induced toxicity which occurred
in the llama dam. Loss of stock (including some crayfish killed by the treatment to the
dam) and costs of remediation of water quality were assessed, under a number of
headings, to amount to $681,739.
The claimants had intended to develop a "low-key" tourist facility based on a
theme associated with the llamas and other exotic animals and the sale of animal
-- 3 of 22 --
4
products - hence the consent use which had been obtained for Lot 1. It was intended
that when the cane farming activities ceased after expiry of the lease, the grazing,
animal farming and tourist visitation activities would be extended over the whole of Lot
1 and eventually some of the activities to Lot 2. The existing grazing area was
becoming overstocked at the date of resumption although some relief was possible
through the grazing use of sugarcane headland and fallow areas. While the whole of
Lot 1 (and the total aggregation) was subject to periodic flooding, the least effect of
flooding occurred on the slightly higher elevation land at the original road frontage.
Animals were able to be either safely accommodated at the existing shelters or, under
extreme flood conditions, transported from the road frontage area. No animal
underpass was provided within the roadworks and the southern areas are physically
severed from the animal shelters and higher ground. The claimants say that to
reinstate the before resumption position, various improvements will be required to be
effected on the southern severance, to allow the intended grazing operation to
proceed. Even then, the need will remain for regular transportation of stock to and
from that land. The various items claimed as a result of the severance to Lot 1,
amount to $370,877.
As a further piecemeal claim, although partly considered in Mr Henderson's
"after resumption" valuation of Lot 2, works required to prevent erosion/scouring to the
southern severances of both Lot 1 and Lot 2 but primarily Lot 2, were assessed in the
total amount of $155,000.
Preliminary Issue
Due to the extent of evidence which was intended to be called relative to the
incidence of and damage associated with the blue-green algal bloom, a preliminary
issue was raised by way of the respondent constructing authority objecting to the claim
for loss of stock. It was submitted that, even on the assumption that a causal link
could be established between the construction activities and the algal bloom, the
Acquisition of Land Act 1967 did not provide the Land Court with jurisdiction to
determine such a heading of claim. The claimants' submission was that, if a causal
link existed then the damage which occurred was one flowing from the resumption and
the construction activities and should be determined by this Court.
After consideration of the objection, and the submissions thereon, it was
decided that the Court did have the necessary jurisdiction to determine the question of
stock losses and the side issues associated with the algal bloom - if the causal link
was established. The hearing then proceeded on that basis.
Blue-Green Algae
It became necessary for the Court to hear considerable evidence relative to
blue-green algae, the causes of algal bloom, treatment of the condition, the potential
for water toxicity and the incidence of adverse health effects within the animal herds.
-- 4 of 22 --
5
On the considerable evidence presented there is seen to be no doubt that an
algal bloom occurred in January 1993. There can also be no doubt that the formation
of the algal bloom in the llama dam was associated with the bacterial genus
Microcystis, an organism which is capable of causing adverse health effects both to
humans and animals.
The expert evidence as it related to water quality indicated that Microcystis is a
common inhabitant of water storages, particularly those with limited flow regimes. It is
not necessary to establish how the cells came to be in the llama dam in the first place.
The question is whether the activities of the respondent's contractors or the
construction of the road stimulated the seeding of the cells.
The primary expert for the claimants in matters of water quality (as well as
hydrology) was Dr T.C. Johnson, whose expertise in the area of water quality was
specialised. He, not unnaturally, had no firsthand knowledge of the llama dam at the
time of the initial algal bloom or prior to the completion of the Motorway construction.
His theories were based on the causation of algal bloom in the dam being linked to
alteration of water table levels. While it is submitted that the claimants' case does not
stand or fall on an alleged sudden drop in the water level of the dam at about the time
of initial road drainage works, that initial bloom is clearly an event critical to the
outcome of the overall claim under this heading. If a sudden drop in water level in the
dam occurred, and that resulted from construction activities, then the algal bloom
might reasonably be linked to the construction activities, based on Dr Johnson's
opinions. However, even if any drop in the water level in the dam did occur but that
was the result of climatic conditions, as the respondent argues, then the algal bloom
and the timing of the construction activities would reasonably be nothing more than
coincidence.
The allegation of the sudden drop in water level in the dam comes from Mr
Barns. It is generally accepted that the principal supply of water to the dam comes
from the excavation being "a window into the water table". As the case was argued,
Dr Johnson's theory of alteration to water table envisages that the "window" is into a
discreet perched water table. The respondent's experts are convinced that no
perched water table exists, but the "window" is into the regional water table.
The gauge for the evidence on water level in the dam, became the position
within the southern bank of an earthenware pipe. Mr Barns gave evidence that when
the dam was excavated he had connected it to an existing deep drain and pondage
area ("the pond drain"), a short distance to the south, by way of 150mm earthenware
pipes. The pond drain contained vegetation and clear water and Mr Barns had
believed the pipe connection would serve as a flushing device. It was his evidence
that the pipe was laid below what he maintained was a fairly static water level in both
-- 5 of 22 --
6
the dam and the pond drain. It was also his evidence that, unless water was pumped
out of the dam (an operation which he had carried out on several occasions but well
prior to the algal bloom) the water level in the dam never fell below the level of the
pipe. Even after significant pumping, the water level would rise, he said, in
equilibrium with the pond drain to above the pipe "within 24 hours". Mr Barns said
that he did not make a habit of regularly checking the water level in the dam.
However, when he had first observed the algal presence he also noticed that the water
level had dropped about 2 feet (60cm) below its normal level, and well below the
earthenware pipe. He referred to pumping and dewatering activities being carried out
in the vicinity of the dam by the contractors at this time. He spoke of the filling in of
the pond drain and culvert construction a short distance to the south-east of the dam
and thought there had been dewatering activities at that location at the time of the
algal bloom. He specifically recalled dewatering activities at that time at a dual culvert
site (3A/3 and 3A/11) about 300 metres to the north-west of the dam. Mr Barns
produced photographs of work being carried out in that location on 22 or 23 January,
1993. Photographs were tendered of the blue-green algae scum in the dam on 23
and 24 January, 1993. There is a photograph showing the western extremity of the
pond drain having been very recently cleaned and a north-western drain deviation
towards culvert 3A/3 under construction but not linked to the pond drain as at 24
January, 1993. There is, not unnaturally, no photography of the water level in the
dam immediately prior to the algal bloom. There is no photographic evidence from
which the water level in the dam relative to the pipe can be established on either 23 or
24 January when the scum was obvious. The only significance which can be placed
on the lack of photographic evidence of the water level at the time of the algal bloom,
is the assertion that a sudden drop had been observed. It is not an unreasonable
suggestion (by the respondent) that an occurrence which was put forward as a
significant event - i.e. the water level being suddenly well below the pipe - was not
photographed when other activities in the immediate vicinity, at the same time, were.
Some general support for the evidence of Mr Barns as to water level in the dam
was given by Mr R.W. Rickards, who has had considerable practical experience in
matters associated with the pondage of water and water quality maintenance, at least
as such matters apply to freshwater crayfish. Mr Rickards had inspected the dam "a
week or two weeks" before December 1992 for the purpose of stocking it with crayfish.
He said that the earthenware pipe was at that time about 4 inches below the water
surface level. He specifically remembered this because he had advised Mr Barns to
screen the external inlet to prevent the entry of predators (eels). He next inspected
the dam on 23 January, 1993, at the request of Mr Barns to advise on the algal bloom.
At that time he stated that he "noticed that the level of the dam had been reduced
considerably. It had been reduced below the level of the pipe. It would have
-- 6 of 22 --
7
dropped approximately 2 feet." Unfortunately, Mr Rickards' evidence did not indicate
any precise recollection of detail, apart from the water quality. He stated that at that
time "Working adjacent to the property were the contractors for the Motorway. They
had also at this stage reduced the airflow over the dam by constructing a portion of the
Motorway to areas well above ground level ...". That, clearly, on evidence from others
which I accept, was not the stage of construction which had been reached at the time
to which Mr Rickards referred. It was on Mr Rickards' advice that the dam was
treated with copper sulphate. He had estimated the dosage by calculation of "the
approximate number of litres in the dam". In company with Mr Barns he had
calculated a water volume of 1000 cubic metres, based on stepped measurements, a
rough V-shaped excavation and a depth of water of 3 metres. There was nothing in
his evidence which indicated that the 3 metres was to take account of the alleged
reduced level. As I understood Mr Barns' evidence, the "normal" depth of water in the
dam was thought to be about 3 metres. Again, nothing of significance turns on Mr
Rickards' calculation, except that the volume of water in the dam was an important
consideration in the correct dosage of copper sulphate.
Dr Johnson found that the reduced water table level complained of by Mr Barns
as being associated with construction works, would be explained if the dam was
sourced by a perched water table rather than the regional water table. The possibility
of such an occurrence is not remote, in his opinion, when coffee rock stratas occur as
they do in the immediate locality. After discussing his understanding of the situation
at the time of and immediately prior to the initial algal bloom, Dr Johnson's tendered
report contained this passage:
"The following factors were therefore all likely to have contributed to a lowering of
the water table in the pond.
.cracking of the impermeable coffee rock layer
.construction of low level table drains, immediately adjacent to the pond and
extending to the south and west before joining culvert 3A/3
.significant dewatering, at levels below the pre-existing standing water level. "
It is clear that Dr Johnson's explanation of Mr Barns' evidence of the sudden
drop in water level related to the information he was supplied by Mr Barns as to the
progress of construction.
The respondent called Mr C.J. Murphy, the construction manager for this
section of the Motorway. After original advice to an inspector, it was to Mr Murphy
that Mr Barns reported the algal bloom. Mr Murphy said that he had not been aware
of any complaint at that time relative to the water level in the dam. He had made
various diary notes of matters where contact with Mr Barns had occurred. These
notes had prompted his recollection of conversations regarding the algal bloom. His
memory of the timing of some discussions was in direct conflict with Mr Barns'
evidence. While his memory of some things, such as an algal bloom on another
-- 7 of 22 --
8
property seems inexplicable, I accept Mr Murphy's evidence as to the timing of the
activities of the contractors. He confirmed that "dewatering" had occurred, but to an
insignificant degree in relation to the water table, at the culverts 3A/3 and 3A/11, when
a low flow drain was being concrete lined, at the time or immediately before the algal
bloom. He said that relatively small volumes of water were pumped from a short and
temporarily bunded section of the drain. The water was pumped to immediately
adjacent areas and not removed from the water table as such. The existing pond
drain had been initially cleaned, but according to Mr Murphy had not been filled in,
diverted or broken into until some days after the algal bloom had occurred. No
dewatering of the pond drain had taken place. His diary had recorded the accidental
breaking of the 150mm earthenware pipe between the dam and the drain on 28
January, several days subsequent to the bloom.
Another witness called by the respondent was Mr A. Litwinowicz, a
geotechnical engineer. His evidence was directed primarily at the rebuttal of Dr
Johnson's suggestion of a perched water table being the main source of water supply
to the llama dam. He saw it as being highly likely that the water level in the dam
would be sympathetic to regional groundwater fluctuations. It was Mr Litwinowicz's
assessment that the regional groundwater table ranged between RL0.3 and 0.9 and
was capable of relatively rapid fluctuation being responsive to variable climatic
conditions. Groundwater measurements at a site not in the immediate vicinity, but in
Mr Litwinowicz's opinion, reflecting the water table associated with the dam, indicated
a level of RL0.37 in February, 1993, fluctuating between RL0.24 and 0.95 in the
months to July, 1993. The invert level of the reference earthenware pipe in the dam
was accepted by the parties as being RL0.46. Mr Litwinowicz had researched and
tendered the recent rainfall history at Coolum and it was his opinion that at the time of
the algal bloom, the regional water table would have been low following a significant
period of below average rainfall.
Whether the llama dam is primarily sourced from the regional water table or a
perched water table is seen only to be relevant if the stage of construction work
reached at the time of the algal bloom was as Dr Johnson had surmised. Dewatering
activities at culvert 3A/3 and 3A/11, it seems, would have been the only possible
explanation of a sudden drop in the water level in the dam. After hearing Mr Murphy's
explanation of that activity, it seems highly unlikely to be the cause of any sudden drop
in the level in the dam. If any fracturing of the coffee rock strata in the immediate
locality of the dam occurred, there is no corresponding construction activity which
might have caused such a happening at least until subsequent to the algal bloom.
I am able to accept that some interaction occurred between the pond drain and
the llama dam but through the pipe connection. While it seems unsupported by some
of the expert evidence, I can also accept that run-off storm water into the pond drain
-- 8 of 22 --
9
was retained in that location due to the control level further downstream before it
linked with the overall drainage system. It seems that some equilibrium was created
between the surface levels in the two pondage areas, but logically that might be
retained only while the level in the pond was in excess of the invert level of the
earthenware pipe. I am not convinced that such water level could have been
regarded as permanent as suggested by Mr Barns.
It seems that the local drainage system as it relates to the pipe level in the dam,
is now more efficient than before, being connected to the overall system, but that was
not the case as at the date of the initial algal bloom.
Dr Johnson also suggested that it is likely that reduced surface run-off and
reduced air flow over the dam could impact upon the potential for future algal bloom.
Certainly, costly measures have been introduced by the claimants in an endeavour to
maintain acceptable stock water quality, due to the primary need to supply a cooling
facility for the llamas.
In the end result, there seems no doubt that conditions existed relative to the
llama dam which were capable of promoting a blue-green algal bloom regardless of
the initial or eventual construction works. I have not been convinced that any
construction works at the time of, or immediately prior to, the initial algal bloom in
January, 1993, could reasonably be linked to that bloom.
It seems to me then that the location of the dam relative to the surface run-off
and motorway embankments becomes of secondary consideration due to the
prevailing climatic conditions, the primary source of the dam water supply, likely
nutrient level within the dam and the use to which a llama pond is required to be
placed.
Whilst obviously an unfortunate and expensive experience, it seems likely that
the introduction of methods to ideally prevent or at least to mitigate against such algal
bloom occurrence were, in hindsight, a necessary function of the management of
these animals in such a geographic location - regardless of the construction or location
of the Motorway.
With the necessary causal link not being established, I am unable to find that
stock losses from death (including the crayfish killed by the application of copper
sulphate) or depreciation in value from physical disabilities, due to initial or subsequent
algal induced toxicity, or costs associated with the prevention or mitigation of further
losses, are a direct or natural consequence of the resumption.
One of the complaints of the claimants is that implicit in their dealings with the
constructing authority relative to the algal bloom, was an understanding that any
knowledge gained by the constructing authority or its agents through the water testing
which was carried out, or potential toxicity, would be immediately communicated to
them. Any breach of the alleged obligation in that regard is not a matter lying within
-- 9 of 22 --
10
the jurisdiction of this Court.
Valuation Approaches
Mr Henderson - claimants.
Mr Henderson valued Lot 1 before resumption as "approved Tourist Facility
land" apportioning values of $40,000 per hectare to most of the frontage grazing lands
of 8.25 hectares which accommodated some of the buildings and $20,000 per hectare
to the rear land. As the rear land of 11.6 hectares was subject to a lease at the date
of resumption he deferred the highest and best use value for 18 months at 9%, then
added a nominal $3,000 as the added value of the lease. The total value of the
grazing and cane land (as leased) was $537,044.
The improvements on Lot 1 associated with the existing grazing use were
valued as follows:
Dwelling $62,500
Cottage $16,500
Stock sheds $21,000
He then apportioned a notional 1500 square metres of the site as
accommodating the stockfeed premises and valued that parcel as improved at
$45,500. A notional 2000 square metres of the site was apportioned for the nursery
premises and he valued that parcel as improved at $23,500.
His total valuation of Lot 1 before resumption was then rounded to $706,000.
After the resumption, Mr Henderson valued the north-eastern severance, which
he calculated to contain 6.28 hectares excluding the stockfeed and nursery premises,
again as "Tourist Facility Land", at $36,000 per hectare and the southern severance,
calculated as 8.415 hectares, as "Tourist Facility Land" at $12,500 per hectare
deferred for 18 months at 9% and the cane lease a nominal $2,000 totalling $309,512.
He valued the dwelling, cottage and stock sheds as before, but reduced the
stockfeed premises to $28,500 and the nursery premises to $14,500. The total after
resumption valuation of Lot 1 was rounded to $462,500, the difference between the
before and after valuations being $243,500.
Lot 2
Mr Henderson valued this land before the resumption as having potential "for
expansion of the tourist facility on Lot 1" at $12,500 per hectare deferred 18 months
until expiry of the lease, then added a nominal value for the lease of $6,000. The
dwelling was valued at $40,000 and the total before resumption valuation became
$256,500.
After the resumption, the southern severance was apportioned as 8.145
hectares of rear land at $11,250 per hectare deferred for 18 months, then 8 hectares
of "front land with severe drainage problems" at $5,000 per hectare, and the cane
lease at $3,000. The small north-eastern severance was valued as a homesite at
-- 10 of 22 --
11
$25,000 and the dwelling remained unaltered at $40,000. The total after resumption
valuation of Lot 2, in the two severance areas was $188,500.
Under the separate heading of drainage rectification works was an allowance
totalling $155,000 for both Lots 1 and 2. This assessment was based on the estimate
of the cost of rectification works as carried out by Dr Johnson and more will be said of
this later.
Lot 3
Mr Henderson valued this land of 13.213 hectares as cane land at $10,000
per hectare then deferred that value for the 18 months of the lease, adding a nominal
value of $3,000 for the lease, then $51,500 for the dwelling, giving a rounded before
resumption valuation of $171,000.
After the resumption, the land was reduced in value to $9,500 per hectare then
again deferred for the lease. His added values of the lease and the dwelling were as
before. The total after valuation was rounded to $165,000.
Mr Carrick - respondent.
Mr Carrick valued the aggregation of Lots 1, 2 and 3 before the resumption as
52.549 hectares of assigned, cultivated, drained sugarcane land at $9,000 per
hectare, with a total land value excluding improvements of $472,941.
After the resumption, he valued the southern severances of Lots 1 and 2 as
follows:
22.7 ha assigned cultivated and
drained cane land @ $7500/ha $170,250
1.7 ha unsuitable for cane production
@ $3000/ha $ 5,100
$175,350
Lot 3 was valued at $9000 per hectare as before in the amount of $118,917.
The 6.662 hectare north-eastern severance of Lot 1 was valued as a separate
rural site in the amount of $80,000 and the 3,280 square metre north-eastern
severance of Lot 2 as a separate titled rural site, in the amount of $20,000.
Mr Carrick held the opinion that while the main dwelling on Lot 1 and the
dwellings on Lots 2 and 3 were injuriously affected as a consequence of the
resumption, none of the original farm buildings were affected. For that reason he did
not attempt a full valuation.
Instead the before and after valuations of the dwellings were as follows:
Lot 1 - before $51,250
after $46,250
Lot 2 - before $36,400
after $31,400
Lot 3 - before $37,800
-- 11 of 22 --
12
after $32,800
Evidence of value and Findings
Before resumption
Mr Henderson relied on two sales to support his valuation of Lot 1 with the
Tourist Facility approval in place.
A site of 4.047 hectares in Mark Road, Caloundra, with a previous approval for
caravan park development, at the rear of an industrial estate, sold in March 1992 to
show a value of $93,897 per hectare. Mr Henderson commented that the sale land
had "overall inferior location".
The original "Big Dinosaur" tourist attraction located on the Old Bruce Highway
at Tanawha, sold in September, 1992, for $300,000 showing a 4.47 hectare land
content, on Mr Henderson's analysis, of $33,500 per hectare. His information was
that the property had been purchased for the purpose of developing the tourist
attraction. It was his opinion that the sale site being 12 kms from beaches and 2 kms
from the new highway, had inferior location to the subject Lot 1.
Mr Carrick had also carried out some investigation as to the circumstances of
the "Big Dinosaur" sale. However, in conflict with Mr Henderson's advices he had
been informed that the property had been purchased not as a tourist facility but
predominantly for rural residential use, associated with a weekend market. He
disagreed with Mr Henderson's analysis of land value content in that sale.
Mr Carrick's opinion was that the approval for development of Lot 1 added no
value to the site. In his opinion the success of any tourist facility was dependant
largely on the selected theme and then exposure to passing traffic. He saw the traffic
on the Yandina-Coolum Road prior to the resumption as being predominantly
localised. If the site had any potential for a tourist facility development before the
resumption, that potential would in his opinion have been enhanced significantly by the
resumption through the exposure to the higher density passing traffic on the Sunshine
Motorway.
The claimants and Mr Henderson do not accept that any increased exposure
through the construction of the Motorway compensates for what they see as access
which is difficult to negotiate.
The claimants said that they recognised an opportunity, before resumption, to
integrate their existing involvement with exotic animals into a low-key family orientated
tourist attraction. The theme already existed in that casual interest in the animals had
been demonstrated by tourists and visitors to the area and as well, there had been
organised visitation by school groups. They say that the development permit had not
-- 12 of 22 --
13
been acted upon due to the original uncertainty of the Motorway proposals.
With the proximity of the site to Coolum Beach which is in itself a holiday
location within the wider Sunshine Coast tourist destination, I am persuaded that the
development permit which had been obtained allowed potential for Lot 1 which was
superior to that of a pure animal and cane farming holding. Nevertheless, the
physical features of the land, its flooding potential and the low intensity development
as approved, all were matters logically affecting market value.
There seemed to be a suggestion by the respondent that because the plans
lodged with the application for the town planning development permit depicted a
plantation of sugar cane near adjacent to the rear of the buildings on Lot 1, as was no
doubt the situation at the date of the application, the permit did not extend to the
farming of animals. Implicit in the suggestion was that different considerations are
relevant when any proposed development within Maroochy Shire would reduce the
area of agricultural land available for the growing of sugar cane. I agree with the
claimants' response in that as the land is zoned Rural A, there is no compulsion on
the owners to continue to grow sugar cane. Use, or extended use, for animal
husbandry does not require Council consent.
The evidence of Mr Henderson as to the overall worth of Lot 1 for the low-key
tourist facility use as proposed is however, not convincing. The concentration of
activity and intensity of use would have related to the Yandina-Coolum Road frontage
while the majority of the land was intended to be used for the grazing of animals with
casual tourist interaction.
Based on the overall evidence provided as to the worth of rural land in a
location such as the subject and being suitable for sugar cane growing, there are no
extraordinary differences between the valuation opinions provided. After considering
Mr Henderson's views as to the lease existing at the relevant date, it seems to me that
Mr Carrick's valuation of $9,000 per hectare for the sugar cane land overall is not
unreasonable. I have concluded that the value of Lot 1 with a permit for the
development as proposed, identifies much more closely with that base Rural A level of
value than to the level of value suggested by Mr Henderson. I will adopt for Lot 1,
before resumption, the value Mr Henderson ascribed to Lot 2 - i.e. $12,500 per
hectare overall. I will adopt Mr Carrick's valuation of $9,000 per hectare for Lot 2. If
it was necessary to do so, I would find a slightly higher value for Lot 3 as a separate
parcel. I am not convinced however that the value of Lot 3, except for the dwelling,
requires further consideration.
After resumption
It is crucial to this aspect of the claimants' case, and as it relates to the value to
them, that the southern severance of Lot 1 be considered as having highest and best
use for tourist orientated animal farming in association with the use of the
-- 13 of 22 --
14
north-eastern severance.
The claimants see it as an infringement of their right to deal with their property
as they see fit by consideration, for example, of the balance of Lot 2 or Lot 3 as
providing land to relieve a developing overstocking problem for their animal herd.
With the support of Mr Henderson, the claimants see it as reasonable that
reinstatement as best it can take place of their previous position, in the absence of a
stock underpass to satisfy their plans for extension of grazing activities, now involves
the provision on the southern severance of Lot 1, of:
(a)access to a standard and physical level as it relates to flood susceptibility
existing at the old Yandina-Coolum Road - estimated cost $139,550;
(b)an area of 1000m2 to be filled to a relative level equivalent to the old
Yandina-Coolum Road frontage - estimated cost $113,330;
(c)yards and loading race - $4,000;
(d)stock shelter shed 150m2 to cater for 40 head - $15,000;
(e)cottage for caretaker purposes - $38,000;
(f)connection of electricity - $20,000;
(g)stock dam - $1000;
(h)boundary fencing - $24,000;
(i)compensation for the transportation of stock, $1440 per annum in perpetuity
at 9% - $15,997.
Where necessary, Mr Henderson was assisted with estimates of cost provided
by Mr N.R. Covey, a civil engineer.
In practical terms, the claim suggests that direct unrestricted access to about
8.4 hectares of flood susceptible grazing land, worth on Mr Henderson's figures about
$92,500, represents a value to the owner of about $370,000.
If the claimants' decision is eventually to use the southern severance of Lot 1
for the grazing and farming of exotic animals, then that is their choice. There can be
no doubt that the provision of a stock underpass would have been convenient for the
extension of animal grazing and to a degree tourist visitation, when the lease for cane
farming expired.
However, with its flooding susceptibility the use of the southern severance for
grazing as a separate entity, is clearly not the highest and best use of that land due to
the costs involved in providing not only acceptable internal access, but facilities for the
management and retrieval of stock.
It seems that the highest and best use of the southern severance of Lot 1 is
-- 14 of 22 --
15
now for aggregation with adjoining land for pure agricultural (sugar cane farming) use.
The cost of providing access and a flood free building site would seriously affect its
value for subdivision as a separate entity. While it might be argued that the land
could possess some enhanced value for disposal to an adjoining owner, it is also
relevant that a quite limited adjoining owner market would exist. In the particular
circumstances of the claimants' land holdings, the potential exists for the southern
severance of Lot 1 to be amalgamated with the southern severance of Lot 2 without it
being subjected to any limiting market forces. For that reason it seems to me that the
approach taken by Mr Carrick in the after resumption valuation of the southern
severances of Lots 1 and 2 takes into account the reality of the situation provided of
course sufficient consideration is given to the disabilities of that aggregation after the
resumption. Questions of access and drainage will be discussed later.
While Mr Carrick has valued the north-eastern severances of Lots 1 and 2 as
being "separate titled rural lots" (when in fact separate titles do not result without
subdivisional application) his verbal evidence suggests that his valuations are intended
to be discounted for the minimal risks involved in obtaining separate title. His evidence
as to the subdivisional position was supported by Mr J. Franklin, a town planner. The
sales evidence produced by both valuers, for rural-residential and rural sites, seems to
support his argument that the sites were considered on an in globo basis. Mr
Henderson has in fact valued the north-eastern severance of Lot 2 at a higher figure
than did Mr Carrick. I will adopt Mr Carrick's valuation of $20,000 for the
north-eastern severance of Lot 2 after resumption, but on the basis of its potential for
separate title to issue on application for subdivision.
Mr Henderson's valuation of the north-eastern severance of Lot 1 is much
higher than that of Mr Carrick, because Mr Henderson sees the tourist facility approval
as possessing significant value, while Mr Carrick values the land purely as a rural site.
It seems logical that, if Lot 1 possessed a premium value for the tourist
attraction theme before the resumption, then the smaller severance area on which the
more intense development was planned, with superior exposure and location adjacent
to an identification roundabout Motorway feature, would be somewhat enhanced in
value, on a pro rata unit of area basis, after the resumption. However, the particular
theme, around which the development was planned, according to the claimants,
required the larger area to accommodate the animal farming segment.
There seems to be no dispute, and certainly Mr Carrick held the opinion, that
the success of any tourist theme park depends not only on suitable location, but the
attraction offered by the particular theme.
If the site is now of insufficient size to accommodate the original proposal, the
alternatives would be to scale down the animal farming segment, or acquire and
develop a suitable replacement site. A third alternative, along the lines it is suggested
-- 15 of 22 --
16
the claimants would follow, would be to fragment the animal farming segment using
alternative land. The third option requires, as I have found earlier, land physically
suitable for such use.
In terms of compensation assessment the claim for items of severance damage
verges on the concept of "disappointed hopes". At the date of resumption, the
proposed tourist attraction development had not commenced. The animal farming
operation was largely contained within the north-eastern section now severed.
Nevertheless, natural extension of that animal farming segment was available before
the resumption and not after. I have been persuaded that the value to the owners
provided by that permit has been affected deleteriously rather than enhanced. If an
alternate property was to be acquired to replace the lost potential, acquisition costs
would be involved. If the animal farming operation was scaled down, business losses
may occur. If that operation was to be fragmented using in addition, alternative
suitable property for expansion, then management problems would result.
I have decided that the uncertainty is best resolved by accepting that any value
which the development permit adds to the site value of the north-eastern severance,
should be ignored due to the risks now associated with the theme, as envisaged by
the claimants.
Accordingly I will adopt Mr Carrick's assessment of that residual area, on the
basis that its value lies as a potential separate rural site, in the amount of $80,000.
Improvements - after resumption.
Mr Carrick has, fairly, in my opinion, allowed for injurious affection of $5,000 to
each of three dwellings. This approach will be adopted.
While Mr Henderson did not depreciate the value of the dwellings, he assessed
injurious affection to the stockfeed and nursery premises in the amounts of $17,000
and $9,000 respectively. His basis of valuation was to assess market rentals before
and after the resumption, adopting the notional sites allowed. The capitalised
difference then became the amounts claimed. It is alleged that the proprietors of the
businesses have suffered a downturn in income because the previous direct access to
passing trade is now denied. It seems that the businesses previously relied on local
trade. If this is so, it is difficult, particularly in the absence of trading figures, to accept
the allegation of loss. If anything, the enhanced exposure for advertising would have
been expected to offset any losses associated with the post-resumption access
situation. Again, I have not been convinced by Mr Henderson that his assessments
of market rentals either before resumption or after, are supported and there is no
substantive evidence as to the alleged downturn in business. The rental
arrangements seem to be somewhat loose and there is no evidence that the claimants
have suffered any direct rental income loss.
No award will be made under the heading of claim for the stockfeed or nursery
-- 16 of 22 --
17
premises.
Additional severance and injurious affection items
As already indicated the award of compensation will be made on the basis that
the highest and best use of the southern severance of Lot 1 is not for the extension of
grazing facilities. It follows that the claim for items of reinstatement to replace the
grazing potential which previously existed, will not be allowed. Without going into
detail as to whether the items as assessed are reasonable or not it is clear that
reinstatement as proposed lacked economic practicality.
Items such as the potential for disturbance to the operation through
transportation of stock and management disabilities have been considered in the site
value approach to the north-eastern severance of Lot 1.
Drainage
The subject properties are significantly affected by flooding. It is evident that a
somewhat complex drainage pattern, both natural and artificial, existed with regard to
flooding events. Mr Barns, through his farming activities and knowledge gained from
local flood experiences, has doubts as to the effectiveness of the drainage works
including the alteration of existing drainage systems, resulting from the Motorway
construction.
Dr Johnson had investigated the background to design criteria finally adopted
for drainage associated with the Motorway as it affects the claimants' property. He
had examined in detail "major concerns" which had been raised by Mr Barns in that:
.the drain lines provided downstream of major culvert crossings incorporated in
the Motorway are much smaller in size than the culverts, and the
orientation of these drains is such that higher flows would be diverted
directly through existing cane areas with commensurate crop and
erosion damage.
.little attention was paid to site concerns raised by the landowners prior to
construction of the Motorway particularly in relation to pre-existing flow
conditions.
Due to the costs involved in undertaking the analyses which he felt would be
necessary to fully understand the complex hydrology of the area, before and after the
roadworks, Dr Johnson was forced to analyse and interpret information obtained for
him from the respondent under Freedom of Information legislation. He was
concerned as to the legality of constructing outlet works on the retained land of the
claimants as well as the concentration of upstream flow discharging on to the
claimants' property in the alleged absence of downstream drainage rights.
He had formed the opinion that where certain works had been effected at the
outlet of drainage through the roundabout and it seems, within the claimants' retained
area, peak outlet flow velocities would be such that insufficient scour protection had
been provided. He assumed a notional area of 200 square metres which would
-- 17 of 22 --
18
require stone pitching protection in this location at a cost of $25,000.
At the Lot 2 downstream outlet of culvert 3A/11, Dr Johnson identified a
potential detriment to the claimants' retained land, through significantly concentrated
flow. "With increasing intensity of flow, the present situation could cause severe
damage to crops and soil" Dr Johnson stated - "It therefore appears incumbent for the
Barns to construct a channel from the culvert outlet to convey the concentrated flow
through what was previously a productive cane field. Failure to do so will almost
certainly result in erosion damage."
After considering several options, and "following discussions, it was decided to
adopt the unlined channel solution and estimate the likely construction costs involved".
That resulted in an estimate of $130,000, for excavation of about 37,500 cubic
metres of soil, to provide a channel about 300 metres long, 90 metres wide and 1.5
metres deep. In response to the evidence given by Dr Johnson, the respondent
called Mr P. Graham and Mr F.C. Abbey, engineers involved in consultancy work for
the constructing authority, to explain the history of hydrology studies and the drainage
design for this section of the Motorway. Some evidence on erosion control was also
given by Mr Murphy but the principal witness for the respondent relative to erosion and
scouring potential was Mr M. Hee who at the relevant period of the Motorway's design
was the Principal Adviser - Hydraulics employed by the constructing authority.
After hearing the technical engineering evidence relative to hydraulics and the
history of the design and construction of the Motorway, I have come to the conclusion
that Dr Johnson's theories as to potential for scour and erosion are, fortunately,
unlikely to be realised. Mr Hee has had considerable practical experience with the
constructing authority over a long period throughout Queensland, dealing with matters
of stormwater drainage design and the causation of scouring and erosion from road
culverts. He was closely involved in the physical modelling on which the Motorway
major flow drainage design was based. It may well be that the complexity of the
drainage in this low gradient flood plain area is such that the precision of modelling for
all flood events is open to argument, but I am satisfied, on Mr Hee's evidence, that the
culvert design has taken account of the potential for scouring. Little weight can be
placed on his broad-brush confidence gained from his experience with culverts in
sugar cane land generally, for he had not visited the site after the construction works,
for the purpose of understanding site- specific physical conditions. However, his
theories as to minimal risk scour potential are based largely on what appears to be
factual - that under high flow conditions water from the eastern side of the Motorway
-- 18 of 22 --
19
will be outletting into and angular to, a vast body of slow-moving flood water on the
western side.
While we heard much of such matters as the prediction of the afflux differential,
flare angles and the like, Mr Hee's practical experience indicated to him that in the
subject location flow velocities capable of causing erosion will be "killed" by
emergence into the body of water which will exist - rather than into air. His theory in
this regard seems logical.
In the alternative, the erosion control suggested by Dr Johnson, at the outlet of
culvert 3A/11 is seen to be lacking in practical application both as to design and net
cost (if as an example, the worth of the excavated material was to be considered).
Nevertheless, the culvert 3A/11 is a dominant feature, largely above surface
level, facing arable land. If an expert such as is Dr Johnson with at least some
information available to him, saw potential for erosion damage, then lay people such
as the lessee who did not replant with sugarcane allegedly because of his erosion
fears, or participants in the marketplace generally, might be forgiven for doubting the
negligible risk seen by Mr Hee.
The piped culvert outlet at the roundabout has involved some drain widening on
the claimants' remaining land and it seems some further but minor scour protection
may have been provided had contractor access not been denied, as it eventually was
by the claimants.
While I do not propose to award compensation for any specific erosion control
works, the question of scouring potential needs to be considered in the land value.
Mr Carrick has reduced his after resumption valuation of the cane land to $7,500 per
hectare to allow for effects of "severance and injurious affection" and has, in addition,
allowed a "buffer" area amounting to 1.7 hectares along the Motorway alignment to
account for matters such as short rows. He saw the area "north of the existing
drainage easement" within Lot 2 having similar cane growing potential after
the resumption as before. It was this area that Mr Henderson had valued on a heavily
discounted basis (for future expansion of tourist facilities on Lot 1) due to the severe
drainage problems which he envisaged. No doubt with a channel 90 metres wide and
1.5 metres deep it would be far less valuable than before.
Mr Carrick's evidence was that he had not seen the need to make any further
allowance for drainage disabilities resulting from either the culvert 3A/11 or the
roundabout outlet. On Mr Hee's evidence Mr Carrick was entitled to take that
approach at least as it related to potential for erosion.
As a side issue, it is observed that the farm access position generally between
the aggregated sections north and south of the drainage easement requires
-- 19 of 22 --
20
consideration. It seems clear that the before resumption internal farm access to the
aggregation was superior to that available after the resumption, due to the existing
drainage configuration.
With consideration to the probability of market reaction to matters such as the
shape and working difficulties of the balance severance areas, drainage arrangements
as they are concentrated in the after resumption situation and potential for effect of
drainage on internal access to the southern severances in aggregation, I will discount
the after resumption valuation to $6,750 per hectare over the total area of 24.4
hectares.
Compensation award
Land
Before resumption
Lot 1 - 20.204 ha Rural A zoned land with consent
for catering shop and tourist attraction
development - partially encumbered by
lease for sugar cane farming @ $12,500/ha $252,550
Lot 2 - 19.139 ha Rural A zoned land with highest and
best use, as leased, for sugar cane farming
@ $9,000/ha say $172 250 $424,800
Adopt $425,000
Less
-- 20 of 22 --
21
After resumption
North-eastern severance Lot 1 -
residual 6.662 hectare Rural A zoned land
with potential for formal site subdivision $ 80,000
North-eastern severance Lot 2 -
residual 3280 sq.m. Rural A zoned land
with potential for formal site subdivision $ 20,000
Southern severances Lots 1 and 2 in aggregation
as 24.4 hectares Rural A zoned land,
with sugar cane assignment - injuriously
affected by shape, working disabilities,
with concentrated drainage discharges under
roadworks and some internal access
disabilities @ $6750 ha overall - adopt $165,000
$265 000
$160,000
Add
Injurious affection to dwellings on
Lots 1, 2 and 3 $ 15,000
$175,000
Add Disturbance items -
Legal and valuation fees as agreed $ 6,417.80
TOTAL COMPENSATION $181,417.80
Interest
The Court was advised that part of the legal fees being an amount of $900 was
paid on 9 March,1992. Part of the valuation fees being the amount of $1,785 was
paid on 7 April, 1993. Interest was not sought on the balance of those fees.
An advance payment in the amount of $95,000 was made on 23 April, 1993.
Although two resumptions are involved, the second, at a slightly later date, is of
a relatively small area. Had it been necessary to apportion compensation for the
second resumption then a quite nominal amount would have resulted. No financial
imposition or advantage of any significance will result if interest is calculated from the
earlier date. It is noted that part of the legal fees as mentioned above were paid
some months prior to the earlier resumption date.
I ORDER that interest at the rate of 8.5 percent per annum be paid by the
respondent constructing authority to the claimants as follows:
-- 21 of 22 --
22
On the amount of $175,900 from 14 August, 1992 up to and including 23
April, 1993
On the amount of $82,685 from 23 April, 1993 (the date on which the advance was
paid and shortly after the date on which the claimants paid part of the valuation
fees) up to and including the date on which final payment of compensation is
made.
RE WENCK